01
Date
2013-01-09
Notice
The purchased products, services and features are stipulated by the contract made between Huawei and
the customer. All or part of the products, services and features described in this document may not be
within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements,
information, and recommendations in this document are provided "AS IS" without warranties, guarantees
or representations of any kind, either expressed or implied.
The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute the warranty of any kind, express or implied.
Web site:
http://www.huawei.com
Email:
support@huawei.com
1544605
Prepared by
Approved
by
Approval
Date
Issue 01 (2010-07-029
)
iii
Contents
Contents
About This Document......................................................................iii
1 Basic Information.......................................................................1-1
2 Problem Description...................................................................2-1
3 Problem Analysis.......................................................................3-1
4 Root Cause................................................................................4-3
5 Corrective Action.......................................................................5-1
5.1 Suggestion......................................................................................................................................................5-1
Issue 01 (2010-07-029
)
Basic Information
Product Name
Version
BSC6900
V900R013ENGC00SPH552
Problem Description
The customer found that PS throughput of Several NodeBs decrease after MPU modification after 12 th Dec.
Problem Analysis
(1) From the PS throughput statistic, NodeBs of which PS throughput decreased from 21th Dec are added in
Subrack 4.
3 Problem Analysis
(2) From the OPT log, the subrack 4 and slot 12 DPUe board was bound to MPU 4:4:0.
The table below shows that relation among MPUXPU and DPU after the operation.
(3) From the performance log, we found all DSPs usage of subrack 4 slot 12 DPU board decrease to zero
and the all DSPs usage of subrack 4 slot 13 DPU board increase sharply over 90% at busy hour. To
ensure admission of CS services and quality of ongoing CS services, the RNC lowers the rates of BE
services when the CPU of a DSP is heavily loaded. By default, this type of flow control is enabled
Issue 01 (2010-07-02)
5 Corrective Action
The principle of control plane resource and the user plane resource allocation is: the MPU will prefer to assign
the control plane resource to SPU which is controlled by it and user plane resource to DPU which is controlled by
it. Only if the CPU load of the SPU subsystem is over the control plane sharing threshold or DSP load is over the
user plane sharing, MPU will share the new service to other MPU to process.
The table below shows that relation between XPU and Number of NodeB after the operation
Issue 01 (2010-07-02)
3 Problem Analysis
We found that the all sites in subrack 4 are controlled by MPU 4:0:0, so the user plane resource was assigned
to subrack 4 slot 13 DPU. In this case, the DSPs of subrack 4 slot 13 were overload and cause the PS throughput
decreased.
The code RR_ERR_MPU_L2RM_0411 showed that MPU share the service to other MPU by DSP load.
Issue 01 (2010-07-02)
5 Corrective Action
Root Cause
All NodeBs were controlled in the MPU 4:0:0 in subrack 4. After the subrack 4 and slot 12 DPUe board
was bound to MPU 4:4:0 on 21th Dec, all service was assigned the subrack 4 and slot 13 DPUe board and
caused the all DSPs were high loaded. To ensure admission of CS services and quality of ongoing CS
services, the RNC lowers the rates of BE services when the CPU of a DSP is heavily loaded. In this case, the
PS throughput decrease after operation.
Issue 01 (2010-07-02)
Corrective Action
5.1 Suggestion
1 Bind NodeBs on the 1~7 subsystem on the sunbrack 4 slot 4 SPUb board.
2 Check the DSP state after MPU modification operation.