Sie sind auf Seite 1von 191

Railway Electrification Works Between

RANI (Excl) - SWARUPGANJ (Excl)

DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF 25 KV,


50HZ, SINGLE PHASE, TRACTION HIGH RISE OVER-HEAD EQUIPMENT,
SWITCHING STATIONS, TRACTION SUB-STATIONS, SCADA, GENERAL
ELECTRICAL SERVICES WORKS ALONG WITH CIVIL ENGINEERING
WORK ie. SERVICE BUILDINGS, QUARTERS AND OTHER ASSOCIATED
WORKS AND ALSO SIGNALING & TELECOMMUNICATION WORKS
BETWEEN RANI (Excl.) SWARUPGANJ (Excl.) 86 RKM / 198 TKM SECTION
IN AJMER DIVISION OF NORTH WESTERN RAILWAY IN THE STATE OF
RAJASTHAN , INDIA

Volume - II
(PREAMBLE, EXPLANATORY NOTES, BOQ FOR PACKAGE 1)

Volume II Price Proposal

Execution of

Package- 1 - DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF 25 KV, 50HZ,


SINGLE PHASE, HIGH RISE TRACTION OVER-HEAD EQUIPMENT, SWITCHING STATIONS,
TRACTION SUB-STATIONS, SCADA, GENERAL ELECTRICAL SERVICES WORKS ALONG WITH CIVIL
ENGINEERING WORK ie. SERVICE BUILDINGS, QUARTERS AND OTHER ASSOCIATED WORKS
AND SIGNALING & TELECOMMUNICATION WORKS BETWEEN RANI (Excl.) TO SWARUPGANJ
(Excl.) SECTION OF 86 RKM/198 TKM IN AJMER DIVISION OF NORTH WESTERN RAILWAY IN
THE STATE OF RAJASTHAN, INDIA.

FEB 2015

Corporate Office:
RAIL VIKAS NIGAM LIMITED
First floor, August Kranti Bhavan,
Bhikaji Cama Place, New Delhi 110 066
Tele : + 91-11-26738191 , Fax : + 91-11-26182957, web : www.rvnl.org

Table of Content
Bill of Quantities
Preamble
Summary sheet of bill of quantities
Bill of quantities(Electrical Engineering)
Bill of quantities(Civil Engineering)
Bill of quantities (Signal & Telecom Engineering )
Explanatory Note( Signal & Telecom Engineering)

Explanatory Notes (Electrical Engineering )

Volume II
Bill Of Quantities
Package-1

Preamble

RVNL/RANI-SRPJ/RE

Bill of Quantities
PREAMBLE
PREAMBLE(Civil Engineering)

1.

The Bill of Quantities shall be read in conjunction with the Instructions to Bidders,
General Conditions, Particular Conditions of Contract, Works Requirement (Technical
Specifications, and Drawings).

2.

The quantities given in the Bill of Quantities are estimated and provisional, and are
given to provide a common basis for bidding. The basis of payment will be the actual
quantities of work ordered and carried out, as measured by the Contractor and verified
by the Engineer and valued at the rates and prices tendered in the priced Bill of
Quantities, where applicable, and otherwise at such rates and prices as the Engineer
may fix within the terms of the Contract.

3.

In the Bill of Quantities, quantity and unit rates and thereby the amount against each
item have been indicated. From this, the estimated price of each bill has been worked
out and indicated in the summary sheet in BOQ. The Bidder shall quote rates as
percentage above/below/at par for each schedule in the summary sheet. If no
percentage as above, below or par is indicated for any particular bill, the same will be
considered as percentage at par.

4.

The rates for each bill shall be written in indelible ink or type written in the summary
sheet against each bill in words and figures as percentage above /below/at par with
RVNLs cost. Thereby, quoted price for each bill shall be calculated and written against
each bill. The total price, as sum of quoted price for all the bills shall be shown at the
bottom of the summary sheet. The total price shall also be written in words and figures.

5.

General directions and descriptions of work and materials are not necessarily repeated
or detailed in the Bill of Quantities. References to the relevant specifications and
sections of the contract documentation should be made before quoting rates in the Bill
of Quantities.

6.

The rates and prices Bid in the priced Bill of Quantities shall, except as otherwise
provided under the Contract, include all construction equipment, plant, labour,
supervision, materials, erection, maintenance, insurance, profit, royalty, octroi, taxes
and duties, together with all general risks, liabilities and obligations set out or implied in
the Contract.

7.

The rates are deemed to be inclusive of all lead (except as otherwise specifically
provided in the description of the particular item), lifts, ascend, descend, handling, rehandling crossing of nallah/streams/tracks any other obstructions.
Page 1 of 16

RVNL/RANI-SRPJ/RE

8.

All enabling works for executing the work e.g. approach road to site, launching
arrangements, procuring right of way, arrangement of water and electricity etc is to be
arranged by the contractor at his own cost and deemed to be included in the quoted
rates.

9.

Storage of Material: All the material at site will have to be properly stacked & stored so
as to facilitate inspection. The material should be properly protected from the
detrimental effects of nature and fire, theft etc. The contractor shall be responsible for
watch & ward and any loss or deterioration on account of above shall lead to rejection
of material and contractor has to replace the same at his own cost.

10.

The method of measurement of completed work for payment shall be in accordance


with provisions in Works Requirements (Specifications) except as otherwise specifically
provided in the description of item or particular bill of quantities or explanatory notes to
the particular bill of quantities.

11.

(a) In items of Bill No. 6: (Building and related items) and Bill No.9: (Site facilities), the
rates are inclusive of cost of all materials including cement, steel, etc. required to deliver
the final product.
(b) In items of bill No.2: (Bridges), Bill No.5: (track linking), and Bill No.7: (Platforms,
passenger amenities and Misc works) where ever cement, reinforcement steel and HTS
wire (strands) are required to be consumed in the item, the rates are exclusive of cost of
these materials and the same shall be paid separately under relevant items for supply of
these materials.
(c) In items of Bill No.4: (P. Way supply) the rates are inclusive of all materials including
cement, steel and HTS wire (strands). Rails required for manufacture of item under Bill
No.4 shall be issued free of cost by RVNL.

12.

NOTES SPECIFIC TO EACH BILL OF QUANTITIES.

12.1. BILL NO.1 FOR EARTH WORK IN FORMATION


12.1.1 The earth work in formation and blanketing has to be executed as per latest RDSO
guidelines for earthwork in railway projects with up to date correction slips. If naturally
available material in the project area is not suitable for using as blanketing material
directly then the blanketing material conforming to RDSO specification has to be
produced by blending various naturally available materials in required proportion in a
pug mill.
12.1.2 Obtaining prior permission for felling of trees including payment of royalty and taxes etc
shall be contractors responsibility and deemed to be included in the rates.
Page 2 of 16

RVNL/RANI-SRPJ/RE

12.1.3 Joining of new formation with existing embankment has to be done with benching of 30
cm (V), 60 cm (H) in the existing bank slope. The rate of earthwork includes the cost of
benching.
12.1.4 Locations where blasting is warranted, prior permission of the employer must be
obtained to ascertain whether blasting is permitted or prohibited. Rate of rock cutting
includes the cost of all precautionary measures necessary for safety during blasting of
rock.
12.2

BILL NO.2: BRIDGES AND BILL NO.7: PLATFORM, PASSENGER AMENITIES AND
MISCELLANEOUS WORK FOR CC, RCC AND PSC ITEMS.

12.2.1 All material, equipment, labour, casting beds, stress frames, from work staging,
scaffolding, etc is to be arranged by the contractor within the quoted rates.
12.2.2 1:4:8, 1:3:6 and 1:2:4 indicates concrete prepared using volumetric mix in proportion of
cement: coarse sand: stone aggregate of specified size, respectively.
12.2.3 All design mix concrete shall be machine batched with automatic weigh batcher,
machine mixed and machine vibrated or Ready Mix Concrete prepared in depot and
transported by transit mixer to the site of work.
12.2.4 Prior to demolishing of any structure measurements have to be taken, scheme of
dismantling has to be got approved from the Engineer.
12.3

BILL NO.4: (PERMANENT WAY SUPPLY)

12.3.1 All P. Way materials shall be procured only from suppliers included in part I list of RDSO
approved suppliers for the particular item. Where, such a list is not maintained by RDSO,
prior approval of source of supply shall be obtained from the employer.
12.3.2 All P. Way materials shall be inspected by the inspecting authority as prevalent over
zonal railway for the particular material. However, employer reserves the right to
nominate any authority or its own representative to inspect the material.
12.3.3 The price quoted also includes RITES/RDSO inspection and testing charges unless
otherwise specified in the bill of qty or technical specification. The prices quoted also
include RITES/RDSO inspection and testing charges unless otherwise specified in the bill
of quantities or Technical Specification. In case of change of inspection from RDSO/RITES
to RVNL/consignee, 1% of cost of material to be deducted by RVNL, as inspection
charges.

Page 3 of 16

RVNL/RANI-SRPJ/RE

12.3.4 If the rails required for manufacture of the finished material are to be issued free of cost
by the Employer, as specified in the description of item, the employer shall issue such
rails either in project area or from Bhilai . The quoted rates include cost of handling and
transportation of rails to the manufacturers workshop and finished materials from the
manufacturers workshop to the site of work.
12.3.5 All P. Way material shall be neatly stacked and stored in the project area and protected
against loss/ deterioration by proper watch and ward staff, insurance, etc, the cost of
which is deemed to be included in the rates.
12.4

BILL NO.5: (PERMANENT WAY LINKING)

12.4.1 Painting of rails for loops & platform lines shall be done before fixing in position and
touching to be done after laying in position.
12.4.2 Rates include day as well as night working and lighting arrangement as per requirement
and to the satisfaction of the engineer.
12.4.3 The welds found defective in USFD, shall have to be replaced by the contractor at his
own cost.
12.4.4 During the maintenance of track after commissioning, all arrangement for
transportation of labour , T&P etc will have to be done by contractor at his own cost.
Necessary T&P for track maintenance will be procured by the contractor including
consumables. The rate includes all such requirements.
12.4.5 The payment of rail cuts and drilling holes will be done as per final layout of
mainline/loop line/sidings and turnouts etc. Rail cuts/hole drilling required for
temporary working will not be paid.
12.5

Bill No.8: (Supply of Cement): Payment for supply shall only be made after the quantity
is consumed in the related item of work. The consumption of cement shall be worked
out based on cement consumption coefficients as given below or the actual
consumption whichever is less.
COEFFICIENTS FOR CEMENT CONSUMPTION

S.
No

Item

Unit

1:3:6 (1 Cement 3 coarse sand, 6


graded stone aggregate)

Cum

Cement consumption
coefficients per unit in
Kg. (Maximum)

Cement Concrete
1.

220
Page 4 of 16

RVNL/RANI-SRPJ/RE

S.
No

Item

Unit

Cement consumption
coefficients per unit in
Kg. (Maximum)

2.

1:2:4 (1 cement, 2 coarse sand, 4


graded stone aggregate)

Cum

320

3.

M20

Cum

400

4.

M25

Cum

410

5.

M30

Cum

420

6.

M35

Cum

428

7.

M40

Cum

435

8.

M45

Cum

480

9.

M50

Cum

500

Cement Mortar
1.

Cement Mortar 1:2 (1 Cement: 2 Sand)

Cum

680

2.

Cement Mortar 1:3 (1 Cement: 3 Sand)

Cum

510

3.

Cement Mortar 1:4 (1 Cement: 4 Sand)

Cum

380

4.

Cement Mortar 1:5 (1 Cement: 5 Sand)

Cum

310

5.

Cement Mortar 1:6 (1 Cement: 6 Sand)

Cum

250

Brick Work
1.

Cement Mortar 1:4 (1 cement: 4 coarse


sand)

Cum

2.

Cement Mortar 1:6 (1 cement: 6 coarse


sand)

Cum

3.

Cement Mortar 1:3 (1 cement: 3 coarse


sand) half brick

SqM

4.

Cement Mortar 1:4 (1 cement: 4 coarse


sand) half brick

SqM

95
62.5
14.28
10.64

Note: Cement consumption for any item if not mentioned above is to be worked out as per
CPWD DSR 2012.
12.6 Bill No.10: (NWR SOR Works)
Specification and mode of measurements will be as per NWR specification

Page 5 of 16

RVNL/RANI-SRPJ/RE

Preamble to SBOQ for Railway Electrification and


General Electrical Works

3.

A.

General Instructions

1.

The bill of quantities (BOQ) shall be read in conjunction with the Instruction to bidders,
General Conditions of Contract, Particular Conditions of Contract, Works requirements,
Technical specifications & Drawings, Explanatory notes detailed after BOQs of RE &
General Electrical works seperately, Payment conditions, pre-bid clarifications and
Addenda and Corrigenda if any.

2.

The summary of schedules is as under:

SN

Schedule No.

Description

16000

RE-General

17000

Switching Post Building

19000

OHE - Ferrous other than steel


structures and SPS

20000

OHE - Non Ferrous A

21000

OHE - Non Ferrous B

24000

TSS

27000

TSS-Spares

28000

Tools & Plants

10

29000

SCADA

11

30000

Common Items for OHE/TSS

12

33000

General Electrical Works

The quantities given in the Bill of Quantities are estimated and provisional, and are given
to provide a common basis for bidding. The basis of payment will be the actual quantities
of work ordered and carried out, as measured by the Contractor and verified by the
Engineer and valued at the rates and prices tendered in the priced Bill of Quantities,
where applicable, and otherwise at such rates and prices as the Engineer may fix within
the terms of the Contract. The Surplus quantities, if any after execution & not required by
Railway, as determined by the engineer during the progress of the work or at the
completion of the work, shall be taken back by the contractor and the recovery of such
material will be adjusted from the pending claims.
Page 6 of 16

RVNL/RANI-SRPJ/RE
4.

In the Bill of Quantities, quantity and unit rates and thereby the amount against each
item have been indicated. From this, the estimated price of each bill has been worked
out and indicated in the summary sheet in BOQ. The Bidder shall quote rates as
percentage above/below/at par for each schedule in the summary sheet. If no
percentage as above, below or at par is indicated for any particular bill, the same will be
considered as percentage at par.

5.

The rates for each bill shall be written in indelible ink or type written in the summary
sheet against each bill, in both words and figures, while clearly indicating whether the
percentage quoted is above/below/at par over the estimated rate in the respective
columns. The price for each bill shall accordingly be calculated and written against each
bill in both words and figures. The total price, as the sum of prices of all bills shall be
shown at the bottom of the summary sheet. The total price shall also be written in both
words and figures.

6.

General directions and descriptions of work and materials are not necessarily repeated
or detailed in the Bill of Quantities. References to the relevant specifications and
sections of the contract documentation should be referred to before quoting rates in the
Bill of Quantities.

7.

The rates and prices Bid in the priced Bill of Quantities shall, except as otherwise
provided under the Contract, include all construction equipment, plant, labour,
supervision, materials, erection, maintenance, insurance, profit, royalty, octroi, taxes and
duties, together with all general risks, liabilities and obligations set out or implied in the
Contract.

8.

The rates are deemed to be inclusive of all lead (except as otherwise specifically
provided in the description of the particular item), lifts, ascend, descend, handling,
rehandling crossing of nallah/streams/tracks any other obstructions.

9.

All enabling works for executing the work e.g. approach road to site, launching
arrangements, procuring right of way, arrangement of water and electricity etc is to be
arranged by the contractor at his own cost and deemed to be included in the quoted
rates. Where a temporary tube well or any other water source are constructed by the
contractor in the railway land for the purpose of taking power /water for construction
purposes, no charge would be recovered from the contractor but written permission will
however, be obtained by the contractor from the Engineer who may, at his discretion,
refuse such permission for such construction of temporary arrangement. The contractor
shall also be required to restore the site to its proper condition as directed by the
Engineer.

10.

Storage of Material: All the material at site will have to be properly stacked & stored so
as to facilitate inspection. The material should be properly protected from the detrimental
effects of nature and fire, theft etc. The contractor shall be responsible for watch & ward
and any loss or deterioration on account of above shall lead to rejection of material and
contractor has to replace the same at his own cost. All the disposable material should be
disposed off outside the railway boundary at a designated place as directed by the
Engineer.

Page 7 of 16

RVNL/RANI-SRPJ/RE
11.

The method of measurement of completed work for payment shall be in accordance with
provisions in Works Requirements (Specifications) except as otherwise specifically
provided in the description of item or particular bill of quantities or explanatory notes to
the particular bill of quantities.

12.

Trees falling in the alignment or any other site of the works which belongs to the railways
will be trimmed and stacked at a nominated place at his /their own cost as directed by
Engineer and the same will be Railway/Employers property. Trees of the forest
department will be trimmed and deposited in the nearest forest depot. No separate
payment on this account shall be made to the contractor.

B.

Instructions for quoting by the bidders

1.

The prices for supply of materials and erection are in accordance with the technical
specifications, approved drawings and designs. The contractor should note that no item
of materials, equipment, fittings and components shall be supplied by the Employer.

2.

UNIT PRICE:

3.

i)

The unit price indicated under Supply in the bills is the all inclusive price of
materials and all incidental charges for transport, loading/unloading and handling
etc.

ii)

The price also include taxes, duties, levies (including octroi) applicable on Works
contracts, insurance/bank guarantee/indemnity bond charges etc.

iii)

The prices also include provision for losses and wastages in transit and erection.

iv)

The price quoted also include RITES/RDSO representative inspection and testing
charges unless otherwise specified in the bill of quantities or Technical
Specification. In case of change of inspection from RDSO/RITES to
RVNL/CONSIGNEE, 1% of the cost of material will be deducted by RVNL as
inspection charges.

(v)

The unit price indicated under Erection in the bills should be inclusive of the cost
of erection and testing and also include all cost of administration of the contract,
insurance premia, bankers charges, cost of stamps/storage/loading/unloading and
handling of materials and also include the cost of transportation which the
contractor may incur for carriage of material to the site of works. The unit prices
should also include cost of works and adjustment that may become necessary
during or after the tests for commissioning.

The whole cost of complying with the provisions of the contract shall be included in the
items/bills provided in the BOQ and, where no items/bills are provided, the cost shall
be deemed to be distributed among the rates and amount entered for related Items of
Works.
Page 8 of 16

RVNL/RANI-SRPJ/RE
C. NOTES SPECIFIC TO PAYMENT: INVOICING PROCEDURE
1.

All invoices shall be submitted with original supporting documents or certified


true copies of supporting documents wherever these are acceptable to the
Engineer as per contract. Where copies of original documents are required in
support of several invoices, true certified copies of the original documents may
be forwarded to the Engineer, with his consent.

2.

Invoices shall be submitted only on the basis of provisions in Contract


Agreement and prices. The quantities and measurement of works completed
should be approved by the Engineer prior to the submission of invoices. For this
purpose, the schedule of quantities and measurement submitted by the
contractor for approval of the Engineer may be only up to the extent of work
completed except in the case of payments on Provisional Acceptance.

D. PAYMENT PROCEDURE
1.

ON ACCOUNT PAYMENT AGAINST SUPPLY OF MATERIAL


On Account Payment will be made as described below:
(i)

On Account Payment shall be made for the items specified in detailed


terms of payment of each schedule under clause No. 4.0 of this
preamble.

(ii)

On Account Payment shall be made to the extent of 85% of the


accepted supply rate, after receipt, acceptance, accountal, proper storage
and protection against loss, damage or deterioration on the items
mentioned in each schedule.

(iii)

On Account Payment made to the contractor will subsequently be


adjusted against progress payments and against payment due on
provisional acceptance.

(iv)

All invoices shall be accompanied with the following, for the purpose of
arranging On Account Payment against the contract:
a. Suppliers Delivery Challans.
b. Inspection certificate granted by the authorized approved
agency/Purchasers representative as per contract agreement.
c. Certificate of receipt of material at Contractors depot/work sites duly
accepted by the Engineer.
d. Comprehensive Insurance Policy for supply and safe custody of
material.
e. Bank Guarantee issued by a Scheduled Bank of the equivalent
amount for which On Account Payment is claimed. Such Bank
Guarantee shall be released after erection of the material and on
certification by the Engineer.
f. Quality assurance documents.
Page 9 of 16

RVNL/RANI-SRPJ/RE

2.

PROGRESS PAYMENT AGAINST SUPPLY AND ERECTION OF MATERIAL:


On completion of each item of BOQ, the contractor shall receive payment to the
extent of 95% of the supply and erection costs after making any recoveries and
adjusting of On Account Payment, which may be due.

3.

REMAINING 5% PAYMENT: The balance 5% of each item of the BOQ shall be


paid to the contractor after commissioning of the portion of the work or handing
over of the installation/material to the employers/Railways representative. This is
applicable for all schedules.

4.0

PROCEDURE OF SCHEDULE WISE PAYMENTS

4.1 Schedule 16000:


(i) Schedule No. 16001 (Design & Drawing)
The payment shall be made as under:
(a)
(b)

50% of Scheduled rates shall be paid after in principle approval


of design/drawings by RVNL.
45% of Scheduled rates shall be paid after the submission &
acceptance of as erected/ completion drawings by RVNL.

(ii) All other items except item No. 16001:


(a)

On Account Payment shall be made only for item Nos. 16009 &
16010 and as per terms and conditions given in clause No. D (1)
under Payment Procedure.

(b)

The Progress Payment to the extent of 95% of all the items in the
schedule shall be paid for the supply and erection prices after
adjustment of On Account payment & other recoveries, if any,
wherever applicable.

4.2 Schedule 17000:


i)
ii)

50% of the Schedule rate shall be paid on Casting of the Roof of the
Switching Station Building.
45% of the Schedule rate shall be paid on completion of the building in all
respects and certification by the Engineer.

4.3 Schedule 19000:


(i)

On Account Payment will be made only for item No. 19004 and as per
terms and conditions given in clause No. D (1) under Payment
Procedure.
Page 10 of 16

RVNL/RANI-SRPJ/RE
(ii)

Schedule No. 19003: On completion of erection of bracket assemblies,


the contractor shall receive payment to the extent of 85% of prices for
supply and erection of bracket assemblies. After final adjustment of OHE
and SED checking, contractor shall receive another 10% payment.

(iii)

The Progress Payment to the extent of 95% of all the items in the
schedule shall be paid for the supply and erection prices after adjustment
of On Account payment & other recoveries, if any, wherever
applicable.

4.4 Schedule 20000:


(i)

On Account Payment will be made only for item Nos. 20002 & 20003
and as per terms and conditions given in clause No. D (1) under
Payment Procedure.

(ii)

Item No. 20001: On completion of erection of the items the contractor


shall receive payment to the extent of 85% of the prices for supply and
erection.

(iii)

The Progress Payment to the extent of 95% of all the items in the
schedule shall be paid for the supply and erection prices after final
adjustment of OHE and SED checking and after adjustment of On
Account payment & other recoveries, if any, wherever applicable.

4.5 Schedule 21000:


(i)

On Account Payment will be made only for item Nos. 21003, 21004,
21005 & 21014 and as per terms and conditions given in clause No.
D(1) under Payment Procedure.

(ii)

The Progress Payment to the extent of 95% of all the items in the
schedule shall be paid for the supply and erection prices after adjustment
of On Account payment & other recoveries, if any, wherever
applicable.

4.6 Schedule 24000:


(i)

Item No. 24001 (Design & Drawing of TSS)


(a)
(b)

50% of Scheduled rates shall be paid after the in principle


approval of design/drawings by RVNL.
45% of Scheduled rates shall be paid after the submission &
acceptance of as erected/ completion drawings by RVNL.

Page 11 of 16

RVNL/RANI-SRPJ/RE

4.7

(ii)

On Account Payment will be made only for item Nos. 24004 to 24014,
24032 to 24036 and as per terms and conditions given in clause No.
D(1) under Payment Procedure.

(iii)

The Progress Payment to the extent of 95% of all the items in the
schedule shall be paid for the supply and erection prices after
adjustment of On Account payment & other recoveries if any
wherever applicable except item No. 24001 which will be paid as per (i)
above.

Schedule 27000 & 28000:


95% of the accepted price shall be paid on receipt & accountal of material at site or
required destination after inspection and production of documents as listed below:
(i)
(ii)
(iii)
(iv)

4.8

Suppliers Delivery Challans.


Inspection certificate granted by the authorized approved
agency/Purchasers representative as per contract.
Certificate of receipt of material at Contractors depot/work sites duly
accepted by the Engineer.
Quality Assurance Documents including Guarantee/Warrantee, if any.

Schedule 29000:
(i) Item No. 29001 (Design & Drawing of SCADA)
(a)

50% of Scheduled rates shall be paid after the in principle


approval of design/drawings by RVNL.

(b)

45% of Scheduled rates shall be paid after successful completion


of the work and handing over of the soft & hard copies of as
erected/completion drawings & software to RVNL.

(ii) On Account Payment shall be made only for item Nos. 29002 to 29005 &
29007 and as per terms and conditions given in clause No. D(1) under
Payment Procedure.

(iii) The Progress Payment to the extent of 95% of all the items in the
schedule shall be paid for the supply and erection prices after adjustment
of On Account payment & other recoveries if any wherever applicable
except item No. 29001 which will be paid as per clause (i) above.
4.9 Schedule 30000:
(i)

(a)

On Account Payment shall be made only for item Nos. 30001 to


30003 and 30005 and as per terms and conditions given in clause
No. D(1) under Payment Procedure.

Page 12 of 16

RVNL/RANI-SRPJ/RE
(b)

The progress payment of the above items to the extent of 95% of


the supply and erection prices shall be paid after adjusting of On
Account payment & other recoveries.

(ii)

Item Nos. 30006, 30007: On completion of foundation work, the


Contractor shall receive payment to the extent of 75% of the prices (for
supply and erection taken together) of foundation and another 20%
after mast erection, muffing, backfilling etc.

(iii)

Item No. 30008: On completion of work, Contractor shall receive


progress payment to the extent of 95% of the prices.

(iv)

Item No. 30009: On completion of erection of structures, the


Contractor shall receive payment to the extent of 85% of the prices for
supply and erection of structures and another 10% after erection of
respective bracket assemblies/equipment.

4.10 SCHEDULE No. 33000 (General Electrical Works):

5.

(i)

85% of
material
bond.

the accepted supply rate shall be paid


on receipt of
at site, after inspection & against submission of an indemnity

(ii)

Further payment of supply & erection cost to cover 95% of the total item
cost shall be paid on completion of the work and on certification by the
Engineer after adjusting already paid amount & other recoveries if any.

FINAL SETTLEMENT
On expiry of the defect liability period and issue of the taking over certificate of the
entire installation, the Bank Guarantee for Performance security shall be released to
the contractor after adjustment of any dues payable by the contractor.

6.

RECOVERIES FROM THE CONTRACTOR


All the recoveries for materials supplied and services rendered by the Purchaser to
the Contractor and other refunds due from the Contractor shall be made by
deductions from payments due to the Contractor covering the value of supply and
erection in the progress payment and from payments due on provisional
Acceptance.

7.

TAXES AND DUTIES


(i) All taxes, duties and levies (including octroi, works contract tax, service tax) arising
out of the transactions between the contractor and his sub-contractor/Suppliers for
this work will be deemed to be included in the accepted rates, unless otherwise
specified in the BOQ or technical specification.
Page 13 of 16

RVNL/RANI-SRPJ/RE
(ii) Where the law makes it statutory for the Purchaser to deduct any amount towards
sales tax or any other taxes on works contract, the same shall be deducted and
remitted to the concerned authority.
8.

PRICE VARIATION
Coefficients governing the adjustment of changes in cost to be read with clause
13.8 of GCC applicable to various schedules are also included.

Page 14 of 16

RVNL/RANI-SRPJ/RE

Signal & Telecommunication Works


1 Bill No.11: (Signal & Telecommunication Works)
2 The bill of quantities (BOQ) shall be read in conjunction with the
instruction to Bidders, General Conditions of contract, Particular
Conditions
of
Contract,
Works
requirements,
Technical
Specifications, Explanatory Notes, Payment conditions, pre-bid
clarifications and Addenda and Corrigenda if any.
BOQ has been divided in four groups i.e.
GROUP C Items starting with Series
38,40 & NS

Contains SUPPLY items on which PVC to be


paid as per RBI indices

GROUP D Items starting with Series


39,40 & NS

Contains EXECUTION items on which PVC


to be paid as per RBI indices

Arrangement for water supply for execution of different items of works will be made by the
contractor at his / their own cost.

3 The unit prices for Supply items in the bills is the all inclusive price
of materials and all incidental charges for transport, loading/unloading
and handling. The prices also include taxes, duties, levies (including
octroi) applicable on works contract, insurance / bank guarantee /
indemnity bond charges etc. The prices also include provision for
losses and wastages in transit and erection. The prices also include
RITES/RDSO or other agencies inspection and testing charges
unless otherwise specified in the bill of quantities or Technical
Specification. In case of change of inspection from RDSO/RITES to
RVNL/consignee, 1% of cost of material to be deducted by RVNL, as
inspection charges.
4 The unit price for Erection items in the bills are inclusive of the cost
of erection and testing/commissioning and also include all cost of
administration of the contract, insurance premium, bankers charges,
cost of stamps/storage /loading/ unloading and handling of materials
and also include the cost of transportation which the contractor may
incur for carriage of material to the site of works. The unit prices also
Page 15 of 16

RVNL/RANI-SRPJ/RE

include cost of works and adjustment that may become necessary


during or after the commissioning test.
5 All invoices for S&T work shall be accompanied with the following, for
the purpose of arranging payment against supply of item:
i.
ii.

Suppliers Delivery Challan


Inspection certification granted by the authorized approved agencies/Purchasers
representatives as per contract.

iii.

Certificate of receipt of material at contractors depots duly accepted by the


Engineer in good condition without damage.

iv.

Comprehensive insurance policy for supply and safe custody of material.

v.

Quality assurance document like Manufacture / Supplier warranty certificate.

6 80% of the accepted cost of material supplied for which installation is


to be done by the contractor will be paid on receipt of the material
duly inspected by the inspecting authority. Balance 10% of the
accepted cost of materials for which installation is to be done by the
contractor will be paid after the installation and testing of the work.
Balance 10% of the accepted cost of material for which installation is
to be done by the contractor will be paid after the commissioning of
the work station/IBH/gate wise portion opened for traffic.
7 100% will be paid for spares, tool kits etc on receipt of equipment,
duly inspected by inspecting agency and Engineer.
8 For the items of designing / installation / erection, 100% payment will
be made after completion for the activity acceptable to the RVNL.
9

Before placing the supply order for STM/MUX counter specific approval of RVNL to be obtained.
The same is required to maintain uniformity in telecom in the section.
10 Released communication items will require shifting to other stations and installed.
******

Page 16 of 16

Summary of Bill of
Quantities

Name of work - Railway Electrification works between RANI (Excl.) - SRPJ (Excl) Section 198 TKM of Ajmer Division of North Western Railway Summary
Sheet of Bill of Quantities Package-1
Rate quoted by Contractor as percentage above/ below/ at par over the
estimated rates
Sr. No.

Description of Schedule

Estimated Cost in Rs.

1
2A
2C

Earthwork in Formation
Bridge work (Other than Steel
works)
Bridge work (Supply of Steel items
)

Write whether Percentage


quoted in Col. 4 & 5 is
above/below/at par over
estimated rates

In Figures

In Words

24,14,940
17,58,350
12,17,930

Ballast Supply

8,44,500

4A

P.Way Supply (Other than steel


items)

7,18,424

4B

P.Way Supply (Steel Items)

5,46,973

5A

Permanent Way Linking:


Installation Works

5,76,083

5B

Permanent Way Linking: Supply


and Installation Works

Percentage in Figures Percentage in Words

Price in Rs.

2,96,280

317,24,528
6

Buildings

7A

Platform, Passenger Amenities and


Miscellaneous Works : Other than
Steel items

7B

Platform, Passenger Amenities and


Miscellaneous Works : Steel items

33,08,568

144,71,760

28,08,000
8

Supply of Cement

Site Facility

10

SOR Items
Group C

11
Group D

Summary Sheet of bill of quantities

152,91,100
6,30,172
227,03,363
151,03,972

Signature of Contractor
Package-1 of RANI-PNU Electrification Project

Page 1 of 2

16000
17000
19000
20000
21000
24000
27000

RE General
Swithing Post Building
OHE Ferrous
OHE Non -ferrous
OHE Insulators
Traction Sub-station
Maintenance Spares (TSS)

28000

Maintenance Tools & Plants (PSI)

29000

SCADA
Common items required for OHE &
TSS
General Eelctrical Works
Miscellaneous items
Total Estimated cost

30000
33000
Miscellaneous

138,25,863
7,02,649
1000,62,133
2285,90,826
200,57,517
448,41,680
9,13,533
8,58,748
94,31,550
2283,41,816
189,79,066
31,94,698
7842,15,022 Total Quoted Price =

Note:
(a) Please refer to ITB 14 and 32 while filling the rates in the summary sheet.
(b) Please mention the percentage rate, in both figures and words, for each schedule in columns 4 & 5 respectively. Please also mention in column 6 whether the percentage rate mentioned in columns 4 & 5
are above or below or at par over the estimated rates.
(c) The price for each bill shall be calculated and written against each bill, in both figures and words, in columns 7 & 8 respectively.
(d) The total price, as sum of the price of all the bills/ schedules shall be shown, in both figures and words under columns 7 & 8 respectively in the last row of the summary sheet.
(e) Bidder should ensure that the rates are filled with due care and caution so as not to lead to any omission or discrepancy or ambiguity.

Summary Sheet of bill of quantities

Signature of Contractor
Package-1 of RANI-PNU Electrification Project

Page 2 of 2

Bill of Quantities
(Civil Engineering)

BOQ for Railway Elecrification works between RANI(Excl.)-SRPJ(Excl.)sectin 198 TKM of Ajmer Division of North Western Railway
BILL No.1 : EARTHWORK IN FORMATION
Description of Item
Qty

S. No.
1001 Earthwork in filling in Embankment Fill and Top Layer of formation including trolley refuges,

etc using contractor's earth of approved quality as per RDSO Guidelines and specifications for
Design of Formation For Heavy Axle Load, Nov 2009 for 25 T Axle Load (using SQ1/SQ2/SQ3
soil with CBR value of 3 or more in Lower Embankment Fill and using either SQ1 soil with CBR
value of 4 or more generally but not less than 3 in isolated cases in Top Layer of 1 meter
thickness or SQ2/SQ3 soil with CBR value of 6 or more generally but not less than 5 in
isolated cases in Top Layer of 0.5 meter thickness), procured from outside railway land
including site clearances, setting out and demarcation, benching, initial compaction of subsoil
after levelling the surface after site clearance, spreading loose earth in 30 CM layers using
grader up to extra width of 0.5 M beyond designed profile, compaction using vibratory
compactors, top and side dressing and removal of extra earth from sides to provide final
formation as per designed profile as per RDSO Guidelines. The rate shall include cutting of
trees with girth upto 30 CM, making good the pockets and depressions left in soil during
clearing and uprooting of jungle/trees at site and one round of heavy rolling of sub-soil
thereafter. The rate shall not include cutting of trees of girth beyond 30 CM and compaction
which shall be paid separately. The minimum Ev2 Criteria as mentioned in the guidelines is
not applicable. The rate shall also not include cost of CBR tests which will be paid vide
separate BOQ item.
Note: 1) Undrained shear strength, CU from Unconfined Compression (UCC) test or Vane Shear
Test and Penetration Number ( N- Value) from Standard Penetration Test of the subsoil will
also be carried out by the bidder before carrying out the work of Earthwork. The quoted rates
are
deemed
to
include
these
tests.
Note:- 2) Pleasenote that shrinkage allowance shall be deducted as per provisions of para
7.1.1.5 of RVNL standard specifications.

Page 1 of 20

4000

Package-1

Unit

Rate in Rs.

Amount in Rs.

Cum

175.00

700000

BOQ for Railway Elecrification works between RANI(Excl.)-SRPJ(Excl.)sectin 198 TKM of Ajmer Division of North Western Railway

Package-1

S. No.
Description of Item
1002 Earthwork in excavation by mechanical means (Hydraulic excavator) in cutting, in
formation, trolley refuges, side drains, yard drains, catch water drains, etc. including
leading usable cut spoils up to 200 M and making formation in filling using the cut
spoils, site clearances, setting out and demarcation, disposing off surplus unusable cut
spoils as per directions of the engineer, and top and side dressing to provide final
formation as per designed profile. The rate shall not include cutting of trees with girth
above 30 CM and compaction, which shall be paid separately.
Note- Rock spoils such as stones, boulders, pebbles, gravels etc available from
excavation, if are found suitable for use in works as per required specifications even
after modifications etc., can be used free of cost but the legally payable royalty and
taxes are to be paid by the contractor to the concerned authorities.

Qty

Unit

Rate in Rs.

Amount in Rs.

1002 a
1002 b
1002 c
1002 d

1000
75
75

Cum
Cum
Cum

146.00
227.00
387.00

146000
17025
29025

50

Cum

485.00

24250

Soil excluding rock.


Rock not requiring blasting.
Hard Rock requiring blasting.
Hard Rock requiring blasting, but blasting not permitted hence to be excavated by
chiselling.

Page 2 of 20

BOQ for Railway Elecrification works between RANI(Excl.)-SRPJ(Excl.)sectin 198 TKM of Ajmer Division of North Western Railway
S. No.
Description of Item
1005 Providing and laying blanketing materials of specifications as per RDSO Guidelines and
Specifications for Design of Formation for Heavy Axle Load - Nov 2009 for 25 T Axle
Load in layers of 30 CM in loose state using graders and compaction using vibratory
compactors, top and side dressing to provide final formation as per designed profile.
The rate shall not include compaction, which shall be paid separately.
NOTE :
1) If naturally available materials do not meet the laid down specifications, blanket
material has to be produced by mechanical process using mechanical crushing or
mechanical blending method or combination of these two methods as given in the
Annexure C of RDSO Guidelines and Specifications for Design of Formation for Heavy
Axle Load -2009. The quoted rates are deemed to include the production of material
by mechanical process.
2) The filter criteria and minimum EV2 Criteria as mentioned in the guidelines is not
applicable.
3) The rate shall not include cost of CBR tests which will be paid vide separate BOQ
item.

1006

1009

Mechanical Compaction of Earth and Blanket materials in layers of about 30 CM (or


more or less) in loose state using vibratory compactor (of adequate capacity) so as to
achieve compaction as per RDSO Guidelines and Specification for Design of Formation
for Heavy Axle Load Nov 2009. Minimum EV2 Criteria as mentioned in the
guidelines is not applicable
Cutting down trees and uprooting of roots including transporting the wood to nearby
railway store or forest godown as per direction of the engineer.
Note:
(i) Cutting of trees with girth less than 30 cm and their clearance is covered under
item No. 1001 & 1002. Girth will be measured at a height of 1 M above ground level.
(ii) Contractor will arrange necessary forest clearance on behalf of RVNL before
cutting/felling trees.

1009 d Girth above 180 CM and up to 270 CM

Page 3 of 20

Package-1

Qty

Unit

Rate in Rs.

Amount in Rs.

1400

Cum

977.00

1367800

5400

Cum

13.94

75276

Each

1339.00

1339

BOQ for Railway Elecrification works between RANI(Excl.)-SRPJ(Excl.)sectin 198 TKM of Ajmer Division of North Western Railway
S. No.
Description of Item
1015 Providing barricading with the help of fencing along the running track where the work
is to be done in close vicinity of the track. The fencing shall be minimum 1.5m high
with 2.2m wooden balli/bamboo posts, 25cm girth (min) placed every 2.0m apart,
embedded in cement concrete (1:2:4) blocks of size 0.23 x 0.23 x 0.23M and every
15th post (or nearer, if there is abrupt change of ground slope), last but one end post
and corner post shall be strutted on both sides and end post one side only and struts
embedded in cement concrete (1:2:4) block of size 0.23 x 0.23 x 0.23M, provided with
3 horizontal wooden/bamboo ballies fixed with G.I. staples/binding wire/nail driven
into the posts including 2 bands (red and white) 300 mm long shall be painted with
water bound paints on the ballies from top and two bands (100mm apart) of yellow
reflective tape of width 50mm shall be pasted on top white band. The rate includes
cost of all materials including cement. After execution of all works requiring safety
fencing in particular stretch, the fencing shall be removed with the approval of the
Engineer-in-charge and formation shall be repaired to its profile and released
materials will be contractors property.
Total for Bill No. 1 (Carried forward to Summary)

Package-1

Qty

Unit

Rate in Rs.

Amount in Rs.

225

meter

241.00

54225

2414940.00

Page 4 of 20

BOQ for Railway Electrification works between RANi(Excl.)-SRPJ(Excl.)section 198 TKM of Ajmer Division of North Western Railway

BILL No.2 : BRIDGES


Bill No. 2A: Bridge work (Other than Steel items)
S. No.

Description of Item

2001

Earth work in excavation in foundation of bridges to desired profile including


backfilling, compaction of back fill, and disposal of surplus earth as per directions
of the Engineer.
Soil excluding rock.
Rock not requiring blasting.
Hard Rock requiring blasting, but blasting not permitted, hence to be excavated
by chiselling.
Providing and laying design mix control concrete M20/M25 in piers, retaining
walls, wing walls, return walls, bottom/top plug of wells and protection work
etc. using well graded stone aggregate of 40 MM/20 MM nominal size.

2001 a
2001 b
2001 d
2004

2005

2042

2042f

Providing and laying Design mix control concrete M25/M30/M35/M40 in cast-insitu RCC works of raft, pile cap, pier, abutment, well steining, RCC well kerb,
well cap, pier cap, Jacketing, dirt wall, return wall, wing wall, fly wing wall,
retaining wall, approach slab, foot path slab, wearing course, ballast retainers,
RCC railing, inspection platform, pedestal, boxes and other miscellaneous works
using well graded stone aggregate of 20 MM nominal size.
Providing & laying non pressure NP-4 Class RCC pipe with collars, jointing with 1:2
Cement and ordinary sand mortar including testing of joints but excluding earth
work with all labour and material as a complete job. Cement for mortar will be
paid separately.
1200 mm dia
Total for Bill No.2A (Carried forward to Summary)

Page 5 of 20

Qty

Unit

Rate in Rs.

Amount in Rs.

40
15

Cum
Cum

233
246

9320
3690

10

Cum

492

4920

35

Cum

4183

146405

300

Cum

5202

1560600

Meter

6683

33415
1758350

Package-1

BOQ for Railway Electrification works between RANI(Excl.)- SRPJ(Excl.)section 198 TKM of Ajmer division of North Western Railway

BILL No.2 : BRIDGES


Bill No. 2C: Supply of Steel items
S. No.

Description of Item

2076

Supplying TMT Fe-500 reinforcement steel conforming to IS:1786-1985


including decoiling, straightening, cutting, bending, placing in position,
binding with 1MM dia GI binding wire.
Note : Reinforcement, shall be measured in length for different diameters
used in the works and then paid as per standard weights as per IS 1732.
Wastages, overlaps, coupling, welded joints, space bars, chairs and binding
wire shall not be measured and cost of these items shall be deemed to be
included in the rates.

Total for Bill No.2C (Carried forward to Summary)

Qty

Unit

17.5

MT

Rate in Rs. Amount in Rs.

69596

1217930

1217930

Page 6 of 20

Package-1

BOQ for Railway Electrification works between RANI(Excl.) - SRPJ(Excl.) section 198 TKM of Ajmer divisionof North Western Railway

BILL No.3 : BALLAST SUPPLY


S. No.

Description of Item

Qty

Unit Rate in
Rs.

3001 Supply of machine-crushed stone ballast on cess as per RDSO specifications for track
ballast: IRS-GE-1 of June, 2004 from outside railway limits stacked in specified quantities
alongside the proposed alignment on either side of track, in yards and at locations as per
site requirement as directed by the Engineer.
Note 1:
Payment will be made on actual stack measurement for gross quantities without any
deduction for voids in following stages: (i) 95% on receipt at site, acceptance,
measurement, account, proper storage and protection against loss, damage or 1000 Cum 837.00
deterioration; and (ii) balance 5% after training out.
Note 2:
i)
Wherever sufficient railway land is not available, contractor will have to arrange
land for supply and stacking of ballast at his own cost for which extra payment as per
item no. 3001a will be admissible.
ii) The rate also includes levelling, dressing of ground for stacking of ballast.
3001 a Extra over item no. 3001 if ballast is to be stacked in private land in case sufficient
railway land is not available.
Total for Bill No. 3 (Carried forward to summary)

250

Cum

30.00

Amount in Rs.

