SUMMARYOFPRICESFORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINNCTOFDELHI&NCR

TenderNo.IGL/ND/C&P/
P12500

BIDDERNAME:

Sl.No.

TotalAmountinRs.
(Figures)

Description

TOTALPRICESFORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINNCTOFDELHI

TOTALPRICESFORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINNCR

TotalAmount(inFigure)
TotalAmount(inWords):Rupees

SEAL&SIGNATUREOFBIDDER

Rev.208.04.2013

CityGasDistributionProjectinNCTofDelhiandNCRRegion

Page1of57

SCHEDULEOFRATESFORRATECONTRACTFORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESIN

ItemNo.

Description

BIDDERNAME:

Unit

Quantity

UNITPRICEINCLUSIVEOFALL
TAXESINCLUDINGBOCWTAX
(EXCLUDINGSERVICETAX),DUTIES,
LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSITINSURANCEOF
FREEISSUEMATERIALSASDEFINED
INBIDDOCUMENT

Receiving andtakingover asdefined inthe specifications,handling,loading,transportationand unloadingofOwnersupplied 3 LayerPEcoatedline pipesalongwithassociated fittingsand


valves from Owner designated stockyard to Contractor's own stock yards/workshops/worksites including preliminary activities, preparation of drawings, wherever required for crossings etc.
includinghandling,stacking,stringingonthepipelineRightofuse/pipelineroutealignment,carryingoutinspectionofcompanysuppliedmaterialsincludinglinepipesatthetimeoftakingover,
laying/installationofcoatedlinepipe,associatedfittingsandaccessories,includingexecutingallworks,"takingover",handling,includingloadingandunloading,transportationofOwnersupplied
materials other than line pipe from Owner's designated place(s) of issue to work site, arrangement of all additional lands required for Contractor's storage, fabrication, access for construction,
procurement and supply of all materials (except Owner supplied materials), consumables, equipment, labor and other inputs, carrying out all temporary, ancillary, auxiliary works, ready for
commissioningofpipelineasperdrawings,Specifications,otherprovisions
ofContractdocumentandinstructionofOwner/OwnersRepresentative,includingbutnotlimitedtocarryingoutthefollowingworks:
Surveyingofdetoursforthedetoursrequiredatthetimeofconstructionincludingmarkingthesameintopographicalsheet,preparationofAFCdrawingsshowingsurveydetails.Andsubmitsame
toOwner/OwnersRepresentativeforreview.
Stakingandinstallationofconstructionmarkers,clearing,fencing,grubbing,cuttingoftrees,fulfillingalltherequirementsofvariousstatutory/environmentauthoritiestotheentiresatisfactionof
concerned authorities, grading of work area, Shifting of all obstruction within the ROU/ pipeline route alignment viz electrical lines/poles, telephone lines/poles, coordination with concerned
authoritiesandobtainpermissionsfromtheseauthorities.
Trenchingtoalldepthsbyexcavationinalltypesofsoilsincludingsoft/hardrock,chiselingorotherwisecuttingdifferenttypesofpavement,footpath,roadsetc.Asrequiredandstoringexcavated
soil,reusablematerialsatdesignatedareaasdirectedbyOwner/OwnersRepresentativeandtoawidthtoaccommodatethepipelineasperrelevantstandard/specificationsetc.(Theminimum
depthofthetopofpipelineshallbe1.2mormorefromthefinishofthestabilizedgradelevel).Dewateroftrenchesifrequiredaspersitecondition.MakingtrialpitsasperinstructionsofEIC
Carrying out repairs of pipe defects/replacement in case of irreparable defects and repairs of defects of pipe coating not attributable to Owner including defects / damages occurring during
transportation/handling.
Checking,cleaning,aligning,bending,cuttingandbeveling(asrequired)ofpipesforweldingandfieldadjustmentsincludingpipefittings,welding,carryingoutnondestructivetestingofweldsas
requiredincluding100%radiographyandprovidingallrequisiteequipment,labor,supervision,materials,films,consumables,allfacilitiesandpersonneltoprocess,develop,examineandinterpret
radiographsandothertestsasrequired,carryingoutrepairsofweldsjointsfounddefectivebyOwner/OwnersRepresentative,carryingoutreradiographyandothertestsasrequiredonrepaired
joints.ProvidingPEwarningmatoverthepipelineetc.
Carryingoutinstallationofcarrierpipeatallcrossingslikeroads/nallasatdesignateddepthsbyopencut/jacking/boring(exceptatcasedcrossingsorcrossingscarriedoutbyHDDmethod).
Carryingoutinstallationofcarrierpipeinthecasingpipeatcasedcrossings(excludinginstallationofcasingpipeswhichiscoveredseparately).
Supply&Installationof10mmthickneopraneSheet/shallbeinstalledasperstandarddrawingno.TEINDSTDGM2014atforeignpipelinecrossing,UndergroundEHVpowercable(66KV)
crossingandHTpowercablecrossinglocations.

Coatingoffieldweldjoints,longradiusbends,buriedfittings&valvesetc.includingsupplyofcoatingmaterialsdulyapprovedbyowneretcasperspecification.
1

CountingthenumberandtypeoftreescutinpresenceofDFO/concernedauthoritiesandkeepingrecordthereof;stackingandhandingoverofallcuttrees.

Rev.208.04.2013

CityGasDistributionProjectinNCTofDelhiandNCRRegion

Page2of57

SCHEDULEOFRATESFORRATECONTRACTFORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESIN

ItemNo.

Description

Unit

Quantity

UNITPRICEINCLUSIVEOFALL
TAXESINCLUDINGBOCWTAX
(EXCLUDINGSERVICETAX),DUTIES,
LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSITINSURANCEOF
FREEISSUEMATERIALSASDEFINED
INBIDDOCUMENT

1
Installation/loweringthepipelineintrenchtorequireddepth,placementof1.0mmthicknessHDPEyellowcolorwarningmat(freeissuebyOwner)overthepipelinealongthecompleteroute,
paddingaroundpipelinewithsuitableapprovedsoilincludingsupplyofpaddingmaterial,backfillingwithavailable/borrowedearth,approvedexcavatedmaterialand/orothersuitablesoilby
crowning.Compactionwithjumpingjackcompactorandwateratsubsequentlayersof150mmorasdirectedbyOwner/OwnersRepresentative.Alltiles/slabs/curbstonesetc.removedduring
excavationshallbeplacedproperly.Roads,pavements,footpaths,etc.tobemademotorablewhereverpipelineislaid.
SupplyandInstallationofslopebreakers,bankprotectionwhereverrequiredandasdirectedbyOwner/Owner'sRepresentative.
Carryingoutaircleaning,pigging,flushing,cleaningandhydrostatictestingofcompletepipelinewithquantityofcorrosioninhibitorincludingpretestingofdesignatedsectionscompleteasper
specification and approved by Owner/ Owners Representative to specified pressures indicated elsewhere and duration after stabilization as per specification, providing all equipment, pumps,
fittings,instruments,deadweighttester,pressurerecorder,thermocouplesetc.,andservices, supervision,labor,consumables,waterincludingsupplyofcorrosioninhibitor,air,etc.asrequired,
locatingofleaksandrectificationofdefectsattributabletoContractor(rectificationofdefectsinlinepipematerialnotattributabletocontractorshallbepaidseparatelyasperscheduleofrate),re
testingafterrectification,dewateringaftersuccessfulcompletionofhydrotestingofentiresectionandasapprovedbyOwner/OwnersRepresentative.
Alltiein,includingthetieinswithadjacentsectionofthepipeline.
Protectivecoatingof450micronthicktwocomponentepoxy/polyurethane(appliedwiththehelpofminimumthreecoats)includingsupplyofmaterialsdulyapprovedbyownerforallpiping,
Valves,fittings,structuralsteelsetc.forburiedinstallationandinsidethevalvepit.
Final clean up and restoration of right of use and disposal of debris and surplus material to designated disposal areas and reinstating the area toitsearlier state andasdirected by Owner/
OwnersRepresentative.
Precommissioning activities like swabbing, drying of the complete pipeline network and the associated facilities being installed to the specified acceptance criteria as per Owner/Owner's
Representative.
Maintainingthecompletedpipelines/installationforanydefect,failuresduringdefectliabilityperiod(i.e.12monthsfromdateofcommissioningofPipeline).
Ensuring proper safetycodes&practicesduringconstruction,cordoningofftheworkarea,providingwarningsigns,barricadingand propertools&tackles,Equippingtheworkerswithsafety
boots,helmetsandflorescentaprons&barricadingasperdrawingno.TEINDSTDGM9001.Thebarricadingistobedonethroughoutalongthetrench/weldingstring.
Anyotheractivitiesnotmentioned/coveredexplicitlyabove,butotherwiserequiredforsatisfactorycompletion/operation/safety/statutory/maintenanceoftheworksshallalsobecoveredunder
thescopeofworkandhastobecompletedbytheContractorwithinspecifiedtimescheduleatnoextracosttoowner.Thepipelinelayingshallbedoneasperspecification,code&standard&
guidelinebyOwner/OwnersRepresentative.
Preparationofasbuiltdrawings,pipebooks(1setoftracingonpolyesterfilmand3setsofasbuiltdrawingsand1softcopyand6copiesofpipebook.)Alltheworksshallbeexecutedin
accordance with the provision of contractincludingcarrying out all temporary/ancillary/auxiliary works required oftheperformance of theworksand all other acts,deeds, matters and things
necessarytomakethepipelinereadyforpipecommissioningactivities.
1.1

SpecifiedNB(inch)

Thkinmm(inch)

Material

a)

12"

6.4(0.252")

API5LX60(ERW/SAW/SMLS)

1500

b)

8"

8.2(0.322")

API5LGr.B(ERW/SMLS)

4500

c)

6"

6.4(0.252")

API5LGr.B(ERW/SMLS)

900

d)

4"

6.4(0.252")

API5LGr.B(ERW/SMLS)

150

Note:
Rev.208.04.2013

CityGasDistributionProjectinNCTofDelhiandNCRRegion

Page3of57

SCHEDULEOFRATESFORRATECONTRACTFORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESIN

ItemNo.

Description

Unit

Quantity

47000

Nos.

UNITPRICEINCLUSIVEOFALL
TAXESINCLUDINGBOCWTAX
(EXCLUDINGSERVICETAX),DUTIES,
LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSITINSURANCEOF
FREEISSUEMATERIALSASDEFINED
INBIDDOCUMENT

1.Thisitemshallbeapplicableforthepipeline,fittings,accessories,valvesetc.betweenexisting/proposedundergroundtapoffpointsfromexistingsteelmaingridtoI.J.forU/Gportion
2.Forrestorationofasphalt/concreteroads,theitemforconstructionofasphaltedtop/concretetop/redstoneshallbepaidseparately.
1.2

Pipelinelayingliaisoningandgettingpermissionsfromthestatutoryauthorities.
Applyingpermission,followupandgettingpermissionfromthestatutoryauthoritiesshallbeincontractorsscope,onlyR.RchargesshallbepaidbyOwnertothe12",8",6"&4"NBsteel
pipeline&180mm&125mmMDPEPipeline.
Note:Singlerateshallbepayableforpipelinelaidincommontrench.

1.3

Pipelinelayingliaisoningandgettingpermissionsfromtherailwayauthority.
Applyingpermission,followupandgettingpermissionfromthestatutoryauthoritiesshallbeincontractorsscope,onlyR.RchargesshallbepaidbyOwnertothe12",8",6"&4"NBsteel
pipeline&180mm&125mmMDPEPipeline.
Note:Singlerateshallbepayableforpipelinelaidincommontrench.

LayingofcarbonsteelpipelineandMDPEPipelineincommontrenchasperDrawingNo.P.003960L161009
LayingofcarbonsteelpipelineasperscopegiveninSORNo.1abovebutwithaminimumcoverofadditionof1m,ODofMDPEpipe&300mmandlayingofMDPEpipelineinthesame
trench.WorkinvolvedinlayingofMDPEpipelineshallbeasfollows:"Receivingandtakingover"asdefinedinthespecification,handling,loading,transportationandunloadingofOwner
suppliedMDPEpipe(PE80,SDR11)of180&125mmdiafromdesignatedplace(s)ofissue/dumpsite(s)tocontractor'sownstockyard(s)/workshop(s)/worksite(s)includingproper
storing,stacking,identification,providingsecurity&insurancecover,stringing/uncoilingonthepipelinerightofuse,laying/installationofMDPElinepipeandownersuppliedassociated
fittingsandaccesoriesi.e.bends,couplers,Endcaps,Tee,PEreducer,CStoPEfittings,Valvessaddletappings,warningmatetc.,includingexecutingofallworks,arrangementofall
additionallandrequiredforcontractor'sstorage,fabrication,accessforconstruction,supplyofallmaterials(exceptOwnersuppliedmaterials),consumables,labourandotherincidentalworks
andhandingoverthesamesurplusmaterialstotheOwner'sdesignatedstockyard(s)
Uncoiling/stringingofpipes,clamping,jointingofpipeends/fittings/valvesbyqualifiedpersonnelusingapprovedtechniquesasperspecifications.
LoweringtheMDPEpipelineinsametrenchwhereincarbonsteelpipehasbeenlaid(asperscopegiveninSORitemno.1abovebutwithaminimumofadditionof1m,ODofMDPEpipeand
300mm)andpaddingdonetothethicknessasindicatedinthespecificationandenclosedcrosssectionaldrawing,providingrequireddepthofpaddingintrenchbed&aboveandaroundthe
pipeline.
Installationandelectrofusionjointingofvalveswhereverrequiredandasdirectedbyengineerincharge.
Cleaning,flushing,pneumatictesting,purgingwithnitrogenasperspecificationandapprovedproceduresprovidingalltoolsandtackles,nitrogen,instruments,manpowerandrelated
accessoriesandaspertheinstructionsoftheEIC.
Anyotheractivitiesnotmentioned/coveredexplicitlyabove,butotherwiserequiredforsatisfactorycompletion/operation/safety/statutory/maintenanceoftheworksshallalsobecoveredunder
thescopeofworkandhastobecompletedbytheContractorwithinspecifiedtimescheduleatnoextracosttoowner.Thepipelinelayingshallbedoneasperspecification,code&standard&
guidelinebyOwner/OwnersRepresentative.
Oncompletionofgaschargingofpipelines.Preparationandsubmissionofasbuiltdrawings,crossingdetails,termination,utilitygraphs.

12"NBCarbonsteel&125mmMDPEPipeinthecommontrench

500

8"NBCarbonsteel&125mmMDPEPipeinthecommontrench

1500

6"NBCarbonsteel&125mmMDPEPipeinthecommontrench

300

Rev.208.04.2013

CityGasDistributionProjectinNCTofDelhiandNCRRegion

Page4of57

SCHEDULEOFRATESFORRATECONTRACTFORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESIN

ItemNo.

Description

4"NBCarbonsteel&125mmMDPEPipeinthecommontrench

Unit

Quantity

50

UNITPRICEINCLUSIVEOFALL
TAXESINCLUDINGBOCWTAX
(EXCLUDINGSERVICETAX),DUTIES,
LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSITINSURANCEOF
FREEISSUEMATERIALSASDEFINED
INBIDDOCUMENT

Note:AtcrossingsthesteelandMDPEpipesshallbesepratedtomaintaintheminimumrequiredinterdistance.
3

Supply&InstallationofCasingpipe:
Supply&InstallationofCasingpipe(Carbonsteel)byHDD/Jacking/boringforNala,road.Railandcanalcrossingswhereverrequiredinalltypesofsoilsandterrain,includinglayingof2nos.
HDPEtelecomduct(freeissuematerial)&allassociatedworksincludingsupplyofallothermaterials,equipment,consumables,manpower,weldingofsteelcasingandjointingofHDPETelecom
Ductincludingvisualinspectionofallweldjoints/HDPEJoints,backfillingandrestorationasoriginalofthefacilitycrossedandperformingallworksasperdrawings,specificationsand
instructionsofOwner/Owner'sRepresentativeandprovisionsofcontractdocument.Submissionofasbuiltdrawings.

