Beruflich Dokumente
Kultur Dokumente
INTRODUCTIO
N
N
Guru Nanak Dev Thermal Power Plant is a coal-based plant. The requirement of
coal for four units based on specific fuel consumption of 0.60 kg / kWh. The conveying
and crushing system will have the same capacity as that of the unloading system. The
coal comes in as large pieces. This coal is fed to primary crushers, which reduce the size
of coal pieces from 400mm to 150mm. Then the coal is sent to secondary crusher through
forward conveyors where it is crushed from 150mm to 200mm as required at the mills.
Then the coal is sent to boilers with the help of primary fans. The coal is burnt in the
boiler. Boiler includes the pipes carrying water through them; heat produced from the
combustion of coal is used to convert water in pipes into steam. This steam generated is
used to run the turbine. When turbine rotates, the shaft of generator, which is
mechanically coupled to the shaft of turbine, gets rotated so, three phase electric supply is
produced.
The basic requirements are:
Fuel (coal)
Boiler
Steam turbine
Generator
Unit auxiliaries
BRIEF HISTORY
BRIEF HISTORY
OF
OF
PLANT
PLANT
Due to high rate of increasing population day by day, widening gap between power
demand and its availability was one the basic reason for envisaging the G.N.D.T.P.
for the state of Punjab. The other factors favoring the installation of the thermal
power station were low initial cost and comparatively less gestation period as
compared to hydro electric generating stations. The foundation stone of G.N.D.T.P.
at bathinda was laid on 19th November 1969, the auspicious occasion of 500th birth
anniversary of great Guru Nanak Dev Ji.
The historic town of bathinda was selected for this first and prestigious thermal
project of the state due to its good railway connections for fast transportations of coal,
availability of canal water and proximity to load center.
The total installed capacity of the power station 440MW with four units of
110MW each. The first unit of the plant was commissioned in September, 1974.
Subsequently second, third and fourth units started generation in September 1975, March
1978, and January 1979 respectively. The power available from this plant gives spin to
the wheels of industry and agricultural pumping sets.
R&M WORKS AT
R&M WORKS AT
GNDTP,
GNDTP,
BATHINDA
BATHINDA
R&M of GNDTP unit 1&2 has already been completed pending PG Test. R&M works of
unit 3&4 is underway to improve performance, enhance capacity and extend operating
life of the units. The present status of R&M works of GNDTP units is as under:
Unit I&II: - Against approved project Report of Rs. 229 Crores, Order was placed on M/S
NASL, New Delhi for major R&M works on Turnkey basis at a total of Rs.183 Crores.
Unit II: R&M works completed in October, 2005 (Pending attending to some deficiencies
by the firm). Average PLF achieved post R&M works is 87%.
Unit I: - R&M works completed and taken for normal operation in May, 2007(Pending
attending to some deficiencies by the firm). Average PLF achieved post R&M during
May07 and June 07 is 95.65%.
Unit III & IV: - Order for executing R&M works on Turnkey basis already placed on M/S
BHEL at a total cost of Rs. 465.36 Crores. 10% advance payment has been made to M/S
BHEL on 22/12/2006 and design and drawing work is in progress. As per Schedule, work
is to be completed in a phased manner upto July 2009. Apart from enhancing the
operating life and performance level of the units, it is also planned to upgrade the
capacity from 110 MW to 120 MW each resulting in total capacity addition of 20 MW.
SITE
SITE
SELECTION
SELECTION
The selection of site for Thermal Power Plant is more difficult compared to Hydro
Power Plant, as it involves number of factors to be considered for its economic
justification. The following consideration should be examined in detail before selection
of the site for the Plant. The location for plant should be made with full consideration not
only of the trends in the development and location but also the availability and location of
the cheapest source of primary energy: Availability of fuel
Ash disposal facilities
Space requirement
Nature of land
Availability of labour
Transport facilities
Public society problems
Development of Backward Area
LANDMARK
LANDMARK
ACHIEVED
ACHIEVED
G.N.D.T.P. won an award of Rs. 3.16 crores from Govt. of India for better
performance in 1983-84.
It again won meritorious productivity awards during the year 1992-1993 and
1993-94 and has become entitled for the year 1996-1997 for better performance.
It also won awards for reduction in fuel oil consumption under Govt. of India
incentive scheme years from 1992-1993 (awards money for 1992, 1993 and 1994
already released for 1995, 1996 and 1997 under the consideration of Govt. of
India).
