DAFTAR ISI

1
1.1
1.2
1.3

Hal.
UMUM .. 1
Tujuan 1
Peraturan dan Standar
1
Dokumen Referensi 1

2 BASIS DESAIN 1
2.1 Material 1
2.2 Pembebanan
1
3

DAYA DUKUNG IJIN TANAH

4
4.1
4.2
4.3
4.4
4.5

PERHITUNGAN PONDASI
Data Mesin
Geometri Pondasi.
Analisa Gaya dan Momen
Analisa Stabilitas..
Pembesian Pondasi..

1
2
3
3
4
4

5 ANALISA STABILITAS SKID


5.1 Data skid.
5.2 Analisa Stabilitas
LAMPIRAN :
1 Data " Load Summary" Flare Stack
2 Data Soil Test Gunung Megang
3 Plot Plan Gunung Megang

4
4
5

IN ASSOCIATION WITH

PT. PERUSAHAAN GAS

NEGARA

(Persero) Tbk.

Doc. No.

Contract No.

Date

SOUTH SUMATRA WEST JAVA GAS PIPELINE PROJECT

Data
a. Skecth Drawing

Design Parameter and Assumption


Length
netto
L
brutto
Lw
Width

netto
brutto

B
Bw

Height

netto
H
Cover thickness
Bruto
Hw

=
=

4600 mm
5000 mm

=
=

2800 mm
3200 mm

=
=
=

3400 mm
180 mm
3880 mm

Wall Thickness

tw

200 mm

Floor slab thickness

ts

300 mm

Cover slab thickness


The long wall
The short wall

tr
Lw
Bw

=
=
=

180 mm
5000 mm
3200 mm

Reinforced Bar
Yield Stress of bar,

fy

4,000 kg/cm2

=
=

2,400 kg/m3
27.6 MPa

Concrete Parameters
Concrete density,
conc
Compressive strength, fc'

350

kg/cm2

Soil Parameters
Refer to Pre-Design Survey - Soil Investigation Report Doc No. 0032-50-G-RE-004-A4 as follow:

Bore Hole no.


Allowable bearing capacity
Specific gravity
void ratio
Saturated soil density
Soil density
Shear angle
Undrained Shear Strength
Ground Water Level

Active earth pressure coeffcient, Ka

CALCULATION
4.1
LOADING
- Dead Load
Selfweight
The long wall,
The short wall,
Floor slab,
Roof slab,

all =
Gs =
e=
sat
s
=
c=
GWL =
w=

SV-01
KP39+240
KP39+250
1.2
2.6167
0.959
1825.267994
1765
11
0.23
2

SV-02
KP47+800
HB-04
0.7
2.6019
1.218
0
1658
10
0.12
5
1000

SV-03
KP56+350
HB-10
1.3
2.6187
1.01
0.000
1785
16
0.15
0.5

Parameter applied
kg/cm2

0.7 kg/cm2

kg/m3
kg/m3
deg
kg/cm2
m
kg/m3

1825 kg/m3
1785 kg/m3
16 deg
0.5 m

(1-sin ) / (1+sin) =

0.568

(Lw x tw x Hw x conc) x 2 =
(Bw x tw x Hw x conc) x 2 =
B x ts x L x conc
=
B x tr x L x conc
=

Total selfweight dead load, DL

- Live Load
Mintenance floor slab
Cover slab (operating floor)
Total Live load, LL
Surcharge Live Load
note: Traffic surcharge will be included into lateral soil load

18624.00
11919.36
9273.60
5564.16
45381.12

400 kg/m2
400 kg/m2
=
400 kg/m'

(lowest from GL)

kg
kg
kg
kg

5152.00 kg
6400.00 kg
11552.00

kg

kg

(SKBI 1.53.1987)
(SKBI 1.53.1987)

IN ASSOCIATION WITH

PT. PERUSAHAAN GAS

NEGARA

(Persero) Tbk.