837000

7500
844500

Page 7 of 20

Package-1

BOQ for Railway Electrification works between RANI(Excl.) - SRPJ(Excl.) section 198 TKM of Ajmer Division of North Western Railway

Package-1

BILL No.4 : PERMANENT WAY SUPPLY


Bill No. 4 A: P.WAY SUPPLY (Other than Steel Items)
S. No.
4001
4001 a
4001 b
4001 c
4002
4002 a
4002 b
4010

4012

4017

4018

Description of Item
Supply of P.Way Components
GFN Liners to RDSO Drg. No. T-3706.
Combination GFN liners to RDSO Drg. No.T-3707 and T-3708.
GRSP to RDSO Drg. No.T-3711.
Supply of glued insulated rail joints G3 L 6.5 M long with 10 MM thick end post on PSC sleepers. Rails will be
issued free of cost by the Employer @ 6.5 M for each joint.
60 KG Kg rail section as per RDSO Drg No. RDSO/T-5843
52 KG rail section as per RDSO Drg No. RDSO/T-5361
Supplying at site of work including leading, loading, unloading and stacking of Special PSC Monoblock
Sleepers (pre-tensioned type) for B.G. 1 in 8 Derailing Switch as per RDSO Drg. No.-T-6068 to suite both
52/60 kg rails as per RDSO Design and IRS Specifications No. T-45-96 (2nd Edition) as amended from time to
time with contractor's labour, materials, tools & Plant, equipment and machinery, transport etc complete .
Supplying at site of work including leading, loading, unloading and stacking PSC turnout sleepers and
approach sleepers for fanshaped layout of 60 kg 1 in 8.5 turnout for B.G 60 Kg. (UIC) rail/52 kg rails to RDSO
Drg. No. T-4865 Alt-5 (for general layout) and drawings thereof with latest alterations if any, complete set
with contractor's labour, materials, tools & Plant, equipment and machinery, transport etc complete .
Supply of Grooved Rubber Sole Plates for 1 in 8.5 turnouts for layout Drg no. T-4865 with latest alterations if
any, complete set for the turnout as per IRS specification for Grooved Rubber Sole Plate (6mm thick) for
placing beneath rails Sl. No. T-47-2006 with up to date corrigendum if any
Supply of Grooved Rubber Sole Plates for 1 in 12 turnouts for layout Drg no. T-4218 with latest alterations if
any, complete set for the turnout as per IRS specification for Grooved Rubber Sole Plate (6mm thick) for
placing beneath rails Sl. No. T-47-2006 with up to date corrigendum if any
Total for Bill No. 4A (Carried forward to summary)

Qty

Unit

Rate in Rs.

Amount in Rs.

1240
1240
1240

Each
Set
Each

9.09
29.53
24.99

11271.6
36617.2
30987.6

10
10

Each
Each

10923
9559

109230
95590

Set

126917

126917

Set

240121

240121

Set

29272

29272

Set

38418

38418
718424.4

Payment Conditions for items of this Bill:

(1) 90% payment shall be made on receipt, acceptance, accountal and taking into custody of complete materials. The invoices shall be accompanied by the following :
a) Supplier's challan and manufacturer's challan.
b) Inspection certificate issued by Employer's/Engineer's nominated inspecting agency.
c) Quality Assurance documents.
d) Indemnity bond for entire cost of material supply.
(2) The remaining 10 % payment shall be made after commissioning of the portion of the work or handing over of the material to the employer's / Railway's
Representative, required for maintenance purposes.
Note: The transportation charges from sleeper manufacturing plant to supply point in the project area as directed by Engineer are inclusive in the rates of special
sleepers. Item No.5031 of Bill No. 5 is for the further movement of the sleeper in project area if required as per the site conditions.

Page 8 of 20

BOQ for Railway Electrification works between RANI(Excl.)- SRPJ(Excl.) section 198 TKM of Ajmer Division of North Western Railway

Package-1

BILL No.4 : PERMANENT WAY SUPPLY


Bill No. 4 B: P.WAY SUPPLY (Steel Items)
S. No.
4021

Description of Item

Qty

Unit

Rate in Rs.

Amount in Rs.

70

173600

Supply of P.Way Components

4021 a

ERC to RDSO Drg. No.T-3701

2480

Each

4021 b

ERC "J" to RDSO Drg. No.T-4158

25

Each

77

1925

4021 d

Supply of rail screws to RDSO Drg. No.T-1035/10675

10

Each

31.74

317.4

4022

Supply of Fish plates

4022 a

60 KG as per Drawing No. T -1898

20

Each

1324

26480

4022 b

52 KG as per Drawing No. T- 090 (M)

20

Each

834

16680

4024

Supply of fish bolts with nuts for 60 KG, 52 KG rails as per RDSO Drawing No.T-1899, T-11501.

50

Each

62

3100

4025

Supply of joggled fish plates (2 No. per set) with 4 pair clamps, 4 No. Bolts & Nuts and 8 No. special
washers.

4025 a

For 60 KG as per RDSO Drawing No. T -4016/T-5849

Set

3620

14480

4025 b

For 52 KG as per RDSO Drawing No. EDO/T-620 or T-5848

Set

2837

5674

4026

Supply of Fish plates one meter long as per standard drawing of RDSO

4026 a

60 KG rail (As per RDSO Drg.No.T-5916/T-5851 )

Each

1597

3194

4026 b

52 KG rail (As per RDSO Drg. No. T-5915/ T-5850 )

Each

1280

2560

Set

73312

73312

Set

45346

45346

Nos

164805

164805

500

each

31

15500

4029

4031

4032

NS 4039

Supply of 52 kg 1 in 8.5, 6400mm OR Switch confirming to RDSO Drg. No. T-4866 with latest
alteration, if any complete with all parts as listed in the drawing with check rails (excluding fish plates,
Fish bolts & nuts, GRSPs, Liners and ERCs).
Supply of 52 KG 1 in 8 Derailing Switch conforming to RDSO Drg No. 5836 with latest alteration, if
any complete with all parts as listed in the drawing including GRSPs (excluding fish plates, fish bolts &
nuts, Liners and ERCs).Note: Rails will be issued free of cost by the employer.
Supply of 52 kg CMS Crossing for 1 in 8 PSC Layout conforming to Drg No. T-4867 with latest
alterations complete with all parts as listed in the drawing (excluding fish plates, fish bolts & nuts,
GRSPs, Liners and ERCs).
Supply of plate scews to RDSO Drawing No T-3912
Total for Bill No. 4B (Carried forward)

546973

Payment Conditions for items of this Bill:


(1) 90% payment shall be made on receipt, acceptance, accountal and taking into custody of complete materials. The invoices shall be accompanied by the following :
a) Supplier's challan and manufacturer's challan.
b) Inspection certificate issued by Employer's/Engineer's nominated inspecting agency.
c) Quality Assurance documents.
d) Indemnity bond for entire cost of material supply.

(2)

The remaining 10 % payment shall be made after commissioning of the portion of the work or handing over of the material to the employer's / Railway's Representative, required for maintenance purposes.

Page 9 of 20

BOQ for Railway Electrification works between RANI(Excl.) - SRPJ(Excl.) section 198 TKM of Ajmer division of North Western Railway

Package-1

BILL No.5 : PERMANENT WAY LINKING


Bill No. 5A : P.Way Linking (Installation Work)
S. No.
Description of Item
5001 Leading upto 100m lead and putting in track/formation of ballast from measured stacks along
side track or on formation or unloaded ballast by contractor's own means and putting the same
into track uniformly to form profile as per IRPWM in following phases: (i) Laying of first layer to form
level bed for sleepers with top surface dressed including mechanical compaction; (ii) Filling ballast in
cribs and making up shoulders; and (iii) Recouping shortages after each packing and finally making
profile as per IRPWM.
5004 Cutting of 60 KG, 52 KG, 90 R rails with contractors Abrasive Disc Cutter complete including men,
material, fuel etc. true to square.
5005 Drilling 26.5 MM, 32 MM diameter holes with Rail Drilling Machine in web of 60 KG, 52 KG, 90 R
rails in track or on cess at correct locations including chamfering.
5006 Transportation of rails, switches, crossings, etc. (supplied by RVNL) from point of issue to their final
location of laying in track
5006 a Average lead, from the place of issue upto the middle point of location of laying in each KM, upto 10
KM
5006 b Incremental rate for lead beyond 10 KM under item 5006 (a) above
5007 Installation of BG track as per methodology specified in para 4.0 of Section 5: Specifications in the
Bidding Documents or any other methodology approved by the Employer in all locations e.g.
straight, curves, bridges, level crossings, yards, etc including installation of SEJ and glued joints
including installation and dismantling of auxiliary track. Note: 60% of the rate shall be paid after
placement of the sleepers, rails, fastening, initial squaring and correcting sleepers spacing

Qty

Unit

Rate in Rs.

Amount in Rs.

1000

Cum

91

91000

300

Each

290

87000

100

Each

70

7000

70

MT

272

19040

2280

MT KM

5.53

12608.4

450

Track Meter

314

141300

1
1

Each
Each

42249
10618

42249
10618

Each

31521

31521

50

Track Meter

104

5200

50

Per Track meter

66

3300

90

Each

47.56

4280.4

5008 Installation of PSC fan shape turnouts, derailing switches 60 KG / 52 KG including lead rails as per
RDSO layout drawings including katcha packing with bars or off track tampers for 20 KMPH speed.
Activities of rail cutting, drilling of holes, welding of joints and transportation are not included in this
item and shall be paid separately under relevant items.
5008 b Turnouts 1 in 81/2
5008 c Derailing switches
5016 Provision of Buffer stop of 60 KG, 52 KG, 90 R rail section as per plan including painting with
luminous paint etc. as directed by the engineer.
Note: Rail required for this item will be issued free of cost by the Employer.
5026 Dismantling of existing BG track, turnouts, derailing switches, dead ends, sand humps, etc. of any
rail section and any type of sleepers of any density and transporting all released material including
sleepers, rails, switches, crossings and fittings & fastenings to the nearest station or manned level
crossing or road loading point as directed by the Engineer.
5026 a Plain track including SEJ and Glued Joints and track at level crossing, bridge & bridge approaches and
sharp curves with check rails
5028 Scarifying, digging existing caked Ballast upto the depth as directed by the Engineer, removal and
screening of Ballast, removal and disposal of muck, dressing of formation to the required profile and
putting back the screen ballast in track.
5030 USFD testing of 60 KG, 52 KG rail welds (Flash Butt / SKV) as per RDSO Manuals and submitting
reports on proforma as directed by the Engineer.

Page 10 of 20

BOQ for Railway Electrification works between RANI(Excl.) - SRPJ(Excl.) section 198 TKM of Ajmer division of North Western Railway

Package-1

5031 Transportation of PSC sleepers including special sleepers for SEJs, check rails, guard rails and turn
out sleepers from the place of issue (in case of sleepers issued free of cost by RVNL) and from
stacking place acceptable to Engineer at work site ( in case of supplied by the contractor ) to their
final location of laying.
Note:
1. For the purpose of payment each turnout sleeper will be considered as 1.5 No. of ordinary line
sleeper. All other special sleepers shall be considered on par with ordinary line sleeper.
(2) 100% payment shall be made on transportation to designated site as directed by
employer/engineer.
(3) The item is intended for transportation of sleepers issued free of cost by the employer or
supplied by the contractor in P.Way supply schedule in the project area. However, if the sleepers to
be issued free of cost by the employer are made available at the sleeper plant and loading of
sleepers is done by concrete sleeper plant even then the rate quoted in the item shall be applicable
subject to recovery @ Rs.10/- per track sleeper.
(4) Rate includes multiple handlings.

5031 a Average lead upto 2 KM (from place of issue to middle point of kilometer of laying in track)
5031 b Incremental rate for lead beyond 2 KM for every km additional lead upto 30 kms over item (a)
above
5031 c Incremental rate for lead beyond 30 KM for every KM additional lead upto 60 KM over item (a) & (b)
above
5031 d Incremental rate for lead beyond 60 KM for every KM additional lead upto 250 KM over item (a),
(b) & (c ) above
5033 Painting of particulars of 1 in 16, 1 in 12 and 1 in 8 turnouts and derailing switches including turn
in curves on the inside web of outer rail with stencils of specified height in black enamel paint on
surface of specified length painted with two coats of yellow enamel paint over a primer coat painted
after cleaning the surface free from dust and dirt.
5034 Fouling marks of size 150x250x225 MM in M20 grade cement concrete including engraving the
letters FM, white washing with two coats and painting the letters in black enamel paint indicating
the numbers of vehicles duly fixed at site.
Total for Bill No. 5A (Carried forward)

693

Sleeper

49.77

34490.61

19404

Sleeper KM

1.66

32210.64

20790

Sleeper KM

0.63

13097.7

110880

Sleeper KM

0.36

39916.8

Turn Out

774

774

Each

476

476
576082.55

NOTE:
1) In case of work being executed under traffic block, extra payment will be made for the item of work over and above the accepted rate of the item @ 50% of the accepted rate of the item for day time working
under traffic block and @ 100% of the accepted rate of the item for night time working under traffic block for BOQ item no. 5007, 5008, 5010 & 5026. Rates include lighting arrangement as per requirement and to the
satisfaction of the Engineer
2) Rates for all the items of this bill except those mentioned in note 1) above include day as well as night working and lighting arrangement as per requirement and to the satisfaction of the Engineer.
3) The welds found defective in USFD, shall have to be replaced by the contractor at his own cost.
4) Track laying a)
For mechanized laying of track only service rails will be made available by RVNL. All other materials such as wooden blocks, fish plates, rail screw etc. will have to be arranged by contractor. The rails will be
b) Manual linking of track may be permitted by the Engineer where mechanical linking is not feasible due to constraints in working. Only 90% of the accepted rates shall be payable in case of Manual linking.
5) During the maintenance of track after commissioning, all arrangement for transportation of labour, T&P etc will have to be done by contractor at his own cost. Necessary T&P for track maintenance will be
produced by the contractor including consumables. The rate includes all such requirements.
6) The payment of rail cuts and drilling holes will be done as per final layout of mainline/loop line /sidings and turnouts etc. Rail cuts/ hole drilling required for temporary working will not be paid.

Page 11 of 20

BOQ for Railway Electrification works between RANI(Excl.) -SRPJ(Excl.) section 198 TKM of Ajmer Division of North western Railway

BILL No.5 : PERMANENT WAY LINKING


Bill No. 5B : P.Way Linking (Supply and Installation works)
S. No.

Description of Item

5053

Alumino thermit welding of 60kg/52 kg rail joints or combination joints of 60kg/52kg rail by
pre-heat (SKV) welding technique using compressed air petrol/LPG for preheating, three piece
moulds and automatic tapping thimbles with all labour, materials including supply of portion,
tools and plants, aligning of rails, placing & fixing of mould, preheating, welding, mechanised
trimming, grinding with profile grinder (including riser), testing, marking, painting with one
coat of high build epoxy paint (two pack conforming to RDSO specification no. M&C/PCN111/88) on the welded area up to 10 cm on either side. The work is to be completed in all
respects as per IRS: T-19-1994 with latest updates and in accordance with RDSO Manual for
Fusion Welding of Rails by Alumino Thermic Process with up to date correction Slips. The work
to be done under supervision of trained welding supervisor and carried out by trained welder
having valid competency certificate from RDSO/TPP, Lucknow. Ultrasonic testing of welded
joints shall be paid separately under relevant items.
Note: 1) In case only portion is supplied by the contractor but welding is not done the rate
shall be payable @ 60% of the item rate.
2) In case welding portion is supplied free of cost by RVNL, the rate shall be payable @ 40% of
the item rate.
3) The above provision in note (1) & (2) shall be operated with the specific approval of CPM.

Total for Bill No. 5B (Carried forward)

Qty

Unit

Rate in
Rs.

90

Each

3292

Amount in Rs.

296280

296280

Page 12 of 20

Package-1

BOQ for Railway Electrification works between RANI(Excl.) -SRPJ(Excl.) section 198 TKM of Ajmer Division of North Western Railway

Package-1

BILL No.6 : BUILDINGS


S.No.

Description of Item

6001 a Service building of single storey (foundation to be designed to take load of double storey) with
open foundation upto 1.2 m depth from ground level and plinth height upto 0.6m from ground
level with floor height upto 3.35m.
6001 e Extra payment for provision of internal sanitary and water supply installations

Qty

Unit

Rates in Rs

712.5

Sqm

15750

265.5

Sqm

630

Sqm

283.5

6001 f Extra for every 0 .3 m or part thereof higher plinth over normal plinth height of 0.6m(on ground
floor area only)
6002

Amount in Rs
11221875

167265

Construction of residential buildings for staff accommodation near railway stations, level crossings
or any other nominated location as per layout drawings and standard railway plans for each type of
staff quarters, provided by the employer and detailed specifications provided in para 4.3 of
section 5: works requirements of the bidding documents including structural design and
preparation of detailed structural drawings. Rate includes cost of cement steel, internal water
supply and sanitary installations and all other materials and labour.

6002 a Type I,II,III Single storeyed floor height upto 2.9 m


6002 b Type IV Single storeyed floor height upto 2.9 m
6002 l Extra for every 0 .3 m or part thereof higher plinth over normal plinth height of 0.6m (on ground
floor area only)
6002 a Type I,II,III double storeyed floor height upto 2.9 m

NS 6006 Extra payment for provision of internal sanitary and water supply installations for
(A)
Type I,II,III Single storeyed floor height upto 2.9 m
NS6007 Extra payment for provision of internal sanitary and water supply installations for staff qtrs( B) Type
IV Single storeyed floor height upto 2.9 m
TOTAL VALUE FOR BILL No.6

663

Sqm

12180

8075340

227.5

Sqm

13440

3057600

Sqm

283.5

663

Sqm

11865

7866495

663

Sqm

1461.6

969040.8

227.5

Sqm

1612.8

366912

Page 13 of 20

31724527.8

BOQ for Railway Electrification works between RANI(Excl.)-SRPJ (Excl.) section 198 TKM of Ajmer Division of North Westetn Railway

BILL No.7: PLATFORM, PASSENGER AMEINITIES AND MISCELLANEOUS WORKS


S. No.

Description of Item

7002

Providing and laying 1:3:6 cement concrete in foundation and floor using well graded stone
aggregate of 40 mm/20 mm nominal size.
Cement Concrete 1:2:4 (cast in-situ/precast ) for Rail level platform wall, coping of platforms,
drains and in other miscellaneous works.
Earth work in filling with contractor's earth of approved quality in platform, circulating area,
level crossing and other areas including all lead and lift in layers not exceeding 30 CM in depth
including mechanical compaction and watering to achieve the desired compaction as per
specifications.
Earth work in cutting in foundation, trenches, drains, etc in all kinds of soil including dressing of
sides, ramming of bottoms, back filling of trenches, getting out the excavated soil and disposal of
surplus excavated soil with all lead and lift as directed by the Engineer.

7003
7004

7005

7005 a
7016

7017

7017 a
7017 b
7017c
7021
7021 a

In all kinds of soil


Providing and fixing pre-painted galvanised sheet 0.6 MM thick with corrugated or trafford
design on previously erected purlins or wall frame work for roofing. The colour coating shall be
polyester coating over hot dipped galvanised sheet and the sheets will be of minimum high tensile
strength of 275 MPa variety. The fixtures used for fixing the sheets shall be as per manufacturer's
specifications. Measurement shall include area of MS sheet, valley gutter, ridges etc excluding
overlaps. The rate includes provision of 110 MM dia PVC rain water pipes, j bolts & other fixtures,
painting of station name on both ends of COP in tri-lingual format.
Providing GI pipes including laying & jointing with all fittings making connections to water
hydrants including connection to source along with excavation & refilling etc. complete. (External
Water supply only)
15 MM Dia
20 MM Dia
25 MM Dia
Brick work with bricks of class designation 75 for miscellaneous works in:
Cement motor 1 : 6 (1 cement : 6 coarse sand)
TOTAL VALUE FOR BILL No.7A (Carried forward to summary)

Qty

Unit

Rate in
Rs.

Amount in Rs.

550

Cum

2188

1203400

400

Cum

2058

823200

2500

Cum

175

437500

1750

Cum

131

229250

527.5

SqM

659

347622.5

112.5
112.5
35

Meter
Meter
Meter

118
146
197

13275
16425
6895

100

Cum

2310

231000
3308567.5

Note :
1. All materials, equipment, labour, casting beds, stress frames, form work staging, scaffolding, etc. is to be arranged by the contractor within the
quoted rates.
2. All design mix concrete shall be machine batched with automatic weight batcher, machine mixed and machine vibrated or ready mix concrete
prepared in depot and transported by transit mixer to the site of work.
3.

Prior to demolishing of any structure measurements have to be taken, scheme of dismantling has to be got approved from the Engineer.

Page 14 of 20

Package-1

BOQ for Railway Electrification works between RANI(Excl.)-SRPJ (Excl.) section 198 TKM of Ajmer Division of North Westetn Railway

4. Wherever, cement, Reinforcement steel are required to be consumed in the item, the rates are exclusive of cost of these materials unless otherwise
specified and the same shall be paid separately under relevant items for supply of these materials.

Page 15 of 20

Package-1

BOQ for Railway Electrification works between RANI(Excl.)-SRPJ(Excl.) section 198 TKM of Ajmer Division of North Western Railway

BILL No.7: PLATFORM, PASSENGER AMEINITIES AND MISCELLANEOUS WORKS


Bill No. 7B: Platform, Passenger amenities and miscellaneous works (Steel items)
S. No.

Description of Item

7061

Providing FOB, platform shelters, height gauge, columns, beams, trusses and other steel
components of miscellaneous works duly launched in position with or without traffic block as
directed by Engineer with contractors steel conforming to IS:2062-1999 including fabrication,
assembly, erection, launching, riveting/welding, bolting, initial coats of zinc chromate priming
conforming to relevant IS specification and three subsequent coats of aluminum paint of approved
quality conforming to IS:2339 after final erection on all surfaces complete. Rate is inclusive of
supply and fixing of MS holding down bolts for IRS type platform shelters and FOBs with required
angles.
TOTAL VALUE FOR BILL No.7B (Carried forward to summary)

Qty

Unit

Rate in
Rs.

Amount in Rs.

170

MT

85128

14471760

14471760

Note :
1. All materials, equipment, labour, casting beds, stress frames, form work staging, scaffolding, etc. is to be arranged by the contractor within the
quoted rates.
2. 1:4:8, 1:3:6 and 1:2:4 indicate, concrete prepared using volumetric mix in proportion of cement : coarse sand : stone aggregate of specified size
respectively.
3. All design mix concrete shall be machine batched with automatic weight batcher, machine mixed and machine vibrated or Ready mix concrete
prepared in depot and transported by transit mixer to the site of work.
4.

Prior to demolishing of any structure measurements have to be taken, scheme of dismantling has to be got approved from the Engineer.

5. Wherever, cement, Reinforcement steel are required to be consumed in the item, the rates are exclusive of cost of these materials unless
otherwise specified and the same shall be paid separately under relevant items for supply of these materials.

Page 16 of 20

Package-1

BOQ for Railway Electrification works between RANI(Excl.) - SRPJ(Excl.) section 198 TKM of Ajmer division of North Western Railway

Bill No.8 : Supply of Cement


S. No.
8001

8002

Description of Item
Supply of 43 grade cement OPC conforming to IS: 8112 with latest amendments and using
the same in the work as per RVNL's approved mix design as per RVNL's prescribed rates of
consumption including all lead lift, labour, loading unloading, ascent, descent, crossing of
Railway lines(s), royalty, taxes, transport (contractor's own), tools and plant complete.
Supply of 53 grade cement OPC conforming to IS: 12269 with latest amendments and using
the same in the work as per RVNL's approved mix design as per RVNL's prescribed rates of
consumption including all lead lift, labour, loading unloading, ascent, descent, crossing of
Railway lines(s), royalty, taxes, transport (contractor's own), tools and plant complete.
TOTAL VALUE FOR BILL No.8 (Carried forward to summary)

Qty

Unit

Rate in Rs.

Amount in Rs.

5000

Bag of 50kg.

312

1560000

4000

Bag of 50kg.

312

1248000

2808000

Note : OPC cement has to be supplied as per requirement of the work in terms of RVNL standard specifications for material and works. Payment against
supply will be made only after consumption of cement in the relevant items of work.

Page 17 of 20

Package-1

BOQ of RaNI -SRPJ

Package -1

BOQ for Railway Electrification works between RANI (Excl.) - SRPJ (Excl) Section 198 TKM of Ajmer
Division of North Western Railway
SITE FACILITIES
BRIEF DESCRIPTION OF ITEMS
9001

9002

9003

Rates as
per SBD

Qty

Total Cost in
Rs.

10657

204

2174028

827760

827760

Vehicle
months
Vehicle
months

44492

81

38284

225

8613900

Per km

10.35

2386

24695

Per km

8.28

5660

Unit

Providing site offices for Employer with Contractor's material, Labour,


Tools and Plant, Equipment etc. including provision of Water Supply,
Drainage, Power arrangements, office maintenance as per the details
mentioned in clauses 3.1 to 3.2.8 & 3.5 to 3.5.2 of Chapter 3 (Site Facilities
for the Employer and the Engineer) of Section 5 (Work's Requirement) of
Tender Documents.
Note 1: This item is provided with the contention that new site offices will
be constructed for this purpose and 75% payment of the accepted rates will
be made after making available functional office, balance 15% payment
shall be made at the end of the completion period and the remaining 10%
will be paid after clearance of site by the contractor .
Note 2: Alternatively if suitable accommodation is available on hire basis at Per Sq.m.
suitable location acceptable to the employer, the contractor can arrange the of Plinth
area
same under the item but in such a case the payment shall be regulated as
below.
(a) 10% payment shall be made on completion of one month from the date
of making available the office fit for functioning.
b) Remaining 90% payment shall be paid in equal monthly instalments that
is (0.9xQuoted rate) / (Stipulated Completion period in months + defect
liability period in months). In case stipulated period gets extended on any
account no additional payment shall be made for the item.

Providing Furniture as given under clauses 3.3, 3.3.1 of Chapter 3 (Site


Facilities for the Employer ) of Section 5 (work's Requirement) of Tender
Documents.
Note : Payment shall be made @ 75% of the accepted rate after making L S Per
available the furniture items in functional office, balance 15% payment shall Site Office
be made at the end of the completion period and the remaining 10% will be
paid after clearance of site by the contractor.
Providing Road Vehicle mentioned below for the use of
Engineer/Employer as per the Conditions mentioned in Clause 3.4.3, i.e
3.4.3.1 to 3.4.3.3 of Chapter 3 (Site Facilities for the Employer and the
Engineer) of Section 5 Work's Requirement) of Tender Documents.

9003a Tavera , Innova or similar


9003b Tata Sumo, Bolero or similar
9003c Extra for running and maintenance of Every additional Km over and
above Kms included under item 9000-3a
9003d Extra for running and maintenance of every additional Km over and
above Kms included under item 9000-3b
Total value for bill no. 9
Grand total carried forward to summary

Page 18 of 20

3603852

46864.8
15291100
15291100

BOQ of RaNI -SRPJ

Page 19 of 20

Package -1

Package-1

BOQ for Railway Electrification works between RANI (Excl.) - SRPJ(Excl.) section 198 TKM of Ajmer division of North western Railway

Bill No. 10 (Other items of work not covered in Bill No. 1 to 9

Item No.

10001

DESCRIPTION of North-Western Railways Unified Standard Schedule of


Rates 2010

Execution of item(s) of works covered by chapter 1 to 25 of USOR -2010


of North Western Railway.
Note: This bill will be operated for only those works wwhich can not be
executed by operation of BOQ items in bill no. 1 to 9.

Quantity

Unit

Rate in %age
above

Amount in
Rs

562151

Rs

12.1

630172

Total

630172

Total for Bill no.10 ( Carried forward)

630172

Bill of Quantities
(Signal & Telecom
Engineering)

S.No. ITEM NO

BOQ OF S&T ARRANGEMENT IN CONNECTION WITH RE WORK OF RANI - SWARUP GANJ (PKG-I) OF NWR
DESCRIPTION OF WORK
UNIT
Rate
QTY.
total Amount

Kms
Kms
Kms
Kms

245057.79
63470.81
95087.39
57079.00

38701
38702
38703

Group - C
Supply of underground Jelly filled 0.9 mm dia 6 Quad Telecom cable.
Supply of PIJF cable of size: 10 PAIR X 0.63 MM.
Supply of PIJF cable of size: 20 PAIR X 0.63 MM.
Supply of 24 Fibre armoured Optical fiber cable as per SPEC No.IRS.TC55/2006 ver.-1 with ammendments.
Supply of RCC pipes 150mm dia, 2 Mtr long along with collars
Supply of DWC pipe of size 120 mm outer dia & 102 mm inner dia.
Supply of SPLIT DWC pipe of size 200 mm outer dia & 175 mm inner dia.

Mtrs.
Mtrs.
Mtrs.

8
9
10
11

38704
38705
38902
40004

Supply of Galvanized Iron pipe 100 mm dia `B' class with end clamps
Supply and jointing of Quad cables with theromoshrinkable jointing kits
Supply of Electronic magneto telephone desk type.
Supply of 4 wire way station equipment as per Spec. no. TC. 38/97 or latest.

12

40005

13

40006

14

40008

15

40009

16

40102

17

40103

18

40104

19

40105

1
2
3
4

38651
38653
38654
38657

5
6
7

14
18
18
60

3430809.06
1142474.58
1711573.02
3424740.00

119.35
189.92
236.62

682
682
27273

81396.70
129525.44
6453337.26

Mtrs.
Nos.
Nos.
Nos.

820.90
4077.52
2407.70
4630.21

455
14
10
41

373509.50
57085.28
24077.00
189838.61

Supply of Power Supply for telecom installation at way side equipment as per
TEC Spcn. IRS.TC-72/97 Amdt.1 or latest.
Supply of portable Emergency telephone 4 wire as per spec. no. IRS TC:75-99
with latest amendment
Supply of Emergency Socket Box with socket six pin flat to RDSO Spec No.
IRS: TC. 42/87. Amdt. 1 or latest.
Supply of VF Tapping Transformer to RDSO Spec. No. IRS.TC-22-76 of type
470:1120, 600:470, 600:1120. exact break up to be decided in consultation
with engineer.
Supply of FCPC To SCPC 10 meter long patch cords with 0db adaptors as
TEC spec G/OJC-01/03 JAN99 Or latest.
Supply of managed Expendable rack type STM-1 ADM L 1.1 as per
Technical Spec. No. TEC GR No. GR/SDH-04/02 Mar 02 with amendment 1 ,
2 ,3 & 4 or latest with STM-1 aggregate interface , 21 E1S and 4 Numbers of
10/100 Base T Ethernet Port order wire, power supply unit, sub rack
installation material and accessories manual etc.The equipment should be fully
wired for its ultimate capacity and provide redundency for power supply and
synchronisation and other detail as given in chapter 3 (model - TJ 100 MC1).

Nos.

3623.41

41

148559.81

Nos.

2205.55

18

39699.90

Nos.

2205.55

19849.95

Nos.

580.26

182

105607.32

Nos.

1473.55

68

100201.40

Nos.

154131.91

15

2311978.65

Supply of SMPS based battery chargers for telecom use 48v, 25 amps in N+1
configuration using 2 modules of 25 A (FR/BC) with automatic switching
between the modules N=2.
Supply of 200 AH capacity LM batteries 24 Nos. at each station with required
no. of porcelene insulator. The suitable wooden rack for keeping batteries
shall also be supplied and it should be painted with 2 coats acid resistnt paint.

Nos.

55184.04

15

827760.60

Nos.

49860.40

15

747906.00

S.No. ITEM NO

20

40356

BOQ OF S&T ARRANGEMENT IN CONNECTION WITH RE WORK OF RANI - SWARUP GANJ (PKG-I) OF NWR
DESCRIPTION OF WORK
UNIT
Rate
QTY.
total Amount
Group - C
Supply of Speaker cable 2 Core Shielded & screened of size 47/0,193 as per
IS-694Cable for modification of existing PA System
Total of SOR Items (Group C)

Mtrs.

41.21

12273

505770.33
21825700.41

NS Items:
21

NS 3

22
23

NS 7
NS 8

24

NS 9

25

NS 10

26

NS 11

27

NS 12

28

NS 13

29

NS 14

Supply, Installation and commissioning of 4 wire DTMF Control Office


equipment and emergency control office equipment and connecting to the
power supply equipment.
Supply of Earth tester - Digital Motwane make
Supply & fixing of PVC Conduit pipe 25 mm dia and thickness 1.5 mm with
suitable clamps at interval of 1 mtr.
Supply of Network Monitoring System (NMS) including associated application
software for 2 mb drop insert mux and its associated item as per technical
spec. and office stipulation detailed with all accessories incl. Power supply as
well as one soft copy of software. (Refer. Telecom special conditons : Chapter3).
Supply of Network Monitoring System (NMS) including associated application
software for STM-1 and its associated item as per technical spec. and office
stipulation detailed with all accessories incl. Power supply as well as one soft
copy of software. (Refer. Telecom special conditons : Chapter-3).

Nos.

14870.65

74353.25

Nos.
Mtrs.

14468.00
44.85

2
1227

28936.00
55030.95

Nos.

106030.00

106030.00

Nos.

106030.00

106030.00

Supply of local craft terminal as per technical spec. and other stipulations
complete with all accessories compataible with NMS.(Refer. Telecom special
conditons : Chapter-3).
Supply of remote service terminal as per tech. Spec.and other stipulations with
all accessories compataible with NMS. It should be possible to plug in remote
service terminal at any of the station. It should be capable to programme any
network element from any location of network and read the full status of any
element in the network from remote service terminal, as well as one soft copy
of the software .(Refer. Telecom special conditons : Chapter-3)

Nos.

54970.00

54970.00

Nos.

129668.25

129668.25

Supply & Provision of Surge protection device for AC Power line incoming,
complete for Single phase power protection
Supply of 2T Transformer .
Total Cost of NS Items (Group-C)
TOTAL (Group-C) carried forward to summary

Nos

24955.00

12

299460.00

Nos.

1008.00

23

23184.00
877662.45
22703362.86

BOQ OF S&T ARRANGEMENT IN CONNECTION WITH RE WORK OF RANI - SWARUP GANJ (PKG-I) OF NWR

S.NO
.
1

2
3

4
5

6
7
8

ITEM
NO

DESCRIPTION OF WORK

Group - D
39652 Excavation of cable trench of 1 m. depth & 300 mm.
wide across the track crossing, road crossing, level
crossing, platform & refilling.
39653 Providing chase in hard rock.
39654 Perforation and Fixing of GI pipes on girder bridges,
RCC bridges, drains, culverts, rocky places
tunnels/deep cutting.
39655 Fixing/ laying of DWC/RCC pipes(FOR SIGNALING
& TELECOM WORK)
39656 Laying of signaling / power / telecom / quad/OFC
cable of various sizes in trench and pipes.include
Testing of point to point insulation / continuity test for
all laid out cables, Measuring Parameters and
preparing the records
39657 Placing of half round ( Split DWC ) pipe over the laid
cable in open trenches.
39658 Supply and Fixing of 20 pair CTB and termination of
quad/ jelly filled cable.
39901 Supply and Installation of Maintenance Free
Earthing and Bonding System as per RDSO
specification
40502 Installation and commissioning of 4 wire way station
equipments, power supply unit at SP/SSP/Station/
TSS/AEN/PWI/SI
offices/
Residences.
The
installation of way station equipment and power
supply unit (supply covered under a separate item)
shall be mounted on a MS angle rack. All the
materials for installation, commissioning of 4 W
equipment and power supply unit shall be provided
by contractor.

UNIT

Rate

Kms.

51262.94

Mtrs.
Mtrs.

94.98
36.44

Kms.

QTY.

Total Amount

40

2050517.60

4545
455

431684.10
16580.20

30018.70

60037.40

Kms.

4115.00

41

168715.00

Kms.

2669.33

20

53386.60

Nos.

3324.24

27

89754.48

Nos.

33770.34

20

675406.80

Nos.

2331.19

41

95578.79

S.NO
.
10

11

ITEM
NO

DESCRIPTION OF WORK

Group - D
40503 Installation of emergency socket box including
socket on the Rail Post in the section and yard at
every one Km distance as pertapping chart supplied
by the survey team. this will include wiring and
termination of quad cable on the socket box
mounted at 1 mtr hight, clamped with 2 nos. UClamps, provision of concreate foundation of rail
post in such a way that the rail post is one meter
above the earth level. The concrete shall be in ratio
of 1:3:6 of cement, sand & stone chips. The
contractor shall jointly test with RVNL Engineer for
its satisfactory operation. This includes painting of
emergency socket post with alternate yellow and
black strip of 6" width and paiting of the socket box
with gray colour paint and painting of arrows on the
telephone posts/cable markers to show the nearest
Emergency socket as instructed by engineer at site.
Rail Posts and MS pipes of required lengths for
fixing Emergency sockets will also be supplied and
installed by the Contractor.
40601 Supply and installation of OFC cable joint enclosure
as per TEC No. G/OJC-01/03 Jan 99 or latest and
splicing o optical fibre cables (24 Fibre) and testing.

UNIT

Rate

QTY.

Total Amount

Nos.

1858.19

10

18581.90

Nos.

8649.87

45

389244.15

S.NO
.

ITEM
NO

DESCRIPTION OF WORK

12

40603

13

40604 (i) 4 wire, E&M, VF interface cards (8 circuits per


card).
40604 (ii) subscriper loop interface cards (6 circuits per
card).
40604 (iii) ISDN Interface (Two BRI Ports per card)
40604 (iv) Exchange loop interface cards (6 circuits per
card).
40604 (v) G 703, 64 kbps data interface cards with a
minimum of 8 ports per card.

UNIT

Rate

QTY.

Total Amount

Nos.

92372.01

11

1016092.11

Nos.

30712.42

0.00

Nos.

27487.94

11

302367.34

Nos.
Nos.

19761.66
23993.54

11
11

217378.26
263928.94

Nos.

29453.54

11

323988.94

Group - D

14
15
16
17

Supply of 2 MB programmable primary digital drop


insert multiplexer with conference facility as per
specifications
IRS:TC/68/2004
with
latest
amendments & other stipulations of tender
document fully wired for 30 channels complete with
power supply unit, remote control supervision facility
& all other accessories installation materials,
manuals etc. It should have facility to accomodate
data interface cards in multi drop mode & should be
able to support card needed for video conference.
NOTE : 1) in case the cards contain less than 8
circuits or 6 circuits as mentioned above suitable
number of cards to equal the total requirements of
circuits must be supplied. 2) If the card contains
more than 2/6/8 ports per card as mentioned in the
schedule, the tenderer shall still supply the number
of cards asked for. The number shall not be scaled
down as per the number of ports.

S.NO
.

ITEM
NO

DESCRIPTION OF WORK

18

40605

19

40106 Blowing of armoured Optical Fiber Cable into duct


by using blowing machine and associated works
.Before blowing the duct integrity shall be tested .If
any defect shall be found during duct integrity test ,
the entire length of HDPE duct from one chamber to
another chamber chamber is to be replaced by
Contractor at free of cost.
40806 Supply and placing of second class bricks of size
225x100x75 mm (9 bricks per mtr) horizentally
breath wise in the trench after covering the laid
cable with soft soil of 50 mm thickness.
Total Cost of SOR Item (Group D)
NS Items:

UNIT

Rate

QTY.

Total Amount

Nos.

35779.77

11

393577.47

Kms.

9901.92

30

297057.60

Nos.

4.85

327273

1587274.05

Group - D

20

Supply, installation testing & commisning including


earthing of 42 u 19" covered racks for housing SDH
and P- MUX equipments, DDF, FMS, MDF, using
krone module etc. Complete with all fittings, wired
and equipped with integrated protection modules
for all channels and adequate numbers of cooling
fans ,AC/DC power supply distribution panels, ULink panels and other hardware like runway, ladders
etc. It should be possible to lock all the equipments
with only order wire telephone remaining outside the
rack. The rack should be of APW President/Rittal
make. The components of the rack are specified
below. Broad description of rack is detailed below
.Rack size 2200(mm) H x 600(mm) W x 600( mm)
D. Fixed side panels 42 U x 600 (mm) D front glass
door plain 42 U x 600 (mm) D rear MS door plain 42
U x 600 (mm) D leveling screws - 4 numbers .Fan
directly mounted on top 48 V DC 90 CFM - 2 Nos.
earth connectivity kit - 1 No. Cable manager with
cable loops-2nos.

8451151.73

S.NO
.
21

ITEM
NO

DESCRIPTION OF WORK

Group - D
NS-18 Excavation of cable trench 1.2m deep x 300mm
width as per Technical Specifications 51.2, at track
& roads crossing, laying of DWC pipes, as per Drg.
No. RVNL/S&T/SG 024/2005, refilling of trench,
ramming. HDPE pipe shall be laid at the bottom of
the trench and after refilling with seived earth by 150200 mm, 6 quad cable shall be laid and restoring the
earth to original condition.

22

NS-19

23

NS-20 Testing & commissioning of complete OFC system.

24
25
26

NS-25 Initial charging of Secondary cells:NS-28 2 Volts, 200 AH


NS-29 Supply of 20 Pair Krone terminal complete with
mounting arrangements.

Horizontal directional drilling for laying of HDPE


125/200mm dia pipe 1.4 Meter to 2.1 meter below
the formation of Earth level below ballast, As per
drawing and instruction of Engineer at site. Terms &
Conditions A) The rate shall include Horizontal
direction drilling at any intermediate obstruction,
either natural or manmade any boundary strata. B)
The rate is inclusive of all material equipments and
labour required during trench less horizontal
directional drilling under. C) The pipes are to be laid
under Railway track/Platform/Pucca Circulating area
etc. Necessary arrangement to be provided and all
precautions are to be taken so that bore coming out
at either end is not deviated from the Horizontal
level by more than 250mm in horizontal. D) The rate
is inclusive of detection and protection of
underground utility encountered during boring. E)
The payment shall be made for boring only when
HDPE pipe is provided in the above

UNIT

Rate

Kms.

67620.00

51

3448620.00

Mtrs.

1500.00

1700

2550000.00

230000.00

360
23

0.00
95760.00
19550.00

System
(Nos.)
Nos.
Nos.

230000.00

266.00
850.00

QTY.

Total Amount

S.NO
.
27
28

29

30

ITEM
NO

DESCRIPTION OF WORK

UNIT

Rate

QTY.

Total Amount

Group - D
NS-30 Supply of Krone insertion/ extrusion tool Krone
make
NS-31 Supply & installation of wire insulator for wire
operating, Level Crossing Lifting barriers/Signals as
per Specification No. IRS S-47-74

Nos.

1150.00

5750.00

No.of wire
Insulator
(Nos.)

555.00

90

49950.00

NS-32 supply and installation of Insulator of Point rodding


at function end and lever end as per Technical
specification.
NS-33 Provision of GPS Clock in Stations

No.of rod
insulator
(Nos.)
Nos.

