Beruflich Dokumente
Kultur Dokumente
Volume - II
(PREAMBLE, EXPLANATORY NOTES, BOQ FOR PACKAGE 1)
Execution of
FEB 2015
Corporate Office:
RAIL VIKAS NIGAM LIMITED
First floor, August Kranti Bhavan,
Bhikaji Cama Place, New Delhi 110 066
Tele : + 91-11-26738191 , Fax : + 91-11-26182957, web : www.rvnl.org
Table of Content
Bill of Quantities
Preamble
Summary sheet of bill of quantities
Bill of quantities(Electrical Engineering)
Bill of quantities(Civil Engineering)
Bill of quantities (Signal & Telecom Engineering )
Explanatory Note( Signal & Telecom Engineering)
Volume II
Bill Of Quantities
Package-1
Preamble
RVNL/RANI-SRPJ/RE
Bill of Quantities
PREAMBLE
PREAMBLE(Civil Engineering)
1.
The Bill of Quantities shall be read in conjunction with the Instructions to Bidders,
General Conditions, Particular Conditions of Contract, Works Requirement (Technical
Specifications, and Drawings).
2.
The quantities given in the Bill of Quantities are estimated and provisional, and are
given to provide a common basis for bidding. The basis of payment will be the actual
quantities of work ordered and carried out, as measured by the Contractor and verified
by the Engineer and valued at the rates and prices tendered in the priced Bill of
Quantities, where applicable, and otherwise at such rates and prices as the Engineer
may fix within the terms of the Contract.
3.
In the Bill of Quantities, quantity and unit rates and thereby the amount against each
item have been indicated. From this, the estimated price of each bill has been worked
out and indicated in the summary sheet in BOQ. The Bidder shall quote rates as
percentage above/below/at par for each schedule in the summary sheet. If no
percentage as above, below or par is indicated for any particular bill, the same will be
considered as percentage at par.
4.
The rates for each bill shall be written in indelible ink or type written in the summary
sheet against each bill in words and figures as percentage above /below/at par with
RVNLs cost. Thereby, quoted price for each bill shall be calculated and written against
each bill. The total price, as sum of quoted price for all the bills shall be shown at the
bottom of the summary sheet. The total price shall also be written in words and figures.
5.
General directions and descriptions of work and materials are not necessarily repeated
or detailed in the Bill of Quantities. References to the relevant specifications and
sections of the contract documentation should be made before quoting rates in the Bill
of Quantities.
6.
The rates and prices Bid in the priced Bill of Quantities shall, except as otherwise
provided under the Contract, include all construction equipment, plant, labour,
supervision, materials, erection, maintenance, insurance, profit, royalty, octroi, taxes
and duties, together with all general risks, liabilities and obligations set out or implied in
the Contract.
7.
The rates are deemed to be inclusive of all lead (except as otherwise specifically
provided in the description of the particular item), lifts, ascend, descend, handling, rehandling crossing of nallah/streams/tracks any other obstructions.
Page 1 of 16
RVNL/RANI-SRPJ/RE
8.
All enabling works for executing the work e.g. approach road to site, launching
arrangements, procuring right of way, arrangement of water and electricity etc is to be
arranged by the contractor at his own cost and deemed to be included in the quoted
rates.
9.
Storage of Material: All the material at site will have to be properly stacked & stored so
as to facilitate inspection. The material should be properly protected from the
detrimental effects of nature and fire, theft etc. The contractor shall be responsible for
watch & ward and any loss or deterioration on account of above shall lead to rejection
of material and contractor has to replace the same at his own cost.
10.
11.
(a) In items of Bill No. 6: (Building and related items) and Bill No.9: (Site facilities), the
rates are inclusive of cost of all materials including cement, steel, etc. required to deliver
the final product.
(b) In items of bill No.2: (Bridges), Bill No.5: (track linking), and Bill No.7: (Platforms,
passenger amenities and Misc works) where ever cement, reinforcement steel and HTS
wire (strands) are required to be consumed in the item, the rates are exclusive of cost of
these materials and the same shall be paid separately under relevant items for supply of
these materials.
(c) In items of Bill No.4: (P. Way supply) the rates are inclusive of all materials including
cement, steel and HTS wire (strands). Rails required for manufacture of item under Bill
No.4 shall be issued free of cost by RVNL.
12.
RVNL/RANI-SRPJ/RE
12.1.3 Joining of new formation with existing embankment has to be done with benching of 30
cm (V), 60 cm (H) in the existing bank slope. The rate of earthwork includes the cost of
benching.
12.1.4 Locations where blasting is warranted, prior permission of the employer must be
obtained to ascertain whether blasting is permitted or prohibited. Rate of rock cutting
includes the cost of all precautionary measures necessary for safety during blasting of
rock.
12.2
BILL NO.2: BRIDGES AND BILL NO.7: PLATFORM, PASSENGER AMENITIES AND
MISCELLANEOUS WORK FOR CC, RCC AND PSC ITEMS.
12.2.1 All material, equipment, labour, casting beds, stress frames, from work staging,
scaffolding, etc is to be arranged by the contractor within the quoted rates.
12.2.2 1:4:8, 1:3:6 and 1:2:4 indicates concrete prepared using volumetric mix in proportion of
cement: coarse sand: stone aggregate of specified size, respectively.
12.2.3 All design mix concrete shall be machine batched with automatic weigh batcher,
machine mixed and machine vibrated or Ready Mix Concrete prepared in depot and
transported by transit mixer to the site of work.
12.2.4 Prior to demolishing of any structure measurements have to be taken, scheme of
dismantling has to be got approved from the Engineer.
12.3
12.3.1 All P. Way materials shall be procured only from suppliers included in part I list of RDSO
approved suppliers for the particular item. Where, such a list is not maintained by RDSO,
prior approval of source of supply shall be obtained from the employer.
12.3.2 All P. Way materials shall be inspected by the inspecting authority as prevalent over
zonal railway for the particular material. However, employer reserves the right to
nominate any authority or its own representative to inspect the material.
12.3.3 The price quoted also includes RITES/RDSO inspection and testing charges unless
otherwise specified in the bill of qty or technical specification. The prices quoted also
include RITES/RDSO inspection and testing charges unless otherwise specified in the bill
of quantities or Technical Specification. In case of change of inspection from RDSO/RITES
to RVNL/consignee, 1% of cost of material to be deducted by RVNL, as inspection
charges.
Page 3 of 16
RVNL/RANI-SRPJ/RE
12.3.4 If the rails required for manufacture of the finished material are to be issued free of cost
by the Employer, as specified in the description of item, the employer shall issue such
rails either in project area or from Bhilai . The quoted rates include cost of handling and
transportation of rails to the manufacturers workshop and finished materials from the
manufacturers workshop to the site of work.
12.3.5 All P. Way material shall be neatly stacked and stored in the project area and protected
against loss/ deterioration by proper watch and ward staff, insurance, etc, the cost of
which is deemed to be included in the rates.
12.4
12.4.1 Painting of rails for loops & platform lines shall be done before fixing in position and
touching to be done after laying in position.
12.4.2 Rates include day as well as night working and lighting arrangement as per requirement
and to the satisfaction of the engineer.
12.4.3 The welds found defective in USFD, shall have to be replaced by the contractor at his
own cost.
12.4.4 During the maintenance of track after commissioning, all arrangement for
transportation of labour , T&P etc will have to be done by contractor at his own cost.
Necessary T&P for track maintenance will be procured by the contractor including
consumables. The rate includes all such requirements.
12.4.5 The payment of rail cuts and drilling holes will be done as per final layout of
mainline/loop line/sidings and turnouts etc. Rail cuts/hole drilling required for
temporary working will not be paid.
12.5
Bill No.8: (Supply of Cement): Payment for supply shall only be made after the quantity
is consumed in the related item of work. The consumption of cement shall be worked
out based on cement consumption coefficients as given below or the actual
consumption whichever is less.
COEFFICIENTS FOR CEMENT CONSUMPTION
S.
No
Item
Unit
Cum
Cement consumption
coefficients per unit in
Kg. (Maximum)
Cement Concrete
1.
220
Page 4 of 16
RVNL/RANI-SRPJ/RE
S.
No
Item
Unit
Cement consumption
coefficients per unit in
Kg. (Maximum)
2.
Cum
320
3.
M20
Cum
400
4.
M25
Cum
410
5.
M30
Cum
420
6.
M35
Cum
428
7.
M40
Cum
435
8.
M45
Cum
480
9.
M50
Cum
500
Cement Mortar
1.
Cum
680
2.
Cum
510
3.
Cum
380
4.
Cum
310
5.
Cum
250
Brick Work
1.
Cum
2.
Cum
3.
SqM
4.
SqM
95
62.5
14.28
10.64
Note: Cement consumption for any item if not mentioned above is to be worked out as per
CPWD DSR 2012.
12.6 Bill No.10: (NWR SOR Works)
Specification and mode of measurements will be as per NWR specification
Page 5 of 16
RVNL/RANI-SRPJ/RE
3.
A.
General Instructions
1.
The bill of quantities (BOQ) shall be read in conjunction with the Instruction to bidders,
General Conditions of Contract, Particular Conditions of Contract, Works requirements,
Technical specifications & Drawings, Explanatory notes detailed after BOQs of RE &
General Electrical works seperately, Payment conditions, pre-bid clarifications and
Addenda and Corrigenda if any.
2.
SN
Schedule No.
Description
16000
RE-General
17000
19000
20000
21000
24000
TSS
27000
TSS-Spares
28000
10
29000
SCADA
11
30000
12
33000
The quantities given in the Bill of Quantities are estimated and provisional, and are given
to provide a common basis for bidding. The basis of payment will be the actual quantities
of work ordered and carried out, as measured by the Contractor and verified by the
Engineer and valued at the rates and prices tendered in the priced Bill of Quantities,
where applicable, and otherwise at such rates and prices as the Engineer may fix within
the terms of the Contract. The Surplus quantities, if any after execution & not required by
Railway, as determined by the engineer during the progress of the work or at the
completion of the work, shall be taken back by the contractor and the recovery of such
material will be adjusted from the pending claims.
Page 6 of 16
RVNL/RANI-SRPJ/RE
4.
In the Bill of Quantities, quantity and unit rates and thereby the amount against each
item have been indicated. From this, the estimated price of each bill has been worked
out and indicated in the summary sheet in BOQ. The Bidder shall quote rates as
percentage above/below/at par for each schedule in the summary sheet. If no
percentage as above, below or at par is indicated for any particular bill, the same will be
considered as percentage at par.
5.
The rates for each bill shall be written in indelible ink or type written in the summary
sheet against each bill, in both words and figures, while clearly indicating whether the
percentage quoted is above/below/at par over the estimated rate in the respective
columns. The price for each bill shall accordingly be calculated and written against each
bill in both words and figures. The total price, as the sum of prices of all bills shall be
shown at the bottom of the summary sheet. The total price shall also be written in both
words and figures.
6.
General directions and descriptions of work and materials are not necessarily repeated
or detailed in the Bill of Quantities. References to the relevant specifications and
sections of the contract documentation should be referred to before quoting rates in the
Bill of Quantities.
7.
The rates and prices Bid in the priced Bill of Quantities shall, except as otherwise
provided under the Contract, include all construction equipment, plant, labour,
supervision, materials, erection, maintenance, insurance, profit, royalty, octroi, taxes and
duties, together with all general risks, liabilities and obligations set out or implied in the
Contract.
8.
The rates are deemed to be inclusive of all lead (except as otherwise specifically
provided in the description of the particular item), lifts, ascend, descend, handling,
rehandling crossing of nallah/streams/tracks any other obstructions.
9.
All enabling works for executing the work e.g. approach road to site, launching
arrangements, procuring right of way, arrangement of water and electricity etc is to be
arranged by the contractor at his own cost and deemed to be included in the quoted
rates. Where a temporary tube well or any other water source are constructed by the
contractor in the railway land for the purpose of taking power /water for construction
purposes, no charge would be recovered from the contractor but written permission will
however, be obtained by the contractor from the Engineer who may, at his discretion,
refuse such permission for such construction of temporary arrangement. The contractor
shall also be required to restore the site to its proper condition as directed by the
Engineer.
10.
Storage of Material: All the material at site will have to be properly stacked & stored so
as to facilitate inspection. The material should be properly protected from the detrimental
effects of nature and fire, theft etc. The contractor shall be responsible for watch & ward
and any loss or deterioration on account of above shall lead to rejection of material and
contractor has to replace the same at his own cost. All the disposable material should be
disposed off outside the railway boundary at a designated place as directed by the
Engineer.
Page 7 of 16
RVNL/RANI-SRPJ/RE
11.
The method of measurement of completed work for payment shall be in accordance with
provisions in Works Requirements (Specifications) except as otherwise specifically
provided in the description of item or particular bill of quantities or explanatory notes to
the particular bill of quantities.
12.
Trees falling in the alignment or any other site of the works which belongs to the railways
will be trimmed and stacked at a nominated place at his /their own cost as directed by
Engineer and the same will be Railway/Employers property. Trees of the forest
department will be trimmed and deposited in the nearest forest depot. No separate
payment on this account shall be made to the contractor.
B.
1.
The prices for supply of materials and erection are in accordance with the technical
specifications, approved drawings and designs. The contractor should note that no item
of materials, equipment, fittings and components shall be supplied by the Employer.
2.
UNIT PRICE:
3.
i)
The unit price indicated under Supply in the bills is the all inclusive price of
materials and all incidental charges for transport, loading/unloading and handling
etc.
ii)
The price also include taxes, duties, levies (including octroi) applicable on Works
contracts, insurance/bank guarantee/indemnity bond charges etc.
iii)
The prices also include provision for losses and wastages in transit and erection.
iv)
The price quoted also include RITES/RDSO representative inspection and testing
charges unless otherwise specified in the bill of quantities or Technical
Specification. In case of change of inspection from RDSO/RITES to
RVNL/CONSIGNEE, 1% of the cost of material will be deducted by RVNL as
inspection charges.
(v)
The unit price indicated under Erection in the bills should be inclusive of the cost
of erection and testing and also include all cost of administration of the contract,
insurance premia, bankers charges, cost of stamps/storage/loading/unloading and
handling of materials and also include the cost of transportation which the
contractor may incur for carriage of material to the site of works. The unit prices
should also include cost of works and adjustment that may become necessary
during or after the tests for commissioning.
The whole cost of complying with the provisions of the contract shall be included in the
items/bills provided in the BOQ and, where no items/bills are provided, the cost shall
be deemed to be distributed among the rates and amount entered for related Items of
Works.
Page 8 of 16
RVNL/RANI-SRPJ/RE
C. NOTES SPECIFIC TO PAYMENT: INVOICING PROCEDURE
1.
2.
D. PAYMENT PROCEDURE
1.
(ii)
(iii)
(iv)
All invoices shall be accompanied with the following, for the purpose of
arranging On Account Payment against the contract:
a. Suppliers Delivery Challans.
b. Inspection certificate granted by the authorized approved
agency/Purchasers representative as per contract agreement.
c. Certificate of receipt of material at Contractors depot/work sites duly
accepted by the Engineer.
d. Comprehensive Insurance Policy for supply and safe custody of
material.
e. Bank Guarantee issued by a Scheduled Bank of the equivalent
amount for which On Account Payment is claimed. Such Bank
Guarantee shall be released after erection of the material and on
certification by the Engineer.
f. Quality assurance documents.
Page 9 of 16
RVNL/RANI-SRPJ/RE
2.
3.
4.0
On Account Payment shall be made only for item Nos. 16009 &
16010 and as per terms and conditions given in clause No. D (1)
under Payment Procedure.
(b)
The Progress Payment to the extent of 95% of all the items in the
schedule shall be paid for the supply and erection prices after
adjustment of On Account payment & other recoveries, if any,
wherever applicable.
50% of the Schedule rate shall be paid on Casting of the Roof of the
Switching Station Building.
45% of the Schedule rate shall be paid on completion of the building in all
respects and certification by the Engineer.
On Account Payment will be made only for item No. 19004 and as per
terms and conditions given in clause No. D (1) under Payment
Procedure.
Page 10 of 16
RVNL/RANI-SRPJ/RE
(ii)
(iii)
The Progress Payment to the extent of 95% of all the items in the
schedule shall be paid for the supply and erection prices after adjustment
of On Account payment & other recoveries, if any, wherever
applicable.
On Account Payment will be made only for item Nos. 20002 & 20003
and as per terms and conditions given in clause No. D (1) under
Payment Procedure.
(ii)
(iii)
The Progress Payment to the extent of 95% of all the items in the
schedule shall be paid for the supply and erection prices after final
adjustment of OHE and SED checking and after adjustment of On
Account payment & other recoveries, if any, wherever applicable.
On Account Payment will be made only for item Nos. 21003, 21004,
21005 & 21014 and as per terms and conditions given in clause No.
D(1) under Payment Procedure.
(ii)
The Progress Payment to the extent of 95% of all the items in the
schedule shall be paid for the supply and erection prices after adjustment
of On Account payment & other recoveries, if any, wherever
applicable.
Page 11 of 16
RVNL/RANI-SRPJ/RE
4.7
(ii)
On Account Payment will be made only for item Nos. 24004 to 24014,
24032 to 24036 and as per terms and conditions given in clause No.
D(1) under Payment Procedure.
(iii)
The Progress Payment to the extent of 95% of all the items in the
schedule shall be paid for the supply and erection prices after
adjustment of On Account payment & other recoveries if any
wherever applicable except item No. 24001 which will be paid as per (i)
above.
4.8
Schedule 29000:
(i) Item No. 29001 (Design & Drawing of SCADA)
(a)
(b)
(ii) On Account Payment shall be made only for item Nos. 29002 to 29005 &
29007 and as per terms and conditions given in clause No. D(1) under
Payment Procedure.
(iii) The Progress Payment to the extent of 95% of all the items in the
schedule shall be paid for the supply and erection prices after adjustment
of On Account payment & other recoveries if any wherever applicable
except item No. 29001 which will be paid as per clause (i) above.
4.9 Schedule 30000:
(i)
(a)
Page 12 of 16
RVNL/RANI-SRPJ/RE
(b)
(ii)
(iii)
(iv)
5.
(i)
85% of
material
bond.
(ii)
Further payment of supply & erection cost to cover 95% of the total item
cost shall be paid on completion of the work and on certification by the
Engineer after adjusting already paid amount & other recoveries if any.
FINAL SETTLEMENT
On expiry of the defect liability period and issue of the taking over certificate of the
entire installation, the Bank Guarantee for Performance security shall be released to
the contractor after adjustment of any dues payable by the contractor.
6.
7.
RVNL/RANI-SRPJ/RE
(ii) Where the law makes it statutory for the Purchaser to deduct any amount towards
sales tax or any other taxes on works contract, the same shall be deducted and
remitted to the concerned authority.
8.
PRICE VARIATION
Coefficients governing the adjustment of changes in cost to be read with clause
13.8 of GCC applicable to various schedules are also included.
Page 14 of 16
RVNL/RANI-SRPJ/RE
Arrangement for water supply for execution of different items of works will be made by the
contractor at his / their own cost.
3 The unit prices for Supply items in the bills is the all inclusive price
of materials and all incidental charges for transport, loading/unloading
and handling. The prices also include taxes, duties, levies (including
octroi) applicable on works contract, insurance / bank guarantee /
indemnity bond charges etc. The prices also include provision for
losses and wastages in transit and erection. The prices also include
RITES/RDSO or other agencies inspection and testing charges
unless otherwise specified in the bill of quantities or Technical
Specification. In case of change of inspection from RDSO/RITES to
RVNL/consignee, 1% of cost of material to be deducted by RVNL, as
inspection charges.
4 The unit price for Erection items in the bills are inclusive of the cost
of erection and testing/commissioning and also include all cost of
administration of the contract, insurance premium, bankers charges,
cost of stamps/storage /loading/ unloading and handling of materials
and also include the cost of transportation which the contractor may
incur for carriage of material to the site of works. The unit prices also
Page 15 of 16
RVNL/RANI-SRPJ/RE
iii.
iv.
v.
Before placing the supply order for STM/MUX counter specific approval of RVNL to be obtained.
The same is required to maintain uniformity in telecom in the section.
10 Released communication items will require shifting to other stations and installed.
******
Page 16 of 16
Summary of Bill of
Quantities
Name of work - Railway Electrification works between RANI (Excl.) - SRPJ (Excl) Section 198 TKM of Ajmer Division of North Western Railway Summary
Sheet of Bill of Quantities Package-1
Rate quoted by Contractor as percentage above/ below/ at par over the
estimated rates
Sr. No.
Description of Schedule
1
2A
2C
Earthwork in Formation
Bridge work (Other than Steel
works)
Bridge work (Supply of Steel items
)
In Figures
In Words
24,14,940
17,58,350
12,17,930
Ballast Supply
8,44,500
4A
7,18,424
4B
5,46,973
5A
5,76,083
5B
Price in Rs.
2,96,280
317,24,528
6
Buildings
7A
7B
33,08,568
144,71,760
28,08,000
8
Supply of Cement
Site Facility
10
SOR Items
Group C
11
Group D
152,91,100
6,30,172
227,03,363
151,03,972
Signature of Contractor
Package-1 of RANI-PNU Electrification Project
Page 1 of 2
16000
17000
19000
20000
21000
24000
27000
RE General
Swithing Post Building
OHE Ferrous
OHE Non -ferrous
OHE Insulators
Traction Sub-station
Maintenance Spares (TSS)
28000
29000
SCADA
Common items required for OHE &
TSS
General Eelctrical Works
Miscellaneous items
Total Estimated cost
30000
33000
Miscellaneous
138,25,863
7,02,649
1000,62,133
2285,90,826
200,57,517
448,41,680
9,13,533
8,58,748
94,31,550
2283,41,816
189,79,066
31,94,698
7842,15,022 Total Quoted Price =
Note:
(a) Please refer to ITB 14 and 32 while filling the rates in the summary sheet.
(b) Please mention the percentage rate, in both figures and words, for each schedule in columns 4 & 5 respectively. Please also mention in column 6 whether the percentage rate mentioned in columns 4 & 5
are above or below or at par over the estimated rates.
(c) The price for each bill shall be calculated and written against each bill, in both figures and words, in columns 7 & 8 respectively.
(d) The total price, as sum of the price of all the bills/ schedules shall be shown, in both figures and words under columns 7 & 8 respectively in the last row of the summary sheet.
(e) Bidder should ensure that the rates are filled with due care and caution so as not to lead to any omission or discrepancy or ambiguity.
Signature of Contractor
Package-1 of RANI-PNU Electrification Project
Page 2 of 2
Bill of Quantities
(Civil Engineering)
BOQ for Railway Elecrification works between RANI(Excl.)-SRPJ(Excl.)sectin 198 TKM of Ajmer Division of North Western Railway
BILL No.1 : EARTHWORK IN FORMATION
Description of Item
Qty
S. No.
1001 Earthwork in filling in Embankment Fill and Top Layer of formation including trolley refuges,
etc using contractor's earth of approved quality as per RDSO Guidelines and specifications for
Design of Formation For Heavy Axle Load, Nov 2009 for 25 T Axle Load (using SQ1/SQ2/SQ3
soil with CBR value of 3 or more in Lower Embankment Fill and using either SQ1 soil with CBR
value of 4 or more generally but not less than 3 in isolated cases in Top Layer of 1 meter
thickness or SQ2/SQ3 soil with CBR value of 6 or more generally but not less than 5 in
isolated cases in Top Layer of 0.5 meter thickness), procured from outside railway land
including site clearances, setting out and demarcation, benching, initial compaction of subsoil
after levelling the surface after site clearance, spreading loose earth in 30 CM layers using
grader up to extra width of 0.5 M beyond designed profile, compaction using vibratory
compactors, top and side dressing and removal of extra earth from sides to provide final
formation as per designed profile as per RDSO Guidelines. The rate shall include cutting of
trees with girth upto 30 CM, making good the pockets and depressions left in soil during
clearing and uprooting of jungle/trees at site and one round of heavy rolling of sub-soil
thereafter. The rate shall not include cutting of trees of girth beyond 30 CM and compaction
which shall be paid separately. The minimum Ev2 Criteria as mentioned in the guidelines is
not applicable. The rate shall also not include cost of CBR tests which will be paid vide
separate BOQ item.
