System Requirements
The following are the electrical system characteristics for which the equipment is to
be designed and utilised:
2.0
Primary LV System
AC 110 V
150 Amps
3.0
(a)
(b)
(c)
(d)
Danger sign boards of the format approved by TNB are fixed on all the
doors.
(e)
HLA96/BESUT/SPEC/SH-EI
SH-1
Cables laid direct in the ground shall be laid in prepared trenches not less than
600mm deep for L.T. cables and of sufficient width to accommodate the number
and size of cables required. There shall be a layer of compacted sand not less than
25mm thick as bedding. After the cables have been laid, sand shall be spread over
the cables covering the entire length and width of the trench to a minimum
thickness of 25mm above the largest cable and leveled. The sand used shall be
fine river sand with no stones included. A layer of bricks shall be placed over the
cables. Backfilling shall be made with first quality material and well compacted
where cable trenches run across turfed area and roadways. The turfing and
reinstatement of the road shall be properly carried out to the C&S Specification
requirement. Wherever possible cables shall be laid in continuous unjointed
lengths for the entire length of the cable route. Where joining of cable is
unavoidable, this cost shall be deemed to have been included in the cabling cost.
Cables shall be properly jointed to ensure full conductivity at rated current. The
Project Director reserves the right to reject cables in short lengths below 27.5
metres.
4.0
5.0
HLA96/BESUT/SPEC/SH-EI
SH-2
All conduits shall terminate on proper conduit fittings and there shall be no
unterminated conduit ends. All conduits shall be adequately supported.
6.0
Steel Trunking
Steel trunking shall be constructed of 16 SWG and cover plates of 14 SWG with
flanged edges and of best quality mild steel sheet. The trunking shall be painted
with a primer and two coats of semi-gloss gray or other approved colour.
Removable covers shall be provided at suitable intervals to facilitate the drawingin or removal of cables at any time. Steel hangers, brackets or other approved
fixing media shall be provided at suitable intervals. If necessary, vertical trunkings
shall be supplied in lengths to suit the installation. Joints and bends shall be so
constructed that cables can be conveniently drawn through. Steel trunking where
used on floor slab or to the damp environment shall be of weatherproof
construction.
7.0
8.0
9.0
Motor Starters
HLA96/BESUT/SPEC/SH-EI
SH-3
Starters for motors shall be in accordance with B.S. 587 and as a guide shall be as
follows: Type
Motor
Direct-on-line
Star-delta or auto-transformer
Electronic soft-starter
Stator-Rotor resistance
All starters shall be of the contactor type suitable for remote control with no-volt
releases and thermal or magnetic overload relays in each phase and is suitable for
fully automatic operation in tropical conditions.
Star delta starters shall have air break triple pole electromagnetic Line
contactor fitted with the necessary auxiliary contacts, closing-holding coil,
adjustable thermal overload relay per phase with resetting device which shall be
accessible from the outside, airbreak triple pole STAR and DELTA contacts
fitted with the necessary auxiliary contacts. The star and delta contactors are to
be electrically and mechanically interlocked. Overload relays are to be connected
in the delta position to give inherent single-phase protection.
Stator rotor resistance starters shall have multiple contactors which accelerate the
rotor by shorting out sections of the starting resistor under the control of time
delay relays and consist of a starter resistor, contact unit, air interlocking contact,
a thermal contact and a temperature fuse, The starter resistor shall be air-cooled
and consist of rustless unbreakable resistor grids mounted between sheet steel
and frames. The interlocking contact shall prevent the motor from being started
up unless all resistance or reactance are in circuit. The thermal contact shall open
the under-voltage trip circuit when the temperature exceeds 90 oC. Overload
relays shall be wired to give inherent single-phase protection. Suitable earth
leakage circuit breakers shall also be provided.
Each starter shall be equipped with auxiliary contacts for wiring to a green pilot
light to indicate the live condition of the out-going circuit and a red pilot when
the motor is tripped due to overload, push buttons and hand-auto-off selector
switch and wired to remote control console.
Each starter shall be entirely suitable for frequent starting of up to 15 starts per
hour. Each starter shall incorporate a H.R.C. fuse and fitted with an isolating
switch in the distribution fuse board.
All contactors, starters, relays and controllers for the motors shall be grouped
together in the control consoles.
All incoming and outgoing circuits and wiring shall be brought to the contactors,
starters, relays and controllers via. insulated terminal strips mounted within the
HLA96/BESUT/SPEC/SH-EI
SH-4
consoles and all wiring between terminal strips and electrical equipment inside the
consoles shall be neatly run and taped .
10.0
Contactors
Contactors where specified shall be totally enclosed, quick action type and of
robust construction. They shall be adequately rated to take the full load current of
the circuit.