G.N.D.T.P. had achieved a generation of 2724240 LUs (at a PLf of 70%) and
registering an oil consumption as low as 1.76ml/kwh during the year 1993-94 has
broken all previous records of performance since the inception of plant.
CONTRIBUTION
CONTRIBUTION
OF
OF
THE PLANT
THE PLANT
Guru Nanak Dev Thermal Plant, Bathinda, in addition to indirect contribution in various
facts of state economy, is also responsible for: Narrowing the gap between power demand and power availability of the state.
Providing employment potentials to thousands of workers.
Covering the backward surrounding area into fully developed Industrial
Township.
Providing additional relief to agricultural pumping sets to meet the irrigation
needs for enhancing the agriculture production.
Reliability and improvement in continuity of supply and system voltage.
Achieving cent percent rural electrification of the state.
PLANT SALIENT
PLANT SALIENT
FEATURES
FEATURES
THE PLANT
THE PLANT
PROJECT AREA:Power plant
238 acres
Ash disposal
845
Lake
180
Residential colony
285
Marshalling yard
256
Total area
1804
TOTAL COST: -
STATION CAPACITY: -
BOILER:Manufacturers
B.H.E.L.
375 T/hr.
139 kg/cm
33.8 kg/cm
540C
240C
Efficiency
86%
STEAM TURBINE:Manufacturers
B.H.E.L.
Rated output
110 MW.
Rated speed
3000 r.p.m.
Number of cylinders
three
Rated pressure
130 kg/cm
Rated temperature
535C
Condenser vacuum
0.9 kg/cm
GENERATOR:Manufacturers
B.H.E.L.
Rated output
(Unit- 1 & 2)
125000KVA
(Unit -3 & 4)
137000KVA
Generator voltage
11000 volts
6560 Amps.
(unit 3 & 4)
7220 Amps.
Generator cooling
hydrogen
Type
centrifugal
Rated discharge
445 T/hr.
Discharge head
1960 MWC.
Speed
4500 r.p.m.
Type
mixed flow
Rated discharge
8600 T/hr.
Discharge head
24 MWC.
COOLING TOWERS:Numbers
four
Water cooled
18000 T/hr.
Cooling range
10C
Height
120/12 metres
Type
drum-ball
Rated output
27 T/hr.
Coal bunkers
16 per unit
630 KW
Vapour fan
320 KW
C.W. Fan
800/746 KW
Coal crusher
520 KW
320 KW
9
320 KW
3500 KW
900/1000 KW
Condensate pump
175 KW
10
WORKING OF
WORKING OF
THERMAL
THERMAL
PLANT
PLANT
Coal received from collieries in the rail wagon is mechanically unloaded by
Wagon Tippler and carried by belt Conveyor System Boiler Raw Coal Bunkers after
crushing in the coal crusher. The crushed coal when not required for Raw Coal Bunker is
carried to the coal storage area through belt conveyor. The raw coal feeder regulates the
quantity of coal from coal bunker to the coal mill, where the coal is pulverized to a fine
powder. The pulverized coal is then sucked by the vapour fan and finally stored in
pulverized coal bunkers. The pulverized coal is then pushed to boiler furnace with the
help of hot air steam supplied by primary air fan. The coal being in pulverized state gets
burnt immediately in the boiler furnace, which is comprised of water tube wall all around
through which water circulates. The water gets converted into steam by heat released by
the combustion of fuel in the furnace. The air required for the combustion if coal is
supplied by forced draught fan. This air is however heated by the outgoing flue gases in
the air heaters before entering the furnace.
The products of combustion in the furnace are the flue gases and the ash. About
20% of the ash falls in the bottom ash hopper of the boiler and is periodically removed
mechanically. The remaining ash carried by the flue gases, is separated in the electrostatic
precipitators and further disposed off in the ash damping area. The cleaner flue gases are
let off to atmosphere through the chimney by induced draught fan.
The chemically treated water running through the water walls of boiler furnace
gets evaporated at high temperature into steam by absorption of furnace heat. The steam
is further heated in the super heater. The dry steam at high temperature is then led to the
turbine comprising of three cylinders. The thermal energy of this steam is utilized in
turbine for rotating its shaft at high speed. The steam discharged from high pressure
(H.P.) turbine is returned to boiler reheater for heating it once again before passing it into
the medium pressure (M.P.) turbine. The steam is then let to the coupled to turbine shaft
is the rotor of the generator, which produces electricity. The power from the generator is
pumped into power grid system through the generator transformer by stepping up the
voltage.