3.1

Carbonsteelcasing

24"NBCarbonsteelcasingpipe(HDDMethod/Augurboring)

150

18"NBCarbonsteelcasingpipe(HDDMethod/Augurboring)

300

12"NBCarbonsteelcasingpipe(HDDMethod/Augurboring)

60

8"NBCarbonsteelcasingpipe(HDDMethod/Augurboring)

NA

3.2

NA

HDPECasingalongwithMDPEPipe(125mm)carrierpipe

250NBHDPEcasingpipe(HDDMethod/Augurboring)

400

250NBHDPEcasingpipe(Moling/JackingMethod)

200

Note:
1.PaymentshallbebasedontheactuallengthofCasedcrossings/HDD.
2.Casingendseals,casinginsulators,Vent&drainconnectionsareprovidedbythecontractor.
3.AboveRateforthisSORitemno.3.1forsteelpipelineisnotinclusiveofcarrierpipestringpreparation(welding,NDT,Pretesting,coating,Hydrotesting,Precommissioningetc.).Theseworks
shallbepaidasperSORitemno.1
4.AboveRateforSORitemno.3.2forMDPEpipelineisinclusiveforuncoiling/stringingofpipes,clamping,jointingofthepipeends/fittings/valves,Cleaning,flushing,pneumatictesting
aspertheinstructionsoftheEIC.
5.Contractorshallprocuretheonlycarbonsteelcasingpipeasperattachedspecification.
6.HDPECasingshallbeprovidedasafreeissuematerialtothecontractor.
4

InstallationofCrossingswithoutcasingpipe:

Rev.208.04.2013

CityGasDistributionProjectinNCTofDelhiandNCRRegion

Page5of57

SCHEDULEOFRATESFORRATECONTRACTFORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESIN

ItemNo.

Description

Unit

Quantity

UNITPRICEINCLUSIVEOFALL
TAXESINCLUDINGBOCWTAX
(EXCLUDINGSERVICETAX),DUTIES,
LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSITINSURANCEOF
FREEISSUEMATERIALSASDEFINED
INBIDDOCUMENT

Receivingandtakingoverasdefinedinthespecifications,handling,loading,transportationandunloadingofOwnersupplied3LayerPEcoatedlinepipesfromOwnerdesignatedstockyardto
Contractor'sownstockyards/workshops/worksitesincludingpreliminaryactivities,carryingoutinspectionofownersuppliedmaterials(3LPEcoatedlinepipe)atthetimeoftakingoverand
supplyofallmaterials(except3LPEcoatedlinepipe)consumables,equipment,laborandotherinputs,carryingoutalltemporary,ancillary,auxiliaryworks,asperdrawings,Specifications,
otherprovisionsofContractdocumentandinstructionofOwner/OwnersRepresentative,includingbutnotlimitedtocarryingoutthefollowingworks:
SitePreparation,welding,radiography,coatingfieldjointswithspecialtypeheatshrinkablesleeves(Direx)pretestingofcompletedcarrierpipeandmakingthestringandweldingofentry&exit
pointofHDD/boringwithmainpipeline.
Preinstallationofhydrotestingincludingleaksandrepairofdefectsandretestingetc.fordefectsattributedtocontractor'sfaultywork
Hydrotestingwithmainpipelineandprecommissioningactivitieslikeswabbing,dryingtothespecifiedcriteriaasperowner/ownersrepresentative.
Purgingwithnitrogen(Includingsupply)andCommissioningofcompletepipelinenetworkincludingsupplyofallequipment,machinery,consumables,toolsandtackles,manpower,etc.,asper
specification,provisionsofbiddocumentandinstructionsofOwner/OwnersRepresentative.
Finaldossierallnotes&calculationsasrequiredinthespecification.
Preparationofasbuiltdrawings,pipebooks(1setoftracingonpolyesterfilmand6setsofasbuiltdrawingsand1softcopyand3copiesofpipebook.)
InstallationofCrossingsofcarrierpipesbyHDD/boringforRail,Road,NalaandCanalcrossingsetcwhereverrequiredinalltypesofsoilsandterrain,includinglayingof2nos.HDPEtelecom
duct(freeissuematerial)&allassociatedworksincludingsupplyofallothermaterials,equipment,consumables,manpower,jointingofHDPETelecomDuctincludingvisualinspectionofall
weldJoints/HDPEJoints,backfillingandrestorationasoriginalofthefacilitycrossedandperformingallworksasperdrawings,specificationsandinstructionsofOwner/Owner'sRepresentative
andprovisionsofcontractdocument.
Anyotheractivitiesnotmentioned/coveredexplicitlyabove,butotherwiserequiredforsatisfactorycompletion/operation/safety/statutory/maintenanceoftheworksshallalsobecoveredunder
thescopeofworkandhastobecompletedbytheContractorwithinspecifiedtimescheduleatnoextracosttoowner.Itshallbedoneasperspecification,code&standard&guidelinebyOwner/
OwnersRepresentative.
a

Installationof12"NBPECoatedSteelpipewithoutanycasingbyHDD

7050

Installationof8"NBPECoatedSteelpipewithoutanycasingbyHDD

21600

Installationof6"NBPECoatedSteelpipewithoutanycasingbyHDD

4440

Installationof4"NBPECoatedSteelpipewithoutanycasingbyHDD

720

Installationof12"NBPECoatedSteelpipewithoutanycasingbyMoiling.

500

Installationof8"NBPECoatedSteelpipewithoutanycasingbyMoiling.

1500

Installationof6"NBPECoatedSteelpipewithoutanycasingbyMoiling.

300

Installationof4"NBPECoatedSteelpipewithoutanycasingbyMoiling.

50

Installationof125mmMDPEcarrierpipewithoutanycasingbyHDD

200

Installationof125mmMDPEcarrierpipewithoutanycasingbyMoling

200

Note:
1.PaymentshallbebasedontheactuallengthofHDD/ManualMoiling.
2.RateforthisSORitemno.4e),f),g)&h)forsteelpipelineisinclusiveofpreparation,pretestingandcoatingfieldjointsheatshrinkablesleevesandrepairofpipelinecoatingofcarrierpipe
stringtillthestringreadyforpulling.
3.AboveRateforSORitemno.4i)&4j)forMDPEpipelineisinclusiveofuncoiling/stringingofpipes,clamping,jointingofthepipeends/fittings/valves,Cleaning,flushing,pneumatic
testingaspertheinstructionsoftheEIC.
Rev.208.04.2013

CityGasDistributionProjectinNCTofDelhiandNCRRegion

Page6of57

SCHEDULEOFRATESFORRATECONTRACTFORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESIN

ItemNo.

Description

Unit

Quantity

UNITPRICEINCLUSIVEOFALL
TAXESINCLUDINGBOCWTAX
(EXCLUDINGSERVICETAX),DUTIES,
LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSITINSURANCEOF
FREEISSUEMATERIALSASDEFINED
INBIDDOCUMENT

RockDrilling
Installationofcarrierpipesbyrockdrillingfornala,roadandcanalcrossingswhereverrequiredinalltypesofrockandterrain.itincludessurveyoftheundergroundutilities,submissionofprofile
forapproval,executionoftheworkasperthestandardprocedure,including,excavationofthepits,insertion/pullingofthecarrierpipe,removalofmalba,subsequentbackfillingandrestorationof
thefacilitycrossedasperoriginalcondition,includingsupplyofallothermaterials,equipment,consumables,manpower.

For8"NB

200

9,245.83

For6"NB

40

6,934.37

For4"NB

40

5,200.78

RockCutting

Excavationofhardrock,whereverhardrockofsinglepieceexceeding1.5minanydirectionandremovableonlybypneumaticchisel/drillasperthespecificationsanddirectionofEIC.Therates
arepayableoverandabovetheLayingratesasperrelevantSORItems.

240

1,618.02

HDDatMajorcrossings(River,Nala,Canal&Road)
Completeworkforthecrossingsincludingtopographic,geotechnical&hydrologicalinvestigationandalladditionaldrilledlengthsnecessitatedbycontractor'sdesignofcrossingswithHDD
lengthfrom250Mto500Manddepthbelowbedlevelmorethan10Meter,constructiondesigncalculationandengineeringofthecrossingsaccordingtodepthbelowbedlevelmorethan10
Meter,mobilizationanddemobilizationatsite(s),supplyofallmaterialsasper"Contractor'sscopeofsupply"includingCSconduitpipeinrequiredlength,allconsumablesequipment,manpower
andotherresources,andacquiringtherequiredlandforsitepreparations,andexecutionof,butnotlimitedto,thefollowingworksinaccordancewithspecifications,drawings,andasperprovisions
oftheContractdocumentandinstructionsoftheOwner/EngineerinCharge;Interpretationofthetopographical,hydrologicalandgeotechnicalsurveycarriedoutbytheContractorrequiredfor
calculationofscourlevelfordesignandconstructionofthecrossing.
Preparationofallnecessaryconstructiondrawingsalongwithdesigndocument,procedure(i.e.scourlevelcalculation&installationdesign)forOwner'sapprovalaspertheprovisionsofthe
Contractordocument,Preparationofdetailedconstructionmethodologyprocedure,Stringspreparationincludingwelding,NDTofweldsandrebevelledareas,radiography,weldrepairandretest,
pretestingofcompletedstring,corrosioncoatingoffieldjointswithheatshrinkablesleeves(direx)andweldingofentry&exitpointofHDD/boringwithmainpipeline.Postinstallationof
hydrotestingincludingleaksandrepairofdefectsandretestingetc.fordefectsattributedtocontractor'sfaultywork.Hydrotestingwithmainpipelineandprecommissioningactivitieslikeswabbing,
dryingtothespecifiedcriteriaasperowner/ownersrepresentative.Purgingwithnitrogen(Includingsupply)andCommissioningofcompletepipelinenetworkincludingsupplyofallequipment,
machinery,consumables,toolsandtackles,manpower,etc.,asperspecification,inspectionofcorrosioncoatingandrepairofdefects,Preconstructionsurveysandcollectionofallnecessarydata,
Pullingofcarrierpipeand6"CSconduitfor2nos.HDPE(includinglayingofducts),belowtheriverbedbyhorizontaldirectionaldrillingtothecorrectprofilei.e.minimum5mbelowcalculated
scourlevel.
Betweenthebanksasperapproveddrawingsandspecification,Postinstallation,hydrotestincludingleaksandrepairofdefectsandretesting,etc.Supply,fabricationandconstructionofprotective
fencingasrequired,Supply,fabricationanderectionofpipelinemarkers,Restorationandcleanupetc.,Preparationofasbuiltdrawingsandotherrecordsetc.,Allotherworksnotspecificallylisted
herein,butrequiredasperspecifications,drawings,provisionofcontractdocument,calculations,andconstructionmethodstatements,leadingtosuccessfulcompletionofworksRiverCrossing.

8"

mtr

600

12"

mtr

300

Rev.208.04.2013

CityGasDistributionProjectinNCTofDelhiandNCRRegion

Page7of57

SCHEDULEOFRATESFORRATECONTRACTFORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESIN

ItemNo.

Description

Unit

Quantity

UNITPRICEINCLUSIVEOFALL
TAXESINCLUDINGBOCWTAX
(EXCLUDINGSERVICETAX),DUTIES,
LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSITINSURANCEOF
FREEISSUEMATERIALSASDEFINED
INBIDDOCUMENT

InstallationofSVstationswithventingarrangement
Allworksforinstallationofallunderground&abovegroundpipingatallelevationsandbelowgroundatalldepthforSectionalizingValveStationasperP&IDno.P.003960P0105/P.003960P
0104&GADno.P.003960L161005/P.003960L161004inalltypeofterrainsandsoilsincluding"Receivingandtakingover"asdefinedinthespecifications,handling,loading,transportation
andunloadingofallOwnersuppliedmaterialsi.e.extendedstem,buttwelded,sectionalizingballvalve,othertypesofvalves,linepipesformainline,fittings,flanges,ventlinesfromOwner's
designatedplace(s)ofissuetoworksite,Supplyofpipes,fittings&valvesforpipingofsizebelow2"dia,supplyofallconsumables,materials,manpowerandcarryingoutallmechanicalworksof
underground and above ground piping including fabrication, welding, nondestructive testing of welds, weld repairs/ retesting, cleaning/ flushing, prehydrotesting & hydrostatic testing,
dewatering,functionaltesting,cuttingofmainlineandbeveling(ifrequired),tieinofvalveassembly,includingradiographyoftieinjoints,corrosion,coatingandexternalpaintingasrequired.
SupplyofpressuregaugesasperDataSheetInstallationofinstrumentslikepressure/temperatureinstruments/gauges,provisionfortubingtotheactuatorinfuture,obtainingallstatutory
clearances,approvalsandpermissionsfortheworks(whereverrequired).
Excavationinalltypesofsoilincludingsoft/hard/rockysurfaces,providing200mmthkPCCforvalvebasesupport,backfillingandcompactionwithapprovedsoilforinstallationofpipesand
fittings,etcincludingsandpaddingallaroundthevalvesinSVstation,pipesupportsandfencingwouldbepaidagainstseparateSORs),painting,finishing,cleanupandrestorationofsite;
preparationofasbuiltdrawings,documentsandprojectrecordsandperformingallworksasperdrawings,specifications,otherprovisionsofContractdocumentandinstructionsofEngineerin
charge.

OnpipelineofNB12"x6.4mmw.t.

Nos.

OnpipelineofNB8"x8.2mmw.t.
Note:
i)ThisworkisexclusiveofallworksassociatedwithmainpipelinecoveredunderSl.No.1above.
ii)Allcivil/structuralworksincludingareafencingandgate,pipesupports,valvechamberwillbepaidseparatelyasperunitrateprovidedelsewhereintheSORs.

Nos.

CompleteworksforTapoffPoints
Completeworksofdesign,engineering,installationofallpiping,valves,fittingsatalldepthsinsidethepitinalltypesofterrainsandsoilsincludingtransportation,handlingofallOwnersupplied
materialsfromOwner'sdesignatedissuepoint(s)toworksite,supplyofContractor'ssuppliedmaterialstoworksite(s),allmechanicalworksincludingfabrication,welding,nondestructivetesting
ofwelds,weldrepairs/retesting,cleaning/flushing,prehydrotesting&hydrostatictesting,dewatering,functionaltesting,cuttingofmainlineandbeveling(ifrequired),tieinofvalveassembly,
includingradiographyoftieinjoints,corrosion,coatingandexternalpaintingasrequired.
Allcivilworksincludingexcavationofpit,pipingsupportsincludingallPCCandRCCworksforpedestalswithinsertplatesasrequired,constructionofvalvechamberincludingwithsupplyof
allmaterialandfinishig,cleanupandrestorationofsite,fillingandgradingofareaaroundvalvestationforavoidinganylocalfloodingofareaandasperspecificationandinstructionsof
Owner/Owner'srepresentative.
Preparationofasbuiltdrawings,documentsandprojectrecordsandperformingallworksasperdrawings,specifications,otherprovisionsofContractdocumentandinstructionsofEngineerin
charge.
Note:Bolts,nuts,washer,Uclamps,gasketsetcrequiredforpipingfacilitesshallbeprocuredandsuppliedbythecontractorwithintheratequoted.
Theseitemsshallnotbeseparatelymasuredandpaid.

12"x12"

Nos.

12"x8"

Nos.

12"x6"

Nos.

Rev.208.04.2013

CityGasDistributionProjectinNCTofDelhiandNCRRegion

Page8of57

SCHEDULEOFRATESFORRATECONTRACTFORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESIN

ItemNo.

Description

Unit

Quantity

8"x8"

Nos.

6"x6"

Nos.

NA

4"x4"

Nos.

8"x6"

Nos.

8"x4"

Nos.

15

6"x4"

Nos.

UNITPRICEINCLUSIVEOFALL
TAXESINCLUDINGBOCWTAX
(EXCLUDINGSERVICETAX),DUTIES,
LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSITINSURANCEOF
FREEISSUEMATERIALSASDEFINED
INBIDDOCUMENT

NA

Note:Makingofvalvepitfortapoffpoints,pipesupportsandfencingwouldbepaidagainstseparateSORitems.

Rev.208.04.2013

CityGasDistributionProjectinNCTofDelhiandNCRRegion

Page9of57

SCHEDULEOFRATESFORRATECONTRACTFORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESIN

ItemNo.

10

Description

Unit

Quantity

UNITPRICEINCLUSIVEOFALL
TAXESINCLUDINGBOCWTAX
(EXCLUDINGSERVICETAX),DUTIES,
LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSITINSURANCEOF
FREEISSUEMATERIALSASDEFINED
INBIDDOCUMENT

Purgingandinertisationofexistingpipeline
Purgingandinertisationofexistingpipelinesectionbetweenthetwoisolationvalveswithnitrogentomakethepipelinesectionfreefromhydrocarbons(priortocarryingoutcutting/installationof
tapoffconnection)andoxygen(aftercompletionoftapoffworksincludingsupplyofrequiredquantityofnitrogenandallequipments,toolsandtackles,manpoweretc.requiredfortheworksand Nos.
asperinstructionofengineerincharge.