Note: 1) Undrained shear strength, CU from Unconfined Compression (UCC) test or Vane Shear
Test and Penetration Number ( N- Value) from Standard Penetration Test of the subsoil will
also be carried out by the bidder before carrying out the work of Earthwork. The quoted rates
are
deemed
to
include
these
tests.
Note:- 2) Pleasenote that shrinkage allowance shall be deducted as per provisions of para
7.1.1.5 of RVNL standard specifications.
Page 1 of 20
4000
Package-1
Unit
Rate in Rs.
Amount in Rs.
Cum
175.00
700000
BOQ for Railway Elecrification works between RANI(Excl.)-SRPJ(Excl.)sectin 198 TKM of Ajmer Division of North Western Railway
Package-1
S. No.
Description of Item
1002 Earthwork in excavation by mechanical means (Hydraulic excavator) in cutting, in
formation, trolley refuges, side drains, yard drains, catch water drains, etc. including
leading usable cut spoils up to 200 M and making formation in filling using the cut
spoils, site clearances, setting out and demarcation, disposing off surplus unusable cut
spoils as per directions of the engineer, and top and side dressing to provide final
formation as per designed profile. The rate shall not include cutting of trees with girth
above 30 CM and compaction, which shall be paid separately.
Note- Rock spoils such as stones, boulders, pebbles, gravels etc available from
excavation, if are found suitable for use in works as per required specifications even
after modifications etc., can be used free of cost but the legally payable royalty and
taxes are to be paid by the contractor to the concerned authorities.
Qty
Unit
Rate in Rs.
Amount in Rs.
1002 a
1002 b
1002 c
1002 d
1000
75
75
Cum
Cum
Cum
146.00
227.00
387.00
146000
17025
29025
50
Cum
485.00
24250
Page 2 of 20
BOQ for Railway Elecrification works between RANI(Excl.)-SRPJ(Excl.)sectin 198 TKM of Ajmer Division of North Western Railway
S. No.
Description of Item
1005 Providing and laying blanketing materials of specifications as per RDSO Guidelines and
Specifications for Design of Formation for Heavy Axle Load - Nov 2009 for 25 T Axle
Load in layers of 30 CM in loose state using graders and compaction using vibratory
compactors, top and side dressing to provide final formation as per designed profile.
The rate shall not include compaction, which shall be paid separately.
NOTE :
1) If naturally available materials do not meet the laid down specifications, blanket
material has to be produced by mechanical process using mechanical crushing or
mechanical blending method or combination of these two methods as given in the
Annexure C of RDSO Guidelines and Specifications for Design of Formation for Heavy
Axle Load -2009. The quoted rates are deemed to include the production of material
by mechanical process.
2) The filter criteria and minimum EV2 Criteria as mentioned in the guidelines is not
applicable.
3) The rate shall not include cost of CBR tests which will be paid vide separate BOQ
item.
1006
1009
Page 3 of 20
Package-1
Qty
Unit
Rate in Rs.
Amount in Rs.
1400
Cum
977.00
1367800
5400
Cum
13.94
75276
Each
1339.00
1339
BOQ for Railway Elecrification works between RANI(Excl.)-SRPJ(Excl.)sectin 198 TKM of Ajmer Division of North Western Railway
S. No.
Description of Item
1015 Providing barricading with the help of fencing along the running track where the work
is to be done in close vicinity of the track. The fencing shall be minimum 1.5m high
with 2.2m wooden balli/bamboo posts, 25cm girth (min) placed every 2.0m apart,
embedded in cement concrete (1:2:4) blocks of size 0.23 x 0.23 x 0.23M and every
15th post (or nearer, if there is abrupt change of ground slope), last but one end post
and corner post shall be strutted on both sides and end post one side only and struts
embedded in cement concrete (1:2:4) block of size 0.23 x 0.23 x 0.23M, provided with
3 horizontal wooden/bamboo ballies fixed with G.I. staples/binding wire/nail driven
into the posts including 2 bands (red and white) 300 mm long shall be painted with
water bound paints on the ballies from top and two bands (100mm apart) of yellow
reflective tape of width 50mm shall be pasted on top white band. The rate includes
cost of all materials including cement. After execution of all works requiring safety
fencing in particular stretch, the fencing shall be removed with the approval of the
Engineer-in-charge and formation shall be repaired to its profile and released
materials will be contractors property.
Total for Bill No. 1 (Carried forward to Summary)
Package-1
Qty
Unit
Rate in Rs.
Amount in Rs.
225
meter
241.00
54225
2414940.00
Page 4 of 20
BOQ for Railway Electrification works between RANi(Excl.)-SRPJ(Excl.)section 198 TKM of Ajmer Division of North Western Railway
Description of Item
2001
2001 a
2001 b
2001 d
2004
2005
2042
2042f
Providing and laying Design mix control concrete M25/M30/M35/M40 in cast-insitu RCC works of raft, pile cap, pier, abutment, well steining, RCC well kerb,
well cap, pier cap, Jacketing, dirt wall, return wall, wing wall, fly wing wall,
retaining wall, approach slab, foot path slab, wearing course, ballast retainers,
RCC railing, inspection platform, pedestal, boxes and other miscellaneous works
using well graded stone aggregate of 20 MM nominal size.
Providing & laying non pressure NP-4 Class RCC pipe with collars, jointing with 1:2
Cement and ordinary sand mortar including testing of joints but excluding earth
work with all labour and material as a complete job. Cement for mortar will be
paid separately.
1200 mm dia
Total for Bill No.2A (Carried forward to Summary)
Page 5 of 20
Qty
Unit
Rate in Rs.
Amount in Rs.
40
15
Cum
Cum
233
246
9320
3690
10
Cum
492
4920
35
Cum
4183
146405
300
Cum
5202
1560600
Meter
6683
33415
1758350
Package-1
BOQ for Railway Electrification works between RANI(Excl.)- SRPJ(Excl.)section 198 TKM of Ajmer division of North Western Railway
Description of Item
2076
Qty
Unit
17.5
MT
69596
1217930
1217930
Page 6 of 20
Package-1
BOQ for Railway Electrification works between RANI(Excl.) - SRPJ(Excl.) section 198 TKM of Ajmer divisionof North Western Railway
Description of Item
Qty
Unit Rate in
Rs.
3001 Supply of machine-crushed stone ballast on cess as per RDSO specifications for track
ballast: IRS-GE-1 of June, 2004 from outside railway limits stacked in specified quantities
alongside the proposed alignment on either side of track, in yards and at locations as per
site requirement as directed by the Engineer.
Note 1:
Payment will be made on actual stack measurement for gross quantities without any
deduction for voids in following stages: (i) 95% on receipt at site, acceptance,
measurement, account, proper storage and protection against loss, damage or 1000 Cum 837.00
deterioration; and (ii) balance 5% after training out.
Note 2:
i)
Wherever sufficient railway land is not available, contractor will have to arrange
land for supply and stacking of ballast at his own cost for which extra payment as per
item no. 3001a will be admissible.
ii) The rate also includes levelling, dressing of ground for stacking of ballast.
3001 a Extra over item no. 3001 if ballast is to be stacked in private land in case sufficient
railway land is not available.
Total for Bill No. 3 (Carried forward to summary)
250
Cum
30.00
Amount in Rs.
837000
7500
844500
Page 7 of 20
Package-1
BOQ for Railway Electrification works between RANI(Excl.) - SRPJ(Excl.) section 198 TKM of Ajmer Division of North Western Railway
Package-1
4012
4017
4018
Description of Item
Supply of P.Way Components
GFN Liners to RDSO Drg. No. T-3706.
Combination GFN liners to RDSO Drg. No.T-3707 and T-3708.
GRSP to RDSO Drg. No.T-3711.
Supply of glued insulated rail joints G3 L 6.5 M long with 10 MM thick end post on PSC sleepers. Rails will be
issued free of cost by the Employer @ 6.5 M for each joint.
60 KG Kg rail section as per RDSO Drg No. RDSO/T-5843
52 KG rail section as per RDSO Drg No. RDSO/T-5361
Supplying at site of work including leading, loading, unloading and stacking of Special PSC Monoblock
Sleepers (pre-tensioned type) for B.G. 1 in 8 Derailing Switch as per RDSO Drg. No.-T-6068 to suite both
52/60 kg rails as per RDSO Design and IRS Specifications No. T-45-96 (2nd Edition) as amended from time to
time with contractor's labour, materials, tools & Plant, equipment and machinery, transport etc complete .
Supplying at site of work including leading, loading, unloading and stacking PSC turnout sleepers and
approach sleepers for fanshaped layout of 60 kg 1 in 8.5 turnout for B.G 60 Kg. (UIC) rail/52 kg rails to RDSO
Drg. No. T-4865 Alt-5 (for general layout) and drawings thereof with latest alterations if any, complete set
with contractor's labour, materials, tools & Plant, equipment and machinery, transport etc complete .
Supply of Grooved Rubber Sole Plates for 1 in 8.5 turnouts for layout Drg no. T-4865 with latest alterations if
any, complete set for the turnout as per IRS specification for Grooved Rubber Sole Plate (6mm thick) for
placing beneath rails Sl. No. T-47-2006 with up to date corrigendum if any
Supply of Grooved Rubber Sole Plates for 1 in 12 turnouts for layout Drg no. T-4218 with latest alterations if
any, complete set for the turnout as per IRS specification for Grooved Rubber Sole Plate (6mm thick) for
placing beneath rails Sl. No. T-47-2006 with up to date corrigendum if any
Total for Bill No. 4A (Carried forward to summary)
Qty
Unit
Rate in Rs.
Amount in Rs.
1240
1240
1240
Each
Set
Each
9.09
29.53
24.99
11271.6
36617.2
30987.6
10
10
Each
Each
10923
9559
109230
95590
Set
126917
126917
Set
240121
240121
Set
29272
29272
Set
38418
38418
718424.4
(1) 90% payment shall be made on receipt, acceptance, accountal and taking into custody of complete materials. The invoices shall be accompanied by the following :
a) Supplier's challan and manufacturer's challan.
b) Inspection certificate issued by Employer's/Engineer's nominated inspecting agency.
c) Quality Assurance documents.
d) Indemnity bond for entire cost of material supply.
(2) The remaining 10 % payment shall be made after commissioning of the portion of the work or handing over of the material to the employer's / Railway's
Representative, required for maintenance purposes.
Note: The transportation charges from sleeper manufacturing plant to supply point in the project area as directed by Engineer are inclusive in the rates of special
sleepers. Item No.5031 of Bill No. 5 is for the further movement of the sleeper in project area if required as per the site conditions.
Page 8 of 20
BOQ for Railway Electrification works between RANI(Excl.)- SRPJ(Excl.) section 198 TKM of Ajmer Division of North Western Railway
Package-1
Description of Item
Qty
Unit
Rate in Rs.
Amount in Rs.
70
173600
4021 a
2480
Each
4021 b
25
Each
77
1925
4021 d
10
Each
31.74
317.4
4022
4022 a
20
Each
1324
26480
4022 b
20
Each
834
16680
4024
Supply of fish bolts with nuts for 60 KG, 52 KG rails as per RDSO Drawing No.T-1899, T-11501.
50
Each
62
3100
4025
Supply of joggled fish plates (2 No. per set) with 4 pair clamps, 4 No. Bolts & Nuts and 8 No. special
washers.
4025 a
Set
3620
14480
4025 b
Set
2837
5674
4026
Supply of Fish plates one meter long as per standard drawing of RDSO
4026 a
Each
1597
3194
4026 b
Each
1280
2560
Set
73312
73312
Set
45346
45346
Nos
164805
164805
500
each
31
15500
4029
4031
4032
NS 4039
Supply of 52 kg 1 in 8.5, 6400mm OR Switch confirming to RDSO Drg. No. T-4866 with latest
alteration, if any complete with all parts as listed in the drawing with check rails (excluding fish plates,
Fish bolts & nuts, GRSPs, Liners and ERCs).
Supply of 52 KG 1 in 8 Derailing Switch conforming to RDSO Drg No. 5836 with latest alteration, if
any complete with all parts as listed in the drawing including GRSPs (excluding fish plates, fish bolts &
nuts, Liners and ERCs).Note: Rails will be issued free of cost by the employer.
Supply of 52 kg CMS Crossing for 1 in 8 PSC Layout conforming to Drg No. T-4867 with latest
alterations complete with all parts as listed in the drawing (excluding fish plates, fish bolts & nuts,
GRSPs, Liners and ERCs).
Supply of plate scews to RDSO Drawing No T-3912
Total for Bill No. 4B (Carried forward)
546973
(2)
The remaining 10 % payment shall be made after commissioning of the portion of the work or handing over of the material to the employer's / Railway's Representative, required for maintenance purposes.
Page 9 of 20
BOQ for Railway Electrification works between RANI(Excl.) - SRPJ(Excl.) section 198 TKM of Ajmer division of North Western Railway
Package-1
Qty
Unit
Rate in Rs.
Amount in Rs.
1000
Cum
91
91000
300
Each
290
87000
100
Each
70
7000
70
MT
272
19040
2280
MT KM
5.53
12608.4
450
Track Meter
314
141300
1
1
Each
Each
42249
10618
42249
10618
Each
31521
31521
50
Track Meter
104
5200
50
66
3300
90
Each
47.56
4280.4
5008 Installation of PSC fan shape turnouts, derailing switches 60 KG / 52 KG including lead rails as per
RDSO layout drawings including katcha packing with bars or off track tampers for 20 KMPH speed.
Activities of rail cutting, drilling of holes, welding of joints and transportation are not included in this
item and shall be paid separately under relevant items.
5008 b Turnouts 1 in 81/2
5008 c Derailing switches
5016 Provision of Buffer stop of 60 KG, 52 KG, 90 R rail section as per plan including painting with
luminous paint etc. as directed by the engineer.
Note: Rail required for this item will be issued free of cost by the Employer.
5026 Dismantling of existing BG track, turnouts, derailing switches, dead ends, sand humps, etc. of any
rail section and any type of sleepers of any density and transporting all released material including
sleepers, rails, switches, crossings and fittings & fastenings to the nearest station or manned level
crossing or road loading point as directed by the Engineer.
5026 a Plain track including SEJ and Glued Joints and track at level crossing, bridge & bridge approaches and
sharp curves with check rails
5028 Scarifying, digging existing caked Ballast upto the depth as directed by the Engineer, removal and
screening of Ballast, removal and disposal of muck, dressing of formation to the required profile and
putting back the screen ballast in track.
5030 USFD testing of 60 KG, 52 KG rail welds (Flash Butt / SKV) as per RDSO Manuals and submitting
reports on proforma as directed by the Engineer.
Page 10 of 20
BOQ for Railway Electrification works between RANI(Excl.) - SRPJ(Excl.) section 198 TKM of Ajmer division of North Western Railway
Package-1
5031 Transportation of PSC sleepers including special sleepers for SEJs, check rails, guard rails and turn
out sleepers from the place of issue (in case of sleepers issued free of cost by RVNL) and from
stacking place acceptable to Engineer at work site ( in case of supplied by the contractor ) to their
final location of laying.
Note:
1. For the purpose of payment each turnout sleeper will be considered as 1.5 No. of ordinary line
sleeper. All other special sleepers shall be considered on par with ordinary line sleeper.
(2) 100% payment shall be made on transportation to designated site as directed by
employer/engineer.
(3) The item is intended for transportation of sleepers issued free of cost by the employer or
supplied by the contractor in P.Way supply schedule in the project area. However, if the sleepers to
be issued free of cost by the employer are made available at the sleeper plant and loading of
sleepers is done by concrete sleeper plant even then the rate quoted in the item shall be applicable
subject to recovery @ Rs.10/- per track sleeper.
(4) Rate includes multiple handlings.
5031 a Average lead upto 2 KM (from place of issue to middle point of kilometer of laying in track)
5031 b Incremental rate for lead beyond 2 KM for every km additional lead upto 30 kms over item (a)
above
5031 c Incremental rate for lead beyond 30 KM for every KM additional lead upto 60 KM over item (a) & (b)
above
5031 d Incremental rate for lead beyond 60 KM for every KM additional lead upto 250 KM over item (a),
(b) & (c ) above
5033 Painting of particulars of 1 in 16, 1 in 12 and 1 in 8 turnouts and derailing switches including turn
in curves on the inside web of outer rail with stencils of specified height in black enamel paint on
surface of specified length painted with two coats of yellow enamel paint over a primer coat painted
after cleaning the surface free from dust and dirt.
5034 Fouling marks of size 150x250x225 MM in M20 grade cement concrete including engraving the
letters FM, white washing with two coats and painting the letters in black enamel paint indicating
the numbers of vehicles duly fixed at site.
Total for Bill No. 5A (Carried forward)
693
Sleeper
49.77
34490.61
19404
Sleeper KM
1.66
32210.64
20790
Sleeper KM
0.63
13097.7
110880
Sleeper KM
0.36
39916.8
Turn Out
774
774
Each
476
476
576082.55
NOTE:
1) In case of work being executed under traffic block, extra payment will be made for the item of work over and above the accepted rate of the item @ 50% of the accepted rate of the item for day time working
under traffic block and @ 100% of the accepted rate of the item for night time working under traffic block for BOQ item no. 5007, 5008, 5010 & 5026. Rates include lighting arrangement as per requirement and to the
satisfaction of the Engineer
2) Rates for all the items of this bill except those mentioned in note 1) above include day as well as night working and lighting arrangement as per requirement and to the satisfaction of the Engineer.
3) The welds found defective in USFD, shall have to be replaced by the contractor at his own cost.
4) Track laying a)
For mechanized laying of track only service rails will be made available by RVNL. All other materials such as wooden blocks, fish plates, rail screw etc. will have to be arranged by contractor. The rails will be
b) Manual linking of track may be permitted by the Engineer where mechanical linking is not feasible due to constraints in working. Only 90% of the accepted rates shall be payable in case of Manual linking.
5) During the maintenance of track after commissioning, all arrangement for transportation of labour, T&P etc will have to be done by contractor at his own cost. Necessary T&P for track maintenance will be
produced by the contractor including consumables. The rate includes all such requirements.
6) The payment of rail cuts and drilling holes will be done as per final layout of mainline/loop line /sidings and turnouts etc. Rail cuts/ hole drilling required for temporary working will not be paid.
Page 11 of 20
BOQ for Railway Electrification works between RANI(Excl.) -SRPJ(Excl.) section 198 TKM of Ajmer Division of North western Railway
Description of Item
5053
Alumino thermit welding of 60kg/52 kg rail joints or combination joints of 60kg/52kg rail by
pre-heat (SKV) welding technique using compressed air petrol/LPG for preheating, three piece
moulds and automatic tapping thimbles with all labour, materials including supply of portion,
tools and plants, aligning of rails, placing & fixing of mould, preheating, welding, mechanised
trimming, grinding with profile grinder (including riser), testing, marking, painting with one
coat of high build epoxy paint (two pack conforming to RDSO specification no. M&C/PCN111/88) on the welded area up to 10 cm on either side. The work is to be completed in all
respects as per IRS: T-19-1994 with latest updates and in accordance with RDSO Manual for
Fusion Welding of Rails by Alumino Thermic Process with up to date correction Slips. The work
to be done under supervision of trained welding supervisor and carried out by trained welder
having valid competency certificate from RDSO/TPP, Lucknow. Ultrasonic testing of welded
joints shall be paid separately under relevant items.
Note: 1) In case only portion is supplied by the contractor but welding is not done the rate
shall be payable @ 60% of the item rate.
2) In case welding portion is supplied free of cost by RVNL, the rate shall be payable @ 40% of
the item rate.
3) The above provision in note (1) & (2) shall be operated with the specific approval of CPM.
Qty
Unit
Rate in
Rs.
90
Each
3292
Amount in Rs.
296280
296280
Page 12 of 20
Package-1
BOQ for Railway Electrification works between RANI(Excl.) -SRPJ(Excl.) section 198 TKM of Ajmer Division of North Western Railway
Package-1
Description of Item
6001 a Service building of single storey (foundation to be designed to take load of double storey) with
open foundation upto 1.2 m depth from ground level and plinth height upto 0.6m from ground
level with floor height upto 3.35m.
6001 e Extra payment for provision of internal sanitary and water supply installations
Qty
Unit
Rates in Rs
712.5
Sqm
15750
265.5
Sqm
630
Sqm
283.5
6001 f Extra for every 0 .3 m or part thereof higher plinth over normal plinth height of 0.6m(on ground
floor area only)
6002
Amount in Rs
11221875
167265
Construction of residential buildings for staff accommodation near railway stations, level crossings
or any other nominated location as per layout drawings and standard railway plans for each type of
staff quarters, provided by the employer and detailed specifications provided in para 4.3 of
section 5: works requirements of the bidding documents including structural design and
preparation of detailed structural drawings. Rate includes cost of cement steel, internal water
supply and sanitary installations and all other materials and labour.
NS 6006 Extra payment for provision of internal sanitary and water supply installations for
(A)
Type I,II,III Single storeyed floor height upto 2.9 m
NS6007 Extra payment for provision of internal sanitary and water supply installations for staff qtrs( B) Type
IV Single storeyed floor height upto 2.9 m
TOTAL VALUE FOR BILL No.6
663
Sqm
12180
8075340
227.5
Sqm
13440
3057600
Sqm
283.5
663
Sqm
11865
7866495
663
Sqm
1461.6
969040.8
227.5
Sqm
1612.8
366912
Page 13 of 20
31724527.8
BOQ for Railway Electrification works between RANI(Excl.)-SRPJ (Excl.) section 198 TKM of Ajmer Division of North Westetn Railway
Description of Item
7002
Providing and laying 1:3:6 cement concrete in foundation and floor using well graded stone
aggregate of 40 mm/20 mm nominal size.
Cement Concrete 1:2:4 (cast in-situ/precast ) for Rail level platform wall, coping of platforms,
drains and in other miscellaneous works.
Earth work in filling with contractor's earth of approved quality in platform, circulating area,
level crossing and other areas including all lead and lift in layers not exceeding 30 CM in depth
including mechanical compaction and watering to achieve the desired compaction as per
specifications.
Earth work in cutting in foundation, trenches, drains, etc in all kinds of soil including dressing of
sides, ramming of bottoms, back filling of trenches, getting out the excavated soil and disposal of
surplus excavated soil with all lead and lift as directed by the Engineer.
7003
7004
7005
7005 a
7016
7017
7017 a
7017 b
7017c
7021
7021 a
Qty
Unit
Rate in
Rs.
Amount in Rs.
550
Cum
2188
1203400
400
Cum
2058
823200
2500
Cum
175
437500
1750
Cum
131
229250
527.5
SqM
659
347622.5
112.5
112.5
35
Meter
Meter
Meter
118
146
197
13275
16425
6895
100
Cum
2310
231000
3308567.5
Note :
1. All materials, equipment, labour, casting beds, stress frames, form work staging, scaffolding, etc. is to be arranged by the contractor within the
quoted rates.
2. All design mix concrete shall be machine batched with automatic weight batcher, machine mixed and machine vibrated or ready mix concrete
prepared in depot and transported by transit mixer to the site of work.
3.
Prior to demolishing of any structure measurements have to be taken, scheme of dismantling has to be got approved from the Engineer.
Page 14 of 20
Package-1
BOQ for Railway Electrification works between RANI(Excl.)-SRPJ (Excl.) section 198 TKM of Ajmer Division of North Westetn Railway
4. Wherever, cement, Reinforcement steel are required to be consumed in the item, the rates are exclusive of cost of these materials unless otherwise
specified and the same shall be paid separately under relevant items for supply of these materials.