- Piping Load
According from the pipe stress analysis (Doc No."0032-50-L-CA-004-A4" )
The value taken from the summary of the pipe stress analysis result nodes:
Node 3695 Sectional Valve at KP 56+350 Sec.Valve 24"
Node 7010 Sectional Valve at KP 47+800 Sec. Valve 24 "
Node 9540 Sectional Valve at KP 39+240 Sec. Valve 24 "
From the Document No.: "0032-50-L-CA-004-A4" here are the max load for Fx, Fy and Fz
Operating condition are follow:
Fx
Fy
Fz
Mx
My
Node
kN
kN
kN
kNm
kNm
3695
0
-55.276
0
0
0
7010
0
-51.518
0
0
0
9540
0
-51.086
0
0
0
Max load
-55.276
Max Fy =

55.276 kN =

Mz
kNm
0
0
0

5636.58 kg

- Seismic Load
Refer to SNI 1726-2002, the static seismic load are as follow:

Where:

V
C
I
R
Wt

=
=
=
=
=
=

Eartquake zone

basic shear nominal static load


seismic response factor
importance factor
seismic reduction factor
total weight
Zone 4

From Gambar 2 of SNI 1726-2002, Earthquake zone 4:


Max seismic response factor (Soft soil),

C=

0.85

From Table 1 of SNI 1726-2002,


Importance factor,

I=

1.6

From Table 3 of SNI 1726-2002,


Seismic reduction factor,

R=

2.8

Wt =

45381.1

kg

Static seismic load for each condition as follow:


Load Condition
Testing

V (kg)
22042.3

For next calculation, seismic loading is taken the maximum value,


Seismic load, S
=
22042.3

kg

- Earth Pressure

h1
P1

P5

H
y1

P2
y2

y3

ts

P3

P4

h2

y4

Pd1 Pd2

Pd3

LLs
H
h2
h1
t

=
=
=
=
=

400
3.4
2.9
0.5
1785.00

kg/m'
m
m
m
kg/m3

sat
Ka
w

=
=
=

1825.27 kg/m3
0.568
1000 kg/m3

(applying the lowest GWL from GL)

Pressure due to soil above the water level per meter width, P1 = Pd1*1/2h1
Pressure due to weight of soil above water level per meter width, P2 = Pd1*h2
Pressure due to soil below the water level per meter width, P3 = Pd2*1/2h2
Pressure due to water per meter width, P4 = Pd3*1/2h2
Pressure due to live load surcharge per meter width, P5 = H*Lsurcharge*Ka
TOTAL LATERAL SOIL LOAD

4.2

SUMMARY OF LOADS
Load Type
Dead Load
Live Load
Piping Load
Seismic Load
Soil Load

4.3

( t.h1.Ka).0,5h1 =
( t.h1.Ka).h2 =
{( sat - w).h2.ka}.0,5h2 =
( w.h2).0,5h2 =
H.LLs.Ka =
=

D
L
P
V
S

F (Vert.) (kg)
45381.12
11552.00
5636.58
0.00
0.00

LOAD COMBINATION
Load Combinations shall refer to Specification for Civil and Structural,
Document No. 0032-50-SP-001-A4.
Load Combination for the design of soil bearing pressure
L1
=
D+P
L2
=
D+P+S+L
L3
=
D + P + S + 0,7V
L4
=
D + P + S + 0,75L + 0,7V
Load Combination for the design of concrete structure
L10
=
L20
=
L30
=
L40
=
L50
=
L60
=

1.4 [D + P]
1.2 [D + P] + 1.6 [S + L]
1.2 [D + P] + L
1.2 [D + P] + L + V
0.9 [D + P] + 1.6 S
0.9 [D + P] + 1.6 S + V

H (Horz.) (kg)
0.00
0.00
0.00
22042.26
8544.25

M (Mmnt)
0
0
0
0
0

127
1470
1971
4205
772
8544

kg
kg
kg
kg
kg
kg

IN ASSOCIATION WITH

PT. PERUSAHAAN GAS

NEGARA

(Persero) Tbk.