330

Note:RateareforNumberofNitrogencylinders
11
11.1

Pipelinelaying/installationofabovegroundpipeline
(WhereverrequiredatCNG/DRS/MRSstationsandconsumerendsetc.)
WeldingofpipeswithPipes/fittings/Valves:
Receivingandtakingoverofallfreeissuematerialsfromcompanysdesignatedplaceofissue,handlingincludinglifting,transportationfromOwnersand/orcontractorsstoragepointtowork
site/workshopasapplicableforfabricationor/andtoworksiteforfieldfabricationanderectionforallpipingitemssuppliedbyCOMPANY/CONTRACTOR.
Fabricationincludingcutting,edgepreparation,inclusiveofgrindingtheedgesofpipes,fittings,etc.tomatchwithgrindingtheedgesofpipes,fittingsetc.tomatchwiththematchingedgesof
uneven/differentthicknesswhereverrequiredfitupbending,preheatingwhereverrequired,weldingetc.pipefittingslikeelbows,tees,reducers,weldolets,sockolets,etc.ventanddrainpoint
connectionetc.includingprovidingstubinconnection,fabricatedfittingsandreinforcementpadsetc.asrequired.CarryingoutNondestructivetestingasperspecification&instructionofEIC.

12"NB

Nos.

8"NB

Nos.

20

6"NB

Nos.

4"NB

Nos.

40

2"NB

Nos.

100

1"NB

Nos.

0.75"NB

Nos.

11.2

WeldingofpipeswithFlanges
Receivingandtakingoverofallfreeissuematerialsfromcompanysdesignatedplaceofissue,handlingincludinglifting,transportationfromOwnersand/orcontractorsstoragepointtowork
site/workshopasapplicableforfabricationor/andtoworksiteforfieldfabricationanderectionforallpipingitemssuppliedbyCOMPANY/CONTRACTOR.
Fabricationincludingcutting,edgepreparation,inclusiveofgrindingtheedgesofpipes,flangesetc.tomatchwithgrindingtheedgesofpipes,flangesetc.tomatchwiththematchingedgesof
uneven/differentthickness,preheatingwhereverrequired,weldingetc.includingsupplyandfixingofalltypesofgaskets(includinggasketsforRTJflanges),boltsandnutsforallsizes.Carrying
outNondestructivetestingasperspecification&instructionofEIC.

12"NB

Nos.

8"NB

Nos.

10

Rev.208.04.2013

CityGasDistributionProjectinNCTofDelhiandNCRRegion

Page10of57

SCHEDULEOFRATESFORRATECONTRACTFORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESIN

ItemNo.

Description

Unit

Quantity

6"NB

Nos.

4"NB

Nos.

10

2"NB

Nos.

40

1"NB

Nos.

0.75"NB

Nos.

11.3

UNITPRICEINCLUSIVEOFALL
TAXESINCLUDINGBOCWTAX
(EXCLUDINGSERVICETAX),DUTIES,
LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSITINSURANCEOF
FREEISSUEMATERIALSASDEFINED
INBIDDOCUMENT

Erection&Testing:
Completeworkoferection,painting,testingandmakingreadyforfurthercommissioning/startupcarbonsteelpipingandfittingsofallsizesandratingsincludingsupply&installationof,all
fittingslikeelbow,tees,reducers,swages,weldolet,sockolets,nipples,flanges,blindflanges,spectacleblindflanges,valves,pipesofsizesbelow2NBandofallratingsincludingsupplyofall
consumables,equipment,manpowerandotherresourcesandexecutionofbutnotlimitedtothefollowingworksinaccordancewithrelevantspecifications,drawings,scopeofworkandinstruction
ofOwner/Owner'sRepresentativeandasperallprovisionsofthecontractdocument.
Erectionofpipesofalltypesandthicknessoversleepers,overheadonrackandatallelevations,connectingwithequipmentnozzle,aligningandinstallationforalltypesofvalves,allonline
instruments andfittingsofallsizes of elbow,reducers,tees,flangesblindflange,spectacleblindflanges,branchconnection/tapping,ventsanddrains,requiredforprocessandhydrotesting,
tappingforpressuregaugesthermowellssampleconnections,etc.
Paintingof entiresystem(includingallpipesandaccessories)asperspecification,includingsupplyofapprovedpaintsandprimers,preparation ofsurfaceandapplicationofprimerandpaint,
identification lettering/numbering, color coding, etc. as specified including rub down & touch up of shop primer or scrapping of shop primer wherever required by COMPANY and providing
scaffoldingforallheightsetc.Cleaningandflushingbywater/compressedair,testingofthesystemincludinghydrostatic,pneumaticandanyothertypeoftestingasspecified,draining,dryingby
compressedair/othermethodsapprovedbyCOMPANY.
Cleaningandflushingbywater/compressedair,testingofthesystemincludinghydrostatic,pneumaticandanyothertypeoftestingasspecified,draining,dryingbycompressedair/othermethods
asapprovedbyOwner.
CompletionofallsuchworkinallrespectasperscopeofworkandasperdrawingsspecificationsandinstructionsoftheCOMPANYandkeepinginthesystemreadyinallrespectsforfurther
commissioningandstartup.
Hookingupwithothersystempipingatbatterylimit.
Preparationofisometric,fabricationdrgs.Billofmaterialsasperspecifications,drawingsandinstructionofOwner/OwnersRepresentative
Diameter

12"NB

50

8"NB

50

6"NB

15

4"NB

100

2"NB

160

1"NB(Includingsupplyofpipe,fittings,flanges,valvesandotheritemsrequired).

0.75"NB(Includingsupplyofpipe,fittings,flanges,valvesandotheritemsrequired).

Rev.208.04.2013

CityGasDistributionProjectinNCTofDelhiandNCRRegion

Page11of57

SCHEDULEOFRATESFORRATECONTRACTFORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESIN

ItemNo.

Description

UNITPRICEINCLUSIVEOFALL
TAXESINCLUDINGBOCWTAX
(EXCLUDINGSERVICETAX),DUTIES,
LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSITINSURANCEOF
FREEISSUEMATERIALSASDEFINED
INBIDDOCUMENT

Unit

Quantity

Nos.

12

M.Ton

0.15

80,901.00

Note:Bolts,nuts,washer,Uclamps,gasketsetcrequiredforpipingfacilitiesshallbeprocuredandsuppliedbythecontractorwithintheratequoted.Theseitemsshallnotbeseparatelymeasured
andpaid.
h

Providing&installationofSSpressuregauge(makewaree)asperdatasheetattachedinthetender

12

Pipesupports&structures
Supply,fabricationanderectionofalltypesofpipesupportsofMSmateriallikeclamps,saddle,guidestops,cradles,turnbuckles,anchors,Tposts;stockade/trestleandpipebridgefor
overheadpiping;framesforcanopy,approachladdersandplatforms,crossover,cabletraysupportsetc.includingpaintingsuitableforhighlycorrosiveareaasperspecificationlaborand
supervision&completeworkasperspecificationsandinstructionofEngineerincharge(Bolts,nuts,washers,Uclampsetc.forsupportingshallbesuppliedbythecontractorwithintherates
quoted.Theseitemswillnotbemeasuredandpaidseparately)thisworkistobecompleteinallrespectasperscopeofwork.

13

Structuralworks(Fencing&Gate)

a.i

Supplyanderectionofsingleleafmildsteelgate2.5mhighwithmeshupto2mheightandbarbedwirefencingand2mwidecompleteinallrespectincludingpaintingasperspecificationonall
MSitems,allworksasperspecificationanddrawingsexcludingfoundationsandRCC

No.

19,069.52

a.ii

Supplyanderectionofdoubleleafmildsteelgate2.5mhighwithmeshupto2mheightandbarbedwirefencingand4mwidecompleteinallrespectincludingpaintingasperTSonallMS
items,allworksasperspecificationanddrawingsexcludingfoundationsandRCC

No.

22,536.71

Supplyofallmaterials,fabricationanderectionofchainlinkfencing2.5mhighwithmeshupto2mheightandbarbedwirefencingcompleteinallrespectincludingpaintingasperTSonallMS
items,allworksasperspecificationanddrawingsexcludingfoundationsandRCC

RM

30

2,889.32

NOTE:Ratetoincludecostofalllabor,tools,tackles,equipment,hirecharges,supplyofallmaterialssuchasminimum43gradecementincludingsulphateresistantcementforsubstructures,
R/Fsteel,inserts,bolts,conduits,bitumen,otherminorconstructionmaterials,shuttering,stinging,earthworkinexcavationandbackfillingusingserviceableearthinallconditions,shorting
bailingandpumpingoutwater,testingofconcrete,curingetc.withallbyeworksandsundryworks.
14

PermanentMarkers
PermanentMarkerssupply,fabricationandinstallationofalltypesofpermanentmarkersalongtherouteincludingallassociatedcivilworkssuchasexcavationinalltypesofsoil,constructionin
alltypesofsoil,constructionofpedestalsandgroutingwithconcrete,clearing,supplyandapplicationofapprovedcolorandqualityofprimerandpaint(powdercoated),stencillettercuttingfor
numbers,direction,chainageetc.,restorationofareatooriginalconditionandperformingallworksasperdrawing,specificationandinstructionofOwner/OwnersRepresentative

RCCroutemarkerasperdrawingno.P.003960L160106

Nos.

915

WarningsignwithPost&foundationsasperdrawingno.TEINDSTDGM9004.Itshallbepowdercoatedonly&beforeinstallingtakeapprovalfromtheEIC.

Nos.

315

15

ConstructionofRCC/Brickvalvechamber

Nos.

Allcivilworksincludingsupplyofallmaterial,excavationofpit,piping&valvesupportsincludingallPCCandRCC/Brickworksforvalvespit,pedestalswithinsertplatesasrequiredsealingof
pipeatvalvepits,providingcoveretcandfinishing,cleanupandrestorationofsite,fillingandgradingofareaaroundthevalvestationtoavoidanylocalfloodingofarea,asperspecification
enclosedandinstructionofEngineerinCharge.
a

BrickChamber(Drawingno.P.003960C149011)
Size2mx1.5m

Rev.208.04.2013

CityGasDistributionProjectinNCTofDelhiandNCRRegion

Page12of57

SCHEDULEOFRATESFORRATECONTRACTFORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESIN

ItemNo.

Description

Unit

Quantity

UNITPRICEINCLUSIVEOFALL
TAXESINCLUDINGBOCWTAX
(EXCLUDINGSERVICETAX),DUTIES,
LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSITINSURANCEOF
FREEISSUEMATERIALSASDEFINED
INBIDDOCUMENT

BrickChamber(Drawingno.P.003960C149012)
Size1.5mx1.5m

Nos.

RCCChamber(Drawingno.P.003960C149009)
Size2mx1.5m

Nos.

22

RCCChamber(Drawingno.P.003960C149010)
Size1.5mx1.5m

Nos.

22

16

PCC

ProvidingandlayingPCC(1:2:4)aspertechnicalspecifications&instructionofEngineerincharge.

m3

5,431.92

ProvidingandlayingPCC(1:4:8)aspertechnicalspecifications&instructionofEngineerincharge.

m3

4,622.91

17

RCC

m3

10,401.56

Design,detailengineeringofTCPsystembasedonsoilresistivitymeasuredfrompipelineROW,SoilIonic&MicrobialLoading,InterferingelementssurveysfrompipelineROW.

Nos.

10

SoilResistivity(Atevery1000meter),SoilIonic&MicrobialLoading(Atevery5KmandwhereverSoilvariation)andInterferingelementssurveysfrompipelineROW.

Km

47

ProvidingandLayingreinforcedcementofgradeM20with20mmanddowngradecrushedstoneaggregateinalltypesofstructureslikefoundations,pedestalsetc.atalldepths&heightsasper
theinstructionofEngineerincharge.
18

TemporaryCathodicProtection:
12",8",6"&4"NB(TotalLength=47KM)

18.1
18.1.1

18.2

Supply,installation,Testing&CommissioningofTestleadPoints(TLP)includingweatherproofTestLeadBoxasspecifiedinspecificationwithbacklitestrip,boltterminals,4diaheavyduty
pipeattopendtofitthetestleadboxandbaseplateweldedatthebottomincludingMSbendforconcreteBase,Bend,Cables,pipetocableconnection,EpoxyEncapsulation&Miscellaneoussuch
asconnectors,Excavationandbackfillingtrenchesforcablelaying&PinBrazingetc.,Theworkshallincludesupply&fixingofanoncorrosivenameplatecontainingthedetailslikeKMlocation,
identification,TLPNo,Directionofflow,connectionscheme,typeetc.,onthesideofTopboxincludingthecostofalllabour,materials,tools&tacklesetc.,
cablesareannealedhighconductivity,tinned,strandedcopper
conductor,XLPEinsulated,650/1100Vgrade,PVCsheathedorasperspecification.

18.2.1

TypeAforPotentialMeasurementwithminimumtwocablesincluding1Cx06Sq.mm&1Cx10Sq.mmarmouredPotentialmeasurementcables,pinbrazingconnectionencapsulationkitetc.,

Nos.

18.2.2

TypeA1forCurrentMeasurementwithminimumfourcablesincluding1Cx06Sq.mm&1Cx10Sq.mmarmouredPotentialmeasurementcables,pinbrazingconnectionencapsulationkitetc.,

Nos.

18.2.3

TypeBforGalvanicAnodetoPipeConnectionwithminimumtwocablesincluding1Cx06Sq.mm&1Cx10Sq.mmPotentialmeasurementcable&1Cx10Sq.mmarmouredgalvanicanode
connection,pinbrazingconnectionencapsulationkitetc.,

Nos.

40

18.2.4

TypeFforforeignPipelineCrossingwithminimumfourcablesincluding1Cx06Sq.mmarmouredPotentialmeasurementcables&1Cx25Sq.mmarmouredBondingConnection,pinbrazing
connectionencapsulationkitetc.,

Nos.

18.2.5

TypeDforCasedCrossingwithminimumfourcablesincludingtwocablesof1Cx06Sq.mmPotentialmeasurementcable&twocablesof1Cx10Sq.mmarmouredanodeconnection,pinbrazing
connectionencapsulationkitetc.,

Nos.

Rev.208.04.2013

CityGasDistributionProjectinNCTofDelhiandNCRRegion

Page13of57

SCHEDULEOFRATESFORRATECONTRACTFORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESIN

ItemNo.

Description

Unit

Quantity

18.2.6

TypeEforGroundingCellwithminimumfourcablesincludingtwocablesof1Cx06Sq.mmarmouredPotentialmeasurementcables&twocablesof1Cx25Sq.mmarmouredgalvanicanode
connection,pinbrazingconnectionencapsulationkitetc.,

Nos.

27

18.2.7

TypeHforHTLineCrossingwithminimumtwocablesincluding1Cx06Sq.mmarmouredPotentialmeasurementcables&1Cx25Sq.mmarmouredgalvanicanodeconnection,pinbrazing
connectionencapsulationkitetc.,

Nos.

18.2.8

Supply&InstallationofTeststationHTLineCrossingwithminimumtwocablesincluding1Cx06Sq.mmarmouredPotentialmeasurementcables&1Cx25Sq.mmarmouredgalvanicanode
connection,pinbrazingconnectionencapsulationkitetc.,toaccomodate5/25/50KApolarizationcell,includingterminalplate,lock,connectiondiagram,plates,cabletermination,lugs,etccomplete
inallrespectincludinglabour,tools,tackles,consumableslikebolts,nut,washeretc.asperdrawing,specificationshallbemountedonexistingfoundationanddirectionofIGL.

Nos.

18.2.9

Supply&Installationof05KAPolarizationcell.ItshouldbeutilizedinvandalproofareasforpassageofinducedvoltageonthepipelineinthevicinityofACtransmissionlinestoearthduring
normalaswellasfaultconditions.ItshallmaintaintheisolationbetweenZnanodeandpipelinesothatCPcurrentshallnotbeconsumedbyZnanode.Polarizationcellshallbeinstalledinvandal
proofareasinaIP55enclosure.

Nos.

Supply&Installationof25KAPolarizationcell.ItshouldbeutilizedinvandalproofareasforpassageofinducedvoltageonthepipelineinthevicinityofACtransmissionlinestoearthduring
18.2.10 normalaswellasfaultconditions.ItshallmaintaintheisolationbetweenZnanodeandpipelinesothatCPcurrentshallnotbeconsumedbyZnanode.Polarizationcellshallbeinstalledinvandal
proofareasinaIP55enclosure.

Nos.

Supply&Installationof50KAPolarizationcell.ItshouldbeutilizedinvandalproofareasforpassageofinducedvoltageonthepipelineinthevicinityofACtransmissionlinestoearthduring
18.2.11 normalaswellasfaultconditions.ItshallmaintaintheisolationbetweenZnanodeandpipelinesothatCPcurrentshallnotbeconsumedbyZnanode.Polarizationcellshallbeinstalledinvandal
proofareasinaIP55enclosure.

Nos.

18.3

Supply&InstallationofprepackedMgAnode(7.6Kg)withonecableincluding1Cx10Sq.mmUnarmouredcable(withsufficentlength)&encapsulationkitforcableconnectionterminationof
AnodetailcableintheTLPetc.,

Nos.

50

18.4

Supply&InstallationofSurgeDiverterforHTlineCrossing

Nos.