Page 15 of 20
Package-1
BOQ for Railway Electrification works between RANI(Excl.)-SRPJ(Excl.) section 198 TKM of Ajmer Division of North Western Railway
Description of Item
7061
Providing FOB, platform shelters, height gauge, columns, beams, trusses and other steel
components of miscellaneous works duly launched in position with or without traffic block as
directed by Engineer with contractors steel conforming to IS:2062-1999 including fabrication,
assembly, erection, launching, riveting/welding, bolting, initial coats of zinc chromate priming
conforming to relevant IS specification and three subsequent coats of aluminum paint of approved
quality conforming to IS:2339 after final erection on all surfaces complete. Rate is inclusive of
supply and fixing of MS holding down bolts for IRS type platform shelters and FOBs with required
angles.
TOTAL VALUE FOR BILL No.7B (Carried forward to summary)
Qty
Unit
Rate in
Rs.
Amount in Rs.
170
MT
85128
14471760
14471760
Note :
1. All materials, equipment, labour, casting beds, stress frames, form work staging, scaffolding, etc. is to be arranged by the contractor within the
quoted rates.
2. 1:4:8, 1:3:6 and 1:2:4 indicate, concrete prepared using volumetric mix in proportion of cement : coarse sand : stone aggregate of specified size
respectively.
3. All design mix concrete shall be machine batched with automatic weight batcher, machine mixed and machine vibrated or Ready mix concrete
prepared in depot and transported by transit mixer to the site of work.
4.
Prior to demolishing of any structure measurements have to be taken, scheme of dismantling has to be got approved from the Engineer.
5. Wherever, cement, Reinforcement steel are required to be consumed in the item, the rates are exclusive of cost of these materials unless
otherwise specified and the same shall be paid separately under relevant items for supply of these materials.
Page 16 of 20
Package-1
BOQ for Railway Electrification works between RANI(Excl.) - SRPJ(Excl.) section 198 TKM of Ajmer division of North Western Railway
8002
Description of Item
Supply of 43 grade cement OPC conforming to IS: 8112 with latest amendments and using
the same in the work as per RVNL's approved mix design as per RVNL's prescribed rates of
consumption including all lead lift, labour, loading unloading, ascent, descent, crossing of
Railway lines(s), royalty, taxes, transport (contractor's own), tools and plant complete.
Supply of 53 grade cement OPC conforming to IS: 12269 with latest amendments and using
the same in the work as per RVNL's approved mix design as per RVNL's prescribed rates of
consumption including all lead lift, labour, loading unloading, ascent, descent, crossing of
Railway lines(s), royalty, taxes, transport (contractor's own), tools and plant complete.
TOTAL VALUE FOR BILL No.8 (Carried forward to summary)
Qty
Unit
Rate in Rs.
Amount in Rs.
5000
Bag of 50kg.
312
1560000
4000
Bag of 50kg.
312
1248000
2808000
Note : OPC cement has to be supplied as per requirement of the work in terms of RVNL standard specifications for material and works. Payment against
supply will be made only after consumption of cement in the relevant items of work.
Page 17 of 20
Package-1
Package -1
BOQ for Railway Electrification works between RANI (Excl.) - SRPJ (Excl) Section 198 TKM of Ajmer
Division of North Western Railway
SITE FACILITIES
BRIEF DESCRIPTION OF ITEMS
9001
9002
9003
Rates as
per SBD
Qty
Total Cost in
Rs.
10657
204
2174028
827760
827760
Vehicle
months
Vehicle
months
44492
81
38284
225
8613900
Per km
10.35
2386
24695
Per km
8.28
5660
Unit
Page 18 of 20
3603852
46864.8
15291100
15291100
Page 19 of 20
Package -1
Package-1
BOQ for Railway Electrification works between RANI (Excl.) - SRPJ(Excl.) section 198 TKM of Ajmer division of North western Railway
Item No.
10001
Quantity
Unit
Rate in %age
above
Amount in
Rs
562151
Rs
12.1
630172
Total
630172
630172
Bill of Quantities
(Signal & Telecom
Engineering)
S.No. ITEM NO
BOQ OF S&T ARRANGEMENT IN CONNECTION WITH RE WORK OF RANI - SWARUP GANJ (PKG-I) OF NWR
DESCRIPTION OF WORK
UNIT
Rate
QTY.
total Amount
Kms
Kms
Kms
Kms
245057.79
63470.81
95087.39
57079.00
38701
38702
38703
Group - C
Supply of underground Jelly filled 0.9 mm dia 6 Quad Telecom cable.
Supply of PIJF cable of size: 10 PAIR X 0.63 MM.
Supply of PIJF cable of size: 20 PAIR X 0.63 MM.
Supply of 24 Fibre armoured Optical fiber cable as per SPEC No.IRS.TC55/2006 ver.-1 with ammendments.
Supply of RCC pipes 150mm dia, 2 Mtr long along with collars
Supply of DWC pipe of size 120 mm outer dia & 102 mm inner dia.
Supply of SPLIT DWC pipe of size 200 mm outer dia & 175 mm inner dia.
Mtrs.
Mtrs.
Mtrs.
8
9
10
11
38704
38705
38902
40004
Supply of Galvanized Iron pipe 100 mm dia `B' class with end clamps
Supply and jointing of Quad cables with theromoshrinkable jointing kits
Supply of Electronic magneto telephone desk type.
Supply of 4 wire way station equipment as per Spec. no. TC. 38/97 or latest.
12
40005
13
40006
14
40008
15
40009
16
40102
17
40103
18
40104
19
40105
1
2
3
4
38651
38653
38654
38657
5
6
7
14
18
18
60
3430809.06
1142474.58
1711573.02
3424740.00
119.35
189.92
236.62
682
682
27273
81396.70
129525.44
6453337.26
Mtrs.
Nos.
Nos.
Nos.
820.90
4077.52
2407.70
4630.21
455
14
10
41
373509.50
57085.28
24077.00
189838.61
Supply of Power Supply for telecom installation at way side equipment as per
TEC Spcn. IRS.TC-72/97 Amdt.1 or latest.
Supply of portable Emergency telephone 4 wire as per spec. no. IRS TC:75-99
with latest amendment
Supply of Emergency Socket Box with socket six pin flat to RDSO Spec No.
IRS: TC. 42/87. Amdt. 1 or latest.
Supply of VF Tapping Transformer to RDSO Spec. No. IRS.TC-22-76 of type
470:1120, 600:470, 600:1120. exact break up to be decided in consultation
with engineer.
Supply of FCPC To SCPC 10 meter long patch cords with 0db adaptors as
TEC spec G/OJC-01/03 JAN99 Or latest.
Supply of managed Expendable rack type STM-1 ADM L 1.1 as per
Technical Spec. No. TEC GR No. GR/SDH-04/02 Mar 02 with amendment 1 ,
2 ,3 & 4 or latest with STM-1 aggregate interface , 21 E1S and 4 Numbers of
10/100 Base T Ethernet Port order wire, power supply unit, sub rack
installation material and accessories manual etc.The equipment should be fully
wired for its ultimate capacity and provide redundency for power supply and
synchronisation and other detail as given in chapter 3 (model - TJ 100 MC1).
Nos.
3623.41
41
148559.81
Nos.
2205.55
18
39699.90
Nos.
2205.55
19849.95
Nos.
580.26
182
105607.32
Nos.
1473.55
68
100201.40
Nos.
154131.91
15
2311978.65
Supply of SMPS based battery chargers for telecom use 48v, 25 amps in N+1
configuration using 2 modules of 25 A (FR/BC) with automatic switching
between the modules N=2.
Supply of 200 AH capacity LM batteries 24 Nos. at each station with required
no. of porcelene insulator. The suitable wooden rack for keeping batteries
shall also be supplied and it should be painted with 2 coats acid resistnt paint.
Nos.
55184.04
15
827760.60
Nos.
49860.40
15
747906.00
S.No. ITEM NO
20
40356
BOQ OF S&T ARRANGEMENT IN CONNECTION WITH RE WORK OF RANI - SWARUP GANJ (PKG-I) OF NWR
DESCRIPTION OF WORK
UNIT
Rate
QTY.
total Amount
Group - C
Supply of Speaker cable 2 Core Shielded & screened of size 47/0,193 as per
IS-694Cable for modification of existing PA System
Total of SOR Items (Group C)
Mtrs.
41.21
12273
505770.33
21825700.41
NS Items:
21
NS 3
22
23
NS 7
NS 8
24
NS 9
25
NS 10
26
NS 11
27
NS 12
28
NS 13
29
NS 14
Nos.
14870.65
74353.25
Nos.
Mtrs.
14468.00
44.85
2
1227
28936.00
55030.95
Nos.
106030.00
106030.00
Nos.
106030.00
106030.00
Supply of local craft terminal as per technical spec. and other stipulations
complete with all accessories compataible with NMS.(Refer. Telecom special
conditons : Chapter-3).
Supply of remote service terminal as per tech. Spec.and other stipulations with
all accessories compataible with NMS. It should be possible to plug in remote
service terminal at any of the station. It should be capable to programme any
network element from any location of network and read the full status of any
element in the network from remote service terminal, as well as one soft copy
of the software .(Refer. Telecom special conditons : Chapter-3)
Nos.
54970.00
54970.00
Nos.
129668.25
129668.25
Supply & Provision of Surge protection device for AC Power line incoming,
complete for Single phase power protection
Supply of 2T Transformer .
Total Cost of NS Items (Group-C)
TOTAL (Group-C) carried forward to summary
Nos
24955.00
12
299460.00
Nos.
1008.00
23
23184.00
877662.45
22703362.86
BOQ OF S&T ARRANGEMENT IN CONNECTION WITH RE WORK OF RANI - SWARUP GANJ (PKG-I) OF NWR
S.NO
.
1
2
3
4
5
6
7
8
ITEM
NO
DESCRIPTION OF WORK
Group - D
39652 Excavation of cable trench of 1 m. depth & 300 mm.
wide across the track crossing, road crossing, level
crossing, platform & refilling.
39653 Providing chase in hard rock.
39654 Perforation and Fixing of GI pipes on girder bridges,
RCC bridges, drains, culverts, rocky places
tunnels/deep cutting.
39655 Fixing/ laying of DWC/RCC pipes(FOR SIGNALING
& TELECOM WORK)
39656 Laying of signaling / power / telecom / quad/OFC
cable of various sizes in trench and pipes.include
Testing of point to point insulation / continuity test for
all laid out cables, Measuring Parameters and
preparing the records
39657 Placing of half round ( Split DWC ) pipe over the laid
cable in open trenches.
39658 Supply and Fixing of 20 pair CTB and termination of
quad/ jelly filled cable.
39901 Supply and Installation of Maintenance Free
Earthing and Bonding System as per RDSO
specification
40502 Installation and commissioning of 4 wire way station
equipments, power supply unit at SP/SSP/Station/
TSS/AEN/PWI/SI
offices/
Residences.
The
installation of way station equipment and power
supply unit (supply covered under a separate item)
shall be mounted on a MS angle rack. All the
materials for installation, commissioning of 4 W
equipment and power supply unit shall be provided
by contractor.
UNIT
Rate
Kms.
51262.94
Mtrs.
Mtrs.
94.98
36.44
Kms.
QTY.
Total Amount
40
2050517.60
4545
455
431684.10
16580.20
30018.70
60037.40
Kms.
4115.00
41
168715.00
Kms.
2669.33
20
53386.60
Nos.
3324.24
27
89754.48
Nos.
33770.34
20
675406.80
Nos.
2331.19
41
95578.79
S.NO
.
10
11
ITEM
NO
DESCRIPTION OF WORK
Group - D
40503 Installation of emergency socket box including
socket on the Rail Post in the section and yard at
every one Km distance as pertapping chart supplied
by the survey team. this will include wiring and
termination of quad cable on the socket box
mounted at 1 mtr hight, clamped with 2 nos. UClamps, provision of concreate foundation of rail
post in such a way that the rail post is one meter
above the earth level. The concrete shall be in ratio
of 1:3:6 of cement, sand & stone chips. The
contractor shall jointly test with RVNL Engineer for
its satisfactory operation. This includes painting of
emergency socket post with alternate yellow and
black strip of 6" width and paiting of the socket box
with gray colour paint and painting of arrows on the
telephone posts/cable markers to show the nearest
Emergency socket as instructed by engineer at site.
Rail Posts and MS pipes of required lengths for
fixing Emergency sockets will also be supplied and
installed by the Contractor.
40601 Supply and installation of OFC cable joint enclosure
as per TEC No. G/OJC-01/03 Jan 99 or latest and
splicing o optical fibre cables (24 Fibre) and testing.
UNIT
Rate
QTY.
Total Amount
Nos.
1858.19
10
18581.90
Nos.
8649.87
45
389244.15
S.NO
.
ITEM
NO
DESCRIPTION OF WORK
12
40603
13
UNIT
Rate
QTY.
Total Amount
Nos.
92372.01
11
1016092.11
Nos.
30712.42
0.00
Nos.
27487.94
11
302367.34
Nos.
Nos.
19761.66
23993.54
11
11
217378.26
263928.94
Nos.
29453.54
11
323988.94
Group - D
14
15
16
17
S.NO
.
ITEM
NO
DESCRIPTION OF WORK
18
40605
19
UNIT
Rate
QTY.
Total Amount
Nos.
35779.77
11
393577.47
Kms.
9901.92
30
297057.60
Nos.
4.85
327273
1587274.05
Group - D
20
8451151.73
S.NO
.
21
ITEM
NO
DESCRIPTION OF WORK
Group - D
NS-18 Excavation of cable trench 1.2m deep x 300mm
width as per Technical Specifications 51.2, at track
& roads crossing, laying of DWC pipes, as per Drg.
No. RVNL/S&T/SG 024/2005, refilling of trench,
ramming. HDPE pipe shall be laid at the bottom of
the trench and after refilling with seived earth by 150200 mm, 6 quad cable shall be laid and restoring the
earth to original condition.
22
NS-19
23
24
25
26
UNIT
Rate
Kms.
67620.00
51
3448620.00
Mtrs.
1500.00
1700
2550000.00
230000.00
360
23
0.00
95760.00
19550.00
System
(Nos.)
Nos.
Nos.
230000.00
266.00
850.00
QTY.
Total Amount
S.NO
.
27
28
29
30
ITEM
NO
DESCRIPTION OF WORK
UNIT
Rate
QTY.
Total Amount
Group - D
NS-30 Supply of Krone insertion/ extrusion tool Krone
make
NS-31 Supply & installation of wire insulator for wire
operating, Level Crossing Lifting barriers/Signals as
per Specification No. IRS S-47-74
Nos.
1150.00
5750.00
No.of wire
Insulator
(Nos.)
555.00
90
49950.00
No.of rod
insulator
(Nos.)
Nos.
591.00
90
53190.00
20000.00
10
200000.00
6652820.00
15103971.73
Bill of Quantities
(Electrical
Engineering)
BOQ of RANI-SRPJ
Package-1
Schedule 16000
BOQ for Railway Electrification works between RANI(Excl.) -SRPJ(Excl.) section 198 TKM of Ajmer Division of North Western Railway
RE General
Supply Erection Total supply in Total Erection Grand total in
Item No SOR ITEM
Description
Unit
Qty
(In Rs)
(In Rs)
Rs
(In Rs)
Rs
16001
OHE-1
16002
OHE-2
16003
OHE-3
16004
16005
OHE-4
OHE-5
198
996
14440
197208
2859120
3056328
1500
444
439
415
36
36
658500
184260
54000
15984
712500
200244
275
78
5871
4704
538
538
1614525
366912
147950
41964
1762475
408876
1600
473
293
275
118
118
468800
130075
188800
55814
657600
185889
12
5
24874
22540
631
631
298488
112700
7572
3155
306060
115855
5985
269
29925
1345
31270
16006
OHE-6
16007
OHE-7
Set
3967
123
19835
615
20450
16008
OHE-8
Set
142372
5061
711860
25305
737165
Set
Set
15
3
58472
57305
8586
8586
877080
171915
128790
25758
1005870
197673
Set
Set
Mtr
Per
month
1
1
0
165899
164732
0
16387
16387
22
165899
164732
0
16387
16387
0
182286
181119
0
155
25265
3916075
3916075
21660
86640
86640
10420
4952
41680
19808
61488
38
6214394
7611469
16009
16010
16011
OHE-10
16012
OHE-11
16013
OHE-12(a)
16014
16015
Total
Grand Total carried forward to summary
OHE-16
13825863
13825863
Page 1 of 25
BOQ of RANI-SRPJ
Package-1
Schedule 17000
BOQ for Railway Electrification works between RANI(Excl.) -SRPJ(Excl.) section 198 TKM of Ajmer Division
of North Western Railway
Switching Post building
Item No
17001
SOR ITEM
Description
Unit
Qty
Rate (In
Rs.)
Grand Total
Rs.
OHE-15
Each
140394
701970
17001(a)
17001(b)
174
Sq.m
174
Sq.m
174
174
Sq.m
331
331
17001(c)
only)
Extra for open foundation on poor soil having every
0.3 m or part there of higher plinth over normal
OHE-15(c)
plinth height (On ground floor area only)
Total cost
OHE-17
702649
702649
2 of 25
BOQ of RANI-SRPJ
Package-1
Schdule 19000
BOQ for Railway electrification works between RANI (Excl.) -SRPJ(Excl.) section 198 TKM Of Ajmer Division of North Western Railway
OHE - Ferrous other than steel structures and SPS
Item No
SOR
ITEM
Description
19001
19002
19003
19004
19005
19006
19007
Unit
Qty
Supply
(In Rs)
Erection
(In Rs)
Total
supply in
Rs
Total
Erection
In Rs
Grand
Total In Rs
Each
641
4651
722
2981291
462802
3444093
Sq M
28
2408
260
67424
7280
74704
Each
5000
11104
622 55520000
3110000
58630000
Each
1653
9937
622 16425861
1028166
17454027
Each
345
36645
2690 12642525
928050
13570575
Each
Each
40
12
7784
6617
679
679
311360
79404
27160
8148
338520
87552
Each
Each
125
30
18268
15934
1908
1908
2283500
478020
238500
57240
2522000
535260
TKM
198
13039
4160
2581722
823680
3405402
93371107
6691026 100062133
100062133
OHE-19
3 of 25
BOQ of RANI-SRPJ
Package-I
Schedule 20000
BOQ For Railway Electrification works between RANI(Excl.)- SRPJ(Excl.) section 198 TKM of Ajmer Division of North
Western Railway
OHE - Non Ferrous 'A'
Item No
20001
SOR ITEM
Description
Total
Grand Total in
Erection
Rs
in Rs
Unit
Qty
TKM
198
41112
8140176
8140176
20002
MT
215
629859
135419685
135419685
20003
MT
135
629859
85030965
85030965
Total
Grand total carried forward to summary
OHE-20
220450650
8140176
228590826
228590826
4 of 25
BOQ of RANI-SRPJ
Package-1
Schedule 21000
BOQ for Railway Electrification works between RANI(Excl.) - SRPJ ( Excl.) section 198 TKM of Ajmer Division of North Western Railway
OHE - Non Ferrous ''B'
Item No
21001
SOR
ITEM
Description
21002
OHE-25
21003
OHE-26
21004
OHE-27
21005
OHE-28
21006
OHE-29
21007
OHE-30
21008
21009
21010
OHE-33
21011
OHE-34
21012
OHE-35
21013
OHE-36
21014
OHE-37
21015
Total
Grand total carried forward to summary
OHE-21
Unit
Qty
Supply
(In Rs)
Erection
(In Rs)
TotalSupply
(In Rs)
Total
Erection
(In Rs)
Grand
Total in
Rs
3970
3970
444160
106372
31760
7940
475920
114312
Each
Each
55520
53186
Each
55
64506
4241
3547830
233255
3781085
Each
14
63339
4241
886746
59374
946120
Each
761250
4349
3045000
17396
3062396
Each
72
66512
4386
4788864
315792
5104656
Each
19
103400
4803
1964600
91257
2055857
Each
130
5790
320
752700
41600
794300
Mtr
261
2634
82
687474
21402
708876
Each
63
7452
320
469476
20160
489636
Mtr
358
1523
138
545234
49404
594638
Each
285
4081
56
1163085
15960
1179045
MT
1197
Set
10844
1796
65064
10776
75840
122
107
32574
28569
61143
Each
267
Each
265310
23882
265310
23882
289192
Each
324501
324501
324501
18764489
1293028 20057517
20057517
5 of 25
BOQ of RANI-SRPJ
Package-1
Schedule-24000
BOQ for Railway Electrification works between RANI(Excl.) - SRPJ ( Excl.) section 198 TKM of Ajmer Division of North Western Railway
Unit
qty
Supply
(In Rs)
Erection
(In Rs)
Total
supply in
Rs
Each
80242
80242
80242
24001
TSS-1
24002
TSS-2
DELETED
Total
Grand total in
Erection
Rs
(In Rs)
Cum
2420
761
24004
Each
581714
5118
24005
Each
1096604
5118
1096604
5118
1101722
Each
235013
2220
Each
235013
2220
470026
4440
474466
Each
197215
1145
Each
197215
4327
591645
12981
604626
Each
131033
1145
Each
246611
1145
115399
115399
48045
811
1414
811
0
461596
0
0
5656
0
0
467252
0
303780
3594
1215120
14376
1229496
359578
3594
Each
55163
473
220652
1892
222544
Each
63755
473
Each
41645
2790
1477300
9279
1477300
9279
1486579
180
417
32
75060
5760
80820
Mtr
350
257
89950
2450
92400
Each
160
1595
20
255200
3200
258400
Each
35
2396
331
83860
11585
95445
Each
24072
384
Each
10
24072
600
240720
6000
246720
Each
20
2943
110
58860
2200
61060
Each
8726
200
Each
14
8726
306
122164
4284
126448
Set
612306
6736
612306
6736
619042
Each
22548
479
67644
1437
69081
Each
30
1885
734
56550
22020
78570
Mtr
900
133
39
119700
35100
154800
Mtr
1200
65
31
78000
37200
115200
Mtr
100
12
13
1200
1300
2500
Mtr
2000
153
13
306000
26000
332000
24003
24006
24007
TSS5(a)
TSS5(b)
24008
TSS-6(a)
24009
TSS-6(b)
24009A
TSS-6(c )
24009B
TSS-6(d)
24010
TSS-7 (a)
Each
24011
24011A
24012
24012A
24013
24013A
24013B
24014
24015
24016
24017
24018
24019
24020
24021
24022
24023
24024
TSS
Description
24025
TSS-19
24026
TSS-20
24027
TSS-21
24028
TSS-22
24029
TSS-23
24030
TSS-24
Each
Mtr
6 of 25
BOQ of RANI-SRPJ
24031
TSS-25
24032
TSS-26(a)
24033
TSS-26(b)
24033A
TSS-26(c )
24033B
TSS-26(d)
24034
TSS-27(a)
24034A TSS-27(b)
24035
TSS-28(a)
24035A TSS-28(b)
24036
TSS-29
24037
TSS-30
Package-1
Mtr
250
169
42250
2250
44500
Each
24091345
184047
Each
33895503
184047
33895503
184047
34079550
Each
17228475
184047
Each
27838617
184047
Each
66784
2127
333920
10635
344555
Each
133680
2127
Each
36927
2127
295416
17016
312432
Each
67826
2127
Each
2018938
42292
2018938
42292
2061230
Each
2184
44286184
555496
44841680
Total
44841680
Provision of cross track, control room building and approach road shall be made in the civil portion of the estimate.
