Canal Cross Drainage Works - Item Unit Rates 2014-15

DATA:

RATE ANALYSIS
UNIT :
15.76

cum
A. MATERIALS:
SI No
N-

C\1
CO d - LO (0

Particulars

Unit

Cement for mix


Cement for incidentals @ 5 kg / cum
Coarse aggregate 20-10 mm
Coarse aggregate 10 mm below
Fine aggregate (Un-Screened)
Super Plasticizer
Use rate of shuttering
Sundries ( asphalt mortar etc )
Total cost of Materials

kg
kg
cum
cum
cum
kg
sqm
LS

B. MACHINERY:
SI No
1
2
3

Description

Unit

Concrete mixer 300/200 Itr ( diesel )


Fuel / Energy charges
5 hp pump ( diesel )
Fuel / Energy charges
Needle vibrator 40 mm dia ( petrol )
Fuel / Energy charges
Total hire charges of Machinery

Hour
Hour
Hour
Hour
Hour
Hour

C. LABOUR:
SI No

Description

x- C\I CO d- LO (0

Crew for Concrete mixer


Crew for Pump
Crew for Needle vibrator
Mason Class-I
work inspector
mazdoor
for batching materials
for loading mortar pans

Unit
Hour
Hour
Hour
Day
Day
Day
Day

26

for laying
for conveying concrete
for cleaning/ washing/ curing
Labour cost for shuttering
Total cost of Labour
labour component/unit qty
Add contractor's profit and overhead charges
labour component/unit qty (including contractor's profit)
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
14.00% Rs:
8203.51
Total cost for
15.76 cum
Rs:
66799.99
Rate per cum
(A+B+C+D)/15.76
Rs.
4238.60
IRR-CCDW-2-27 Providing and laying insitu vibrated M-20
( 28 days cube compressive strength
not less than 20 N / sq mm ) grade
cement concrete using 20 mm down size
approved, clean, hard, graded
aggregates for troughs including cost of
all materials, machinery, labour,
formwork, scaffolding, cleaning,
batching, mixing, placing in position ,
levelling, vibrating, finishing, curing etc.,
complete with initial lead upto 50 m
and all lifts.

Day
Day
Day
sqm

0.1

Note:
If water is to be brought from
charges @ 500 Itr / cum. to the data
(Cement content: 330 kg / cum
with use of super plasticiser(0.4%
by wt. of cement), CA : 0.80cum,
Blending Ratio of CA--65:35, FA :
0.45 cum)

DATA:

RATE ANALYSIS
UNIT:
15.76

cum
A. MATERIALS:

Canal Cross Drainage Works - Item Unit Rates 2014-15

SI No
N-

C\1
Cr) d- LO
CO

Particulars

Cement for mix


Cement for incidentals @ 5 kg / cum
Coarse aggregate 20-10 mm
Coarse aggregate 10 mm below
Fine aggregate (Un-Screened)
Super Plasticizer
Use rate of shuttering for 40 uses
Scaffolding @ of shuttering
Sundries
Total cost of Materials

k
k
c
c
c
k
s
2
L

B. MACHINERY:
SI No
1
2
3

Description

Concrete mixer 300/200 Itr ( diesel )


Fuel / Energy charges
5 hp pump ( diesel )
Fuel / Energy charges
Needle vibrator 40 mm dia ( diesel )
Fuel / Energy charges
Total hire charges of Machinery

H
H
H
H
H
H

C. LABOUR:
SI No

Description

N-

C\I Cr) d- LO CO

Crew for Concrete mixer


Crew for Pump
Crew for Needle vibrator
Mason Class-I
work inspector
mazdoor
for batching materials
for loading mortar pans
for laying

H
H
H
D

D
D

262

for conveying concrete


for cleaning/ washing/ curing
Labour cost for shuttering
Labour cost for scaffolding @
Total cost of Labour
labour component/unit qty
Add contractor's profit and overhead charges
labour component/unit qty (including contractor's profit)
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on
(A+B+C) 14.00% Rs:
11740.73
Total cost for
15.76 cum
Rs:
95603.12
Rate per cum
(A+B+C+D)/15.76
Rs.
6066.20
IRR-CCDW-3 FOUNDATION WELL SINKING WORKS :
IRR-CCDW-3-1 Sinking RCC wells
vertically for foundation of
piers and abutments in all kinds
of soil, sand DATA:
Unit =
Running meter
Taking output = lm
diameter of well = 6.00m
(i)
Depth below bed level upto 3.0m
Rate of sinking = 0.50 m /hour

D
D
s
2

a) Lab
Mate (Mason Cl- II )
our
Sinker ( skilled)
0.12
Sinking helper ( Semi skilled)
1.00
2.00
b) Machinery

sub total (a)

Canal Cross Drainage Works - Item Unit Rates 2014-15

ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on
(A+B+C) 14.00% Rs:876.12
Total cost for
10.00 cum
Rs:
7134.12
Rate per cum
(A+B+C+D)/10.0
Rs.
713.40
IRR-CCDW-7-2 Providing and
filling
murrum /
gravely soil
( CNS soil )
for
foundation or
around pipes

282

including
breaking
clods,
spreading in
layers of 10 to
15 cm,
watering,
compaction by
earth masters
to achieve
density control
of not less

than 95
percent etc.,
complete with
lead

upto 50 m and all lifts.

DATA:
ANALYSIS

RATE
UNIT :
10.00

cum
A. MATERIALS:
SI No
1

Particulars

Murum

c
Total cost of Materials

B. MACHINERY:
SI No
1

Description

Nill
Total hire charges of Machinery

C. LABOUR:
SI No

Description

1
2
3

Cartman with double bullock cart


work inspector
mazdoor
Total cost of Labour

labour component/unit qty


Add contractor's profit and overhead charges
labour component/unit qty (including contractor's profit)
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on
(A+B+C) 14.00% Rs:481.11
Total cost for
10.00 cum
Rs:
3917.61
Rate per cum
(A+B+C+D)/10.0
Rs.
391.80
IRR-CCDW-7-3 Providing and filling murum / gravely soil ( CNS
soil ) for foundation or above pipes
including
breaking clods,
spreading in
layers of 10 to
15 cm,
watering,
compaction by
power roller to
achieve
density control

D
D
D

of not less

than 98
percent etc.,
complete with
lead upto

50 m and all lifts.

DATA:
ANALYSIS

RATE
UNIT :
10.00

cum
A. MATERIALS:
SI No
1

Particulars

Murum

c
Total cost of Materials

B. MACHINERY:
1 SI No 1