18.5

Supply&InstallationofprepackedZincAnode(40yearsdesignlife/Min.20Kg)forHTLinecrossingwithonecableincluding1Cx25Sq.mmarmouredcable(withsufficentlength),
encapsulationkitterminationofAnodetailcableintheTLPetc.,.

Nos.

36

18.6

Supply&InstallationofSparkGapArresterforInsulatingJoint.

Nos.

27

18.7

Supply&InstallationofZincGroundingCellof20KgeachforIJwithtwocablesincluding1Cx25Sq.mmarmouredcable(withsufficentlength),encapsulationkitterminationofAnodetailcable
intheTLPetc.,

Nos.

27

18.8

Supply&InstallationofcablesAnnealedhighconductivity,tinned,strandedcopperconductor,XLPEinsulated,650/1100Vgrade,PVCsheathedorasperspecificationandMiscellaneoussuch
astermination,tagging,excavatingthetrenchforcablelaying,backfilling,etc.,includingthecostofalllabour,materials,toolsandtackles.(Thisunitrsteshallbeapplicableonlyforanyadditional
workonexisting/forthesamesystem)

18.8.1

1Cx6Sq.mmarmouredPotentialMeasurement&referencecellcable.

10

18.8.2

1Cx10Sq.mmunarmouredAnodeTailCable.

10

18.8.3

1Cx10Sq.mmarmouredCurrentMeasurement

10

18.8.4

1Cx25Sq.mmarmouredBonding/GroundingCell

10

MonitoringtheInstalled(TCP)SystemalongwithIGL/PMConmonthlybasisandsubmissionofmonitoringreporttoIGL&PMC,tillPCPsystemiscommissionedoruptohandedovertheTCP
systemtoIGL(O&M).

LS

18.9

Rev.208.04.2013

CityGasDistributionProjectinNCTofDelhiandNCRRegion

UNITPRICEINCLUSIVEOFALL
TAXESINCLUDINGBOCWTAX
(EXCLUDINGSERVICETAX),DUTIES,
LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSITINSURANCEOF
FREEISSUEMATERIALSASDEFINED
INBIDDOCUMENT

Page14of57

SCHEDULEOFRATESFORRATECONTRACTFORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESIN

ItemNo.

19

20

Description

CIPLSurveyforUndergroundSteelPipeline:
CIPLSurveyofundergroundsteelpipelineofdifferentsizesofPipesrangingfrom4"to12toassesstheeffectivenessofCPsystemofthepipeline,tostudytheinterferenceeffectdueto
Tractions/Transmissionlines&foreignpipelinesetc.andtoprovidemitigationmeasures&complianceforthesame.
DCVGSurveyforUndergroundSteelPipeline:
DCVGSurveyofundergroundsteelpipelineofdifferentsizesofPipesrangingfrom4"to12toidentifythepipelinesectionswherecoatingisgoodandbad,topinpointcoatingdefectinpipeline
sectionswherecoatingisbad,togiveaccuratecoatingdefectlocationsforfuturecoatingrepairs,tosizethedefectsbystandardmethodandclassifydefectsasAnodicorCathodic.Repairofcoating
defectsincludingallassociatedcivilworks.

Unit

Quantity

KM

27

KM

20

Nos.

UNITPRICEINCLUSIVEOFALL
TAXESINCLUDINGBOCWTAX
(EXCLUDINGSERVICETAX),DUTIES,
LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSITINSURANCEOF
FREEISSUEMATERIALSASDEFINED
INBIDDOCUMENT

NOTESforitemno.19&20:
1.Anyothermaterial&activitiesnotmentioned/coveredabove,butotherwiserequiredforsatisfactorycompletion/safetyofworkasdefinedintenderhastobesupplied/donebycontractorwithin
quotedprice.Noextrapaymentshallbemade.
2.Theabovequantitiesaretentativeandmayvaryduringdetailedengineeringconsiderablydependinguponsitecondition,methodologyadoptedaspersiterequirementwithdueapprovalof
Owner/Consultant.
3.Thequantitymayvaryduringexecutionstageandpaymentshallbemadebasedontheworkfortheactualquantityexecuted.

21
21.1
21.1.1

TELECOMMUNICATIONSITEWORK(asperscopeofworkandStandardSpecificationofBiddocuments)
SupplyandInstallation&CommissioningofElectronicMarkerSystemasperspecification,testcertificateanddocumentsetc.consistingof:
ElectronicMarkerasperattachedspecificationandinstructionsofOwner/owner'srepresentative.
TotalRs.(infigure)

SEAL&SIGNATUREOFBIDDER

Rev.208.04.2013

CityGasDistributionProjectinNCTofDelhiandNCRRegion

Page15of57

TenderNo.IGL/ND/C&P/
P12500

LAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINNCTOFDELHI

Rev.208.04.2013

SERVICETAX@
12.36%ONUNIT
RATE(COL.3)

UNITPRICEINCLUSIVEOFALL TOTALPRICEINCLUSIVEOF
TAXESINCLUDINGBOCWTAX ALLTAXESINCLUDINGBOCW
&SERVICETAX,DUTIES,
TAX&SERVICETAX,DUTIES,
LEVIES,FREIGHT,INSURANCE LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSIT
INCLUDINGTRANSIT
INSURANCEOFFREEISSUE
INSURANCEOFFREEISSUE
MATERIALSASDEFINEDINBID MATERIALSASDEFINEDINBID
DOCUMENT
DOCUMENT
(3)+(4)
(2)X(5)
5

CityGasDistributionProjectinNCTofDelhiandNCRRegion

Page16of57

LAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINNCTOFDELHI

Rev.208.04.2013

SERVICETAX@
12.36%ONUNIT
RATE(COL.3)

TenderNo.IGL/ND/C&P/
P12500

UNITPRICEINCLUSIVEOFALL TOTALPRICEINCLUSIVEOF
TAXESINCLUDINGBOCWTAX ALLTAXESINCLUDINGBOCW
&SERVICETAX,DUTIES,
TAX&SERVICETAX,DUTIES,
LEVIES,FREIGHT,INSURANCE LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSIT
INCLUDINGTRANSIT
INSURANCEOFFREEISSUE
INSURANCEOFFREEISSUE
MATERIALSASDEFINEDINBID MATERIALSASDEFINEDINBID
DOCUMENT
DOCUMENT
(3)+(4)
(2)X(5)

CityGasDistributionProjectinNCTofDelhiandNCRRegion

Page17of57

LAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINNCTOFDELHI

Rev.208.04.2013

SERVICETAX@
12.36%ONUNIT
RATE(COL.3)

TenderNo.IGL/ND/C&P/
P12500

UNITPRICEINCLUSIVEOFALL TOTALPRICEINCLUSIVEOF
TAXESINCLUDINGBOCWTAX ALLTAXESINCLUDINGBOCW
&SERVICETAX,DUTIES,
TAX&SERVICETAX,DUTIES,
LEVIES,FREIGHT,INSURANCE LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSIT
INCLUDINGTRANSIT
INSURANCEOFFREEISSUE
INSURANCEOFFREEISSUE
MATERIALSASDEFINEDINBID MATERIALSASDEFINEDINBID
DOCUMENT
DOCUMENT
(3)+(4)
(2)X(5)

CityGasDistributionProjectinNCTofDelhiandNCRRegion

Page18of57

TenderNo.IGL/ND/C&P/
P12500

LAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINNCTOFDELHI

Rev.208.04.2013

SERVICETAX@
12.36%ONUNIT
RATE(COL.3)

UNITPRICEINCLUSIVEOFALL TOTALPRICEINCLUSIVEOF
TAXESINCLUDINGBOCWTAX ALLTAXESINCLUDINGBOCW
&SERVICETAX,DUTIES,
TAX&SERVICETAX,DUTIES,
LEVIES,FREIGHT,INSURANCE LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSIT
INCLUDINGTRANSIT
INSURANCEOFFREEISSUE
INSURANCEOFFREEISSUE
MATERIALSASDEFINEDINBID MATERIALSASDEFINEDINBID
DOCUMENT
DOCUMENT
(3)+(4)
(2)X(5)

NA

NA

NA

CityGasDistributionProjectinNCTofDelhiandNCRRegion

Page19of57

LAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINNCTOFDELHI

Rev.208.04.2013

SERVICETAX@
12.36%ONUNIT
RATE(COL.3)

TenderNo.IGL/ND/C&P/
P12500

UNITPRICEINCLUSIVEOFALL TOTALPRICEINCLUSIVEOF
TAXESINCLUDINGBOCWTAX ALLTAXESINCLUDINGBOCW
&SERVICETAX,DUTIES,
TAX&SERVICETAX,DUTIES,
LEVIES,FREIGHT,INSURANCE LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSIT
INCLUDINGTRANSIT
INSURANCEOFFREEISSUE
INSURANCEOFFREEISSUE
MATERIALSASDEFINEDINBID MATERIALSASDEFINEDINBID
DOCUMENT
DOCUMENT
(3)+(4)
(2)X(5)

CityGasDistributionProjectinNCTofDelhiandNCRRegion

Page20of57

TenderNo.IGL/ND/C&P/
P12500

LAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINNCTOFDELHI

Rev.208.04.2013

SERVICETAX@
12.36%ONUNIT
RATE(COL.3)

UNITPRICEINCLUSIVEOFALL TOTALPRICEINCLUSIVEOF
TAXESINCLUDINGBOCWTAX ALLTAXESINCLUDINGBOCW
&SERVICETAX,DUTIES,
TAX&SERVICETAX,DUTIES,
LEVIES,FREIGHT,INSURANCE LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSIT
INCLUDINGTRANSIT
INSURANCEOFFREEISSUE
INSURANCEOFFREEISSUE
MATERIALSASDEFINEDINBID MATERIALSASDEFINEDINBID
DOCUMENT
DOCUMENT
(3)+(4)
(2)X(5)

1,142.78

10,388.61

2,077,722.92

857.09

7,791.46

311,658.33

642.82

5,843.60

233,743.86

199.99

1,818.01

436,321.75

CityGasDistributionProjectinNCTofDelhiandNCRRegion

Page21of57

LAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINNCTOFDELHI

Rev.208.04.2013

SERVICETAX@
12.36%ONUNIT
RATE(COL.3)

TenderNo.IGL/ND/C&P/
P12500

UNITPRICEINCLUSIVEOFALL TOTALPRICEINCLUSIVEOF
TAXESINCLUDINGBOCWTAX ALLTAXESINCLUDINGBOCW
&SERVICETAX,DUTIES,
TAX&SERVICETAX,DUTIES,
LEVIES,FREIGHT,INSURANCE LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSIT
INCLUDINGTRANSIT
INSURANCEOFFREEISSUE
INSURANCEOFFREEISSUE
MATERIALSASDEFINEDINBID MATERIALSASDEFINEDINBID
DOCUMENT
DOCUMENT
(3)+(4)
(2)X(5)

CityGasDistributionProjectinNCTofDelhiandNCRRegion

Page22of57

TenderNo.IGL/ND/C&P/
P12500

LAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINNCTOFDELHI

Rev.208.04.2013

SERVICETAX@
12.36%ONUNIT
RATE(COL.3)

NA

UNITPRICEINCLUSIVEOFALL TOTALPRICEINCLUSIVEOF
TAXESINCLUDINGBOCWTAX ALLTAXESINCLUDINGBOCW
&SERVICETAX,DUTIES,
TAX&SERVICETAX,DUTIES,
LEVIES,FREIGHT,INSURANCE LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSIT
INCLUDINGTRANSIT
INSURANCEOFFREEISSUE
INSURANCEOFFREEISSUE
MATERIALSASDEFINEDINBID MATERIALSASDEFINEDINBID
DOCUMENT
DOCUMENT
(3)+(4)
(2)X(5)

NA

NA

CityGasDistributionProjectinNCTofDelhiandNCRRegion

Page23of57

LAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINNCTOFDELHI

Rev.208.04.2013

SERVICETAX@
12.36%ONUNIT
RATE(COL.3)

TenderNo.IGL/ND/C&P/
P12500

UNITPRICEINCLUSIVEOFALL TOTALPRICEINCLUSIVEOF
TAXESINCLUDINGBOCWTAX ALLTAXESINCLUDINGBOCW
&SERVICETAX,DUTIES,
TAX&SERVICETAX,DUTIES,
LEVIES,FREIGHT,INSURANCE LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSIT
INCLUDINGTRANSIT
INSURANCEOFFREEISSUE
INSURANCEOFFREEISSUE
MATERIALSASDEFINEDINBID MATERIALSASDEFINEDINBID
DOCUMENT
DOCUMENT
(3)+(4)
(2)X(5)

CityGasDistributionProjectinNCTofDelhiandNCRRegion

Page24of57

LAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINNCTOFDELHI

Rev.208.04.2013

SERVICETAX@
12.36%ONUNIT
RATE(COL.3)

TenderNo.IGL/ND/C&P/
P12500

UNITPRICEINCLUSIVEOFALL TOTALPRICEINCLUSIVEOF
TAXESINCLUDINGBOCWTAX ALLTAXESINCLUDINGBOCW
&SERVICETAX,DUTIES,
TAX&SERVICETAX,DUTIES,
LEVIES,FREIGHT,INSURANCE LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSIT
INCLUDINGTRANSIT
INSURANCEOFFREEISSUE
INSURANCEOFFREEISSUE
MATERIALSASDEFINEDINBID MATERIALSASDEFINEDINBID
DOCUMENT
DOCUMENT
(3)+(4)
(2)X(5)

CityGasDistributionProjectinNCTofDelhiandNCRRegion

Page25of57

TenderNo.IGL/ND/C&P/
P12500

LAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINNCTOFDELHI

Rev.208.04.2013

SERVICETAX@
12.36%ONUNIT
RATE(COL.3)

UNITPRICEINCLUSIVEOFALL TOTALPRICEINCLUSIVEOF
TAXESINCLUDINGBOCWTAX ALLTAXESINCLUDINGBOCW
&SERVICETAX,DUTIES,
TAX&SERVICETAX,DUTIES,
LEVIES,FREIGHT,INSURANCE LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSIT
INCLUDINGTRANSIT
INSURANCEOFFREEISSUE
INSURANCEOFFREEISSUE
MATERIALSASDEFINEDINBID MATERIALSASDEFINEDINBID
DOCUMENT
DOCUMENT
(3)+(4)
(2)X(5)

9,999.36

90,900.36

13,635.05

2,356.99

21,426.51

64,279.54

2,785.54

25,322.25

75,966.74

357.12

3,246.44

97,393.20

CityGasDistributionProjectinNCTofDelhiandNCRRegion

Page26of57

TenderNo.IGL/ND/C&P/
P12500

LAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINNCTOFDELHI

Rev.208.04.2013

SERVICETAX@
12.36%ONUNIT
RATE(COL.3)

UNITPRICEINCLUSIVEOFALL TOTALPRICEINCLUSIVEOF
TAXESINCLUDINGBOCWTAX ALLTAXESINCLUDINGBOCW
&SERVICETAX,DUTIES,
TAX&SERVICETAX,DUTIES,
LEVIES,FREIGHT,INSURANCE LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSIT
INCLUDINGTRANSIT
INSURANCEOFFREEISSUE
INSURANCEOFFREEISSUE
MATERIALSASDEFINEDINBID MATERIALSASDEFINEDINBID
DOCUMENT
DOCUMENT
(3)+(4)
(2)X(5)

671.39

6,103.31

18,309.92

571.39

5,194.30

15,582.91

1,285.63

11,687.19

35,061.58

CityGasDistributionProjectinNCTofDelhiandNCRRegion

Page27of57

LAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINNCTOFDELHI

Rev.208.04.2013

SERVICETAX@
12.36%ONUNIT
RATE(COL.3)

TenderNo.IGL/ND/C&P/
P12500

UNITPRICEINCLUSIVEOFALL TOTALPRICEINCLUSIVEOF
TAXESINCLUDINGBOCWTAX ALLTAXESINCLUDINGBOCW
&SERVICETAX,DUTIES,
TAX&SERVICETAX,DUTIES,
LEVIES,FREIGHT,INSURANCE LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSIT
INCLUDINGTRANSIT
INSURANCEOFFREEISSUE
INSURANCEOFFREEISSUE
MATERIALSASDEFINEDINBID MATERIALSASDEFINEDINBID
DOCUMENT
DOCUMENT
(3)+(4)
(2)X(5)

CityGasDistributionProjectinNCTofDelhiandNCRRegion

Page28of57

LAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINNCTOFDELHI

Rev.208.04.2013

SERVICETAX@
12.36%ONUNIT
RATE(COL.3)

TenderNo.IGL/ND/C&P/
P12500

UNITPRICEINCLUSIVEOFALL TOTALPRICEINCLUSIVEOF
TAXESINCLUDINGBOCWTAX ALLTAXESINCLUDINGBOCW
&SERVICETAX,DUTIES,
TAX&SERVICETAX,DUTIES,
LEVIES,FREIGHT,INSURANCE LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSIT
INCLUDINGTRANSIT
INSURANCEOFFREEISSUE
INSURANCEOFFREEISSUE
MATERIALSASDEFINEDINBID MATERIALSASDEFINEDINBID
DOCUMENT
DOCUMENT
(3)+(4)
(2)X(5)

CityGasDistributionProjectinNCTofDelhiandNCRRegion

Page29of57

SCHEDULEOFRATESFORRATECONTRACTFORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINN

ItemNo.