2. Provisio
2 Provision of yard lighting and water jet pump shall be made in the general electrical portion of the estiate.
TSS
7 of 25
BOQ of RANI-SRPJ
Paackage-1
Schedule 27000
BOQ for Railway Electrification works between RANI(Excl.)-SRPJ (Excl.) section 198 TKM of Ajmer Division of North
Western Railway
TSS Spares
Item No
27001
27002
27003
27004
27005
27006
27007
27008
27009
Description of item
SF-6 Gas Cylinder with filling arrangement
25KV CB Bushing
Interruptor Bushing
Earth fault Relay
Buchholz Relay
Relay Testing Kit
HRC fuse 2A, 4A, 10A, 15A, 32 Amp
Transformer Oil
Capacitor unit of capacitor bank
Total
Unit
Qty
SOR rates in Rs
Each
Each
Each
Each
Each
Set
Set
Litre
Set
0
1
1
1
1
1
10
5000
1
29590
31527
11298
7209
16140
146334
1076
28
550265
Total supply in Rs
0
31527
11298
7209
16140
146334
10760
140000
550265
913533
913533
BOQ of RANI-SRPJ
Package-1
SCHEDULE -28000
BOQ for Railway Electrification works between RANI(Excl.) - SRPJ(Excl.) section 198 TKM of Ajmer Division of North Western Railway
Item No
28001
28002
28003
28004
28005
28006
28007
28008
28009
28010
28011
28012
28013
28014
28015
28016
28017
28018
28019
28020
28021
28022
28023
28024
28025
28026
28027
28028
28029
28030
28031
28032
28033
28034
28035
28036
28037
28038
28039
28040
28041
28042
28043
28044
28045
28046
28047
28048
28049
Qty
1
1
1
1
1
3
6
2
1
Rate
6672
9118
8285
3670
9453
1023
7228
4893
9453
Total supply
1
1
5
1112
722
134
1112
722
2
2
2
8
1
1
2
3892
4226
1112
1390
1501
1112
2224
1
1
1
4
3
1
2
2
5561
556
834
5561
4448
6672
1112
1112
7784
8452
2224
11120
1501
1112
4448
0
5561
556
834
22244
13344
6672
2224
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Set
1
1
1
2
2
2
1
2
1
1
1
1
1
3
4
5561
4671
1669
890
1669
1112
2780
4448
7228
14456
111207
1669
1112
5005
5347
5561
4671
1669
1780
3338
2224
2780
8896
7228
14456
111207
1669
1112
15015
Set
Each
Each
Each
Each
Each
Each
1
0
1
2
0
0
0
4010
789735
290615
58123
1076933
796547
398800
4010
0
290615
116246
0
0
6672
9118
8285
3670
9453
3069
43368
9786
9453
670
2224
21388
Total(schedule items)
809543
Each
45835
45835
Each
Each
Each
1790
5
5
158
158
1790
790
790
49205
858748
Grand total (schedule & non schedule items) carried forward to Summary
Page 9 of 25
BOQ of RANI-SRPJ
Package-1
Schedule-29000
BOQ for Railway Electrification works between RANI (Excl.) - SRPJ (Excl.) section 198 TKM of Ajmer Division of North Western Railway
SCADA
Item No
SOR ITEM
Description
Unit
Qty
Total
supply in
Rs
Total
erection
in Rs
Grand
total (In
Rs)
29001
SCADA-1
Job
736096
736096
736096
29002
SCADA-2
Set
3710933
3710933
3710933
29003
SCADA-3(a)
Each
347373
694746
694746
29004
SCADA-3(b)
Each
223178
669534
669534
29005
SCADA-3(c)
Each
223178
1115890
1115890
29006
SCADA-4(a)
Set
192502
192502
192502
29007
29008
SCADA-4(b)
SCADA-5
Set
Set
1
1
198711
186292
0
0
198711
186292
0
0
198711
186292
29009
SCADA-6
Nos.
31049
62098
62098
29010
SCADA-7(a)
Job
436502
436502
436502
29011
SCADA-7(b)
Job
220828
220828
220828
29012
SCADA-8(a)
Job
176661
176661
176661
29013
SCADA-8(b)
Job
58887
58887
58887
29014
SCADA-8(c)
Job
147218
147218
147218
29015
SCADA-9
Set
371342
371342
371342
29016
SCADA-10
Set
453310
453310
453310
SCADA
Supply of UPS.
Supply of furniture.
Supply of Data logging Printer for Remote Control
Centre.
Erection, testing & commissioning charges for
items SCADA-2 to SCADA-6.
Integration of new SCADA system to existing
system at RCC.
Erection, integration, testing & commissioning for
existing and new equipments for TSS.
Erection, integration, testing & commissioning for
existing and new equipments for SSP.
Erection, integration, testing & commissioning for
existing and new equipments for SP.
Supply of Equipment and Components (As per list
B)
Supply of Spl. T & P (As per list C)
Total
Grand total carried forward to summary
7655358
1776192
9431550
9431550
10 of 25
BOQ of RANI-SRPJ
Package-1
BOQ for Railway Electrical works between RANI(Excl.)- SRPJ(Excl.) section 198 TKM of Ajmer Division of North Western Railway
Common Schedule of OHE/TSS
Item No
SOR
ITEM
30001
CS-1
30002
CS-2
30003
CS-3
30004
CS-4
30005
CS-5
30006
CS-6
30007
CS-7
30008
30009
30010
30011
30012
30013
30014
30015
30016
30017
Description
Supply and erection of 25 KV,1600 Amp vacuum
Interruptor
Supply and erection of 25 KV Potential Trasformer
Type-I or Type-II
Supply and erection of 42 KV Lightning Arrestor
with surge monitor, counter and cable
Supply and installation of cables for SWS/TSS
Supply, erection, oil filteration, testing &
commissioning of 25KV/240V 10 KVA Auxiliary
(LT) Supply Transformers oil type with DO fuse
switch, anti climbing device, pedestal insulators,
copper jumper and earth electrode etc.
(a) With Porcelain Insulators 1050mm CD
(b) With Composite Insulators 1050mm CD
Providing and laying of Concrete For Foundation
and Plinth In Other Than Hard and Rocky soil
Providing and laying of Concrete For Foundation
and Plinth In all types of soils and soft rock.
Total
Grand total carried forward to summary
Common OHE
Unit
Qty
Supply
(In Rs)
Erection in
Rs
Total
Supply in
Rs
Each
16
241008
2755
3856128
44080
3900208
Each
16
49111
518
785776
8288
794064
Each
19
17710
363
336490
6897
343387
Mtr
3758
137
11
514846
41338
556184
Set
Set
19
6
63719
62552
8506
8506
1210661
375312
161614
51036
1372275
426348
CUM
12696
3102
1004
39382992
12746784
52129776
CUM
125
3205
1493
400625
186625
587250
CUM
57
MT
2382
66552
2103
158526864
5009346
163536210
Mtr
1783
1956
66
3487548
117678
3605226
Each
21
1540
163
32340
3423
35763
Mtr
106
929
98
98474
10388
108862
Mtr
239
229
34
54731
8126
62857
Cum
284
698
198232
1420
199652
Nos
10
1875
18750
18750
PerMonth
15
15548
233220
233220
each
location
49677
34545
99354
69090
168444
4620
Total
Grant total
Erection in
(In Rs)
Rs
263340
209623713
263340
18718103
228341816
228341816
11 of 25
BOQ of RANI-SRPJ
Package-1
BOQ for Railway Electrification works of between RANI(Excl.)-SRPJ(Excl.) section 198 TKM of Ajmer Division of North Western Railway
SCHEDULE -33000
Amount in Rs
Description of Items
1
SECTION - A :
ELECTRIFICATION OF STAFF QUARTERS
33001
Unit
Qty
Supply
Erection
Total supply
Total Erection
Grant total
i)
ii)
iii)
iv)
v)
Type - I quarter
Type - II quarter
Type - III quarter
Type - IV quarter
Type - V quarter
Each
Each
Each
Each
Each
0
16
4
1
0
0
0
0
0
0
23379
24591
30867
57106
78371
0
0
0
0
0
0
393456
123468
57106
0
0
393456
123468
57106
0
vi)
Extra for stair case light point controlled with two nos. two way switches
Each
10
502
5020
5020
Each
2.00
0.00
14546.00
29092
29092
490.00
0.00
908.00
444920
444920
33002
33003 (i)
GEW
Point
Page 12 of 25
BOQ of RANI-SRPJ
Wiring for power plug point including circuit wiring, sub main wiring, with
Fire Retardant (FR) PVC insulated, multistranded, copper conductor,
single core cable on surface/in recessed PVC conduits, distribution
boards, sub distribution boards, earthing with G.I.pipe electrode etc as
required.
Wiring shall be done as per sizes of cables, no. of points
permissible in each circuit and sub main as indicated in Explanatory
Notes.
Extra for provision of industrial type iron clad plug socket with 32A DP
MCB in M.S.Box
Package-1
Point
54.00
0.00
1666.00
89964
89964
Point
10.00
0.00
455.00
4550
4550
33005 (i)
No.
286
1214
191
347204
54626
401830
33005 (ii)
No.
16
1657
414
26512
6624
33136
33006 (i)
No.
2456
386
No.
1703
426
No.
125
3132
783
391500
97875
489375
33003 (ii)
33003 (iii)
33006 (ii)
33006 (iii)
GEW
Page 13 of 25
BOQ of RANI-SRPJ
33006 (iv)
33006 (v)
Supply, installation, testing and commissioning of prewired 4x14 watt, T5, energy efficient street light luminary , complete with T-5 tubes,
electronic ballast etc.on bracket pipe of erected pole or on wall bracket of
GI class "B" pipe & connections from junction box/overhead line/light
point etc. to luminary with 1.5 sq.mm FRLS PVC insulated multistranded
copper conductor single core/three cable as instructed & earthing etc as
required.
Supply, installation, testing and commissioning of prewired 4x24 watt, T5, energy efficient street light luminary complete with T-5 tubes,
electronic ballast etc on bracket pipe of erected pole or on wall bracket of
GI class "B" pipe & connections from junction box/overhead line/light
point etc. to luminary with 1.5 sq.mm FRLS PVC insulated multistranded
copper conductor single core cable & earthing etc as required.
Package-1
No.
5810
1452
Nos.
6207
1552
No.
No.
5
0
4453
5196
699
815
22265
0
3495
0
25760
0
33007
(i)
(ii)
1 x 70 Watt.
1 x 150 Watt
33008
i)
ii)
No.
No.
65
5
1255
1363
196
214
81575
6815
12740
1070
94315
7885
33009
Supply and fixing of stepped type, electronic fan regulator, 300 watts,
on the existing phenolic laminated sheet cover plate/modular plate of
switch box, including connections,testing & commissioning as required.
No.
70
256
57
17920
3990
21910
33010
No.
23
134
21
3082
483
3565
33011
(i)
No.
20
2024
317
40480
6340
46820
GEW
Page 14 of 25
BOQ of RANI-SRPJ
Package-1
Each
51938
8157
207752
32628
240380
No.
55866
8775
111732
17550
129282
No
50929
7999
101858
15998
117856
No.
57765
9072
57765
9072
66837
(a)
(b)
(ii) Outgoing MCCB 40A, 4 pole, 25kA, fixed type (Ics=100%Icu) - 3 Nos
(iii) Outgoing MCB double pole, 6-32A, 10kA - 20 Nos
(iv) Sleeved/Epoxy coated copper bus-bar 200A in bus bar chamber
(V) Indication Lights
33014
33015
Deleted
Supply, installation, testing & commissioning of weather proof, L.T.
feeder pillar of different capacities
LT Feeder Pillar 63 Amp comprising of the items indicated as under:
(i) Incoming MCCB 63A, 4 pole, 35kA, fixed type (Ics=100%Icu) - 1 No
(i)
(ii) Outgoing MCCB 40A, 4 pole, 25kA, fixed type (Ics=100%Icu) - 4 Nos
(iii) Outgoing MCB double pole, 40A, 10 KA - 4 Nos
(iv) Sleeved/Epoxy coated copper bus-bar 200A in bus bar chamber 2 set .
(v) Indication lights
GEW
Page 15 of 25
BOQ of RANI-SRPJ
Package-1
No.
68942
10828
68942
10828
79770
No.
106892
16788
No.
8677
1363
No.
8955
1407
No.
13025
2047
(iii)
33016
Deleted
SECTION - D : EXTERNAL ELECTRIFICATION
WORKS
Supply and erection of different length , swaged type steel tubular pole ,
complete with the following:
a) Double door, weather proof M.S. junction box (degree of protection not
less than IP54) complete with MCB 6 amps, copper bus bar for looping 4core, 3 nos. LT cables and clamping with pole, as required.
33017
b) Casting of foundation with concrete of M10 grade and providing
muffing up to 300 mm above ground level,as required
c) Erection of GI pipe class 'B' ISI marked up to junction box for passing
cable.
(Payment of G.I. pipe shall be made against the relevant BOQ item).
i)
ii)
iii)
GEW
7 Meter long pole with canopy type single pipe bracket (for one
luminary)
7 Meter long pole with canopy type double pipe bracket (for two
luminaries)
9 Meter long pole with canopy type single pipe bracket
Page 16 of 25
BOQ of RANI-SRPJ
33018
Deleted
33019
Supply of GI pipe - class' B' ISI marked with accessories including bends
etc. for support of cable with erected pole/recessing in wall/floor/passing
earth strip OR passing cable as required:
i)
ii)
iii)
iv)
v)
vi)
vii)
32 mm dia
40 mm dia
50 mm dia
65 mm dia
80mm dia
100mm dia
150mm dia
Supply, erection, testing & commissioning of control and distribution
panel for colour light signalling supply in 25kV AC traction system as per
33020
RDSO technical specifications No.TI/SPC/PSI/CLS/0023 including latest
amendment.
(i)
For 10kVA AT
(ii)
For 25kVA AT
ELECTRIFICATION OF FOOT OVER BRIDGE
Electrification of foot over bridge complete with 3.5 meter long, 50 mm
dia, G.I. pipe pole with GI pipe bracket, luminary with lamp, M.S. junction
box, connection from junction box to luminary with 1.5 sq.mm, Flame
33021
Retardant (FR), PVC insulated, copper conductor cable and connection
to earthing system. etc. and as per scale of fittings indicated in
Explanatory Notes.
SECTION - E: POWER SUPPLY DISTRIBUTION ARRANGEMENT
Supply, installation, testing and commissioning of 11kV/415 Volt,
Delta/Star connected, copper wound, power distribution transformer
33022
(outdoor type) conforming to IS:2026 (Latest Version) complete with all
accessories as required.
(i)
100 kVA
(ii)
250 kVA
(iii)
500 kVA
Extra for providing fencing /enclosure for above item as indicated in
(iv)
Explanatory Notes.
Extra for construction of foundation for transformer installation as
(v)
required
GEW
Package-1
Meter
Meter
Meter
Meter
Meter
Meter
Meter
0
250
400
0
0
150
50
173
206
267
337
448
631
1027
28
32
42
54
70
99
162
0
51500
106800
0
0
94650
51350
0
8000
16800
0
0
14850
8100
0
59500
123600
0
0
109500
59450
No
No
10
1
47669
101421
7487
15929
476690
101421
74870
15929
551560
117350
No
2.00
0.00
8451.00
16902
16902
No.
No.
No.
2
1
0
172543
279389
359714
31565
51112
65806
345086
279389
0
63130
51112
0
408216
330501
0
Kg
200
53
12
10600
2400
13000
Cu.M
25
3339
944
83475
23600
107075
Page 17 of 25
BOQ of RANI-SRPJ
33023
33024
Package-1
No.
20391
3731
40782
7462
48244
Set
1143754
209240
No.
765235
75673
No.
1180859
116773
33025
33026
33027(i)
33027(ii)
33028
GEW
iv). Out going switch fuse unit/fuse switch unit cat AC 23 (TPN) with HRC
fuses 400 Amp) - 3 Nos
v). Out going switch fuse unit/fuse switch unit cat AC 23 (TPN) with HRC
fuses 250 Amp) - 4 Nos
vi) Out going switch fuse unit/fuse switch unit cat AC 23 (TPN) with HRC
fuses 125 Amp - 4 Nos.
vii) Out going switch fuse unit/fuse switch unit cat AC 23 (TPN) with HRC
fuses 63 Amp - 5 Nos.
Sleeved/epoxy coated copper bus-bar - 1600A for phases and 800A for
neutral.
Deleted
Deleted
Deleted
Page 18 of 25
BOQ of RANI-SRPJ
33029
33030
(i)
Package-1
Set
45449
7138
227245
35690
262935
82.5 kVA DG set with 160 amp, 4-pole, MCCB 50kA (Ics=100%Icu), 250
amps copper bus-bars, 4 pole contactors 250amp.
Set
863493
85389
863493
85389
948882
(ii)
160 kVA DG set with 250 amp, 4-pole MCCB 50 KA(Ics=100%Icu), 400
amps copper bus-bars, 4 pole contactors 400amps
Set
1367729
135252
1367729
135252
1502981
(iii)
250 kVA DG set with 400 amp, 4-pole MCCB 50kA (Ics=100%Icu), 600
amp copper bus-bars, 4 pole contactors 600amps.
Set
1961462
193966
33031
No.
363114
35907
363114
35907
399021
Job
56
1907
300
106792
16800
123592
33033
Job
30
2118
332
63540
9960
73500
33034
Job
16
3742
587
59872
9392
69264
Meter
400
43
17200
3200
20400
Meter
10
70
11
700
110
810
Meter
160
555
87
88800
13920
102720
EARTH CONNECTIONS
33035(i)
33035(ii)
33035(iii)
GEW
Page 19 of 25
BOQ of RANI-SRPJ
CABLING
Supply, laying . 1.1 KV grade LT XLPE insulated armoured, aluminum
conductor cable , making good the damages, end terminations with
33036
aluminium crimping sockets/lugs, provision of cable route markers,
testing and commissioning etc. as required as per Technical
specifications:
i)
2 Core 16 Sq.mm
ii)
2 core 25sq.mm
iii)
2 Core 70 Sq.mm
iv)
2 Core 185 Sq.mm
v)
4 Core 16 Sq.mm
vi)
3.5 Core 35 Sq.mm
vii)
3.5 Core 70Sq.mm
viii)
3.5 Core 120Sq.mm
ix)
3.5 Core 185Sq.mm
x)
3.5 Core 300Sq.mm
xi)
single core 400 sq.mm
Extra for provision of cable route marker
xii)
SECTION - H : ELECTRIFICATION BY HIGH MASTS
Package-1
SECTION - G :
33037
16 Meter high mast system with 6 nos. 2x400 watts MH luminaries and
MH lamps
16 Meter high mast system with 9 nos. 2x400 watts MH luminaries and
ii)
MH lamps
SECTION - I : LAYING OF 11 KV / 33 KV CABLES
Supply and laying of following sizes XLPE (E) insulated, armoured,
33038
aluminium conductor HT cable .
GEW
250
500
0
100
8500
1517
500
250
250
50
0
500
185
213
364
752
238
337
537
848
1187
1923
618
224
42
50
58
74
53
54
85
84
118
90
98
11
46250
106500
0
75200
2023000
511229
268500
212000
296750
96150
0
112000
10500
25000
0
7400
450500
81918
42500
21000
29500
4500
0
5500
56750
131500
0
82600
2473500
593147
311000
233000
326250
100650
0
117500
Job
613453
60664
1226906
121328
1348234
Job
654135
64685
Meter
Meter
Meter
Meter
50
400
125
0
970
1655
3679
5189
153
164
173
173
48500
662000
459875
0
7650
65600
21625
0
56150
727600
481500
0
i)
(i)
(ii)
(iii)
(iv)
33039
Meter
meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
No.
11 KV, 3 core 70 sq mm
11 KV, 3 core 185 sq mm
33 KV, 3 core 300 sq mm
33 KV, 3 core 400 sq mm
Deleted
Page 20 of 25
BOQ of RANI-SRPJ
33040
Supply of outdoor type, heat shrinkable, end termination kit, suitable for
following cable sizes XLPE(E) insulated, armoured aluminium conductor
cable and making termination, connections with overhead conductor,
testing & commissioning etc.
3 core 11 KV 70 to 185 sq mm
3 core 33 KV 240 to 400 sq mm
Deleted
Package-1
No.
No.
9
2
7469
23425
1173
2317
67221
46850
10557
4634
77778
51484
33042
No.
45127
4462
180508
17848
198356
33043
No.
18
813
80
14634
1440
16074
33044 (i)
Supply and laying of 200 mm dia RCC hume pipe, ISI marked, NP-4
under the Railway track/road etc, digging of trench and back filling
with excavated earth after laying of pipe and making good the damages
as required.
Meter
300
301
30
90300
9000
99300
Meter
150
301
1210
45150
181500
226650
Job
Job
2
0
52952
48492
5236
4796
105904
0
10472
0
116376
0
5650
28250
28250
(i)
(ii)
33041
Supply and laying 200 mm dia RCC hume pipe, ISI marked , NP-4
under the Railway track with trench less method and making good the
damages as required
SECTION - J: PROVISION OF PUMPS
Supply, installation, testing & commissioning of submersible pump set
suitable to operate on 3 phase, 415V, 50 Hz AC supply along with control
33045
panel etc complete for supplying water at suitable discharge and head as
per site requirements:
(i)
7.5 HP pump set
(ii)
5 HP pump set
SECTION - K: MISC. WORKS
33044 (ii)
33046
GEW
Page 21 of 25
BOQ of RANI-SRPJ
33047
Package-1
Job
116451
116451
116451
Job
91935
91935
91935
750
236
36
177000
27000
204000
No.
79175
12435
79175
12435
91610
Job
2863
450
2863
450
3313
Job
7747
1217
33049
Fabrication, supply, installation, testing and commissioning of , precooling point as per details given in explanatory notes.
SECTION -N : DISMANTLING WORKS
33052
GEW
Page 22 of 25
BOQ of RANI-SRPJ
Package-1
33053
5358
16074
16074
33054(i)
No.
100
536
53600
53600
33054 (ii)
Job
10175
10175
10175
(i)
Provision of temporary lighting arrangement with 1x40 watt F.L. tube light
fittings/CFL fittings /flood light/halogen fittings and pedestral/ceiling fans,
desert coolers in temporary tents, buildings, goomties, on tracks, in yard
area including wiring, cabling, earthing etc.as directed by the Engineer
and as per site requirement for pre/post/during non - interlocking period, Per day
including providing stand by D.G set of suitable capacity and deployment
of staff for operation of DG set as per site requirement.
Note: Normal power supply may be used, up to sanctioned load, if
surplus available at site.
16073
80365
80365
33055 (ii)
25
3189
79725
79725
33056
(a)
2.0 Tonne window type AC (Not less than 3 star energy rating)
No
31108
2143
(b)
No
30562
2143
155540
152810
10715
10715
166255
163525
No
No
No
No
100
0
90
10
6898
9562
288
341
1693
2347
71
84
689800
0
25920
3410
169300
0
6390
840
859100
0
32310
4250
SECTION -O : (N.I.Works)
33055
33057
i)
ii)
iii)
iv)
GEW
Page 23 of 25
BOQ of RANI-SRPJ
Package-1
33058
i)
No
14
8723
2141
122122
29974
152096
ii)
No
22
10217
2507
224774
55154
279928
iii)
No
12138
2979
24276
5958
30234
14638747
4005148
18643895
Total (A)
Section -P Non Schedule Items
NS-1
NS-2
NS-3
GEW
No
32133
5670
224931
39690
264621
No
4651
1163
4651
1163
5814
No
34
1523
381
51782
12954
64736
281364
14920111
53807
4058955
335171
18979066
18979066
Page 24 of 25
BOQ of RANI-SRPJ
Package-1
BOQ for Railway Electrification works between RANI (Excl.) - SRPJ (Excl) Section 198 TKM of Ajmer Division of North Western Railway
Misc Items
ITEM
Description
M-1
Unit
QTY
TOTAL
SUPPLY
(In Rs)
TOTAL
ERECTION
(In Rs)
GRAND
TOTAL
(In Rs)
Loc
100
19182
4796
1918200
479600
2397800
Nos
10
11270
112700
112700
Nos
7263
6537
7263
6536.7
13800
Each
50
960
48000
48000
Man
Month
36
12000
432000
432000
Sq.Mtr
250
700
53
175000
13250
188250
Each
1.00
2148
2148
2148
2100463
1094235
3194698
M-5
Manning of anti theft transformer in Night
M-6
Landscape filling of specified arears with 1:3 mixture of
farmyard manure to red earth, for a minimum depth of 0.3
m, including levelling, making to required shape, grading,
tamping, soddig, with Mexican carpet grass in 0.6x0.3 m
pieces, ensuring no visible joints and proper slope for
surface water drainage maintenance upto six months with
free replacement of any mortality including watering upto
22 ltrs per sq.m per day including materials, labour, tools,
plant, all lead and lift, water etc. complete as per
specifications and as directed by the Engineer.
