Beruflich Dokumente
Kultur Dokumente
Agenda
LEED program overview
How Trane can help
Case studies of LEED-certified projects
LEED Milestones
History
Progress of LEED
17,047
2150
projects
registered
NC certified
projects
(number of projects)
(number of projects)
212
2001 2002 2003 2004 2005 2006 2007 2008
5
2001
2002
2003
2004
2005
2006
2007
2008
Progress of USGBC
17,846
69,151
LEED accredited
professionals
USGBC
membership
1137
2001
527
2002
2003
2004
2005
2006
Growth
2007
2008
2001
2002
2003
2004
2005
2006
2007
2008
Certified
Silver
Gold
Platinum
LEED 2009
4049 points
5059 points
6079 points
80+ points
available
points
Sustainable sites
Water efficiency
8
3
26
10
35
14
15
Regional
4
110
100
pts
Bonus
available
points
Trane
assisted
Sustainable sites
Water efficiency
26
10
35
35
14
15
4
110
1
54
Sustainable Sites
LEED checklist
Construction activity
Prereq.
1
reqd
Credit
1
2
Points
1
5
3
4.14.4
5.15.2
6.16.2
7.17.2
8
1
12
2
2
2
1
Total
26
pollution reduction
Site selection
Development density &
community connectivity
Brownfield redevelopment
Alternative transportation
Site development
Stormwater design
Heat island effect
Light pollution reduction
10
SS
Water Efficiency
new in
LEED
2009
LEED checklist
Prereq.
Water use reduction
1
Water efficient
Credits
1.11.2
landscaping
Innovative wastewater
technologies
Water use reduction
reqd
Points
24
3
Total
24
10
Earn up to 6 points
11
WE
Optimize energy
performance
On-Site renewable
energy
Enhanced commissioning
Enhanced refrigerant
management
Measurement &
verification
Green power
12
EA
Prereq.
1
reqd
reqd
reqd
Credits
1
Points
119
17
3
4
2
2
6
Total
2
35
Optimize performance
New
Existing building
construction
renovation
12%
14%
16%
18%
20%
22%
24%
26%
28%
30%
32%
34%
36%
38%
40%
42%
44%
46%
48%
13
8%
10%
12%
14%
16%
18%
20%
22%
24%
26%
28%
30%
32%
34%
36%
38%
40%
42%
44%
LEED
points
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
14
Demand-controlled ventilation
Chillercooling tower operation
Pump/fan pressure optimization
Ventilation/supply air/chilled water/hot water reset
Optimal start/stop
Time of day scheduling
15
EAc2
% Renewable
Energy
Points
1%
3%
5%
7%
9%
11%
13%
Prereq.
1
reqd
Building reuse
Construction waste
Credits
1.11.4
2.12.2
Points
14
2
3.13.2
4.14.2
5.15.2
6
2
2
2
1
7
Total
1
14
management
Materials reuse
Recycled content
Regional materials
Rapidly renewable
materials
Certified wood
16
MR
OA delivery monitoring
Increased ventilation
Construction IAQ
management plan
Low-emitting materials
Indoor chemical &
pollutant source control
Controllability of systems
Thermal comfort
Daylight & views
17
IEQ
Prerequisite
1
reqd
2
reqd
Credits
1
2
3.13.2
Points
1
1
2
4.14.4
5
4
1
6.16.2
7.17.2
8.18.2
Total
2
2
2
15
18
Strategies
Earn up to 3 points
19
ID
Credits Points
1.11.4 14
Credit
Total
20
RP
People
Local sales and service support
C.D.S. Support
LEED Accredited Professionals - 600+
21
Resources
22
American Honda
Northwest
Regional Facility
Gresham, OR
office warehouse training
Trane air handlers, chiller,
heat recovery
Tracer Summit building
automation system for rainwater
collection control
Herman Miller
MarketPlace
Zeeland, MI
commercial office
Daylighting
Trane HVAC system with
desiccant dehumidification
Tracer Summit building
automation system
Questions
25