Where,
D
L
P
SP
V

=
=
=
=
=

Dead load
Live load
Piping load
Lateral soil with/without ground water pressure
Earthquake load

Load Combination for the design of soil bearing pressure


Comb 01
Comb 02
Comb 03
Comb 04

Fa (Vert.)(kg)
51017.70
62569.70
51017.70
59681.70

D+P
D+P+S+L
D + P + S + 0,7V
D + P + S + 0,75L + 0,7V

Max

62569.70

Comb 100
Comb 200
Comb 300
Comb 400
Comb 500
Comb 600

23973.83

Fu (Vert.)(kg)
71424.783026
79704.442594
72773.242594
72773.242594
45915.931945
45915.931945

1.4 [D + P]
1.2 [D + P] + 1.6 [S + L]
1.2 [D + P] + L
1.2 [D + P] + L + V
0.9 [D + P] + 1.6 S
0.9 [D + P] + 1.6 S + V

Max

0.00

Hu (Horz.)(kg) Mu (Mmnt)(kg.m)
0.00
0
13670.80
0
0.00
0
22042.26
0
13670.80
0
35713.06
0

79704.442594

4.4

Lx =

Ha (Horz.)(kg) Ma (Mmnt)(kg.m)
0.00
0.00
8544.25
0.00
23973.83
0.00
23973.83
0.00

35713.06

ROOF SLAB DESIGN

2800 mm

Ly =

4600 mm

Since the slab ratio is Ly/Lx < 2.5 we can assumed as two ways action
Ly / Lx
=
1.6
<
Two way slab calculation
Type slab
=
S1
Thickness, tr
=
180
mm
Material
fc'
=
350 kg/cm2
fy
concrete cover

=
=

4000 kg/cm2
40 mm

2.5

(SNI 2002 for diameter Re-bar < 36mm)

Structural model:
Ly/Lx =
1.64
<
from SKSNI T-15-1991-03, we find:
MIx = -Mtx =
0.001.q.Ix *
MIy = -Mty =
0.001.q.Ix *

Lx

2.5

(two way action)


78
54

Ly

Loading

- Selfweight of slab, ts*c =


- 1 cm mortar, tm*m =
q DL =
q LL =
q u = 1.2q DL + 1.6 q LL =

a. Dead load

b. Live load
c. Ultimate load
Moment
MIx = -Mtx =
MIy = -Mty =

m=

fy
0 . 85fc '

2 .m . R n
1
1 1
=
m
fy

13.45

16
132

Rn=

Mu
. b . d2

max = 0,75* balance


0.0013

As = r min x b x d =

mm
mm

5.187

kg/cm2

0.0013

r min =
1.4/fy =
0.00357 ; if 1.33 x req > 1.4/fy
r min =
0,18% =
0.0018 ; if 1.33 x req < 1.4/fy
balance = i * 0.85 fc' *
600
fy
600 + fy

required =

kg/m2
kg/m2
kg/m2
kg/m2
kg/m2

723.06 kg.m
500.58 kg.m

Rebar Required:
(x-dir)
Re-bar to be applied =
d = tr - c - (reinf dia*0.5) =
b=
1000
mm
=
0.8
=

432
20
452
400
1182.4

1.73 cm2 / m'

min

0.0018

0.0382

max

0.0287

IN ASSOCIATION WITH

PT. PERUSAHAAN GAS

NEGARA

(Persero) Tbk.

(y-dir)
d = tr - c - (reinf dia*1,5) =
b=
1000
mm
=
0.8
=
=
13.45
fy

116

Rn=

m=

0. 85fc '
2 .m . R n
1
= 1 1
=
m
fy

mm

Mu
. b . d2

4.6502

kg/cm2

0.0012

r min =
1.4/fy =
0.00357 ; if 1.33 x req > 1.4/fy
r min =
0,18% =
0.0018 ; if 1.33 x req < 1.4/fy
balance = i * 0.85 fc' *
600
fy
600 + fy
max = 0,75* balance
required =

min

0.0018

0.0382

max

0.0287

0.0012

As = r min x b x d =

1.36 cm2 / m'

Re-bar selection
D=
16
mm ;
Longitudinal Re-bar (for shorter span)
Transversal Re-bar (for longer span)
No. of Re-bar per meter,

spacing of Re-bar,
sx =
sy =

Ab =

2.0096 cm2
S max = 3 x tr =
S max = 5 x tr =

n = As o / Ab
nx=
ny=
s = 1000/(n-1)
use D
use D

200 mm
200 mm

540
900

mm
mm

0.9
0.7
16 @
16 @

200 mm =
200 mm =

10.05
10.05

>
>

1.7 cm2 / m'


