OIL AND GAS DEVELOPMENT COMPANY LIMITED

ELECTRICAL SECTION (CHANDA ATA-2013) JOBS TO BE CARRIED OUT


THROUGH CONTRACTOR FROM ________to_________
S
#
1

Area and job Description

Name/Tag No/rating

Plant Area Motors & MCUS/


Withdrawable Modules in MCC

Stabilized Crude Oil Transfer


Pump Motor and MCU
P-100,380V,22.5A,11KW

1) Checking of all terminations


of MCUS, Power cable and
connection in area and
Meggering of cables.
2) Greasing of all motors and
replacement of bearings
3) Refurbishment/test of local
control switch ON/OFF and
replacement of faulty parts/
Ampere meters with new at
all local control stations.
4) Refurbishment/test of
withdrawable starter
modules in MCC and
replacement of faulty part
like magnetic contactor/
overload relay / FUSE /
LOAD BREAK SWITCH if
required etc
5) Bus bars inspection &
tightening in
MCC and their cleaning as
well.
.

Rema
rks
A
B

Condensate Transfer Pump


Motor and
MCU at LP Suction Knock-out
Vessel
P-101,380V,41A,22KW
Condensate Transfer Pump
Motor and MCU at LP
Discharge Knock-out Vessel
P-102,380V,41A,22KW
Product cooler Fan Motor
and MCU
E-111, 380v, 41Amp, 22KW
LPG Reflux Motor and MCU
P-103,380V,5.8A,2.2KW

A
B
A
B
A
B
A
B

LPG Overhead Condenser


Fan Motor
E-109,380V,5,5KW
MEG Transfer Pump Motor
P-200,380V,5.8A,2.2KW

MEG Transfer Pump Motor


P-200,380V,5.8A,2.2KW

Refrigeration Condenser Fan


and Cooling Water Pump
Motor
E-701,380V,,14KW
P-701,380V,5.1A,2.2KW
Refrigeration Package
Ignition System
Altronic Ignition System.
Hot oil Pump motor

P-400, 380V, 22kw/30HP

OIL AND GAS DEVELOPMENT COMPANY LIMITED


ELECTRICAL SECTION (CHANDA ATA-2013) JOBS TO BE CARRIED OUT
THROUGH CONTRACTOR FROM ________to_________
S
#
2

Area and job Description


Power House/Utilities/LPG
Storage/ Flare System/CPI
Area Motors, MCUS &
withdrawable modules
1) Checking and inspection of
all alternators power and
control connections, AVR,
Exciters, Dusts and Webs
from safe side of all
Generators.
2) All terminations checking
and inspection of
Generators local Panels.
3) Main CBs of Generators to
be checked and inspection
of measuring instruments,
interposing relays panels.
4) Inspection and testing of
all plant skids, Buildings
and Loading areas
earthings.
5) Inspection, servicing,
testing, cleaning, greasing
and replacement (if
required) of bearings of
motors.
6) Checking and testing
(shutdown /alarming of
engine) to ensure the
securities of Gas Genset

Name/Tag No/Rating
Generators
1-Gas Genset G1&G2
235KW, G3&G4 200KW and
Diesel Genset DG 200KW
2-Jacket water/after cooler
Fan
Motors 380V,5A,2.2KW
3-Exhaust Fan Motors
380V,13.3A,5.5KW
ACB
G1,G2,G3,G4 & DG 1250A
Utility Pump Motor and MCU
P-801,380V,7.8A,4KW

Rema
rks
5N
O
2N
O
2N
O

A
B

Fire Water Pump Motor and


MCU
P-802,380V,32,5A,18.5KW

A
B

Flare Knock-out Drum


Transfer Pump Motor
P-500,380V,11KW, 22.5Amp
LPG Loading Pump Motor
and MCU
P-104,380V,16A,7.5KW

A
B

CPI Pit Pump Motor


P-1201,380V,5HP

B
Instrument Air Compressor
K-600,380V,,43KW Make:
Ingersoll Rand

A
B

G1,G2,G3,G4, & Diesel


Genset
From their local authorized
dealer Allied
engineering services
Ltd and R.A company.

OIL AND GAS DEVELOPMENT COMPANY


LIMITED
ELECTRICAL SECTION (CHANDA ATA-2013) JOBS TO BE CARRIED OUT
THROUGH CONTRACTOR FROM
________to_________
S
#
3

Area and job Description

Name/Tag No/Rating

Portable Extension Boards


Provision of portable extension
boards for the provision of electric
supply for
welding/grinding/cutting and
lighting jobs in different areas on
as and when requred.

Power
extension
boards
with
industrial sockets and cable rating
10mm size, extension boards Main
DB having main incoming 63Amps
& out going 32Amps, 16 amps,
10amps industrial sockets male &
female,
24VDC
lighting
arrangement for vessels, 250watt
flood lights for night hours jobsetc.
Will be arranged by contractor.

Dispatch and Lighting System


1) Complete cleaning of lights
in plant and fence area.
2) Cable termination checking
at all junction boxes at
plant area fixture light.
2x36watt

68nos Tube Light Fixtures ( 2


x36watt)
(Plant Area) and the Perimeter
lights 250watt.

Rema
rks

1. Contractor should submit Cvs of the man power being hired at least
before 15 days of the job startus.
2. Contractor should submit list of the tools available & ensure its
availability at least 3 days before start-up & an inspection of tools
by OGDCL field professionals be carried out to avoid any short fall.
3. Contractor will be responsible for arranging of Food and proper
accommodation for their manpower and OGDCL will not provide
food and accomodation.
4. Liftig/shifting and movement of equipments like motors, valves from
field area to workshop area and back will be the responsibility of
contractor He should arrage moving trolleys and transport in this
regard to speed up the process.any delay will be unbearable.
5. All consumeables will be provided by OGDCL
Tools to be provded by contracror.
Different Size of screw drivers= 03 each
Open End spanner 6-32mm
= 02 set
Ring spanner set 6-32mm
= 02 set
Pipe wrench different size
= 01 each
Monkey pllier
= 02 nos
Bearing lock opner plier
= 02 Nos
Hammers Brass and Iron 5LB, 8LB. = 02 Nos. each
Chain Block 2.0 ton
= 01 Nos
Lifting Belt 2.0 ton
= 03 Nos
Elan key set 1.5mm to 10mm
=01 set
Elan key set 12mm to 25mm
=01 set
Elan key set 3/8 inch to 1/8 inch
=01 set
Grip plier
=02 Nos
Ratchet set 10mm to 32mm
= 03 Nos
For each ATE and Electrician complete tool kit should be consisting the,
( Star set, Plier, Nose plier, AVO meter, Adjustable 7, Side cutter,
Small Hammer, test pen, cableknif, Permanent marker, Large medium
small size Screw driver set.)
Bearing Puller Small, medium, large = 01 No each
Bearing heater
= 01 No
Chisel set 10mm to 32mm
= 01 No
Air blower
= 02 Nos
Note: Skilled/unskilled Manpower should be equipped with complete safety