11
Fig No.1.1
12
The steam after doing the useful work in turbine is condensed to water in the
condenser for recycling in the boiler. The water is pumped to deaerator from the
condenser by the condensate extraction pumps after being heated in the low pressure
heater (L.P.H) from the deaerator, a hot water storage tank. The boiler feed pump
discharge feed water to boiler at the economizer by the hot flue gases leaving the boiler,
before entering the boiler drum to which the water walls and super heater of boiler are
connected.
The condenser is having a large number of brass tubes through which the cold
water is circulated continuously for condensing the steam passing out sides the surface of
the brass tubes, which has discharged down by circulating it through the cooling tower
shell. The natural draught of cold air is created in the cooling tower, cools the water fall
in the sump and is then recirculated by circulating water pumps to the condenser.
13
GENERAL
GENERAL
DESCRIPTION
DESCRIPTION
BOILER FEED PUMP:As the heart is to human body, so is the boiler feed pump to the steam power plant. It is
used for recycling feed water into the boiler at a high pressure for reconversion into
steam. Two nos. 100% duty, barrel design, horizontal, centrifugal multistage feed pumps
with hydraulic coupling are provided for each unit. This is the largest auxiliary of the
power plant driven by 3500 KW electric motor.
The capacity of each boiler at GURU NANAK DEV THERMAL PLANT is
375 tones/hr. The pump which supplies feed water to the boiler is named as boiler feed
pump. This is the largest auxiliary in the unit with 100% capacity which takes suction of
feed water from feed water tank and supplies to the boiler drum after preheating the same
in HP-1, HP-2 and economizer. The delivery capacity of each boiler feed pump is 445
tones/hr. to meet better requirements corresponding to the various loads, to control steam
temperature, boiler make up water etc. The detailed particulars checking of protections
and inter locks, starting permission etc. are as below:-
Particulars of BFP and its main motor: BOILER FEED PUMP: - The 110 MW turboset is provided with two boiler feed
pumps, each of 100% of total quantity. It is of barrel design and is of horizontal
arrangement, driven by an electric motor through a hydraulic coupling.
Type
200 KHI
No. of stages
Delivery capacity
445 t/hr.
158C
Speed
4500 rpm
Pressure at suction
8.30 kg/cm
Stuffing box
mechanical seal
Lubrication of pump
230 L/min.
14
WATER TREATMENT PLANT:The water before it can be used in the boiler has to be chemically treated, since untreated
water results in scale formation in the boiler tubes especially at high pressure and
temperatures. The water is demineralised by Ion Exchange Process. The water treatment
plant has production capacity of 1800 Tonnes per day for meeting the make-up water
requirement of the power station.
COAL MILL:Coal Mill pulverizes the raw coal into a fine powder before it is burnt in the boiler
furnace. The pulverizing of coal is achieved with the impact of falling steel balls,
weighing 52.5 tonnes, contained in the mill drum rotating at a slow speed of 17.5 r.p.m.
The raw coal is dried, before pulverizing, with inert hot flue gases tapped from the boiler.
Three coal mills each with a pulverizing capacity of 27 T/hr. are provided for one unit.
INDUCED DRAUGHT FAN:Two nos. axial flow Induced Draught Fans are provided for each unit to exhaust ash laden
flue gases from boiler furnace through dust extraction equipment and to chimney. The fan
is driven by an electric motor through a flexible coupling and is equipped with remote
controlled regulating vanes to balance draught conditions in the furnace. The fan is
designed to handle hot flue gases with a small percentage of abrasive particles in
suspension.
CONTROL ROOM:The control room is the operational nerve center of the power plant. The performance of
all the equipments of the plant is constantly monitored here with the help of sophisticated
instrumentation and controllers. Any adverse deviation in the parameters of various
systems is immediately indicated by visual and audio warning and suitable corrective
action is taken, accordingly. The control room is air conditioned to maintain the desired
temperature for proper functioning of the instruments.
15
16
BOILER:It is a single drum, balanced draught, natural circulation, reheat type, vertical combustion
chamber consists of seamless steel tubes on all its sides through which water circulates
and is converted into steam with the combustion of fuel. The temperature inside the
furnace where the fuel is burnt is of the order of 1500C. The entire boiler structure is of
42meter height.