Description

BIDDERNAME:

Unit

Quantity

UNITPRICEINCLUSIVEOFALL
TAXESINCLUDINGBOCWTAX
(EXCLUDINGSERVICETAX),DUTIES,
LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSITINSURANCEOF
FREEISSUEMATERIALSASDEFINED
INBIDDOCUMENT

Receivingandtakingoverasdefinedinthespecifications,handling,loading,transportationandunloadingofOwnersupplied3LayerPEcoatedlinepipesalongwith
associatedfittingsandvalvesfromOwnerdesignatedstockyardtoContractor'sownstockyards/workshops/worksitesincludingpreliminaryactivities,preparationof
drawings,whereverrequiredforcrossingsetc.includinghandling,stacking,stringingonthepipelineRightofuse/pipelineroutealignment,carryingoutinspectionof
company supplied materials including line pipes at the time of taking over, laying / installation of coated line pipe, associated fittings and accessories, including
executingallworks,"takingover",handling,includingloadingandunloading,transportationofOwnersuppliedmaterialsotherthanlinepipefromOwner'sdesignated
place(s)ofissuetoworksite,arrangementofalladditionallandsrequiredforContractor'sstorage,fabrication,accessforconstruction,procurementandsupplyofall
materials (except Owner supplied materials), consumables, equipment, labor and other inputs, carrying out all temporary, ancillary, auxiliary works, ready for
commissioningofpipelineasperdrawings,Specifications,otherprovisions
ofContractdocumentandinstructionofOwner/OwnersRepresentative,includingbutnotlimitedtocarryingoutthefollowingworks:
Surveying ofdetours for thedetours requiredatthetimeofconstructionincludingmarking the same intopographicalsheet, preparationof AFC drawings showing
surveydetails.AndsubmitsametoOwner/OwnersRepresentativeforreview.
Staking and installation of construction markers, clearing, fencing, grubbing, cutting of trees, fulfilling all the requirements of various statutory / environment
authoritiestotheentiresatisfactionofconcernedauthorities,gradingofworkarea,ShiftingofallobstructionwithintheROU/pipelineroutealignmentvizelectrical
lines/poles,telephonelines/poles,coordinationwithconcernedauthoritiesandobtainpermissionsfromtheseauthorities.
Trenchingtoalldepthsbyexcavationinalltypesofsoilsincludingsoft/hardrock,chiselingorotherwisecuttingdifferenttypesofpavement,footpath,roadsetc.As
requiredandstoringexcavatedsoil,reusablematerialsatdesignatedareaasdirectedbyOwner/OwnersRepresentativeandtoawidthtoaccommodatethepipelineas
perrelevantstandard/specificationsetc.(Theminimumdepthofthetopofpipelineshallbe1.2mormorefromthefinishofthestabilizedgradelevel).Dewaterof
trenchesifrequiredaspersitecondition.MakingtrialpitsasperinstructionsofEIC
Carrying out repairs of pipe defects/replacement in case of irreparable defects and repairs of defects of pipe coating not attributable to Owner including defects /
damagesoccurringduringtransportation/handling.
Checking,cleaning,aligning,bending,cuttingandbeveling(asrequired)ofpipesforweldingandfieldadjustmentsincludingpipefittings,welding,carryingoutnon
destructive testing of welds as required including 100% radiography and providing all requisite equipment, labor, supervision, materials, films, consumables, all
facilitiesandpersonneltoprocess,develop,examineandinterpretradiographsandothertestsasrequired,carryingoutrepairsofweldsjointsfounddefectivebyOwner/
OwnersRepresentative,carryingoutreradiographyandothertestsasrequiredonrepairedjoints.ProvidingPEwarningmatoverthepipelineetc.
Carryingoutinstallationofcarrierpipeatallcrossingslikeroads/nallasatdesignateddepthsbyopencut/jacking/boring(exceptatcasedcrossingsorcrossingscarried
outbyHDDmethod).
Carryingoutinstallationofcarrierpipeinthecasingpipeatcasedcrossings(excludinginstallationofcasingpipeswhichiscoveredseparately).
Supply&Installationof10mmthickneopraneSheet/shallbeinstalledasperstandarddrawingno.TEINDSTDGM2014atforeignpipelinecrossing,Underground
EHVpowercable(66KV)crossingandHTpowercablecrossinglocations.

Rev. 2- 08.04.2013

City Gas Distribution Project in NCT of Delhi and NCR Region

Page 30 of 57

SCHEDULEOFRATESFORRATECONTRACTFORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINN

ItemNo.

Description

Unit

Quantity

UNITPRICEINCLUSIVEOFALL
TAXESINCLUDINGBOCWTAX
(EXCLUDINGSERVICETAX),DUTIES,
LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSITINSURANCEOF
FREEISSUEMATERIALSASDEFINED
INBIDDOCUMENT

Coatingoffieldweldjoints,longradiusbends,buriedfittings&valvesetc.includingsupplyofcoatingmaterialsdulyapprovedbyowneretcasperspecification.

CountingthenumberandtypeoftreescutinpresenceofDFO/concernedauthoritiesandkeepingrecordthereof;stackingandhandingoverofallcuttrees.

Installation/loweringthepipelineintrenchtorequireddepth,placementof1.0mmthicknessHDPEyellowcolorwarningmat(freeissuebyOwner)overthepipeline
along the complete route, padding around pipeline with suitable approved soil including supply of padding material, backfilling with available/ borrowed earth,
approvedexcavatedmaterialand/orothersuitablesoilbycrowning.Compactionwithjumpingjackcompactorandwateratsubsequentlayersof150mmorasdirected
byOwner/OwnersRepresentative.Alltiles/slabs/curbstonesetc.removedduringexcavationshallbeplacedproperly.Roads,pavements,footpaths,etc.tobemade
motorablewhereverpipelineislaid.

SupplyandInstallationofslopebreakers,bankprotectionwhereverrequiredandasdirectedbyOwner/Owner'sRepresentative.

Carrying out air cleaning, pigging, flushing, cleaning and hydrostatic testing of complete pipeline with quantity of corrosion inhibitor including pretesting of
designated sections complete as per specification and approved by Owner/ Owners Representative to specified pressures indicated elsewhere and duration after
stabilization as per specification, providing all equipment, pumps, fittings, instruments, dead weight tester, pressure recorder, thermocouples etc., and services,
supervision, labor, consumables, water including supply of corrosion inhibitor, air, etc. as required, locating of leaks and rectification of defects attributable to
Contractor (rectification of defects in linepipe material not attributable to contractor shall be paid separately as per schedule of rate), retesting after rectification,
dewateringaftersuccessfulcompletionofhydrotestingofentiresectionandasapprovedbyOwner/OwnersRepresentative.

Alltiein,includingthetieinswithadjacentsectionofthepipeline.
Protective coating of 450 micron thick two component epoxy / polyurethane (applied with the help of minimum three coats) including supply of materials duly
approvedbyownerforallpiping,Valves,fittings,structuralsteelsetc.forburiedinstallationandinsidethevalvepit.
Finalcleanupandrestorationofrightofuseanddisposalofdebrisandsurplusmaterialtodesignateddisposalareasandreinstatingtheareatoitsearlierstateandas
directedbyOwner/OwnersRepresentative.
Precommissioningactivitieslikeswabbing,dryingofthecompletepipelinenetworkandtheassociatedfacilitiesbeinginstalledtothespecifiedacceptancecriteriaas
perOwner/Owner'sRepresentative.
Maintainingthecompletedpipelines/installationforanydefect,failuresduringdefectliabilityperiod(i.e.12monthsfromdateofcommissioningofPipeline).

Rev. 2- 08.04.2013

City Gas Distribution Project in NCT of Delhi and NCR Region

Page 31 of 57

SCHEDULEOFRATESFORRATECONTRACTFORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINN

ItemNo.

Description

Unit

Quantity

m
m
m
m

2000
6000
1200
200

47000

Nos.

23500

UNITPRICEINCLUSIVEOFALL
TAXESINCLUDINGBOCWTAX
(EXCLUDINGSERVICETAX),DUTIES,
LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSITINSURANCEOF
FREEISSUEMATERIALSASDEFINED
INBIDDOCUMENT

Ensuringpropersafetycodes&practicesduringconstruction,cordoningofftheworkarea,providingwarningsigns,barricadingandpropertools&tackles,Equipping
theworkerswithsafetyboots,helmetsandflorescentaprons&barricadingasperdrawingno.TEINDSTDGM9001.Thebarricadingistobedonethroughoutalong
thetrench/weldingstring.
Anyotheractivitiesnotmentioned/coveredexplicitlyabove,butotherwiserequiredforsatisfactorycompletion/operation/safety/statutory/maintenanceoftheworks
shallalsobecoveredunderthescopeofworkandhastobecompletedbytheContractorwithinspecifiedtimescheduleatnoextracosttoowner.Thepipelinelaying
shallbedoneasperspecification,code&standard&guidelinebyOwner/OwnersRepresentative.

Preparationofasbuiltdrawings,pipebooks(1setoftracingonpolyesterfilmand3setsofasbuiltdrawingsand1softcopyand6copiesofpipebook.)Allthe
worksshallbeexecutedinaccordancewiththeprovisionofcontractincludingcarryingoutalltemporary/ancillary/auxiliaryworksrequiredoftheperformanceofthe
worksandallotheracts,deeds,mattersandthingsnecessarytomakethepipelinereadyforpipecommissioningactivities.
1.1
a)
b)
c)
d)

SpecifiedNB
Thkinmm(inch)
Material
(inch)
12"
6.4(0.252")
API5LX60(ERW/SAW/SMLS)
8"
8.2(0.322")
API5LGr.B(ERW/SMLS)
6"
6.4(0.252")
API5LGr.B(ERW/SMLS)
4"
6.4(0.252")
API5LGr.B(ERW/SMLS)
Note:
1.Thisitemshallbeapplicableforthepipeline,fittings,accessories,valvesetc.betweenexisting/proposedundergroundtapoffpointsfromexistingsteelmaingridto
I.J.forU/Gportion
2.Forrestorationofasphalt/concreteroads,theitemforconstructionofasphaltedtop/concretetop/redstoneshallbepaidseparately.

1.2

Pipelinelayingliaisoningandgettingpermissionsfromthestatutoryauthorities(ExceptRailway&Forest).
Applyingpermission,followupandgettingpermissionfromthestatutoryauthoritiesshallbeincontractorsscope,onlyR.RchargesshallbepaidbyOwnerfor12",
8",6"&4"NBsteelpipeline&180mm&125mmMDPEPipeline.
Note:Singlerateshallbepayableforpipelinelaidincommontrench.

1.3

Pipelinelayingliaisoningandgettingpermissionsfromtherailwayauthority.
Applyingpermission,followupandgettingpermissionfromthestatutoryauthoritiesshallbeincontractorsscope,onlyR.RchargesshallbepaidbyOwnerfor12",
8",6"&4"NBsteelpipeline&180mm&125mmMDPEPipeline.

1.4

Note:Singlerateshallbepayableforpipelinelaidincommontrench.
Pipelinelayingliaisoningandgettingpermissionsfromtheforestauthority.
Applyingpermission,followupandgettingpermissionfromthestatutoryauthoritiesshallbeincontractorsscope,onlyR.RchargesshallbepaidbyOwnerfor12",
8",6"&4"NBsteelpipeline&180mm&125mmMDPEPipeline.

Rev. 2- 08.04.2013

City Gas Distribution Project in NCT of Delhi and NCR Region

Page 32 of 57

SCHEDULEOFRATESFORRATECONTRACTFORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINN

ItemNo.

Description

Unit

Quantity

UNITPRICEINCLUSIVEOFALL
TAXESINCLUDINGBOCWTAX
(EXCLUDINGSERVICETAX),DUTIES,
LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSITINSURANCEOF
FREEISSUEMATERIALSASDEFINED
INBIDDOCUMENT

Note:Singlerateshallbepayableforpipelinelaidincommontrench.
2

LayingofcarbonsteelpipelineandMDPEPipelineincommontrenchasperDrawingNo.P.003960L161009
LayingofcarbonsteelpipelineasperscopegiveninSORNo.1abovebutwithaminimumcoverofadditionof1m,ODofMDPEpipe&300mmandlayingof
MDPE pipeline in the same trench. Work involved in laying of MDPE pipeline shall be as follows: " Receiving and taking over " as defined in the specification,
handling,loading,transportationandunloadingofOwnersuppliedMDPEpipe(PE80,SDR11)of180&125mmdiafromdesignatedplace(s)ofissue/dumpsite
(s)tocontractor'sownstockyard(s)/workshop(s)/worksite(s)includingproperstoring,stacking,identification,providingsecurity&insurancecover,stringing/
uncoilingonthepipelinerightofuse,laying/installationofMDPElinepipeandownersuppliedassociatedfittingsandaccesoriesi.e.bends,couplers,Endcaps,Tee,
PEreducer,CStoPEfittings,Valvessaddletappings,warningmatetc.,includingexecutingofallworks,arrangementofalladditionallandrequiredforcontractor's
storage,fabrication,accessforconstruction,supplyofallmaterials(exceptOwnersuppliedmaterials),consumables,labourandotherincidentalworksandhanding
overthesamesurplusmaterialstotheOwner'sdesignatedstockyard(s)
Uncoiling/stringingofpipes,clamping,jointingofpipeends/fittings/valvesbyqualifiedpersonnelusingapprovedtechniquesasperspecifications.
LoweringtheMDPEpipelineinsametrenchwhereincarbonsteelpipehasbeenlaid(asperscopegiveninSORitemno.1abovebutwithaminimumofadditionof
1m,ODofMDPEpipeand300mm)andpaddingdonetothethicknessasindicatedinthespecificationandenclosedcrosssectionaldrawing,providingrequireddepth
ofpaddingintrenchbed&aboveandaroundthepipeline.
Installationandelectrofusionjointingofvalveswhereverrequiredandasdirectedbyengineerincharge.
Cleaning , flushing , pneumatic testing , purging with nitrogen as per specification and approved procedures providing all tools and tackles, nitrogen, instruments,
manpowerandrelatedaccessoriesandaspertheinstructionsoftheEIC.

Anyotheractivitiesnotmentioned/coveredexplicitlyabove,butotherwiserequiredforsatisfactorycompletion/operation/safety/statutory/maintenanceoftheworks
shallalsobecoveredunderthescopeofworkandhastobecompletedbytheContractorwithinspecifiedtimescheduleatnoextracosttoowner.Thepipelinelaying
shallbedoneasperspecification,code&standard&guidelinebyOwner/OwnersRepresentative.
Oncompletionofgaschargingofpipelines.Preparationandsubmissionofasbuiltdrawings,crossingdetails,termination,utilitygraphs.
a

12"NBCarbonsteel&125mmMDPEPipeinthecommontrench

500

b
c
d

8"NBCarbonsteel&125mmMDPEPipeinthecommontrench
6"NBCarbonsteel&125mmMDPEPipeinthecommontrench
4"NBCarbonsteel&125mmMDPEPipeinthecommontrench
Note:AtcrossingsthesteelandMDPEpipesshallbesepratedtomaintaintheminimumrequiredinterdistance.

m
m
m

1500
300
50

Supply&InstallationofCasingpipe:

Rev. 2- 08.04.2013

City Gas Distribution Project in NCT of Delhi and NCR Region

Page 33 of 57

SCHEDULEOFRATESFORRATECONTRACTFORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINN

ItemNo.