591.00

90

53190.00

20000.00

10

200000.00

Total Cost of NS Item


Grand Total of Group D(Carried forward to summary)

6652820.00
15103971.73

Bill of Quantities
(Electrical
Engineering)

BOQ of RANI-SRPJ

Package-1

Schedule 16000
BOQ for Railway Electrification works between RANI(Excl.) -SRPJ(Excl.) section 198 TKM of Ajmer Division of North Western Railway
RE General
Supply Erection Total supply in Total Erection Grand total in
Item No SOR ITEM
Description
Unit
Qty
(In Rs)
(In Rs)
Rs
(In Rs)
Rs

16001

OHE-1

16002

OHE-2

16003

OHE-3

16004

16005

OHE-4

OHE-5

Preparation and submission of designs and drawings


for
Overhead Equipment,
Switching
Station,
Sectioning
diagram,Power
supply
diagram,
TKM
Schematic diagram of Switching Stations, Traction
working rule diagram and Instructions etc. required
for commissioning of OHE
Supply and Erection of large Span wire (130 sq.mm)
including its fittings with insulators:
(a) With Porcelain Insulators 1050mm CD
Mtr
(b) With Composite Insulators 1050mm CD
Mtr
Supply and Erection of materials for Termination of
single conductor of overhead equipment or a
terminating wire
(a) With Porcelain Insulators 1050mm CD
Each
(b) With Composite Insulators 1050mm CD
Each
Supply and Erection of materials for Termination of
all aluminum 25 KV feeder conductor single (spider)
including feeder wire
(a) With Porcelain Insulators 1050mm CD
Mtr
(b) With Composite Insulators 1050mm CD
Mtr
Supply and Erection of material for Termination of
copper cross feeder with gantries including cross
feeder wire
(a) With Porcelain Insulators 1050mm CD
Set
(b) With Composite Insulators 1050mm CD
Set
Supply and Erection of Terminal boards in control
Each
cubicles,

198

996

14440

197208

2859120

3056328

1500
444

439
415

36
36

658500
184260

54000
15984

712500
200244

275
78

5871
4704

538
538

1614525
366912

147950
41964

1762475
408876

1600
473

293
275

118
118

468800
130075

188800
55814

657600
185889

12
5

24874
22540

631
631

298488
112700

7572
3155

306060
115855

5985

269

29925

1345

31270

16006

OHE-6

16007

OHE-7

Supply and Erection of iron clad 240V AC and 110V


D.C. board with fuse box in control cubicles,

Set

3967

123

19835

615

20450

16008

OHE-8

Supply and Erection of Lead Acid Batteries 40 AH


with Battery Chargers:

Set

142372

5061

711860

25305

737165

Set
Set

15
3

58472
57305

8586
8586

877080
171915

128790
25758

1005870
197673

Set
Set
Mtr
Per
month

1
1
0

165899
164732
0

16387
16387
22

165899
164732
0

16387
16387
0

182286
181119
0

155

25265

3916075

3916075

21660

86640

86640

10420

4952

41680

19808

61488

38

6214394

7611469

16009

Supply, Erection, Oil Filtration, Testing and


Commissioning of 25 KV/240 Volt, 5 KVA, LT supply
transformer with 25 KV D. O. fuse switch assembly,
OHE-9(a) anticlimbing device, post insulators, copper jumper
and earth electrode etc:
(a) With Porcelain Insulators 1050mm CD
(b) With Composite Insulators 1050mm CD

16010

Supply, Erection, oil Filtration, Testing and


Commissioning of 25 KV/240 Volt, 25 KVA, LT
supply transformer with 25 KV D. O. fuse switch
OHE- 9(b) assembly, anticlimbing device ,post insulators,
copper jumper and earth electrode etc:

16011

OHE-10

(a) With Porcelain Insulators 1050mm CD


(b) With Composite Insulators 1050mm CD
Modification to existing OHE

16012

OHE-11

Manning of switching station i.e. SP/SSP and TSS:

16013

OHE-12(a)

16014
16015

Electrification of switching station building as per


Each
specification
Supply & Erection of Earthing arrangement at
OHE-12(b)
Job
switching station
Loading/Unloading transportation and handing over
OHE-13 of all type of materials etc. other than contractor
MT/KM
material

Total
Grand Total carried forward to summary

OHE-16

13825863
13825863

Page 1 of 25

BOQ of RANI-SRPJ

Package-1

Schedule 17000
BOQ for Railway Electrification works between RANI(Excl.) -SRPJ(Excl.) section 198 TKM of Ajmer Division
of North Western Railway
Switching Post building

Item No

17001

SOR ITEM

Description

Unit

Qty

Rate (In
Rs.)

Grand Total
Rs.

OHE-15

Construction of Switching Station building, RCC work


,plastering, brick masonry, retaining wall, filling,
compacting and leveling work etc as per RDSO
standard drawing and supply and erection of name
board of switching station

Each

140394

701970

17001(a)

Extra for every 0.3 m or part there of higher plinth


OHE-15(a) over normal plinth height (On ground floor area only)

17001(b)

OHE-15(b) foundations over normal depth (On ground floor area

174
Sq.m

174

Sq.m

174

174

Sq.m

331

331

Extra for every 0.3 m or part there of deeper

17001(c)

only)
Extra for open foundation on poor soil having every
0.3 m or part there of higher plinth over normal
OHE-15(c)
plinth height (On ground floor area only)

Total cost

Grand Total carried forward to summary

OHE-17

702649

702649

2 of 25

BOQ of RANI-SRPJ

Package-1

Schdule 19000
BOQ for Railway electrification works between RANI (Excl.) -SRPJ(Excl.) section 198 TKM Of Ajmer Division of North Western Railway
OHE - Ferrous other than steel structures and SPS

Item No

SOR
ITEM

Description

19001
19002

OHE-16 Supply and Erection of a guy rod assembly.


OHE-17 Supply and Erection of protective screen on FOBs/ROBs

19003

OHE-18 Supply and Erection of bracket assembly with insulators


as per OHE plan:
(a) With Porcelain stay & bracket Insulators 1050mm
CD
(b) With Composite stay & bracket Insulators 1050mm
CD
OHE-19 Supply and Erection of regulating equipment (3 pulley
type) with counter weight assembly for conventional
OHE
OHE-20 Supply and Erection of material for termination of double
Overhead Equipment conductor

19004

19005

19006

19007

(a) With Porcelain Insulators 1050mm CD


(b) With Composite Insulators 1050mm CD
OHE-21 Supply and Erection of anti-creep with galvanized steel
wire
(a) With Porcelain Insulators 1050mm CD
(b) With Composite Insulators 1050mm CD
OHE-22 Supply and Erection of a structure bond/longitudinal
bond/ transverse and special bond:.
Total

Unit

Qty

Supply
(In Rs)

Erection
(In Rs)

Total
supply in
Rs

Total
Erection
In Rs

Grand
Total In Rs

Each

641

4651

722

2981291

462802

3444093

Sq M

28

2408

260

67424

7280

74704

Each

5000

11104

622 55520000

3110000

58630000

Each

1653

9937

622 16425861

1028166

17454027

Each

345

36645

2690 12642525

928050

13570575

Each
Each

40
12

7784
6617

679
679

311360
79404

27160
8148

338520
87552

Each
Each

125
30

18268
15934

1908
1908

2283500
478020

238500
57240

2522000
535260

TKM

198

13039

4160

2581722

823680

3405402

93371107

6691026 100062133

Grand total carried forward to summary

100062133

OHE-19

3 of 25

BOQ of RANI-SRPJ

Package-I

Schedule 20000
BOQ For Railway Electrification works between RANI(Excl.)- SRPJ(Excl.) section 198 TKM of Ajmer Division of North
Western Railway
OHE - Non Ferrous 'A'
Item No

20001

SOR ITEM

Description

Supply and Erection of Over Head


Equipment i.e. contact & catenary wire
(excluding cost of supply of contact &
catenary wires), jumper wire, dropper
wire, contact/catenary clips, fasteners
OHE-23(a) and all other material required at turn
out/overlaps/diamond crossings etc.
Final checking of OHE and adjustment,
inspection to be done by tower wagon
for commissioning of conventional OHE.

Supply (In Erection Total Supply


Rs)
(In Rs)
in Rs

Total
Grand Total in
Erection
Rs
in Rs

Unit

Qty

TKM

198

41112

8140176

8140176

20002

Supply of contact wire (HDGCC 107


OHE-23(b) Sq.mm) only.

MT

215

629859

135419685

135419685

20003

Supply of cadmium copper catenary wire


OHE-23(c) (65 Sq. mm) only

MT

135

629859

85030965

85030965

Total
Grand total carried forward to summary

OHE-20

220450650

8140176

228590826
228590826

4 of 25

BOQ of RANI-SRPJ

Package-1

Schedule 21000
BOQ for Railway Electrification works between RANI(Excl.) - SRPJ ( Excl.) section 198 TKM of Ajmer Division of North Western Railway
OHE - Non Ferrous ''B'

Item No

21001

SOR
ITEM

Description

Supply and Erection of anti-creep with cadmium copper


catenary wire.
OHE-24 (a) With Porcelain Insulators 1050mm CD
(b) With Composite Insulators 1050mm CD

21002

OHE-25

21003

OHE-26

21004

OHE-27

21005

OHE-28

21006

OHE-29

21007

OHE-30

21008
21009

Supply and erection of section insulator assembly and


associated fittings & fasteners for OHE with Bar
Insulator
(a) With Porcelain Insulators 1050mm CD and Bar
Insulator
(b) With Composite Insulators 1050mm CD and
Porcelain Bar Insulator
Supply and Erection of PTFE type short neutral section
assembly
Supply and Erection of 25 KV, S.P Isolators and with
insulator with/without earth contact assembly:
Supply and Erection of 25 KV double pole isolator and
with insulator with/without earth contact assembly:
Supply and Erection of all types of copper jumpers

Supply and Erection of insulated catenary cable in the


span under over-line structure.
Supply of materials and erection of a large copper
OHE-31 jumper (160sqmm) between aluminium bus / OHE and
cross feeder with all associated fittings:
Supply and Erection of solid copper busbar 18 mm dia.
OHE-32
Supply and Erection of all types of connectors for
aluminium/copper bus bar required for commissioning of
switching stations with fasteners.
Dismantling of traction structure, portals,TTC and
associated SPS by cutting:
Supply and Erection of safety items i. e. Fire
extinguishers, set of fire bucket with stand and first aid
box, key box with suitable key chain, locks and other
misc items required for commissioning of switching
station.
Supply and Erection of 25 KV AC OHE danger
board/danger board for height gauge, public/staff caution
board and special boards required for commissioning of
OHE/SWSs
Supply, Erection and commissioning of light weight
section insulator assembly 25 KV as per drawing
no.6.2758.0 RDSO spec.no. TI/Spec/OHE/LWDSI/007

21010

OHE-33

21011

OHE-34

21012

OHE-35

21013

OHE-36

21014

OHE-37

21015

Supply, installation and commissioning of the


OHE-38 maintenance free earth as per RDSO specification No.
RDSO/PE/SPEC/PS/0109(REV.O)-2008

Total
Grand total carried forward to summary

OHE-21

Unit

Qty

Supply
(In Rs)

Erection
(In Rs)

TotalSupply
(In Rs)

Total
Erection
(In Rs)

Grand
Total in
Rs

3970
3970

444160
106372

31760
7940

475920
114312

Each

Each

55520
53186

Each

55

64506

4241

3547830

233255

3781085

Each

14

63339

4241

886746

59374

946120

Each

761250

4349

3045000

17396

3062396

Each

72

66512

4386

4788864

315792

5104656

Each

19

103400

4803

1964600

91257

2055857

Each

130

5790

320

752700

41600

794300

Mtr

261

2634

82

687474

21402

708876

Each

63

7452

320

469476

20160

489636

Mtr

358

1523

138

545234

49404

594638

Each

285

4081

56

1163085

15960

1179045

MT

1197

Set

10844

1796

65064

10776

75840

122

107

32574

28569

61143

Each

267

Each

265310

23882

265310

23882

289192

Each

324501

324501

324501

18764489

1293028 20057517
20057517

5 of 25

BOQ of RANI-SRPJ

Package-1

Schedule-24000
BOQ for Railway Electrification works between RANI(Excl.) - SRPJ ( Excl.) section 198 TKM of Ajmer Division of North Western Railway

TRACTION SUB- STATION

Item No SOR ITEM

Unit

qty

Supply
(In Rs)

Erection
(In Rs)

Total
supply in
Rs

Each

80242

80242

80242

24001

TSS-1

Design and drawings for 220/27 or 132/27 KV or


110/27 KV traction sub-station including feeding post
and capacitor bank

24002

TSS-2

DELETED

Total
Grand total in
Erection
Rs
(In Rs)

Cum

2420

761

24004

Construction of baffle wall complete with


TSS-3
reinforcement, brick work, plastering etc
Supply, erection, testing & commissioning of 132 KV
TSS-4(a) double pole SF-6 gas circuit breakers with interlock

Each

581714

5118

24005

Supply, erection, testing & commissioning of 220 KV


TSS-4(b) double pole SF-6 gas circuit breakers with interlock

Each

1096604

5118

1096604

5118

1101722

Each

235013

2220

Each

235013

2220

470026

4440

474466

Each

197215

1145

Each

197215

4327

591645

12981

604626

Each

131033

1145

Each

246611

1145

115399
115399
48045

811
1414
811

0
461596
0

0
5656
0

0
467252
0

303780

3594

1215120

14376

1229496

359578

3594

Each

55163

473

220652

1892

222544

Each

63755

473

Each

41645

2790

1477300

9279

1477300

9279

1486579

180

417

32

75060

5760

80820

Mtr

350

257

89950

2450

92400

Each

160

1595

20

255200

3200

258400

Each

35

2396

331

83860

11585

95445

Each

24072

384

Each

10

24072

600

240720

6000

246720

Each

20

2943

110

58860

2200

61060

Each

8726

200

Each

14

8726

306

122164

4284

126448

Set

612306

6736

612306

6736

619042

Each

22548

479

67644

1437

69081

Each

30

1885

734

56550

22020

78570

Mtr

900

133

39

119700

35100

154800

Mtr

1200

65

31

78000

37200

115200

Mtr

100

12

13

1200

1300

2500

Mtr

2000

153

13

306000

26000

332000

24003

24006
24007

TSS5(a)
TSS5(b)

Supply and erection of 132 KV double pole isolators


(manually operated)
Supply and erection of 220 KV double pole isolators
(manually operated)
Supply & erection of 132 KV current transformer
assembly (400-200/5A)
Supply & erection of 220 KV current transformer
assembly (200-100/5A)
Supply & erection of 110 KV current transformer
assembly (400-200/5A)
Supply & erection of 132 kV current transformer
assembly (1200-800-400/5-5-5A)
Supply & erection of 120 KV lightning arrestors

24008

TSS-6(a)

24009

TSS-6(b)

24009A

TSS-6(c )

24009B

TSS-6(d)

24010

TSS-7 (a)

Each

24011

TSS-7 (b) Supply & erection of 198 KV lightning arrestors


Each
TSS-7 (c ) Supply & erection of 96 KV lightning arrestors
Each
Supply, erection, testing & commissioning of 25 KV
TSS -8(a) single pole Vacuum circuit breaker with interlocking of Each
rating 1600 amps

24011A
24012

24012A
24013
24013A
24013B
24014

24015
24016
24017
24018
24019
24020
24021
24022
24023
24024

TSS

Description

Supply, erection, testing & commissioning of 25 KV


TSS -8(b) single pole Vacuum circuit breaker with interlocking of Each
rating 2000 amps
Supply & erection of 25 KV current transformers
(1500-750/5A)
Supply & erection of 25 kV current transformers
TSS -9(b)
(3000-1500/5 Amps)
Supply & erection of 25 KV current transformers (200TSS -9(c )
100/5A)
TSS-10 Supply, erection, testing and commissioning of
control & relay numeric panel suitable for double
transformer traction sub -stations of 220/27 or
132/27 KV or 110/27 KV
TSS-11 Supply & erection of tubular aluminum bus bars
50mm x 39mm dia
TSS-12 Supply & erection of Zebra ACSR conductor
Supply & erection of all type of connectors, bus splice
TSS-13 & TEE connectors etc required for commissioning of
TSS equipments
Supply & erection of copper jumper with fittings and
TSS-14
fasteners required for TSS
Supply & erection of 110/132 KV support insulators
TSS-15(a)
with fittings and fasteners
TSS -9(a)

Supply & erection of 220 KV support insulators with


fittings and fasteners
Supply & erection of 25 KV support insulators with
TSS-16
fittings and fastener
Supply & erection of 110/132 KV termination
TSS-17(a)
with/without adjuster complete with disc insulators
Supply & erection of 220 KV termination with/without
TSS-17(b)
adjuster complete with disc insulators
Supply & erection of low maintenance lead acid
TSS-18 batteries set with 2 nos. of suitable battery charger
TSS-15(b)

24025

TSS-19

24026

TSS-20

24027

TSS-21

24028

TSS-22

24029

TSS-23

24030

TSS-24

Supply & erection of 240Volt AC and 110 V DC


Distribution boards in the control room
Supply and erection of earth electrode
Supply and erection of earth leads 75 x 8 mm mild
steel flat laid in the ground or exposed as per site
requriment
Supply and erection of earth leads 50 x6 mm mild
steel flat laid in the ground or exposed as per site
requriment
Supply and erection of 8 SWG GI Wire for earthing
Supply and erection of 32mm dia MS rod for earth
mat

Each

Mtr

6 of 25

BOQ of RANI-SRPJ

24031

TSS-25

24032

TSS-26(a)

24033

TSS-26(b)

24033A

TSS-26(c )

24033B

TSS-26(d)

24034

TSS-27(a)

24034A TSS-27(b)
24035

TSS-28(a)

24035A TSS-28(b)

24036

TSS-29

24037

TSS-30

Supply & erection of earth screen wire including


termination
Suppy, erection, testing & commissioning of 132/27
KV, 21.6/30.24 MVA, ONAN/ONAF, single phase
traction power transformers
Suppy, erection, testing & commissioning of 220/27
KV, 21.6/30.24 MVA, ONAN/ONAF, single phase
traction power transformers
Suppy, erection, testing & commissioning of 110/27
KV, 21.6/30.24 MVA, ONAN/ONAF, single phase
traction power transformers
Suppy, erection, testing & commissioning of 132/27
KV, 30/42 MVA, ONAN/ONAF, single phase traction
power transformers
Supply and erection of 25 Kv double pole isolator
1600 Amp with insulators
Supply and erection of 25 Kv double pole isolator
3150 Amp with insulators
Supply and erection of single pole isolator 1600 Amp
with insulators
Supply and erection of single pole isolator 3150 Amp
with insulators
Supply, erection, testing & commissioning of 25 KV
shunt capacitor bank of 2400 KVAR rating at 25 KV
including lowloss sereis reactor, 25 KV neutral current
transformer, and other accessories etc.,
Excavation of Earth to the depth of 2 meter below
ground level for burying 13mtrs long rail and
connecting it as per RDSO drawing (Rail will be
supplied by RVNL)

Package-1

Mtr

250

169

42250

2250

44500

Each

24091345

184047

Each

33895503

184047

33895503

184047

34079550

Each

17228475

184047

Each

27838617

184047

Each

66784

2127

333920

10635

344555

Each

133680

2127

Each

36927

2127

295416

17016

312432

Each

67826

2127

Each

2018938

42292

2018938

42292

2061230

Each

2184

44286184

555496

44841680

Total

Grand total carried forward to summary


NOTE: 1

44841680

Provision of cross track, control room building and approach road shall be made in the civil portion of the estimate.

2. Provisio

2 Provision of yard lighting and water jet pump shall be made in the general electrical portion of the estiate.

TSS

7 of 25

BOQ of RANI-SRPJ

Paackage-1

Schedule 27000
BOQ for Railway Electrification works between RANI(Excl.)-SRPJ (Excl.) section 198 TKM of Ajmer Division of North
Western Railway
TSS Spares
Item No
27001
27002
27003
27004
27005
27006
27007
27008
27009

Description of item
SF-6 Gas Cylinder with filling arrangement
25KV CB Bushing
Interruptor Bushing
Earth fault Relay
Buchholz Relay
Relay Testing Kit
HRC fuse 2A, 4A, 10A, 15A, 32 Amp
Transformer Oil
Capacitor unit of capacitor bank
Total

Grand total carried forward to summary

Unit

Qty

SOR rates in Rs

Each
Each
Each
Each
Each
Set
Set
Litre
Set

0
1
1
1
1
1
10
5000
1

29590
31527
11298
7209
16140
146334
1076
28
550265

Total supply in Rs
0
31527
11298
7209
16140
146334
10760
140000
550265
913533
913533

BOQ of RANI-SRPJ

Package-1

SCHEDULE -28000
BOQ for Railway Electrification works between RANI(Excl.) - SRPJ(Excl.) section 198 TKM of Ajmer Division of North Western Railway

Item No
28001
28002
28003
28004
28005
28006
28007
28008
28009
28010
28011
28012
28013
28014
28015
28016
28017
28018
28019
28020
28021
28022
28023
28024
28025
28026
28027
28028
28029
28030
28031
28032
28033
28034
28035
28036
28037
28038
28039
28040
28041
28042
28043
28044
28045
28046
28047
28048
28049

Tools & Plants (OHE & PSI)


Description
Unit
Tirfor 2.5T/1.5T
Nos
Trifor 5T/3T
Nos
Pull lift 3 T
Nos
Pull lift 3/4 T
Nos
Aluminium / Light weight metal conduit Platform ladder trolley
Nos
Rail jumpers with clamps at both ends
Nos
Earthing discharge rod complete
Nos
Aluminium Straight ladder extensive (11 M)
Nos
Portable Electric Drill 21mm, single phase, 230V (for drilling) Ralli
Nos
Wolf, Hitachi, Black & Decker makes only
First aid box filled with medicines as per standard
Nos
Stretcher
Nos
Fire bucket (10 Ltrs) capacity with one stand and cover for set of 4/6
Nos
buckets at each switching station/TSS
Portable fire extinguisher dry chem. Powder (10 Ltr)
Nos
Portable fire extinghuisher foam type (cap 9 Ltr)
Nos
D' Shackles set of on each (1", 3/4", 5/8", 1/2")
Nos
Set of Steel sling with Eye each end of 2 M & 3 M
Nos
Micro meter Mitutoyo make/ as required by Railway
Nos
Bench Vice 6"
Nos
Canvass Tarpaulin 12 m x 12m
Nos
TESTING AND MEASURING EQUIPMENTS
Insulation Megger 250V
Nos
Binoculars
Nos
Vernier Callipers Mitutoyo make/ as required by Railway
Nos
Walkie Talkie Sets (2W output)
Nos
Digital Multimeter
Nos
Magic Pole ladder 8'
Nos
Drop out fuse pull rod
Nos
1/2" square drive socket set containing 19 sockets with 6 attachments
Nos
Transformer oil Acidity testing Kit
Motor operated insulation tester 5 Kv
Pocket size clip on Tong tester
A.C. Voltmeter 0 - 150 V
A.C Voltmeter 0 - 500 V
Digital time interval meter 15 - 1000 seconds
Insulation tester 2.5 KV
Earth tester
Insulation Megger 500 V
Transformer Oil BDV testing Kit
125 Litre cap oil filtration plant
Auto transformer 2 A capacity
Load cell tester suitable for 40 AH and 200 AH battery
Emergency Telephone
Spanner set double ended, 24 size 12 pieces set (6mm to 42mm)
Gedore or Tapraia make with ISI Mark
Cogex or Similar 52 pieces socket set (box spanners)
Primary current injection testing kit (0 - 3000 amps)
Digital Insulation testing meter (5 KV Megger)
Digital earth resistance meter
Thermal Imaging camera with software
Tan delta field test set
Supply, installation, testing & commissioning of GPS based OHE
monitoring & current collection system as per RDSO spec No.
TI/SPC/OHE/OLIVIR/0050(01/06) or latest

Qty
1
1
1
1
1
3
6
2
1

Rate
6672
9118
8285
3670
9453
1023
7228
4893
9453

Total supply

1
1
5

1112
722
134

1112
722

2
2
2
8
1
1
2

3892
4226
1112
1390
1501
1112
2224

1
1
1
4
3
1
2
2

5561
556
834
5561
4448
6672
1112
1112

7784
8452
2224
11120
1501
1112
4448
0
5561
556
834
22244
13344
6672
2224

Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Set

1
1
1
2
2
2
1
2
1
1
1
1
1
3
4

5561
4671
1669
890
1669
1112
2780
4448
7228
14456
111207
1669
1112
5005
5347

5561
4671
1669
1780
3338
2224
2780
8896
7228
14456
111207
1669
1112
15015

Set
Each
Each
Each
Each
Each
Each

1
0
1
2
0
0
0

4010
789735
290615
58123
1076933
796547
398800

4010
0
290615
116246
0
0

6672
9118
8285
3670
9453
3069
43368
9786
9453

670

2224

21388

Total(schedule items)

809543

NON SCHEDULE ITEMS


NS-1
NS-2
NS-3
NS-4

Dielectric tester 0 to 75 kv with accessories.


Digital thermometer (Motwani/Meco/Testica or similar reputed make)
Cutting plier (Good Quality) 9 inches
Nose plier (Good Quality) 9 inches long Handle insulated for 2 KV
Total (Non schedule items)

Each

45835

45835

Each
Each
Each

1790

5
5

158
158

1790
790
790
49205
858748

Grand total (schedule & non schedule items) carried forward to Summary

Page 9 of 25

BOQ of RANI-SRPJ

Package-1

Schedule-29000
BOQ for Railway Electrification works between RANI (Excl.) - SRPJ (Excl.) section 198 TKM of Ajmer Division of North Western Railway
SCADA

Item No

SOR ITEM

Description

Unit

Qty

Supply (In Erection


Rs)
in Rs

Total
supply in
Rs

Total
erection
in Rs

Grand
total (In
Rs)

29001

SCADA-1

Preparation and supply of Design & Drawing for


SCADA at RCC,TSS,SP & SSP.

Job

736096

736096

736096

29002

SCADA-2

Supply of SCADA equipments & Software for RCC.

Set

3710933

3710933

3710933

29003

SCADA-3(a)

Supply of RTUs for FP/TSS

Each

347373

694746

694746

29004

SCADA-3(b)

Supply of RTU for SP.

Each

223178

669534

669534

29005

SCADA-3(c)

Supply of RTUs for SSP.

Each

223178

1115890

1115890

29006

SCADA-4(a)

Supply of Maintenance Free/Low Maintenance type


Lead Acid battery.

Set

192502

192502

192502

29007
29008

SCADA-4(b)
SCADA-5

Set
Set

1
1

198711
186292

0
0

198711
186292

0
0

198711
186292

29009

SCADA-6

Nos.

31049

62098

62098

29010

SCADA-7(a)

Job

436502

436502

436502

29011

SCADA-7(b)

Job

220828

220828

220828

29012

SCADA-8(a)

Job

176661

176661

176661

29013

SCADA-8(b)

Job

58887

58887

58887

29014

SCADA-8(c)

Job

147218

147218

147218

29015

SCADA-9

Set

371342

371342

371342

29016

SCADA-10

Set

453310

453310

453310

SCADA

Supply of UPS.
Supply of furniture.
Supply of Data logging Printer for Remote Control
Centre.
Erection, testing & commissioning charges for
items SCADA-2 to SCADA-6.
Integration of new SCADA system to existing
system at RCC.
Erection, integration, testing & commissioning for
existing and new equipments for TSS.
Erection, integration, testing & commissioning for
existing and new equipments for SSP.
Erection, integration, testing & commissioning for
existing and new equipments for SP.
Supply of Equipment and Components (As per list
B)
Supply of Spl. T & P (As per list C)
Total
Grand total carried forward to summary

7655358

1776192

9431550
9431550

10 of 25

BOQ of RANI-SRPJ

Package-1

BOQ for Railway Electrical works between RANI(Excl.)- SRPJ(Excl.) section 198 TKM of Ajmer Division of North Western Railway
Common Schedule of OHE/TSS
Item No

SOR
ITEM

30001

CS-1

30002

CS-2

30003

CS-3

30004

CS-4

30005

CS-5

30006

CS-6

30007

CS-7

30008
30009
30010
30011
30012
30013
30014

30015

30016

30017

Description
Supply and erection of 25 KV,1600 Amp vacuum
Interruptor
Supply and erection of 25 KV Potential Trasformer
Type-I or Type-II
Supply and erection of 42 KV Lightning Arrestor
with surge monitor, counter and cable
Supply and installation of cables for SWS/TSS
Supply, erection, oil filteration, testing &
commissioning of 25KV/240V 10 KVA Auxiliary
(LT) Supply Transformers oil type with DO fuse
switch, anti climbing device, pedestal insulators,
copper jumper and earth electrode etc.
(a) With Porcelain Insulators 1050mm CD
(b) With Composite Insulators 1050mm CD
Providing and laying of Concrete For Foundation
and Plinth In Other Than Hard and Rocky soil
Providing and laying of Concrete For Foundation
and Plinth In all types of soils and soft rock.

Providing and laying of Reinforced Concrete for


CS-8 Pier/Coloumn/Pile, Cable Trench and Trench
Cover
Supply and erection of all types of galvanised
CS-9
Steel Structures, Small Parts Steel etc.
Supply and erection of Fencing Panels, Uprights,
CS-10
Gate and Anti-Climbing device
Supply and erection of Aluminium Jumper with
CS-11
Fastners
Supply and erection of Copper Strips for
CS-12
equipment earthing
Supply and erection of Aluminium Bus Bar
CS-13
36mmx28mm
CS-14

Supply and spreading of gravel/ ballast in the


swich yard (TSS/SP/SSP)

Dismantling of redunant foundation with


compressor powered machines/manually with
CS-15
contractor's own men and material including
consumables like Diesel Oil etc.
Monthly charges for one crane operator for full
CS-16 time operation for one crane including Monthly
charges for one Watch&Ward for one crane.
Supply and Erection of anti theft transformer 240
volt/2.2 KV 5 KVA, with DO Fuse switch
CS-17 excavation of cable trench, laying of cables,
earthing, jumpering, DG set including dismantling
of above equipments.

Total
Grand total carried forward to summary

Common OHE

Unit

Qty

Supply
(In Rs)

Erection in
Rs

Total
Supply in
Rs

Each

16

241008

2755

3856128

44080

3900208

Each

16

49111

518

785776

8288

794064

Each

19

17710

363

336490

6897

343387

Mtr

3758

137

11

514846

41338

556184

Set
Set

19
6

63719
62552

8506
8506

1210661
375312

161614
51036

1372275
426348

CUM

12696

3102

1004

39382992

12746784

52129776

CUM

125

3205

1493

400625

186625

587250

CUM

57

MT

2382

66552

2103

158526864

5009346

163536210

Mtr

1783

1956

66

3487548

117678

3605226

Each

21

1540

163

32340

3423

35763

Mtr

106

929

98

98474

10388

108862

Mtr

239

229

34

54731

8126

62857

Cum

284

698

198232

1420

199652

Nos

10

1875

18750

18750

PerMonth

15

15548

233220

233220

each
location

49677

34545

99354

69090

168444

4620

Total
Grant total
Erection in
(In Rs)
Rs

263340

209623713

263340

18718103

228341816
228341816

11 of 25

BOQ of RANI-SRPJ

Package-1

BOQ for Railway Electrification works of between RANI(Excl.)-SRPJ(Excl.) section 198 TKM of Ajmer Division of North Western Railway
SCHEDULE -33000

Bill No.33 :GENERAL SERVICES ELECTRICAL WORKS


This schedule shall be read in conjunction with its Explanatory Notes and Technical Specifications for detailed description for various items included therein.

Amount in Rs

Rate (in Rs.)


BOQ item No.

Description of Items

1
SECTION - A :
ELECTRIFICATION OF STAFF QUARTERS

33001

Unit

Qty

Supply

Erection

Total supply

Total Erection

Grant total

Electrification of staff quarter complete with point wirings, circuit wirings,


sub main wirings etc. with Fire Retardant (FR) PVC insulated,
multistranded, copper conductor, single core cable on surface /in
recessed PVC conduits, along with provision of luminaries with lamps,
call bells, ceiling & exhaust fans, distribution boards, loose wire box,
geyser, energy meters in M.S. box including earthing with G.I. pipe
electrode etc. as per Scale of fittings,and cable sizes, nos. of points
permissible in each circuit and sub main/s etc.for each type of quarter as
indicated in Explanatory Notes.

i)
ii)
iii)
iv)
v)

Type - I quarter
Type - II quarter
Type - III quarter
Type - IV quarter
Type - V quarter

Each
Each
Each
Each
Each

0
16
4
1
0

0
0
0
0
0

23379
24591
30867
57106
78371

0
0
0
0
0

0
393456
123468
57106
0

0
393456
123468
57106
0

vi)

Extra for stair case light point controlled with two nos. two way switches

Each

10

502

5020

5020

Each

2.00

0.00

14546.00

29092

29092

490.00

0.00

908.00

444920

444920

ELECTRIFICATION OF GATE MAN LODGES AT LEVEL CROSSINGS

33002

Electrification of gate man lodge complete with point wirings, circuit


wirings etc. with Fire Retardant (FR), PVC insulated, multistranded,
copper conductor, single core cable on surface/in recessed PVC
conduits including provision of luminaries with lamps, ceiling fan,
distribution board, earthing with G.I.pipe electrode etc. as per Scale of
fittings, Cable sizes, no. of points permissible in each circuit and sub
mains as indicated in Explanatory Notes.

ELECTRIFICATION OF SERVICE BUILDINGS & PASSENGER SHELTER AND SHED

33003 (i)

GEW

Wiring for light/ceiling fan/exhaust fan/call bell/light plug/group etc. points


including circuit wiring, sub-main wiring with Fire Retardant (FR), PVC
insulated, multistranded, copper conductor, single core cable on
surface/in recessed PVC conduits, distribution boards, sub distribution
boards, earthing etc as required. Wiring shall be done as per sizes of
cables, no. of points permissible in each circuit and sub main as
indicated in Explanatory Notes.

Point

Page 12 of 25

BOQ of RANI-SRPJ

Wiring for power plug point including circuit wiring, sub main wiring, with
Fire Retardant (FR) PVC insulated, multistranded, copper conductor,
single core cable on surface/in recessed PVC conduits, distribution
boards, sub distribution boards, earthing with G.I.pipe electrode etc as
required.
Wiring shall be done as per sizes of cables, no. of points
permissible in each circuit and sub main as indicated in Explanatory
Notes.
Extra for provision of industrial type iron clad plug socket with 32A DP
MCB in M.S.Box

Package-1

Point

54.00

0.00

1666.00

89964

89964

Point

10.00

0.00

455.00

4550

4550

33005 (i)

Supply, installation, testing and commissioning of prewired 1x28watt, T-5,


energy efficient, surface type luminary with epoxy powder coated CRCA
sheet steel housing with reflector cover, complete with electronic ballast,
T-5 tube etc. & earthing etc. as required.

No.

286

1214

191

347204

54626

401830

33005 (ii)

Supply, installation, testing and commissioning of prewired 2x28watt, T-5,


energy efficient, surface type luminary with epoxy powder coated
CRCA sheet steel housing with reflector cover, complete with electronic
ballast, T-5 tube etc. & earthing etc. as required.

No.

16

1657

414

26512

6624

33136

33006 (i)

Supply, installation, testing and commissioning of prewired 2x28watt, T-5,


energy efficient street light luminary , complete with T-5 tubes, electronic
ballast etc.on bracket pipe of erected pole or on wall bracket of GI class
"B" pipe & connections from junction box/overhead line/light point etc. to
luminary with 1.5 sq.mm FRLS PVC insulated multistranded copper
conductor single core/three cable as instructed & earthing etc as
required.

No.

2456

386

No.

1703

426

No.

125

3132

783

391500

97875

489375

33003 (ii)

33003 (iii)

ELECTRIFICATION OF PASSENGER SHELTER AND SHEDS


33004 (i)
Deleted
33004 (ii)
33004 (iii)
SECTION -B :PROVISION OF LUMINARIES,FANS,WATER COOLERS ETC.

33006 (ii)

33006 (iii)

GEW

Supply, installation, testing and commissioning of prewired 1x28watt, T-5,


energy efficient street light luminary , complete with T-5 tubes,
electronic ballast etc.on bracket pipe of erected pole or on wall bracket of
GI class "B" pipe & connections from junction box/overhead line/light
point etc. to luminary with 1.5 sq.mm FRLS PVC insulated multistranded
copper conductor single core/three cable as instructed & earthing etc as
required.
Supply, installation, testing and commissioning of prewired 2x14 watt, T5, energy efficient street light luminary complete with T-5 tubes,
electronic ballast etc.on bracket pipe of erected pole or on wall bracket of
GI class "B" pipe & connections from junction box/overhead line/light
point etc. to luminary with 1.5 sq.mm FRLS PVC insulated multistranded
copper conductor single core/three cable as instructed & earthing etc as
required.

Page 13 of 25

BOQ of RANI-SRPJ

33006 (iv)

33006 (v)

Supply, installation, testing and commissioning of prewired 4x14 watt, T5, energy efficient street light luminary , complete with T-5 tubes,
electronic ballast etc.on bracket pipe of erected pole or on wall bracket of
GI class "B" pipe & connections from junction box/overhead line/light
point etc. to luminary with 1.5 sq.mm FRLS PVC insulated multistranded
copper conductor single core/three cable as instructed & earthing etc as
required.
Supply, installation, testing and commissioning of prewired 4x24 watt, T5, energy efficient street light luminary complete with T-5 tubes,
electronic ballast etc on bracket pipe of erected pole or on wall bracket of
GI class "B" pipe & connections from junction box/overhead line/light
point etc. to luminary with 1.5 sq.mm FRLS PVC insulated multistranded
copper conductor single core cable & earthing etc as required.

Package-1

No.

5810

1452

Nos.

6207

1552

No.
No.

5
0

4453
5196

699
815

22265
0

3495
0

25760
0

33007

Supply, installation, testing and commissioning of metal halide street light


luminary complete with MH/HPSV lamp, on bracket pipe of erected pole
or on wall bracket of class"B"G.I.pipe & connections from junction
box/overhead line/ light point etc. to luminary with 1.5 sq.mm FRLS PVC
insulated multistranded copper conductor, single core/three cable as
instructed & earthing etc as required.

(i)
(ii)

1 x 70 Watt.
1 x 150 Watt

33008

Supply, installation, testing and commissioning of 230V A.C. ceiling fan


with double ball bearing and suitable capacitor complete with wiring with
1.5sq.mm FR, PVC insulated, copper conductor, single/three core
cable as instructed, etc. as required.

i)
ii)

1200 mm (without Regulator)


1400 mm (without Regulator)

No.
No.

65
5

1255
1363

196
214

81575
6815

12740
1070

94315
7885

33009

Supply and fixing of stepped type, electronic fan regulator, 300 watts,
on the existing phenolic laminated sheet cover plate/modular plate of
switch box, including connections,testing & commissioning as required.

No.

70

256

57

17920

3990

21910

33010

Supplying, installation, testing and commissioning of 11-23 watts, 250


volts, 2 pin, compact fluorescent lamp (CFL) complete with electronic
ballast etc. as required.

No.

23

134

21

3082

483

3565

33011

Supplying, erection, testing and commissioning of exhaust fan suitable


for 1-phase, 230 volts, AC supply system complete with capacitor, louver
shutters, grouting bolts with nuts, making opening/modification in the wall
to suit the size of the fan, making good the damages, connections with
1.5sq.mm, FR, PVC insulated, multistranded copper conductor, single
core /three cable as instructed, earthing etc. as required.

(i)

AC exhaust fan 300 mm 900 rpm with/without louver shutters.

No.

20

2024

317

40480

6340

46820

GEW

Page 14 of 25

BOQ of RANI-SRPJ

Supply, installation, testing and commissioning of self contained drinking


water cooler 150 liters capacity complete with all connected standard
33012
fittings, accessories etc. and 5KVA , wall mounted, I.C. controlled
electronic auto-voltage corrector with time delay relay, connection to
earthing system etc as required.
SECTION - C: L.T.SWITCH BOARDS AND FEEDER PILLAR
33013

Package-1

Each

51938

8157

207752

32628

240380

No.

55866

8775

111732

17550

129282

No

50929

7999

101858

15998

117856

No.

57765

9072

57765

9072

66837

Supply, installation, testing & commissioning of cubical type, wall


mounted, dust & vermin proof, LT switch board of different capacities,.
LT Switch Board 125 Amp comprising of the items indicated as
under:
i) Incoming MCCB 125A, 4 pole, 35kA, fixed type (Ics=100%Icu) - 1 No
ii) Outgoing MCCB 63A, 25kA, fixed type (Ics=100%Icu) - 4 Nos

(a)

iii) Outgoing MCB 40A, 4 pole, 10kA - 4 Nos


iv) Outgoing MCB 32A, double pole, 10kA
6 Nos
v) Sleeved/Epoxy coated copper bus-bar 250 A in bus bar chamber
vi) CT's, Indication lights
LT Switch Board 63 Amp comprising items indicated as under:
(i) Incoming MCCB 63A, 4 pole, 35kA, fixed type (Ics=100%Icu) - 1 No

(b)

(ii) Outgoing MCCB 40A, 4 pole, 25kA, fixed type (Ics=100%Icu) - 3 Nos
(iii) Outgoing MCB double pole, 6-32A, 10kA - 20 Nos
(iv) Sleeved/Epoxy coated copper bus-bar 200A in bus bar chamber
(V) Indication Lights

33014
33015

Deleted
Supply, installation, testing & commissioning of weather proof, L.T.
feeder pillar of different capacities
LT Feeder Pillar 63 Amp comprising of the items indicated as under:
(i) Incoming MCCB 63A, 4 pole, 35kA, fixed type (Ics=100%Icu) - 1 No

(i)

(ii) Outgoing MCCB 40A, 4 pole, 25kA, fixed type (Ics=100%Icu) - 4 Nos
(iii) Outgoing MCB double pole, 40A, 10 KA - 4 Nos
(iv) Sleeved/Epoxy coated copper bus-bar 200A in bus bar chamber 2 set .
(v) Indication lights

GEW

Page 15 of 25

BOQ of RANI-SRPJ

Package-1

LT Feeder Pillar 125 Amp comprising of the items indicated as


under:
(i) Incoming MCCB 125A, 4 pole, 35kA (Ics=100%Icu) - 1 No
(ii) Outgoing MCCB 63A, 4 pole, 25kA (Ics=100%Icu ) - 4 Nos
(ii)

(iii) Outgoing MCB 40A, 4 pole, 10kA - 4 Nos

No.

68942

10828

68942

10828

79770

No.

106892

16788

No.

8677

1363

No.

8955

1407

No.

13025

2047

(iv) Outgoing MCB 32A, DP, 10kA - 6 Nos


(v) Modular digital time switch and 3 phase contactor 63 A -- 2 set.
(vi)Sleeved/Epoxy coated copper bus-bar 250 A in bus bar chamber
(vii) Indication lights

(iii)

LT Feeder Pillar 250 Amp comprising of the items indicated as


under:
i)Incoming MCCB 250 A FP 35KA(Ics=100%Icu) Fixed Type-1 No
ii)Outgoing MCCB 125 A FP 35KA(Ics=100%Icu) Fixed Type- 2 Nos
iii) Outgoing MCCB 63 Amps FP 25KA (Ics=100%Icu) Fixed Type - 4 Nos
iv) Outgoing MCB 40 Amps FP 10 KA -4 Nos
v) Outgoing MCB 32 Amps DP 10 KA-6 Nos
(vi) Modular digital Time switch and3 phase contractor 63 A- 2 set
(vii) Sleeved / Epoxy coated Copper bus-bar 400 A in Bus Bar chamber
(viii)Indication lights

33016
Deleted
SECTION - D : EXTERNAL ELECTRIFICATION
WORKS
Supply and erection of different length , swaged type steel tubular pole ,
complete with the following:
a) Double door, weather proof M.S. junction box (degree of protection not
less than IP54) complete with MCB 6 amps, copper bus bar for looping 4core, 3 nos. LT cables and clamping with pole, as required.
33017
b) Casting of foundation with concrete of M10 grade and providing
muffing up to 300 mm above ground level,as required
c) Erection of GI pipe class 'B' ISI marked up to junction box for passing
cable.
(Payment of G.I. pipe shall be made against the relevant BOQ item).
i)
ii)
iii)

GEW

7 Meter long pole with canopy type single pipe bracket (for one
luminary)
7 Meter long pole with canopy type double pipe bracket (for two
luminaries)
9 Meter long pole with canopy type single pipe bracket

Page 16 of 25

BOQ of RANI-SRPJ

33018

Deleted

33019

Supply of GI pipe - class' B' ISI marked with accessories including bends
etc. for support of cable with erected pole/recessing in wall/floor/passing
earth strip OR passing cable as required:

i)
ii)
iii)
iv)
v)
vi)
vii)

32 mm dia
40 mm dia
50 mm dia
65 mm dia
80mm dia
100mm dia
150mm dia
Supply, erection, testing & commissioning of control and distribution
panel for colour light signalling supply in 25kV AC traction system as per
33020
RDSO technical specifications No.TI/SPC/PSI/CLS/0023 including latest
amendment.
(i)
For 10kVA AT
(ii)
For 25kVA AT
ELECTRIFICATION OF FOOT OVER BRIDGE
Electrification of foot over bridge complete with 3.5 meter long, 50 mm
dia, G.I. pipe pole with GI pipe bracket, luminary with lamp, M.S. junction
box, connection from junction box to luminary with 1.5 sq.mm, Flame
33021
Retardant (FR), PVC insulated, copper conductor cable and connection
to earthing system. etc. and as per scale of fittings indicated in
Explanatory Notes.
SECTION - E: POWER SUPPLY DISTRIBUTION ARRANGEMENT
Supply, installation, testing and commissioning of 11kV/415 Volt,
Delta/Star connected, copper wound, power distribution transformer
33022
(outdoor type) conforming to IS:2026 (Latest Version) complete with all
accessories as required.
(i)
100 kVA
(ii)
250 kVA
(iii)
500 kVA
Extra for providing fencing /enclosure for above item as indicated in
(iv)
Explanatory Notes.
Extra for construction of foundation for transformer installation as
(v)
required

GEW

Package-1

Meter
Meter
Meter
Meter
Meter
Meter
Meter

0
250
400
0
0
150
50

173
206
267
337
448
631
1027

28
32
42
54
70
99
162

0
51500
106800
0
0
94650
51350

0
8000
16800
0
0
14850
8100

0
59500
123600
0
0
109500
59450

No
No

10
1

47669
101421

7487
15929

476690
101421

74870
15929

551560
117350

No

2.00

0.00

8451.00

16902

16902

No.
No.
No.