M-7
3194698
Grand total carried forward to summary
Page 25 of 25
Explanatory Notes
( Signal & Telecom
Engineering)
38653
38654
38657
Supply of 24 Fibre armoured Optical fiber cable as per SPEC No.IRS.TC55/2006 ver.-1 with ammendments.
RDSO
38701
Supply of RCC pipes 150mm dia, 2 Mtr long along with collars as per
Specn. No. IS/458/1971 for use near OHE Substation for cable
protection.
RITES
38702
Supply of DWC pipe with one snap fit coupler and 'O' ring conforming to
IS 14930 (part 2 : 2001), Non metallic, corrugated, multiwalled, normal
duty, pliable, without protection against chemical attack and Non flame
propagating in 6 meter length of size 120 mm outer dia & 102 mm inner
dia.( Permitted tolerance in dia = +/- 2 mm).
RITES
38703
RITES
38704
Supply of Galvanized Iron pipe 100 mm dia medium grade with screw
end both side and fitted with sockets as per specn. No.IS-1239, part 1 /
1990 in length of approx 6 meters
RITES
38705
RDSO
Supply and jointing of Quad cables with theromoshrinkable jointing kits.
This includes:
Supply of theromoshrinkable jointing kits as per RDSO Spec.
RDSO
No. IRS. TC77-2000/Amdt.1 ( or latest) suitable for 6 quad cable
Supply of 2T type small VF transformer (470:1120) for quad derivation ENGINEER
joints suitable for 6 quad cable - required only for derivation joints.
a
b
RDSO
RDSO
Making of Joint on Quad cable as Straight through joint with out ENGINEER
transformer or derivation joint with 2T Transformer as directed by
engineer at site.The derivation joint includes tapping of nominated quad
of 6 quad cable at specific location to 10 pair PIJF cable already laid in
the ground. This also includes supply of all other materials required for
the work. After jointing the cable thorough test such as insulation test,
continuity test etc., to be carried out jointly with Engineer and in case of
defective joints, same will be rejected along with jointing material.
10
38902
ENGINEER
11
40004
RDSO
12
40005
13
40006
14
40008
15
40009
16
40102
17
40103
Supply of 4 wire way station equipment as per Spec. no. TC. 38/97 or
latest.
Supply of Power Supply for telecom installation at way side equipment as
per TEC Spcn. IRS.TC-72/97 Amdt.1 or latest.
Supply of portable Emergency telephone 4 wire as per spec. no. IRS
TC:75-99 with latest amendment
Supply of Emergency Socket Box with socket six pin flat to RDSO Spec
No. IRS: TC. 42/87. Amdt. 1 or latest.
Supply of VF Tapping Transformer to RDSO Spec. No. IRS.TC-22-76 of
type 470:1120, 600:470, 600:1120. exact break up to be decided in
consultation with engineer.
Supply of FCPC To SCPC 10 meter long patch cords with 0db adaptors
as TEC spec G/OJC-01/03 JAN99 Or latest.
Supply of managed Expendable rack type STM-1 ADM L 1.1 as per
Technical Spec. No. TEC GR No. GR/SDH-04/02 Mar 02 with
amendment 1 , 2 ,3 & 4 or latest with STM-1 aggregate interface , 21
E1S and 4 Numbers of 10/100 Base T Ethernet Port order wire, power
supply unit, sub rack installation material and accessories manual
etc.The equipment should be fully wired for its ultimate capacity and
provide redundency for power supply and synchronisation and other
detail as given in chapter 3 (model - TJ 100 MC1).
18
40104
19
40105
20
40356
ENGINEER
RDSO
ENGINEER
RDSO
ENGINEER
RDSO
Supply of SMPS based battery chargers for telecom use 48v, 25 amps in
N+1 configuration using 2 modules of 25 A (FR/BC) with automatic
switching between the modules N=2. RDSO/SPN/TC/ 102-2013 Ver0.0
with Amendments.
Supply of 200 AH capacity LM batteries 24 Nos. at each station with
required no. of porcelene insulator. The suitable wooden rack for keeping
batteries shall also be supplied and it should be painted with 2 coats acid
resistnt paint. (IRS: S 88/2004 Version 1.0 or latest)
RDSO
ENGINEER
RDSO
NS 3
22
23
NS 7
NS 8
24
NS 9
25
NS 10
26
NS 11
27
NS 12
28
NS 13
29
NS 14
Supply of DTMF based headquarter equipment (2/4 wire) with all accessories
for control office as per RDSO spec no. IRS TC:60/2007 or latest including
12V power supply unit to suit RDSO spec. no. IRS TC 72/97 with latest
amendments and to be procured from RDSO approved firms only.
RDSO
ENGINEER
ENGINEER
ENGINEER
ENGINEER
ENGINEER
ENGINEER
ENGINEER
ENGINEER
Group - D
1
39652
ENGINEER
Trenching up to depth of 1000mm with 300mm wide base in all
types of soil and backfilling after laying of HDPE pipe / OFC cable
and 6 quad/PIJF cable etc. at 1000mm & 800 mm depth
respectively. Ramming and consolidation of soil in trenches as well
as disposal of the soil if any. This includes supply & provision of all
protective works as per specifications, drawings and stipulations of
tender documents and as per cable route plan such as GI pipe with
socket, RCC pipe/RCC split pipe, M.S. cable route markers and
bricks etc. This also includes cutting of armour of cable as per para
17 of Section III, chapter III of Tender document.
39653 Providing chase in hard rock deep enough to fix GI pipe for laying of ENGINEER
S&T cable and minimum 100 mm concreting over GI pipe after
providing suitable U clamp to GI pipe. Chase to be provided where
optimum depth(minimum 0.6 mtrs) is not possible and which is
verified and agreed by engineer in charge of the work or his
representative NOTE: Where digging of depth as specified is not
possible, the depth can be reduced with the approval of the
engineer in charge and the payment shall be made proportionately
S.No
INSPECTION
AGENCY
Group - D
39656 Laying of various sizes and types of cables in trenches: Laying of ENGINEER
signaling / power / telecom / quad/OFC cable of various sizes in the
excavated trench and through laid pipes. This includes
loading/unloading & transportation of cables to site. Whenever
several cables are to be laid separation of cables should be as
advised by site engineer. This includes unwinding of cable drum
using proper jigs without causing damage to cable.
39657 Placing of half round ( Split DWC ) pipe over the laid cable in open ENGINEER
trenches in yards between Home signal to Home signal and tieing
pipe with cable with loose armouring as per Drg.
39658 Supply of 20 pair CT Box and fixing on Hylam board on wall and ENGINEER
termination of quad/ telecom cable at station/ SP/ SSP/ TSS/ LC
gate/ Relay room/ office/ residences as per requirement and details
given by engineer at site. The CT box after termination shall be
sealed by pouring paraffin wax.
39901 Supply and Installation of Maintenance free Earthing and Bonding
ENGINEER
System as per RDSO specification. This includes:
a
Supply of MAINTENANCE FREE EARTHING AND BONDING
RDSO
SYSTEM (Two Earth Pit) as per RDSO specification no:
RDSO/SPN/197/2008 consisting of (a) Earth electrodes made of
high tensile low carbon steel circular rods, molecular bonded with
copper on outer surface as per RDSO spn - 2 no. (b) RDSO
approved Earth Enhancing compound (c) (MEEB) Main
equipotential earth busbar of Copper of 300x25x6 mm (Min) and
(SEEB) Sub equipotential earth busbar of copper 150x25x6 mm
(Min) (d) Multistrand single core PVC insulated copper cable as per
IS:694 -(i) of size 10 sqmm to connect individual equipment to
SEEB using copper lugs with stainless steel nuts and bolts, (ii) of
size 16 sqmm to connect SEEB to MEEB using copper lugs with
stainless steel nut and bolts (iii) of size 16sqmm to connect Surge
protection devices (SPD) to MEEB using copper lugs with stainless
steel nut and bolts (iv) of size 35 sqmm (duplicated) to connect
MEEB to main earth electrode (e) Copper tape of size 25x2mm to
connect the two earth pits, (f) Earthpits x 150 mm to terminate on
earth electrode.
b
Construction of earthpit and making of earth as per RDSO
Engineer
specification no. RDSO/SPN/197/2008 and drawing no:
SDO/RDSO/E&B/001, Equipotential Earth bus bar and its
connection to equipments and surge protection devices in the
equipment room as RDSO Drg. no. SDO/RDSO/E&B/002.
Provision of Exothermic weld connections, fixtures for mounting the
Copper tape in the relay room, weld materials, tools & fixtures for
the weld shall be arranged by the contractor.
S.No
Group - D
40502 Installation and commissioning of 4 wire way station equipments,
power supply unit at SP/SSP/Station/ TSS/AEN/PWI/SI offices/
Residences. The installation of way station equipment and power
supply unit (supply covered under a separate item) shall be
mounted on a MS angle rack. All the materials for installation,
commissioning of 4 W equipment and power supply unit shall be
provided by contractor.
INSPECTION
AGENCY
ENGINEER
10
11
40601 Supply and installation of OFC cable joint enclosure as per TEC No. ENGINEER
G/OJC-01/03 Jan 99 or latest and splicing o optical fibre cables (24
Fibre) and testing.
40603 Supply of 2 MB programmable primary digital drop insert
RDSO
multiplexer with conference facility as per specifications
IRS:TC/68/2004 with latest amendments & other stipulations of
tender document fully wired for 30 channels complete with power
supply unit, remote control supervision facility & all other
accessories installation materials, manuals etc. It should have
facility to accomodate data interface cards in multi drop mode &
should be able to support card needed for video conference. NOTE
: 1) in case the cards contain less than 8 circuits or 6 circuits as
mentioned above suitable number of cards to equal the total
requirements of circuits must be supplied. 2) If the card contains
more than 2/6/8 ports per card as mentioned in the schedule, the
tenderer shall still supply the number of cards asked for. The
number shall not be scaled down as per the number of ports.
12
13
14
15
ENGINEER
RDSO
RDSO
RDSO
S.No
16
17
18
INSPECTION
AGENCY
Group - D
40604 (iv) Exchange loop interface cards (6 circuits per card).
RDSO
40604 (v) G 703, 64 kbps data interface cards with a minimum of 8 ports
RDSO
per card.
40605 Supply, installation testing & commisning including earthing of 42 u ENGINEER
19" covered racks for housing SDH and P- MUX equipments, DDF,
FMS, MDF, using krone module etc. Complete with all fittings, wired
and equipped with integrated protection modules for all channels
and adequate numbers of cooling fans ,AC/DC power supply
distribution panels, U-Link panels and other hardware like runway,
ladders etc. It should be possible to lock all the equipments with
only order wire telephone remaining outside the rack. The rack
should be of APW President/Rittal make. The components of the
rack are specified below. Broad description of rack is detailed
below. Rack size 2200(mm) H x 600(mm) W x 600( mm) D. Fixed
side panels 42 U x 600 (mm) D front glass door plain 42 U x 600
(mm) D rear MS door plain 42 U x 600 (mm) D leveling screws - 4
numbers .Fan directly mounted on top 48 V DC 90 CFM - 2 Nos.
earth connectivity kit - 1 No. Cable manager with cable loops-2nos.
19
40106 Blowing of armoured Optical Fiber Cable into duct by using blowing
machine and associated works .Before blowing the duct integrity
shall be tested .If any defect shall be found during duct integrity test
, the entire length of HDPE duct from one chamber to another
chamber chamber is to be replaced by Contractor at free of cost.
ENGINEER
20
ENGINEER
21
ENGINEER
S.No
22
INSPECTION
AGENCY
Group - D
NS-19 Horizontal directional drilling for laying of HDPE 125/200mm dia
ENGINEER
pipe 1.4 Meter to 2.1 meter below the formation of Earth level below
ballast, As per drawing and instruction of Engineer at site. Terms &
Conditions A) The rate shall include Horizontal direction drilling at
any intermediate obstruction, either natural or manmade any
boundary strata. B) The rate is inclusive of all material equipments
and labour required during trench less horizontal directional drilling
under. C) The pipes are to be laid under Railway
track/Platform/Pucca Circulating area etc. Necessary arrangement
to be provided and all precautions are to be taken so that bore
coming out at either end is not deviated from the Horizontal level by
more than 250mm in horizontal. D) The rate is inclusive of detection
and protection of underground utility encountered during boring. E)
The payment shall be made for boring only when HDPE pipe is
provided in the above
23
24
25
26
NS-20
NS-25
NS-28
NS-29
27
28
NS-30
NS-31
29
NS-32
30
NS-33
ENGINEER
ENGINEER
ENGINEER
ENGINEER
ENGINEER
ENGINEER
ENGINEER
RDSO
Explanatory Notes
(Electrical Engineering)
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
EXPLANATORY NOTES
OVER HEAD EQUIPMENTS
SOR ITEM OHE-1
PREPARATION AND SUBMISSION OF DESIGNS AND DRAWINGS FOR
OVERHEAD EQUIPMENT SWITCHING STATION, SECTIONING DIAGRAM,
POWER SUPPLY DIAGRAM, SCHEMATIC DIAGRAM OF SWS, TRACTION
WORKING RULE DIAGRAM AND INSTRUCTIONS etc REQUIRED FOR
COMMISSIONING OF OHE
The price shall cover preparation and submission of overhead equipment plans indicating
location of structures in stages, and preparation of all drawings and designs relevant to the
tendered works and required to be finalized by the Contractor. The price shall include the
following:
(i)
Preparation and submission of pegging plans layout plans incorporating span, height,
chainage, curves, gradients, type of masts/portals, foundations, ATD locations, stagger,
location of cut-in-insulators, signal locations etc, making minor modifications with the
approval of the Employer/Engineer to the layout of the structures and overhead
equipment, if necessary.
(ii)
Preparation and submission of cross section drawings and structure erection drawings
for each structure location.
(iii)
Choice of type and size of foundations to suit soil and loading conditions
(iv)
Preparation and submission of long section drawings of overhead equipment
where such drawings are required including detailed study of over line structures such
as foot over bridges, road over bridges etc. for maintaining the specified height of
contact wire and requisite clearances.
(v)
Preparation and submission of other designs and drawings including drawings of small
parts steel work (other than those for which RDSO standard drawings
are available) and detailed designs for LT. Supply Transformer stations, design of
OHE structures for bridges etc.
(vi)
Supply of requisite number of copies of Bonding Plan drawings.
(vii) Design, preparation and submission of switching station drawings including
survey, investigation of soil bearing pressure from NABL accredited agency,
preparation of cross section drawings, preparation of general arrangement drawings,
detailed layout of equipment, bus-bar connections and insulators, layout of earthing
system and earth connections, cable run layout, detailed designs and drawings for steel
work and structural support, excluding the ones for which supply is made by the
Employer/Engineer, suitable concrete plinths for equipment and drawings for
equipments, components, fitting and materials supplied by the Contractor. The price
shall include supply of requisite number of copies of all drawings, including
completion drawings.
(viii) Preparation, supply and fixing of Sectioning / Schematic / TSWR diagram boards for
stations / Cabins / SWS / RCC and 25 Kv AC Traction Station Working Rule
instructions including supply & fixing of shock treatment chart etc.
(ix)
Supply of requisite no. of soft (in Auto Cad) and hard copies of all drawings, including
completion/approved/as erected drawings for OHE and Switching stations.
Page 1 of 48
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
NOTES FOR MEASUREMENTS: For the purpose of payment against this item,
the length of track shall be measured as under :1. General: By the difference in the chainages of the length under consideration, as
incorporated in the layout plans.
2. Turnouts: The track taking off shall be deemed as starting from the SRJ of the
Turnout.
3. Cross-overs: The length of track shall be taken as the difference in the
chainages of the toes of switches of the two turnouts constituting the crossover.
4. Diamond crossing with or without slips: The two tracks crossing each other
shall be measured independently as per note 1 above as though there were no
crossing. No extra payment shall be provided for slip points.
5. Dead ends and tops of loops: The lengths for payment under this item shall be
up to the chainage of anchor mast of the terminating OHE.
6. Feeders and return feeders from grid sub-station to feeding station: This item
will also be applicable independently in case of feeders / return feeders / conductors
from grid sub-station to overhead equipment feeding stations or in a case of feeders
/ conductors running on independent structures (not supporting OHE) along or
across tracks.
In such a case the length of line to be considered for purpose shall be measured by
(a) the distance between the center of gantries of the grid sub-station and feeding
stations in case of feeder / return feeders / conductors line from grid sub-station, or
(b) by the distance between the center line of the two structures to which the feeders
/ return feeders / conductors are anchored in case of feeders running along the track
if such feeder / return feeders / conductors are running completely on independent
structures or (c) by the distance between the center of the two structures supporting
the OHE on either side of the first and last independent structure or (d) in case of
feeders / return feeders / conductors running along the track supporting OHE.
7. No extra payment shall be made for any revision/changes/Modification in
OHE/PSI drawings on account of changes in ESP/SIP/L-section etc.
SOR ITEM OHE-2
SUPPLY AND ERECTION OF A LARGE SPAN WIRE (130 Sq.mm)
INCLUDING ITS FITTINGS WITH INSULATORS:
The price shall cover supply of all components including large span wire, , adjusters,
terminal fittings and mast attachments required to attach a large span wire or a Head
span wire or Cross span wire or Steady span wire or a Support span wire for
supporting contact wire only, at both ends, to traction masts/structures or special
brackets, solid core insulators The price shall cover erection of all components
including mounting arrangements, span wire, 9 Ton solid core insulators and all small
part steel work if any.
SOR ITEM OHE-3
SUPPLY AND ERECTION OF MATERIALS FOR TERMINATION OF
SINGLE CONDUCTOR OF OVERHEAD EQUIPMENT OR A TERMINATING
WIRE WITH INSULATORS:
The price shall cover supply of all material necessary for the termination of single
conductor of overhead equipment or terminating wire on a traction mast or structure, all
SPS work as required including appropriate mast anchor fittings, clevis assembly,
Page 2 of 48
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
adjuster, anchor double straps, ending clamp for the catenary or contact wire or
terminating wire and fittings including 9-tonne insulators. The price shall cover erection
of all materials including 9-tonne insulator assembly and terminating wire, if any.
Note: In case of V type anchorage is adopted for terminating a single conductor such
an arrangement would be counted as two off under this item for the purpose of
payment.
SOR Item OHE-4
SUPPLY AND ERECTION OF MATERIALS FOR TERMINATION OF ALL
ALUMINUM 25 KV FEEDER (SPIDER) INCLUDING FEEDER WIRE WITH 9TONNE INSULATORS:
The price shall cover supply of all materials required for the termination of an allaluminum 25 KV feeder (SPIDER), all SPS work as required including appropriate
mast anchor fittings, adjuster, strain clamp and fittings including feeder wire and 9tonne insulators. The price shall cover erection of all materials including 9-tonne
insulators assembly.
SOR Item OHE-5
SUPPLY AND ERECTION OF MATERIAL FOR TERMINATION OF COPPER
CROSS FEEDER WITH GANTRIES INCLUDING CROSS FEEDER WIRE
WITH 9-TONNE INSULATORS:
The price shall cover the supply of all materials required for termination of copper cross
feeder wire (37/2.25mm HDBC) all SPS work as required including appropriate mast
anchor fitting (3231), 18mm single clevis (5040), 9-tonne adjuster (5020-2), feeder
ending clamp (1130), double clevis (3010) and other components as necessary
including feeder wire (37/2.25 mm HDBC) and 9- tonne insulator assembly. The price
shall also cover the erection of all these materials/components including 9 ton insulator
and termination of cross feeder at either ends. Fittings/Components required for
termination of one cross feeder at both ends constitute one set.
SOR Item OHE-6
SUPPLY AND ERECTION OF TERMINAL BOARDS IN CONTROL
CUBICLES:
The price shall cover supply and erection of a wall mounted terminal boards with six
numbers of two way terminal blocks for connecting the cables from the outdoor
equipment of a switching station as per RDSO Drawing.
SOR Item OHE-7
SUPPLY AND ERECTION OF AN IRON CLAD 240V AC AND 110V D.C.
BOARD WITH FUSE BOX IN CONTROL CUBICLES:
The price shall cover supply and erection of a 15A, 240V, A.C. iron clad 4 way
fuse box and a 15A, 110V DC iron clad two way fuse box on the wall inside the
remote control cubicles. The fuse boxes shall be complete with four fuses and two
fuse carriers and bases respectively.
Page 3 of 48
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
Page 4 of 48
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
NOTE: 1.Contractor at his own cost shall do the replacement of the transformer oil
on account of testing and leakages during the warranty period.
SOR Item OHE-10
MODIFICATION TO EXISTING OVERHEAD EQUIPMENT:
The item price covers all inclusive cost of all the associated works of OHE
modification
including
transfer,
dismantling/erection,
slewing/reslewing/readjustment, extension of OHE by providing splices or otherwise etc of
all the components of OHE including brackets, insulators, feeder wire/return
conductor, terminations, ATDs, isolators, traction bonds cross over OHE etc in a
particular length of track except items which are excluded specifically under this
schedule.
The price shall cover transfer of overhead equipment to a bracket assembly on a
new mast or support and dismantling of the existing erected bracket assembly from
old mast or support, supply and provision of a multiple cantilever cross arm
wherever required and erection of bracket assemblies on the multiple cantilever
cross arm, and consequent adjustment to overhead equipment required such as respacing of droppers, leveling etc.
The price shall not include supply and erection of an additional bracket assembly,
which will be paid for under item OHE-18.
Dismantling of masts/portals/TTC/DA are covered under item OHE-34.
The price shall also cover the re-adjustment of the head span polygon to enable the
additional equipments to be suspended from the head span. Payment for the
suspension of additional overhead equipment shall be made for under item OHE-2
as extra to this item.
The price shall also cover the cost of dismantling of overhead equipment including
terminations, auto tensioning devices, guy rod assemblies, anti-creep, suspension
assemblies, super masts, feeder, return conductor, section insulator, an isolator,
single or gang operated, including dismantling of connections to the overhead
equipment, a pedestal/ pin insulator including dismantling of jumper connections
and traction bonds if any, temporary slewing or lowering of erected OHE adjusted
and/or unadjusted to ground for special works and restoration and readjustment of
the equipment after completion of special works and associated small parts steel
work.
The price shall also cover the cost of splicing of terminated overhead equipment for
extension and consequent adjustment of the affected equipment. The extended
overhead equipment shall be deemed as starting from the centre line of the structure
preceding the old terminating structure and the extended overhead equipment shall
be paid for under item OHE 23 (a).
The price under this item shall cover various modifications required to be carried
out to the existing overhead equipment, under power block, on account of
electrification of the section provided such modifications are not on account of
non-compliance of specifications, approved drawings and instructions given by the
Employer for the execution of the work from time to time, during the progress of
the work.
All the prices are on a flat rate all inclusive basis and cover only the important and
most frequent type of modifications required to compensate the contractor for the
work involved. No extra payments shall be admissible for any other associated
Page 5 of 48
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
work, minor modifications, which may be necessary in the course of work. All
work done shall be paid for at normal rates as per BOQ.
In all these cases, the dismantled equipment shall be handed over by the contractor
to the Employers Engineer at the Employers godown/depot as required by
Engineer. The cost of loading / unloading and transportation shall be paid under
item OHE-13.
Where prices under this item are applicable, the contractor shall finalise the
quantities of work jointly with the Engineer before taking the work in hand.
NOTES:
1.
2. All claims under this item have to be supported by the following certificate to
be furnished by the contractor on the connected bill.
a) The modifications are not on account of non-compliance of specifications
approved and instructions given by the Engineers for execution of works.
b) The quantities of work involved for modification have been finalised jointly
with the Engineer-in-charge before taking the work in hand.
c) The dismantled materials shall be/has been handed over to
Engineers/Railways representative.
3. The price of SPS work complete with bolts & nuts wherever required, is not
included in the item and will be payable under Item CS-9.