11.0
Time Switches
Time switches shall be of the electricity wound type Venner or other approved
makes with a 24 hours dial provided with setting adjustment. Time switch shall be
enclosed in metal casing fitted with a removable panel with viewing glass and
complete with by-pass switch suitable for the full load current of the circuits.
12.0
b)
c)
The required number of capacitor units to form the capacitor bank shall
be built-in with the cubicle. Each capacitor unit shall be manufactured in
accordance with BS 1650 and housed in its own steel container
HLA96/BESUT/SPEC/SH-EI
SH-5
Exterior Lighting
Exterior lighting will be required for the mixing chamber, flocculation channels,
sedimentation tanks, filters, roadways car park and site. The types and positions
of the lighting fittings shall be suitable and adequate for the functions.
All exterior lighting shall be controlled by time switches with contactors and
manual overriding by-pass switches. the underground cables shall be PVCinsulated, steel wire armouring and P.V.C. served with annealed copper
conductors (PVC/SWA/PVC). Where underground cables terminate in a column,
the loop-in and out system shall be adopted.
Steel poles for outdoor lighting shall generally conform to B.S. 5649 and shall
have adequate strength to carry the designed load with a safety factor of 2.5
when subject to a wind velocity of 96 km.p.h. at right angles to the poles.
All poles shall be provided with square base plates measuring not less than 1 1/2
times the largest diameter of the poles. Weather proof compartments and access
door covers shall be provided to house the control gear and looping boxes. In
soft or unstable ground, the bottom of excavation shall be provided with precast
or cast-in-to concrete slabs of adequate dimensions to spread the pole load. Steel
poles at a depth of 600mm below ground level. The steel poles shall be of
minimum height 9.15M with 1.5M buried in ground. Access for cable entry shall
be provided in the steel poles at a depth of 600mm below ground level. The steel
poles shall be complete with outdoor lighting fittings, lamps, control gear, H.R.C.
fuses and fuse holders, switch fuses, looping boxes, wiring base plates, etc. The
steel poles shall be hot dipped galvanised internally and externally in accordance
to B.S. 729.
14.0
Lighting Fittings
HLA96/BESUT/SPEC/SH-EI
SH-6
Lighting fittings shall generally be in accordance with the types and sizes as given
hereof. All fittings shall be supplied and installed complete with fluorescent tubes
and necessary accessories, readily detachable and accessible for cleaning,
maintenance and replacement.
The types and numbers or lighting fittings and power socket-outlets for the
various locations are shown in the drawings.
15.0
Switches
Switches shall be to B.S. 3676 rated at 5 amps or 15 amps as appropriate for the
respective circuit. All sub-circuit switches shall be of the quick make and break
type.
Generally all switches for lighting circuits shall be flush mounting for concealed
wiring and surface-mounting for surface wiring. Flush switch cover plates shall be
of approved white coloured moulded plastic of the break resistant material such
as polycarbonate.
Adjacent switches shall be grouped under one cover plate and the switch boxes
shall be suitable for the number of switches required.
Mounting height for lighting switches shall be 1,350mm above finished floor
level.
16.0
17.0
18.0
Telephone Installation
HLA96/BESUT/SPEC/SH-EI
SH-7
18.1
General
The Contractor must be registered with Telekom Malaysia Berhad (TMB) and
shall supply, deliver, install and connect a complete key telephone system c/w
telephone distribution boxes, trunking, conduit, telephone socket outlets,
manholes and cabling to TMB Standards and requirements. The equipment
capacity is 8 exchange lines and 20 extensions..
18.2
18.3
18.4
HLA96/BESUT/SPEC/SH-EI
SH-8
The Contractor shall be responsible for all the necessary wiring of telephone
cables from the distribution frame to the distribution boxes and from the
distribution boxes to the various telephone socket outlets.
The type of distribution boxes is different at localities as shown in the drawings.
All telephone wiring points shall terminate at TMB approved sockets outlets.
18.5
18.6
18.7
Test
HLA96/BESUT/SPEC/SH-EI
SH-9
Before test of any materials or equipment are undertaken, the Contractor shall
submit to the Project Director for approval a detailed inspection schedule
covering all aspects of inspection, works and site testing.
During the progress of the work and prior to Commissioning the Contractor shall
carry out all test required by TMB and the Engineer. He shall provide test
certificate and Certificate of Fitness for all equipment as may required by the
Local Authorities or the Project Director and shall provide all necessary tools,
instrument and equipment for conducting site tests. All fees imposed by the
Authorities for such tests shall be borne by the Contractor.
In general the Contractor shall be responsible for the testing of all equipment and
certifying that such equipment is safe before commissioning and that all the
equipment complies with the requirements of the Specification.