2
1
0

172543
279389
359714

31565
51112
65806

345086
279389
0

63130
51112
0

408216
330501
0

Kg

200

53

12

10600

2400

13000

Cu.M

25

3339

944

83475

23600

107075

Page 17 of 25

BOQ of RANI-SRPJ

33023

33024

Supply, erection, testing and commissioning of 3 pole, 11kV, 400amps,


gang operated switch complete with drop out fuses etc. as required.
Supply, installation, testing and commissioning of 11kV, 350 MVA, 630 A
draw out type manually operated, 3 panel HT VCB board complete
with CTs, PTs etc as required.

Package-1

No.

20391

3731

40782

7462

48244

Set

1143754

209240

No.

765235

75673

No.

1180859

116773

Supply, installation , testing & commissioning of , 17 panel LT switch


board comprising of following:
i) Incoming ACB 800A, 4 pole, 50kA (manual draw out type) with CTR
400/5A - 2 Nos

33025

ii) ACB bus coupler 800A, 4 pole, 50kA (fixed type) - 1 No


iii) On load change over switch 400A, 4 pole, utilisation cat. AC 23 - 1
No.
iv) Out going switch fuse unit/fuse switch unit cat AC23 (TPN) with HRC
fuses (250 Amp) - 4 Nos
v) Out going switch fuse unit/fuse switch unit cat AC 23 (TPN) with HRC
fuses 125 Amp - 4 Nos.
vi) Out going switch fuse unit/fuse switch unit cat AC 23 (TPN) with HRC
fuses 63 Amp - 5 Nos.
vii) Sleeved/epoxy coated copper bus-bar - 800A for phases and 400A
for neutral.
Supply, erection, testing & commissioning of 20 panel LT switch
board comprising of the following:
i). Incoming ACB 800A, 4 pole, 50kA (manual draw out type) with CTR
800/5A - 2 Nos
ii). ACB bus coupler 1600A, 4 pole, 50kA (fixed type) - 1 No
iii). On load change over switch 800A, 4 pole, cat AC 23 - 1 No.

33026

33027(i)
33027(ii)
33028

GEW

iv). Out going switch fuse unit/fuse switch unit cat AC 23 (TPN) with HRC
fuses 400 Amp) - 3 Nos
v). Out going switch fuse unit/fuse switch unit cat AC 23 (TPN) with HRC
fuses 250 Amp) - 4 Nos
vi) Out going switch fuse unit/fuse switch unit cat AC 23 (TPN) with HRC
fuses 125 Amp - 4 Nos.
vii) Out going switch fuse unit/fuse switch unit cat AC 23 (TPN) with HRC
fuses 63 Amp - 5 Nos.
Sleeved/epoxy coated copper bus-bar - 1600A for phases and 800A for
neutral.
Deleted
Deleted
Deleted

Page 18 of 25

BOQ of RANI-SRPJ

33029

Supply, erection/fixing of Fire extinguishing equipments (ISI)


Marked,Rubber mat (ISI marked) ,GI fire buckets filled with clean dry
sandheld on free standing steel stand,First Aid Box with medicines (ISI
marked) and associated materials,shock treatment chart on aluminum
frame,Schematic diagram of HT/LT installation & transformer data on
white hylem sheet with aluminium frame & fixing / providing in the sub
stationarea as per details in explanatory notes.

33030

Supply, installation, testing and commissioning of DG set with acoustic


enclosure, complete with AMF panel and all other accessories and
construction of plinth etc,

(i)

Package-1

Set

45449

7138

227245

35690

262935

82.5 kVA DG set with 160 amp, 4-pole, MCCB 50kA (Ics=100%Icu), 250
amps copper bus-bars, 4 pole contactors 250amp.

Set

863493

85389

863493

85389

948882

(ii)

160 kVA DG set with 250 amp, 4-pole MCCB 50 KA(Ics=100%Icu), 400
amps copper bus-bars, 4 pole contactors 400amps

Set

1367729

135252

1367729

135252

1502981

(iii)

250 kVA DG set with 400 amp, 4-pole MCCB 50kA (Ics=100%Icu), 600
amp copper bus-bars, 4 pole contactors 600amps.

Set

1961462

193966

33031

Supply, erection, testing & commissioning of 125 kVAR Automatic Power


Factor Controller panel (capacitor bank) complete and connection with
the main panel as per site requirement.

No.

363114

35907

363114

35907

399021

Job

56

1907

300

106792

16800

123592

SECTION - F: EARTHING ARRANGEMENT


Earthing with 3 meter long, 50 mm dia, G.I. pipe class 'B' earth
electrode, adding of charcoal or coke and salt , providing masonry
enclosure and cover plate with lifting arrangement etc. including
33032
connections with 4mm G.I.wire from earth electrode to switch
board/electrical equipment as required.

33033

Earthing with 600mmx600mmx6mm thick G.I. earth plate, adding of


charcoal or coke and salt , providing masonry enclosure and cover plate
with lifting arrangement, watering pipe etc. as required.

Job

30

2118

332

63540

9960

73500

33034

Earthing with 600mmx600mmx3mm thick copper earth plate, adding of


charcoal or coke and salt , providing masonry enclosure and cover plate
with lifting arrangement, watering pipe etc. as required.

Job

16

3742

587

59872

9392

69264

Meter

400

43

17200

3200

20400

Meter

10

70

11

700

110

810

Meter

160

555

87

88800

13920

102720

EARTH CONNECTIONS
33035(i)
33035(ii)
33035(iii)

GEW

Supply and laying 25 mm x 6 mm G. I. strip at not less than 0.50 meter


below ground or in recess as required.
Supply and laying 40 mm x 6 mm G. I. strip at not less than 0.50 meter
below ground or in recess as required.
Supplying and fixing 40 mm x 5 mm copper strip on surface or in recess
or in 50 mm dia G.I. pipe as required.

Page 19 of 25

BOQ of RANI-SRPJ

CABLING
Supply, laying . 1.1 KV grade LT XLPE insulated armoured, aluminum
conductor cable , making good the damages, end terminations with
33036
aluminium crimping sockets/lugs, provision of cable route markers,
testing and commissioning etc. as required as per Technical
specifications:
i)
2 Core 16 Sq.mm
ii)
2 core 25sq.mm
iii)
2 Core 70 Sq.mm
iv)
2 Core 185 Sq.mm
v)
4 Core 16 Sq.mm
vi)
3.5 Core 35 Sq.mm
vii)
3.5 Core 70Sq.mm
viii)
3.5 Core 120Sq.mm
ix)
3.5 Core 185Sq.mm
x)
3.5 Core 300Sq.mm
xi)
single core 400 sq.mm
Extra for provision of cable route marker
xii)
SECTION - H : ELECTRIFICATION BY HIGH MASTS

Package-1

SECTION - G :

33037

16 Meter high mast system with 6 nos. 2x400 watts MH luminaries and
MH lamps
16 Meter high mast system with 9 nos. 2x400 watts MH luminaries and
ii)
MH lamps
SECTION - I : LAYING OF 11 KV / 33 KV CABLES
Supply and laying of following sizes XLPE (E) insulated, armoured,
33038
aluminium conductor HT cable .

GEW

250
500
0
100
8500
1517
500
250
250
50
0
500

185
213
364
752
238
337
537
848
1187
1923
618
224

42
50
58
74
53
54
85
84
118
90
98
11

46250
106500
0
75200
2023000
511229
268500
212000
296750
96150
0
112000

10500
25000
0
7400
450500
81918
42500
21000
29500
4500
0
5500

56750
131500
0
82600
2473500
593147
311000
233000
326250
100650
0
117500

Job

613453

60664

1226906

121328

1348234

Job

654135

64685

Meter
Meter
Meter
Meter

50
400
125
0

970
1655
3679
5189

153
164
173
173

48500
662000
459875
0

7650
65600
21625
0

56150
727600
481500
0

Supply, erection, testing & commissioning of hot dipped galvanised , high


mast system complete with all accessories, foundation, carriage
arrangement suitable for 9 luminaries symmetrically arranged & control
gear boxes and lighting finial etc., twin dome aviation obstruction lights,
control panel, multi core flexible copper conductor cable, connection to
earthing system and fencing panel as per requirement.

i)

(i)
(ii)
(iii)
(iv)
33039

Meter
meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
No.

11 KV, 3 core 70 sq mm
11 KV, 3 core 185 sq mm
33 KV, 3 core 300 sq mm
33 KV, 3 core 400 sq mm
Deleted

Page 20 of 25

BOQ of RANI-SRPJ

33040

Supply of outdoor type, heat shrinkable, end termination kit, suitable for
following cable sizes XLPE(E) insulated, armoured aluminium conductor
cable and making termination, connections with overhead conductor,
testing & commissioning etc.
3 core 11 KV 70 to 185 sq mm
3 core 33 KV 240 to 400 sq mm
Deleted

Package-1

No.
No.

9
2

7469
23425

1173
2317

67221
46850

10557
4634

77778
51484

33042

Supply and erection of pre-stressed, cement concrete (PSCC) double


pole structure 9-11 meters long suitable for 330 KG working load with top
section 200 mm X 105 mm and bottom section 410 mm X 140 mm
complete with 4 nos. channel cross arms & 2 nos. cross bracing angles,
clamps, bolts, nuts , galvanized stay set , anti climbing devices,
Danger plates on the erected pole galvanised stay rod, casting of
foundation for poles & stays etc. as required.

No.

45127

4462

180508

17848

198356

33043

Supply and erection of 11 KV Porcelain Disc insulator complete with


galvanised iron hardware etc. including terminating with 11KV / 33 KV
overhead conductor and dismantelling, handing over works as required.

No.

18

813

80

14634

1440

16074

33044 (i)

Supply and laying of 200 mm dia RCC hume pipe, ISI marked, NP-4
under the Railway track/road etc, digging of trench and back filling
with excavated earth after laying of pipe and making good the damages
as required.

Meter

300

301

30

90300

9000

99300

Meter

150

301

1210

45150

181500

226650

Job
Job

2
0

52952
48492

5236
4796

105904
0

10472
0

116376
0

5650

28250

28250

(i)
(ii)
33041

Supply and laying 200 mm dia RCC hume pipe, ISI marked , NP-4
under the Railway track with trench less method and making good the
damages as required
SECTION - J: PROVISION OF PUMPS
Supply, installation, testing & commissioning of submersible pump set
suitable to operate on 3 phase, 415V, 50 Hz AC supply along with control
33045
panel etc complete for supplying water at suitable discharge and head as
per site requirements:
(i)
7.5 HP pump set
(ii)
5 HP pump set
SECTION - K: MISC. WORKS
33044 (ii)

33046

GEW

Co-ordination/liasoning and chasing with State Utility Company for


availing new electrical connection/augmentation of sanctioned load at
stations, level crossings etc. including applying for load, collection of
estimates for loads, modification of power line crossings, arranging
Each Location
payment from RVNL, depositing payment to State Utility Company,
arranging release of load & other related works. Payment to be made to
SEB for new connection, load augmentation, modification of power line
crossings etc. shall be made by RVNL .

Page 21 of 25

BOQ of RANI-SRPJ

33047

Design and preparation of working & completion drawings of all HT/LT


electrical installations of the project section where work is carried out
such as platform lighting, internal electrification of staff quarters, level
crossings, station building, offices, power line crossings, power supply
distribution arrangements of stations /sub stations, electrification of substation buildings etc.& approval from the competent authority.

Package-1

Job

116451

116451

116451

Job

91935

91935

91935

750

236

36

177000

27000

204000

No.

79175

12435

79175

12435

91610

Job

2863

450

2863

450

3313

Job

7747

1217

Conducting check survey of the complete project section to compile


details of all the existing LT, HT and EHT Power Line Electrical overhead
and underground power/telegraphic/other lines running along or accross
the track and recording measurements of horizontal distances of
structures from the existing & proposed tracks, vertical clearances of
conductors & guard wire from rail level, angle of crossings w.r.t. track,
height and type of towers/poles and preparation of lists as below:
33048

i) List of Overhead/Underground Crossings infringing and requiring


modification. Proposed modification may also be indicated.
ii) List of Overhead/Underground Parallel Alignments infringing and
requiring modification. Proposed modification may also be indicated.

iii) List of Overhead/Underground Crossings/Parallel Alignments in


conformity with the rules/regulations and not requiring modification
.
SECTION - L : GLOW SIGN BOARDS

33049

Supply, installation, testing & commissioning of out door type, single


side, /Double side Glow sign boards/Pictorial signage boards with
suspension /side mounting/wall mounting type arrangements as Sq.Feet
required,. (Payment for Double sided glow sign board shall be made @
150% of the rate of single sided glow sign boards)

SECTION - M BATTERY CHARGING & PRE - COOLING ARRANGEMENT


Supply, installation, testing & commissioning of Silicon rectifier battery
charging set conforming to relevant IS (latest), suitable for operation on
33050
3 phase 4 wire, 415 volts AC supply system, 125 Volts to 150 Volts DC
output, 200 Amps. capacity as per Tech. Specification including
earthing, etc. as required.
33051

Fabrication, supply, installation, testing and commissioning of 110 volts


Battery charging point suitable for operation on 150 volts DC supply
system including erection on MS channel, foundation etc complete.

Fabrication, supply, installation, testing and commissioning of , precooling point as per details given in explanatory notes.
SECTION -N : DISMANTLING WORKS
33052

GEW

Page 22 of 25

BOQ of RANI-SRPJ

Package-1

33053

Dismantling of wiring installations of buildings, sheds, quarters etc.


complete with luminaries, fans, distribution boards, L.T. Panels and
associated cables including accountal,stocking, transportation
Each
andStation/ gate lodge/
3
handing over of released materials to Electrical department as directed
by the Engineer and making temporary arrangements if required.

5358

16074

16074

33054(i)

Dismantling of erected pole/overhead conductor, GI wire, cross arm


brackets, insulators, stay, luminary etc including accountal , stocking,
handing over the released material to railways authorized official as
instructed by the Engineer and making temporary arrangements if
required.

No.

100

536

53600

53600

33054 (ii)

Dismantling of Sub-Station equipments such as transformers, DG Set,


HT & LT Panels, cables etc. at site including transporting, stocking and
handing over to Electrical department as instructed by the Engineer and
making temporary arrangements if required.

Job

10175

10175

10175

(i)

Provision of temporary lighting arrangement with 1x40 watt F.L. tube light
fittings/CFL fittings /flood light/halogen fittings and pedestral/ceiling fans,
desert coolers in temporary tents, buildings, goomties, on tracks, in yard
area including wiring, cabling, earthing etc.as directed by the Engineer
and as per site requirement for pre/post/during non - interlocking period, Per day
including providing stand by D.G set of suitable capacity and deployment
of staff for operation of DG set as per site requirement.
Note: Normal power supply may be used, up to sanctioned load, if
surplus available at site.

16073

80365

80365

33055 (ii)

Extra for operation and maintenance of temporary wiring installations,


replacement of consumables, supply of diesel oil, lub oil etc for operation Per day
of DG set etc.

25

3189

79725

79725

33056

Supply, installation, testing and commissioning of A.C.Unit, complete with


LCD display cordless remote suitable for 1-phase 230 10% voltage AC
supply including supply & installation of 5 KVA, wall mounted, I.C.
controlled electronic auto voltage corrector

(a)

2.0 Tonne window type AC (Not less than 3 star energy rating)

No

31108

2143

(b)

1.5 Tonne split type AC (5 star rating)


Supply & erection of G.I Octogonal pole including digging of pit, making
foundation with cement, sand & concrete in ratio 1:2:6, muffing,
accomodating G.I. Pipe in foundation for cable loop-in-loop out of
suitable size as required
5 meters long
7 meters long
Additional cost of single arm bracket suitable for street light fixture
Additional cost of double arm bracket suitable for street light fixture

No

30562

2143

155540
152810

10715
10715

166255
163525

No
No
No
No

100
0
90
10

6898
9562
288
341

1693
2347
71
84

689800
0
25920
3410

169300
0
6390
840

859100
0
32310
4250

SECTION -O : (N.I.Works)

33055

33057
i)
ii)
iii)
iv)

GEW

Page 23 of 25

BOQ of RANI-SRPJ

Package-1

33058

Supply installation testing & commissioning of cubical type mast mouted,


dust & vermin proof, L.T control switch board conforming to IS:8623
(latest version), complete.

i)

a) with TPN MCCB 32A, 35KA, fixed type (Ics=100%Icu) - 1 No


b) copper busbars 200A
(for 5 KVA AT)

No

14

8723

2141

122122

29974

152096

ii)

a) with TPN MCCB 63A, 35KA, fixed type (Ics=100%Icu) - 1 No


b) copper busbars 200A
(for 10 KVA AT)

No

22

10217

2507

224774

55154

279928

iii)

a) with TPN MCCB 150A, 35KA, fixed type (Ics=100%Icu) - 1 No


b) copper busbars 300A
(for 25 KVA AT)

No

12138

2979

24276

5958

30234

14638747

4005148

18643895

Total (A)
Section -P Non Schedule Items

NS-1

NS-2

NS-3

GEW

Supply, erection ,testing & commissioning of control and distribution


panel for colour light signalling supply in 25 KV AC traction system as per
RDSO technical specifications No. TI/SPC/PSI/CLS/0023 includind latest
amendment for 5 KVA AT
Supply, installation, testing & commissioning of fabricated Double door
distribution board confirming to IS ; 13031,IS:8623 With degree of
protection not less than IP 42 as per IS 13947/Pt.1/1993 with powder
coated finish for Non Emergency Load complete with MCB's ,Copper bus
bar
of
100
Amps
,
Neutral
link,inter
connections,ammeter,Voltmeter,Indication lights etc,and shall be suitable
for operation on three phase 4 wire 415 volts AC supply system
,comprising
(i)MCB FP 63 Amps --- 1 No. incomming
(ii)MCB TPN 40 Amps -- 1 No. outgoing
(iii) MCB SP 16 Amps - 3 No. outgoing
(iv) MCB SP 10 Amps - 5 No. outgoing
Supply,fixing,testing & commissioning of energy efficient light fittings
model MAR 114 FTL HF (l1612) of GE with Tube rod complete in all
respect with clear Polycorbonate cover with high frequency warm start
electronic ballast and wide input voltage range as per spec- MakeBajaj/Philips/ Cromption/GE
Total (NON Schedule Items) (B)
G. Total ( SOR AND NON SCHEDULE ITEMS) (A+B)
Grand total carried forward to summary

No

32133

5670

224931

39690

264621

No

4651

1163

4651

1163

5814

No

34

1523

381

51782

12954

64736

281364
14920111

53807
4058955

335171
18979066
18979066

Page 24 of 25

BOQ of RANI-SRPJ

Package-1

BOQ for Railway Electrification works between RANI (Excl.) - SRPJ (Excl) Section 198 TKM of Ajmer Division of North Western Railway

Misc Items
ITEM

Description

M-1

Unit

QTY

Supply (In Erection


Rs)
(In Rs)

TOTAL
SUPPLY
(In Rs)

TOTAL
ERECTION
(In Rs)

GRAND
TOTAL
(In Rs)

Loc

100

19182

4796

1918200

479600

2397800

Nos

10

11270

112700

112700

Nos

7263

6537

7263

6536.7

13800

Each

50

960

48000

48000

Man
Month

36

12000

432000

432000

Sq.Mtr

250

700

53

175000

13250

188250

Each

1.00

2148

2148

2148

2100463

1094235

3194698

Drilling of 50mm dia holes in the existing RCC tresle


beam/pier/mass concrete beam to the depth between
450mm to 1000mm with pneumatic drillers, compressor
etc. and making the hole surface fit insertion of bolts with
all lead and lift. Manufacture and supply of galvanized MS
bolts of size 32/25 mm dia with threaded at both ends of
varying lengths including nuts, check nuts, washers etc.,
(All labour and materials by the contractor). Pressure
Grouting the drilled holes (50mm dia) by epoxy grouting at
a minimum pressure of 7Kg/sqcm of approved quality of
epoxy resin hardner and thinner Payment for bolts and
nuts will be paid under separate item.
M-2
Shifting of mast along with foundation block by excavating
surrounding earth, un-supporting the OHE and pushing
the foundation manually using Hydraulic jack of required
capacity, alignment of mast back filling of earth, supporting
OHE and compaction (Maximum shift of 60 cm)
M-3
Supply, fixing, connecting and commissioning of Street
light energy efficient flourescent tube light fitting single
phase 50Hz, 230 Volt supply conforming to IS:10322 part 5 section 3 or latest and as per IP - 65 protection with 2
feet 4 x 24 watt (T-5) day light tube rod and premium
control control gears one control gear for each tube rod
and aluminium body with clear acrylic cover UV treated
similar to CGL,OSRAM,BAJAJ, PHILLIPS
M-4

Clearing of Ballast/rails/sleepers stacked to enable to cast


foundations.

M-5
Manning of anti theft transformer in Night
M-6
Landscape filling of specified arears with 1:3 mixture of
farmyard manure to red earth, for a minimum depth of 0.3
m, including levelling, making to required shape, grading,
tamping, soddig, with Mexican carpet grass in 0.6x0.3 m
pieces, ensuring no visible joints and proper slope for
surface water drainage maintenance upto six months with
free replacement of any mortality including watering upto
22 ltrs per sq.m per day including materials, labour, tools,
plant, all lead and lift, water etc. complete as per
specifications and as directed by the Engineer.
M-7

Excavation of earth to the depth of 2 mtrs below ground


level for buring 13 meter long rail and connecting it as per
RDSO drawing(Rail will supplied by RVNL)
Total

3194698
Grand total carried forward to summary

Page 25 of 25

Explanatory Notes
( Signal & Telecom
Engineering)

MODIFICATION OF S&T ARRANGEMENT IN CONNECTION WITH RE WORK OF RANI - SWARUP GANJ


(PKG-I) OF NWR
S.No ITEM NO EXPLAINATORY NOTES
INSPECTION
AGENCY
Group - C
1
38651 Supply of Railway underground jelly filled , 0.9 mm dia, 6 Quad cable as
RDSO

per spec. No. TC/30/2005 Amndt-2 or latest.


Supply of PIJF-Polythene insulated polythene sheathed jelly filled
telephone cable with poly-AL moisture barrier with armoured of size: 10
PAIR X 0.63 MM. as per specification IRS:TC-41/97 amendment no. 1 or
latest
Supply of PIJF-Polythene insulated polythene sheathed jelly filled
telephone cable with poly-AL moisture barrier with armoured of size: 20
PAIR X 0.63 MM. as per specification IRS:TC-41/97 amendment no. 1 or
latest

38653

38654

38657

Supply of 24 Fibre armoured Optical fiber cable as per SPEC No.IRS.TC55/2006 ver.-1 with ammendments.

RDSO

38701

Supply of RCC pipes 150mm dia, 2 Mtr long along with collars as per
Specn. No. IS/458/1971 for use near OHE Substation for cable
protection.

RITES

38702

Supply of DWC pipe with one snap fit coupler and 'O' ring conforming to
IS 14930 (part 2 : 2001), Non metallic, corrugated, multiwalled, normal
duty, pliable, without protection against chemical attack and Non flame
propagating in 6 meter length of size 120 mm outer dia & 102 mm inner
dia.( Permitted tolerance in dia = +/- 2 mm).

RITES

38703

Supply of SPLIT DWC pipe conforming to IS 14930 (part 2 : 2001), Non


metallic, corrugated, multiwalled, normal duty, pliable, without protection
against chemical attack and Non flame propagating in 2 meter length of
size 200 mm outer dia & 175 mm inner dia.( Permitted tolerance in dia =
+/-2 mm) ( TWO half round pipe constitute one split pipe)

RITES

38704

Supply of Galvanized Iron pipe 100 mm dia medium grade with screw
end both side and fitted with sockets as per specn. No.IS-1239, part 1 /
1990 in length of approx 6 meters

RITES

38705

RDSO
Supply and jointing of Quad cables with theromoshrinkable jointing kits.
This includes:
Supply of theromoshrinkable jointing kits as per RDSO Spec.
RDSO
No. IRS. TC77-2000/Amdt.1 ( or latest) suitable for 6 quad cable
Supply of 2T type small VF transformer (470:1120) for quad derivation ENGINEER
joints suitable for 6 quad cable - required only for derivation joints.

a
b

RDSO

RDSO

MODIFICATION OF S&T ARRANGEMENT IN CONNECTION WITH RE WORK OF RANI - SWARUP GANJ


(PKG-I) OF NWR
S.No ITEM NO EXPLAINATORY NOTES
INSPECTION
AGENCY
Group - C

Making of Joint on Quad cable as Straight through joint with out ENGINEER
transformer or derivation joint with 2T Transformer as directed by
engineer at site.The derivation joint includes tapping of nominated quad
of 6 quad cable at specific location to 10 pair PIJF cable already laid in
the ground. This also includes supply of all other materials required for
the work. After jointing the cable thorough test such as insulation test,
continuity test etc., to be carried out jointly with Engineer and in case of
defective joints, same will be rejected along with jointing material.

10

38902

Supply of Electronic magneto telephone desk type as per specn.No.IRS


:TC79/2000.with latest amendment

ENGINEER

11

40004

RDSO

12

40005

13

40006

14

40008

15

40009

16

40102

17

40103

Supply of 4 wire way station equipment as per Spec. no. TC. 38/97 or
latest.
Supply of Power Supply for telecom installation at way side equipment as
per TEC Spcn. IRS.TC-72/97 Amdt.1 or latest.
Supply of portable Emergency telephone 4 wire as per spec. no. IRS
TC:75-99 with latest amendment
Supply of Emergency Socket Box with socket six pin flat to RDSO Spec
No. IRS: TC. 42/87. Amdt. 1 or latest.
Supply of VF Tapping Transformer to RDSO Spec. No. IRS.TC-22-76 of
type 470:1120, 600:470, 600:1120. exact break up to be decided in
consultation with engineer.
Supply of FCPC To SCPC 10 meter long patch cords with 0db adaptors
as TEC spec G/OJC-01/03 JAN99 Or latest.
Supply of managed Expendable rack type STM-1 ADM L 1.1 as per
Technical Spec. No. TEC GR No. GR/SDH-04/02 Mar 02 with
amendment 1 , 2 ,3 & 4 or latest with STM-1 aggregate interface , 21
E1S and 4 Numbers of 10/100 Base T Ethernet Port order wire, power
supply unit, sub rack installation material and accessories manual
etc.The equipment should be fully wired for its ultimate capacity and
provide redundency for power supply and synchronisation and other
detail as given in chapter 3 (model - TJ 100 MC1).

18

40104

19

40105

20

40356

ENGINEER
RDSO
ENGINEER
RDSO

ENGINEER
RDSO

Supply of SMPS based battery chargers for telecom use 48v, 25 amps in
N+1 configuration using 2 modules of 25 A (FR/BC) with automatic
switching between the modules N=2. RDSO/SPN/TC/ 102-2013 Ver0.0
with Amendments.
Supply of 200 AH capacity LM batteries 24 Nos. at each station with
required no. of porcelene insulator. The suitable wooden rack for keeping
batteries shall also be supplied and it should be painted with 2 coats acid
resistnt paint. (IRS: S 88/2004 Version 1.0 or latest)

RDSO

Supply of Speaker cable 2 Core Shielded & screened of size 47/0,193 as


per IS-694Cable for modification of existing PA System

ENGINEER

RDSO

MODIFICATION OF S&T ARRANGEMENT IN CONNECTION WITH RE WORK OF RANI - SWARUP GANJ


(PKG-I) OF NWR
S.No ITEM NO EXPLAINATORY NOTES
INSPECTION
AGENCY
Group - C
NS Items:
21

NS 3

22
23

NS 7
NS 8

24

NS 9

25

NS 10

26

NS 11

27

NS 12

28

NS 13

29

NS 14

Supply of DTMF based headquarter equipment (2/4 wire) with all accessories
for control office as per RDSO spec no. IRS TC:60/2007 or latest including
12V power supply unit to suit RDSO spec. no. IRS TC 72/97 with latest
amendments and to be procured from RDSO approved firms only.

Supply of Earth tester - Digital Motwane make


Supply & fixing of PVC Conduit pipe 25 mm dia and thickness 1.5 mm
with suitable clamps at interval of 1 mtr.
Supply of Network Monitoring System (NMS) including associated
application software for 2 mb drop insert mux and its associated item
as per technical spec. and office stipulation detailed with all accessories
incl. Power supply as well as one soft copy of software. (Refer. Telecom
special conditons : Chapter-3).
Supply of Network Monitoring System (NMS) including associated
application software for STM-1 and its associated item as per
technical spec. and office stipulation detailed with all accessories incl.
Power supply as well as one soft copy of software. (Refer. Telecom
special conditons : Chapter-3).
Supply of local craft terminal with minimum intel core i5 - 4210U
Processor, windows 8.1 OS, 4GB RAM/1TB HDD, Sparkling Black / 15.6,
2GB Graphic Card as per technical spec. and other stipulations complete
with all accessories compataible with NMS (Refer. Telecom special
conditons : Chapter-3).
Supply of remote service terminal as per tech. Spec.and other
stipulations with all accessories compataible with NMS. It should be
possible to plug in remote service terminal at any of the station. It should
be capable to programme any network element from any location of
network and read the full status of any element in the network from
remote service terminal, as well as one soft copy of the software .(Refer.
Telecom special conditons : Chapter-3)
Supply & Provision of Surge protection device for AC Power line
incoming, complete for Single phase power protection as per RDSO
specification RDSO/SPN/244/2004 or latest shall be procured from
RDSO approved/recommended sources only.
Supply of 2T Transformer small transformer (470:1120) for quad
derivation joints suitable for 6 quad cable as per RDSO Spen No.
IRS:TC:76/2000 with latest amendments.

RDSO

ENGINEER
ENGINEER
ENGINEER

ENGINEER

ENGINEER

ENGINEER

ENGINEER

ENGINEER

MODIFICATION OF S&T ARRANGEMENT IN CONNECTION WITH RE WORK OF RANI - SWARUP


GANJ (PKG-I) OF NWR
S.No ITEM EXPLAINATORY NOTES
INSPECTION
NO
AGENCY

Group - D
1

39652

ENGINEER
Trenching up to depth of 1000mm with 300mm wide base in all
types of soil and backfilling after laying of HDPE pipe / OFC cable
and 6 quad/PIJF cable etc. at 1000mm & 800 mm depth
respectively. Ramming and consolidation of soil in trenches as well
as disposal of the soil if any. This includes supply & provision of all
protective works as per specifications, drawings and stipulations of
tender documents and as per cable route plan such as GI pipe with
socket, RCC pipe/RCC split pipe, M.S. cable route markers and
bricks etc. This also includes cutting of armour of cable as per para
17 of Section III, chapter III of Tender document.
39653 Providing chase in hard rock deep enough to fix GI pipe for laying of ENGINEER
S&T cable and minimum 100 mm concreting over GI pipe after
providing suitable U clamp to GI pipe. Chase to be provided where
optimum depth(minimum 0.6 mtrs) is not possible and which is
verified and agreed by engineer in charge of the work or his
representative NOTE: Where digging of depth as specified is not
possible, the depth can be reduced with the approval of the
engineer in charge and the payment shall be made proportionately

39654 Perforation ( 24 to 36 perforation in a pipe) and Fixing of GI pipes ENGINEER


for entry of cable on girder bridges, RCC bridges, drains, culverts,
rocky places tunnels/deep cutting or at places as advised by the
engineer in charge of the work & concreting the ends with brick
channeling at both ends as per drg. The pipes are to be fixed on the
bridges by suitable bridge fixtures or MS clamps or brick support at
an interval of 3.0 mts (max) or as per approved drawing and
directives of Railway Engineers. On masonry bridges or in rocky
place if required the entire length of the pipe by cement, sand and
15-25 mm chips. All the fixing materials nut & bolts, clamps,
materials for construction of pillars. MS channel etc. will be supplied
by the contractor.

39655 Fixing/Laying of RCC pipe(at TSS/SP/SSP), DWC pipes with ENGINEER


collars for laying of cables in open trench or underneath the track,
road, platform etc. as directed by Engineer and drg. Issued.

S.No

ITEM EXPLAINATORY NOTES


NO

INSPECTION
AGENCY

Group - D
39656 Laying of various sizes and types of cables in trenches: Laying of ENGINEER
signaling / power / telecom / quad/OFC cable of various sizes in the
excavated trench and through laid pipes. This includes
loading/unloading & transportation of cables to site. Whenever
several cables are to be laid separation of cables should be as
advised by site engineer. This includes unwinding of cable drum
using proper jigs without causing damage to cable.
39657 Placing of half round ( Split DWC ) pipe over the laid cable in open ENGINEER
trenches in yards between Home signal to Home signal and tieing
pipe with cable with loose armouring as per Drg.
39658 Supply of 20 pair CT Box and fixing on Hylam board on wall and ENGINEER
termination of quad/ telecom cable at station/ SP/ SSP/ TSS/ LC
gate/ Relay room/ office/ residences as per requirement and details
given by engineer at site. The CT box after termination shall be
sealed by pouring paraffin wax.
39901 Supply and Installation of Maintenance free Earthing and Bonding
ENGINEER
System as per RDSO specification. This includes:
a
Supply of MAINTENANCE FREE EARTHING AND BONDING
RDSO
SYSTEM (Two Earth Pit) as per RDSO specification no:
RDSO/SPN/197/2008 consisting of (a) Earth electrodes made of
high tensile low carbon steel circular rods, molecular bonded with
copper on outer surface as per RDSO spn - 2 no. (b) RDSO
approved Earth Enhancing compound (c) (MEEB) Main
equipotential earth busbar of Copper of 300x25x6 mm (Min) and
(SEEB) Sub equipotential earth busbar of copper 150x25x6 mm
(Min) (d) Multistrand single core PVC insulated copper cable as per
IS:694 -(i) of size 10 sqmm to connect individual equipment to
SEEB using copper lugs with stainless steel nuts and bolts, (ii) of
size 16 sqmm to connect SEEB to MEEB using copper lugs with
stainless steel nut and bolts (iii) of size 16sqmm to connect Surge
protection devices (SPD) to MEEB using copper lugs with stainless
steel nut and bolts (iv) of size 35 sqmm (duplicated) to connect
MEEB to main earth electrode (e) Copper tape of size 25x2mm to
connect the two earth pits, (f) Earthpits x 150 mm to terminate on
earth electrode.
b
Construction of earthpit and making of earth as per RDSO
Engineer
specification no. RDSO/SPN/197/2008 and drawing no:
SDO/RDSO/E&B/001, Equipotential Earth bus bar and its
connection to equipments and surge protection devices in the
equipment room as RDSO Drg. no. SDO/RDSO/E&B/002.
Provision of Exothermic weld connections, fixtures for mounting the
Copper tape in the relay room, weld materials, tools & fixtures for
the weld shall be arranged by the contractor.

S.No

ITEM EXPLAINATORY NOTES


NO

Group - D
40502 Installation and commissioning of 4 wire way station equipments,
power supply unit at SP/SSP/Station/ TSS/AEN/PWI/SI offices/
Residences. The installation of way station equipment and power
supply unit (supply covered under a separate item) shall be
mounted on a MS angle rack. All the materials for installation,
commissioning of 4 W equipment and power supply unit shall be
provided by contractor.

INSPECTION
AGENCY

ENGINEER

10

40503 Installation of emergency socket box including socket on the Rail


Post in the section and yard at every one Km distance as
pertapping chart supplied by the survey team. this will include wiring
and termination of quad cable on the socket box mounted at 1 mtr
hight, clamped with 2 nos. U-Clamps, provision of concreate
foundation of rail post in such a way that the rail post is one meter
above the earth level. The concrete shall be in ratio of 1:3:6 of
cement, sand & stone chips. The contractor shall jointly test with
RVNL Engineer for its satisfactory operation. This includes painting
of emergency socket post with alternate yellow and black strip of 6"
width and paiting of the socket box with gray colour paint and
painting of arrows on the telephone posts/cable markers to show
the nearest Emergency socket as instructed by engineer at site.
Rail Posts and MS pipes of required lengths for fixing Emergency
sockets will also be supplied and installed by the Contractor.

11

40601 Supply and installation of OFC cable joint enclosure as per TEC No. ENGINEER
G/OJC-01/03 Jan 99 or latest and splicing o optical fibre cables (24
Fibre) and testing.
40603 Supply of 2 MB programmable primary digital drop insert
RDSO
multiplexer with conference facility as per specifications
IRS:TC/68/2004 with latest amendments & other stipulations of
tender document fully wired for 30 channels complete with power
supply unit, remote control supervision facility & all other
accessories installation materials, manuals etc. It should have
facility to accomodate data interface cards in multi drop mode &
should be able to support card needed for video conference. NOTE
: 1) in case the cards contain less than 8 circuits or 6 circuits as
mentioned above suitable number of cards to equal the total
requirements of circuits must be supplied. 2) If the card contains
more than 2/6/8 ports per card as mentioned in the schedule, the
tenderer shall still supply the number of cards asked for. The
number shall not be scaled down as per the number of ports.

12

13
14
15

40604 (i) 4 wire, E&M, VF interface cards (8 circuits per card).


40604 (ii) subscriper loop interface cards (6 circuits per card).
40604 (iii) ISDN Interface (Two BRI Ports per card)

ENGINEER

RDSO
RDSO
RDSO

S.No

16
17
18

ITEM EXPLAINATORY NOTES


NO

INSPECTION
AGENCY

Group - D
40604 (iv) Exchange loop interface cards (6 circuits per card).
RDSO
40604 (v) G 703, 64 kbps data interface cards with a minimum of 8 ports
RDSO
per card.
40605 Supply, installation testing & commisning including earthing of 42 u ENGINEER
19" covered racks for housing SDH and P- MUX equipments, DDF,
FMS, MDF, using krone module etc. Complete with all fittings, wired
and equipped with integrated protection modules for all channels
and adequate numbers of cooling fans ,AC/DC power supply
distribution panels, U-Link panels and other hardware like runway,
ladders etc. It should be possible to lock all the equipments with
only order wire telephone remaining outside the rack. The rack
should be of APW President/Rittal make. The components of the
rack are specified below. Broad description of rack is detailed
below. Rack size 2200(mm) H x 600(mm) W x 600( mm) D. Fixed
side panels 42 U x 600 (mm) D front glass door plain 42 U x 600
(mm) D rear MS door plain 42 U x 600 (mm) D leveling screws - 4
numbers .Fan directly mounted on top 48 V DC 90 CFM - 2 Nos.
earth connectivity kit - 1 No. Cable manager with cable loops-2nos.

19

40106 Blowing of armoured Optical Fiber Cable into duct by using blowing
machine and associated works .Before blowing the duct integrity
shall be tested .If any defect shall be found during duct integrity test
, the entire length of HDPE duct from one chamber to another
chamber chamber is to be replaced by Contractor at free of cost.

ENGINEER

20

40806 Supply and placing of second class bricks of size 225x100x75 mm


(9 bricks per mtr) horizentally breath wise in the trench after
covering the laid cable with soft soil of 50 mm thickness.
NS Items:
NS-18 Excavation of cable trench 1.2m deep x 300mm width as per
Technical Specifications 51.2, at track & roads crossing, laying of
DWC pipes, as per Drg. No. RVNL/S&T/SG 024/2005, refilling of
trench, ramming. HDPE pipe shall be laid at the bottom of the
trench and after refilling with seived earth by 150- 200 mm, 6 quad
cable shall be laid and restoring the earth to original condition.

ENGINEER

21

ENGINEER

S.No

22

ITEM EXPLAINATORY NOTES


NO

INSPECTION
AGENCY

Group - D
NS-19 Horizontal directional drilling for laying of HDPE 125/200mm dia
ENGINEER
pipe 1.4 Meter to 2.1 meter below the formation of Earth level below
ballast, As per drawing and instruction of Engineer at site. Terms &
Conditions A) The rate shall include Horizontal direction drilling at
any intermediate obstruction, either natural or manmade any
boundary strata. B) The rate is inclusive of all material equipments
and labour required during trench less horizontal directional drilling
under. C) The pipes are to be laid under Railway
track/Platform/Pucca Circulating area etc. Necessary arrangement
to be provided and all precautions are to be taken so that bore
coming out at either end is not deviated from the Horizontal level by
more than 250mm in horizontal. D) The rate is inclusive of detection
and protection of underground utility encountered during boring. E)
The payment shall be made for boring only when HDPE pipe is
provided in the above

23
24
25
26

NS-20
NS-25
NS-28
NS-29

27
28

NS-30
NS-31

29

NS-32

30

NS-33

Testing & commissioning of complete OFC system.


Initial charging of Secondary cells:2 Volts, 200 AH
Supply of 20 Pair Krone terminal complete with mounting
arrangements.
Supply of Krone insertion/ extrusion tool Krone make
Supply & installation of wire insulator for wire operating, Level
Crossing Lifting barriers/Signals as per Specification No. IRS S-4774
supply and installation of Insulator of Point rodding at function end
and lever end as per Technical specification.
Provision of GPS Clock in Stations

ENGINEER
ENGINEER
ENGINEER
ENGINEER
ENGINEER
ENGINEER

ENGINEER
RDSO

Explanatory Notes
(Electrical Engineering)

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

EXPLANATORY NOTES
OVER HEAD EQUIPMENTS
SOR ITEM OHE-1
PREPARATION AND SUBMISSION OF DESIGNS AND DRAWINGS FOR
OVERHEAD EQUIPMENT SWITCHING STATION, SECTIONING DIAGRAM,
POWER SUPPLY DIAGRAM, SCHEMATIC DIAGRAM OF SWS, TRACTION
WORKING RULE DIAGRAM AND INSTRUCTIONS etc REQUIRED FOR
COMMISSIONING OF OHE
The price shall cover preparation and submission of overhead equipment plans indicating
location of structures in stages, and preparation of all drawings and designs relevant to the
tendered works and required to be finalized by the Contractor. The price shall include the
following:
(i)
Preparation and submission of pegging plans layout plans incorporating span, height,
chainage, curves, gradients, type of masts/portals, foundations, ATD locations, stagger,
location of cut-in-insulators, signal locations etc, making minor modifications with the
approval of the Employer/Engineer to the layout of the structures and overhead
equipment, if necessary.
(ii)
Preparation and submission of cross section drawings and structure erection drawings
for each structure location.
(iii)
Choice of type and size of foundations to suit soil and loading conditions
(iv)
Preparation and submission of long section drawings of overhead equipment
where such drawings are required including detailed study of over line structures such
as foot over bridges, road over bridges etc. for maintaining the specified height of
contact wire and requisite clearances.
(v)
Preparation and submission of other designs and drawings including drawings of small
parts steel work (other than those for which RDSO standard drawings
are available) and detailed designs for LT. Supply Transformer stations, design of
OHE structures for bridges etc.
(vi)
Supply of requisite number of copies of Bonding Plan drawings.
(vii) Design, preparation and submission of switching station drawings including
survey, investigation of soil bearing pressure from NABL accredited agency,
preparation of cross section drawings, preparation of general arrangement drawings,
detailed layout of equipment, bus-bar connections and insulators, layout of earthing
system and earth connections, cable run layout, detailed designs and drawings for steel
work and structural support, excluding the ones for which supply is made by the
Employer/Engineer, suitable concrete plinths for equipment and drawings for
equipments, components, fitting and materials supplied by the Contractor. The price
shall include supply of requisite number of copies of all drawings, including
completion drawings.
(viii) Preparation, supply and fixing of Sectioning / Schematic / TSWR diagram boards for
stations / Cabins / SWS / RCC and 25 Kv AC Traction Station Working Rule
instructions including supply & fixing of shock treatment chart etc.
(ix)
Supply of requisite no. of soft (in Auto Cad) and hard copies of all drawings, including
completion/approved/as erected drawings for OHE and Switching stations.