SOR Item OHE-11
MANNING OF SWITCHING STATION INCLUDING TSS:
The prices shall cover the payment/wages to the staff to be deployed at each
switching station including TSS as directed by Employers Engineer on flat rate
basis per month per location. Manning shall be done round the clock. The staff,
holding minimum ITI qualification, shall be deployed in each shift. They shall be
fully conversant with operation of various equipments installed in the switching
station. The staff shall be deployed after test and trial by Employer/Engineer and on
issue of competency certificate. The staff deployed shall act in accordance with
instructions / directions given by Traction Power Controller (TPC)/representative
of Employer. The staff shall not leave the working place (Switching station) in any
case without permission of Employers representative. The price shall cover
conveyance charges to the staff for going and coming to the working place. The
period of manning shall be decided by the Employer during the execution of
contract and manning shall commence on receipt of intimation in writing from the
Employer one month in advance.
Note: Unit of the item shall be per month each location.
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
iii)
iv)
v)
vi)
Materials such as light fittings, ceiling fan, exhaust fan, switches, sockets,
ceiling rose, socket outlets all shall be with ISI mark and shall be one of the
make mentioned in technical specification. Light fittings shall be 1X28W
T5 energy efficient or equivalent LED fitting as decided by engineer. All
switches, plug points and sockets shall be modular type. Ceiling fan and
exhaust fan shall have min 3 star energy rating.
vii)
viii)
ix)
After completion
of wiring work necessary testing of wiring
and
earthing station shall be done and results submitted to the site-in-charge
duly signed by representatives of both the contractor and purchaser.
Note: - Scale of fitting shall be as per latest RDSO guidelines and RVNL
specifications. Drawing/fittings shall be got approved by the Engineer
before taking up the work.
SOR Item OHE-12(b)
SUPPLY & ERECTION OF EARTHING ARRANGEMENT AT
SWITCHING STATION
The price shall cover supply and erection of an earth bus, earthing stations with a
single pipe embedded into the ground by driving or otherwise complete with
protective concrete box & lugs suitable for directly connecting two mild steel flats
of minimum size 50mm x 6mm.
The price shall also cover supply of all materials including 50 mm x 6 mm mild
steel flats for providing earth bus. The price shall also cover erection of earth bus
either buried at a depth of 300 mm below ground level painted with 02 coats of red
oxide zinc chromate primer and 02 finishing coats of bitumen or fixed on wooden
gutties on walls. It shall include connecting the earth bus to earth electrodes and to
various floor-or-wall-mounted equipments or structures to be earthed and also
connections to non-track-circuited rails, wherever required. It shall also cover the
cost of making recesses in concrete foundation blocks for floor or cubicles and
Page 7 of 48
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
covering them up. The connection of earth strips to each other shall be made either
by riveting or by welding. The connection of earth strips to various equipment,
structures or fencing post shall be made with G.I. bolts and nuts and spring
washers/locknuts.
The price shall cover supply and erection of 8 SWG G.I. wire used for earthing for
all LT electrical equipments including remote control cubicles and fencing panels.
Price shall also cover measuring and painting of earth values of all the earth pits,
combined earth value etc as per standard.
SOR Item OHE-13
LOADING/UNLOADING TRANSPORTATION AND HANDING OVER OF
ALL TYPE OF MATERIALS ETC. OTHER THAN CONTRACTOR
MATERIAL
The price shall cover loading/unloading and transportation charges to (from)
site/depot and handing over of material (if required) for all type of steel structures,
portals, copper/ aluminum conductors, SPS, CBs, BMs, ATs, PTs, CTs, LAs and
other electrical equipments etc. into/from BFR/ trailer/ truck for other than
contractors material for the completion of the present work as instructed by the
engineer.
SOR Item OHE-14
EXTRA ON ERECTION RATE OF WORK UNDER POWER BLOCK:
Deleted.
SOR item OHE-15, 15(a), (b), (c)
CONSTRUCTION OF SWITCHING STATION BUILDING, RCC WORK,
PLASTERING, BRICK MASONARY, RETAINING WALL, FILLING,
COMPACTING AND LEVELLING WORK PITCHING WORK etc. &
SUPPLY AND ERECTION OF NAME BOARD FOR SWITCHING
STATION.
The price shall cover the construction of Control room of SP/SSP building and will
include labour/erection and material cost for the entire work all inclusive including
following works:
i)
RCC, PCC, masonry work, including earthwork, leveling, stone pitching
in high embankment (if required).
ii)
RCC work in plinth, lintels, chhajja, Roof slab.
iii)
Pre-cast RCC Slab, RCC jali.
iv)
Cement concrete in flooring and cable trenchs.
v)
Brick masonry in walls.
vi)
Plastering works.
vii)
Provision of Doors, Windows, Grills, Rolling shutters, Water pipe line ,
Ventilators and painting thereof.
viii) White washing and colour washing and painting of doors/windows.
ix)
Acid proof or painting of floor and wall in battery room.
x)
Supply and spreading of stone metal shall be payable under CS-14.
xi)
Provision of RCC pipe etc.
xii)
Any other item of work required to complete the work which has not
been mentioned/included above shall also be done by the contractor and
nothing extra shall be paid for the same.
Page 8 of 48
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
Page 9 of 48
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
COMPONENTS REQUIREMENT
Rly. Id No.
Description of components
3232
1 off
5001/5001-1
or
1 Set
1 off
1 off
5007-1
1 off
5008
Anchor loop
1 off
5220
5001-3
5002
5004
or
5005 or 50061 or
5070 or 5071
NOTE :
1. In case the Contractor desires to adopt a different design for guy rod assembly,
the same shall be indicated by him in the Tender and the components required
should be clearly listed under this item as deviation.
2. Supply and erection of guy rod assembly at anticreep portals will also be paid for
under this item.
SOR Item OHE-17
SUPPLY AND ERECTION OF PROTECTIVE SCREEN ON FOBS/ROBS:
The price shall cover the cost of supply and erection of protective screen on
ROBs/FOBs/ etc. The price shall cover the cost of all material required for
fabrication of protective screen including MS Angle, Tee, expanded metal (Jali), GI
sheet, paints, suitable fixtures for fixing on the ROB/FOB etc. The price shall also
include the labour cost for fabrication, erection on ROB/FOB and painting. The
fabrication and erection work shall be done as per RDSO Drg.. No. ETI/C/0068
(07/09) Rev-H.
SOR Item OHE-18
SUPPLY AND ERECTION OF BRACKET ASSEMBLY WITH
INSULATORS AS PER OHE PLAN:
The price shall cover on a flat rate basis for supply and erection of any bracket
assembly on a traction mast or support or drop arm and shall include those on
Page 10 of 48
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
high/low level platform, in the vicinity of turnouts, over bridges or over-laps and at
locations with reduced encumbrance or terminating wires. The price shall include
the cost of supply of all components including galvanized steel tube, dropper wires
and small parts steel work complete with bolts and nuts etc., if any. The price
shall cover erection of all components including solid core insulators and dropper
wires, small parts steel work, if any. However, this does not include the anticreep
arrangement at masts/ structures.
The price shall include the cost of following components:
Rly. Id No.
Description of components
Qty.
for unit
1
2
3
3020
Mast fitting for hook insulator with 2 off
1 set
bolts, nuts, lock nuts and washers of 16 mm
dia.
2400
Tubular stay arm assembly (including
1 set
galvanised steel tube).
2110/
Catenary suspension bracket assembly or
1 off
2130/2380
hook bracket
1160
Suspension clamp
1 off (as
required)
2120/2140/
Bracket tube assembly complete with tube 1 set
2040/2080
cap and sleeve where required (including
galvanised steel tube).
3070-1/2
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
The price shall include supply of all extra fittings including the double contact wire
swivel clip.
SOR Item OHE-19
SUPPLY AND ERECTION OF REGULATING EQUIPMENT (3 PULLEY
TYPE) WITH COUNTER WEIGHT ASSEMBLY FOR CONVENTIONAL
OHE:
The price shall cover supply and erection of a 3-Pulley type counter weight
assembly including 9 ton adjuster with double strap assembly and normal/anti-theft
guide tube assembly, the supply of regulating equipment, provision of adequate
length pipe on Hex-Tie rod at crossovers and short tension length ATDs wherever
required and stainless steel wire rope required for the regulating equipment, anti
slipping device assembly (Spacer Angles as per RDSO DRAWING NO.
TI/DRG/OHE/ATD/RDSO/00009 and small part steel work, if any. The price shall
also cover adjustment of the entire regulating equipment. The price shall not
include supply and erection of termination, which will be paid under SOR item
OHE-20.
SOR ITEM OHE-20
SUPPLY AND ERECTION OF MATERIAL FOR TERMINATION OF
DOUBLE OVERHEAD EQUIPMENT CONDUCTOR WITH INSULATORS:
The price shall cover supply of all material necessary for the yoked termination of
two overhead equipment conductors on a traction mast or structure , including all
SPS such as appropriate mast anchor fittings, clevis assembly , two adjusters,
ending clamps for catenary and contact wires, anchor double strap assembly,
equalizing/compensating plates, and double eye distance rods (if required) and
fittings and terminating wire ,if any including 9- ton insulators assembly The price
shall also cover erection of all materials with 9 ton insulator.
SOR Item OHE-21
SUPPLY AND ERECTION OF ANTI CREEP WITH GALVANIZED STEEL
WIRE INCLUDING INSULATORS.
The price shall cover supply of all materials for an anti-creep including adjusters,
galvanized steel wire, mast anchor fittings at its terminations on either side of
structures, ending clamps, fittings and including 9- ton insulators assembly
conforming to RDSO specification.
The price shall cover erection of all materials including 9- ton insulator assembly
with small parts steel work, if any.
Page 12 of 48
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
Rly. Id No.
1
1360
5020-1/
5020-2
5030
3010/5040
3231
1170
Less 1160
5183
Description of components
2
Galvanized steel wire
3
As required
(19/2.50 mm
2 off
2 off
As required
2 off
2 sets.
1 off
(-) 1 off
As required.
NOTE -1.In case the anti-creep extends beyond one span on either side of anti
creep center, payment for the supply and erection of extra length shall be paid
additionally at the rate of 20% of the rate per extra span.
SOR ITEM OHE-22
SUPPLY AND ERECTION OF A STRUCTURE BOND/ A LONGITUDINAL
BOND/ TRANSVERSE AND SPECIAL BOND:
The price shall cover supply of all materials including mild steel flats size 40 x 6
mm required to provide all kinds of bonds such as a structure bond connecting a
traction mast or structures to the nearest non-track-circuited rail, or earth electrode,
including all fastenings at both ends. The price shall include shaping and drilling of
the bond and erection of all materials including provision of heat shrinkable PVC
tube for structure bond under track circuit rail. This would also cover connection or
earthing terminals of equipments like LT Transformers with structure and then to
rails as per relevant drawings.
The price shall cover provision of connection of buried rails to running rail as per
RDSO drawing No. ETI/OHE/G/05306 & shall include supply, fabrication and
erection of all connections (including drilling at both ends) and refilling of buried
rail pit.
The price shall cover the supply of all materials including mild steel flats size 40 x
6 mm, fasteners etc. required to provide longitudinal bond / transverse bonds
connecting to rails at the rail joint at the locations to be specified by the Employer.
The price shall include shaping and drilling of the bond and erection of all
materials including the bonds.
The price shall also cover the supply of all materials including mild steel flats size
40 x 6 mm to provide special bonds at level crossings, foot over/road over
bridge/protective screen, girder bridge, metallic sheds, fencing etc. for which the
location will be specified by the Employer. The price shall include shaping and
drilling of the bond and erection of all materials including the bond.
The item covers the new bonds to be provided in the yard due to modifications
involved as per revised bonding plan of the station.
Page 13 of 48
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
Page 14 of 48
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
Rly. Id No.
Description of components
1
1040-2
or
SK-534/1
&
SK-575/2
or
SK-576/1
&
SK-535/2 or 10413
1180/SK-572/1
& SK-572/2
1192
2
Contact wire parallel clamp small
7501
Qty. for
unit
3
As
required
-do-
-do-do-
1110-2
1120
-do-
1140
-do-
5020-1/5020-2
Adjuster
-do-
5030
-do-
5191/5192
-do-
-do-
All the warning boards provided on OHE structure shall be of retro reflective type as
per latest Rly. Board/RDSO guidelines. Similarly structure Number plates on OHE
mast at specific locations should be retro reflective types as per latest Rly. Board/RDSO
guidelines.
Separate DJ close Boards to be provided for MEMU/EMU wherever required for
MEMU/EMU operation.
The price shall cover supply of all components required for a pull-off arrangement to
pull one equipment only including head-span mast fittings complete with M.S. angle,
equalizing plate assembly, steady-arm, catenary wire dropper clip, contact wire swivel
clip and fittings including solid core insulators. The price shall cover erection of all
components including solid core insulators, small jumper wire, large jumper wire and
conductors.
The price shall cover supply and erection of all additional fittings required including the
supply of required conductors/jumper wires, in case the pull off pulls more than one
equipment.
The price shall cover final checking, adjustment and inspection of OHE by tower car.
Further details are given in Section 5 Chapter 2 of Volume-1 of bid document
Page 15 of 48
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
Page 16 of 48
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
Rly. Id No
Description of components
Bar insulator
As required
12 off
3 sets
To be supplied bythe
contractor
-do-
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
steel works for support of isolators and for support of operating rods on gantries masts
including supply and erection of 25 KV Solid Core Post and Operating rod insulator.
The price shall also cover for supply and erection of an earth contact assembly in the
isolator. The price shall cover the cost of supply and erection of 3 x 25 mm copper
connections between earth contact assembly and the structures.
The price shall cover supply and erection of an inter locking mechanism on an
isolator along with small parts steel if any, to permit working of two or more isolators.
The price excludes provision of pipe electrode earthing.
Note :
1. All Isolators are to be supplied with required numbers of 25 kV operating rod
insulators with complete accessories and small parts steel. Isolator key box of
appropriate size shall be provided for at each station on the section, one number at
the nearby OHE depot in charge of the section and one number at SSP/SP, as
desired by the Engineer at site.
2. Payment of jumper shall be payable under SOR item OHE-29
SOR ITEM OHE-29
SUPPLY AND ERECTION OF ALL TYPES OF COPPER JUMPERS :
The price shall cover the supply of large jumper wire size 105 sq. mm (19/7/1.02mm),
small copper jumper size 50 sq. mm (19/1.80mm), 65 sq. mm Cadmium copper
conductor, 5 mm dia. dropper wire made of annealed 100% pure copper conductor as
per RDSOs spec No. ETI/OHE/3 (2/94) with A & C Slip No.1 and on a flat rate
basis, the supply of all components and fittings required for providing a flexible, and
bolted type terminal connectors wherever required for connection, including supply of
parallel clamps, bi-metallic and aluminum-copper strips, wherever required, and bolted
type terminal connectors wherever required.
The prices shall also cover the erection of the complete jumper assembly including
jumper wire. The price shall not, however, be applicable for jumper connections already
included under a particular item (e.g. OHE-23, OHE-9(a) & (b), CS-3, CS-5 etc), but
shall be applicable for any jumper connection in any combination between feeders,
isolators and booster stations. Continuity jumper at boom anchor anti-creep will be
payable under this item.
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
SET OF FIRE BUCKET WITH STAND AND FIRST AID BOX, KEY BOX
WITH SUITABLE KEY CHAIN, LOCKS AND OTHER MISC ITEMS
REQUIRED FOR COMMISSIONING OF SWITCHING STATION:
The price shall cover supply and erection of fire extinguishers, as per details given
below including mounting arrangements. Each set would consist of following and each
of 4-litre capacity.
i.
CO-2 type
- 01 Nos.
The fire extinguishers supplied shall be of approved brand and as per relevant
specification.
The price shall also cover supply and erection of standard first Aid box of made of GI
Sheet with pad lock as approved by the Employer. The list of items/medicines to be
supplied along with in the first aid box shall be obtained from employer/engineer.
The price shall cover supply and erection of six number of fire buckets with stand of
standard size, cover shed, and locking arrangement as per standard practice of
concerned Railway and as approved by the Employer.
The price shall also covers Supply and installation of key box in SSP/SP with suitable
key chains and locks, associated registers of appropriate size in printed profarma (if
required in newly electrified section and as per local Railway practice), 1 no wooden
stool of appropriate size,1 no steel arm cushion chair, gum boots- 1 pair, rubber gloves1 pair etc as directed by Employer/Engineer in charge.
The key box shall be of teak wood plank made of size 12inchesx18 inchesx5 inches.
SOR ITEM OHE-36
SUPPLY AND ERECTION OF 25 KV AC DANGER BOARD/DANGER BOARD
FOR HEIGHT GAUGE, PUBLIC/ STAFF CAUTION AND SPECIAL BOARDS
BOARD REQUIRED FOR COMMISSIONING OF OHE/SWSs.
The payment under this item shall cover supply and erection of 25 KV AC danger
board, danger board for height gauge, public/ staff caution boards and special boards
on uniform basis as decided by the engineer. Purchaser will advise the requirement of
the various types of boards and location to contractor. The above payment shall also
include supply of necessary clamps, nuts, and bolts etc., required for the erection of the
boards. Caution boards shall be made in bi-lingual or Hindi/English and vernacular
language, where ever required and same will be advised to contractor. The various
types of above boards to be supplied shall be as per the standard size and standard
specification of Railways/RDSO.
This item shall also cover special caution boards to be provided on all departmental
vehicles, track machines, platform shelters as per Railway board letter No.
2009/RE/161/4 FTS-748 dtd.26-08-14 as per directions of the engineer.
SOR ITEM OHE-37
SUPPLY, ERECTION AND COMMISSIONING OF LIGHT WEIGHT
SECTION INSULATOR ASSEMBLY 25 KV AS PER DRAWING NO.6.2758.0
RDSO SPEC.NO. TI/SPEC/OHE/LWDSI/007
The price shall cover supply, erection and commissioning of light weight section
insulator assembly of 25 KV including all accessories as per drawing no. 6.2758.0
RDSO spec. No. TI/Spec/OHE/LWDSI/007
Page 20 of 48
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
TRACTION SUBSTATION
SOR ITEM TSS-1
DESIGN AND DRAWINGS FOR 220/27 or 132/27 KV or 110/27 KV TRACTION
SUB-STATIONS INCLUDING FEEDING POST AND CAPACITOR BANK:
The price shall cover on a flat rate basis for preparation and submission of design and
drawings per sub-station, new or existing, including provision of additional bay, for
erection of transformer and associated equipments, replacement of existing transformer
with new one, augmentation of existing bus bars and various type of connectors and
terminals, per feeding station in addition to site survey, investigation of soil bearing
pressure and soil resistivity, preparation and submission of cross section drawings,
preparation and submission of general arrangement drawings, detailed layout of
equipment, bus-bar connections and insulators, layout of cable trenches outdoor and
inside the control room, layout of earthing system and earth connections, layout of earth
screen wire, design of supporting structures for 132 kV/27 kV equipments, detailed
designs and drawings for steel work and structural support, suitable concrete pedestals,
and foundation plinths for equipment and drawings for equipments, components,
fittings and materials and approval of the same by the Employer.
The prices shall also cover on a flat rate basis for preparation of all designs and
drawings required in connection with supply, erection, testing and commissioning of
Shunt Capacitor equipment at the traction sub-stations. The price shall cover on a flat
rate basis cost of site survey, investigation of soil bearing pressure and soil resistivity,
preparation of cross section drawings, general arrangement drawings, detailed layout of
equipments, bus bar connections and insulators, layout of cable trenches out door and
inside the control room, earthing system and earth connection layout, and design of
supporting structures.
The price shall also include supply of required number of copies in soft and hard copies
in Auto Cad with one tracing on RTF paper of designs, drawings, technical booklets of
proposed/approved and completion drawings (as erected) per substation, feeding station
and capacitor bank as mentioned in the tender specifications.
The price shall also cover supply of associated maintenance/record registers of
appropriate size in printed pro-farma (if required in newly electrified section and as per
local Railway practice) etc as directed by Employer/Engineer in charge.
NOTE: The design for Oil Soak pit and drain water sump will also be got approved
from the Employer.
Page 21 of 48
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
WITH
The price shall cover excavation and construction of brick baffle wall as per RDSO
Drg. No. ETI/C/0213 for wind pressure upto 112.5 kgf/sqm.. The price shall include
supply of steel for reinforcement and other materials. The price shall also include
bending/binding and laying of reinforcement, shoring, shuttering and scoff-folding
arrangement, required for the construction of baffle wall and its curing. The price shall
include dismantling of all connected temporary arrangements, back filling required and
removal of soil. The price shall also include the plaster (12mm thickness with cement
mortar 1:4 mix) on the baffle wall. The price shall also include dismantling of all
connected temporary arrangements and removal of soil. The price shall include the cost
of cement also. For RCC baffle wall as per RDSO Drg. No. ETI/C/0214 for wind
pressure upto 150 kgf/sqm, the payment shall be made under CS-8.
Note for TSS- 3
(1) The prices under this item shall be the same for any shape or size of concrete blocks,
& brick wall. In calculating the individual volume of concrete and brick wall
fraction of a cubic meter beyond the third decimal shall be rounded off to the
nearest third decimal.
(2) For purpose of computation of volume of concrete and brick wall under this item, the
volume of steel work embedded in the foundation block or muff shall be ignored.
(3) The prices shall include cost of embedded drain pipes, conduits for cable or earthing
flats wherever necessary.
(4) Dowel bars in special foundations and nominal reinforcement in other foundations
will be necessary. Such nominally reinforced in other foundation will be payable
under Item TSS-3. The steel for nominal reinforcement and dowel bars will be
supplied by the Contractor and the concrete mixture in such a case shall be same as
for the normal foundations i.e. 1:3:6.
(5) At each Traction substation one number Oil soak pit for main transformer and one
drain water sump for the cable trenches will be provided by the contractor.
SOR ITEM TSS-4 (a)
SUPPLY, ERECTION, TESTING & COMMISSIONING OF 132 KV DOUBLE
POLE SF-6 GAS CIRCUIT BREAKER WITH INTERLOCK:
The price shall cover erection of 132 kV double pole SF-6 Gas Circuit Breakers,
complete with operating mechanism, all fittings and accessories including terminal
connectors. The price shall cover grouting the supporting frame and Mechanism box on
the foundation block and mounting of other accessories in their respective places. It
shall also cover the testing and commissioning of the Circuit Breaker. The price shall
also cover the supply and erection of an enamelled number plate. The Contractor shall
make his own arrangement for filling of the SF-6 gas and power supply required for
testing purpose. All necessary tools, equipments, instruments required for carrying out
necessary checks, tests and commissioning shall be arranged by the Contractor.
The price shall cover erection of an Interlocking Mechanism on an Isolator to permit
Page 22 of 48
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
working of an Isolator and or earthing blade assembly in a desired sequence. The price
shall include supply and erection of interlock for Circuit Breaker.
SOR ITEM TSS-4 (b)
SUPPLY, ERECTION, TESTING & COMMISSIONING OF 220 KV DOUBLE
POLE SF-6 GAS CIRCUIT BREAKER WITH INTERLOCK:
Same as for item TSS-4(a) except that the price shall cover supply, erection, testing &
commissioning of 220 KV Double Pole SF-6 gas Circuit Breaker with Interlock.
SOR ITEM TSS-5(a)
SUPPLY AND ERECTION OF 132 KV DOUBLE POLE ISOLATORS
(MANUALLY OPERATED):
The price shall cover supply & erection and connecting of a 132 KV Double Pole
Isolator with a manually operated mechanism complete with mounting base and all
accessories required for its operation including terminal connectors. The price shall
include supply and erection of an enamelled number plate and padlock. The price shall
include mounting of the Isolator and the operating rod in position and their alignment
for smooth and trouble free operation. The prices shall also include the cost of 132 kV
solid core post insulator, operating rod and earthing blade assembly for 132 kV
Isolators.