BOILER CHIMNEY:The flue from the boiler, after removal of ash in the precipitators, are let off to
atmosphere through boiler chimney, a tall ferro-concrete structure standing as high as the
historic Qutab Minar. Four chimneys, one for each unit, are installed. The chimney is
lined with fire bricks for protection of ferro-concrete against hot flue gases. A protective
coating of acid resistant paint is applied outside on its top 10 meters.
CIRCULATING WATER PUMP:Two nos. of circulating water pumps provided for each unit, circulate water at the rate of
17200 T/hr. in a closed cycle comprising of Turbine Condenser and Cooling Tower. An
additional Circulating Water Pump provided serves by for two units. The water
requirement for bearing cooling of all the plant auxiliaries is also catered by these pumps.
17
COAL
COAL
MILLING
PLANT
MILLING PLANT
Since G.N.D.T.P. units are primarily coal fired units so each boiler is
provided with closed milling circuits to pulverize the raw coal which is
received from coal conveying system after coal crushes before it is fired in
the furnace. The necessity of pulverizing the coal is to be ensuring its
maximum possible combustion in the furnace. The coal data for units are: -
COAL DATA
UNITS 1 & 2
Type of Coal
Net Calorific Value
UNITS 3 & 4
Bituminous
Bituminous
4300 Kcal/kg
4727 Kcal/Kg
Moisture
10 %
7.5 %
Ash Content
30 %
32 %
24 %
27 %
10 mm
20 mm
Volatile
Incombustible
Matter
Inlet of Coal
18
COAL MILL
Fig No.2.1
19
RAW COAL BUNKER:Each of three raw coal bunkers is fabricated from the sheet metal and is well stiffened all
around. The storage capacity of each raw coal bunker is about 500 tones. There are four
outlet gates with each bunker. The gates are electrically operated from site. In case of
failure of the electric motors the gate can be hand operated from site. At a time only one
gate opening is suffices but should be changed so that there is no pilling within the
bunker.
RAW COAL CHAIN FEEDER:The raw coal chain feeder transports coal from raw coal bunker to the inlet chute leading
to the pulverized/coal mills. There is a double link chain of high tensile strength steel,
which moves on wheels and sweeps the raw coal falling over the top of the raw coal
chute of the mill. The height of the coal bed in the chain feeder can be adjusted manually
by means of lever operated damper. The maximum and minimum heights of the coal bed
are 200mm and 120mm respectively. The signaling equipment indicates the absence of
coal flow in the feeder, which is annunciated in the unit control board (U.C.B.). The main
shaft on the driving end is connected to the driving unit, consisting of variator, a gear box
and a motor all mounted as a single unit. The chain wheel on the driving end shaft is
provided with a shear pin, which will shear off and disconnect the driving mechanism if
there is any overload on the feeder. The speed of the chain feeder is regulated
automatically/remotely by actuating the control spindle of the variator through a
servomotor. A pump for circulating the oil in the gear box of variator is an integral part of
variator driven by a separator motor. Some of the technical data about the raw coal chain
feeder is given here:1. Output of the chain feeder
10-45 tonnes/hr.
2. Speed variations
0.0503-0.151m/sec.
3. Main motor
0.05kW, 220V
20
DRUM MILL:Each mill consists of single compartment drum, bearings driving motor, coal inlet
and discharge piping, ball change and lubricating equipment for mill bearings. Mill drum
is fabricated from thick steel plates and is supported on to the anti-friction bearings. The
mill is driven by an electric motor of capacity 630kW, 990 rpm, 6.6kV through a
reduction gear, which reduces the speed to 17.5 rpm. The ball charge for the mill consists
of the three different sizes of forged steel balls detailed as below. The capacity of each
mill is 27 T/hr. in case of unit 1 & 2 and 28 T/hr.
1. 40mm diameter
22500 kg
2. 50mm diameter
20000kg
3. 60mm diameter
10000kg
52500kg
During operation only 60mm diameter balls are added is approx. 500 kg per week
and the guiding factor is the amperage of the coal mill, normally it should be 66-ampere
approx. at full load and when it falls below the above value ball charging of the mill is
carried out. Lubricating system consists of the oil tank, gear pump, oil cooler and base
frame to mount all these equipments. Gear pump is driven by an electric motor of rating 1
H.P., 415 V, 1440 rpm. Suction side of the gear pump is connected to the tube oil tank and
the delivery side is connected to inlet of the oil cooler and after cooling oil goes to the
bearings. The oil from the bearings is cooled to the required temperature in the cooler by
the means of plant bearing cooler water.