1.4 cm2 / m'

Sketch:
180

Dia. 16 @ 200mm
top and bottom
4.5
4.5.1

WALL DESIGN
Wall thickness bearing control

a2
a4

a3

3880 mm

a1

5000 mm
Length, L =
Width, B =
Area of roof slab, A =
Area a1 & a2 =
Area a3 & a4 =

5.0 m
3.88 m
19.40 m2
5.49 m2
3.23 m2

Distribution of load to the long wall


Ratio the load to the long wall, RL =
Ratio the load to the short wall, RS =
DL = S/w roof slab x RL =
LL = LL roof slab x RL =

a1 / A =
a3 / A =
2373 kg
2197 kg

0.2831494845
0.1666666667

Axial load, P ult = 1.2DL + 1.6LL =

6363.21

Area wall, Aw1 = tw . L =


Area wall, Aw2 = tw . B =
=
0.6
Axial long wall capacity = .Aw1.fc' =
Axial short wall capacity = .Aw2.fc' =
P wall

>

4.5.2
4.5.2.1
L
H
L/H
Wall thickness, tw =
Cover, c =

kg

10000 cm
7760 cm

2,100,000
1,629,600

P ult

kg =
kg =

2100 T
1629.6 T

200 mm wall is adequate for axial load

Wall Flexural Design


For the Long Wall
=
5.0 m
=
3.88 m
=
1.29
200
40

<

2.5

the wall assumed as 2 ways slab

mm
mm

Hu =
35713.1 kg
qu = Hu/L
= 35713.058 / 5
=
7142.6 kg/m

(Max load combination for lateral force)

From table 1.65, table for the analysis of plates, slabs, and diaphragms
L/h =
Mx max =
My max =
R01 =
R01 =

1.3
0.001*qu*h^2*68 =
0.001*qu*h^2*55 =
1/2*qu*h =
1/2*qu*h =

0.001*7142.62*15.06*68 =
0.001*7142.62*15.06*55 =
0.5*7142.62*3.88 =
0.5*7142.62*3.88 =

7311.886
5914.025
13856.666
13856.666

kg.m
kg.m
kg
kg

6.36

IN ASSOCIATION WITH

PT. PERUSAHAAN GAS

NEGARA

(Persero) Tbk.

Rebar Required:
(x-dir)
Re-bar to be applied =
d = tw - c - (reinf dia*0.5) =
b=
1000
mm
=
0.8

m=

fy
0 . 85fc '

2 .m . R n
1
1 1
=
m
fy

16
152

Rn=

13.45

mm
mm

Mu
. b . d2

39.6

0.0107

r min =
1.4/fy =
0.00357 ; if 1.33 x req > 1.4/fy
r min =
0,18% =
0.0018 ; if 1.33 x req < 1.4/fy
balance = i * 0.85 fc' *
600
fy
600 + fy
max = 0,75* balance
min
0.0107

Check :
required =

req

<

As = r min x b x d =

max

<

m=

fy
0 . 85fc '

2 .m . R n
1
1 1
=
m
fy

136

Rn=

13.45

min
0.0108

Mu
. b . d2

req

<

No. of Re-bar per meter,

spacing of Re-bar,
sx =
sy =

<

Ab =

max

n = As o / Ab
n ver =
n hor =
s = 1000/(n-1)
use D
use D

125 mm
125 mm

c = 75mm

inner side

outer side

16 @
16 @

125 mm =
125 mm =

200
Check shear capacity for the wall
Vu = max of R01&R02 =
Concrete shear capacity, Vc:

13856.67

kg

Vc = 1/3 fc' bo.d

mm
mm
mm
168114.2 N
17142.87874 kg
Vu

OK!

