Beruflich Dokumente
Kultur Dokumente
Edificio Vertice
Lima
Project Province/State :
Lima
Project Number :
Vertice 237
Not Assigned
Lima 01
Peru
City :
Lima
Income Category :
Upper Middle
Building Data
Area Details
Default
User Entry
Bedroom :
38.4
35 m
128 m
Kitchen :
19.2
20 m
Bedrooms/Unit :
3 no.
Living/Dining :
48.6
45 m
Floors :
4 no.
Bathroom :
12.8
13 m
Units :
12 no.
Occupancy (People/Unit) :
3 no.
128.0
30.2
18%
15.0 m
128.0 m
30 m
Building Systems
Air Conditioning : No
Space Heating : No
File Number :
Project No. :
15112510002645
Not Assigned
EDGE Version :
1.0
User Entry
Electric Resistance
Electric Resistance
Electricity
Electricity
Cost of Electricity :
0.4
0.45 S/./kWh
1.8
1.75 S/./L
Jan :
22.5
23
1.9
1.83 S/./L
Feb :
23.2
23.5
Cost of Water :
3.2
3.3 S/./kL
Mar :
23.1
23
262.9
263 g/kWh
Apr :
20.9
21
0.3
May :
19.2
20
0.7
Jun :
18.5
18
0.3
Jul :
17.0
17.5
0.8
Aug :
16.6
17
Roof U Value :
2.2
W/m.k
Sep :
17.1
17.5
Wall U Value :
2.4
W/m.k
Oct :
17.8
18
Glass U Value :
5.7
W/m.k
Nov :
19.3
19.5
Glass SHGC :
0.8
Factor
Dec :
21.5
21
AC System Efficiency :
2.9
COP
Latitude :
12.1
File Number :
Project No. :
15112510002645
Not Assigned
EDGE Version :
User Entry
Deg
1.0
Results
Final Energy Use :
15 kL/Month/Unit
321 S/./Month/Unit
71 S/./Month/Unit
No
WWR %
WFR
18%
50
No
SR
No
HME03 Reflective Paint for External Walls - Solar Reflectivity (SR) of 70%
SR
No
HME04 External Shading Devices - Annual Average Shading Factor (AASF) of 0.51
Yes
[W/m K]
No
[W/m K]
No
[W/m K]
AASF
SHGC
No
[W/m K]
SHGC
No
No
File Number :
Project No. :
15112510002645
Not Assigned
EDGE Version :
1.0
No
COP
No
% Eff.
No
% Eff.
No
No
Yes
Yes
No
No
COP
% Hot Water
Collector Area(m)/Unit
No
No
0.8
File Number :
Project No. :
15112510002645
Not Assigned
EDGE Version :
1.0
17.6%
WATER SAVINGS
Yes
Lt./min
Yes
Lt./min
10
Yes
Lt./min
No
HMW04 Dual Flush for Water Closets - 6 lt./first flush and 3 lt./second flush
1st - Lt./flush
2nd - Lt./flush
Yes
No
HMW06 Rainwater Harvesting System - 50% of Roof Area Used for Rainwater Collection
No
No
File Number :
Project No. :
Lt./flush
15112510002645
Not Assigned
EDGE Version :
1.0
Materials Efficiency Measures 62.5% EMBODIED ENERGY SAVINGS Meets EDGE Materials Standard
HMM01
Floor Slabs
mm
200
HMM02
Roof Construction
mm
150
HMM03
External Walls
mm
150
HMM04
Internal Walls
mm
150
HMM05
Flooring
HMM06
Window Frames
Aluminium
HMM07
Roof Insulation
None
HMM08
Wall Insulation
None
File Number :
Project No. :
15112510002645
Not Assigned
EDGE Version :
1.0