CLASSIFIER:The classifier is fabricated from the steel plates. It is an equipment that separates fine
pulverized coal from the coarser pieces. The pulverized coal along with the carrying as
well as drying medium (flue gas) strikes the impact plate in the classifier and the coarser
pieces get separated due to the change in the direction of flow and go back to mill. The
stream then passes to the outlet branch of the classifier through an adjustable telescopic
tube. At the outlet adjustable vanes are provided to change the size of coal when required.
21
CYCLONE SEPARATOR:The centrifugal type cyclone separator consists of two cyclones made up of welded
sheets. It is equipment in the milling plant, which serves for separating the pulverized
coal from the vapours i.e. carrying medium. The pulverized coal gets stored in the
pulverized coal bunkers and vapours go to suction of vapour fan. At the bottom of the
cyclone separator a rotary valve (Turnikete) is provided to transport coal from cyclone
separator to P.C. bunker on the worm conveyor as the case may be.
VAPOUR FAN:Pulverized coal bunker is welded from thick steel sheets and has a capacity of 4 hours
coal consumption at maximum continuous rating of the boiler. The whole bunker is
insulated externally. The carbon-dioxide blanketing system has been provided in the P.C.
bunker to prevent fire hazards inside the bunker. The while storage bunker is divide into
four parts namely A, B C & D. Further four coal feeders are taken out from each bunker
leading to each corner of the furnace.
CRUSHING OF COAL:When coal reaches the plant, normal size of coal is about 500mm. After unloading the
coal from the rake is fed to primary crusher, which reduces the size to 120mm. Then coal
is fed to secondary crusher which reduces the size to 25mm and this coal goes to bunker
with the help of conveyor belt from where coal finally goes to coal mill where coal is
transferred in form of pulverized coal. The coal is heated with the help of hot primary air.
We maintain the temperature of about 70C in coal mill. This temperature is maintained
with the help of cold air and a hot air damper.
USE OF OIL:Before the coal reaches the furnace, we preheat the furnace in order to remove the
moisture and raise the temperature of furnace, so that coal can catch fire easily without
any delay. This preheating of furnace is done with the help of oil. With burning of oil, we
maintain the temperature of furnace at 350C. we cut the oil supply after 350C because
22
oil is very costly. Source of oil for G.N.D.T.P., Bathinda is Mathura Oil Refinery. Other
use of oil is in bearing system for cooling. There are large number of bearings for plant.
For example bearing system of turbine. These bearings get heated upto high temperature,
which is dangerous. So we cool the bearing by circulating water in bearing.
COAL FEEDING AND COAL MILL:From the coal handling plant, coal comes in two belts namely 5A and 5B and then by
belts 6A and 6B coal comes in bunkers. Bunker capacity is 300 tonnes. Number of outlets
of bunker is three. First gate is opened for one hour and second and then third. If open the
one gate for long time, then coal will stop going to mill. That is why we open the gate
turn by turn.
RAW COAL CHAIN FEEDER:Raw coal chain feeder is just below raw coal bunker. It is a sliding chain which feed the
coal to mill. We can change the quantity of coal which is fed to mill in two ways.
gear system with motor with a pin called shear pin. The prevent the overloading of motor
because when the coal quantity of coal on chain is greater than its capacity then the pin
will break and prevent the pin from overloading. Speed of Raw Coal chain is 2 to 6/sec.
Ball Mills
ii)
Bowl Mills
23
Ball Mills: - In Ball Mills there are steel balls which are revolving in horizontal
cylindrical drum. These balls are free from any shaft and balls are touching with each
other and with internal body of drum. These types of mills are at Bathinda Thermal Plant.
On the other hand, bowl mills part of the mill contain drive system i.e. it contains 6.6 kV
electric motor and gear system which translates the revolution about horizontal axis to
revolve about vertical axis. The revolving vertical axis contains a bowl about the driving
system. This bowl is fixed with driving and revolving with shaft. There are also three
rollers which are suspended at some inclination, so that there is a gap of few mm between
roller surface. These rollers are free to rotate about the axis.
Bowl Mills: - The coal is grinded and then fed into the mill at the center or near of
revolving bowl. It passes between the grinding ring in revolving bowl and rolls as
centrifugal force causes the material to travel towards the out perimeter of bowl. The
springs, which load the rolls, impart the necessary force for grinding. The partially
pulverized coal continue going up and down and over the edge of bowl.