SOR ITEM TSS-5(b)
SUPPLY AND ERECTION OF 220 KV DOUBLE POLE ISOLATORS
(MANUALLY OPERATED):
Same as for item TSS-5(a) except that the price shall cover supply and erection of 220
KV Double Pole Isolators (Manually operated).
SOR ITEM TSS-6(a)
SUPPLY & ERECTION OF 132 KV CURRENT TRANSFORMER ASSEMBLY
(400-200/5A):
The price shall cover supply & erection and commissioning of a 132 kV Current
Transformer (400-200/5A) complete with all fittings and accessories including terminal
connectors. It shall also include mounting of the transformer in position, and supply and
erection of an enamelled number plate as per the drawing ETI/PSI/P/7528.
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
Page 24 of 48
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
the traction sub-station, wherever required. The price shall include straightening,
shaping and connecting / clamping of the conductor to the equipment terminals /bus bar
supports as required.
NOTE: For purpose of payment, the length of aluminum conductor strung as bus-bar
between gantries shall be taken as horizontal distance between the interfaces of the
gantries. The total length used at a sub-station shall be rounded off to the nearest meter
(0.5 m and below being ignored).
SOR ITEM TSS-13
SUPPLY & ERECTION OF ALL CONNECTORS, BUS SPLICE & TEE
CONNECTORS etc REQUIRED FOR COMMISSIONING OF TSS
EQUIPMENTS:
The price shall cover supply and erection of a busbar junction and connector of the type
specified, including bolts, nuts, lock nuts, washers etc. required at the junction of bus
bars. The price shall also include supply and erection of ALCU bimetallic strip, if
required, to be provided at the junction.
NOTE:
1) For purpose of payment for this item fraction of a meter in the total length used at a
sub-station shall be rounded off to the nearest meter (0.5 m and below being
ignored).
SOR ITEM TSS-14
SUPPLY & ERECTION OF COPPER JUMPER WITH FITTINGS AND
FASTENER REQUIRED FOR TSS:
The price shall cover, on a flat rate basis, the supply and erection of jumper wire
complete with all components and fittings required for providing a flexible copper
jumper connection, including parallel clamps, bi-metallic and Aluminum -Copper
strips, wherever required, and terminal or Tee clamps at either end, including jumper
wire.
The price shall be applicable for any jumper connection in any combination between
feeders, L.T. Transformers drop out switch, lightening arrestors for overhead
equipments, isolators for overhead equipment and out going bus bars for switching
stations.
SOR ITEM TSS-15 (a)
SUPPLY & ERECTION OF 110/132 KVKV SUPPORT INSULATORS WITH
FITTINGS AND FASTENERS:
The price shall cover supply and erection of 132 kV support insulators complete with
fixing bolts, nuts and studs, Busbar jumper, clamps for clamping the busbar and SPS, if
required .
SOR ITEM TSS-15 (b)
SUPPLY & ERECTION OF 220 KV SUPPORT INSULATORS WITH
FITTINGS AND FASTENERS:
Same as for item TSS-15(a) except that the price shall cover supply and erection of 220
KV Support insulators with fittings and Fasteners.
Page 26 of 48
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
The price shall also cover supply and erection of a 110 VDC distribution board in the
control room. The price shall include the grouting of the frame work of the distribution
board in position or mounting it on the wall and necessary connections.
SOR ITEM TSS-20
SUPPLY AND ERECTION OF EARTH ELECTRODE:
The price shall cover supply and erection of an earth electrode, a typical drawing of
which is included in RVNLs technical specification. The price shall cover the
provision of a protective concrete box with removable cover as shown in the drawing.
The price shall include the testing of earth value and painting the particulars on the box.
SOR ITEM TSS-21
SUPPLY AND ERECTION OF EARTH LEADS 75 X 8 MM MILD STEEL
FLAT LAID IN THE GROUND OR EXPOSED AS PER SITE REQURIMENT:
The price shall cover supply and installation per meter length of 75x8mm mild steel
flat, buried at a depth of 60 cm below ground level. The price shall also cover
connections of the steel flats to the earth electrodes to constitute the main earth ring and
to the earthed terminals of the 132/25 kV transformers etc. as required.
The price shall also cover supply and installation per meter length of 75x8 mm mild
steel flat, painted all around with two coats of painting with red oxide and two coats of
colour grass green shade-218 of IS:5 passing through cable trench or exposed above
ground level. The price shall also cover the connections of the steel flats to the earth
electrodes, to constitute the main earth ring and to the earthed terminals of the various
equipments as required.
SOR ITEM TSS -22
SUPPLY AND ERECTION OF EARTH LEADS 50 X6 MM MILD STEEL FLAT
LAID IN THE GROUND OR EXPOSED AS PER SITE REQURIMENT:
The price shall cover supply and installation per meter length of 50x6mm mild steel flat
buried at a depth of 60cm below ground level. The price shall also cover connections of
the steel flats to the main earth ring and to the steel structures and metallic frame work/
terminals of various equipments, as required.
The price shall cover supply and installations per meter length of 50x6 mm mild steel
flat painted all around with two coats of painting with red oxide and two coats of colour
grass green shade-218 of IS:5 passing through cable trench or exposed above ground
level. The price shall also cover the connections of the steel flats to the main earth ring
and to the steel structures and metallic frame work/terminals of various outdoor
equipments as required.
SOR ITEM TSS-23
SUPPLY AND ERECTION OF 8 SWG G.I. WIRE FOR EARTHING:
The price shall cover supply, shaping and erection of 8 SWG G.I wire per metre used
for earthing of control panels, LT, AC and DC distribution boards, battery chargers, etc.
at sub-station control rooms. The requirement of fencing panel earthing to the nearest
fencing upright shall also be included and paid for under this item.
Page 28 of 48
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
required for carrying out necessary checks and tests and commissioning of the
transformer shall be arranged by the Contractor.
SOR ITEM TSS-26 (b)
SUPPY, ERECTION, TESTING & COMMISSIONING OF 220/27 KV, 21.6/30.24
MVA ONAN/ONAF, SINGLE PHASE TRACTION POWER
TRANSFORMERS:
Same as for item TSS-26(a) except that the price shall cover supply, erection, testing
and commissioning of 220/27 KV, 21.6/30.24 MVA ONAN/ONAF, single phase
Traction Power Transformer.
SOR Item TSS- 26(c)
SUPPY, ERECTION, TESTING & COMMISSIONING OF 110/27 KV, 21.6/30.24
MVA
ONAN/ONAF,
SINGLE
PHASE
TRACTION
POWER
TRANSFORMERS:
Same as for item TSS-26(a) except that the price shall cover supply, erection, testing
and commissioning of 110/27 KV, 21.6/30.24 MVA ONAN/ONAF, single phase
Traction Power Transformer. The transformer should be as per RDSO specification No.
ETI/PSI/118 A&C-10 or latest.
SOR Item TSS- 26(d)
SUPPY, ERECTION, TESTING & COMMISSIONING OF 132/27 KV, 30/42
MVA ONAN/ONAF, SINGLE PHASE TRACTION POWER TRANSFORMERS
Same as for item TSS-26(a) except that the price shall cover supply, erection, testing
and commissioning of 132/27 KV, 30/42 MVA ONAN/ONAF, single phase Traction
Power Transformer as per RDSO Specification No.TI/SPC/PSI/30TRN/2070 or latest
with latest amendments.
SOR ITEM TSS-27(a)
SUPPLY AND ERECTION OF 25 KV DOUBLE POLE ISOLATORS (1600A)
WITH INSULATORS:
The price shall cover the supply and erection, alignment and connecting up 25 kV
Double Pole Isolator (1600Amp capacity) complete with mounting base, operating rod,
operating mechanism and all accessories required for its smooth and trouble free
operation. The price including solid core Post Insulator, operating rod insulator etc.
Price shall also cover supply and erection of an enamelled number plate and a pad lock
for each Isolator, Bus bar connector provided for making connection to Isolator
terminal pad shall be paid under Item TSS-13.
SOR Item TSS- 27(b)
SUPPLY AND ERECTION OF 25 KV DOUBLE POLE BUS COUPLER
ISOLATORS (3150A) WITH INSULATORS:
Same as for item TSS-27(a) except that the DP isolator shall be of 3150 amps capacity.
SOR ITEM TSS-28(a)
Supply & erection of 25 kV Single Pole Isolators (1600A) with insulator:
Page 30 of 48
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
Same as for item TSS-27(a) except that the price shall cover supply and erection of
single pole Isolator 1600 amps capacity instead of double pole Isolator
SOR Item TSS-28(b)
SUPPLY & ERECTION OF 25 KV SINGLE POLE ISOLATORS (3150A) WITH
INSULATORS :
Same as for TSS-27(a) except that the price shall cover supply and erection of single
pole Isolator of 3150 amps capacity instead of double pole Isolator.
SOR ITEM TSS-29
Supply, Erection, Testing & Commissioning of 25KV shunt capacitor bank of 2400
KVAR rating including low loss series reactor, 25KV Neutral Current
Transformer (NCT) etc.
The lump sum price shall cover supply, erection, testing and commissioning of 2400
KVAR (i.e.6600 KVAR at 40 KV) shunt capacitor bank at Traction substations,
complete with capacitor unit internal fuses, discharge devices, rack insulator assembly,
interconnector between units, insulators, suitable earthing lugs including terminal
connectors and other material and hard ware required for satisfactory working of the
unit. It shall also include mounting of the capacitor bank on the supporting structures
and its connecting up to other equipments. Payment for supporting structures shall
be made under item no CS-9 of schedule 30. The contractor shall carry out precommissioning tests as approved by the purchaser and commission the shunt capacitor
bank strictly in accordance with the instructions of the shunt capacitor bank
manufacturer or his commissioning Engineer at site to the complete satisfaction of the
purchaser. The contractor shall be held responsible to ensure that the work is carried out
to the highest standards, in accordance with relevant code of practice and any special
conditions/ guidelines/ requirements as laid down by the manufacturer of the shunt
capacitor bank are properly complied with. The contractor shall notify the manufacturer
regarding likely date of commissioning, one month in advance so that the manufacturer
can depute his representative, if so desired by him, at his own cost, for warranty
obligation purposes. Notwithstanding availability of manufacturers representative or
otherwise it shall be contractors responsibility to ensure that the equipment is
commissioned as per laid down procedure. All necessary tools, equipments, instruments
required for carrying out necessary checks and commissioning of the shunt capacitor
bank shall be arranged by the contractor.
The price shall cover supply, erection & connecting up of series reactor suitable for
6600 KVAR rating (at 40KV) capacitor bank complete with all fittings and accessories
including connectors. It shall include mounting of the series reactor in position.
The price shall cover supply, erection of 25kv neutral current transformer for protection
of the capacitor bank. The price shall also cover connecting of neutral current
transformer with capacitor bank and control and relay panel. It shall also cover
mounting of the neutral current transformer on the supporting frame.
The price shall cover connecting up of control panel with protective and auxiliary relays
for circuit breakers, instrument transformers and capacitor bank as per RDSO latest
specifications with all wirings control switches and mimic diagram. LEDs annunciation
labels, alarm cancellation push buttons and local/remote switches. It shall also include
cost of wiring/terminal blocks required for providing the facility of remote operation.
The price for erection shall include alignment and grouting of the panels in positions
and all necessary connection to bring the control panel in operation. It shall also include
Page 31 of 48
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
the cost of connecting the frame of each control panel to the earth bus inside the control
room and suitable size rubber mat in front and back. The price of control and relay
panel for shunt capacitor bank is included in TSS-10.
SOR Item TSS- 30
EXCAVATION OF EARTH TO THE DEPTH OF 2 METERS BELOW
GROUND LEVEL FOR BURYING 13 METERS LONG RAIL.
The price under this item shall cover the cost of excavation of earth 13 meters in length
and two (02) meters in depth below ground level. The price shall also cover the cost of
burying 13 meters long rail and connecting it with mat in TSS as per latest RDSO
drawing (Rail will be supplied by RVNL). The price shall also cover the cost of
loading, unloading and transportation to site of work of rail.
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
and ensure correct execution and tele-signals from control centre to various
remote controlled posts and vice-versa. The drawing shall show the details
of TSSs, SPs & SSPs with details of RTUs, layout of equipments, cable
colour codes, tag numbers, terminals numbers, in addition to various telecommands & tele-signals and panel indication. All drawings shall be got
approved by the client/engineer and Railways before commencement of
execution. All the as erected drawing & design in soft copies in CDs and
hard copies six numbers of each drawing shall be handed over to the
purchaser for final approval.
SOR Item SCADA-2
Supply of SCADA equipment at RCC.
The lump sum price shall include the supply of standard Supervisory
Control and Data Acquisition system as per RDSOs Specification No.
TI/SPC/RCC/SCADA/0130/Rev.1 (04/2014) or latest with up to date
amendment issued by RDSO. There shall be two work station (first of 3
PCs and second of 2 PCs) and main & standby computer and FEP process.
The price shall include supply of one supervisory console PC, one coloured
LAPTOP (Dual Core Intel Pentium Processor at 3.2 GHz or Higher) and
associated MODEMS for remote SCADA monitoring through a DOT Link
as per RDSO specification. The price shall also include the cost of any
steel cabinets required for housing the equipments and also the material
required for internal wiring and mounting the cabinets in the position. The
cost shall also cover testing of the system at the manufacturers works. The
latest version of hardware shall be considered at the time of supply.
The price shall also cover the license fee for the supply and installation of
Standard Electric Traction SCADA software. The successful bidder has to
purchase this from the RDSO approved supplier for standard software as
per RDSO Specification No. TI/SPC/RCC/SCADA/0130/Rev.1 (04/2014)
or latest.
SOR Item SCADA-3(a)
Supply of RTUs for FP/TSS.
The price includes the cost of RTU supplied for the controlled posts and
shall include necessary transducers, summation CTs, PT, supply change
over arrangement, digital/analog modules, limit setting, modems, CPU
cards. Power supply, surge arrestors, relay and contactors etc. at Traction
Sub-stations and feeding post for different analog parameters and
measurements. A tentative list of different telecommands, telesignals and
measurands are given in annexure as per RDSOs Specification No.
TI/SPC/RCC/SCADA/0130/Rev.1 (04/2014) or latest.
SOR Item SCADA-3 (b)
Supply of RTUs for SP.
The price shall cover supply of RTUs for SP. The details given in Item
SCADA-3(a) above are applicable to the SP also except that the different
analog parameters and measurands required have to be suitable for SP.
Page 33 of 48
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
center and the controlled stations. The cost of erection shall cover the cost
of transportation of equipments, their positioning, fixing and their
alignment for smooth trouble free operation. The price shall also cover the
cost of inter connecting cables, laying of cable in trenches of approved size,
wiring connection to batteries, UPS, surge arrestors, operators console etc.
and all other works necessary for proper functioning of the equipments.
The price for erection shall also include carrying out liasion with software
supplier or at the site work to finalise any matching details between the
RCC software and the hardware vendor. The price for erection shall also
include the cost of adjustments, testing after erection at site, testing to work
all items or equipments specified, integration and commissioning as
considered necessary by the purchaser. The price for erection shall also
cover all cost of administration of the contract, insurance premia, bankers
charges for guarantee cost stamps, loading and unloading, handling of the
materials and for any road transport which the contractor use to carry the
materials between their depot and site of work. It shall also include cost of
erection of separate earthing, if required as per RDSO standard
specification No. TI/SPC/RCC/ SCADA/0130/Rev.1 (04/2014) or latest.
The price shall include complete finishing work at Remote Control Centre,
TSS, SP & SSPs to the satisfaction of the Employer.
SOR Item SCADA-7(b)
Integration of new SCADA system to existing system at RCC.
The price shall cover the integration of entire new SCADA system with
existing SCADA system at RCC. This shall also include the cost of any
hardware and software required to complete the work. The item covers the
administrative work of supply, transport, execution of contractual items of
work, liasoning, testing and commissioning as per specified protocol
mentioned
in
RDSO
standard
specification
No.
TI/SPC/RCC/SCADA/0130/Rev.1 (04/2014) or latest as well as for the
efficient working of complete SCADA installation and trouble free
commissioning of the above work in all respects.
SOR Item SCADA-8
Erection, integration, testing & commissioning for existing and new
equipments
(a) TSS RTU (b) SSP RTU (c) SP RTU
The price shall cover the adjustment charges (modification/upgradation in
existing RTUs and SCADA system) required during the execution and final
testing on RTUs at TSS, SP & SSP with remote control centre for final
commissioning.
Page 35 of 48
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
Description
Transducers:
i) Current
ii) Voltage
iii) Power Factor
8 Port serial Card
Contactors/Interposing Relays
RETI Modules :
i) PR-80 (Power supply module)
ii) CPU Module
iii) DO Module
iv) AI Module
v) DI Module
vi) Modem Card
vii) Input conditions PCB_
viii) Cat UV/PT fuse fail Module
ix) CVT
x) DC-DC convertor
Key Board
Power Supply Unit for servers
FEP
Power Supply Unit for Work
Station
18 GB wide ULTRA-2 SCI-HDD
20 GB IDE HDD
16 port 10/100 Ethernet LAN
HUB
Surge Arrestor (Set of 3)
Qty.
Unit
1
1
2
1
28
Nos
Nos.
Nos.
Nos.
Nos.
2
2
3
1
3
1
3
6
1
1
1
1
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
1
1
1
Nos.
Nos.
Nos.
Nos.
Note: The above list is provisional and may be updated as per zonal railway or
specific sectional requirement within overall cost.
SOR Item SCADA-10
Supply of Special T&P (List C)
List of Maintenance Tools and Instrument for SCADA system
Sr.No.
Description
1.
4-1/2Digit Multi meter MECO Model 235
MK-11
2.
Tong Tester
3.
Electrician Plier 8
4.
Electrician Plier 6
5.
Cutting Plier
6.
Nose Plier
7.
I.C. Extractor
Qty.
4 Nos.
2 Nos.
3 Set
3 Set
3 Nos.
3 Nos.
3 Nos.
Page 36 of 48
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
8.
9.
10.
11.
12.
13.
14.
Card Extenders
Level meter APLAB Model 2031A
Wire Stripper
Fault Analyser
Dual trace oscilloscope (0-30 Mhz)
Remote Terminal Test Unit (In P-IV Laptop
Computer kit)
Tool kit consisting of a) Brief Case
b) Stripper & Cutter
c) Crimping Tool
d) Screw Driver Kit (6 Blades)
e) Screw Driver Kit (1 Set Start type 6
Blades)
f) Desolding Pump
g) Brush (To clean the RTU)
h) Soldering wire (18 SWG)
i) Solder Sucker
j) Soldering Iron
k) Nose Plier
l) Spanner
3 Nos.
2 Nos.
1 Nos.
1 Nos.
2 Nos.
2 Nos.
1 Nos.
1 Nos.
1 Nos.
1 Nos.
1 Nos.
1 Nos.
1 Nos.
100 gms.
3 Nos.
3 Nos.
1 Nos.
1 Nos.
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
Type -II complete with all fittings and accessories as per relevant latest specification,
including terminal connectors and fixing bolts. The price for supply and erection shall
include proper alignment of the transformer in position. The price shall also cover the
supply and erection of an enameled number plate and fixing bolts. The price shall not
include the cost of any small parts steel work.
SOR Item CS-3
SUPPLY AND ERECTION OF A 42 KV LIGHTNING ARRESTOR:
The price shall cover supply and erection of a 42 kV lightning arrestor complete with
all fittings and accessories as per relevant latest specification including terminal
connectors. The cost of erection shall include proper alignment of the lighting arrestor
in position. The price shall cover supply and erection of cadmium copper jumper (65),
which will be paid under item OHE-29. The price shall not include the cost of any small
part steel work. The price shall also include supply and erection of surge counter with
leakage current monitor along with cable (unarmored PVC insulated copper cable size
35 Sq. mm 1100 volts grade). The surge counter shall be mounted on the structure at a
convenient height as per. Specification No. ETI/PSI/71 revision-1(1/87), A&C slip
No.1 to 7 or latest.
SOR Item CS-4
SUPPLY AND INSTALLATION OF CABLES FOR SWS/TSS:
The price shall cover supply, installation, and connecting-up the cable for control and
indication, (PVC 1100 V grade 2.5 sq mm copper conductor 7 core), from the
interruptor to the terminal board, supply and erection of terminal connectors at ends
if required and conduits wherever necessary, heater supply cable, (1100 V grade
PVC insulated heavy duty 2 core 4 sq mm aluminium conductor), from interruptor
to the 230 V fuse box mounted on wall inside the control cubicle and from this box
to LT distribution board inside the control cubicle, supply and erection of terminal
connector at each end, if required, conduit if any at the interruptor end, catenary
indication (240 V AC circuit cable, PVC1100 V grade 2.5 sq mm Copper conductor
2 core), between potential transformer Type-I and terminal board inside the control
cubicle and supply and erection of terminal connectors at both ends, if required and
conduit to be embedded between the steel work base and the cable trench and shall
include all fastenings on masts and structural members to support them, LT power
supply cable, (1100 V grade aluminium conductor XLPE insulated PVC sheathed
and steel armoured heavy duty cable conforming to IS7098/Pt.I/1988 2x25 sq mm
for 5 KVA AT, 2x70 sq mm for 10 KVA AT, 2x185 sq mm for 25 KVA AT),
between L T supply transformer at switching station and LT distribution board
provided in control cubicle and suitable cable boxes and connectors at both ends if
required, cable between 110V battery charger and battery, between battery and the
DC fuse box and between the DC fuse box and terminal board and etc. The price
shall include supply and erection of terminal connectors wherever required.
NOTES:
1 In case of feeding stations which are located within the traction sub-station
premises, the cables shall be run from individual equipment and terminated inside
the sub-station control room.
Page 38 of 48
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
2 Notwithstanding the sizes of cables given above, the bidder shall assure himself that
various cables would suit the ratings of equipments offered by him.
3 Price shall be payable on flat rate basis per meter irrespective of size of cable for
different types of cables used switching stations/TSS.
SOR item CS-5
SUPPLY, ERECTION, OIL FILTRATION, TESTING AND COMMISSIONING
OF 25 KV/240 VOLT, 10 KVA, AUXILIARY (LT) SUPPLY TRANSFORMER
OIL TYPE WITH 25 KV D. O. FUSE SWITCH, ANTICLIMBING DEVICE,
INSULATOR, COPPER JUMPER AND EARTH ELECTRODES etc:
The price shall cover Supply of 25KV/240V, 10 KVA LT supply transformer at site
with DO fuse assembly (including fuse carrier) and all other mounting accessories, as
per the RDSOs latest specification and its erection complete with terminal connectors
on a mast or gantry. The price shall also be applicable for transformers mounted on
steel pedestals at switching stations. The price shall also cover supply and erection of an
enameled number plate of approved design.
The price shall also cover oil filtration and pre- commissioning tests as approved by the
Employers or Engineer. The contractor shall make his own arrangement for oil filtration
equipments, as well as power supply required for the same. All necessary tools,
equipments, instruments required for carrying out oil filtration / checks / tests /
commissioning shall be arranged by the contractor. The price shall also cover supply &
erection of a DO fuse switch assembly complete with all mounting accessories,
post/pedestal insulator for DO fuse switch assembly.
The price shall also cover on a lump sum basis the supply and erection of anti-climbing
device consisting of galvanized steel fixtures mounted on the masts below the
transformer.
The price shall also cover supply of conductor / jumper wires on a flat rate basis and the
supply of all components including parallel clamps, bi-metallic and Aluminium copper
Al-Cu strips wherever required. The price shall also cover the erection of complete
jumper assembly including conductor/jumper wire to be provided between the Over
Head Equipment and L.T. Transformers, drop out switch assembly.
The price shall also cover supply and erection of an earthing station/ stations with a
pipe/pipes required to achieve permissible earth resistance value embedded into the
ground by drilling or otherwise complete with protective concrete box and lugs suitable
for directly connecting two mild steel flats of minimum size 50 mm x6 mm and copper
earthing strip 25X3 mm at LT side earthing point to mast.
The price shall not include cost of supply and provision of structure bond connecting
LT transformer with structure and then to rails which will be paid for under item
OHE-22.