For the Short Wall

3.20 m
3.88 m
1.2

<

2.5

the wall assumed as 2 ways slab

mm
mm

Hu =
35713.1 kg
qu = Hu/H
= 35713.058 / 3.88
=
9204.4 kg/m

min

0.00357

0.0382

max

0.0287

600
1000

mm
mm

8.1
7.3

Dia. 16 @ 125mm
Ver and Hor

200
40

kg/cm2

OK

c = 40 mm

Wall thickness, tw =
Cover, c =

0.0287

40.0

2.0096 cm2
S max = 3 x tw =
S max = 5 x tw =

Sketch:

For the short side wall


B
=
H
=
H/B
=

max

14.65 cm2 / m'

Re-bar selection
D=
16
mm ;
Vertical Re-bar (for shorter span)
Horizontal Re-bar (for longer span)

>

0.0382

0.01077

As = r min x b x d =

4.5.2.2

mm

max = 0,75* balance

0.6
1000
tw - d'
40
160

0.00357

OK

r min =
1.4/fy =
0.00357 ; if 1.33 x req > 1.4/fy
r min =
0,18% =
0.0018 ; if 1.33 x req < 1.4/fy
balance = i * 0.85 fc' *
600
fy
600 + fy

=
bo =
d=
d' =
d=
Vc =
Vc =
Vc

min

16.19 cm2 / m'

(y-dir)
d = tw - c - (reinf dia*1.5) =
b=
1000
mm
=
0.8

Check :
required =

kg/cm2

(Max load combination for lateral force)

16.08
16.08

<
>

16.2 cm2 / m'


14.7 cm2 / m'

IN ASSOCIATION WITH

PT. PERUSAHAAN GAS

NEGARA

(Persero) Tbk.

From table 1.65, table for the analysis of plates, slabs, and diaphragms
h/L =
1.2
Mx max = 0.001*qu*B^2*63 =
0.001*9204.4*15.06*63 =
My max = 0.001*qu*B^2*54 =
0.001*9204.4*15.06*54 =
R01 = 1/2*qu*B =
0.5*9204.4*3.2 =
R01 = 1/2*qu*B =
0.5*9204.4*3.2 =
Rebar Required:
(x-dir)
Re-bar to be applied =
d = tw - c - (reinf dia*0.5) =
b=
1000
mm
=
0.8

m=

fy
0 . 85fc '

2 .m . R n
1
1 1
=
m
fy

16
152

Rn=

13.45

5937.940
5089.663
14727.034
14727.034

kg.m
kg.m
kg
kg

mm
mm

Mu
. b . d2

32.126

0.00852

r min =
1.4/fy =
0.00357 ; if 1.33 x req > 1.4/fy
r min =
0,18% =
0.0018 ; if 1.33 x req < 1.4/fy
balance = i * 0.85 fc' *
600
fy
600 + fy
max = 0,75* balance
Check :
min
0.0085
required =
As = r min x b x d =

<

req

m=

fy
0 . 85fc '

2 .m . R n
1
1 1
=
m
fy

max

<

136

Rn=

13.45

As = r min x b x d =

0.0382

max

0.0287

mm

Mu
. b . d2

34.397

kg/cm2

0.00916

max = 0,75* balance


min
0.0092

0.00357

OK

r min =
1.4/fy =
0.00357 ; if 1.33 x req > 1.4/fy
r min =
0,18% =
0.0018 ; if 1.33 x req < 1.4/fy
balance = i * 0.85 fc' *
600
fy
600 + fy

Check :
required =

min

12.95 cm2 / m'

(y-dir)
d = tw - c - (reinf dia*1.5) =
b=
1000
mm
=
0.8
=

kg/cm2

<

req

<

12.46 cm2 / m'

max

OK

min

0.00357

0.0382

max

0.0287

IN ASSOCIATION WITH

PT. PERUSAHAAN GAS

NEGARA

(Persero) Tbk.

Re-bar selection
D=
16
mm ;
Vertical Re-bar (for shorter span)
Horizontal Re-bar (for longer span)
No. of Re-bar per meter,

spacing of Re-bar,
sx =
sy =

Ab =

2.0096 cm2
S max = 3 x tw =
S max = 5 x tw =

n = As o / Ab
n ver =
n hor =
s = 1000/(n-1)
use D
use D

150 mm
150 mm

Sketch:

c = 75 mm

inner side

outer side

600
1000

mm
mm

6.4
12.5
16 @
16 @

150 mm =
150 mm =

13.40
13.40

>
>

12.9 cm2 / m'


12.5 cm2 / m'

c = 40 mm
Dia. 16 @ 150mm
Ver and Hor

200
Check shear capacity for the wall
Vu = max of R01&R02 =
Concrete shear capacity, Vc:

14727.03 kg

Vc = 1/3 fc' bo.d


=
bo =
d=
d' =
d=
Vc =
Vc =
Vc

4.6

0.6
1000
tw - d'
50
150
157607.1
16071.4
>

mm
mm
mm
N
kg
Vu

OK!