Description

Unit

Quantity

m
m
m
m

150
300
60
NA

m
m

400
200

UNITPRICEINCLUSIVEOFALL
TAXESINCLUDINGBOCWTAX
(EXCLUDINGSERVICETAX),DUTIES,
LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSITINSURANCEOF
FREEISSUEMATERIALSASDEFINED
INBIDDOCUMENT

Supply&InstallationofCasingpipe(Carbonsteel)byHDD/Jacking/boringforNala,road.Railandcanalcrossingswhereverrequiredinalltypesofsoilsandterrain,
includinglayingof2nos.HDPEtelecomduct(freeissuematerial)&allassociatedworksincludingsupplyofallothermaterials,equipment,consumables,manpower,
weldingofsteelcasingandjointingofHDPETelecomDuctincludingvisualinspectionofallweldjoints/HDPEJoints,backfillingandrestorationasoriginalofthe
facility crossed and performing all works as per drawings, specifications and instructions of Owner/ Owner's Representative and provisions of contract document.
Submissionofasbuiltdrawings.
3.1
a
b
c
d
3.2
a
b

Carbonsteelcasing
24"NBCarbonsteelcasingpipe(HDDMethod/Augurboring)
18"NBCarbonsteelcasingpipe(HDDMethod/Augurboring)
12"NBCarbonsteelcasingpipe(HDDMethod/Augurboring)
8"NBCarbonsteelcasingpipe(HDDMethod/Augurboring)
HDPECasingalongwithMDPEPipe(180mm&125mm)carrierpipe
250NBHDPEcasingpipe(HDDMethod/Augurboring)
250NBHDPEcasingpipe(Moling/JackingMethod)
Note:
1.PaymentshallbebasedontheactuallengthofCasedcrossings/HDD.
2.Casingendseals,casinginsulators,Vent&drainconnectionsareprovidedbythecontractor.
3.AboveRateforthisSORitemno.3.1forsteelpipelineisnotinclusiveofcarrierpipestringpreparation(welding,NDT,Pretesting,coating,Hydrotesting,
Precommissioningetc.,).TheseworksshallbepaidasperSORitemno.1.
4.AboveRateforSORitemno.3.2forMDPEpipelineisinclusiveforuncoiling/stringingofpipes,clamping,jointingofthepipeends/fittings/valves,
Cleaning,flushing,pneumatictestingaspertheinstructionsoftheEIC.
5.Contractorshallprocureonlythecarbonsteelcasingpipeasperattachedspecification.
6.HDPECasingshallbeprovidedasafreeissuematerialtothecontractor.

NA

InstallationofCrossingswithoutcasingpipe:
Receiving and takingover as defined in the specifications, handling, loading, transportation and unloading of Owner supplied 3 Layer PE coated line pipes from
OwnerdesignatedstockyardtoContractor'sownstockyards/workshops/worksitesincludingpreliminaryactivities,carryingoutinspectionofownersuppliedmaterials
( 3LPE coated line pipe ) at the time of taking over and supply of all materials ( except 3LPE coated line pipe ) consumables, equipment, labor and other inputs,
carrying out all temporary, ancillary, auxiliary works, as per drawings, Specifications,other provisions of Contract document and instructionof Owner/ Owners
Representative,includingbutnotlimitedtocarryingoutthefollowingworks:
SitePreparation,welding,radiography,coatingfieldjointswithspecialtypeheatshrinkablesleeves(Direx)pretestingofcompletedcarrierpipeandmakingthestring
andweldingofentry&exitpointofHDD/boringwithmainpipeline.
Preinstallationofhydrotestingincludingleaksandrepairofdefectsandretestingetc.fordefectsattributedtocontractor'sfaultywork
Hydrotestingwithmainpipelineandprecommissioningactivitieslikeswabbing,dryingtothespecifiedcriteriaasperowner/ownersrepresentative.
Purgingwithnitrogen(Includingsupply)andCommissioningofcompletepipelinenetworkincludingsupplyofallequipment,machinery,consumables,toolsand
tackles,manpower,etc.,asperspecification,provisionsofbiddocumentandinstructionsofOwner/OwnersRepresentative.
Finaldossierallnotes&calculationsasrequiredinthespecification.
Preparationofasbuiltdrawings,pipebooks(1setoftracingonpolyesterfilmand6setsofasbuiltdrawingsand1softcopyand3copiesofpipebook.)

Rev. 2- 08.04.2013

City Gas Distribution Project in NCT of Delhi and NCR Region

Page 34 of 57

SCHEDULEOFRATESFORRATECONTRACTFORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINN

ItemNo.

Description

UNITPRICEINCLUSIVEOFALL
TAXESINCLUDINGBOCWTAX
(EXCLUDINGSERVICETAX),DUTIES,
LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSITINSURANCEOF
FREEISSUEMATERIALSASDEFINED
INBIDDOCUMENT

Unit

Quantity

m
m
m
m
m
m
m
m
m
m

6050
20100
4140
670
500
1500
300
50
200
200

m
m
m

200
40
40

9,245.83
6,934.37
5,200.78

InstallationofCrossingsofcarrierpipesbyHDD/boringforRail,Road,NalaandCanalcrossingsetcwhereverrequiredinalltypesofsoilsandterrain,including
layingof2nos.HDPEtelecomduct(freeissuematerial)&allassociatedworksincludingsupplyofallothermaterials,equipment,consumables,manpower,jointing
ofHDPETelecomDuctincludingvisualinspectionofallweldJoints/HDPEJoints,backfillingandrestorationasoriginalofthefacilitycrossedandperformingall
worksasperdrawings,specificationsandinstructionsofOwner/Owner'sRepresentativeandprovisionsofcontractdocument.
Anyotheractivitiesnotmentioned/coveredexplicitlyabove,butotherwiserequiredforsatisfactorycompletion/operation/safety/statutory/maintenanceoftheworks
shallalsobecoveredunderthescopeofworkandhastobecompletedbytheContractorwithinspecifiedtimescheduleatnoextracosttoowner.Itshallbedoneasper
specification,code&standard&guidelinebyOwner/OwnersRepresentative.
a
b
c
d
e
f
g
h
i
j

Installationof12"NBPECoatedSteelpipewithoutanycasingbyHDD
Installationof8"NBPECoatedSteelpipewithoutanycasingbyHDD
Installationof6"NBPECoatedSteelpipewithoutanycasingbyHDD
Installationof4"NBPECoatedSteelpipewithoutanycasingbyHDD
Installationof12"NBPECoatedSteelpipewithoutanycasingbyMoiling.
Installationof8"NBPECoatedSteelpipewithoutanycasingbyMoiling.
Installationof6"NBPECoatedSteelpipewithoutanycasingbyMoiling.
Installationof4"NBPECoatedSteelpipewithoutanycasingbyMoiling.
Installationof125mmMDPEcarrierpipewithoutanycasingbyHDD
Installationof125mmMDPEcarrierpipewithoutanycasingbyMoling
Note:
1.PaymentshallbebasedontheactuallengthofHDD/ManualMoiling.
2.RateforthisSORitemno.4e),f),g)&h)forsteelpipelineisinclusiveofpreparation,pretestingandcoatingfieldjointsheatshrinkablesleevesandrepairof
pipelinecoatingofcarrierpipestringtillthestringreadyforpulling.
3.AboveRateforSORitemno.4i)&4j)forMDPEpipelineisinclusiveofuncoiling/stringingofpipes,clamping,jointingofthepipeends/fittings/valves,
Cleaning,flushing,pneumatictestingaspertheinstructionsoftheEIC.

RockDrilling
Installationofcarrierpipesbyrockdrillingfornala,roadandcanalcrossingswhereverrequiredinalltypesofrockandterrain.itincludessurveyoftheunderground
utilities,submissionofprofileforapproval,executionoftheworkasperthestandardprocedure,including,excavationofthepits,insertion/pullingofthecarrierpipe,
removal of malba, subsequent backfilling and restoration of the facility crossed as per original condition, including supply of all other materials, equipment,
consumables,manpower.

a
b
c

For8"NB
For6"NB
For4"NB

RockCutting

Rev. 2- 08.04.2013

City Gas Distribution Project in NCT of Delhi and NCR Region

Page 35 of 57

SCHEDULEOFRATESFORRATECONTRACTFORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINN

ItemNo.

Description

Unit

Quantity

UNITPRICEINCLUSIVEOFALL
TAXESINCLUDINGBOCWTAX
(EXCLUDINGSERVICETAX),DUTIES,
LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSITINSURANCEOF
FREEISSUEMATERIALSASDEFINED
INBIDDOCUMENT

Excavationofhardrock,whereverhardrockofsinglepieceexceeding1.5minanydirectionandremovableonlybypneumaticchisel/drillasperthespecifications
anddirectionofEIC.TheratesarepayableoverandabovetheLayingratesasperrelevantSORItems.

m3

240

1,618.02

HDDatMajorcrossings(River,Nala,Canal&Road)

mtr
mtr

600
800

Completeworkforthecrossingsincludingtopographic,geotechnical&hydrologicalinvestigationandalladditionaldrilledlengthsnecessitatedbycontractor'sdesign
of crossings with HDD length from 250 M to 500 M and depth below bed level more than 10 Meter, construction design calculation and engineering of the
crossingsaccordingto depthbelowbedlevelmore than10Meter,mobilizationanddemobilizationatsite(s),supplyofallmaterialsasper"Contractor'sscopeof
supply"includingCSconduitpipeinrequiredlength,allconsumablesequipment,manpowerandotherresources,andacquiringtherequiredlandforsitepreparations,
andexecutionof,butnotlimitedto,thefollowingworksinaccordancewithspecifications,drawings,andasperprovisionsoftheContractdocumentandinstructionsof
the Owner/Engineerin Charge; Interpretation of the topographical, hydrological and geotechnical survey carried out by the Contractor required for calculation of
scourlevelfordesignandconstructionofthecrossing.
Preparationofallnecessaryconstructiondrawingsalongwithdesigndocument,procedure(i.e.scourlevelcalculation&installationdesign)forOwner'sapprovalasper
the provisions of the Contractor document, Preparation of detailed construction methodology procedure, Strings preparation including welding, NDT of welds and
rebevelledareas,radiography,weldrepairandretest,pretestingofcompletedstring,corrosioncoatingoffieldjointswithheatshrinkablesleeves(direx)andwelding
ofentry&exitpointofHDD/boringwithmainpipeline.Postinstallationofhydrotestingincludingleaksandrepairofdefectsandretestingetc.fordefectsattributedto
contractor's faulty work.Hydrotesting with mainpipeline and precommissioning activities like swabbing, drying to the specified criteria as per owner/owners
representative. Purging with nitrogen ( Including supply ) and Commissioning of complete pipeline network including supply of all equipment, machinery,
consumables,toolsandtackles,manpower,etc.,asperspecification,inspectionofcorrosioncoatingandrepairofdefects,Preconstructionsurveysandcollectionofall
necessarydata,Pullingofcarrierpipeand6"CSconduitfor2nos.HDPE(includinglayingofducts),belowtheriverbedbyhorizontaldirectionaldrillingtothecorrect
profilei.e.minimum5mbelowcalculatedscourlevel.
Betweenthebanksasperapproveddrawingsandspecification,Postinstallation,hydrotestincludingleaksandrepairofdefectsandretesting,etc.Supply,fabrication
andconstructionofprotectivefencingasrequired,Supply,fabricationanderectionofpipelinemarkers,Restorationandcleanupetc.,Preparationofasbuiltdrawings
and other records etc., All other works not specifically listed herein, but required as per specifications, drawings, provision of contract document, calculations, and
constructionmethodstatements,leadingtosuccessfulcompletionofworksRiverCrossing.
a
b
8

8"
12"
InstallationofSVstationswithventingarrangement
Allworksforinstallationofallunderground&abovegroundpipingatallelevationsandbelowgroundatalldepthforSectionalizingValveStationasperP&IDno.
P.003960P0105/P.003960P0104 & GAD no.P.003960L161005/P.003960L161004 in all type of terrains and soils including "Receiving and taking over" as
definedinthespecifications,handling,loading,transportationandunloadingofallOwnersuppliedmaterialsi.e.extendedstem,buttwelded,sectionalizingballvalve,
othertypesofvalves,linepipesformainline,fittings,flanges,ventlinesfromOwner'sdesignatedplace(s)ofissuetoworksite,Supplyofpipes,fittings&valvesfor
piping of size below 2" dia, supply of all consumables, materials, manpower and carrying out all mechanical works of underground and above ground piping
including fabrication, welding, nondestructive testing of welds, weld repairs/ retesting, cleaning/ flushing, prehydrotesting & hydrostatic testing, dewatering,
functionaltesting,cuttingofmainlineandbeveling(ifrequired),tieinofvalveassembly,includingradiographyoftieinjoints,corrosion,coatingandexternalpainting
asrequired.

Rev. 2- 08.04.2013

City Gas Distribution Project in NCT of Delhi and NCR Region

Page 36 of 57

SCHEDULEOFRATESFORRATECONTRACTFORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINN

ItemNo.

Description

Unit

Quantity

Nos.
Nos.

1
7

Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.

1
2
2
4
NA
3
4
15
3

UNITPRICEINCLUSIVEOFALL
TAXESINCLUDINGBOCWTAX
(EXCLUDINGSERVICETAX),DUTIES,
LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSITINSURANCEOF
FREEISSUEMATERIALSASDEFINED
INBIDDOCUMENT

SupplyofpressuregaugesasperDataSheetInstallationofinstrumentslikepressure/temperatureinstruments/gauges,provisionfortubingtotheactuatorinfuture,
obtainingallstatutoryclearances,approvalsandpermissionsfortheworks(whereverrequired).
Excavationinalltypesofsoilincludingsoft/hard/rockysurfaces,providing200mmthkPCCforvalvebasesupport,backfillingandcompactionwithapprovedsoil
forinstallationofpipesandfittings,etcincludingsandpaddingallaroundthevalvesinSVstation,pipesupportsandfencingwouldbepaidagainstseparateSORs),
painting, finishing, cleanup and restoration of site; preparation of asbuilt drawings, documents and project records and performing all works as per drawings,
specifications,otherprovisionsofContractdocumentandinstructionsofEngineerincharge.
a
b

OnpipelineofNB12"x6.4mmw.t.
OnpipelineofNB8"x8.2mmw.t.
i)ThisworkisexclusiveofallworksassociatedwithmainpipelinecoveredunderSl.No.1above.
ii)Allcivil/structuralworksincludingareafencingandgate,pipesupports,valvechamberwillbepaidseparatelyasperunitrateprovidedelsewhereintheSORs.

CompleteworksforTappoffPoints
WorksatFutureConnections
Completeworksofdesign,engineering,installationofallpiping,valves,fittingsatalldepthsinsidethepitinalltypesofterrainsandsoilsincludingtransportation,
handlingofallOwnersuppliedmaterialsfromOwner'sdesignatedissuepoint(s)toworksite,supplyofContractor'ssuppliedmaterialstoworksite(s),allmechanical
worksincludingfabrication,welding,nondestructivetestingofwelds,weldrepairs/retesting,cleaning/flushing,prehydrotesting&hydrostatictesting,dewatering,
functionaltesting,cuttingofmainlineandbeveling(ifrequired),tieinofvalveassembly,includingradiographyoftieinjoints,corrosion,coatingandexternalpainting
asrequired.
All civil works including excavation of pit, piping supports including all PCC and RCC works for pedestals with insert plates as required, construction of valve
chamber including with supply of all material and finishig, clean up and restoration of site, filling and grading of area around valve station for avoiding any local
floodingofareaandasperspecificationandinstructionsofOwner/Owner'srepresentative.
Preparationofasbuiltdrawings,documentsandprojectrecordsandperformingallworksasperdrawings,specifications,otherprovisionsofContractdocumentand
instructionsofEngineerincharge.
Note:Bolts,nuts,washer,Uclamps,gasketsetcrequiredforpipingfacilitesshallbeprocuredandsuppliedbythecontractorwithintheratequoted.
Theseitemsshallnotbeseparatelymasuredandpaid.

a
b
c
d
e
f
g
h
i

12"x12"
12"x8"
12"x6"
8"x8"
6"x6"
4"x4"
8"x6"
8"x4"
6"x4"
Note:Makingofvalvepitfortapoffpoints,pipesupportsandfencingwouldbepaidagainstseparateSORitems.

10

Purgingandinertisationofexistingpipeline

Rev. 2- 08.04.2013

City Gas Distribution Project in NCT of Delhi and NCR Region

NA

Page 37 of 57

SCHEDULEOFRATESFORRATECONTRACTFORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINN

ItemNo.

Description

Unit

Purging and inertisation of existing pipeline section between the two isolation valves with nitrogen to make the pipeline section free from hydrocarbons (prior to
carrying out cutting / installation of tap off connection) and oxygen (after completion of tap off works including supply of required quantity of nitrogen and all Nos.
equipments,toolsandtackles,manpoweretc.requiredfortheworksandasperinstructionofengineerincharge.

11
11.1

Quantity

UNITPRICEINCLUSIVEOFALL
TAXESINCLUDINGBOCWTAX
(EXCLUDINGSERVICETAX),DUTIES,
LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSITINSURANCEOF
FREEISSUEMATERIALSASDEFINED
INBIDDOCUMENT

330

Note:RateareforNumberofNitrogencylinders
Pipelinelaying/installationofabovegroundpipeline
(WhereverrequiredatCNG/DRS/MRSstationsandconsumerendsetc.)
WeldingofpipeswithPipes/fittings/Valves:
Receiving and taking over of all free issue materials from companys designated place of issue, handling including lifting, transportation from Owners and / or
contractorsstoragepointtoworksite/workshopasapplicableforfabricationor/andtoworksiteforfieldfabricationanderectionforallpipingitemssuppliedby
COMPANY/CONTRACTOR.
Fabricationincludingcutting,edgepreparation,inclusiveofgrindingtheedgesofpipes,fittings,etc.tomatchwithgrindingtheedgesofpipes,fittingsetc.tomatch
withthematchingedgesofuneven/differentthicknesswhereverrequiredfitupbending,preheatingwhereverrequired,weldingetc.pipefittingslikeelbows,tees,
reducers, weldolets, sockolets, etc. vent and drain point connection etc. including providing stub in connection, fabricated fittings and reinforcement pads etc. as
required.CarryingoutNondestructivetestingasperspecification&instructionofEIC.

a
b
c
d
e
f
g
11.2

12"NB
8"NB
6"NB
4"NB
2"NB
1"NB
0.75"NB

Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.