Page 1 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

NOTES FOR MEASUREMENTS: For the purpose of payment against this item,
the length of track shall be measured as under :1. General: By the difference in the chainages of the length under consideration, as
incorporated in the layout plans.
2. Turnouts: The track taking off shall be deemed as starting from the SRJ of the
Turnout.
3. Cross-overs: The length of track shall be taken as the difference in the
chainages of the toes of switches of the two turnouts constituting the crossover.
4. Diamond crossing with or without slips: The two tracks crossing each other
shall be measured independently as per note 1 above as though there were no
crossing. No extra payment shall be provided for slip points.
5. Dead ends and tops of loops: The lengths for payment under this item shall be
up to the chainage of anchor mast of the terminating OHE.
6. Feeders and return feeders from grid sub-station to feeding station: This item
will also be applicable independently in case of feeders / return feeders / conductors
from grid sub-station to overhead equipment feeding stations or in a case of feeders
/ conductors running on independent structures (not supporting OHE) along or
across tracks.
In such a case the length of line to be considered for purpose shall be measured by
(a) the distance between the center of gantries of the grid sub-station and feeding
stations in case of feeder / return feeders / conductors line from grid sub-station, or
(b) by the distance between the center line of the two structures to which the feeders
/ return feeders / conductors are anchored in case of feeders running along the track
if such feeder / return feeders / conductors are running completely on independent
structures or (c) by the distance between the center of the two structures supporting
the OHE on either side of the first and last independent structure or (d) in case of
feeders / return feeders / conductors running along the track supporting OHE.
7. No extra payment shall be made for any revision/changes/Modification in
OHE/PSI drawings on account of changes in ESP/SIP/L-section etc.
SOR ITEM OHE-2
SUPPLY AND ERECTION OF A LARGE SPAN WIRE (130 Sq.mm)
INCLUDING ITS FITTINGS WITH INSULATORS:
The price shall cover supply of all components including large span wire, , adjusters,
terminal fittings and mast attachments required to attach a large span wire or a Head
span wire or Cross span wire or Steady span wire or a Support span wire for
supporting contact wire only, at both ends, to traction masts/structures or special
brackets, solid core insulators The price shall cover erection of all components
including mounting arrangements, span wire, 9 Ton solid core insulators and all small
part steel work if any.
SOR ITEM OHE-3
SUPPLY AND ERECTION OF MATERIALS FOR TERMINATION OF
SINGLE CONDUCTOR OF OVERHEAD EQUIPMENT OR A TERMINATING
WIRE WITH INSULATORS:
The price shall cover supply of all material necessary for the termination of single
conductor of overhead equipment or terminating wire on a traction mast or structure, all
SPS work as required including appropriate mast anchor fittings, clevis assembly,

Page 2 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

adjuster, anchor double straps, ending clamp for the catenary or contact wire or
terminating wire and fittings including 9-tonne insulators. The price shall cover erection
of all materials including 9-tonne insulator assembly and terminating wire, if any.
Note: In case of V type anchorage is adopted for terminating a single conductor such
an arrangement would be counted as two off under this item for the purpose of
payment.
SOR Item OHE-4
SUPPLY AND ERECTION OF MATERIALS FOR TERMINATION OF ALL
ALUMINUM 25 KV FEEDER (SPIDER) INCLUDING FEEDER WIRE WITH 9TONNE INSULATORS:
The price shall cover supply of all materials required for the termination of an allaluminum 25 KV feeder (SPIDER), all SPS work as required including appropriate
mast anchor fittings, adjuster, strain clamp and fittings including feeder wire and 9tonne insulators. The price shall cover erection of all materials including 9-tonne
insulators assembly.
SOR Item OHE-5
SUPPLY AND ERECTION OF MATERIAL FOR TERMINATION OF COPPER
CROSS FEEDER WITH GANTRIES INCLUDING CROSS FEEDER WIRE
WITH 9-TONNE INSULATORS:
The price shall cover the supply of all materials required for termination of copper cross
feeder wire (37/2.25mm HDBC) all SPS work as required including appropriate mast
anchor fitting (3231), 18mm single clevis (5040), 9-tonne adjuster (5020-2), feeder
ending clamp (1130), double clevis (3010) and other components as necessary
including feeder wire (37/2.25 mm HDBC) and 9- tonne insulator assembly. The price
shall also cover the erection of all these materials/components including 9 ton insulator
and termination of cross feeder at either ends. Fittings/Components required for
termination of one cross feeder at both ends constitute one set.
SOR Item OHE-6
SUPPLY AND ERECTION OF TERMINAL BOARDS IN CONTROL
CUBICLES:
The price shall cover supply and erection of a wall mounted terminal boards with six
numbers of two way terminal blocks for connecting the cables from the outdoor
equipment of a switching station as per RDSO Drawing.
SOR Item OHE-7
SUPPLY AND ERECTION OF AN IRON CLAD 240V AC AND 110V D.C.
BOARD WITH FUSE BOX IN CONTROL CUBICLES:
The price shall cover supply and erection of a 15A, 240V, A.C. iron clad 4 way
fuse box and a 15A, 110V DC iron clad two way fuse box on the wall inside the
remote control cubicles. The fuse boxes shall be complete with four fuses and two
fuse carriers and bases respectively.

Page 3 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

SOR Item OHE-8


SUPPLY AND ERECTION OF LEAD ACID BATTERIES 40 AH WITH
BATTERY CHARGERS:
The price shall cover supply and erection of 110V, 40AH, lead acid batteries with
two no. of suitable battery chargers for 110V 40 AH lead acid battery complete
with stand of approved design, accessories, tool board with hydrometer,
thermometer, connecting lead and plug for connection to 230V AC supply to the
battery charger. The price for erection shall include installation and connecting up
of the battery, filling up of electrolyte, initial/final charging, mounting of the
charger in position and connecting it up to 230V AC distribution board including
the cost of connecting cables.
SOR item OHE-9(a) & (b)
SUPPLY,
ERECTION,
OIL
FILTRATION,
TESTING
AND
COMMISSIONING OF 25 KV/240 VOLT, 5/25 KVA, LT SUPPLY
TRANSFORMER WITH 25 KV D.O.
FUSE SWITCH ASSEMBLY,
ANTICLIMBING DEVICE, INSULATOR, COPPER JUMPER AND
EARTH ELECTRODES etc:
The price shall cover Supply of 25KV/240V, 5/25 KVA LT supply transformer
with suitably filled transformer oil, DO fuse assembly (including fuse carrier) and
all other mounting accessories, SPS as required at site, as per the RDSOs latest
specification and erection of the same complete with terminal connectors on a mast
or gantry. The price shall also be applicable for transformers mounted on steel
pedestals at switching stations also. The price shall cover supply and erection of an
enameled number plate of approved design. The price shall also cover oil filtration
and pre- commissioning tests as approved by the Employers or Engineer. The
contractor shall make his own arrangement for oil filtration equipments, as well as
power supply required for the same. All necessary tools, equipments, instruments
required for carrying out oil filtration/checks/tests/commissioning shall be arranged
by the contractor. The price shall also cover supply & erection of a DO fuse switch
assembly complete with all mounting accessories, post/pedestal insulator for DO
fuse switch assembly.
The price shall also cover on a lump sum basis the supply and erection of anticlimbing device consisting of galvanized steel fixtures mounted on the masts below
the transformer.
The price shall also cover supply and erection of conductor/ jumper wires and the
supply of all components including parallel clamps, bi-metallic and Aluminiumcopper Al-Cu strips wherever required. The price shall also cover the erection of
complete jumper assembly including conductor/jumper wire to be provided
between the Over Head Equipment and L.T. Transformers, drop out
switch
assembly.
The price shall also cover supply and erection of an earthing station with a single
pipe embedded into the ground by driving or otherwise complete with protective
concrete box and lugs suitable for directly connecting two mild steel flats of
minimum size 50 mm x6 mm and copper earthing strip 25X3 mm at LT side
earthing point to mast.
The price shall not include cost of and supply and provision of structure bond
connecting LT transformer with structure and then to rails which will be paid for
under item OHE-22.

Page 4 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

NOTE: 1.Contractor at his own cost shall do the replacement of the transformer oil
on account of testing and leakages during the warranty period.
SOR Item OHE-10
MODIFICATION TO EXISTING OVERHEAD EQUIPMENT:
The item price covers all inclusive cost of all the associated works of OHE
modification
including
transfer,
dismantling/erection,
slewing/reslewing/readjustment, extension of OHE by providing splices or otherwise etc of
all the components of OHE including brackets, insulators, feeder wire/return
conductor, terminations, ATDs, isolators, traction bonds cross over OHE etc in a
particular length of track except items which are excluded specifically under this
schedule.
The price shall cover transfer of overhead equipment to a bracket assembly on a
new mast or support and dismantling of the existing erected bracket assembly from
old mast or support, supply and provision of a multiple cantilever cross arm
wherever required and erection of bracket assemblies on the multiple cantilever
cross arm, and consequent adjustment to overhead equipment required such as respacing of droppers, leveling etc.
The price shall not include supply and erection of an additional bracket assembly,
which will be paid for under item OHE-18.
Dismantling of masts/portals/TTC/DA are covered under item OHE-34.
The price shall also cover the re-adjustment of the head span polygon to enable the
additional equipments to be suspended from the head span. Payment for the
suspension of additional overhead equipment shall be made for under item OHE-2
as extra to this item.
The price shall also cover the cost of dismantling of overhead equipment including
terminations, auto tensioning devices, guy rod assemblies, anti-creep, suspension
assemblies, super masts, feeder, return conductor, section insulator, an isolator,
single or gang operated, including dismantling of connections to the overhead
equipment, a pedestal/ pin insulator including dismantling of jumper connections
and traction bonds if any, temporary slewing or lowering of erected OHE adjusted
and/or unadjusted to ground for special works and restoration and readjustment of
the equipment after completion of special works and associated small parts steel
work.
The price shall also cover the cost of splicing of terminated overhead equipment for
extension and consequent adjustment of the affected equipment. The extended
overhead equipment shall be deemed as starting from the centre line of the structure
preceding the old terminating structure and the extended overhead equipment shall
be paid for under item OHE 23 (a).
The price under this item shall cover various modifications required to be carried
out to the existing overhead equipment, under power block, on account of
electrification of the section provided such modifications are not on account of
non-compliance of specifications, approved drawings and instructions given by the
Employer for the execution of the work from time to time, during the progress of
the work.
All the prices are on a flat rate all inclusive basis and cover only the important and
most frequent type of modifications required to compensate the contractor for the
work involved. No extra payments shall be admissible for any other associated
Page 5 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

work, minor modifications, which may be necessary in the course of work. All
work done shall be paid for at normal rates as per BOQ.
In all these cases, the dismantled equipment shall be handed over by the contractor
to the Employers Engineer at the Employers godown/depot as required by
Engineer. The cost of loading / unloading and transportation shall be paid under
item OHE-13.
Where prices under this item are applicable, the contractor shall finalise the
quantities of work jointly with the Engineer before taking the work in hand.
NOTES:
1.

In case modification / dismantling is carried out at particular location i.e.


dismantling of an isolator, bracket assembly, pin/ post insulator, guy rod etc.,
for the purpose of payment, half of the span on both ends will be considered.

2. All claims under this item have to be supported by the following certificate to
be furnished by the contractor on the connected bill.
a) The modifications are not on account of non-compliance of specifications
approved and instructions given by the Engineers for execution of works.
b) The quantities of work involved for modification have been finalised jointly
with the Engineer-in-charge before taking the work in hand.
c) The dismantled materials shall be/has been handed over to
Engineers/Railways representative.
3. The price of SPS work complete with bolts & nuts wherever required, is not
included in the item and will be payable under Item CS-9.
SOR Item OHE-11
MANNING OF SWITCHING STATION INCLUDING TSS:
The prices shall cover the payment/wages to the staff to be deployed at each
switching station including TSS as directed by Employers Engineer on flat rate
basis per month per location. Manning shall be done round the clock. The staff,
holding minimum ITI qualification, shall be deployed in each shift. They shall be
fully conversant with operation of various equipments installed in the switching
station. The staff shall be deployed after test and trial by Employer/Engineer and on
issue of competency certificate. The staff deployed shall act in accordance with
instructions / directions given by Traction Power Controller (TPC)/representative
of Employer. The staff shall not leave the working place (Switching station) in any
case without permission of Employers representative. The price shall cover
conveyance charges to the staff for going and coming to the working place. The
period of manning shall be decided by the Employer during the execution of
contract and manning shall commence on receipt of intimation in writing from the
Employer one month in advance.
Note: Unit of the item shall be per month each location.

SOR Item OHE-12(a)


ELECTRIFICATION OF SWITCHING STATION (SP/SSP) BUILDING AS
PER SPECIFICATION:
The price shall cover all cost of supply, erection, testing and commissioning of
wiring work as per approved wiring diagram. Wiring work shall be done in
accordance with IE rules, IS-732, RVNL tech specifications The various activities
Page 6 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

involved in the work are as follows:i)


Fixing of PVC conduits in recess on wall and drawing of wires for circuit
and point wiring.
ii)

Provision of MS switch boxes of appropriate size concealed in wall


at appropriate height
with
modular PVC/fibre sheet for fixing of
switches, plugs etc.

iii)

Provision of main board and distribution boards and connection thereof.

iv)

Provision of light fittings, exhaust fan, outdoors luminaries complete with


tubes and lamps.

v)

Provision of earthing station and connection between earthing station to


main board with the help of 8 SWG GI wires. Earthing work shall be
done in accordance with IS: 3043/1987.

vi)

Materials such as light fittings, ceiling fan, exhaust fan, switches, sockets,
ceiling rose, socket outlets all shall be with ISI mark and shall be one of the
make mentioned in technical specification. Light fittings shall be 1X28W
T5 energy efficient or equivalent LED fitting as decided by engineer. All
switches, plug points and sockets shall be modular type. Ceiling fan and
exhaust fan shall have min 3 star energy rating.

vii)

Provision of switches, sockets out lets, ceiling roses on respective switch


boards and points in appropriate numbers and connection thereof.

viii)

Provision of 150 watts HPSV street light fitting/other energy efficient


luminaries with better luminosity as decided by engineer, complete in all
respect including lamp on the wall of the building.

ix)

After completion
of wiring work necessary testing of wiring
and
earthing station shall be done and results submitted to the site-in-charge
duly signed by representatives of both the contractor and purchaser.

Note: - Scale of fitting shall be as per latest RDSO guidelines and RVNL
specifications. Drawing/fittings shall be got approved by the Engineer
before taking up the work.
SOR Item OHE-12(b)
SUPPLY & ERECTION OF EARTHING ARRANGEMENT AT
SWITCHING STATION
The price shall cover supply and erection of an earth bus, earthing stations with a
single pipe embedded into the ground by driving or otherwise complete with
protective concrete box & lugs suitable for directly connecting two mild steel flats
of minimum size 50mm x 6mm.
The price shall also cover supply of all materials including 50 mm x 6 mm mild
steel flats for providing earth bus. The price shall also cover erection of earth bus
either buried at a depth of 300 mm below ground level painted with 02 coats of red
oxide zinc chromate primer and 02 finishing coats of bitumen or fixed on wooden
gutties on walls. It shall include connecting the earth bus to earth electrodes and to
various floor-or-wall-mounted equipments or structures to be earthed and also
connections to non-track-circuited rails, wherever required. It shall also cover the
cost of making recesses in concrete foundation blocks for floor or cubicles and
Page 7 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

covering them up. The connection of earth strips to each other shall be made either
by riveting or by welding. The connection of earth strips to various equipment,
structures or fencing post shall be made with G.I. bolts and nuts and spring
washers/locknuts.
The price shall cover supply and erection of 8 SWG G.I. wire used for earthing for
all LT electrical equipments including remote control cubicles and fencing panels.
Price shall also cover measuring and painting of earth values of all the earth pits,
combined earth value etc as per standard.
SOR Item OHE-13
LOADING/UNLOADING TRANSPORTATION AND HANDING OVER OF
ALL TYPE OF MATERIALS ETC. OTHER THAN CONTRACTOR
MATERIAL
The price shall cover loading/unloading and transportation charges to (from)
site/depot and handing over of material (if required) for all type of steel structures,
portals, copper/ aluminum conductors, SPS, CBs, BMs, ATs, PTs, CTs, LAs and
other electrical equipments etc. into/from BFR/ trailer/ truck for other than
contractors material for the completion of the present work as instructed by the
engineer.
SOR Item OHE-14
EXTRA ON ERECTION RATE OF WORK UNDER POWER BLOCK:
Deleted.
SOR item OHE-15, 15(a), (b), (c)
CONSTRUCTION OF SWITCHING STATION BUILDING, RCC WORK,
PLASTERING, BRICK MASONARY, RETAINING WALL, FILLING,
COMPACTING AND LEVELLING WORK PITCHING WORK etc. &
SUPPLY AND ERECTION OF NAME BOARD FOR SWITCHING
STATION.
The price shall cover the construction of Control room of SP/SSP building and will
include labour/erection and material cost for the entire work all inclusive including
following works:
i)
RCC, PCC, masonry work, including earthwork, leveling, stone pitching
in high embankment (if required).
ii)
RCC work in plinth, lintels, chhajja, Roof slab.
iii)
Pre-cast RCC Slab, RCC jali.
iv)
Cement concrete in flooring and cable trenchs.
v)
Brick masonry in walls.
vi)
Plastering works.
vii)
Provision of Doors, Windows, Grills, Rolling shutters, Water pipe line ,
Ventilators and painting thereof.
viii) White washing and colour washing and painting of doors/windows.
ix)
Acid proof or painting of floor and wall in battery room.
x)
Supply and spreading of stone metal shall be payable under CS-14.
xi)
Provision of RCC pipe etc.
xii)
Any other item of work required to complete the work which has not
been mentioned/included above shall also be done by the contractor and
nothing extra shall be paid for the same.
Page 8 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Construction of Switching station shall be done as per RDSOs drawing No:


ETI/C/0067(Mod- B) or latest and Technical specifications.
The price shall cover the provision of all shuttering, frame works, arrangement of
water, all tools and plants required for the work, consumable, materials etc.
The materials used for the work such as brick, sand, stone aggregates, steel for door
frame, grill / rolling shutters; RCC Pipe shall be of best quality in accordance with
Railways specification.
The price shall cover the cost of concreting required for foundation with 40 mm
stone ballast rammed in layers of 15 mm thick in cement and sand ratio 1:4:8, RCC
work for construction of column, brick work, retaining wall drainage etc required
for building.
The price shall also cover the provision of opening on the wall of suitable size, for
installation of exhaust fan in the battery room.
The price shall also cover the cost of supply and erection of name board for
switching station.
The payment shall be on uniform basis. The price shall also include supply of
necessary clamps, nuts, and bolts etc., required for the erection of the boards. Name
boards shall be made in bi-lingual or Hindi/English and vernacular language. The
boards to be supplied shall be as per the standard size and standard specification of
RDSO/Railways.
However, keeping in view local soil type and its bearing pressure, firm may adopt
different design for foundation/plinth adhering to the min inside dimensions as per
RDSO drawing and taking prior approval of the engineer. No extra payment is
payable for such redesigned basic structure except as detailed under 15(a) to (c).
SOR Item OHE-16
SUPPLY AND ERECTION OF A GUY ROD ASSEMBLY:
The price shall cover supply and erection of a guy rod assembly of various lengths
for traction masts/Portals/TTC, feeder line towers or supports etc complete with
mast guy rod fittings, guy rod with adjustments and part/s to be grouted in the
anchor block. The price shall not include the cost of supply and erection of a dwarf
or stub mast with anchor plates drilled and welded in position, where required for
anchorage, and small parts steel work, complete with bolts and nuts etc., if any for
attaching the mast guy rod fittings to the mast/structure which shall be paid for
separately under the relevant item.

Page 9 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

COMPONENTS REQUIREMENT
Rly. Id No.

Description of components

Qty. for unit

3232

Mast guy rod fitting (welded) complete


with 4 short bolts, nuts, lock nuts and
washers for attachment to mast/S.P.S
including appropriate fittings

1 off

5001/5001-1
or

Anchor bolts (complete with nuts, lock


nuts and split pins)

1 Set

Guy rod stirrup

1 off

Guy rod with nut, washer and split pin

1 off

5007-1

Anchor 'v bolt

1 off

5008

Anchor loop

1 off

5220

Guy rod double strap assembly

5001-3
5002
5004

or

5005 or 50061 or
5070 or 5071

1 off or 2 off (as


required )

NOTE :
1. In case the Contractor desires to adopt a different design for guy rod assembly,
the same shall be indicated by him in the Tender and the components required
should be clearly listed under this item as deviation.
2. Supply and erection of guy rod assembly at anticreep portals will also be paid for
under this item.
SOR Item OHE-17
SUPPLY AND ERECTION OF PROTECTIVE SCREEN ON FOBS/ROBS:
The price shall cover the cost of supply and erection of protective screen on
ROBs/FOBs/ etc. The price shall cover the cost of all material required for
fabrication of protective screen including MS Angle, Tee, expanded metal (Jali), GI
sheet, paints, suitable fixtures for fixing on the ROB/FOB etc. The price shall also
include the labour cost for fabrication, erection on ROB/FOB and painting. The
fabrication and erection work shall be done as per RDSO Drg.. No. ETI/C/0068
(07/09) Rev-H.
SOR Item OHE-18
SUPPLY AND ERECTION OF BRACKET ASSEMBLY WITH
INSULATORS AS PER OHE PLAN:
The price shall cover on a flat rate basis for supply and erection of any bracket
assembly on a traction mast or support or drop arm and shall include those on
Page 10 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

high/low level platform, in the vicinity of turnouts, over bridges or over-laps and at
locations with reduced encumbrance or terminating wires. The price shall include
the cost of supply of all components including galvanized steel tube, dropper wires
and small parts steel work complete with bolts and nuts etc., if any. The price
shall cover erection of all components including solid core insulators and dropper
wires, small parts steel work, if any. However, this does not include the anticreep
arrangement at masts/ structures.
The price shall include the cost of following components:
Rly. Id No.
Description of components
Qty.
for unit
1
2
3
3020
Mast fitting for hook insulator with 2 off
1 set
bolts, nuts, lock nuts and washers of 16 mm
dia.
2400
Tubular stay arm assembly (including
1 set
galvanised steel tube).
2110/
Catenary suspension bracket assembly or
1 off
2130/2380
hook bracket
1160
Suspension clamp
1 off (as
required)
2120/2140/
Bracket tube assembly complete with tube 1 set
2040/2080
cap and sleeve where required (including
galvanised steel tube).
3070-1/2

Mast bracket fitting assembly including 2 1 set


off bolts, nuts, lock nuts and washers of 16
mm for attachment to structure or to small
part steel work.
2150-1 &
Register arm hook assembly complete with
1 off
2160-1
bolts, nuts and lock nuts.
2420 or
Register arm assembly or raised register arm 1 set
2430
assembly (including galvanised steel
tube).
2270-4 or 5, Register arm dropper assembly including 1 set
2460 Style- 02 dropper wire complete with bolts, nuts etc.
or
2470 Style - 02
2390/2540/
BFB steady arm or bent steady arm
( As
2520
required)
2360/2490-2
25 mm steady arm drop bracket/clamp
-do1220/1370/-1
Contact wire swivel clip or raised register
1 off
arm
2550-1/2
Anti wind clamp
As
required
7mm/5mm inclined copper/steel dropper
As
(on girder bridges use steel wire droppers) required
Bracket insulator/Stay arm insulator
one set
The price is also applicable for the provision of any additional fitting & required to
support an additional OHE on a single bracket assembly payable under this item.
Page 11 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

The price shall include supply of all extra fittings including the double contact wire
swivel clip.
SOR Item OHE-19
SUPPLY AND ERECTION OF REGULATING EQUIPMENT (3 PULLEY
TYPE) WITH COUNTER WEIGHT ASSEMBLY FOR CONVENTIONAL
OHE:
The price shall cover supply and erection of a 3-Pulley type counter weight
assembly including 9 ton adjuster with double strap assembly and normal/anti-theft
guide tube assembly, the supply of regulating equipment, provision of adequate
length pipe on Hex-Tie rod at crossovers and short tension length ATDs wherever
required and stainless steel wire rope required for the regulating equipment, anti
slipping device assembly (Spacer Angles as per RDSO DRAWING NO.
TI/DRG/OHE/ATD/RDSO/00009 and small part steel work, if any. The price shall
also cover adjustment of the entire regulating equipment. The price shall not
include supply and erection of termination, which will be paid under SOR item
OHE-20.
SOR ITEM OHE-20
SUPPLY AND ERECTION OF MATERIAL FOR TERMINATION OF
DOUBLE OVERHEAD EQUIPMENT CONDUCTOR WITH INSULATORS:
The price shall cover supply of all material necessary for the yoked termination of
two overhead equipment conductors on a traction mast or structure , including all
SPS such as appropriate mast anchor fittings, clevis assembly , two adjusters,
ending clamps for catenary and contact wires, anchor double strap assembly,
equalizing/compensating plates, and double eye distance rods (if required) and
fittings and terminating wire ,if any including 9- ton insulators assembly The price
shall also cover erection of all materials with 9 ton insulator.
SOR Item OHE-21
SUPPLY AND ERECTION OF ANTI CREEP WITH GALVANIZED STEEL
WIRE INCLUDING INSULATORS.
The price shall cover supply of all materials for an anti-creep including adjusters,
galvanized steel wire, mast anchor fittings at its terminations on either side of
structures, ending clamps, fittings and including 9- ton insulators assembly
conforming to RDSO specification.
The price shall cover erection of all materials including 9- ton insulator assembly
with small parts steel work, if any.

Page 12 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Rly. Id No.
1
1360
5020-1/
5020-2
5030
3010/5040
3231
1170
Less 1160
5183

Description of components

Qty. for unit

2
Galvanized steel wire

3
As required

(19/2.50 mm

Steel wire ending clamp


9 -ton adjuster

2 off
2 off

Anchor double strap assembly


Clevis assembly
Mast anchor fitting with bolts, nuts etc.
Double suspension clamp
Suspension clamp
Double eye distance rod

As required
2 off
2 sets.
1 off
(-) 1 off
As required.

NOTE -1.In case the anti-creep extends beyond one span on either side of anti
creep center, payment for the supply and erection of extra length shall be paid
additionally at the rate of 20% of the rate per extra span.
SOR ITEM OHE-22
SUPPLY AND ERECTION OF A STRUCTURE BOND/ A LONGITUDINAL
BOND/ TRANSVERSE AND SPECIAL BOND:
The price shall cover supply of all materials including mild steel flats size 40 x 6
mm required to provide all kinds of bonds such as a structure bond connecting a
traction mast or structures to the nearest non-track-circuited rail, or earth electrode,
including all fastenings at both ends. The price shall include shaping and drilling of
the bond and erection of all materials including provision of heat shrinkable PVC
tube for structure bond under track circuit rail. This would also cover connection or
earthing terminals of equipments like LT Transformers with structure and then to
rails as per relevant drawings.
The price shall cover provision of connection of buried rails to running rail as per
RDSO drawing No. ETI/OHE/G/05306 & shall include supply, fabrication and
erection of all connections (including drilling at both ends) and refilling of buried
rail pit.
The price shall cover the supply of all materials including mild steel flats size 40 x
6 mm, fasteners etc. required to provide longitudinal bond / transverse bonds
connecting to rails at the rail joint at the locations to be specified by the Employer.
The price shall include shaping and drilling of the bond and erection of all
materials including the bonds.
The price shall also cover the supply of all materials including mild steel flats size
40 x 6 mm to provide special bonds at level crossings, foot over/road over
bridge/protective screen, girder bridge, metallic sheds, fencing etc. for which the
location will be specified by the Employer. The price shall include shaping and
drilling of the bond and erection of all materials including the bond.
The item covers the new bonds to be provided in the yard due to modifications
involved as per revised bonding plan of the station.

Page 13 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

SOR ITEM OHE 23 (a)


SUPPLY AND ERECTION OF OVER HEAD EQUIPMENT i.e. CONTACT
AND CATENARY WIRE (EXCLUDING COST OF CONTACT AND
CATENARY
WIRES),
JUMPER
WIRE,
DROPPER
WIRE,
CONTACT/CATENARY CLIPS, FASTENERS AND ALL OTHER MATERIAL
REQUIRED AT TURN OUT/OVERLAPS/DIAMOND CROSSINGS etc FINAL
CHECKING OF OHE AND ADJUSTMENT, INSPECTION TO BE DONE BY
TOWER WAGON FOR COMMISSIONING OF CONVENTIONAL OHE.
The price shall cover supply & erection of complete overhead equipment with all
components and wire and conductors including contact wire, catenary wire droppers, all
types of jumpers including anti-theft jumpers (50/65/105 sq mm), and terminating
wires at turn outs/ overlaps/ diamond crossings/ cross overs etc, if any. [Excluding the
cost of contact & Catenary which will be paid under Item No. 23(b) & (c)].
The price shall also cover supply & erection of contact wire as false contact wire (if
demanded by zonal Railways in place of insulated catenary wire) under overline
structures with all associated components [Cost of contact wire shall be payable under
SOR OHE 23(b). Provision of insulated catenary shall be payable under OHE-30)]
Provision of long cross type G-jumper on parallel run side instead of cross-over/turn out
side as per RDSO drawing No ETI/OHE/G/02141 Rev C or latest shall be ensured.
The price shall also cover supply of all components including dropper clips, parallel
clamps for jumpering and splices (where their use is approved), dropper wire, jumper
wire and terminating wire/small parts steel works complete with bolts and nuts etc. for
attachment of number plates to mast/structure, if any.
The price shall include provision of enameled/retro reflective number plates,
enameled/retro reflective sigma boards on masts before stop signals, different types of
boards required to be provided as per ACTM (caution/warning, DJ ON/OFF, DJ
ON/OFF for MEMU, 500m, 250m neutral section boards, unwired section, engine stop
board, power block limit board etc on traction masts or structures. Sigma
marking/boards shall be provided before signals on OHE masts/structures as per Rly
Board letter no 2001/Elect(G)/170/1 pt dt.7.5.2012 as decided by engineer.
The price shall also include the cost of painting the setting distance of masts/structures,
rail level on masts/structures, stenciling of symbol for direction of emergency telephone
socket and Y marking at BWA locations as per temperature and local instructions. This
price also includes supply and erection of different type caution warning boards on
OHE Structure.

Page 14 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Rly. Id No.
Description of components
1
1040-2
or
SK-534/1
&
SK-575/2
or
SK-576/1
&
SK-535/2 or 10413
1180/SK-572/1
& SK-572/2
1192

2
Contact wire parallel clamp small

7501

Qty. for
unit
3
As
required

Contact wire dropper clip(107)

-do-

Catenary dropper clip complete with bolts, nuts etc.

-do-do-

1110-2

Enameled number plates complete with 2 Galva.


MS. bolts m 10x35/30, nuts and lead washer for m
10 bolts but excluding SPS for attachment of
number plate to masts/structures.
Contact wire ending clamp

1120

Catenary ending clamp

-do-

1140

Large span wire clamp (130)

-do-

5020-1/5020-2

Adjuster

-do-

5030

Anchor double strap assembly

-do-

5191/5192

Compensating plate/Equalizing plate.

-do-

-do-

All the warning boards provided on OHE structure shall be of retro reflective type as
per latest Rly. Board/RDSO guidelines. Similarly structure Number plates on OHE
mast at specific locations should be retro reflective types as per latest Rly. Board/RDSO
guidelines.
Separate DJ close Boards to be provided for MEMU/EMU wherever required for
MEMU/EMU operation.
The price shall cover supply of all components required for a pull-off arrangement to
pull one equipment only including head-span mast fittings complete with M.S. angle,
equalizing plate assembly, steady-arm, catenary wire dropper clip, contact wire swivel
clip and fittings including solid core insulators. The price shall cover erection of all
components including solid core insulators, small jumper wire, large jumper wire and
conductors.
The price shall cover supply and erection of all additional fittings required including the
supply of required conductors/jumper wires, in case the pull off pulls more than one
equipment.
The price shall cover final checking, adjustment and inspection of OHE by tower car.
Further details are given in Section 5 Chapter 2 of Volume-1 of bid document

Page 15 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

SOR ITEM OHE 23 (b)


SUPPLY OF HDGCC 107 SQ MM COPPER CONTACT WIRE
The price shall cover the cost of supply of hard drawn grooved continuous cast copper
contact wire 107 sq mm for overhead equipment. The cost of erection of contact wire
shall be payable under Item No. 23(a). Reconciliation of material should be done as per
actual use taking into account anchor and overlap. The measurement will be from centre
line of anchoring mast. Unused contact wire pieces/drums shall be on the contractor
account.
SOR ITEM OHE-23 (c)
SUPPLY OF 65 SQ MM COPPER CATENARY WIRE
The price shall cover the cost of supply of stranded copper catenary wire for overhead
equipment. The cost of erection of catenary wire shall be payable under Item No. 23(a).
Reconciliation of material should be done as per actual use taking into account anchor
and overlap. The measurement will be from centre line of anchoring mast. Unused
catenary wire pieces/drums shall be on the contractor account.

SOR ITEM OHE-24


SUPPLY AND ERECTION OF ANTI CREEP WITH CADMIUM COPPER
CATENARY WIRE INCLUDING INSULATORS.
The price shall cover supply and erection of all materials for anti-creep including
cadmium copper catenary wire, adjusters, mast anchor at its terminations on either side
of structure, ending clamps & fittings, 9 ton insulators assembly and SPS work if any.
The price shall cover erection of all materials for anti-creep including 9 ton insulators
assembly and SPS work if any.
RDSO drawing No. TI/DRG/OHE/GENL/RDSO/00001/12/0 REV 0 or latest,
Ref.ETI/OHE/G/02111 Rev-A dt.23.10.2012 or latest is to be followed for use of
catenary wire in place of GI wire at ACC locations in polluted area as decided by zonal
Railways.

SOR ITEM OHE-25


SUPPLY AND ERECTION OF A SECTION INSULATOR ASSEMBLY WITH
INSULATORS AND ASSOCIATED FITTINGS & FASTENERS FOR OHE:
The price shall cover supply, erection and adjustment of all components required for a
standard section insulator assembly (serving both the overhead equipment conductors)
including 9 ton insulator, bar insulator special droppers etc. for supporting the
equipment and all terminal fittings for conductors and the section insulator assembly,
dropper wires as required,.

Page 16 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Rly. Id No

Description of components

1120/or SK/436 or 1122 Catenary ending clamp


&
1123
1192/ETI/OHE/SK/333 Catenary dropper clip assembly
6170
Parallel clamp for double contact
wire
6180
Section insulator dropper
assembly
6100
Section insulator assembly
6020
9 ton insulator assembly
6110

Bar insulator

Qty. for unit


3
2 off

As required
12 off
3 sets

To be supplied bythe
contractor
-do-

SOR ITEM OHE-26


SUPPLY AND ERECTION OF PTFE TYPE SHORT NEUTRAL SECTION
ASSEMBLY:
The price shall cover supply, erection and adjustment of PTFE type short neutral
sections assembly. The price shall also cover supply and erection of, all fittings for
contact and catenary wire as necessary including supply of required dropper wire.
SOR ITEM OHE-27
SUPPLY AND ERECTION OF 25 KV S.P ISOLATORS WITH INSULATOR
WITH/ WITHOUT EARTH CONTACT ASSEMBLY, WITH/WITHOUT
INTERLOCK:
The prices shall cover supply and erection of isolator switches of approved make 1250
Amp capacity, complete with arcing horns, operating rods, operating rod guides, and
mounting base including supply and erection of 25 KV Solid Core Post and Operating
rod insulator.
The price shall also cover supply and erection of a number plate of approved design,
supply and erection of small parts steel work complete with bolts and nuts etc. for
support of each isolator and for support of operating rods on gantries/ masts, jumper
connectors and post insulator to support jumper. The price shall also cover supply and
erection of pad lock, integral lock and interlock if required. The price excludes
provision of pipe electrode earthing.
Note: Payment of jumper shall be payable under SOR item OHE-29

SOR ITEM OHE-28


SUPPLY AND ERECTION OF 25 KV DOUBLE POLE ISOLATOR WITH
INSULATOR WITH/WITHOUT EARTH CONTACT ASSEMBLY WITH/
WITHOUT INTERLOCK:
The price shall cover supply and erection of a double pole isolator 1250 Amp capacity
complete with mounting base, operating rod, operating rod guides required for the
operation of the isolator, jumper connectors. The price shall also cover supply and
erection of alluminium-copper strips, a padlock, integral lock and interlock if required,
a number plate of approved design for each isolator, supply and erection of small parts
Page 17 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

steel works for support of isolators and for support of operating rods on gantries masts
including supply and erection of 25 KV Solid Core Post and Operating rod insulator.
The price shall also cover for supply and erection of an earth contact assembly in the
isolator. The price shall cover the cost of supply and erection of 3 x 25 mm copper
connections between earth contact assembly and the structures.
The price shall cover supply and erection of an inter locking mechanism on an
isolator along with small parts steel if any, to permit working of two or more isolators.
The price excludes provision of pipe electrode earthing.
Note :
1. All Isolators are to be supplied with required numbers of 25 kV operating rod
insulators with complete accessories and small parts steel. Isolator key box of
appropriate size shall be provided for at each station on the section, one number at
the nearby OHE depot in charge of the section and one number at SSP/SP, as
desired by the Engineer at site.
2. Payment of jumper shall be payable under SOR item OHE-29
SOR ITEM OHE-29
SUPPLY AND ERECTION OF ALL TYPES OF COPPER JUMPERS :
The price shall cover the supply of large jumper wire size 105 sq. mm (19/7/1.02mm),
small copper jumper size 50 sq. mm (19/1.80mm), 65 sq. mm Cadmium copper
conductor, 5 mm dia. dropper wire made of annealed 100% pure copper conductor as
per RDSOs spec No. ETI/OHE/3 (2/94) with A & C Slip No.1 and on a flat rate
basis, the supply of all components and fittings required for providing a flexible, and
bolted type terminal connectors wherever required for connection, including supply of
parallel clamps, bi-metallic and aluminum-copper strips, wherever required, and bolted
type terminal connectors wherever required.
The prices shall also cover the erection of the complete jumper assembly including
jumper wire. The price shall not, however, be applicable for jumper connections already
included under a particular item (e.g. OHE-23, OHE-9(a) & (b), CS-3, CS-5 etc), but
shall be applicable for any jumper connection in any combination between feeders,
isolators and booster stations. Continuity jumper at boom anchor anti-creep will be
payable under this item.

SOR ITEM OHE-30


SUPPLY AND ERECTION OF INSULATED CATENARY CABLE IN THE
SPAN UNDER OVER-LINE STRUCTURE:
The price shall cover supply of insulated catenary wire, catenary wire splice (1090) for
each location and required dropper clip and erection of the same for each location. The
prices shall also cover erection and adjustment of special droppers wherever required.
The insulated catenary wire to be supplied shall be as per RDSOs specification No.
TI/SPC/OHE/INSCAT/0000 (04/00) or latest. The work shall be executed in
accordance with drawing No.ETI/OHE/ SK/570. The price shall also cover the cutting
of existing Catenary wire, supply and erection of all materials and components
including adjustment of dropper wires. Insulated catenary is to be provided under all
Page 18 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

ROB/FOB as per RDSO maintenance instruction No. TI/MI/0036 (09/99) Rev 0 as


directed by RVNL/ Zonal Railway.
SOR ITEM OHE-31
SUPPLY OF MATERIALS AND ERECTION OF A LARGE COPPER JUMPER
(160 SQMM) BETWEEN ALUMINIUM BUS/OHE AND CROSS FEEDER
WITH ALL ASSOCIATED FITTINGS:
This jumper shall be provided between 36 mm aluminium bus/OHE and the copper
cross feeder at SSP, SP and FP.
The price shall cover the supply of 160 sq. mm flexible copper jumper wire made of
annealed stranded 100% pure copper conductor as per RDSOs spec No. ETI/OHE/3
(2/94) with A & C Slip No.1 or latest, all components and fittings required for
providing a flexible copper jumper 160 sq. mm and connection between 36 mm
aluminium bus/OHE & copper cross feeder including terminal connector 19 mm
multiple hole bolted type (1009), parallel clamp (1050-3) aluminium-copper bimetallic
strips fasteners etc.
The price shall also cover the erection of the complete jumper assembly including
jumper wire, connectors and fasteners etc.
SOR ITEM OHE-32
SUPPLY AND ERECTION OF SOLID COPPER BUSBAR 18 MM DIA:
The price shall cover supply and erection of solid copper bus bar 18 mm and its
terminal connector. The price shall include bending and shaping of bus bar.

SOR ITEM OHE-33


SUPPLY AND ERECTION OF ALL TYPES OF CONNECTORS REQUIRED
FOR ALUMINIUM/COPPER BUS BAR REQUIRED FOR COMMISSIONING
OF SWITCHING STATIONS WITH FASTENERS.
The price shall cover supply and erection of solid copper bus bar junction and
connectors of various type specified including bolts, nuts etc. required at junction or
termination of aluminum bus bars/solid copper bus bar etc.

SOR ITEM OHE-34


DISMANTLING OF TRACTION STRUCTURES, PORTALS, TTC AND
ASSOCIATED SPS BY CUTTING
The price shall cover on flat rate basis dismantling of OHE structures or portals by
cutting the same from the top of the foundation and handing over the same to the
Employers Depot. The price shall also include dismantling of drop arms and booms of
the portal and their all associated fittings like SPS, bonds etc. Crane charges for the
purpose are included in the flat rate. The transportation of dismantled structures shall be
payable under item no OHE-13.
SOR ITEM OHE-35
SUPPLY AND ERECTION OF SAFETY ITEMS i. e. FIRE EXTINGUISHERS,
Page 19 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

SET OF FIRE BUCKET WITH STAND AND FIRST AID BOX, KEY BOX
WITH SUITABLE KEY CHAIN, LOCKS AND OTHER MISC ITEMS
REQUIRED FOR COMMISSIONING OF SWITCHING STATION:
The price shall cover supply and erection of fire extinguishers, as per details given
below including mounting arrangements. Each set would consist of following and each
of 4-litre capacity.
i.
CO-2 type
- 01 Nos.
The fire extinguishers supplied shall be of approved brand and as per relevant
specification.
The price shall also cover supply and erection of standard first Aid box of made of GI
Sheet with pad lock as approved by the Employer. The list of items/medicines to be
supplied along with in the first aid box shall be obtained from employer/engineer.
The price shall cover supply and erection of six number of fire buckets with stand of
standard size, cover shed, and locking arrangement as per standard practice of
concerned Railway and as approved by the Employer.
The price shall also covers Supply and installation of key box in SSP/SP with suitable
key chains and locks, associated registers of appropriate size in printed profarma (if
required in newly electrified section and as per local Railway practice), 1 no wooden
stool of appropriate size,1 no steel arm cushion chair, gum boots- 1 pair, rubber gloves1 pair etc as directed by Employer/Engineer in charge.
The key box shall be of teak wood plank made of size 12inchesx18 inchesx5 inches.
SOR ITEM OHE-36
SUPPLY AND ERECTION OF 25 KV AC DANGER BOARD/DANGER BOARD
FOR HEIGHT GAUGE, PUBLIC/ STAFF CAUTION AND SPECIAL BOARDS
BOARD REQUIRED FOR COMMISSIONING OF OHE/SWSs.
The payment under this item shall cover supply and erection of 25 KV AC danger
board, danger board for height gauge, public/ staff caution boards and special boards
on uniform basis as decided by the engineer. Purchaser will advise the requirement of
the various types of boards and location to contractor. The above payment shall also
include supply of necessary clamps, nuts, and bolts etc., required for the erection of the
boards. Caution boards shall be made in bi-lingual or Hindi/English and vernacular
language, where ever required and same will be advised to contractor. The various
types of above boards to be supplied shall be as per the standard size and standard
specification of Railways/RDSO.
This item shall also cover special caution boards to be provided on all departmental
vehicles, track machines, platform shelters as per Railway board letter No.
2009/RE/161/4 FTS-748 dtd.26-08-14 as per directions of the engineer.
SOR ITEM OHE-37
SUPPLY, ERECTION AND COMMISSIONING OF LIGHT WEIGHT
SECTION INSULATOR ASSEMBLY 25 KV AS PER DRAWING NO.6.2758.0
RDSO SPEC.NO. TI/SPEC/OHE/LWDSI/007
The price shall cover supply, erection and commissioning of light weight section
insulator assembly of 25 KV including all accessories as per drawing no. 6.2758.0
RDSO spec. No. TI/Spec/OHE/LWDSI/007

Page 20 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

SOR ITEM OHE-38


SUPPLY, INSTALLATION AND COMMISSIONING OF THE MAINTENANCE
FREE
EARTH
AS
PER
RDSO
SPECIFICATION
NO.
RDSO/PE/SPEC/PS/0109(REV.O)-2008 INCLUDING ALL MATERIALS etc.
The price shall cover supply, erection and commissioning of a maintenance free earth
system as per RDSO specification no. RDSO/PE/SPEC/PS/0109(REV.O)-2008.The
price shall cover the cost of all the materials required for the earthing system including
bond strip size 40x6 mm and civil works. The price shall include the testing of earth
value and painting the particulars on the concrete box as decided by the engineer.