FLOOR DESIGN

3.20 m

5m
L
B
L/H

=
=
=

5.0 m
3.20 m m
1.6

Thickness, tr
Material
fc'
fy
Cover, c

(Ly)
(Lx)
<

2.5

the wall assumed as 2 ways slab


300

=
=
=

mm

350 kg/cm2
4000 kg/cm2
75

DL =
P=
LL floor =
=

45381.12 kg
5636.58
kg
400 kg/m2
5152.00 kg
(Llfloor * floor Area)

mm
Area of floor =
=

4.6*2.8
12.88

m2
m2

Structural model:
Ly/Lx =
1.6
<
from SKSNI T-15-1991-03, we find:
MIx = -Mtx =
0.001.q.Ix *
MIy = -Mty =
0.001.q.Ix *

L
x

2.5

(two way slab)


78
54

Ly

Ultimate load =

Moment
MIx = -Mtx =
MIy = -Mty =

Vu max = 1.2*(45381.12+5636.583) +1.6*5152 =


Ly =
qu =
12061.4
8350.2

kg.m
kg.m

69464.4 kg
5m
15101.0 kg/m

(per meter length of Ly)

IN ASSOCIATION WITH

PT. PERUSAHAAN GAS

NEGARA

(Persero) Tbk.

Rebar Required:
(x-dir)
Re-bar to be applied =
d = tr - c - (reinf dia*0.5) =
b=
1000
mm
=
0.8

m=

fy
0 . 85fc '

2 .m . R n
1
1 1
=
m
fy

16
217

Rn=

13.45

mm
mm

Mu
. b . d2

32

0.00849

r min =
1.4/fy =
0.00357 ; if 1.33 x req > 1.4/fy
r min =
0,18% =
0.0018 ; if 1.33 x req < 1.4/fy
balance = i * 0.85 fc' *
600
fy
600 + fy
max = 0,75* balance
min
0.0085

Check :
required =

req

<

As = r min x b x d =

max

<

min

0.00357

0.0382

max

0.0287

OK

18.42 cm2 / m'

(y-dir)
d = tr - c - (reinf dia*1.5) =
b=
1000
mm
=
0.8
=
=
13.45
fy

201

Rn=

m=

0. 85fc '
2 .m . R n
1
= 1 1
=
m
fy

mm

Mu
. b . d2

25.8

max = 0,75* balance


min
0.0068

kg/cm2

0.00677

r min =
1.4/fy =
0.00357 ; if 1.33 x req > 1.4/fy
r min =
0,18% =
0.0018 ; if 1.33 x req < 1.4/fy
balance = i * 0.85 fc' *
600
fy
600 + fy

Check :
required =

kg/cm2

req

<

As = r min x b x d =

<

max

min

0.00357

0.0382

max

0.0287

OK

13.60 cm2 / m'

Re-bar selection
D=
16
mm ;
Longitudinal Re-bar (for shorter span)
Transversal Re-bar (for longer span)
No. of Re-bar per meter,

spacing of Re-bar,
sx =
sy =

100 mm
100 mm

Ab =

2.0096 cm2
S max = 3 x tr =
S max = 5 x tr =

n = As o / Ab
nx=
ny=
s = 1000/(n-1)
use D
use D

900
1500

mm
mm

9.2
6.8
16 @
16 @

100 mm =
100 mm =

20.10
20.10

>
>

18.4 cm2 / m'


13.6 cm2 / m'

Sketch:
300

Dia. 16 @ 100mm
top and bottom
4.7

PEDESTAL DESIGN
Dimension:
Hp =
Lp =
Bp =

4.7.1
Nc =
=
=

130 mm
800 mm
800 mm

Pedestal axial capacity


. 0,85 . fc' . Ap
0.65*0.85*350*80*80
1237600 kg

Nc =

4.7.2

; where :

1237600 kg

>
>

P=
Pu =
=
=
fc' =

Pu
7891.215 kg

5636.58 kg
1,4 * P
7891.22 kg/cm2
0.65
350 kg/cm2

(max Fy from Piping load)

(for compression)

OK !