5
20
8
40
100
3
5

Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.

5
10
4
10
40
2
2

WeldingofpipeswithFlanges
Receiving and taking over of all free issue materials from companys designated place of issue, handling including lifting, transportation from Owners and / or
contractorsstoragepointtoworksite/workshopasapplicableforfabricationor/andtoworksiteforfieldfabricationanderectionforallpipingitemssuppliedby
COMPANY/CONTRACTOR.
Fabricationincludingcutting,edgepreparation,inclusiveofgrindingtheedgesofpipes,flangesetc.tomatchwithgrindingtheedgesofpipes,flangesetc.tomatch
with the matching edges of uneven / different thickness, preheating wherever required, welding etc. including supply and fixing of all types of gaskets (including
gasketsforRTJflanges),boltsandnutsforallsizes.CarryingoutNondestructivetestingasperspecification&instructionofEIC.

a
b
c
d
e
f
g

Rev. 2- 08.04.2013

12"NB
8"NB
6"NB
4"NB
2"NB
1"NB
0.75"NB

City Gas Distribution Project in NCT of Delhi and NCR Region

Page 38 of 57

SCHEDULEOFRATESFORRATECONTRACTFORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINN

ItemNo.

11.3

Description

Unit

Quantity

UNITPRICEINCLUSIVEOFALL
TAXESINCLUDINGBOCWTAX
(EXCLUDINGSERVICETAX),DUTIES,
LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSITINSURANCEOF
FREEISSUEMATERIALSASDEFINED
INBIDDOCUMENT

Erection&Testing:
Completeworkoferection,painting,testingandmakingreadyforfurthercommissioning/startupcarbonsteelpipingandfittingsofallsizesandratingsincluding
supply&installationof,allfittingslikeelbow,tees,reducers,swages,weldolet,sockolets,nipples,flanges,blindflanges,spectacleblindflanges,valves,pipesofsizes
below2NBandofallratingsincludingsupplyofallconsumables,equipment,manpowerandotherresourcesandexecutionofbutnotlimitedtothefollowingworks
in accordance with relevant specifications, drawings, scope of work and instruction of Owner/ Owner's Representative and as per all provisions of the contract
document.
Erectionofpipesofalltypesandthicknessoversleepers,overheadonrackandatallelevations,connectingwithequipmentnozzle,aligningandinstallationforall
typesofvalves,allonlineinstrumentsandfittingsofallsizesofelbow,reducers,tees,flangesblindflange,spectacleblindflanges,branchconnection/tapping,vents
anddrains,requiredforprocessandhydrotesting,tappingforpressuregaugesthermowellssampleconnections,etc.

Painting of entire system (including all pipes and accessories) as per specification, including supply of approved paints and primers, preparation of surface and
applicationofprimerandpaint,identificationlettering/numbering,colorcoding,etc.asspecifiedincludingrubdown&touchupofshopprimerorscrappingofshop
primerwhereverrequiredbyCOMPANYandprovidingscaffoldingforallheightsetc.Cleaningandflushingbywater/compressedair,testingofthesystemincluding
hydrostatic,pneumaticandanyothertypeoftestingasspecified,draining,dryingbycompressedair/othermethodsapprovedbyCOMPANY.
Cleaningandflushingbywater/compressedair,testingofthesystemincludinghydrostatic,pneumaticandanyothertypeoftestingasspecified,draining,dryingby
compressedair/othermethodsasapprovedbyOwner.
CompletionofallsuchworkinallrespectasperscopeofworkandasperdrawingsspecificationsandinstructionsoftheCOMPANYandkeepinginthesystemready
inallrespectsforfurthercommissioningandstartup.
Hookingupwithothersystempipingatbatterylimit.
Preparationofisometric,fabricationdrgs.Billofmaterialsasperspecifications,drawingsandinstructionofOwner/OwnersRepresentative

Diameter
12"NB
8"NB
6"NB
4"NB
2"NB
1"NB(Includingsupplyofpipe,fittings,flanges,valvesandotheritemsrequired).
0.75"NB(Includingsupplyofpipe,fittings,flanges,valvesandotheritemsrequired).
Note:Bolts,nuts,washer,Uclamps,gasketsetcrequiredforpipingfacilitiesshallbeprocuredandsuppliedbythecontractorwithintheratequoted.Theseitemsshall
notbeseparatelymeasuredandpaid.
Providing&installationofSSpressuregauge(makewaree)asperdatasheetattachedinthetender

12

Pipesupports&structures

a
b
c
d
e
f
g

Rev. 2- 08.04.2013

City Gas Distribution Project in NCT of Delhi and NCR Region

m
m
m
m
m
m
m

50
50
15
100
160
3
2

Nos.

12

Page 39 of 57

SCHEDULEOFRATESFORRATECONTRACTFORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINN

ItemNo.

Description

Unit

Supply,fabricationanderectionofalltypesofpipesupportsofMSmateriallikeclamps,saddle,guidestops,cradles,turnbuckles,anchors,Tposts;stockade/
trestleandpipebridgeforoverheadpiping;framesforcanopy,approachladdersandplatforms,crossover,cabletraysupportsetc.includingpaintingsuitablefor
highlycorrosiveareaasperspecificationlaborandsupervision&completeworkasperspecificationsandinstructionofEngineerincharge(Bolts,nuts,washers,U M.Ton
clamps etc. for supporting shall be supplied by the contractor within the rates quoted . These items will not be measured and paid separately ) this work is to be
completeinallrespectasperscopeofwork.

Quantity

UNITPRICEINCLUSIVEOFALL
TAXESINCLUDINGBOCWTAX
(EXCLUDINGSERVICETAX),DUTIES,
LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSITINSURANCEOF
FREEISSUEMATERIALSASDEFINED
INBIDDOCUMENT

0.15

80,901.00

13

Structuralworks(Fencing&Gate)

a.i

Supplyanderectionofsingleleafmildsteelgate2.5mhighwithmeshupto2mheightandbarbedwirefencingand2mwidecompleteinallrespectincludingpainting
No.
asperspecificationonallMSitems,allworksasperspecificationanddrawingsexcludingfoundationsandRCC.

19,069.52

a.ii

Supplyanderectionofdouble leafmildsteelgate2.5mhighwithmeshupto2mheightandbarbedwirefencingand4mwidecompleteinallrespectincluding
No.
paintingasperTSonallMSitems,allworksasperspecificationanddrawingsexcludingfoundationsandRCC.

22,536.71

RM

30

2,889.32

PermanentMarkers
typesofsoil,constructioninalltypesofsoil,constructionofpedestalsandgroutingwithconcrete,clearing,supplyandapplicationofapprovedcolorandqualityof
primerandpaint(powdercoated),stencillettercuttingfornumbers,direction,chainageetc.,restorationofareatooriginalconditionandperformingallworksasper
RCCroutemarkerasperdrawingno.P.003960L160106
Nos.

915

WarningsignwithPost&foundationsasperdrawingno.TEINDSTDGM9004.Itshallbepowdercoatedonly&beforeinstallingtakeapprovalfromtheEIC.

Nos.

315

15

ConstructionofRCC/Brickvalvechamber

14

Supplyofallmaterials,fabricationanderectionofchainlinkfencing2.5mhighwithmeshupto2mheightandbarbedwirefencingcompleteinallrespectincluding
paintingasperTSonallMSitems,allworksasperspecificationanddrawingsexcludingfoundationsandRCC.
NOTE:Ratetoincludecostofalllabor,tools,tackles,equipment,hirecharges,supplyofallmaterialssuchasminimum43gradecementincludingsulphate
resistantcementforsubstructures,R/Fsteel,inserts,bolts,conduits,bitumen,otherminorconstructionmaterials,shuttering,stinging,earthworkinexcavationand

Allcivilworksincludingsupplyofallmaterial,excavationofpit,piping&valvesupportsincludingallPCCandRCC/Brickworksforvalvespit,pedestalswithinsert
platesasrequiredsealingofpipeatvalvepits,providingcoveretcandfinishing,cleanupandrestorationofsite,fillingandgradingofareaaroundthevalvestationto
avoidanylocalfloodingofarea,asperspecificationenclosedandinstructionofEngineerinCharge.
a

BrickChamber(Drawingno.P.003960C149011)
Size2mx1.5m

Nos.

BrickChamber(Drawingno.P.003960C149012)
Size1.5mx1.5m

Nos.

RCCChamber(Drawingno.P.003960C149009)
Size2mx1.5m

Nos.

22

Nos.

22

d
16

Rev. 2- 08.04.2013

RCCChamber(Drawingno.P.003960C149010)
Size1.5mx1.5m
PCC

City Gas Distribution Project in NCT of Delhi and NCR Region

Page 40 of 57

SCHEDULEOFRATESFORRATECONTRACTFORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINN

ItemNo.

Description

Unit

Quantity

UNITPRICEINCLUSIVEOFALL
TAXESINCLUDINGBOCWTAX
(EXCLUDINGSERVICETAX),DUTIES,
LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSITINSURANCEOF
FREEISSUEMATERIALSASDEFINED
INBIDDOCUMENT

ProvidingandlayingPCC(1:2:4)aspertechnicalspecifications&instructionofEngineerincharge.

m3

5,431.92

ProvidingandlayingPCC(1:4:8)aspertechnicalspecifications&instructionofEngineerincharge.

m3

4,622.91

17

RCC

m3

10,401.56

ProvidingandLayingreinforcedcementofgradeM20with20mmanddowngradecrushedstoneaggregateinalltypesofstructureslikefoundations,pedestalsetc.
atalldepths&heightsaspertheinstructionofEngineerincharge.
18

TemporaryCathodicProtection:
12",8",6"&4"NB(TotalLength=47KM)

18.1

Design,detailengineeringofTCPsystembasedonsoilresistivitymeasuredfrompipelineROW,SoilIonic&MicrobialLoading,Interferingelementssurveysfrom
pipelineROW.

Nos.

10

18.1.1

SoilResistivity(Atevery1000meter),SoilIonic&MicrobialLoading(Atevery5KmandwhereverSoilvariation)andInterferingelementssurveysfrompipeline
ROW.

Km

47

18.2

Supply,installation,Testing&CommissioningofTestleadPoints(TLP)includingweatherproofTestLeadBoxasspecifiedinspecificationwithbacklitestrip,bolt
terminals,4diaheavydutypipeattopendtofitthetestleadboxandbaseplateweldedatthebottomincludingMSbendforconcreteBase,Bend,Cables,pipeto
cableconnection,EpoxyEncapsulation&Miscellaneoussuchasconnectors,Excavationandbackfillingtrenchesforcablelaying&PinBrazingetc.,Theworkshall
includesupply&fixingofanoncorrosivenameplatecontainingthedetailslikeKMlocation,identification,TLPNo,Directionofflow,connectionscheme,typeetc.,
onthesideofTopboxincludingthecostofalllabour,materials,tools&tacklesetc.,cablesareannealedhighconductivity,tinned,strandedcopperconductor,XLPE
insulated,650/1100Vgrade,PVCsheathedorasperspecification.

18.2.1

TypeAforPotentialMeasurementwithminimumtwocablesincluding1Cx06Sq.mm&1Cx10Sq.mmarmouredPotentialmeasurementcables,pinbrazing
connectionencapsulationkitetc.,

Nos.

18.2.2

Type A1 for Current Measurement with minimum four cables including 1Cx06 Sq.mm & 1Cx10 Sq.mm armoured Potential measurement cables, pin brazing
Nos.
connectionencapsulationkitetc.,

18.2.3

TypeBforGalvanicAnodetoPipeConnectionwithminimumtwocablesincluding1Cx06Sq.mm&1Cx10Sq.mmPotentialmeasurementcable&1Cx10Sq.mm
Nos.
armouredgalvanicanodeconnection,pinbrazingconnectionencapsulationkitetc.,

40

18.2.4

TypeFforforeignPipelineCrossingwithminimumfourcablesincluding1Cx06Sq.mmarmouredPotentialmeasurementcables&1Cx25Sq.mmarmouredBonding
Connection,pinbrazingconnectionencapsulationkitetc.,

Nos.

18.2.5

TypeDforCasedCrossingwithminimumfourcablesincludingtwocablesof1Cx06Sq.mmPotentialmeasurementcable&twocablesof1Cx10Sq.mmarmoured
Nos.
anodeconnection,pinbrazingconnectionencapsulationkitetc.,

18.2.6

TypeEforGroundingCellwithminimumfourcablesincludingtwocablesof1Cx06Sq.mmarmouredPotentialmeasurementcables&twocablesof1Cx25Sq.mm
Nos.
armouredgalvanicanodeconnection,pinbrazingconnectionencapsulationkitetc.,

27

Rev. 2- 08.04.2013

City Gas Distribution Project in NCT of Delhi and NCR Region

Page 41 of 57

SCHEDULEOFRATESFORRATECONTRACTFORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINN

ItemNo.

Description

Unit

Quantity

18.2.7

TypeHforHTLineCrossingwithminimumtwocablesincluding1Cx06Sq.mmarmouredPotentialmeasurementcables&1Cx25Sq.mmarmouredgalvanicanode
Nos.
connection,pinbrazingconnectionencapsulationkitetc.,

18.2.8

Supply&InstallationofTeststationHTLineCrossingwithminimumtwocablesincluding1Cx06Sq.mmarmouredPotentialmeasurementcables&1Cx25Sq.mm
armoured galvanic anode connection, pin brazing connection encapsulation kit etc.,to accomodate 5 KA polarization cell,including terminal plate,lock,connection
Nos.
diagram,plates,cabletermination,lugs,etccompleteinallrespectincludinglabour,tools,tackles,consumableslikebolts,nut,washeretc.asperdrawing,specification
shallbemountedonexistingfoundationanddirectionofIGL.

18.2.9

Supply&Installationof05KAPolarizationcell.ItshouldbeutilizedinvandalproofareasforpassageofinducedvoltageonthepipelineinthevicinityofAC
transmissionlinestoearthduringnormalaswellasfaultconditions.ItshallmaintaintheisolationbetweenZnanodeandpipelinesothatCPcurrentshallnotbe
consumedbyZnanode.PolarizationcellshallbeinstalledinvandalproofareasinaIP55enclosure.

Nos.

18.2.10

Supply&Installationof25KAPolarizationcell.ItshouldbeutilizedinvandalproofareasforpassageofinducedvoltageonthepipelineinthevicinityofAC
transmissionlinestoearthduringnormalaswellasfaultconditions.ItshallmaintaintheisolationbetweenZnanodeandpipelinesothatCPcurrentshallnotbe
consumedbyZnanode.PolarizationcellshallbeinstalledinvandalproofareasinaIP55enclosure.

Nos.

18.2.11

Supply&Installationof50KAPolarizationcell.ItshouldbeutilizedinvandalproofareasforpassageofinducedvoltageonthepipelineinthevicinityofAC
transmissionlinestoearthduringnormalaswellasfaultconditions.ItshallmaintaintheisolationbetweenZnanodeandpipelinesothatCPcurrentshallnotbe
consumedbyZnanode.PolarizationcellshallbeinstalledinvandalproofareasinaIP55enclosure.

Nos.

18.3

Supply&InstallationofprepackedMgAnode(7.6Kg)withonecableincluding1Cx10Sq.mmUnarmouredcable(withsufficentlength)&encapsulationkitforcable
Nos.
connectionterminationofAnodetailcableintheTLPetc.,

50

18.4

Supply&InstallationofSurgeDiverterforHTlineCrossing

Nos.

18.5

Supply&InstallationofprepackedZincAnode(40yearsdesignlife/Min.20Kg)forHTLinecrossingwithonecableincluding1Cx25Sq.mmarmouredcable(with
sufficentlength),encapsulationkitterminationofAnodetailcableintheTLPetc.,.

Nos.

36

18.6

Supply&InstallationofSparkGapArresterforInsulatingJoint.

Nos.

27

18.7

Supply&InstallationofZincGroundingCellof20KgeachforIJwithtwocablesincluding1Cx25Sq.mmarmouredcable(withsufficentlength),encapsulationkit
terminationofAnodetailcableintheTLPetc.,

Nos.