TRACTION SUBSTATION
SOR ITEM TSS-1
DESIGN AND DRAWINGS FOR 220/27 or 132/27 KV or 110/27 KV TRACTION
SUB-STATIONS INCLUDING FEEDING POST AND CAPACITOR BANK:
The price shall cover on a flat rate basis for preparation and submission of design and
drawings per sub-station, new or existing, including provision of additional bay, for
erection of transformer and associated equipments, replacement of existing transformer
with new one, augmentation of existing bus bars and various type of connectors and
terminals, per feeding station in addition to site survey, investigation of soil bearing
pressure and soil resistivity, preparation and submission of cross section drawings,
preparation and submission of general arrangement drawings, detailed layout of
equipment, bus-bar connections and insulators, layout of cable trenches outdoor and
inside the control room, layout of earthing system and earth connections, layout of earth
screen wire, design of supporting structures for 132 kV/27 kV equipments, detailed
designs and drawings for steel work and structural support, suitable concrete pedestals,
and foundation plinths for equipment and drawings for equipments, components,
fittings and materials and approval of the same by the Employer.
The prices shall also cover on a flat rate basis for preparation of all designs and
drawings required in connection with supply, erection, testing and commissioning of
Shunt Capacitor equipment at the traction sub-stations. The price shall cover on a flat
rate basis cost of site survey, investigation of soil bearing pressure and soil resistivity,
preparation of cross section drawings, general arrangement drawings, detailed layout of
equipments, bus bar connections and insulators, layout of cable trenches out door and
inside the control room, earthing system and earth connection layout, and design of
supporting structures.
The price shall also include supply of required number of copies in soft and hard copies
in Auto Cad with one tracing on RTF paper of designs, drawings, technical booklets of
proposed/approved and completion drawings (as erected) per substation, feeding station
and capacitor bank as mentioned in the tender specifications.
The price shall also cover supply of associated maintenance/record registers of
appropriate size in printed pro-farma (if required in newly electrified section and as per
local Railway practice) etc as directed by Employer/Engineer in charge.
NOTE: The design for Oil Soak pit and drain water sump will also be got approved
from the Employer.

Page 21 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

SOR ITEM TSS-2 : DELETED


SOR ITEM TSS-3
CONSTRUCTION
OF
BAFFLE
WALL
COMPLETE
REINFORCEMENT, BRICK WORK, PLASTERING ETC.:

WITH

The price shall cover excavation and construction of brick baffle wall as per RDSO
Drg. No. ETI/C/0213 for wind pressure upto 112.5 kgf/sqm.. The price shall include
supply of steel for reinforcement and other materials. The price shall also include
bending/binding and laying of reinforcement, shoring, shuttering and scoff-folding
arrangement, required for the construction of baffle wall and its curing. The price shall
include dismantling of all connected temporary arrangements, back filling required and
removal of soil. The price shall also include the plaster (12mm thickness with cement
mortar 1:4 mix) on the baffle wall. The price shall also include dismantling of all
connected temporary arrangements and removal of soil. The price shall include the cost
of cement also. For RCC baffle wall as per RDSO Drg. No. ETI/C/0214 for wind
pressure upto 150 kgf/sqm, the payment shall be made under CS-8.
Note for TSS- 3
(1) The prices under this item shall be the same for any shape or size of concrete blocks,
& brick wall. In calculating the individual volume of concrete and brick wall
fraction of a cubic meter beyond the third decimal shall be rounded off to the
nearest third decimal.
(2) For purpose of computation of volume of concrete and brick wall under this item, the
volume of steel work embedded in the foundation block or muff shall be ignored.
(3) The prices shall include cost of embedded drain pipes, conduits for cable or earthing
flats wherever necessary.
(4) Dowel bars in special foundations and nominal reinforcement in other foundations
will be necessary. Such nominally reinforced in other foundation will be payable
under Item TSS-3. The steel for nominal reinforcement and dowel bars will be
supplied by the Contractor and the concrete mixture in such a case shall be same as
for the normal foundations i.e. 1:3:6.
(5) At each Traction substation one number Oil soak pit for main transformer and one
drain water sump for the cable trenches will be provided by the contractor.
SOR ITEM TSS-4 (a)
SUPPLY, ERECTION, TESTING & COMMISSIONING OF 132 KV DOUBLE
POLE SF-6 GAS CIRCUIT BREAKER WITH INTERLOCK:
The price shall cover erection of 132 kV double pole SF-6 Gas Circuit Breakers,
complete with operating mechanism, all fittings and accessories including terminal
connectors. The price shall cover grouting the supporting frame and Mechanism box on
the foundation block and mounting of other accessories in their respective places. It
shall also cover the testing and commissioning of the Circuit Breaker. The price shall
also cover the supply and erection of an enamelled number plate. The Contractor shall
make his own arrangement for filling of the SF-6 gas and power supply required for
testing purpose. All necessary tools, equipments, instruments required for carrying out
necessary checks, tests and commissioning shall be arranged by the Contractor.
The price shall cover erection of an Interlocking Mechanism on an Isolator to permit
Page 22 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

working of an Isolator and or earthing blade assembly in a desired sequence. The price
shall include supply and erection of interlock for Circuit Breaker.
SOR ITEM TSS-4 (b)
SUPPLY, ERECTION, TESTING & COMMISSIONING OF 220 KV DOUBLE
POLE SF-6 GAS CIRCUIT BREAKER WITH INTERLOCK:
Same as for item TSS-4(a) except that the price shall cover supply, erection, testing &
commissioning of 220 KV Double Pole SF-6 gas Circuit Breaker with Interlock.
SOR ITEM TSS-5(a)
SUPPLY AND ERECTION OF 132 KV DOUBLE POLE ISOLATORS
(MANUALLY OPERATED):
The price shall cover supply & erection and connecting of a 132 KV Double Pole
Isolator with a manually operated mechanism complete with mounting base and all
accessories required for its operation including terminal connectors. The price shall
include supply and erection of an enamelled number plate and padlock. The price shall
include mounting of the Isolator and the operating rod in position and their alignment
for smooth and trouble free operation. The prices shall also include the cost of 132 kV
solid core post insulator, operating rod and earthing blade assembly for 132 kV
Isolators.
SOR ITEM TSS-5(b)
SUPPLY AND ERECTION OF 220 KV DOUBLE POLE ISOLATORS
(MANUALLY OPERATED):
Same as for item TSS-5(a) except that the price shall cover supply and erection of 220
KV Double Pole Isolators (Manually operated).
SOR ITEM TSS-6(a)
SUPPLY & ERECTION OF 132 KV CURRENT TRANSFORMER ASSEMBLY
(400-200/5A):
The price shall cover supply & erection and commissioning of a 132 kV Current
Transformer (400-200/5A) complete with all fittings and accessories including terminal
connectors. It shall also include mounting of the transformer in position, and supply and
erection of an enamelled number plate as per the drawing ETI/PSI/P/7528.

SOR ITEM TSS-6(b)


SUPPLY & ERECTION OF 220 KV CURRENT TRANSFORMER ASSEMBLY
(200-100/5A):
Same as for item TSS-6(a) except that the price shall cover supply and erection of 220
KV Current Transformer assembly (200-100/5A).
SOR Item TSS- 6(c)
SUPPLY & ERECTION OF 110 KV Current Transformer (400-200/5A):
Same as for item TSS-6(a) except that the price shall cover supply and erection of 110
KV Current Transformer assembly (400-200/5A).
SOR Item TSS- 6(d)
SUPPLY & ERECTION OF 132 KV CURRENT TRANSFORMER ASSEMBLY
(1200-800-400/5-5-5A
Same as for item TSS-6(a) except that the price shall cover supply and erection of 132
Page 23 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

KV Current Transformer assembly (1200-800-400/5-5-5A) as per RDSOs specification


ETI/PSI/117 (7/88) with A&C Slip no 1 to 9.
SOR ITEM TSS-7(a)
SUPPLY & ERECTION OF 120 KV LIGHTNING ARRESTOR:
The price shall cover supply & erection and connecting up of a 120kV Lightning
arrestor with surge counters and leakage current monitor complete with all fittings and
accessories including terminal connector. It shall also include mounting of the
Lightning arrestor in position and supply and erection of enamelled number plate.
SOR ITEM TSS-7(b)
SUPPLY & ERECTION OF 198 KV LIGHTNING ARRESTOR
Same as for item TSS-7(a) except that the price shall cover supply and erection of 198
KV Lightning Arrestor.
SOR Item TSS- 7(c)
SUPPLY, ERECTION, TESTING & COMMISSIONING OF 96 KV,
LIGHTNING ARRESTOR
Same as for item TSS-7(a) except that the price shall cover supply and erection of 96
KV Lightning Arrestor.
SOR ITEM TSS -8(a)
SUPPLY, ERECTION, TESTING & COMMISSIONING OF 25 KV SINGLE
POLE VACUUM CIRCUIT BREAKER WITH INTERLOCKING:
The price shall cover supply and erection of 25 kV Vacuum Circuit Breaker (1600 Amp
Rating) complete with operating mechanism, all fittings, and accessories including
terminal connectors. The price shall cover grouting the supporting frame and
mechanism box on foundation block and mounting of other accessories in their
respective places. It shall also cover, testing and commissioning of the circuit breaker.
The price shall also cover the supply and erection of an enamelled number plate. The
Contractor shall make his own arrangement for power supply required for testing
purpose. The price shall also include supply of interlocks and shall be applicable
individually for each, Circuit Breaker. The supply of vacuum circuit breaker shall be as
per RDSO specification No. TI/SPC/PSI/CB/0000 with A&C slip No. 1 to 5 or latest.
SOR Item TSS- 8(b)
SUPPLY, ERECTION, TESTING & COMMISSIONING OF 25 KV SINGLE
POLE VACUUM CIRCUIT BREAKER (2000 Amps rated current) WITH
INTERLOCKING:
Same as SOR item TSS-8(a) except current rating of CB shall be 2000 amps with
relevant RDSO specifications.
SOR ITEM TSS -9(a)
SUPPLY & ERECTION OF 25 KV CURRENT TRANSFORMERS (1500750/5A):
The price shall cover supply & erection and connecting of a 25 kV Current Transformer
(ratio 1500-750/5A) complete with all fittings and accessories including terminal
connectors. It shall include mounting of the transformer in position and supply and
erection of an enamelled number plate. The price shall also include the cost of small
parts steel work if any.

Page 24 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

SOR Item TSS-9(b)


SUPPLY & ERECTION OF 25 KV CURRENT TRANSFORMERS (30001500/5A):
Same as TSS-9(a) except rating of CT shall be 3000-1500/5A.
SOR Item TSS- 9(c)
Supply & erection of 25 kV Current Transformers (200-100/5A):
Same as TSS-9(a) except rating of CT shall be 200-100/5A as per RDSOs specification
ETI/PSI/90(6/95) Rev. 4(Jan03).
SOR ITEM TSS-10
SUPPLY, ERECTION, TESTING AND COMMISSIONING OF NUMERICAL
CONTROL & RELAY PANEL SUITABLE FOR DOUBLE TRANSFORMER
TRACTION SUB -STATIONS OF 220/27 or 132/27 KV or 110/27 KV:
The price shall cover supply, erection, testing and commissioning of Control & Relay
Panel complete with RDSO approved Numerical Type protective relays for Control,
monitoring and protection in the traction sub-station comprising of 132 and 25 KV
circuit breakers, 25 KV interrupters and 132/25 Kv single phase transformers, substation equipments, 25 KV over head equipment (OHE) feeders, shunt capacitor banks
and transmission lines (if applicable) as per RDSO specification No
TI/SPC/PSI/PROTCT/6070 (9/08) with latest version.
The prices shall also include protective relays for 132 Kv and 25 Kv circuit breakers,
interrupters, isolators complete with all wiring, control switches, meters, protective and
auxiliary relays, mimic panels and suitable size rubber mat in front and back etc.
including erection , alignment, grouting and earthing of the panel in position and all
connection for its commissioning. The control panel shall cater for a TSS having two
bays of HV & LV side associated equipments along with 02 feeder circuit breakers.

SOR ITEM TSS-11


SUPPLY & ERECTION OF TUBULAR ALUMINUM BUS BARS 50MM X
39MM DIA:
The price shall cover supply and erection per meter length of 50x39mm dia. Aluminum
tube to serve as bus bar or equipment to equipment bus bar connection in the traction
sub-station, wherever required. The price shall include bending, shaping and connecting
/clamping of the Aluminium tube to the equipment terminals/ bus bar supports as
required.
NOTE- For purpose of payment for this item fraction of a meter in the total length used
at a sub-station shall be rounded off to the nearest meter (0.5 m and below being
ignored).
SOR ITEM TSS-12
SUPPLY & ERECTION OF ZEBRA ACSR CONDUCTOR:
The price shall cover supply and erection per meter length of 61/3.18 mm (ZEBRA
ACSR) conductor to serve as bus bar or equipment to equipment bus bar connection in
Page 25 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

the traction sub-station, wherever required. The price shall include straightening,
shaping and connecting / clamping of the conductor to the equipment terminals /bus bar
supports as required.
NOTE: For purpose of payment, the length of aluminum conductor strung as bus-bar
between gantries shall be taken as horizontal distance between the interfaces of the
gantries. The total length used at a sub-station shall be rounded off to the nearest meter
(0.5 m and below being ignored).
SOR ITEM TSS-13
SUPPLY & ERECTION OF ALL CONNECTORS, BUS SPLICE & TEE
CONNECTORS etc REQUIRED FOR COMMISSIONING OF TSS
EQUIPMENTS:
The price shall cover supply and erection of a busbar junction and connector of the type
specified, including bolts, nuts, lock nuts, washers etc. required at the junction of bus
bars. The price shall also include supply and erection of ALCU bimetallic strip, if
required, to be provided at the junction.
NOTE:
1) For purpose of payment for this item fraction of a meter in the total length used at a
sub-station shall be rounded off to the nearest meter (0.5 m and below being
ignored).
SOR ITEM TSS-14
SUPPLY & ERECTION OF COPPER JUMPER WITH FITTINGS AND
FASTENER REQUIRED FOR TSS:
The price shall cover, on a flat rate basis, the supply and erection of jumper wire
complete with all components and fittings required for providing a flexible copper
jumper connection, including parallel clamps, bi-metallic and Aluminum -Copper
strips, wherever required, and terminal or Tee clamps at either end, including jumper
wire.
The price shall be applicable for any jumper connection in any combination between
feeders, L.T. Transformers drop out switch, lightening arrestors for overhead
equipments, isolators for overhead equipment and out going bus bars for switching
stations.
SOR ITEM TSS-15 (a)
SUPPLY & ERECTION OF 110/132 KVKV SUPPORT INSULATORS WITH
FITTINGS AND FASTENERS:
The price shall cover supply and erection of 132 kV support insulators complete with
fixing bolts, nuts and studs, Busbar jumper, clamps for clamping the busbar and SPS, if
required .
SOR ITEM TSS-15 (b)
SUPPLY & ERECTION OF 220 KV SUPPORT INSULATORS WITH
FITTINGS AND FASTENERS:
Same as for item TSS-15(a) except that the price shall cover supply and erection of 220
KV Support insulators with fittings and Fasteners.
Page 26 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

SOR ITEM TSS-16


SUPPLY & ERECTION OF 25 KV SUPPORT INSULATORS WITH FITTINGS
AND FASTENERS:
The price shall cover the supply and erection of a 25 kV solid core post insulator to
support Aluminum bus bars. It shall include supply of fixing bolts, nuts, locknuts,
washers and studs etc.
It shall also cover-erection of all components required for the assembly including post
insulator, Busbar jumper, clamps for clamping the busbar and SPS, if required.
SOR ITEM TSS-17(a)
SUPPLY & ERECTION OF 110/132 KV TERMINATION WITH/WITHOUT
ADJUSTER COMPLETE WITH DISC INSULATORS:
The price shall cover supply and erection of all materials for the termination of a single
ACSR conductor (61/3.18 mm ZEBRA) strung between gantries/portals, including
anchor fittings, single clevis assembly, adjuster, anchor double straps, string of 12 nos.
of 280mm (11) Disc Insulators, strain clamps and arcing ring and other fittings to
complete the assembly. The assembly shall be of breaking strength of not less than
11500 kgf.
SOR ITEM TSS-17(b)
SUPPLY & ERECTION OF 220 KV TERMINATION WITH / WITHOUT
ADJUSTER COMPLETE WITH DISC INSULATORS:
Same as for item TSS-17(a) except that the price shall cover supply and erection of 220
KV Termination with/without adjuster complete with suitable number of disc
insulators.

SOR ITEM TSS-18


SUPPLY, ERECTION AND COMMISSIONING OF LOW MAINTENANCE
LEAD ACID BATTERIES SET WITH 2 NOs. OF SUITABLE BATTERY
CHARGER:
The price shall cover supply and erection of a 110 V, 200 AH low maintenance type
lead acid battery complete with stand as approved by engineer and accessories as
mentioned in relevant specification and a tool board with thermometer, hydro meter.
The price for erection shall include installation, connecting up, filling up of electrolyte,
initial/final charging, and commissioning of the battery.
The price for erection shall also include grouting of the chargers in position or
mounting it on the wall and connecting it to 240V single phase AC supply.
SOR ITEM TSS-19
SUPPLY, ERECTION AND COMMISSIONING OF 240V AC AND 110 V D.C.
DISTRIBUTION BOARDS IN THE CONTROL ROOM:
The price shall cover supply and erection of a 240V AC distribution board in the
control room. It shall include the grouting of the framework of the distribution board in
position or mounting it on the wall and necessary connections.
Page 27 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

The price shall also cover supply and erection of a 110 VDC distribution board in the
control room. The price shall include the grouting of the frame work of the distribution
board in position or mounting it on the wall and necessary connections.
SOR ITEM TSS-20
SUPPLY AND ERECTION OF EARTH ELECTRODE:
The price shall cover supply and erection of an earth electrode, a typical drawing of
which is included in RVNLs technical specification. The price shall cover the
provision of a protective concrete box with removable cover as shown in the drawing.
The price shall include the testing of earth value and painting the particulars on the box.
SOR ITEM TSS-21
SUPPLY AND ERECTION OF EARTH LEADS 75 X 8 MM MILD STEEL
FLAT LAID IN THE GROUND OR EXPOSED AS PER SITE REQURIMENT:
The price shall cover supply and installation per meter length of 75x8mm mild steel
flat, buried at a depth of 60 cm below ground level. The price shall also cover
connections of the steel flats to the earth electrodes to constitute the main earth ring and
to the earthed terminals of the 132/25 kV transformers etc. as required.
The price shall also cover supply and installation per meter length of 75x8 mm mild
steel flat, painted all around with two coats of painting with red oxide and two coats of
colour grass green shade-218 of IS:5 passing through cable trench or exposed above
ground level. The price shall also cover the connections of the steel flats to the earth
electrodes, to constitute the main earth ring and to the earthed terminals of the various
equipments as required.
SOR ITEM TSS -22
SUPPLY AND ERECTION OF EARTH LEADS 50 X6 MM MILD STEEL FLAT
LAID IN THE GROUND OR EXPOSED AS PER SITE REQURIMENT:
The price shall cover supply and installation per meter length of 50x6mm mild steel flat
buried at a depth of 60cm below ground level. The price shall also cover connections of
the steel flats to the main earth ring and to the steel structures and metallic frame work/
terminals of various equipments, as required.
The price shall cover supply and installations per meter length of 50x6 mm mild steel
flat painted all around with two coats of painting with red oxide and two coats of colour
grass green shade-218 of IS:5 passing through cable trench or exposed above ground
level. The price shall also cover the connections of the steel flats to the main earth ring
and to the steel structures and metallic frame work/terminals of various outdoor
equipments as required.
SOR ITEM TSS-23
SUPPLY AND ERECTION OF 8 SWG G.I. WIRE FOR EARTHING:
The price shall cover supply, shaping and erection of 8 SWG G.I wire per metre used
for earthing of control panels, LT, AC and DC distribution boards, battery chargers, etc.
at sub-station control rooms. The requirement of fencing panel earthing to the nearest
fencing upright shall also be included and paid for under this item.

Page 28 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

SOR ITEM TSS -24


SUPPLY AND ERECTION OF 32 MM DIA MS ROD FOR EARTH MAT:
The price shall cover supply and installation per meter length of bare mild steel rod of
dia 32mm to be buried at a depth of 60cm, below the ground level to form the earthing
grid & connected to earth electrodes. The price shall also cover jointing of the MS. rods
to form earthing grid and connection to MS. flats for system earthing.
NOTE FOR SOR ITEM TSS-21,22,23 and 24: For the purposes of payment, fraction
of a meter in the total length of earth lead of each type used at a substation shall be
rounded off to the nearest metre (0.5m and below being ignored).
SOR ITEM TSS -25
SUPPLY & ERECTION OF EARTH SCREEN WIRE INCLUDING
TERMINATION:
The price shall cover supply and stringing per meter length of 19/2.5mm (70 Kg/mm2)
galvanized steel stranded wire. It shall include the supply and erection of suitable
terminations using strain clamps adjuster (on one side only) etc. It shall also include
connecting by means of suitable terminal spades, the end of the earth screen wire to the
main members of the columns of portals gantries across which these wires are strung or
to 50x6mm MS. flat earth leads. For purposes of payment the clear span between the
structures on which earth wire is run shall be adopted. The clear span will be rounded
off to the nearest meter (0.5m and below being ignored).
SOR ITEM TSS-26 (a)
SUPPY, ERECTION, TESTING & COMMISSIONING OF 132/27 KV, 21.6/30.24
MVA ONAN/ONAF, SINGLE PHASE TRACTION POWER
TRANSFORMERS:
The price shall include the cost of supply, erection, testing and commissioning of
transformer with all accessories, 132 and 25 KV side bushings, cooling fans etc as per
latest RDSO specifications. Price includes loading, unloading of transformer and
bringing it to the erection site for commissioning. The Contractor shall bring the
transformer on to its correct position on the foundation and erect all the accessories,
check up the alignment and make connections of HV and LV terminals to the 132 kV
and 27 kV busbars. The Contractor shall carry out oil filtration and pre-commissioning
tests as approved by the Employer and commission the transformers strictly in
accordance with the instructions of the transformer manufacturer or his commissioning
Engineer at site to the complete satisfaction of the Employer. The Contractor shall be
held responsible to ensure that the work is carried out to the highest standards, in
accordance with the relevant codes of practice and any special
conditions/guidelines/requirements as laid down by the manufacturer of the transformer
are properly complied with. Contractor shall notify the manufacturer regarding likely
date of commissioning, one month in advance, so that the manufacturer can depute his
representative if so desired by him at his own cost, for warranty obligation purposes.
Notwithstanding availability of manufacturers representative or otherwise, it shall be
contractors responsibility to ensure that the equipment is commissioned as per laid
down procedure. However, in case of any extra cost being incurred in this regard, due to
delay on the part of the Contractor the same shall be recovered from the Contractor. The
Contractor shall make his own arrangements for oil filtration equipment as well as
power supply required for the same. All necessary tools, equipment, instruments
Page 29 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

required for carrying out necessary checks and tests and commissioning of the
transformer shall be arranged by the Contractor.
SOR ITEM TSS-26 (b)
SUPPY, ERECTION, TESTING & COMMISSIONING OF 220/27 KV, 21.6/30.24
MVA ONAN/ONAF, SINGLE PHASE TRACTION POWER
TRANSFORMERS:
Same as for item TSS-26(a) except that the price shall cover supply, erection, testing
and commissioning of 220/27 KV, 21.6/30.24 MVA ONAN/ONAF, single phase
Traction Power Transformer.
SOR Item TSS- 26(c)
SUPPY, ERECTION, TESTING & COMMISSIONING OF 110/27 KV, 21.6/30.24
MVA
ONAN/ONAF,
SINGLE
PHASE
TRACTION
POWER
TRANSFORMERS:
Same as for item TSS-26(a) except that the price shall cover supply, erection, testing
and commissioning of 110/27 KV, 21.6/30.24 MVA ONAN/ONAF, single phase
Traction Power Transformer. The transformer should be as per RDSO specification No.
ETI/PSI/118 A&C-10 or latest.
SOR Item TSS- 26(d)
SUPPY, ERECTION, TESTING & COMMISSIONING OF 132/27 KV, 30/42
MVA ONAN/ONAF, SINGLE PHASE TRACTION POWER TRANSFORMERS
Same as for item TSS-26(a) except that the price shall cover supply, erection, testing
and commissioning of 132/27 KV, 30/42 MVA ONAN/ONAF, single phase Traction
Power Transformer as per RDSO Specification No.TI/SPC/PSI/30TRN/2070 or latest
with latest amendments.
SOR ITEM TSS-27(a)
SUPPLY AND ERECTION OF 25 KV DOUBLE POLE ISOLATORS (1600A)
WITH INSULATORS:
The price shall cover the supply and erection, alignment and connecting up 25 kV
Double Pole Isolator (1600Amp capacity) complete with mounting base, operating rod,
operating mechanism and all accessories required for its smooth and trouble free
operation. The price including solid core Post Insulator, operating rod insulator etc.
Price shall also cover supply and erection of an enamelled number plate and a pad lock
for each Isolator, Bus bar connector provided for making connection to Isolator
terminal pad shall be paid under Item TSS-13.
SOR Item TSS- 27(b)
SUPPLY AND ERECTION OF 25 KV DOUBLE POLE BUS COUPLER
ISOLATORS (3150A) WITH INSULATORS:
Same as for item TSS-27(a) except that the DP isolator shall be of 3150 amps capacity.
SOR ITEM TSS-28(a)
Supply & erection of 25 kV Single Pole Isolators (1600A) with insulator:
Page 30 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Same as for item TSS-27(a) except that the price shall cover supply and erection of
single pole Isolator 1600 amps capacity instead of double pole Isolator
SOR Item TSS-28(b)
SUPPLY & ERECTION OF 25 KV SINGLE POLE ISOLATORS (3150A) WITH
INSULATORS :
Same as for TSS-27(a) except that the price shall cover supply and erection of single
pole Isolator of 3150 amps capacity instead of double pole Isolator.
SOR ITEM TSS-29
Supply, Erection, Testing & Commissioning of 25KV shunt capacitor bank of 2400
KVAR rating including low loss series reactor, 25KV Neutral Current
Transformer (NCT) etc.
The lump sum price shall cover supply, erection, testing and commissioning of 2400
KVAR (i.e.6600 KVAR at 40 KV) shunt capacitor bank at Traction substations,
complete with capacitor unit internal fuses, discharge devices, rack insulator assembly,
interconnector between units, insulators, suitable earthing lugs including terminal
connectors and other material and hard ware required for satisfactory working of the
unit. It shall also include mounting of the capacitor bank on the supporting structures
and its connecting up to other equipments. Payment for supporting structures shall
be made under item no CS-9 of schedule 30. The contractor shall carry out precommissioning tests as approved by the purchaser and commission the shunt capacitor
bank strictly in accordance with the instructions of the shunt capacitor bank
manufacturer or his commissioning Engineer at site to the complete satisfaction of the
purchaser. The contractor shall be held responsible to ensure that the work is carried out
to the highest standards, in accordance with relevant code of practice and any special
conditions/ guidelines/ requirements as laid down by the manufacturer of the shunt
capacitor bank are properly complied with. The contractor shall notify the manufacturer
regarding likely date of commissioning, one month in advance so that the manufacturer
can depute his representative, if so desired by him, at his own cost, for warranty
obligation purposes. Notwithstanding availability of manufacturers representative or
otherwise it shall be contractors responsibility to ensure that the equipment is
commissioned as per laid down procedure. All necessary tools, equipments, instruments
required for carrying out necessary checks and commissioning of the shunt capacitor
bank shall be arranged by the contractor.
The price shall cover supply, erection & connecting up of series reactor suitable for
6600 KVAR rating (at 40KV) capacitor bank complete with all fittings and accessories
including connectors. It shall include mounting of the series reactor in position.
The price shall cover supply, erection of 25kv neutral current transformer for protection
of the capacitor bank. The price shall also cover connecting of neutral current
transformer with capacitor bank and control and relay panel. It shall also cover
mounting of the neutral current transformer on the supporting frame.
The price shall cover connecting up of control panel with protective and auxiliary relays
for circuit breakers, instrument transformers and capacitor bank as per RDSO latest
specifications with all wirings control switches and mimic diagram. LEDs annunciation
labels, alarm cancellation push buttons and local/remote switches. It shall also include
cost of wiring/terminal blocks required for providing the facility of remote operation.
The price for erection shall include alignment and grouting of the panels in positions
and all necessary connection to bring the control panel in operation. It shall also include
Page 31 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

the cost of connecting the frame of each control panel to the earth bus inside the control
room and suitable size rubber mat in front and back. The price of control and relay
panel for shunt capacitor bank is included in TSS-10.
SOR Item TSS- 30
EXCAVATION OF EARTH TO THE DEPTH OF 2 METERS BELOW
GROUND LEVEL FOR BURYING 13 METERS LONG RAIL.
The price under this item shall cover the cost of excavation of earth 13 meters in length
and two (02) meters in depth below ground level. The price shall also cover the cost of
burying 13 meters long rail and connecting it with mat in TSS as per latest RDSO
drawing (Rail will be supplied by RVNL). The price shall also cover the cost of
loading, unloading and transportation to site of work of rail.

SCHEDULE 29000 (SCADA)


1. Supply, erection, testing, protocol of hardware, software, communication
cable, colour codes of cable and various parameters of each of the
schedule item, shall conform to RDSOs Specification No.
TI/SPC/RCC/SCADA/0130/Rev.1 (04/2014) or latest with up to date
amendment issued by RDSO and shall be obtained by the contractor.
SCADA shall be suitable to match and interface with existing SCADA of
RCC centre. Data transfer speed of Traction SCADA system should be
min 9600 bps as per RDSO instructions No. TI/IN/022(02/10) Rev 0.
2. The complete SCADA system shall be supplied, erected and
commissioned through Railways approved vendors. The venders list is
updated by RDSO/CORE Allahabad and shall be valid for the contractual
period. Vendors under trial period shall not be considered for this project.
3. Supply of furniture as per RDSO specifications equipments and
components (List B) and supply of special tools and plants (List C) as per
the schedule rate shall be done in consultation with the Engineer/RVNL
at site/RCC Centre. Items and costs are as per explanatory notes under
relevant items.
4. The work of SCADA of Supply, Erection, Testing & Commissioning
including maintenance & Warrantee shall govern by RDSOs
Specification No. TI/SPC/RCC/SCADA/0130/Rev.1 (04/2014) or latest.
SOR Item SCADA-1
Preparation and supply of Design & Drawing for SCADA at RCC, TSS,
SP & SSP.
Price shall cover the cost of Design & Drawing for SCADA and shall give
all details of various items of equipment at remote control center and the
controlled stations with updated equipment numbering and shall comply
with details of RCC center corresponding mimic panel, the various
interface with the main computer and the monitor/console on which
traction power controllers will monitor status and execute the commands
Page 32 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

and ensure correct execution and tele-signals from control centre to various
remote controlled posts and vice-versa. The drawing shall show the details
of TSSs, SPs & SSPs with details of RTUs, layout of equipments, cable
colour codes, tag numbers, terminals numbers, in addition to various telecommands & tele-signals and panel indication. All drawings shall be got
approved by the client/engineer and Railways before commencement of
execution. All the as erected drawing & design in soft copies in CDs and
hard copies six numbers of each drawing shall be handed over to the
purchaser for final approval.
SOR Item SCADA-2
Supply of SCADA equipment at RCC.
The lump sum price shall include the supply of standard Supervisory
Control and Data Acquisition system as per RDSOs Specification No.
TI/SPC/RCC/SCADA/0130/Rev.1 (04/2014) or latest with up to date
amendment issued by RDSO. There shall be two work station (first of 3
PCs and second of 2 PCs) and main & standby computer and FEP process.
The price shall include supply of one supervisory console PC, one coloured
LAPTOP (Dual Core Intel Pentium Processor at 3.2 GHz or Higher) and
associated MODEMS for remote SCADA monitoring through a DOT Link
as per RDSO specification. The price shall also include the cost of any
steel cabinets required for housing the equipments and also the material
required for internal wiring and mounting the cabinets in the position. The
cost shall also cover testing of the system at the manufacturers works. The
latest version of hardware shall be considered at the time of supply.
The price shall also cover the license fee for the supply and installation of
Standard Electric Traction SCADA software. The successful bidder has to
purchase this from the RDSO approved supplier for standard software as
per RDSO Specification No. TI/SPC/RCC/SCADA/0130/Rev.1 (04/2014)
or latest.
SOR Item SCADA-3(a)
Supply of RTUs for FP/TSS.
The price includes the cost of RTU supplied for the controlled posts and
shall include necessary transducers, summation CTs, PT, supply change
over arrangement, digital/analog modules, limit setting, modems, CPU
cards. Power supply, surge arrestors, relay and contactors etc. at Traction
Sub-stations and feeding post for different analog parameters and
measurements. A tentative list of different telecommands, telesignals and
measurands are given in annexure as per RDSOs Specification No.
TI/SPC/RCC/SCADA/0130/Rev.1 (04/2014) or latest.
SOR Item SCADA-3 (b)
Supply of RTUs for SP.
The price shall cover supply of RTUs for SP. The details given in Item
SCADA-3(a) above are applicable to the SP also except that the different
analog parameters and measurands required have to be suitable for SP.

Page 33 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

SOR Item SCADA-3 (c)


Supply of RTU for SSP.
The price shall cover supply of RTUs for SSPs. The details given in Item
SCADA-3(a) above are applicable to the SSPs also, the different analog
parameters and measurands required have to be suitable for SSPs.
SOR Item SCADA-4(a)
Supply of maintenance free type Lead Acid Battery
The price shall cover supply of Maintenance Free or low maintenance (if
former not available in approved list) Lead Acid type Battery of 110V DC
with adequate Amp. Hour capacity to work with UPS. The battery shall
meet the requirements as RDSOs standard specification No.
TI/SPC/RCC/SCADA/0130/Rev.1 (04/2014) or latest and shall be
complete with all parts and accessories including stand, terminal board and
accessories required for its efficient operation.
SOR Item SCADA-4 (b)
Supply of UPS
The price shall cover supply of dual on-line UPS of 5 KVA capacity
suitable to work in standalone mode at remote control centre, so as to meet
the requirements, as enumerated in TI/SPC/RCC/SCADA/0130/Rev.1
(04/2014) or latest. The price shall not include the cost of Batteries which is
covered under item SCADA-4(a) above.
SOR Item SCADA-5
Supply of furniture
The lump sum price shall cover the supply of furniture at work station to
work independently and shall meet requirement as mentioned in RDSO
standard specification No. TI/SPC/RCC/SCADA/0130/Rev.1 (04/2014) or
latest. The price shall also include furniture for switching posts as per
requirement.
SOR Item SCADA-6
Supply of Data logging Printer for control centre
The price shall cover, supply of diagnostic data logging printer, 2 nos. of
HP DeskJet, 1125C/Ink jet A3 size coloured and two DOT Matrix (132
column) A3 size printer for the section suitable to work as input output
terminal to computer for data logging purposes. The price shall also cover
the equipment (printer server etc.) needed to put these printers on LAN or
latest printer, standard accessories suitable to work with the existing data
logger at RCC, complete with spare black and colour ink cartridge,
connecting power plug and cable to connect the data logger.
SOR Item SCADA-7 (a)
Erection charges for items SCADA-2 to SCADA-6.
The price shall cover the cost of erection of various items of equipments the
supply of which is covered under above mentioned items at remote control
Page 34 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

center and the controlled stations. The cost of erection shall cover the cost
of transportation of equipments, their positioning, fixing and their
alignment for smooth trouble free operation. The price shall also cover the
cost of inter connecting cables, laying of cable in trenches of approved size,
wiring connection to batteries, UPS, surge arrestors, operators console etc.
and all other works necessary for proper functioning of the equipments.
The price for erection shall also include carrying out liasion with software
supplier or at the site work to finalise any matching details between the
RCC software and the hardware vendor. The price for erection shall also
include the cost of adjustments, testing after erection at site, testing to work
all items or equipments specified, integration and commissioning as
considered necessary by the purchaser. The price for erection shall also
cover all cost of administration of the contract, insurance premia, bankers
charges for guarantee cost stamps, loading and unloading, handling of the
materials and for any road transport which the contractor use to carry the
materials between their depot and site of work. It shall also include cost of
erection of separate earthing, if required as per RDSO standard
specification No. TI/SPC/RCC/ SCADA/0130/Rev.1 (04/2014) or latest.
The price shall include complete finishing work at Remote Control Centre,
TSS, SP & SSPs to the satisfaction of the Employer.
SOR Item SCADA-7(b)
Integration of new SCADA system to existing system at RCC.
The price shall cover the integration of entire new SCADA system with
existing SCADA system at RCC. This shall also include the cost of any
hardware and software required to complete the work. The item covers the
administrative work of supply, transport, execution of contractual items of
work, liasoning, testing and commissioning as per specified protocol
mentioned
in
RDSO
standard
specification
No.
TI/SPC/RCC/SCADA/0130/Rev.1 (04/2014) or latest as well as for the
efficient working of complete SCADA installation and trouble free
commissioning of the above work in all respects.
SOR Item SCADA-8
Erection, integration, testing & commissioning for existing and new
equipments
(a) TSS RTU (b) SSP RTU (c) SP RTU
The price shall cover the adjustment charges (modification/upgradation in
existing RTUs and SCADA system) required during the execution and final
testing on RTUs at TSS, SP & SSP with remote control centre for final
commissioning.

Page 35 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

SOR Item SCADA- 9


Supply of Equipment and Components (List B)
Schedule of item for spare equipments and components
Sr.No.
1.

2.
3.
4.

5.
6.
7.
8.
9.
10.
11.

Description
Transducers:
i) Current
ii) Voltage
iii) Power Factor
8 Port serial Card
Contactors/Interposing Relays
RETI Modules :
i) PR-80 (Power supply module)
ii) CPU Module
iii) DO Module
iv) AI Module
v) DI Module
vi) Modem Card
vii) Input conditions PCB_
viii) Cat UV/PT fuse fail Module
ix) CVT
x) DC-DC convertor
Key Board
Power Supply Unit for servers
FEP
Power Supply Unit for Work
Station
18 GB wide ULTRA-2 SCI-HDD
20 GB IDE HDD
16 port 10/100 Ethernet LAN
HUB
Surge Arrestor (Set of 3)

Qty.

Unit

1
1
2
1
28

Nos
Nos.
Nos.
Nos.
Nos.

2
2
3
1
3
1
3
6
1
1
1
1

Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.

Nos.

1
1
1

Nos.
Nos.
Nos.

Nos.

Note: The above list is provisional and may be updated as per zonal railway or
specific sectional requirement within overall cost.
SOR Item SCADA-10
Supply of Special T&P (List C)
List of Maintenance Tools and Instrument for SCADA system
Sr.No.
Description
1.
4-1/2Digit Multi meter MECO Model 235
MK-11
2.
Tong Tester
3.
Electrician Plier 8
4.
Electrician Plier 6
5.
Cutting Plier
6.
Nose Plier
7.
I.C. Extractor

Qty.
4 Nos.
2 Nos.
3 Set
3 Set
3 Nos.
3 Nos.
3 Nos.
Page 36 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

8.
9.
10.
11.
12.
13.
14.