24
Bituminous Coal
4300 kcal/kg
10%
Ash content
Volatile matter in combustibles
Grind ability index
30%
24%
50 Hard Groove
The coal handling plant at G.N.D.T.P. has been supplied and erected by M/s Elecon
Engineering Company Limited, Vallabh Vidya Nagar, Gugarat. Coal is transported from
the coal mines to the plant site by Railways. Generally, the raw coal comes by railway
wagons of either eight wheels weighing about 75 to 80 tones each or four wheels
weighing about 35 to 40 tones each. The loaded wagon rake is brought by railways main
line loco and left on one of the loaded wagon tracks in the power station marshalling
yard. The main line loco escapes through the engine track. The station marshalling yard is
provided with 8 tracks. The arrangement of the tracks in the marshalling yard is as
follows:-
DESTINATION
NO. OF TRACKS
Four
Three
One
25
UNLOADING OF COAL:In order to unload coal from the wagons, two Roadside Tipplers of Elecon make
are provided. Each is capable of unloading 12 open type of wagons per hour. Normally
one tippler will be in operation while the other will be standby. The loaded wagons are
brought to the tippler side by the loco shunters. Then with the help of inhaul beetle one
wagon is brought on the tippler table. The wagon is then tilted upside down and emptied
in the hopper down below. The emptied wagon comes back to the tippler table and the
outhaul beetle handles the empty wagons on the discharge side of the tippler. The tippler
is equipped with the integral weighbridge machine. This machine consists of a set of
weighing levers centrally disposed relative to tippler. The rail platform rests on the
weighing girders and free from rest of the tippler when the wagon is being weighed. After
weighing the loaded wagons is tipped and returned empty to the weighing girders and
again weighed. Thus the difference of the gross weight and the tare weight gives the
weight of the wagon contents. The tipplers are run by motors of 80 H.P. each through
gears only.
WAGON TIPPLER
Fig No.3.1
26
90 seconds
Pause
5-12 seconds
Return
90 secondS
Weighing
30 seconds
Total
215-222 seconds
Allowing 85 seconds for wagon changing it will be seen that 12 eight-wheel wagons or
24 four-wheel wagons per hours can be tipped. However since the coal carrying capacity
is 500 tones per hour load of 12 wagons comes to 8 to 9 per hour.
DUST TRAPPING SYSTEM:The tippler is also provided with the dust trapping systems by which the dust nuisance
will be minimized. As the tippler rotates, a normally closed hopper valve opens
automatically and the discharged material passes through it into the hopper with its dustsetting chamber, there is an air valve of large area, which opens, simultaneously with the
hopper valve. The object of this air valve is to blow back through the hopper valve into
the tipping chamber, which must occur if, the settling chamber were closed, it being
remembered that a large wagon contains some 240 cubic feet of material and that this
volume of dust air would be forced back at each tip if the hopper chamber were a closed
bottle. The air valve and the hopper valve are shut immediately on reversal of the tippler
and are kept shut at all times except during the actual discharge. The hopper valve is
operated by a motor of 10 H.P., 415 Volts and the air valve is operated by electrohydraulic thruster. Inlet valve consists of large number of plates sliding under the wagon
tippler grating. Coal in the wagon tippler hopper forms the heap and as such obstructs the
movement of sliding valve and damaging the plates. The inlet and outlet valves have
therefore been bypassed.
The unloaded material falls into the wagon tippler hopper (common to both
tipplers) having a capacity of 210 tones. The hopper has been provided with a grating of
27
300mm X 300mm size at the top so as to large size boulders getting into the coal stream.
There is also a provision of unloading the wagons manually into the MANUALLY
UNLOADED HOPPER of 110 tones capacity. Manually unloading will be restored to
while unloading coal from sick wagons or closed wagons.
MAGNETIC PULLEYS:On belt conveyor no. 4A and 4B, there have been provided high intensity
electromagnetic pulleys for separating out tramp iron particles/pieces from the main
stream of coal conveying. D.C. supply for the magnet is taken on 415 volt, 3 phase, 50
cycles A.C. supply system.
In addition to above high intensity suspension type electromagnets have also been
provided on belt conveyors 4A and 4B for separating out tramp iron pieces/particles.
RECLAIMING:If the receipt of coal on any day more than the requirement of the boilers, the
balanced material will be stocked via conveyor 7Aand 7B and through telescopic chute
fitted at the end of the conveyor. At the end of the chute one tele level switch is provided,
which automatically lifts the telescopic chute to a predetermined height every time. The
tele level switch is actuated by the coal pile. When the telescopic chute reaches maximum
height during operation, which will be cut off by limit, switch and stop the conveying
system. When the pile under the telescopic chute is cleared, the telescopic chute can be
independently lower manually by push buttons.