27

18.8

Supply&InstallationofcablesAnnealedhighconductivity,tinned,strandedcopperconductor,XLPEinsulated,650/1100Vgrade,PVCsheathedorasper
specificationandMiscellaneoussuchastermination,tagging,excavatingthetrenchforcablelaying,backfilling,etc.,includingthecostofalllabour,materials,tools
andtackles.(Thisunitrsteshallbeapplicableonlyforanyadditionalworkonexisting/forthesamesystem)

18.8.1

1Cx6Sq.mmarmouredPotentialMeasurement&referencecellcable.

10

18.8.2

1Cx10Sq.mmunarmouredAnodeTailCable.

10

Rev. 2- 08.04.2013

City Gas Distribution Project in NCT of Delhi and NCR Region

UNITPRICEINCLUSIVEOFALL
TAXESINCLUDINGBOCWTAX
(EXCLUDINGSERVICETAX),DUTIES,
LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSITINSURANCEOF
FREEISSUEMATERIALSASDEFINED
INBIDDOCUMENT

Page 42 of 57

SCHEDULEOFRATESFORRATECONTRACTFORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINN

ItemNo.

Description

Unit

Quantity

18.8.3

1Cx10Sq.mmarmouredCurrentMeasurement

10

18.8.4

1Cx25Sq.mmarmouredBonding/GroundingCell

10

MonitoringtheInstalled(TCP)SystemalongwithIGL/PMConmonthlybasisandsubmissionofmonitoringreporttoIGL&PMC,tillPCPsystemiscommissionedor
uptohandedovertheTCPsystemtoIGL(O&M).

LS

18.9

19

20

CIPLSurveyforUndergroundSteelPipeline:
CIPLSurveyofundergroundsteelpipelineofdifferentsizesofPipesrangingfrom4"to12toassesstheeffectivenessofCPsystemofthepipeline,tostudythe KM
interferenceeffectduetoTractions/Transmissionlines&foreignpipelinesetc.andtoprovidemitigationmeasures&complianceforthesame.
DCVGSurveyforUndergroundSteelPipeline:
DCVG Survey of underground steel pipeline of different sizes of Pipes ranging from 4" to 12 to identify the pipeline sections where coating is good andbad , to
pinpointcoating defectin pipelinesections wherecoating isbad, togive accuratecoating defectlocationsforfuture coatingrepairs,tosizethedefects bystandard KM
methodandclassifydefectsasAnodicorCathodic.Repairofcoatingdefectsincludingallassociatedcivilworks.

UNITPRICEINCLUSIVEOFALL
TAXESINCLUDINGBOCWTAX
(EXCLUDINGSERVICETAX),DUTIES,
LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSITINSURANCEOF
FREEISSUEMATERIALSASDEFINED
INBIDDOCUMENT

27

20

NOTE:
1.Anyothermaterial&activitiesnotmentioned/coveredabove,butotherwiserequiredforsatisfactorycompletion/safetyofworkasdefinedintenderhastobe
supplied/donebycontractorwithinquotedprice.Noextrapaymentshallbemade.
2.Theabovequantitiesaretentativeandmayvaryduringdetailedengineeringconsiderablydependinguponsitecondition,methodologyadoptedaspersiterequirement
withdueapprovalofOwner/Consultant.
3.Thequantitymayvaryduringexecutionstageandpaymentshallbemadebasedontheworkfortheactualquantityexecuted.
21
21.1
21.1.1

TELECOMMUNICATIONSITEWORK(asperscopeofworkandStandardSpecificationofBiddocuments)
SupplyandInstallation&CommissioningofElectronicMarkerSystemasperspecification,testcertificateanddocumentsetc.consistingof:
ElectronicMarkerasperattachedspecificationandinstructionsofOwner/owner'srepresentative.

Nos.

TotalRs.(infigure)

SEAL&SIGNATUREOFBIDDER

Rev. 2- 08.04.2013

City Gas Distribution Project in NCT of Delhi and NCR Region

Page 43 of 57

TenderNo.IGL/ND/C&P/
P12500

FORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINNCR

UNITPRICEINCLUSIVEOF
ALLTAXESINCLUDINGBOCW
TAX&SERVICETAX,DUTIES,
SERVICETAX@
LEVIES,FREIGHT,INSURANCE
12.36%ONUNITRATE
INCLUDINGTRANSIT
(COL.3)
INSURANCEOFFREEISSUE
MATERIALSASDEFINEDIN
BIDDOCUMENT
(3)+(4)
4

Rev. 2- 08.04.2013

TOTALPRICEINCLUSIVEOF
ALLTAXESINCLUDINGBOCW
TAX&SERVICETAX,DUTIES,
LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSIT
INSURANCEOFFREEISSUE
MATERIALSASDEFINEDIN
BIDDOCUMENT
(2)X(5)
6

City Gas Distribution Project in NCT of Delhi and NCR Region

Page 44 of 57

FORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINNCR

UNITPRICEINCLUSIVEOF
ALLTAXESINCLUDINGBOCW
TAX&SERVICETAX,DUTIES,
SERVICETAX@
LEVIES,FREIGHT,INSURANCE
12.36%ONUNITRATE
INCLUDINGTRANSIT
(COL.3)
INSURANCEOFFREEISSUE
MATERIALSASDEFINEDIN
BIDDOCUMENT
(3)+(4)

Rev. 2- 08.04.2013

TenderNo.IGL/ND/C&P/
P12500
TOTALPRICEINCLUSIVEOF
ALLTAXESINCLUDINGBOCW
TAX&SERVICETAX,DUTIES,
LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSIT
INSURANCEOFFREEISSUE
MATERIALSASDEFINEDIN
BIDDOCUMENT
(2)X(5)

City Gas Distribution Project in NCT of Delhi and NCR Region

Page 45 of 57

FORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINNCR

UNITPRICEINCLUSIVEOF
ALLTAXESINCLUDINGBOCW
TAX&SERVICETAX,DUTIES,
SERVICETAX@
LEVIES,FREIGHT,INSURANCE
12.36%ONUNITRATE
INCLUDINGTRANSIT
(COL.3)
INSURANCEOFFREEISSUE
MATERIALSASDEFINEDIN
BIDDOCUMENT
(3)+(4)

Rev. 2- 08.04.2013

TenderNo.IGL/ND/C&P/
P12500
TOTALPRICEINCLUSIVEOF
ALLTAXESINCLUDINGBOCW
TAX&SERVICETAX,DUTIES,
LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSIT
INSURANCEOFFREEISSUE
MATERIALSASDEFINEDIN
BIDDOCUMENT
(2)X(5)

City Gas Distribution Project in NCT of Delhi and NCR Region

Page 46 of 57

FORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINNCR

UNITPRICEINCLUSIVEOF
ALLTAXESINCLUDINGBOCW
TAX&SERVICETAX,DUTIES,
SERVICETAX@
LEVIES,FREIGHT,INSURANCE
12.36%ONUNITRATE
INCLUDINGTRANSIT
(COL.3)
INSURANCEOFFREEISSUE
MATERIALSASDEFINEDIN
BIDDOCUMENT
(3)+(4)

Rev. 2- 08.04.2013

TenderNo.IGL/ND/C&P/
P12500
TOTALPRICEINCLUSIVEOF
ALLTAXESINCLUDINGBOCW
TAX&SERVICETAX,DUTIES,
LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSIT
INSURANCEOFFREEISSUE
MATERIALSASDEFINEDIN
BIDDOCUMENT
(2)X(5)

City Gas Distribution Project in NCT of Delhi and NCR Region

Page 47 of 57

TenderNo.IGL/ND/C&P/
P12500

FORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINNCR

UNITPRICEINCLUSIVEOF
ALLTAXESINCLUDINGBOCW
TAX&SERVICETAX,DUTIES,
SERVICETAX@
LEVIES,FREIGHT,INSURANCE
12.36%ONUNITRATE
INCLUDINGTRANSIT
(COL.3)
INSURANCEOFFREEISSUE
MATERIALSASDEFINEDIN
BIDDOCUMENT
(3)+(4)

NA

Rev. 2- 08.04.2013

NA

TOTALPRICEINCLUSIVEOF
ALLTAXESINCLUDINGBOCW
TAX&SERVICETAX,DUTIES,
LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSIT
INSURANCEOFFREEISSUE
MATERIALSASDEFINEDIN
BIDDOCUMENT
(2)X(5)

NA

City Gas Distribution Project in NCT of Delhi and NCR Region

Page 48 of 57

TenderNo.IGL/ND/C&P/
P12500

FORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINNCR

UNITPRICEINCLUSIVEOF
ALLTAXESINCLUDINGBOCW
TAX&SERVICETAX,DUTIES,
SERVICETAX@
LEVIES,FREIGHT,INSURANCE
12.36%ONUNITRATE
INCLUDINGTRANSIT
(COL.3)
INSURANCEOFFREEISSUE
MATERIALSASDEFINEDIN
BIDDOCUMENT
(3)+(4)

1142.78
857.09
642.82

Rev. 2- 08.04.2013

10388.61
7791.46
5843.60

TOTALPRICEINCLUSIVEOF
ALLTAXESINCLUDINGBOCW
TAX&SERVICETAX,DUTIES,
LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSIT
INSURANCEOFFREEISSUE
MATERIALSASDEFINEDIN
BIDDOCUMENT
(2)X(5)

2077722.92
311658.33
233743.86

City Gas Distribution Project in NCT of Delhi and NCR Region

Page 49 of 57

TenderNo.IGL/ND/C&P/
P12500

FORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINNCR

UNITPRICEINCLUSIVEOF
ALLTAXESINCLUDINGBOCW
TAX&SERVICETAX,DUTIES,
SERVICETAX@
LEVIES,FREIGHT,INSURANCE
12.36%ONUNITRATE
INCLUDINGTRANSIT
(COL.3)
INSURANCEOFFREEISSUE
MATERIALSASDEFINEDIN
BIDDOCUMENT
(3)+(4)

199.99

Rev. 2- 08.04.2013

1818.01

TOTALPRICEINCLUSIVEOF
ALLTAXESINCLUDINGBOCW
TAX&SERVICETAX,DUTIES,
LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSIT
INSURANCEOFFREEISSUE
MATERIALSASDEFINEDIN
BIDDOCUMENT
(2)X(5)

436321.75

City Gas Distribution Project in NCT of Delhi and NCR Region

Page 50 of 57

TenderNo.IGL/ND/C&P/
P12500

FORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINNCR

UNITPRICEINCLUSIVEOF
ALLTAXESINCLUDINGBOCW
TAX&SERVICETAX,DUTIES,
SERVICETAX@
LEVIES,FREIGHT,INSURANCE
12.36%ONUNITRATE
INCLUDINGTRANSIT
(COL.3)
INSURANCEOFFREEISSUE
MATERIALSASDEFINEDIN
BIDDOCUMENT
(3)+(4)

NA

Rev. 2- 08.04.2013

NA

TOTALPRICEINCLUSIVEOF
ALLTAXESINCLUDINGBOCW
TAX&SERVICETAX,DUTIES,
LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSIT
INSURANCEOFFREEISSUE
MATERIALSASDEFINEDIN
BIDDOCUMENT
(2)X(5)

NA

City Gas Distribution Project in NCT of Delhi and NCR Region

Page 51 of 57

FORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINNCR

UNITPRICEINCLUSIVEOF
ALLTAXESINCLUDINGBOCW
TAX&SERVICETAX,DUTIES,
SERVICETAX@
LEVIES,FREIGHT,INSURANCE
12.36%ONUNITRATE
INCLUDINGTRANSIT
(COL.3)
INSURANCEOFFREEISSUE
MATERIALSASDEFINEDIN
BIDDOCUMENT
(3)+(4)

Rev. 2- 08.04.2013

TenderNo.IGL/ND/C&P/
P12500
TOTALPRICEINCLUSIVEOF
ALLTAXESINCLUDINGBOCW
TAX&SERVICETAX,DUTIES,
LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSIT
INSURANCEOFFREEISSUE
MATERIALSASDEFINEDIN
BIDDOCUMENT
(2)X(5)

City Gas Distribution Project in NCT of Delhi and NCR Region

Page 52 of 57

FORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINNCR

UNITPRICEINCLUSIVEOF
ALLTAXESINCLUDINGBOCW
TAX&SERVICETAX,DUTIES,
SERVICETAX@
LEVIES,FREIGHT,INSURANCE
12.36%ONUNITRATE
INCLUDINGTRANSIT
(COL.3)
INSURANCEOFFREEISSUE
MATERIALSASDEFINEDIN
BIDDOCUMENT
(3)+(4)

Rev. 2- 08.04.2013

TenderNo.IGL/ND/C&P/
P12500
TOTALPRICEINCLUSIVEOF
ALLTAXESINCLUDINGBOCW
TAX&SERVICETAX,DUTIES,
LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSIT
INSURANCEOFFREEISSUE
MATERIALSASDEFINEDIN
BIDDOCUMENT
(2)X(5)

City Gas Distribution Project in NCT of Delhi and NCR Region

Page 53 of 57

TenderNo.IGL/ND/C&P/
P12500

FORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINNCR

UNITPRICEINCLUSIVEOF
ALLTAXESINCLUDINGBOCW
TAX&SERVICETAX,DUTIES,
SERVICETAX@
LEVIES,FREIGHT,INSURANCE
12.36%ONUNITRATE
INCLUDINGTRANSIT
(COL.3)
INSURANCEOFFREEISSUE
MATERIALSASDEFINEDIN
BIDDOCUMENT
(3)+(4)

Rev. 2- 08.04.2013

TOTALPRICEINCLUSIVEOF
ALLTAXESINCLUDINGBOCW
TAX&SERVICETAX,DUTIES,
LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSIT
INSURANCEOFFREEISSUE
MATERIALSASDEFINEDIN
BIDDOCUMENT
(2)X(5)

9999.36

90900.36

13635.05

2356.99

21426.51

64279.54

2785.54

25322.25

75966.74

357.12

3246.44

97393.20

City Gas Distribution Project in NCT of Delhi and NCR Region

Page 54 of 57

TenderNo.IGL/ND/C&P/
P12500

FORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINNCR

UNITPRICEINCLUSIVEOF
ALLTAXESINCLUDINGBOCW
TAX&SERVICETAX,DUTIES,
SERVICETAX@
LEVIES,FREIGHT,INSURANCE
12.36%ONUNITRATE
INCLUDINGTRANSIT
(COL.3)
INSURANCEOFFREEISSUE
MATERIALSASDEFINEDIN
BIDDOCUMENT
(3)+(4)

Rev. 2- 08.04.2013

TOTALPRICEINCLUSIVEOF
ALLTAXESINCLUDINGBOCW
TAX&SERVICETAX,DUTIES,
LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSIT
INSURANCEOFFREEISSUE
MATERIALSASDEFINEDIN
BIDDOCUMENT
(2)X(5)

671.39

6103.31

18309.92

571.39

5194.30

15582.91

1285.63

11687.19

35061.58

City Gas Distribution Project in NCT of Delhi and NCR Region

Page 55 of 57

FORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINNCR

UNITPRICEINCLUSIVEOF
ALLTAXESINCLUDINGBOCW
TAX&SERVICETAX,DUTIES,
SERVICETAX@
LEVIES,FREIGHT,INSURANCE
12.36%ONUNITRATE
INCLUDINGTRANSIT
(COL.3)
INSURANCEOFFREEISSUE
MATERIALSASDEFINEDIN
BIDDOCUMENT
(3)+(4)

Rev. 2- 08.04.2013

TenderNo.IGL/ND/C&P/
P12500
TOTALPRICEINCLUSIVEOF
ALLTAXESINCLUDINGBOCW
TAX&SERVICETAX,DUTIES,
LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSIT
INSURANCEOFFREEISSUE
MATERIALSASDEFINEDIN
BIDDOCUMENT
(2)X(5)

City Gas Distribution Project in NCT of Delhi and NCR Region

Page 56 of 57

FORLAYINGOFLARGEDIAMETERCOATEDCARBONSTEELPIPELINESINNCR

UNITPRICEINCLUSIVEOF
ALLTAXESINCLUDINGBOCW
TAX&SERVICETAX,DUTIES,
SERVICETAX@
LEVIES,FREIGHT,INSURANCE
12.36%ONUNITRATE
INCLUDINGTRANSIT
(COL.3)
INSURANCEOFFREEISSUE
MATERIALSASDEFINEDIN
BIDDOCUMENT
(3)+(4)

Rev. 2- 08.04.2013

TenderNo.IGL/ND/C&P/
P12500
TOTALPRICEINCLUSIVEOF
ALLTAXESINCLUDINGBOCW
TAX&SERVICETAX,DUTIES,
LEVIES,FREIGHT,INSURANCE
INCLUDINGTRANSIT
INSURANCEOFFREEISSUE
MATERIALSASDEFINEDIN
BIDDOCUMENT
(2)X(5)

City Gas Distribution Project in NCT of Delhi and NCR Region

Page 57 of 57