Card Extenders
Level meter APLAB Model 2031A
Wire Stripper
Fault Analyser
Dual trace oscilloscope (0-30 Mhz)
Remote Terminal Test Unit (In P-IV Laptop
Computer kit)
Tool kit consisting of a) Brief Case
b) Stripper & Cutter
c) Crimping Tool
d) Screw Driver Kit (6 Blades)
e) Screw Driver Kit (1 Set Start type 6
Blades)
f) Desolding Pump
g) Brush (To clean the RTU)
h) Soldering wire (18 SWG)
i) Solder Sucker
j) Soldering Iron
k) Nose Plier
l) Spanner

3 Nos.
2 Nos.
1 Nos.
1 Nos.
2 Nos.
2 Nos.

1 Nos.
1 Nos.
1 Nos.
1 Nos.
1 Nos.
1 Nos.
1 Nos.
100 gms.
3 Nos.
3 Nos.
1 Nos.
1 Nos.

COMMON ITEMS OHE/TSS


SOR Item CS-1
SUPPLY AND ERECTION OF 25 KV VACUUM INTERRUPTER:
The price shall cover supply of a 25 Kv AC 50 Hz Single Pole, Outdoor type 1600 Amp
rating vacuum interrupter with all accessories and components as per RDSOs latest
Specification at site and erection of the same with supporting framework and terminal
connectors with interlock .
The price for erection shall include preparation of its foundation alignment and grouting
of the interrupter on its foundation block and mounting of accessories, if any in their
respective positions. The price shall also cover supply and erection of enameled number
plates. All necessary tools, equipments, instruments, including power supply required
for carrying out necessary checks, tests and commissioning shall be arranged by the
contractor.
The supply of vacuum interruptor shall be as per RDSO specification No.
ETI/S/PSI/167(09/97) with A&C slip No. 1 & 2.
SOR Item CS-2
SUPPLY AND ERECTION OF A 25 KV POTENTIAL TRANSFORMER TYPEI OR TYPE -II:
The price shall cover supply and erection of a 25 KV Potential transformer Type-I or
Page 37 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Type -II complete with all fittings and accessories as per relevant latest specification,
including terminal connectors and fixing bolts. The price for supply and erection shall
include proper alignment of the transformer in position. The price shall also cover the
supply and erection of an enameled number plate and fixing bolts. The price shall not
include the cost of any small parts steel work.
SOR Item CS-3
SUPPLY AND ERECTION OF A 42 KV LIGHTNING ARRESTOR:
The price shall cover supply and erection of a 42 kV lightning arrestor complete with
all fittings and accessories as per relevant latest specification including terminal
connectors. The cost of erection shall include proper alignment of the lighting arrestor
in position. The price shall cover supply and erection of cadmium copper jumper (65),
which will be paid under item OHE-29. The price shall not include the cost of any small
part steel work. The price shall also include supply and erection of surge counter with
leakage current monitor along with cable (unarmored PVC insulated copper cable size
35 Sq. mm 1100 volts grade). The surge counter shall be mounted on the structure at a
convenient height as per. Specification No. ETI/PSI/71 revision-1(1/87), A&C slip
No.1 to 7 or latest.
SOR Item CS-4
SUPPLY AND INSTALLATION OF CABLES FOR SWS/TSS:
The price shall cover supply, installation, and connecting-up the cable for control and
indication, (PVC 1100 V grade 2.5 sq mm copper conductor 7 core), from the
interruptor to the terminal board, supply and erection of terminal connectors at ends
if required and conduits wherever necessary, heater supply cable, (1100 V grade
PVC insulated heavy duty 2 core 4 sq mm aluminium conductor), from interruptor
to the 230 V fuse box mounted on wall inside the control cubicle and from this box
to LT distribution board inside the control cubicle, supply and erection of terminal
connector at each end, if required, conduit if any at the interruptor end, catenary
indication (240 V AC circuit cable, PVC1100 V grade 2.5 sq mm Copper conductor
2 core), between potential transformer Type-I and terminal board inside the control
cubicle and supply and erection of terminal connectors at both ends, if required and
conduit to be embedded between the steel work base and the cable trench and shall
include all fastenings on masts and structural members to support them, LT power
supply cable, (1100 V grade aluminium conductor XLPE insulated PVC sheathed
and steel armoured heavy duty cable conforming to IS7098/Pt.I/1988 2x25 sq mm
for 5 KVA AT, 2x70 sq mm for 10 KVA AT, 2x185 sq mm for 25 KVA AT),
between L T supply transformer at switching station and LT distribution board
provided in control cubicle and suitable cable boxes and connectors at both ends if
required, cable between 110V battery charger and battery, between battery and the
DC fuse box and between the DC fuse box and terminal board and etc. The price
shall include supply and erection of terminal connectors wherever required.
NOTES:
1 In case of feeding stations which are located within the traction sub-station
premises, the cables shall be run from individual equipment and terminated inside
the sub-station control room.
Page 38 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

2 Notwithstanding the sizes of cables given above, the bidder shall assure himself that
various cables would suit the ratings of equipments offered by him.
3 Price shall be payable on flat rate basis per meter irrespective of size of cable for
different types of cables used switching stations/TSS.
SOR item CS-5
SUPPLY, ERECTION, OIL FILTRATION, TESTING AND COMMISSIONING
OF 25 KV/240 VOLT, 10 KVA, AUXILIARY (LT) SUPPLY TRANSFORMER
OIL TYPE WITH 25 KV D. O. FUSE SWITCH, ANTICLIMBING DEVICE,
INSULATOR, COPPER JUMPER AND EARTH ELECTRODES etc:
The price shall cover Supply of 25KV/240V, 10 KVA LT supply transformer at site
with DO fuse assembly (including fuse carrier) and all other mounting accessories, as
per the RDSOs latest specification and its erection complete with terminal connectors
on a mast or gantry. The price shall also be applicable for transformers mounted on
steel pedestals at switching stations. The price shall also cover supply and erection of an
enameled number plate of approved design.
The price shall also cover oil filtration and pre- commissioning tests as approved by the
Employers or Engineer. The contractor shall make his own arrangement for oil filtration
equipments, as well as power supply required for the same. All necessary tools,
equipments, instruments required for carrying out oil filtration / checks / tests /
commissioning shall be arranged by the contractor. The price shall also cover supply &
erection of a DO fuse switch assembly complete with all mounting accessories,
post/pedestal insulator for DO fuse switch assembly.
The price shall also cover on a lump sum basis the supply and erection of anti-climbing
device consisting of galvanized steel fixtures mounted on the masts below the
transformer.
The price shall also cover supply of conductor / jumper wires on a flat rate basis and the
supply of all components including parallel clamps, bi-metallic and Aluminium copper
Al-Cu strips wherever required. The price shall also cover the erection of complete
jumper assembly including conductor/jumper wire to be provided between the Over
Head Equipment and L.T. Transformers, drop out switch assembly.
The price shall also cover supply and erection of an earthing station/ stations with a
pipe/pipes required to achieve permissible earth resistance value embedded into the
ground by drilling or otherwise complete with protective concrete box and lugs suitable
for directly connecting two mild steel flats of minimum size 50 mm x6 mm and copper
earthing strip 25X3 mm at LT side earthing point to mast.
The price shall not include cost of supply and provision of structure bond connecting
LT transformer with structure and then to rails which will be paid for under item
OHE-22.
NOTE:1. Contractor at his own cost shall do the replenishment of the transformer oil
on account of testing and leakages during the warranty period.
SOR Item CS-6
PROVIDING AND LAYING

OF CONCRETE FOR FOUNDATION AND


Page 39 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

PLINTH
IN ALL TYPES OF SOILS AND SOFT ROCK
The price shall cover excavation, supply and handling of all materials and accessories,
temporary arrangements for excavation in all types of soils and soft rock,
concrete/masonry drains/walls, shoring wherever necessary, casting concrete including
frame work wherever necessary, tamping of concrete, grouting of masts and finishing
the top of concrete foundation or anchor blocks. The price also includes dismantling of
all connected temporary arrangements, back filling with excavated earth and
compacting the same to the required height and width as per drawing to ensure safety of
foundation, confining the exposed height of foundation block to within 10 cm., and
removal of spoil. The price shall also include the cost of supply of cement.
Notes for measurement
1. The payable volume of the foundations under the above item shall be the designed
one as shown in the drawings for which the hole has been made, irrespective of the
actual configuration.
2. The depth of the excavation shall be measured from the formation level to the
maximum excavated point.
3. The prices shall be calculated for the individual volume of concrete, fraction of a
cubic metre beyond the third decimal shall be rounded off to the next nearest third
decimal.
4. The prices shall apply for concreting of all foundations for mast, gantries, portals,
anchor blocks for guy rods, and fencing uprights.
5. For purposes of computation of volume of concrete, the volume of steel work
embedded in the foundation block shall be ignored.
6 For the purpose of computation of volume of concrete, the volume of concrete shall
include the volume of sand and bitumen in sand cored foundation. However, for the
purpose of computation of quantity of cement utilised in sand core foundations, the
volume of the sand and bitumen used in core hole should be deducted from the
total volume of the foundation.
7 For purposes of computation of volume of concrete, the volume of each muff for all
masts shall be taken as 0.02 cu.m. except for masts with balance weights and for
each column of portal, mast, 2 or 3 track cantilever masts, and special fabricated
masts for which the volume of muff shall be taken as 0.08 cum. irrespective of the
size and shape of muff, on a flat basis.
8. The item shall also be applicable to include the concrete of equipments, at the
switching stations/traction sub-station (except building foundations) as well as
embedded drain pipes, wherever required.
9. The prices shall also cover the cost of diversion of masonry/earth drain wherever
necessary for casting of foundations.
10. (a)RDSO guidelines shall be followed for grade of concrete, type of foundations etc.
Generally concrete for foundation shall be nominal mix of Grade-M-10 and for
grouting, muffing, embedding of structure in foundation concrete of M-15 Grade as
per latest RDSO guidelines shall be used.
(b) In Soft/Hard rock, Foundation in contact/Buried under Non-aggressive soil/ground
water:
Foundation concrete shall be of M-15 grade and core concrete shall be of M-20
grade.
(c) In Soft/Hard rock Foundation in coastal area: Foundation as well as core concrete
shall be of M-20 grade.
11. No extra payment shall be made for foundation casted with steel reinforcement as
Page 40 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

per RDSO drawing. Similarly, no extra payment shall be made for foundations
casted as per 10(b), (c).
SOR Item CS-7
PROVIDING AND LAYING OF CONCRETE FOR FOUNDATION AND
PLINTH IN HARD AND ROCKY SOIL REQUIRING CHISELING/BLASTING:
The price shall cover excavation, supply and handling of all materials and accessories,
temporary arrangements for excavation in hard rock requiring chiseling/blasting and
concrete / masonry drains / walls. Shoring wherever necessary, casting concrete
including frame work where necessary, tamping of concrete, grouting of masts and
finishing the top of concrete foundation or anchor blocks.
The price also includes dismantling of all connected temporary arrangements, back
filling with earth and compacting the same to the required height and width as per
drawing to ensure safety of foundation, confining the exposed height of foundation
block to within 10 cm., and removal of spoil.
The Employer's Engineer shall certify where use of chisel and hammer or blasting has
been necessary. The contractor shall arrange for supply of explosives and all tools and
plants for blasting operations at his own cost. The price shall also include the cost of
supply of cement.
Notes for measurement
1. The payable volume of the foundations under the above item shall be the designed
one as shown in the drawings for which the hole has been blasted, irrespective of
the actual configuration assumed by the latter due to the blasting.
2. The depth of the excavation shall be measured from the formation level to the
maximum excavated point.
3.

The prices shall be same for any shape or size of concrete blocks. In calculating the
individual volume of concrete, fraction of a cubic metre beyond the third decimal
shall be rounded off to the next nearest third decimal.

4. The prices shall apply for concreting of all foundations for mast, gantries, portals,
anchor blocks for guy rods, and fencing uprights.
5.

If half or more of the volume of excavation is in hard rock requiring


chiseling/blasting, entire foundations shall be paid for under this item.

6.

For purposes of computation of volume of concrete the volume of steel work


embedded in the foundation block shall be ignored.

7.

For the purpose of computation of volume of concrete, the volume of concrete shall
include the volume of sand and bitumen in sand cored foundation. However, for the
purpose of computation of quantity of cement utilised in sand core foundations, the
volume of the sand and bitumen used in core hole should be deducted from the
total volume of the foundation.

8.

For purposes of computation of volume of concrete, the volume of each muff for all
Page 41 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

masts shall be taken as 0.02 cu.m. except for masts with balance weights and for
each column of portal, each head span mast, 2 or 3 track cantilever masts, and
special fabricated masts for which the volume of muff shall be taken as 0.08 cum.
Irrespective of the size and shape of muff, on a flat basis.
9.

The price under this item shall also include in cost of concrete at the switching
stations as well as embedded of drain pipes, wherever required.
10. The prices shall also cover the cost of diversion of masonry/earth drain wherever
necessary for casting of foundations.
11.(a) RDSO guidelines shall be followed for grade of concrete, type of foundations etc.
Generally Concrete for foundation shall be nominal mix of Grade-M-10 and for
grouting, muffing, embedding of structure in foundation concrete of M-15 Grade
as per latest RDSO guidelines shall be used.
(b) In Soft/Hard rock, Foundation in contact/Buried under Non-aggressive soil/ground
water:
Foundation concrete shall be of M-15 grade and core concrete shall be of M-20
grade.
(c) In Soft/Hard rock Foundation in coastal area: Foundation as well as core concrete
shall be of M-20 grade.
12.
No extra payment shall be made for foundation casted with steel reinforcement
as per RDSO drawing. Similarly, no extra payment shall be made for foundations
casted as per 11(b), (c)
SOR Item CS-8
PROVIDING AND LAYING OF REINFORCED CONCRETE
PIER/COLUMN/PILE, CABLE TRENCH AND TRENCH COVER

FOR

The price shall cover excavation and providing and laying of all reinforced
concrete work for pier/column/pile, cable trench and trench cover and other materials
including bending, binding, laying of the reinforcement, shoring where necessary,
casting concrete including frame work where necessary, grouting and finishing the tops
of foundation blocks with the required slope/muff but excluding supply of steel
for reinforcement. The price shall also include dismantling of all connected temporary
arrangements, back filling as required and removal of spoil. The price shall also include
the cost of supply of cement.
Notes for measurement
1. The Concrete for cable trenches/trench cover/pier/column/pile shall be nominal mix
of 1:2:4(M-15 grade)
2. The prices shall be same for any shape or size of concrete blocks. In calculating the
individual volume of concrete, fraction of a cubic metre beyond the third decimal
shall be rounded off to the next nearest third decimal.
3. The prices shall apply for concreting of all foundations for mast, gantries, portals,
anchor blocks for guy rods, and fencing uprights.
4. For purposes of computation of volume of concrete the volume of steel work
embedded in the foundation block shall be ignored.
5. The price under this item shall also include the cost of concrete cable trenches and

Page 42 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

trench covers at the switching stations/traction sub-station as well as embodiment of


drain pipe, where required.
6. The prices shall also cover the cost of diversion of masonry/earth drain wherever
necessary for casting of concrete.
7. The payment for required steel shall be made under Civil Engineering BOQ Item
2076. However cost of cable support and trays is payable under BOQ item CS-9
SOR Item CS-9
SUPPLY AND ERECTION OF ALL TYPES OF GALVANISED STEEL
STRUCTURES, SMALL PARTS STEEL etc:
The price shall cover the cost of supply, erection, alignment and setting before grouting
of individual mast of finished traction mast fabricated from rolled mild steel beam
(BFB) 152 mm x 152mm x 37.1Kg/m. designated SC-150, table 3.1 of IS-808/1989
duly drilled as per RDSOs Specification No. ETI/OHE/C/00144 Mod- B or latest and
galvanized as per speciation No. ETI/OHE/13(4/84) with A&C slip No. 1 to 3 or latest.
The length of mast will be 9.5 or 8.5 meter as required.
The price shall also cover the cost of supply, erection, alignment and setting before
grouting of individual traction masts and main masts of switching stations including
those for head spans. of traction mast, main mast of switching stations fabricated from
Rolled Mild Steel Joist (RSJ) 203 mmX152 mm x 52.0 Kg/m designation WB-200,
Table 2.2 of IS- 808/1989 duly drilled as per RDSO drawing nos. given below for
various type of masts and galvanized as per specification No. ETI/OHE/13(4/84) with
A & C slip No.1 to 3 or latest. The price shall also cover the cost of supply of any other
structures fabricated out of RSJ beam.
Drg. Nos.

(i)
(ii)
(iii)
(iv)
(v)
(vi)

ETI/OHE/C/0000144 ModETI/C/0030 Mod-F


ETI/C/0031 Mod-D
ETI/C/0036 Mod-E
ETI/C/0181 Mod-C
ETI/C/0184 Mod-B

09.5 M long
11.4 m (S1)
11.4 m (S2)
08.0 m (S4)
12.4 m (S6)
09.4 m (S9)

The price shall also cover the cost of supply of O, N and R type portals with necessary
components as per following RDSO Drawing Nos., cost of erection, alignment and
setting before grouting, wherever required, of portals assembly of boom components
and erection of the same. The prices shall also include supply and erection of
galvanized bolts, nuts washers etc. wherever required as per approved designs and
drawings. The price shall cover assembling, adjustment and erection of all types of
booms including TTC booms and any special structures across the track, not covered
under this item.
The structures shall be fabricated and galvanized from steel conforming to IS-2062 or
A as per concerned specification i.e. IS:2062/1984, IS-808/1989 and RDSO
specification No. ETI/OHE/13 (4/84) with A&C slip Nos 1 to 3 or latest.
(i)
(ii)

ETI/C/0008 Sheet No. 2 to 6 latest Mod for N type


ETI/C/0017 Sheet No. 2 to 6 latest Mod for O type

Page 43 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

(iii)

ETI/C/0011/69 Sheet No. 2 to 6 latest Mod for R type

The price shall also cover the cost of supply of B-Series traction mast 9.5 m long i.e. B150, B-175 and B-200 etc fabricated and galvanized as per RDSO Drg No. ETI/C/0071
(Mod-E) and specification No. ETI/OHE/13 (4/84) or latest. The price shall also cover
the supply of any other size of B-series or K-Series mast required, that has not been
mentioned in this item.
Note : For the purpose of payment, the weights of individual traction mast and
masts of head span shall be determined for each type on the basis of the payable
weight per meter length shown below for standard types, For special types, the
payable weight per meter length will be indicated by the Employer at the time of
approval of designs.
PAYABLE UNIT WEIGHTS FOR STANDARD MASTS
S. No.
Type of masts
Weight in Kg per meter
including galvanization
1

6"x6" BFB

38.03

162x154 BFB

38.00

200x200 BFB

51.20

8"x6" RSJ

53.39

S1

53.30

S3

76.40

S4

53.39

S5

111.53

S6

53.39

10

S7

76.40

11

S8

111.53

12

K 100

23.70

13

K 125

30.30

14

K150

38.18

15

K175

43.72

Page 44 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

16

K200

49.87

17

K225

57.50

18

K250

66.72

19

B100

27.71

20

B125

32.47

21

B150

39.07

22

B175

44.61

23

B200

50.76

24

B225

61.50

25

B250

70.72

26

S 100

23.72

27

S101

19.98

28

Other Sections

As & when issued by


RDSO/market survey etc

The price shall also cover the cost of supply of special fabricated and galvanized steel
structures (other than BFB/RSJ/B Series Masts and Portals). The structure to be
supplied under this item TTC, G Type, BFB Type portals, Bridge masts, Emergency
masts and Double/Fabricated S Series masts such as S-3, S-5, S-7, S-8, S-100, S-101,
T-150, cable trays etc., Any other similar structure required during the execution of
work shall also be supplied under this item.
The price shall also include the cost of steel, fabrication, galvanization and supply at
site for erection. Steel shall be conforming to IS:2062 Grade A SK 1984 (Latest), Zinc
conforming to IS:209/1997 (Latest) and galvanization to RDSOs specification
No.ETI/OHE/13 (4/84) with A & C slip No. 1 to 3 or latest. The various structures
covered under this item are .

S.No
1
1

Description
2
TTC with 5.5/8.0 mtrs boom

2
3

G type Portal Up right and End Pieces


BFB Portal

4
5
6

S-7, 12.4 MTRS Length


S-8, 12.4 Mtrs Length
S-100, for LT Transformer at SWS

Drawing No
3
ETI/C/0009
Sheet 2 to 5
ETI/C/0056
ETI/C/0026
Sheet 2
ETI/C/0182
ETI/C/0183
ETI/C/0043

Mod.
4
B
C
A
C
C
B
Page 45 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

7
S-101, for Isolators inside SWS
ETI/C/0180
A
8
S-3, 11.4 Mtrs
ETI/C/0180
C
9
S-5, 11.4 Mtrs
ETI/C/0042
E
10
T-150, for LT Supply Transformer
ETI/PSI/037
C
The price shall cover cost of erection, alignment and setting before grouting, wherever
required, gantries, including tower / steel tower / steel work for feeders for traction substation, drop arms, standard super masts and suspension brackets for feeders and return
conductors. Dwarf masts of stub masts for anchoring, complete with anchor plates
drilled and welded in position multiple cantilever cross arm, chairs, adopters for bracket
assemblies and all other small part steel works, the erection of which is carried out by
the contractor irrespective of whether they are supplied by purchaser/contractor. The
prices shall also include supply and erection of galvanized bolts, nuts washers etc.,
wherever required as per approved designs and drawings.
The steel shall be conforming to IS-2062/1992 (latest) Gr A SK zinc conforming to
IS-209/1992 or latest.
The price shall also include the cost of repairing of platform shelters in case the shelter
is dismantled/removed/damaged during the course of erection of a mast / portal at
platforms.
Note:
(i) The prices for the items shall also include the cost of stenciling of location number
on masts/portal uprights in the manner as directed by the Purchaser.
(ii) The price shall also include straightening of masts/portals uprights wherever
approved by the purchaser and cutting of mast/portals/upright to suit the site
condition.
(iii)The payment shall be made on the basis of the final lengths/weight of the
structures, in case the same are cut or modified as indicated above before erection.
The price shall also cover the cost of supply of all fabricated steel work excluding
fasteners which are required to be supplied by the Contractor. The cost of erection for
such steel work, if carried out by the Contractor shall be paid for under relevant item
For standard fabricated steel work for which RDSO'S approved drawings are available,
the weight of steel work as specified in RDSO'S drawings shall be considered for
payment. However, in case the unit sectional weight of any member indicated in
RDSO's drawing is not in conformity with the unit sectional weight as per the latest IS
specification, the weight of the fabricated steel work shall be calculated on the basis of
latest IS specification and the same will be considered for payment. For the nonstandard fabricated steel work, the calculated weight to be considered for payment
under this item shall be included in the relevant drawing based on, latest IS sectional
weight at the time of submitting the designs for approval of the Employer.
1

NOTES :
For the purpose of payment against items, weight of structures or fabricated steel
work will be calculated according to the weight of black steel given in section
books for the lengths of various members shown in the approved drawings. There
will be no addition for increased weight due to galvanizing or painting or weld
material or reduction for holes or skew cuts.
The rates against item shall be applicable to the erection of small part steel work
which are not covered under the various other items of work.
Page 46 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

SOR Item CS-10


SUPPLY AND ERECTION OF FENCING PANELS, UPRIGHTS, GATE, AND
ANTI-CLIMBING DEVICE:
The price shall include supply and erection of fencing panels painted with two coats of
red oxide zinc chromate primer to IS: 2074 and finished with two coats of aluminium
paint. The prices shall also include supply and erection of fencing upright, anti-climbing
devices including the cost of fasteners and the price shall be for a meter length of the
panels 2.4 m height measured in the plan view of the appropriate approved drawings.
The prices shall be on the basis of black weight of the steel with no deduction for holes
or skew cuts or no increase for weld materials.
The price shall also cover supply and erection of an anti-climbing device consisting of
galvanized steel fixtures mounted on the fencing panels as per approved design. The
price shall be per meter length of the panel. Fencing panel shall be manufactured with 8
SWG GI wire as per CORE drawing no CORE/ALD/PSI/001 Mod B.
SOR Item CS-11
SUPPLY AND ERECTION OF ALUMINUM JUMPER WITH FASTENERS:
The price shall cover on flat rate basis the supply and erection of an aluminum jumper
complete with all components and fittings required for providing jumper connection
including parallel clamps, bi-metallic Aluminium-Copper strips wherever required and
terminal or tee clamps at either end. The price shall be applicable for any aluminum
jumper/ connection in any combination between feeders, return conductors, overhead
equipment, isolators, and out-going bus bars or switching stations and booster stations.
Jumper connections for 25 kV feeding stations will also be paid under this item.
SOR Item CS-12
SUPPLY AND ERECTION OF COPPER STRIPS FOR EQUIPMENT
EARTHING:
The price shall cover supply and erection of 25mm x 3mm copper strips to connect the
earth terminals of equipment like potential transformers, lighting arrestor, and LT
supply transformers to the main masts of the gantries on which they are mounted. The
price shall also cover all fastenings required for fixing the copper strip along any
structure member of the gantry.
SOR ITEM CS-13
SUPPLY AND ERECTION OF ALUMINIUM BUS BAR 36MMx28MM:
The price shall cover supply and erection of aluminium bus bar 36mmx 28 mm
including bending, shaping and clamping on to insulators, connectors or equipment
terminals.
SOR ITEM CS-14
SUPPLY AND SPREADING OF GRAVEL/ BALLAST IN THE SWITCH YARD
(SP/SSP/TSS):
The price shall be per cubic metre rate and shall cover supply and spreading of
uniformly graded gravel/ballast of size 20mm as per IS:383-1970 in the outdoor switch
yard/TSS after completing all the works and levelling the switch yard area, but before
commissioning of the sub-station. The gravel/ballast shall be of good quality and free
from any dust and dirt. Prior approval of ballast shall be taken from the Employer for
the gravel samples. The gravel/ballast shall be spread out uniformly to a depth of
minimum 10cm. over the area indicated by the Employers Engineer.
Page 47 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

SOR Item CS-15


DISMANTLING OF REDUNDANT FOUNDATIONS WITH COMPRESSOR
POWERED MACHINES:
The price under this item shall cover the cost of breaking of redundant foundations with
compressor powered machines or manually with required tools. The price shall also
cover the cost of any required material including consumables like HSD Oil etc
required for breaking of foundation block and shifting the broken material from site to
a place/location and refilling the excavated pit with earth as directed by employer at
site of work. No price is payable for dismantling of any foundation due to fault of
contractor.
SOR Item CS-16
MONTHLY CHARGES FOR ONE CRANE OPERATOR, WATCH AND WARD
STAFF FOR ONE CRANE/UTV.
The price under this item shall cover monthly charges on lump sum basis to be paid for
one crane operator in day/night time as per work requirement for OHE mast/structure
erection, loading/unloading of material etc. Price shall also cover monthly charges to be
paid to Watch & Ward staff to be deputed for the crane round the clock at site of work
for security and miscellaneous works as per requirement. The deployment shall be done
as per directions of the engineer at site.
Note: Unit of the item shall be per month.
SOR Item CS-17
SUPPLY AND ERECTION OF ANTI-THEFT TRANSFORMER 240 VOLT/2.2
KV 5 KVA , DO FUSE SWITCH ASSEMBLY, EXCAVATION OF CABLE
TRENCH, LAYING OF CABLES, EARTHING, JUMPERING, DG SET,
INCLUDING DISMANTLING OF ABOVE EQUIPMENTS.
The price under this item shall cover all items required for anti theft arrangement of
OHE at each location including supply and erection of a Anti-theft single phase
transformer of 230 volt/2.2 KV, 5 KVA capacity at site, mounting it on structure or
gantry with suitable mounting and tripping arrangement as per the RDSO specification.
Price shall also cover supply and erection of a DO Fuse switch assembly complete with
all mounting accessories, post/pedestal insulators, DG set of 5 KVA capacity. The price
shall also cover the supply and erection of anti-climbing device consisting of galvanized
steel wire with fixtures mounted on the mast below the transformer. The price shall also
cover supply and erection of a copper jumper along with suitable clamps and bimetallic strips wherever required between OHE/cable and transformer, drop out switch
assembly. The price shall also cover supply, mounting of a 230 Volt 63 Amp. ICDP
switch on transformer structure and its connections. The price shall also cover
excavation of cable trench from supply point to transformer structure wherever
required, supply and laying of suitable size cables. The price shall also cover
dismantling of the complete system when advised by the Engineer. The price shall not
cover the provision of structure bond connecting anti-theft transformer with structure
and then to rails which will be paid for under item OHE-22. Local electricity if
available at station may be used for the purpose free of charge after approval. The price
shall cover cost of diesel, lub oil etc required for running of DG set when electricity is
not available.

Page 48 of 48

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Schedule-33000(GENERAL ELECTRICAL WORKS)


(Quarters, Service buildings, Pumps, Track crossings etc.)
1.
i

Explanatory notes for various items of work in Electrical General Services Schedule are given below:
All electrical works should comply with Indian Electricity Act 2003 and Rules framed there under.

ii

All electrical installations shall conform to the relevant Indian Standard and shall be carried out as per the relevant safety Code of
Practices and guidance for Safety Procedures in Electrical Works as per IS:5216/Pt I & II/1982.

iii

Notwithstanding the ratings specified in the BOQ, all components proposed to be used in the installations, shall be of approp riate
rating of voltage, current and frequency without any additional financial implication on RVNL. Discrepancies, if any, in this regard,
shall be brought to the notice of the Engineer by the Contractor.

iv

All minor items viz. hardware items, foundation bolts, termination lugs for electrical connections etc. as required and necessary for
proper working of the equipment shall be deemed to have been included in the Bill of Quantities, whether such items are
specifically mentioned or not.

vi

vii
viii

(a)

The basic quantities of components & materials required to make up a unit of work for selected items are approximate. The
Contractor shall plan the work, estimate the actual quantities required and get the same approved by the Engineer before plac ing
orders.

(b)

In estimating the prices for various items of work, provision for loss or wastage in transit and erection including freight, handling,
taxes and duties, insurance if any etc. should be taken into account and firm unit price offered for a complete unit of work to be
done by the contractor.
The various items to be supplied/provided/erected should be as per the list of approved suppliers included in RVNLs Technica l
Specifications/list followed by concerned zonal Railway. Items not appearing in the approved list shall be procured from good
quality sources in line with best industries practices and shall be either ISI marked or conforming to latest IS (if any). Before
procurement, vendor approval shall be obtained from the Employer.
Good workmanship and total compliance with safety and other statutory rules and regulations, shall invariably be observed by the
Contractor.
All approvals from the relevant and appropriate government & statutory authorities shall be the total responsibility of the Contractor
unless specified otherwise.
Page 1 of 40

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
ix

All quoted rates shall cover supply of materials, handling of materials, labour required, civil works, taxes and duties, fabrication,
installation, testing and commissioning, training and free maintenance till handing over to the Employers representative.

If any activity of work is essential for the satisfactory completion of the work but is not mentioned specifically in the Bill of Quantities
or elsewhere in the bidding documents, the same shall be deemed to be included In the scope of work and shall be executed by the
contractor within the accepted cost. The work shall be handed over in a functional manner complete in all respects.

xi

The inspection of various items shall be carried out by the agencies as specified in RVNL specifications. The prices quoted also
include RITES/RDSO representative inspection and testing charges unless otherwise specified in the bill of quantities or Technical
Specification. In case of change of inspection from RDSO/RITES to RVNL/CONSIGNEE, 1% of the cost of material will be
deducted by RVNL as inspection charges.

xii

The inspection of above items will be done at the manufactures works/place decided by the Employer based on item, its quantity,
Inspecting Authority etc.

2.
2.1

DRAWINGS
The contractor shall prepare drawings in Auto Cad for all LT/HT installations, indicating proposed works and shall obtain approval of
Engineer prior to taking up the work. Such drawings shall be prepared in coordination with all other agencies executing works at the
same site and a maximum of 10(ten) copies as are required by RVNL with one tracing on RTF paper.

2.2

After commissioning, these drawings shall be duly updated as per erection work at site and submitted in six copies and one tracing in
RTF paper, as Completion Drawings, along with a soft copy to the Employer.

2.3

Where the contractor proposes to use an item of equipment, other than that specified or detailed on the drawings, which requi res any redesign of the structure, partitions, foundation, piping, wiring or any other part of the mechanical, electrical or architectural layouts, he shall
inform the Engineer well in advance and obtain his approval. Delays resulting from such re-design shall be On Contractors account.
He shall also submit all related information as may be required for approval of such redesign, to the Engineer.

2.4

Where the work of the Contractor has to be executed in close proximity to or will interfere with work of other agencies, the Contractor
shall work out space/time adjustments in coordination with other agencies. If the contractor installs his work before coordinating with
other agencies, so as to cause any interference with their work, he shall make the necessary changes without extra cost to th e owners of
the installation.
Page 2 of 40

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
3.

EXPLANATORY NOTES FOR BOQ ITEMS


The descriptions of all items are self explanatory. These Explanatory Notes are supplementary to the BOQ description. Further details are
available in latest booklet of RVNLs STANDARD SPECIFICATIONS FOR MATERIAL AND WORKS Volume-II(GENERAL
ELECTRIFICATION AND RAILWAY ELECTRIFICATION WORKS) as amended from time to time.
NOTE: Following particular requirements shall be followed for wiring works:
1
2
3
4.
5
6
7
8
9
10
11
12
13
14

No conduit shall be of size less than 20 mm.


Occupancy of wiring cable in conduit shall not exceed 45% of the capacity of conduit.
Switch boxes shall be of galvanized sheet metal of suitable sizes from approved sources:
Separate conduit shall be laid for each circuit/sub main/main wiring.
Water cooler/AC Points and other such inductive loads shall be controlled with C series MCBs.
Neutral cable shall be brought into each switch box.
Earth cable shall be brought into each switch box.
Fan point wiring shall include supply & fixing of fan box.
Approx.150 mm long wiring cable shall be kept loose in switch box/SDB/DB etc.
Conduits laid in sheds shall be clamped with the shed structure with clamps made from GI. strips of 25x1.6mm and spaced at
about 1000mm interval, fixed with 8mm dia bolts with nuts.
Brass screw and cup washers shall be used for fixing sheets on the front of switch box .
All the wiring work shall be in conformity with IS732/1989 (Latest Version) CODE OF PRACTICE FOR ELECTRICAL WIRING
INSTALLATIONS & IS 4648/1968 (Latest Version) Guide for Electrical Wiring in Residential Buildings.
The equipments which are available with ISI mark in Indian market, they shall be supplied having ISI mark only whether
specifically mentioned in BOQ & its explanatory notes or not.
All the energy consuming equipments which are available in Indian market with energy star rating issued by BEE, shall be
supplied with minimum 3 star energy rating only whether specifically mentioned in BOQ & its explanatory notes or not.

Page 3 of 40

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

ITEM NO 33001 (i) to (vi) ELECTRIFICATION OF STAFF QUARTERS


(a)

The item price includes cost of labour & all materials required to electrify the quarter in all respect complete with ceiling and exhaust fans,
luminaries with lamps and other items indicated in the scale of fittings for each type of quarter. It also includes the cost of wiring cables
(sizes indicated for point wiring, circuit wiring and sub main wiring), PVC conduits with accessories, junction boxes, modular switches,
sockets, metal boxes, lamp holders and ceiling roses, modular plates, pre-wired sub distribution boards and meter boards with meters,
MCBs, earth electrodes etc.
The work of staircase wiring covers complete work of wiring and all the materials required including conduit, wiring cable of size for point
wiring, two nos of two way switches etc. Payment for this item shall be in addition to the one point wiring covered under Item No-33003 (i).

(b)

Scale of fittings, wiring points, fans, luminary etc. for each type of quarter, Cable sizes, no. of wires permissible in each circuit and sub
main, meters, etc has been indicated here under.
SCALE OF ELECTRICAL FITTINGS FOR QUARTERS
Details of Points to be provided in each type of quarter
Type of
Qtr.
I
II
III
IV

No. of
Points

LP

Tube

Total

FP

PP 5A PP 15A Call Bell Ex. Fan

Geyser

AC (32A)

Total
Points

14

16

10

20

11

16

31

15

21

43

Page 4 of 40

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
Sizes of single core (copper conductor) cable for point wiring, circuit wiring and sub main wiring, circuits, distribution board/s, etc.
for Qrs.
Nos. of points and size of wiring cables
Nos. of circuits and size of wiring
Size of Sub main wiring
cables
cable

Size of point wiring cable


(copper conductor)
LP TLP FP CBP EFP PP5A PP
15A

Size of circuit wiring cable


(copper conductor)

GP

PP32A For L&F For 5A For


(ACP)
Plug
15A.
Plug

For
32A.
AC

For L & F Load

For
load

Power

For geyser

Phases
and
neutral

1.5 sq.mm

2.5s
q.
mm

4sq
mm

6sq
mm

6sq
mm

2.5 sq. 4sq.


mm
mm

4sq.
mm

6sq.
mm

6 sq.mm

4 sq mm

10 sq mm

Continuo
us earth

1.5 sq.mm

2.5s
q
mm

4
sq
mm

6
sq
mm

6sq
mm

2.5sq
mm

4 sq 6sq
mm
mm

6 sq.mm

4 sq mm

10 sq mm

4sq
mm

Page 5 of 40

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Nos. of points

Type of
Quarter

Nos. of circuits

Single phase Double


Door Distribution board
(4 incomer +8 outgoing)

LP TL FP CBP EFP PP5A PP GP PP32A For For 5A For 15A. For 32A For Total
P
15A
(ACP) Lights Plug
Plug
AC geyser Ckt.
Qty
Fans &
call bell

2 2

1 No.

II

2 2

1 No.

III

3 3

1 No.

Earth Electrode
Details

Incoming MCB (a) Single unit


DP-20 Amp with Quarter - 1 No
RCCB 100 mA
and O/G --- 6- (b) two units
16amps. MCB Quarter - 1 No,
SP -5 Nos.
Incoming MCB
(c)Three/four
DP-20 Amp with units
RCCB 100 mA
quarter - 2 Nos.
and O/G --- 616amps. MCB
SP -6 Nos
I/C MCB DP-20
Amp with RCCB
100 mA and
O/G --- 616amps. MCB
SP - 8 Nos.

Page 6 of 40

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

1
IV

11

15

6 5

12

18

I/C MCB DP32Amp with


1 No.
RCCB 100 mA
( for
and Outgoing
L&F)
- (i) MCB SP 616amps ---6
Nos,
I/C MCB DP32Amp with
RCCB 100 mA
and Outgoing
1 No.
- (i) MCB SP
( for
16amps ---4
Nos,(PP15A)
power
(ii) MCB SP 20
circuit)
amps -- 1
No.(Geyser)
(iii) MCB SP 32
amps -- 1
No(AC/WC)
1no.(for I/C MCB SPNL&F)
32Amp with
RCCB 100mA
and Outgoing
(i) MCB SP 616 amps 12
Nos,
1.No.
I/C MCB TPN(for
40 Amp with
Power
RCCB 100 MA
circuits) mA and
Outgoing (i)
MCB SP

One Number for


each quarter

Two Numbers
for each quarter

Page 7 of 40

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
16amps -6 nos,
(PP15A) (ii)
MCB SP 20
amps 2 nos
(Geyser) (iii)
MCB SP 32
amps 2 No
(AC)
Abbreviations
LP

Light point with 18 watt CFL

PP5A

Light plug point complete with socket and switch

TLP

Tube light point with 1x28 watt T-5 Luminary and T-5 lamp

PP15A

Power plug point complete with socket and switch

FP

Ceiling Fan point with 1200/1400 mm fan with 300 watts PP32A
electronic regulator
(ACP)

Air Conditioner point with Industrial type iron clad plug


32 amps & 20A DP MCB in metal clad box

CBP

Call bell point with ding dong type call bell

Geyser point with 25 liters storage geyser

EFP

Exhaust fan point with 300 mm Exhaust fan

GP

Details of Meter board


(A) Electronic Energy Meter with LCD display and outgoing MCB for quarters
Type of Qtr

Block of one unit


Meter

1 No.

Outgoing DP
MCB
1 No.

II
III

1 No.
1 No.

1 No.
1 No.

Block of two units


Meter
2 Nos.

Outgoing
DP MCB
2 Nos.

2 Nos.
2 Nos.

2 Nos.
2 Nos.

Block of three units


Meter
3 Nos.

Outgoing DP
MCB
3 Nos.

3 Nos.
3 Nos.

3 Nos.
3 Nos.

Block of four units


Meter

Capacity
Meter

DP MCB

4 Nos.

Outgoing
DP MCB
4 Nos.

10-40 A

20 A

4 Nos.
4 Nos.

4 Nos.
4 Nos.

10-40 A
10-40 A

20 A
20 A
Page 8 of 40

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
IV

1 No.

1 No.

2 Nos.

2 Nos.

3 Nos.

3 Nos.

4 Nos.

4 Nos.

10-40 A

40 A

1 No.

1 No.

2 Nos.

2 Nos.

3 Nos.

3 Nos.

4 Nos.

4 Nos.

10-40 A single
phase (for
L&F)
10-40 A, 3
Phase (for Power
load)

40 A

40 A TPN
Note: - Outgoing MCB and meter for individual unit shall be housed in separate chamber .Sealing arrangement for individual unit shall be made.
(B). Incoming MCBs in meter Boards (in separate chamber for each unit)
Qtr

Block of one
unit

Type Rating MCB

Block of two
units
Rating MCB

Block of three
units

Block of four units

Bus bar chamber

Rating

MCB

Rating

DP MCB

Copper Bus bars

Type

32 A

DP

40 A

DP

63 A

DP

63 A

DP

100A

Double door

II

32 A

DP

40 A

DP

63 A

DP

63 A

DP

100A

Double door

III

32 A

DP

40 A

DP

63 A

DP

63 A

DP

100A

Double door

IV

40 A

DP

63 A

DP

63 A

TPN

63A

TPN

100A

Double door

40 A

TPN

63 A

TPN

100 A

TPN

100A

TPN

200A

Double door

Note: - Bus bar chamber required only beyond two units quarter block.

Page 9 of 40

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

ITEM NO: 33002: ELECTRIFICATION OF GATE MAN LODGE AT LEVEL CROSSING


(a) The item price includes cost of labour & all materials required to electrify the gate man lodge in all respect complete with ceiling fans,
luminary with lamps and other items indicated in scale of fittings including cost of wiring cables (sizes indicated for point wiring, circuit wiring),
PVC conduits with accessories, junction boxes, switches, metal boxes, lamp holders and ceiling roses, phenolic laminated sheet covers, pre
wired sub distribution board, earth electrodes etc.
(b) Scale of fittings, wiring points, fans, luminary etc. and Cable sizes, no. of wires permissible in each circuit and sub main, etc has been
indicated below.
(c) Payment for providing bracket on wall is included under item for GI pipe and shall be made on measurement of length basis.
SCALE OF ELECTRICAL FITTINGS
Details of
Points
Quantity

LP

TLP (T-5)

FP

STL

PP5A

Total Points

DB

EE

2 No.

2 No.

1No.

1No.

1No.

7 Nos.

1No.

1No.

Abbreviations
LP

Light point with 18 watt CFL

STL

FP

Ceiling Fan point with 1200 mm D B


fan & 300watt stepped type
Electronic regulator

TLP T-5

light point with 1x28 watt EE


surface type(metal sheet) T-5
luminary with lamp

PP5A

Light plug point complete with


socket and switch

light point with 1x28 watt street light (aluminium sheet) T-5
luminary with lamp and G.I.pipe bracket grouted on wall
Pre wired Distribution board comprising of following: Incoming DP MCB32A with 100mA RCCB --- 1No.
Outgoing SP MCB 6-16A 4Nos.
100A copper bus bars
G.I.pipe earth electrode

Page 10 of 40

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
Sizes of single core (copper conductor) cable for point wiring, circuit wiring,

Size of
circuit
wiring
cable

Size of point wiring cable

LP

T-5

Phases
1.5 sq.mm
and neutral
Continuous
earth
1.5 sq.mm

FP

STL

PP5A

Nos. of circuits

LP, FP & PP5A

STL

1 No.

1 No.

2.5 sq.mm

2.5 sq.mm

ITEM NO.33003: ELECTRIFICATION OF SERVICE BUILDINGS &PASSENGER SHELTER AND SHEDS


a) The item price includes cost of labour & all materials required to electrify the buildings in all respects in surface/recess (excluding supply and
erection of fans, luminaries, air conditioners, water coolers, geyser which are covered elsewhere under BOQ). The cost includes wiring cables
(sizes indicated for point wiring, circuit wiring and sub main wirings), PVC conduits with accessories, junction boxes, modular switches, metal
boxes, lamp holders and ceiling roses, modular plates sub distribution boards, distribution boards and earth electrodes etc.
b)
c)

Service buildings shall also include buildings at isolated locations such as relay huts at level crossings etc.
Wiring for essential and non essential load and their control shall be carried out separately at station buildings and other locations as
required.

Page 11 of 40

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
d)

The payment for provision of industrial type iron clad plug socket with 32A DP MCB in M.S.Box [Item 33003(iii)] shall be paid in addition to
one power point work covered under 33003(ii).

NOTES: i)

Earth Electrode shall be provided for each building as per IE rules.

ii)

Single phase distribution system is permitted up to 10 KW load calculated on the basis of load of points as indicated here under.

iii)

Three phase distribution system shall be carried out for the buildings having load above 10 KW calculated on the basis of load of
points as indicated here under.

iv) Separate SDBs shall be provided for L&F and Power loads as per site requirements.
v)

Each SDB shall be provided with RCCB 100 mA with incoming DP MCB.

vi) Each Distribution Board and Sub Distribution board shall be designed based on the requirement of load as per site conditions and
considering 25% additional circuits (minimum- 1 No.) as spare (MCB) on outgoing and minimum 50% additional load on Incoming
(for future requirements)
vii) Approval for design shall be obtained from the Engineer, prior to ordering boards on the basis of sample calculation for assessment
of electrical load, circuits and wattage of points as indicated below.

Page 12 of 40

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

A) Sample Calculation for Assessment of Electrical load, Circuits and wattage of points
A-1) Wattage of points
Light Point /Call Bell
point

60 Watts.

Ceiling
Fan Point

100
Watts.

Exh. Fan
Point

200 watts

Light Plug
point

Power plug
point

5A

15A

100 Watts

500 Watts

Geyser

PP 32A

Air Conditioner Point /Water Cooler

Point

1500 Watts

2000 Watts

Page 13 of 40

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

A-2) Sample Calculation for Assessment of Electrical load and Circuits:Building with load as detailed here under
LIGHT & FAN CIRCUIT

Wattage of points
No. of points
Total watts
Total Load
Nos. of points
permitted in a
circuit
No. of circuits
Total circuits

POWER CIRCUIT

Light Point
/Call Bell
point

Ceiling
Exh. Fan
Fan Point
Point

Light Plug
point
5A

60 Watts.

100 Watts 200 watts

100 Watts

500 Watts

1500 Watts

2000 Watts

25
1500

10
4
1000
800
3800 watts

5
500

4
2000

1
1500

2
4000

3 Nos

1 No

1 No

2 Circuits

4 Circuits

1 Circuit

8 Nos

5 Circuits

Geyser
Point

PP 32A
Air Conditioner Point
/Water Cooler

7500 watts

7 Circuits

Sub Distribution Incoming 40 A DP MCB with RCCB --- 1 No


Outgoing SP MCB 6--16amps9 Nos (including
Board
spares)

Distribution Board

Power plug
point
15A

1 No

2 Circuits
7 Circuits

Incoming 63 A DP MCB with RCCB1 No,


Outgoing (including spares)
(i) SP MCB 32A -- 3 Nos for (AC/WC)
(ii) SP MCB 20A 2 Nos. For Geyser
(iii) SP MCB 16A 5 Nos. for 15A plugs
Incoming 63 A TPN MCB --- 1 No
Outgoing (including spares)
DP MCB 63 amps --2 Nos
DP MCB 40 amps -- 2 Nos
Page 14 of 40

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

A-3) Size/s of single core (copper conductor) cable for point wiring, circuit wiring and sub main wiring, circuits, Sub Distribution Board/s,
etc.for buildings, offices etc.

Nos. of points and size of wiring


cables
Size of point wiring cables
Light
Point/Fan Group
Point/Call point PP
GP
Bell point/ wiring/ 15A
PP5A
5A
etc.
wiring
Phase/s
and neutral

1.5
sq.mm

2.5
sq.
mm

1.5 sq.
mm

2.5
sq.
mm

PP32
A
(ACP/
WC)

4
6
6sq
sq
sq.
mm
mm mm

4
6
sq
sq.
mm mm

Minimu
m size
of main
wiring
cable

G.I.pipe
Earth
Electrode

Size of circuit wiring cables

6sq
mm
continuous
earth

Nos. of circuits and size of


wiring cables

Minimum
size of
Sub main
wiring
cable

For
L&F
and
5A Plug

For
For
For
32A.
10
15A.
Geyser (AC/WC sq.mm
Plug
etc)

2.5
sq.mm

4
4 sq.
sq.
mm
mm

6 sq.
mm

10 sq.
mm

2.5 sq.
mm

16
sq.mm

16 sq.
Mm

16 sq.
mm
4
4 sq.
sq.
mm
mm

6 sq.
mm

10 sq.
mm

(i)
One No. for
Each single Phase
SDB/DB
(ii) two Nos. for each
three phase SDB/DB

Page 15 of 40

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Nos. of points
No.of circuits permited in a
permitted in a circuit
Distribution Board
Light
Point/Fan
PP32A For L&F
For
For 32A
Point/Call
PP
For
PP5A
GP (ACP/ and 5A
15 A
(AC/WC
Bell point/
15A
Geyeser
WC) plug
plug
etc)
PP5A
etc.
8 Nos.

4 Nos 1 No 1 No 1 No

12 Nos.

12 Nos

10
sq.mm

16
sq.mm

Abbreviations
LP

Light point

PP5A

Light plug point complete with socket and switch

FP

Ceiling Fan point.