Punching shear at floor due to pedestal

ts =
Cover, c =
Re-bar to be applied =
d = tr - c - (reinf dia*0.5) =

300
75
16
217

Pedestal length = Lp =
800
Pedestal width = Bp =
800
Perimeter L = Lo = Lp + 2d
=
1234
Perimeter B = Bo = Bp + 2d
=
1234

mm
mm
mm
mm
mm
mm
mm
mm

Ultimate axial, Pu = 1.4*(P+D) (from max Piping load Fy + Weight of pedestal)


= 1.4*(5636.59+199.68)
kg
=
8170.77
kg

Shear strength, Vc =

2 1
fc ' bo d
1 6

( )

1+
or

Vc =

1
3

fc ' bo d

=
=
=

0.75*(1+2/1)*0.34*761.76*1234*217
1055.0929
107588.87746

kN
kN
kg

0.75*0.34*761.76*1234*217

kN

; where:

=
1 =

0.75
1

IN ASSOCIATION WITH

PT. PERUSAHAAN GAS

(Persero) Tbk.

NEGARA

1
3

fc ' bo d

=
=

351.6976
35862.9592

kN
kg

IN ASSOCIATION WITH

PT. PERUSAHAAN GAS

NEGARA

(Persero) Tbk.

Control the minimum shear strength against ultimate axial from Piping
>
Pu
Vc
35862.96 kg
>
8170.77 kg
OK ! Slab base is save for punching shear

4.8
4.8.1

STABILITY CHECK
BEARING CAPACITY

The soil bearing stress analyzed by ignoring the GWL that caused uplift, increasing the soil bearing capacity.
Max Va
=
62569.70 kg
Base Area of valve box, A
=
5*3.2 m2
=
16 m2

4.8.2

P/A

.<

=
=

all

3910.6064 kg/m2
0.3911 kg/cm2

...OK!!

<

all =

0.700
kg/cm2
(Taking the lowest from pre design survey report )

the allowable bearing pressure is adequate

BOUYANCY

The anti bouyancy check analyzed with the worst GWL condition (at -0,5m from GL), for conservatively control the structure's stability
Total Dead Load (Va)
Bouyancy (uplift) force

=
=
=
=

62569.70 kg
Lw * Bw * h2 * w
5*3.2*2.9*1000 kg
46400 kg

Safety Factor for Buoyance

= 62569.703 / 46400
=
1.34848

>

1.1

OK!

Formula Terzaghi (General Shear Failure) :


qult
= 1,3. c. Nc + q. Nq + 0,4. '. B. N
See table reference factor bearing Terzaghi
Nc
=
10.3
Nq
=
3
N
=
1.5
'
= ' - w
=
540 kg/m3
q
= ' . D
=
17.01 kN/m2
q ult
=
189.866 kN/m2
q all

= q ult / SF ..SF= 3
= 63.28867 kN/m2
= 0.632887 kg/cm2

Self weight
The Long wall = (Lw x tw x Hw x yconc)x 2
The Short wall = (Bw x tw x Hw x yconc)x 2
Floor slab
Roof slab
Total Weight

= B x ts x L x yconc
= B x tr x L x yconc
=

Floor slab

=
=
=

=
=
=

250 kg/m2
400 kg/m2

19158

=
=
=

12648
8404.8
5883.36
46094.16 kg

3371.25
8755
12126.25

17

5.1.1. Geometry of
Foundation
Length

Wall thickness

L
Lw
B
Bw
H
Hw
tw

= 4.65 m
= 5,15 m
= 2.9 m
= 3.4 m
= 2.9 m
= 3.1 m
= 0.25 m

Floor slab thickness


Roof slab thickness
The long wall
The short wall

ts
tr
Lw
Bw

= 0.2 m
= 0.14 m
= 5,15 m
= 3,4 m

Width

netto
brutto
netto
brutto

Height
bruto