There are five bulldozers to spread and compact the coal pile. Bulldozers of Bharat Earth
Movers Limited Make are fitted with 250 H.P. diesel engines. Each bulldozer is able to
spread the crushed coal at the rate of 250 tones/hr. over a load distance of 60m the coal
can be stacked to a height of 6m the stockpile stores coal for about 45 days for four units
with an annual load factor of 0.66.
Whenever coal is to be reclaimed the bulldozers are employed to push the coal in
the reclaim hopper having a capacity of 110 tones. The coal from the reclaim hopper is
fed either 9A or 9B belt conveyor through vibratory feeders 8A and 8B.
28
CRUSHER HOUSE:The crusher house accommodates the discharge ends of the conveyor 4A, 4B receiving
ends of conveyor 5A, 5B and conveyor 7A and 7B, two crushers, vibrating feeders and
necessary chute work. There are two crushers each driven by 700H.P. electric motor, 3
phase, 50 cycles and 6.6 kV supply. The maximum size of the crushed coal is 10mm. The
capacity of each crusher is 500 tones/hr. one crusher works at a time and the other is
standby. From the crusher the coal can be fed either to the conveyors 5A, 5B or 7A, 7B
by adjusting the flap provided for this purpose. There is built in arrangement of bypassing
the crusher by which the coal can be fed directly to the conveyors bypassing crusher.
29
30
Boiler section
The steam generating unit is designed to meet the nominal requirements of 110MW turbo
generator set. The unit is designed for a maximum continuous rating of 375 tones/hr. at a
pressure of 139kg/cm2 and a steam temperature of 5400C. the reheated steam flows at
MCR 32H tones/hr. at the feed water temp at MCR is 2400C. The unit is a balance
draught dry bottom; single drum natural circulation, vertical water tube type, construction
with skin casing and a single reheat system. The furnace is arranged for dry ash discharge
and is fitted with burners located at the four corners. Each corner burner comprises coal,
vapour oil and secondary air compartments. The unit is provided with three ball mills and
arranged to operate with intermediate cool powder bunker. The steam super heater
consists of 4 stages Viz. Ceiling, convection, platen and final superheated. The ceiling
super heated forms the roof of the furnace and horizontal pass and finishes as the rear
wall of the second pass. The convection super heated is made up of horizontal banks
located in the second pass. While the platens are located at the furnace exit, the portion
above the furnace nose encloses the final superheated reheater are in two stages, first
stage is the triflux heat exchangers located in the second pass, which absorbs heat from
superheated steam as well as from the flue gases. The second stage is exit reheater
located in the horizontal pass as pendant tubular loops.
(a) The flue gas for drying the cool in the mills is tapped off after the triflux heat
exchangers. The damper located in the hot flue gases pipe leading to mill controls the
quantity. Control the circulating vapour of the mill entry effect temperature control.
Immediately after the triflux heat exchanger, the air heaters and economizers are located.
The air heater is in 2 stages.
(b) The hot air for combustion from air heater stage 2 is led into the common wind box
located on the sided of the furnace. 4 cool air mixed pipes from pulverized coal bounders
are connected to 4 cool burners nozzle at the corners. There will be totally 16 coal
nozzles. 4 located in each corner. Oil guns will be located in the secondary air nozzle for
coal burning. The turn down ratio of the guns will be so selected that it will be possible to
31
use them also for pulverized fuels flame stabilization while operating under load below
the control point.
(c) Take into consideration the high % age of ash and the relatively poor quality of coal
due regards has been paid to wide pitching the tubes and to the gas velocity across the
heating surface areas. In order to insure reliable and continuous operation sample sot
blowing equipment is provided. There are short retractable steam root blowers provide at
the top of furnace fully retractable rotary type blowers are located for cleaning of the
secondary super heater and final heater partly retractable steam blowers are arranged for
the horizontal reheater and super heaters in the second pass. The steam root blowers are
electrically operated.
(d) Root blowing nozzles using blow down from boilers drum are provide for the
cleaning of areas around the burners nozzles zone for dislodging of slag boulder if any in
the bottom ash hopper in the furnace.