PP15A

Power plug point complete with socket and switch

CBP

Call bell point

PP32A
Air Conditioner/Water cooler point with Industrial type iron clad plug
(ACP/WC) 32 amps & 20A DP MCB in metal clad box

EFP

Exhaust fan point

GP

Geyser point

Page 16 of 40

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

ITEM NO 33004: DELETED


ITEM NO 33005: Supply, installation, testing and commissioning of prewired T-5, energy efficient luminaries.
The item price includes labour & cost of all materials including cost of luminary complete with accessories, T-5 tube, FR PVC
insulated multistranded single core copper conductor cable, earthing etc. Requirements of this item shall be as per technical
details furnished here under and as per instructions of Engineer.
Installation of luminary on wall/ceiling Luminary shall be fixed properly on ceiling or on the wall with wooden/ roll plugs and
screws.
Installation of luminary on Passenger shelter/sheds -Luminary shall be fixed with structure of shed with 2 No clamps of
GI.strips of 25x1.6mm and nut & bolts,
33005(i) Fitting & arrangement shall be similar to Havell's Cat. Ref. No.LHIT12128032 complete with electronic ballast, T-5 tube.
& earthing etc. as required.
33005(ii) Fitting & arrangement shall be similar to Havell's Cat. Ref. No.LHIT11228033 complete with electronic ballast, T-5 tube
& earthing etc. as required.

ITEM NO.33006: Supply, installation, testing and commissioning of street light luminary with prewired T-5
energy efficient tubes.
The item price includes labour & cost of all materials including cost of FR PVC insulated multistranded single core copper
conductor cable, earthing etc. Luminary shall be provided on the bracket of pole / on wall / as required. For provision of luminary
on wall, G.I.Pipe bracket is payable under G.I.Pipe item on measurement of length basis. It also includes
33006 (i): Fitting & arrangement shall be similar to Havell's Cat. Ref. No. LHRT05228033, complete with T-5 tubes, electronic
ballast etc.
33006 (ii): Fitting & arrangement shall be similar to Havell's Cat. Ref. No. LHRT05128032, complete with T-5 tubes, electronic
ballast etc.
33006 (iii): Fitting & arrangement shall be similar to Havell's Cat. Ref. No. LHRT15214040, complete with T-5 tubes, electronic
ballast etc.
Page 17 of 40

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
33006 (iv): Fitting & arrangement shall be similar to Havell's Cat. Ref. No. LHRT18414040, complete with T-5 tubes, electronic
ballast etc.
33006 (v): Fitting & arrangement shall be similar to Havell's Cat. Ref. No. LHRT18424034, complete with T-5 tubes, electronic
ballast etc. OR similar to Bajaj Cat Ref No BGEST 85 RF CFL FG E40 complete with 85W CFL as required by Railway.
CFL luminary shall be Integral, powder coated die-cast aluminium housing, pot optics reflector with full glass cover, accessories
complete.

ITEM NO.33007: Supply, installation, testing and commissioning of Metal Halide/HPSV Street light luminary
with lamp.
The item price includes labour & cost of all materials including cost of Metal halide/HPSV street light luminary complete with
lamp, FR PVC insulated multistranded single core copper conductor cable earthing etc.
Luminary shall be provided on the bracket of pole / on wall / as required. For provision of luminary on wall, G.I.Pipe bracket is
payable under G.I.Pipe item on measurement of length basis.
33007(i) Fitting & arrangement shall be similar to Crompton cat. ref MHSGN1107IH.
33007(i) Fitting & arrangement shall be similar to Crompton cat. ref MHSG2115IH/FG.

ITEM NO 33008: Supply, installation, testing and commissioning of A.C. ceiling fan. (Without Regulator)
The item price includes supply & erection cost of all materials including cost of 230V A.C. ceiling fan having 3/4 blades, double
ball bearing, copper wound motor, suitably sized down rod, canopies and capacitor etc complete with all accessories including
fixing phenolic laminated sheet cover on the fan box, FR PVC insulated multistranded single/three core copper conductor cable
wiring and connecting with earthing system etc. Fan should have ISI mark and as per IS-374/1979, min 3 star energy rating
issued by BEE.
Fan point wiring is covered under item 33003.

Page 18 of 40

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

ITEM NO 33009: Supply, installation, testing and commissioning of stepped type, electronic fan regulator on
the existing phenolic laminated sheet.
The item price includes labour & cost of all materials including cost of stepped type, electronic regulator 300W and connecting
cables etc.

ITEM NO 33010: Supplying, installation, testing and commissioning of 11-23 watts, compact fluorescent lamp
complete with electronic ballast
The item price includes labour & cost of all materials including cost of compact fluorescent lamp of suitable wattage complete
with electronic ballast of approved make etc as advised by Engineer.

ITEM NO 33011: Supplying, installation, testing and commissioning of Exhaust fan


The item price includes labour & cost of all materials including cost of Exhaust fan (ISI marked, as per IS-2312), min 3 star
energy rating issued by BEE(if available in Indian market), grouting bolts & nuts, FR PVC insulated multistranded single core
copper conductor cable, connection to earthing system and making opening in the wall/modifications as required. The exhaust
fan should be preferably with louvers if available in Indian market.

ITEM NO 33012: Supply, installation, testing and commissioning of stationary vertical storage type drinking
water cooler complete with Supply and installation of Auto Voltage Corrector.
The item price includes labour & cost of self contained drinking water cooler 150 liters capacity (cooling capacity 150 Lts. per
hour) water cooler [conforming to IS-1475 (part-1)/2001, ISI marked, min 3 star rated], suitable for operation on 230 volts+/-10%,
50Hz, AC supply system complete with all connected standard fittings, accessories etc. and 5KVA , wall mounted, I.C. controlled
electronic auto-voltage corrector conforming to relevant IS (latest version), suitable for operation on single phase 180 to 260
volts, 50Hz incoming AC supply and output 200 to 230 volts A.C. supply, complete with time delay relay, voltmeter, instant start
provision with push button switch, connection to earthing system etc as required.

Page 19 of 40

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

ITEM NO 33013 (a), (b):Supplying, installation, testing and commissioning of LT Switch Boards different
capacities
The item price includes labour & cost of all materials including cost of LT switch board, connection of cables for incoming and
outgoing etc. LT switch board shall be cubical type, wall mounted, dust & vermin proof, conforming to IS:8623 (latest version). LT
switch board shall be suitable for operation on 3 phase, 4 wire, 415 volt, AC supply system, fabricated with 16 SWG M.S. sheet,
powder coated and complete with inter connections, instrument connections with copper conductor cable, copper bus bars
200/250 amps. (as per capacity of switch board 63/125A), CT's, voltmeter, ammeter, LED type indication lights, cable glands,
earthing studs etc.

ITEM NO.33014: DELETED


ITEM NO.33015 (i),(ii) & (iii):Supply, installation, testing and commissioning of L.T. Feeder pillars of different
capacities
The item price includes labour & cost of all materials including cost of L.T. Feeder pillar, construction of brick masonry platform
450 mm high, inter connections, connection of cables for incoming and outgoing etc. L.T. feeder pillar shall be weather proof
(degree of protection not less than IP54), fabricated with 2 mm thick CRCA sheet, conforming to IS:8623 (latest version), powder
coated, suitable for operation on 3 phase, 4 wire, 415 volt, AC supply system., copper bus bars of 200/250/400 amps (as per
capacity of feeder pillar 63/125/250A), LED type indication lights, cable glands, earthing studs etc.

ITEM NO.33016: DELETED


ITEM NO 33017 (i), (ii), (iii): Supply and erection of different length Tubular pole with Junction box etc.
The item price includes labour & cost of all materials including cost of swaged type steel Tubular pole 7/9 meters long conforming
to IS-2713 /Part I to III/1980 (latest version) (designation 410 SP 3/ 410 SP - 30), canopy type with suitable length and diameter
brackets, Junction box, erection of pole, casting of foundation, muffing and painting of pole, connection to the earthing system
etc.
Entire Work shall be in conformity with IS 2713/Part 1-3 and specifications of RVNL.
Page 20 of 40

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

ITEM NO.33018: DELETED


ITEM NO.33019: Supply and erection of classB G.I.Pipe with bends, accessories etc.
The item price includes labour & cost of cost of G.I.Pipe class' B', ISI marked with bends, accessories etc.

ITEM NO.33020: Supply, installation, testing and commissioning of automatic changeover panel complete.
The item price includes labour & cost of all materials including cost of automatic changeover panel complete as per RDSO
specification No.TI/SPC/PSI/CLS/0023 with amendment No.3 dated 21.03.07 or latest, connections as required.
Note: Make of panel shall be on the approved list of manufacturers issued by RDSO/Lucknow.

ITEM NO.33021: ELECTRIFICATION OF FOB


The item price includes labour & cost of all materials required to electrify the FOB complete with G.I.pipe pole with bracket of
suitable length and diameter, luminary with lamp, suitable connection to the earth with GI wire M.S. junction box, connection with
1.5 sq.mm, FR PVC insulated, single core, copper conductor cable etc. Pole shall be clamped with FOB structure with clamps
manufactured with galvanized MS flat 50x50x6mm, Nut & bolts 16 mm dia at not less than two locations.
Junction box shall be Double door, weather proof (degree of protection not less than IP 54) complete with MCB 6 amps, copper
bus bars 100A for looping 4 core 3 nos. LT cables , as required. Payment for Earthing shall be covered under relevant BOQ Item.
The price includes following scale of fittings:
SCALE OF FITTINGS
Details

Quantity

Bclass, ISI marked 50mm dia ,3.5


meters long G.I.pipe pole complete
with bracket

G.I.Flat clamp of
50x50x6mm with G.I.bolts &
nuts etc

STL

Jn. box

EE

1No.

2 Nos.

1No.

1No.

1No.

Page 21 of 40

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
Abbreviations
STL

2X24W street light T5 luminary complete with T5 tube OR CFL fitting with CFL. Luminary shall be powder
coated die-cast aluminium housing, pot optics reflector with full glass cover, accessories for 85W CFL
similar to Bajaj Cat Ref No BGEST 85 RF CFL FG E40 as required by Railway.

Jn. Box

M.S. junction box (1-phase 230 volts) complete with wiring including following:-

EE

MCB SP 6 A
4 Nos. 100A copper bus bars for looping 3 cables
Connection to earthing system with GI wire

ITEM NO.33022: Supply, installation, testing and commissioning of 100/250/500 KVA Power Distribution
Transformer, fencing and foundation
The item price includes labour & cost of all materials including cost of Transformer, erection testing and commissioning as p er
standard code of practice.
Extra payment shall be made for construction of foundation for transformer, providing fencing enclosure and Iron Gate (if
directed by the employer).
Requirements shall be as per details given here under:(i) Foundation
M10 grade cement concrete foundation shall be constructed with 20 mm coarse aggregate The size of foundation shall be as
per approved drawing based on size of transformer but shall not be less than 2 x1.5 mt (Length x breadth) and 600mm above
ground level duly plastered and finished surface. Curing shall be done as per code applicable. Excavation shall be done
complying with Code of Safety as per IS 3764/1992(Latest Version).

Page 22 of 40

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
(ii) Fencing
Fabrication of enclosure for housing transformer shall be made in rectangular formation as required with M.S. Angle iron
50x50x8mm spaced at about 2 meters and 12 SWG GI wire mesh GI wire shall be cut according to size and welded with the
angle frame. MS strip not less than 15x3mm size shall be provided and welded above GI wire along the angle frame to hold the
GI wire mesh. Height of enclosure shall be 2 meter above ground level. The portion of MS angle to be grouted in foundation
shall be 500mm.
The fencing panels shall be erected on foundation constructed of size 200mmx200mmx500mm deep with cement, & concrete of
M10 grade.
(iii ) Iron Gate
Iron gate shall be fabricated with 50mm x 50mm x 8mm MS angle iron frame with iron grill etc.as approved. The size of the gate
shall be 2mt (height) x 3.5mt (width ) and fabricated in two parts of 1.75 mt each. Gate shall be provided with sliding Lockable
bolt with Pad lock.
Gate shall be fixed on channels of size not less than100x50mm, weighing 7.90 Kg per meter with bolts & Nuts and welded.
Channels shall be erected on foundation constructed of size 300mmx300mmx500mm deep with cement, concrete M10 grade
Complete enclosure including Gate and angles (except galvanized portion) shall be painted with approved shade enamel paint
over two coats of red oxide primer.
Installation shall be as per IS 10028 (Pt. II/1981) Latest Version.
Drawing of the enclosure with Iron Gate etc. shall be got approved from the Engineer.

ITEM NO.33023: Supply, installation, testing and commissioning of 3 pole 11 KV, 400 amps Gang Operated
Switch complete with drop out fuses etc.
The item price includes labour & cost of all materials including cost of 3 poles 11 KV, 400amps. Gang Operated Switch complete
with drop out fuses, operation system, clamps, connections with ACSR conductor, sleeves, etc. as required. All the materials
used for manufacturing Gang Operated Switch shall conform to IS-2544, IS-5340 (Part-III) and IS-9921 (Part-I to V).

ITEM NO.33024: Supply, installation, testing and commissioning of 11 KV 3 Panel HT Vacuum Circuit Breaker
board and end termination etc.
Page 23 of 40

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
The item price includes labour & cost of all material including cost of 11 KV 3 Panel (one incoming and two outgoings) HT
VCB board, conforming to IS:13118/1991 & IS:3427/97, erection, testing, commissioning as per RVNL specifications. VCB panel
shall be 11kV, 350MVA, 630 Amps, draw out type, manually operated, 3 panel HT VCB board comprising of 1 No. Incoming: 3
Pole, Vacuum Circuit Breaker complete with PT, relays, electronic metering devices including ammeter, voltmeter, frequency
meter, power factor meter and trivector meter (with 30 minutes integration) for maximum demand indicator of suitable range for
unbalanced loads, clustered LED type indication lights, double ratio copper wound current transformer (ratio 80/40/5A -- for
500KVA & 60/30/5A for 250 KVA) and 2 Nos. Outgoing: 3 Pole, Vacuum Circuit Breaker complete with relays, Digital Ammeter,
LED type Indication light, double ratio copper wound current transformer ( ratio 60/30/5A -- for 500KVA & 30/15/5A for 250 KVA)
complete.

ITEM NO.33025 & 33026: Supply, installation, testing and commissioning of LT Switch board.
The item price includes labour & cost of all material including cost of LT Switch board, erection, connections of cables, testing,
and commissioning etc. as per RVNL specifications. LT panel shall be cubical type, floor mounted, dust & vermin proof, multi-tier
construction, fabricated with 2mm thick CRCA sheet with base MS channel 100x50x7.5mm (nominal size), and powder coated.
The LT switchboard shall conform to IS:8623 (latest version) and shall be suitable for operation on 3 phase, 4 wire, 415 volt, AC
supply system. The switch board shall be complete with inter connections, instrument connections with copper conductor cable,
copper bus bars, front operated switchgears, selector switches, ammeter, voltmeter etc. on each incoming and ammeter on each
outgoing with LED type indication lights, cable glands, earthing studs etc. Each panel shall be in segregated compartment.

ITEM NO.33027 : DELETED


ITEM NO.33028 : DELETED
ITEM NO.33029: Supply, installation, testing and commissioning of safety items in the substation.
The item price shall cover cost of fire extinguishing equipments (ISI marked), Rubber mat (ISI marked), GI fire buckets filled with
dry sand held on free standing steel stand, First aid box with medicines (ISI marked) and associated materials, Shock treatment
chart suitably laminated on aluminium frame, schematic diagram of HT & LT installation & transformer data on white hylem sheet
with aluminium frame & fixing/providing in the sub-station area as directed by Engineer-in-charge of the work at site.

Page 24 of 40

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Stand for holding of fire buckets shall be free standing, manufactured with MS angle frame 50x50x6mm with base angle frame ,
shade and hanging arrangements for buckets as per approved drawing.
Details of items are as under:
i) Fire extinguisher, dry chemical powder type (ISI marked) suitable for electric fire,10kg capacity - 2 Nos
ii) Rubber mat (ISI marked) non-skid type suitable for 11kV AC supply of size 3600x1000x25mm - 2 nos

iii) 6 nos. GI fire buckets of 10 Ltrs. capacity (24 gauge) duly fitted on MS angle 50x50x6mm stand, shade and filled
with clean dry ordinary sand -1set
iv) First Aid Box (ISI marked) complete with medicines of approved make - 1 set
v) Electric shock treatment chart (large size) with aluminum frame and laminated as approved. - 2 Nos.
vi) 11kV/415 Volt danger plates conforming to relevant IS. - 8 Nos.
vii) Schematic diagram of HT/LT installation on white hylem sheet with aluminium frame of size 1200x600 mm.
computer printed and suitably laminated - 1 No.
viii) Data of transformer on white hylum sheet with aluminum frame of size 900x600mm. - 2 Nos

ITEM NO. 33030: Supply, installation, testing & commissioning of DG set with acoustic enclosure with all
other accessories etc.
The item price includes labour & cost of all materials including cost of DG set with acoustic enclosure , AMF panel and all other
accessories, construction of plinth with materials as per OEM recommendations and approved drawing, first filling of lubricating
oil, supply of High speed Diesel oil required for testing, commissioning at site etc as per details given in RVNL specifications. DG
set shall be complete with diesel engine, copper wound alternator, battery set, anti-vibration pads, fuel tank and all other
Page 25 of 40

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

accessories/equipments/protective devices etc and AMF control panel conforming to relevant IS, fabricated with CRCA, 16 SWG
sheet, powder coated and comprising of incoming 4 pole, MCCB 50kA, copper bus-bars, 4 pole, heavy duty contactors,
multifunction panel meter for display of current and voltage on phases and lines, power factor, frequency, kWH, MD etc, LED
indications lights including connections with single core 1.1 kV grade LT XLPE insulated copper conductor control cable
between LT panel, AMF panel and alternator for auto and manual operation etc.

ITEM NO. 33031: Supply, installation, testing and commissioning of 125 KVAR APFC Panel.
The item price includes Supply, erection, testing & commissioning of 125 kVAR (10x12.5) Automatic Power Factor Controller
panel (capacitor bank) complete with low loss capacitors similar to MD-XL type of L&T make, 250 amp MCCB incomer
(Ics=100%Icu), with auto and manual option, suitable for 3 phase, 415 Volt, 50 Hz AC supply & switching ratio1:2:3:4, conforming
to relevant IS (latest version). APFC Panel shall be similar to L&T make cat.ref.A1256A10CMM. APFC panel shall be connected
with the main panel as per site requirement.
Cable for providing connections are payable under relevant BOQ item.

ITEM NO.33032: Earthing with 3 meter long, 50 mm dia G.I. Pipe class 'B' earthing electrode:
The item price includes labour & cost of all materials including cost of GI pipe, masonry enclosure, cover plate with lifting handle,
charcoal/coke and salt, etc.
Earthing shall be in conformity to IS 3043/1987 (Latest Version) and as per approved drawing. Excavation shall be done
complying with Code of Safety as per IS 3764/1992(Latest Version). Earth resistance shall not be greater than 5 ohm in normal
soil and 8 ohm in rocky area.

ITEM NO. 33033 Earthing with 600mmx600mmx6mm thick G.I. earth plate
The item price includes labour & cost of all material including cost of supply of GI earth Plate, masonry enclosure, cover plate
with lifting handle, G. I. watering pipe, charcoal or coke and salt etc.The price shall also cover erection including digging of
earth pit in any kind of soil at the specified location. The work shall also cover the earth treated to obtain earth resistan ce of less
than 1 ohm. Connection of earth electrode should be made by providing GI clamps nuts, bolts.

Page 26 of 40

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
Work shall be in conformity to IS 3043/1987 (Latest Version) and as per approved drawing. Excavation shall be done complying
with Code of Safety as per IS 3764/1992. Earth resistance shall not be greater than 1 ohm in normal soil and 2 ohm in rocky
area.
Payment of G.I.strips to be laid for connections are payable under relevant BOQ item

ITEM NO. 33034 : Earthing with 600mmx600mmx3mm thick copper plate earth plate
The item price includes labour & cost of all material including cost of supply of copper earth Plate, masonry enclosure, cover
plate with lifting handle, G. I. watering pipe, charcoal or coke and salt etc. The price shall also cover erection including digging
of earth pit in any kind of soil at the specified location. The work shall also cover the earth treated to obtain earth resistance of
less than 1 ohm. Connection of earth electrode should be made by providing cadmium plated brass bolts & nuts. Earth resistance
shall not be greater than 1 ohm in normal soil and 2 ohm in rocky area.
Work shall be in conformity to IS 3043/1987 (Latest Version) and as per approved drawing. Excavation shall be done complying
with Code of Safety as per IS 3764/1992
Payment of copper strips to be laid for connections are payable under relevant BOQ item.

ITEM NO. 33035 (i&ii): Supply and laying of G.I. strip below ground or surface/in recess.
The item price includes labour & cost of all materials including cost of G.I. strip on surface or recess or digging in ground/making
chase in wall/floor and making good the damages, connections including soldering/riveting etc as required.

ITEM NO. 33035 (iii): Supply and laying copper strip on surface or in recess or in 50 mm dia G.I. pipe
The item price includes labour & cost of all materials including cost of copper strip on surface or recess or digging in ground 0.50
meter below ground/ making suitable holding arrangements on transformer /D.G. Set end, making good the damages,
Connections of strip including soldering/riveting etc as required.
Rates for G.I.pipe are payable separately under relevant BOQ item.

Page 27 of 40

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

ITEM NO.33036: Supply, laying, testing and commissioning of LT cable.


The item price includes labour & cost of all material including cost of LT XLPE cable conforming to IS:7098/Pt I (latest version),
bricks, sand, cement, termination lugs/crimping socket, supply and erection of cable route markers of size not less than
200x150x5mm thick M.S.Plate and bolted to 40x40x6mm M.S angle iron of suitable length to hold the laid cable including fixing.
Inscription on the plate shall be as specified in RVNL tech. spec. Cable markers shall be provided as instructed by Engineer at
not more than 50 m interval and at locations where cable route is changing or cable joint provided.
In substation area, laying of cable includes construction of suitable trench. Trench shall be filled with dry sand up to 300 mm
above the cable after it is laid. U frame shall be manufactured with MS angle 50x50x6mm & grouted vertical in floor for holding
cable on transformer end. Cable shall be held vertical with clamps of MS flat 50x6mm at two places on frame on transformer and
panel side. Painting of U frame and clamps shall be done with approved shade paint. Cables shall be terminated with LT panel &
on the transformer side with aluminium crimping sockets & tested and commissioned as required.
Rates for RCC/G.I/HDPE pipe are payable separately under relevant BOQ item.

ITEM NO.33037 (I & II) : Supply and erection of high mast system complete with accessories,
The item price includes labour & cost of Supply, erection, testing & commissioning of hot dipped galvanised (inside & outside),
16m high mast system (in two sections), complete with accessories, foundation bolts with nuts, washers, anchor plates &
templates etc. manufactured from special steel, head frame, 2-point suspension system with steel wire rope 6mm dia (7/19
construction), double drum winch, galvanised lantern carriage arrangement suitable for 9 luminaries symmetrically arranged &
control gear boxes and lighting finial etc. The mast shall have integral type power tool at the base compartment for its rais ing and
lowering operation, twin dome aviation obstruction lights with 100 watt lamp, control panel etc. High mast shall be supplied
complete with 2x400 watts MH luminaries (degree of protection IP-65) with control gear boxes, MH lamps, multi core flexible
copper conductor cable of suitable rating, connection with earthing system etc. as required.
Control panel shall consist of:
(a) 1X63 A TPN MCB for incoming supply
Page 28 of 40

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
(b) 3X32 A SPN MCB for outgoing (50% lighting, 100% lighting, motor)
(c) Automatic timer with contactor for controlling above lights of suitable capacity.
(d) 1 no multi plug socket 16A
High mast shall be provided with fencing panel of size 2Mx2Mx1.5M in square shape for protection of erected high mast tower
wherever required as directed by Engineer. The cost shall also include construction of foundation as per recommendation of
manufacturer and approved drawing and its fixing arrangements etc.
Note: Pipe electrode earthing is payable extra under relevant SOR.

ITEM NO 33038

(i) to (iv): Supply, laying, testing and commissioning of 33 /11 KV XLPE (E) insulated,
armoured aluminium conductor cable.

The item price includes the cost of supply of cable conforming to IS:7098/Pt.II/85 and all other materials including bricks, sand
and cement. The item price also includes laying of cable, , miscellaneous works such as digging of trench, provision of suitable
clamps as per site requirements and testing & commissioning. Laying of cable shall cover all type of pipes, horizontally or
vertically, underground, on wall or in air or under the Railway track/road. It also includes coordination for arranging shut down
from state Electricity authorities and returning/ transporting of released materials to state electricity authorities.

In substation area, laying of cable includes construction of suitable trench. Trench shall be filled with dry sand up to 300 mm
above cable after laying. U frame shall be manufactured with MS angle 50x50x6mm & grouted vertical in floor for holding cab le
on transformer and HT panel end. Cable shall be held vertical with clamps of MS flat 50x6mm at two places on frame on
transformer and panel side. Painting of U frames and clamps shall be done with approved shade paint.
The cable shall be laid as per RVNLs technical specifications.
The cost of GI/RCC/HDPE pipe and cable route markers is payable under separate BOQ items.

ITEM NO.33039 : DELETED


ITEM NO. 33040 : Supply, termination, testing & commissioning of 33 KV/11KV outdoor types, heat shrinkable
end termination kit.
The item price includes labour & cost of all materials including cost of 33KV/11KV outdoor type, heat shrinkable end termination
kit, making termination and connecting to the overhead lines.

ITEM NO.33041 : DELETED


Page 29 of 40

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

ITEM NO 33042: Supplying and erection of pre-stressed, cement concrete (PSCC) double pole structure 9-11
meters long complete with galvanized stay set, anti climbing devices and fixing of Danger
plates on the erected pole.
The item price includes coordination with SEB/concerned authorities, labour & cost of all materials including cost of prestressed, cement concrete (PSCC)/RSJ (As per site requirement) double pole structure(H-pole) 9-11 meters long, 4 nos. channel
cross arms & 2 nos cross bracing angles, clamps, bolts, nuts etc. including erection, casting of foundation , muffing etc. The item
price also includes supply and erection of galvanized stay set with 19/20 mm dia x1.8 meters long stay rod, anchor plate of size
45cm.x45cm x 7.5mm thick, thimble, stay clamp of galvanised MS flat 50 x 6 mm, turn buckle (20mmx600 mm), 7/4.00 mm dia G
I stay wire conforming to IS 2141-1968, 11KV strain insulators etc. including digging of pit, casting of foundation for poles & stays
with cement, concrete M10 grade and refilling, supply and erection of anti climbing devices, and danger plates on the erected
poles. Above items are for guidelines purpose. The entire work has to be done in coordination and as per standards of concern ed
State Electricity Board.

ITEM NO. 33043:Supply and erection of 11 KV Porcelain Disc insulators complete with galvanized iron
hardware etc. including terminating with 11KV/ 33 KV overhead conductors as required.
The item price includes labour & cost of all materials including cost of 11 KV porcelain Disc insulators complete with galvanized
iron hardware, terminations with overhead with PG clamps, dismantling of materials transporting and handing over to concerned
authorities wherever required, etc.

ITEM NO. 33044: (i): Supply and laying of RCC Hume pipe under the Railway track /Road.
The item price includes labour & cost of all materials including cost of RCC Hume pipe, ISI marked, NP-4 class, digging of trench,
laying of pipe and back filling of trench with excavated earth etc.
Prior to start of excavation works under track/road, proper permission shall be obtained from the concerned authorities.
Page 30 of 40

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

ITEM NO. 33044 (ii): Supply and laying RCC Hume pipe under the Railway tracks with trench less method.
The item price includes labour & cost of all material including cost of RCC Hume pipe ISI marked, NP-4 class, making trench with
trenchless method with suitable machines etc and making good the damages..
Prior to start of works, proper permission shall be obtained from the concerned authorities.
Due care should be taken to avoid damage to tracks alignment, existing cables, pipes or other such installations during
Drilling/Boring. Horizontal distance of the proposed trench from the existing and proposed electric mast shall not be less than
5.0 meters and shall be away from the track joints.

ITEM NO. 33045 (I & II):Supply, installation, testing & commissioning of Submersible pump set, control panel
etc
The item price includes labour & cost of all material including cost of Submersible pump set ISI marked and min 3 star energy
rating with control panel, cable etc suitable for supplying water at required head and discharge as per site conditions and as
directed by Engineer. The horse power of the motor is approximate. Suitable motor has to be installed keeping in view the site
conditions. However, all items required for the safe and efficient operation whether stated or not, shall be deemed to be included.
Control panel shall be wall mounted cubicle type, dust & vermin proof, suitable for operation on 415 volts AC supply system, with
degree of protection not less than IP 54, fabricated with 16SWG thick CRCA sheet steel, duly powder coated.
Details of accessories etc are as under:1

Flat, water submersible, 3 core cable of size as recommended by the


manufacturer and of the required length.

Cable ties for clamping of flat cable to pipe at every 1 mtr interval through out the
length.

Page 31 of 40

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
3

Two pairs of MS suspension clamps made of suitable size of MS flat - 1 set.

Full way valve of suitable size ISI mark - 1 No.

Pressure gauge of required capacity - 1 No.

Bore cover - 1 No.

GI bend of suitable size - as required

BCH/L&T make Cubicle type, weather proof control panel with degree of
protection not less than IP54, complete with the following :-

i)

TPN MCB 32A 10kA - 1 No.

ii)

Direct On Line starter (DOL) suitable to the above - 1 No.

iii)

Suitable pump set measurement and protection


engineer - 1 set

iv)

MINILEC current based dry run protection - 1 No.

v)

Suitable capacitors to improve PF to min 0.99.

system as approved by

ITEM NO. 33046:Co-ordination/ Liaisoning and chasing with State Electricity Board authorities for availing
New Electric Connection / augmentation of load/modification of crossings etc.
The item price includes cost for Co-ordination/Liasoning /chasing with State Electricity Board authorities for various activities
involved for availing new connections, augmentation of loads, including collection of estimates for New connections, addition al
load & crossings modifications, arranging payment from RVNL, depositing payment to SEB's authority, release of load & other
connected works etc.as required.
Note: Payments made for application forms will be reimbursed by RVNL on proof of documents.

Page 32 of 40

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

ITEM NO. 33047: Design and preparation of working & completion drawings of the installations.
The item price includes cost for design of electrical works and preparation of working & completion drawings of the installat ions
covered under general electrical services work of the complete project including internal electrification of quarters, level
crossings, station buildings, offices, buildings, Power line crossings, Power supply distribution arrangements of stations with
platform lightings, sub stations, Electrification of Sub stations building, etc as required on Auto Cad & arranging approval from
competent authority.
On award of contract, survey of all the installations (Excluding Power line crossings which are covered under other BOQ item)
shall be carried out and drawings indicating existing & proposed works, schematic layout /arrangements etc. shall be prepared on
Auto Cad based on Zonal Railways and SEBs norms & requirements and shall be got approved from the competent authorities
i.e. RVNL/Zonal Railways/SEBs etc. as required. All the drawings shall be speaking with conventional signs and symbols.
After completion of entire work, as executed drawings shall be prepared and supplied while handing over the completed works to
the Zonal Railways.
Design and Drawings will be the property of Railways.
Following drawings shall be prepared and submitted.
WORKING DRAWINGS
1

Soft Copy

One set of each drawing prepared on Autocad.

Hard Copy

Three set of each drawing of not less than A-3 size on RTF (Re-producible Tracing Film) and four
sets on paper

Page 33 of 40

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

COMPLETION DRAWINGS
1

Soft Copy

One set of each drawing prepared on Autocad.

Hard Copy

Three set of each drawing of not less than A-3 size on RTF (Re-producible Tracing Film) and four
sets on paper.

NOTES:
1) Drawing for all HT installations are to be got approved from the Chief Electrical Engineer of the zonal railway in his capacity as
Electrical Inspector to Govt.of India.
2) Drawings for LT/11kV/33kV crossings of State Utility Company, that are being modified, are to be got approved from the
concerned Utility Company, prior to taking up the work.

ITEM NO. 33048 : Conducting check survey for the existing LT, HT and EHT Power line Electrical crossings on
the section and measurements of clearances to identify modification required/not required
The item price includes cost for conducting check survey of complete section for all the existing LT, HT and EHT Power line
Electrical crossings, power lines running parallel to track from the proposed track route and requiring modification keeping in
view Regulations for Electrical crossing of Railway Track 1987 and IRSOD-2004 with latest amendments , measurements of
horizontal distances of structures (up to next two structures on each side) from the existing & proposed tracks etc, vertical
clearances of lowest conductors & guard wires from existing & proposed rail level, angle of crossings, height and type of
towers/poles, preparation of list of crossings requiring modification & list of crossings not requiring modifications etc. (Height/
clearances shall be accurate with zero tolerances)
Measurements shall be recorded on a format as approved and be submitted considering all aspects including details required as
indicated above. Proposal for modification arrangement of infringing power line crossing shall also be submitted.

Page 34 of 40

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

ITEM NO. 33049 : Supply, erection, testing & commissioning of outdoor type, single side and double side
Glow sign board /Pictorial signage board with suspension/ mounting arrangement.
The item price includes Supply, installation, testing & commissioning of outdoor type, single side, /Double side Glow sign
boards/Pictorial signage boards with suspension /side mounting/wall mounting type arrangements as required, complete
including internal wiring with 2x1.5sq mm FR PVC insulated, multistrand, copper conductor single core cable on surface PVC
conduit, earthing with 1.5 sq mm FR PVC insulated multi strand copper conductor single core cable conforming to IS 694(lat est
version) etc, acrylic sheet of thickness not less than 4mm on front side, G.I /Aluminium Sheet of 24 SWG on all 5 / 4 sides with
louvers etc.as required. Depth of board shall not be less than 200mm. Erection arrangement shall be as approved by Railways.
Matter to be written / displayed on signboards shall be got approved before manufacturing of board. Glow sign board shall have
degree of protection not less than IP 54.
Prewired 1x28 watts T-5 surface type Luminary complete with electronic ballast etc. shall be provided. Provision of Nos. of
luminary shall be based on one No.28 watts T-5, surface type luminary per 8 Sq. ft area.
Note: 1. Boards of smaller dimensions/area which may not accommodate 28 watt luminary shall be provided with 1x14
watt luminary per 4 sq.feet area.
2. Payment for Double sided glow sign board shall be made @ 150% of the total rate of single sided glow sign
boards.
Wiring shall conform to relevant IS and code of practice as applicable.

ITEM NO. 33050: Supply, installation, testing & commissioning of Silicon rectifier battery charging set 200
Amps capacity including connections.
The item price includes labour & cost of all materials including cost of battery charging set as per RVNL tech specifications.
Payment for L.T. cable shall be made under relevant BOQ item. .

ITEM NO. 33051: Supply, erection, testing and commissioning of weather proof, outdoor type, dust and
vermin, floor mounted, 110 volts battery charging point.
110 V DC battery charging points shall be manufactured as per RVNL technical specification OR as per approved Drawing of
Zonal Railway / RVNL.
Page 35 of 40

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

The item price includes labour & cost of all material including cost of Fabrication, supply, installation, testing and commissioning
of cubicle type, weather proof, outdoor type, dust & vermin proof, 110 volts Battery charging point conforming to IS 8623 (latest
version) with degree of protection not less than IP54. Battery Charging point shall be suitable for operation on 150 volts DC
supply system and fabricated with 14 SWG galvanised MS sheet, M.S. channel size 100x50mm (weight 7.914kg/metre)
1200mm long, powder coated, inter-connections with single core, PVC insulated, multi stranded, copper conductor cable of size
10 sqmm, 3 nos. aluminum bus bar of size 25x10mm, complete with one no. MCB DP 63 Amps (DC series) 10kA, including
vertical grouting of channel 300mm deep in ground for erection with cement concrete M10 grade as per standard drawing of
zonal railway/as approved by the Engineer. .

ITEM NO. 33052: Supply, erection, testing & commissioning of weather proof, dust & vermin proof, Precooling point
The item price includes labour & cost of all material including cost of Fabrication, supply, installation, testing and commissioning
of cubicle type, weather proof, outdoor type, dust & vermin proof, pre- cooling point conforming to IS 8623 (latest version) with
degree of protection not less than IP54. Pre-cooling point shall be manufactured with 3.15mm CRCA sheet with 4 pedestals (on
corners) of M.S. angle size 65x65x8mm (900mm long) with base frame of M.S. angle size 40x40x5mm, duly powder coated
including vertical grouting of MS. angles 300mm deep in ground for erection with cement concrete M10 grade as per standard

drawing of zonal railway/as approved by the Engineer. Pre-cooling point shall be complete including following:.
i)
ii)
iii)
iv)
v)
vi)
vi)

One no. 100 A, 4 pole, MCCB 35 kA (Fixed type )


One no. 63A industrial type, iron clad 5 pin (3P +N+E) 415 V plug socket with spring locked cover.
One No. 32 A Industrial type iron clad 3 pin (P+N+E) 250 V plug socket with spring locked cover.
Batten Holder fixed on Bakelite sheet base plate with suitable lamp and controlled by 5 A piano type switch.
300 A Aluminium bus bar for Phases & 200 A for Neutral, with epoxy coating/ PVC colour coded sleeves.
Cable entry glands of suitable size
LED indication lights.

The connections from bus bars to MCCB and from MCCB to the feeding terminal (Iron Clad Sockets) shall be done with single
core, copper conductor cable of suitable rating with suitably sized galvanized MS bolts, nuts and washers.
Page 36 of 40

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
Fluorescent screen printed indication plates on the front shall be provided for clear indication of 415 Volts, AC pre-cooling point.
Pre cooling points shall be manufactured as per RVNL technical specification OR as per approved Drawing of Zonal Railway /
RVNL.

ITEM NO. 33053: Dismantling of wiring installations


The item price includes cost of labour for dismantling of complete electrical/solar and wiring installations as per site conditions,
stocking, accountal, transporting and handing over the released material to electrical department. Buildings, offices, sheds, gate
lodges etc. infringing the new works may also require dismantling of Electrical installations.
The item covers dismantling of wiring installation, lamp /tube fittings, street light fittings, fans, Distribution boards, ma ins, sub
mains, L.T.Panel(s), solar panels and associated cables etc and other such accessories of Railway station building/service
building/sheds/gate lodges etc, removal from site, transportation or shifting to new location and handing over of released
materials to Electrical department as instructed and if required making temporary arrangements as per instructions of the
engineer.

ITEM NO. 33054 (i): Dismantling of erected pole and its associated overhead conductor, GI wire, cross arms
brackets, insulators, Stay, luminary.
The item price includes cost of labour for dismantling of erected pole and its associated overhead conductor, GI wire, cross arms
brackets, insulators, Stay, luminary etc as are at site including stocking , transporting and handing over released material to
concerned official as instructed and if required making temporary arrangements as per instructions of the engineer.

ITEM NO. 33054 (ii): Dismantling of Sub Station Equipments.


Dismantling of Sub Station Equipments including Transformers, DG Sets, HT & LT Panels, cables, etc as are at site including
stocking , transporting and handing over to concerned official as instructed. Prior to dismantling of work, it shall be ensured that
the temporary power supply to the feeders shall be arranged to meet the requirements as per instructions of the engineer.

Page 37 of 40

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

ITEM NO. 33055 (i&II): Providing temporary wiring/cabling arrangements for lights & fans with stand by
D.G.Sets.
The item price includes labour & cost of all materials required for temporary arrangements in adequate quantity distributed over
entire station area as decided by the engineer including wiring, cabling, luminaries with lamps, Pedestal fans, cost of
consumables for replacement, deployment of staff for maintaining temporary arrangements during pre/post/during non interlocking period as required, arrangement of DG sets for Power supply to temporary installations including operation and
Supply of required Diesel oil, lube oil,, provision of earthing arrangement as required.
D.G. Sets including spare DG set should be of suitable capacity as decided by Engineer in charge to meet the load required
during non interlocking period.
Work of temporary wiring installation shall comply with latest code of practices and IE. Rules.
After completion of requirements of non interlocking work, installation shall be dismantled and material shall be taken away from
the site as directed by the Engineer.
NOTE: Normal power supply, if spare load is available, may be used up to sanctioned load with prior approval free of cost.

Item No.33056 (a): Supply, installation, testing and commissioning of 2.0Tonne window type A.C.unit (3 star
rating) complete with Supply and installation of Auto Voltage Corrector.
The item price includes labour & cost of Supply, installation, testing and commissioning of window type A.C.Unit ISI marked and
min 3 star energy rated conforming to IS-1391 Pt-I/1992 (amdt 1,2), complete with LCD display cordless remote (for control of
functions, on/off, timer, selecting fan speed (three speeds) and setting up of temperature), rotary compressor, 3/3 speed
cooling/fan, air ventilator, air bacteria filter, condensor (type - GOLD), suitable for 1-phase 230 10% voltage AC supply including
supply & installation of 5 KVA, wall mounted, I.C. controlled electronic auto voltage corrector conforming to relevant IS (latest
version), suitable for operation on single phase 180 to 260 volts, 50 Hz incoming AC supply and output 200 to 230 volts A.C
supply, with time delay relay, voltmeter, instant start provision with push button switch, earthing etc as required.
Page 38 of 40

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
NOTE: AC unit shall be fixed in the space available and shall be provided with the frame in approved manner (polished hard
wood or other material as approved).

Item No. 33056 (b): Supply, installation, testing, & commissioning of Split type, 1.5 Tonne Cap. AC unit (5star
rating) complete with Supply and installation of Auto Voltage Corrector.
The item price includes of Supply, installation, testing and commissioning of split type A.C.Unit ISI marked and 5 star energy
rated conforming to IS-1391 Pt-II/1992 (amdt 1), complete with LCD display, cordless remote [for control of functions, on/off,
timer, selecting fan speed (three speeds) and setting up of temperature], rotary compressor, 3/3 speed cooling/fan, air ventilator,
air bacteria filter, condensor (type - GOLD), suitable for 1-phase 230 10% voltage AC supply complete with stand (as approved)
for fixing outdoor unit, provision of rubber pads below the outdoor unit, heavy duty PVC flexible pipe (ISI marked) for drain,
interconnecting cable and refrigerant copper pipes with thermal insulation, including supply & installation of 5 KVA, wall mounted,
I.C. controlled electronic auto voltage corrector conforming to relevant IS (latest version), suitable for operation on single phase
180 to 260 volts, 50 Hz incoming AC supply and output 200 to 230 volts A.C supply, with time delay relay, voltmeter, instant start
provision with push button switch, earthing etc as required.
The item price also includes labour & cost of extra copper refrigerant pipes with insulation as required (in addition to standard
length supplied with the unit), electric cable for connection etc as required

Item No.33057: SUPPLY & ERECTION OF G.I. OCTAGONAL POLE


Item price includes labour & cost of all materials including cost of G.I. octagonal pole, single/Double arm bracket, foundation etc
as per details given in RVNL tech specifications.

Item No.33058:Supply, installation, testing & commissioning of cubical type, Mast mounted, dust & vermin
proof, L.T control switch board for AT.
Item price includes supply, installation, testing & commissioning of L.T control switch board for AT. Switch board shall be cubical
type mast mouted, dust & vermin proof, conforming to IS:8623 (latest version), suitable for operation on single phase, 2 wire, 415
Page 39 of 40

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

volt, AC supply system, fabricated with 16 SWG, CRCA sheet, powder coated and complete with inter connections with copper
conductor cable, copper bus bars in bus chamber, clustered LED type indication lights, cable glands for incoming and outgoing
clamping with mast with 50x50x6 mm MS flat clamps, earth studs etc., complete with TPN MCCB, copper busbars etc. as per
details given in RVNL tech specifications.
Item. NS -1: Supply, installation, testing & commissioning of control and distribution panel for colour light

signal.
Item price includes supply, installation, testing & commissioning of L.T control and distribution panel for colour light signalling
supply in 25 KV AC traction system as per RDSO tech. Specification No. TI/SPC/CLS/0023 ( latest amendment) for
5 KVA AT
Item NS- 2 : Supply, installation, testing & commissioning of fabricated double door distribution board for non

emergency load.
Item price includes supply, installation, testing & commissioning of fabricated double door distribution board confirming to IS
13031, IS 8623 with degree of protection not less than IP 42 aas per IS 13947/Pt. 1/1993 with power coated finish for non
emergency load with MCBs etc.
Item NS-3: Supply, installation, testing & commissioning of energy efficient 1x14 watt T-5 type light fitting.
Item price includes supply, installation, testing & commissioning of Lumanariry with lamp (Rod ) 1x14 watt T-5 type light
complete in all respect with clear Polycorbonate cover with high frequency warm start electronic ballast and wide input voltage
range with IP -65 protection to be fixed fitting including connection from light point with 3x1.5 sqmm FRP insulated copper
conductor single core cable etc.

Page 40 of 40

Das könnte Ihnen auch gefallen