(e) Two FD fans are provided per boiler. The FD fans are of the axial type driven by
constant speed motor. The regulation of quantity and pressure is done by inlet vane
control. The flue gases are sucked through the mechanical and electrostatic precipitators
by I.D. fans and delivered into the chimney. Two I.D. fans are provided for each boiler
and they are of the axial type driven by constant speed motors. Inlet vane control effects
the capacity change with reference to load. Both the I.D. and FD fans have been
dimensioned taking into account the minimum margins of 15% on volume and 32% on
pressure.
Specification
Manufacturer
B.H.E.L
375tones/hr.
139kg /cm2
33.8 kg/cm2
540 deg.c
240deg.c
Efficiency
86% (stage-1)
87% (stage-2)
32
1500 tones
33
TURBINE SECTION
The turbine is the prime mover for the generator in the power plant Different
types of steam turbines used in thermal power plants, but the ones. Which
are used at G.N.D.T. P. are categorized as follows
S.No.
Type of Turbine
Turbine at G.N.D.T.P.
1.
Horizontal/vertical
Horizontal
2.
Single/multi cylinder
Multi cylinder
3.
Condensing/non condensing
condensing
4.
Reheat/ non-reheat
5.
6.
Reheat
temperature of steam is increased upto 535C in the boiler shell and steam is
again introduced in M.P (Medium pressure) turbine. After M.P.turbine, the
steam is passed on to L.P. (Low-pressure) turbine. This process helps the
turbine to reach the speed of 3000 rpm. After L.P. turbine, the steam is
condensed in condenser, build below the turbine unit. The condenser
contains a number of brass tubes through which cooling out from L.P.
turbine it comes in contact with colder brass tubes then steam get
transformed into water. This water get collected in HOT WELL just below
the condenser. From here the hot water is again pumped with the help of
condensate pumps. The cooling water is used to condense steam gets heated
up and is cooled by falling from cooling tower. This completes the
processing of steam through turbine and condenser.
ROTOR OF TURBINE
All the rotors are manually by means of rigid coupling, including the rotors
of the generator. The speed of whole system of rotor lies in the following
ranges of the speed at the operating conditions: 1900 to 2000 rpm Best noticed on the M.P. and L.P. rotors and generators.
2350 rpm Best noticed on H.P. rotor.
1. BEARING OF ROTORS
The axial load of the entire system of rotors is taken up by a double-sided
axial bearing located in the bearing stand between the H.P. and M.P casing.
These are two protections mounted near the axial bearing one hydro
35
chemical and one electromagnetic, which fouls the turboset during the nonpermissible movement of the rotor.
The rotors are placed on radial bearing which are machined to elliptical
shape. Further scrapping operations or change top and side clearances and
change in temperature of oil, influence the oil wedge and the position of the
journal bearing to maintain the same condition as existed during the initial
assembly.
In the lower half of bearing a hollow groove is provided in the babbit metal
through which oil the supplied through a drilled hole through H.P. jacking
oil pumps.
The high-pressure oil rotors are lifted in the bearing so that any scrapping of
the bearing is prevented.
2. TURBINE CASING
The high-pressure part of turbine is consisted of two-concentric horizontal
casing. Inner casing is connected in such a way to the other casing that it
enables to expand in all direction. The nozzles are attached to the inner
casing. The steam pipe is connected to the condensers and the condensers
are supported by springs. The casings are inter connected by the system of
guide keys through bearing pedestals in such a way that thermal expansion
of casing does not destroy the various parts of turbine.
36
37
Fig No.4.1
GOVERNING
The quality of steam entering in the turbine is regulated by the four
governing valves on the inlet to the M.P. part. The amount of opening at any
instant of these valves is controlled by the pressure of secondary oil, which
38
40
CONCLUSION
CONCLUSION
Spending Our six months of training in Guru Nanak Dev Thermal Plant, Bathinda, We
concluded that this is a very excellent industry of its own type. They have achieved
milestones in the field of power generation. They guide well to every person in the
industry i.e. trainees or any worker. We had an opportunity to work in various sections
namely switch gear, Boiler section, Turbine section, EM-2 CELL etc. while attending
various equipments and machines. We had got an endeverous knowledge about the
handling of coal, various processes involved like unloading, belting, crushing and firing
of coal. The other machines related to my field that We got familiar with boiler, turbine,
compressors, condenser etc. We found that there existed a big gap between the working in
an institute workshop and that in the industry. Above all the knowledge about the
production of electricity from steam helped me a lot to discover and sort out my problems
in my mind related to the steam turbine, their manufacture, their capacity, their angle of
blades and their manufacturing. The training that We had undergone in this industry will
definitely help me to apply theoretical knowledge to the practical situation with
confidence.
41