NOTE:1. Contractor at his own cost shall do the replenishment of the transformer oil
on account of testing and leakages during the warranty period.
SOR Item CS-6
PROVIDING AND LAYING
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
PLINTH
IN ALL TYPES OF SOILS AND SOFT ROCK
The price shall cover excavation, supply and handling of all materials and accessories,
temporary arrangements for excavation in all types of soils and soft rock,
concrete/masonry drains/walls, shoring wherever necessary, casting concrete including
frame work wherever necessary, tamping of concrete, grouting of masts and finishing
the top of concrete foundation or anchor blocks. The price also includes dismantling of
all connected temporary arrangements, back filling with excavated earth and
compacting the same to the required height and width as per drawing to ensure safety of
foundation, confining the exposed height of foundation block to within 10 cm., and
removal of spoil. The price shall also include the cost of supply of cement.
Notes for measurement
1. The payable volume of the foundations under the above item shall be the designed
one as shown in the drawings for which the hole has been made, irrespective of the
actual configuration.
2. The depth of the excavation shall be measured from the formation level to the
maximum excavated point.
3. The prices shall be calculated for the individual volume of concrete, fraction of a
cubic metre beyond the third decimal shall be rounded off to the next nearest third
decimal.
4. The prices shall apply for concreting of all foundations for mast, gantries, portals,
anchor blocks for guy rods, and fencing uprights.
5. For purposes of computation of volume of concrete, the volume of steel work
embedded in the foundation block shall be ignored.
6 For the purpose of computation of volume of concrete, the volume of concrete shall
include the volume of sand and bitumen in sand cored foundation. However, for the
purpose of computation of quantity of cement utilised in sand core foundations, the
volume of the sand and bitumen used in core hole should be deducted from the
total volume of the foundation.
7 For purposes of computation of volume of concrete, the volume of each muff for all
masts shall be taken as 0.02 cu.m. except for masts with balance weights and for
each column of portal, mast, 2 or 3 track cantilever masts, and special fabricated
masts for which the volume of muff shall be taken as 0.08 cum. irrespective of the
size and shape of muff, on a flat basis.
8. The item shall also be applicable to include the concrete of equipments, at the
switching stations/traction sub-station (except building foundations) as well as
embedded drain pipes, wherever required.
9. The prices shall also cover the cost of diversion of masonry/earth drain wherever
necessary for casting of foundations.
10. (a)RDSO guidelines shall be followed for grade of concrete, type of foundations etc.
Generally concrete for foundation shall be nominal mix of Grade-M-10 and for
grouting, muffing, embedding of structure in foundation concrete of M-15 Grade as
per latest RDSO guidelines shall be used.
(b) In Soft/Hard rock, Foundation in contact/Buried under Non-aggressive soil/ground
water:
Foundation concrete shall be of M-15 grade and core concrete shall be of M-20
grade.
(c) In Soft/Hard rock Foundation in coastal area: Foundation as well as core concrete
shall be of M-20 grade.
11. No extra payment shall be made for foundation casted with steel reinforcement as
Page 40 of 48
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
per RDSO drawing. Similarly, no extra payment shall be made for foundations
casted as per 10(b), (c).
SOR Item CS-7
PROVIDING AND LAYING OF CONCRETE FOR FOUNDATION AND
PLINTH IN HARD AND ROCKY SOIL REQUIRING CHISELING/BLASTING:
The price shall cover excavation, supply and handling of all materials and accessories,
temporary arrangements for excavation in hard rock requiring chiseling/blasting and
concrete / masonry drains / walls. Shoring wherever necessary, casting concrete
including frame work where necessary, tamping of concrete, grouting of masts and
finishing the top of concrete foundation or anchor blocks.
The price also includes dismantling of all connected temporary arrangements, back
filling with earth and compacting the same to the required height and width as per
drawing to ensure safety of foundation, confining the exposed height of foundation
block to within 10 cm., and removal of spoil.
The Employer's Engineer shall certify where use of chisel and hammer or blasting has
been necessary. The contractor shall arrange for supply of explosives and all tools and
plants for blasting operations at his own cost. The price shall also include the cost of
supply of cement.
Notes for measurement
1. The payable volume of the foundations under the above item shall be the designed
one as shown in the drawings for which the hole has been blasted, irrespective of
the actual configuration assumed by the latter due to the blasting.
2. The depth of the excavation shall be measured from the formation level to the
maximum excavated point.
3.
The prices shall be same for any shape or size of concrete blocks. In calculating the
individual volume of concrete, fraction of a cubic metre beyond the third decimal
shall be rounded off to the next nearest third decimal.
4. The prices shall apply for concreting of all foundations for mast, gantries, portals,
anchor blocks for guy rods, and fencing uprights.
5.
6.
7.
For the purpose of computation of volume of concrete, the volume of concrete shall
include the volume of sand and bitumen in sand cored foundation. However, for the
purpose of computation of quantity of cement utilised in sand core foundations, the
volume of the sand and bitumen used in core hole should be deducted from the
total volume of the foundation.
8.
For purposes of computation of volume of concrete, the volume of each muff for all
Page 41 of 48
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
masts shall be taken as 0.02 cu.m. except for masts with balance weights and for
each column of portal, each head span mast, 2 or 3 track cantilever masts, and
special fabricated masts for which the volume of muff shall be taken as 0.08 cum.
Irrespective of the size and shape of muff, on a flat basis.
9.
The price under this item shall also include in cost of concrete at the switching
stations as well as embedded of drain pipes, wherever required.
10. The prices shall also cover the cost of diversion of masonry/earth drain wherever
necessary for casting of foundations.
11.(a) RDSO guidelines shall be followed for grade of concrete, type of foundations etc.
Generally Concrete for foundation shall be nominal mix of Grade-M-10 and for
grouting, muffing, embedding of structure in foundation concrete of M-15 Grade
as per latest RDSO guidelines shall be used.
(b) In Soft/Hard rock, Foundation in contact/Buried under Non-aggressive soil/ground
water:
Foundation concrete shall be of M-15 grade and core concrete shall be of M-20
grade.
(c) In Soft/Hard rock Foundation in coastal area: Foundation as well as core concrete
shall be of M-20 grade.
12.
No extra payment shall be made for foundation casted with steel reinforcement
as per RDSO drawing. Similarly, no extra payment shall be made for foundations
casted as per 11(b), (c)
SOR Item CS-8
PROVIDING AND LAYING OF REINFORCED CONCRETE
PIER/COLUMN/PILE, CABLE TRENCH AND TRENCH COVER
FOR
The price shall cover excavation and providing and laying of all reinforced
concrete work for pier/column/pile, cable trench and trench cover and other materials
including bending, binding, laying of the reinforcement, shoring where necessary,
casting concrete including frame work where necessary, grouting and finishing the tops
of foundation blocks with the required slope/muff but excluding supply of steel
for reinforcement. The price shall also include dismantling of all connected temporary
arrangements, back filling as required and removal of spoil. The price shall also include
the cost of supply of cement.
Notes for measurement
1. The Concrete for cable trenches/trench cover/pier/column/pile shall be nominal mix
of 1:2:4(M-15 grade)
2. The prices shall be same for any shape or size of concrete blocks. In calculating the
individual volume of concrete, fraction of a cubic metre beyond the third decimal
shall be rounded off to the next nearest third decimal.
3. The prices shall apply for concreting of all foundations for mast, gantries, portals,
anchor blocks for guy rods, and fencing uprights.
4. For purposes of computation of volume of concrete the volume of steel work
embedded in the foundation block shall be ignored.
5. The price under this item shall also include the cost of concrete cable trenches and
Page 42 of 48
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
(i)
(ii)
(iii)
(iv)
(v)
(vi)
09.5 M long
11.4 m (S1)
11.4 m (S2)
08.0 m (S4)
12.4 m (S6)
09.4 m (S9)
The price shall also cover the cost of supply of O, N and R type portals with necessary
components as per following RDSO Drawing Nos., cost of erection, alignment and
setting before grouting, wherever required, of portals assembly of boom components
and erection of the same. The prices shall also include supply and erection of
galvanized bolts, nuts washers etc. wherever required as per approved designs and
drawings. The price shall cover assembling, adjustment and erection of all types of
booms including TTC booms and any special structures across the track, not covered
under this item.
The structures shall be fabricated and galvanized from steel conforming to IS-2062 or
A as per concerned specification i.e. IS:2062/1984, IS-808/1989 and RDSO
specification No. ETI/OHE/13 (4/84) with A&C slip Nos 1 to 3 or latest.
(i)
(ii)
Page 43 of 48
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
(iii)
The price shall also cover the cost of supply of B-Series traction mast 9.5 m long i.e. B150, B-175 and B-200 etc fabricated and galvanized as per RDSO Drg No. ETI/C/0071
(Mod-E) and specification No. ETI/OHE/13 (4/84) or latest. The price shall also cover
the supply of any other size of B-series or K-Series mast required, that has not been
mentioned in this item.
Note : For the purpose of payment, the weights of individual traction mast and
masts of head span shall be determined for each type on the basis of the payable
weight per meter length shown below for standard types, For special types, the
payable weight per meter length will be indicated by the Employer at the time of
approval of designs.
PAYABLE UNIT WEIGHTS FOR STANDARD MASTS
S. No.
Type of masts
Weight in Kg per meter
including galvanization
1
6"x6" BFB
38.03
162x154 BFB
38.00
200x200 BFB
51.20
8"x6" RSJ
53.39
S1
53.30
S3
76.40
S4
53.39
S5
111.53
S6
53.39
10
S7
76.40
11
S8
111.53
12
K 100
23.70
13
K 125
30.30
14
K150
38.18
15
K175
43.72
Page 44 of 48
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
16
K200
49.87
17
K225
57.50
18
K250
66.72
19
B100
27.71
20
B125
32.47
21
B150
39.07
22
B175
44.61
23
B200
50.76
24
B225
61.50
25
B250
70.72
26
S 100
23.72
27
S101
19.98
28
Other Sections
The price shall also cover the cost of supply of special fabricated and galvanized steel
structures (other than BFB/RSJ/B Series Masts and Portals). The structure to be
supplied under this item TTC, G Type, BFB Type portals, Bridge masts, Emergency
masts and Double/Fabricated S Series masts such as S-3, S-5, S-7, S-8, S-100, S-101,
T-150, cable trays etc., Any other similar structure required during the execution of
work shall also be supplied under this item.
The price shall also include the cost of steel, fabrication, galvanization and supply at
site for erection. Steel shall be conforming to IS:2062 Grade A SK 1984 (Latest), Zinc
conforming to IS:209/1997 (Latest) and galvanization to RDSOs specification
No.ETI/OHE/13 (4/84) with A & C slip No. 1 to 3 or latest. The various structures
covered under this item are .
S.No
1
1
Description
2
TTC with 5.5/8.0 mtrs boom
2
3
4
5
6
Drawing No
3
ETI/C/0009
Sheet 2 to 5
ETI/C/0056
ETI/C/0026
Sheet 2
ETI/C/0182
ETI/C/0183
ETI/C/0043
Mod.
4
B
C
A
C
C
B
Page 45 of 48
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
7
S-101, for Isolators inside SWS
ETI/C/0180
A
8
S-3, 11.4 Mtrs
ETI/C/0180
C
9
S-5, 11.4 Mtrs
ETI/C/0042
E
10
T-150, for LT Supply Transformer
ETI/PSI/037
C
The price shall cover cost of erection, alignment and setting before grouting, wherever
required, gantries, including tower / steel tower / steel work for feeders for traction substation, drop arms, standard super masts and suspension brackets for feeders and return
conductors. Dwarf masts of stub masts for anchoring, complete with anchor plates
drilled and welded in position multiple cantilever cross arm, chairs, adopters for bracket
assemblies and all other small part steel works, the erection of which is carried out by
the contractor irrespective of whether they are supplied by purchaser/contractor. The
prices shall also include supply and erection of galvanized bolts, nuts washers etc.,
wherever required as per approved designs and drawings.
The steel shall be conforming to IS-2062/1992 (latest) Gr A SK zinc conforming to
IS-209/1992 or latest.
The price shall also include the cost of repairing of platform shelters in case the shelter
is dismantled/removed/damaged during the course of erection of a mast / portal at
platforms.
Note:
(i) The prices for the items shall also include the cost of stenciling of location number
on masts/portal uprights in the manner as directed by the Purchaser.
(ii) The price shall also include straightening of masts/portals uprights wherever
approved by the purchaser and cutting of mast/portals/upright to suit the site
condition.
(iii)The payment shall be made on the basis of the final lengths/weight of the
structures, in case the same are cut or modified as indicated above before erection.
The price shall also cover the cost of supply of all fabricated steel work excluding
fasteners which are required to be supplied by the Contractor. The cost of erection for
such steel work, if carried out by the Contractor shall be paid for under relevant item
For standard fabricated steel work for which RDSO'S approved drawings are available,
the weight of steel work as specified in RDSO'S drawings shall be considered for
payment. However, in case the unit sectional weight of any member indicated in
RDSO's drawing is not in conformity with the unit sectional weight as per the latest IS
specification, the weight of the fabricated steel work shall be calculated on the basis of
latest IS specification and the same will be considered for payment. For the nonstandard fabricated steel work, the calculated weight to be considered for payment
under this item shall be included in the relevant drawing based on, latest IS sectional
weight at the time of submitting the designs for approval of the Employer.
1
NOTES :
For the purpose of payment against items, weight of structures or fabricated steel
work will be calculated according to the weight of black steel given in section
books for the lengths of various members shown in the approved drawings. There
will be no addition for increased weight due to galvanizing or painting or weld
material or reduction for holes or skew cuts.
The rates against item shall be applicable to the erection of small part steel work
which are not covered under the various other items of work.
Page 46 of 48
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
Page 48 of 48
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
Explanatory notes for various items of work in Electrical General Services Schedule are given below:
All electrical works should comply with Indian Electricity Act 2003 and Rules framed there under.
ii
All electrical installations shall conform to the relevant Indian Standard and shall be carried out as per the relevant safety Code of
Practices and guidance for Safety Procedures in Electrical Works as per IS:5216/Pt I & II/1982.
iii
Notwithstanding the ratings specified in the BOQ, all components proposed to be used in the installations, shall be of approp riate
rating of voltage, current and frequency without any additional financial implication on RVNL. Discrepancies, if any, in this regard,
shall be brought to the notice of the Engineer by the Contractor.
iv
All minor items viz. hardware items, foundation bolts, termination lugs for electrical connections etc. as required and necessary for
proper working of the equipment shall be deemed to have been included in the Bill of Quantities, whether such items are
specifically mentioned or not.
vi
vii
viii
(a)
The basic quantities of components & materials required to make up a unit of work for selected items are approximate. The
Contractor shall plan the work, estimate the actual quantities required and get the same approved by the Engineer before plac ing
orders.
(b)
In estimating the prices for various items of work, provision for loss or wastage in transit and erection including freight, handling,
taxes and duties, insurance if any etc. should be taken into account and firm unit price offered for a complete unit of work to be
done by the contractor.
The various items to be supplied/provided/erected should be as per the list of approved suppliers included in RVNLs Technica l
Specifications/list followed by concerned zonal Railway. Items not appearing in the approved list shall be procured from good
quality sources in line with best industries practices and shall be either ISI marked or conforming to latest IS (if any). Before
procurement, vendor approval shall be obtained from the Employer.
Good workmanship and total compliance with safety and other statutory rules and regulations, shall invariably be observed by the
Contractor.
All approvals from the relevant and appropriate government & statutory authorities shall be the total responsibility of the Contractor
unless specified otherwise.
Page 1 of 40
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
ix
All quoted rates shall cover supply of materials, handling of materials, labour required, civil works, taxes and duties, fabrication,
installation, testing and commissioning, training and free maintenance till handing over to the Employers representative.
If any activity of work is essential for the satisfactory completion of the work but is not mentioned specifically in the Bill of Quantities
or elsewhere in the bidding documents, the same shall be deemed to be included In the scope of work and shall be executed by the
contractor within the accepted cost. The work shall be handed over in a functional manner complete in all respects.
xi
The inspection of various items shall be carried out by the agencies as specified in RVNL specifications. The prices quoted also
include RITES/RDSO representative inspection and testing charges unless otherwise specified in the bill of quantities or Technical
Specification. In case of change of inspection from RDSO/RITES to RVNL/CONSIGNEE, 1% of the cost of material will be
deducted by RVNL as inspection charges.
xii
The inspection of above items will be done at the manufactures works/place decided by the Employer based on item, its quantity,
Inspecting Authority etc.
2.
2.1
DRAWINGS
The contractor shall prepare drawings in Auto Cad for all LT/HT installations, indicating proposed works and shall obtain approval of
Engineer prior to taking up the work. Such drawings shall be prepared in coordination with all other agencies executing works at the
same site and a maximum of 10(ten) copies as are required by RVNL with one tracing on RTF paper.
2.2
After commissioning, these drawings shall be duly updated as per erection work at site and submitted in six copies and one tracing in
RTF paper, as Completion Drawings, along with a soft copy to the Employer.
2.3
Where the contractor proposes to use an item of equipment, other than that specified or detailed on the drawings, which requi res any redesign of the structure, partitions, foundation, piping, wiring or any other part of the mechanical, electrical or architectural layouts, he shall
inform the Engineer well in advance and obtain his approval. Delays resulting from such re-design shall be On Contractors account.
He shall also submit all related information as may be required for approval of such redesign, to the Engineer.
2.4
Where the work of the Contractor has to be executed in close proximity to or will interfere with work of other agencies, the Contractor
shall work out space/time adjustments in coordination with other agencies. If the contractor installs his work before coordinating with
other agencies, so as to cause any interference with their work, he shall make the necessary changes without extra cost to th e owners of
the installation.
Page 2 of 40
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
3.
Page 3 of 40
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
The item price includes cost of labour & all materials required to electrify the quarter in all respect complete with ceiling and exhaust fans,
luminaries with lamps and other items indicated in the scale of fittings for each type of quarter. It also includes the cost of wiring cables
(sizes indicated for point wiring, circuit wiring and sub main wiring), PVC conduits with accessories, junction boxes, modular switches,
sockets, metal boxes, lamp holders and ceiling roses, modular plates, pre-wired sub distribution boards and meter boards with meters,
MCBs, earth electrodes etc.
The work of staircase wiring covers complete work of wiring and all the materials required including conduit, wiring cable of size for point
wiring, two nos of two way switches etc. Payment for this item shall be in addition to the one point wiring covered under Item No-33003 (i).
(b)
Scale of fittings, wiring points, fans, luminary etc. for each type of quarter, Cable sizes, no. of wires permissible in each circuit and sub
main, meters, etc has been indicated here under.
SCALE OF ELECTRICAL FITTINGS FOR QUARTERS
Details of Points to be provided in each type of quarter
Type of
Qtr.
I
II
III
IV
No. of
Points
LP
Tube
Total
FP
Geyser
AC (32A)
Total
Points
14
16
10
20
11
16
31
15
21
43
Page 4 of 40
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
Sizes of single core (copper conductor) cable for point wiring, circuit wiring and sub main wiring, circuits, distribution board/s, etc.
for Qrs.
Nos. of points and size of wiring cables
Nos. of circuits and size of wiring
Size of Sub main wiring
cables
cable
GP
For
32A.
AC
For
load
Power
For geyser
Phases
and
neutral
1.5 sq.mm
2.5s
q.
mm
4sq
mm
6sq
mm
6sq
mm
4sq.
mm
6sq.
mm
6 sq.mm
4 sq mm
10 sq mm
Continuo
us earth
1.5 sq.mm
2.5s
q
mm
4
sq
mm
6
sq
mm
6sq
mm
2.5sq
mm
4 sq 6sq
mm
mm
6 sq.mm
4 sq mm
10 sq mm
4sq
mm
Page 5 of 40
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
Nos. of points
Type of
Quarter
Nos. of circuits
LP TL FP CBP EFP PP5A PP GP PP32A For For 5A For 15A. For 32A For Total
P
15A
(ACP) Lights Plug
Plug
AC geyser Ckt.
Qty
Fans &
call bell
2 2
1 No.
II
2 2
1 No.
III
3 3
1 No.
Earth Electrode
Details
Page 6 of 40
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
1
IV
11
15
6 5
12
18
Two Numbers
for each quarter
Page 7 of 40
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
16amps -6 nos,
(PP15A) (ii)
MCB SP 20
amps 2 nos
(Geyser) (iii)
MCB SP 32
amps 2 No
(AC)
Abbreviations
LP
PP5A
TLP
Tube light point with 1x28 watt T-5 Luminary and T-5 lamp
PP15A
FP
Ceiling Fan point with 1200/1400 mm fan with 300 watts PP32A
electronic regulator
(ACP)
CBP
EFP
GP
1 No.
Outgoing DP
MCB
1 No.
II
III
1 No.
1 No.
1 No.
1 No.
Outgoing
DP MCB
2 Nos.
2 Nos.
2 Nos.
2 Nos.
2 Nos.
Outgoing DP
MCB
3 Nos.
3 Nos.
3 Nos.
3 Nos.
3 Nos.
Capacity
Meter
DP MCB
4 Nos.
Outgoing
DP MCB
4 Nos.
10-40 A
20 A
4 Nos.
4 Nos.
4 Nos.
4 Nos.
10-40 A
10-40 A
20 A
20 A
Page 8 of 40
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
IV
1 No.
1 No.
2 Nos.
2 Nos.
3 Nos.
3 Nos.
4 Nos.
4 Nos.
10-40 A
40 A
1 No.
1 No.
2 Nos.
2 Nos.
3 Nos.
3 Nos.
4 Nos.
4 Nos.
10-40 A single
phase (for
L&F)
10-40 A, 3
Phase (for Power
load)
40 A
40 A TPN
Note: - Outgoing MCB and meter for individual unit shall be housed in separate chamber .Sealing arrangement for individual unit shall be made.
(B). Incoming MCBs in meter Boards (in separate chamber for each unit)
Qtr
Block of one
unit
Block of two
units
Rating MCB
Block of three
units
Rating
MCB
Rating
DP MCB
Type
32 A
DP
40 A
DP
63 A
DP
63 A
DP
100A
Double door
II
32 A
DP
40 A
DP
63 A
DP
63 A
DP
100A
Double door
III
32 A
DP
40 A
DP
63 A
DP
63 A
DP
100A
Double door
IV
40 A
DP
63 A
DP
63 A
TPN
63A
TPN
100A
Double door
40 A
TPN
63 A
TPN
100 A
TPN
100A
TPN
200A
Double door
Note: - Bus bar chamber required only beyond two units quarter block.
Page 9 of 40
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
LP
TLP (T-5)
FP
STL
PP5A
Total Points
DB
EE
2 No.
2 No.
1No.
1No.
1No.
7 Nos.
1No.
1No.
Abbreviations
LP
STL
FP
TLP T-5
PP5A
light point with 1x28 watt street light (aluminium sheet) T-5
luminary with lamp and G.I.pipe bracket grouted on wall
Pre wired Distribution board comprising of following: Incoming DP MCB32A with 100mA RCCB --- 1No.
Outgoing SP MCB 6-16A 4Nos.
100A copper bus bars
G.I.pipe earth electrode
Page 10 of 40
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
Sizes of single core (copper conductor) cable for point wiring, circuit wiring,
Size of
circuit
wiring
cable
LP
T-5
Phases
1.5 sq.mm
and neutral
Continuous
earth
1.5 sq.mm
FP
STL
PP5A
Nos. of circuits
STL
1 No.
1 No.
2.5 sq.mm
2.5 sq.mm
Service buildings shall also include buildings at isolated locations such as relay huts at level crossings etc.
Wiring for essential and non essential load and their control shall be carried out separately at station buildings and other locations as
required.
Page 11 of 40
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
d)
The payment for provision of industrial type iron clad plug socket with 32A DP MCB in M.S.Box [Item 33003(iii)] shall be paid in addition to
one power point work covered under 33003(ii).
NOTES: i)
ii)
Single phase distribution system is permitted up to 10 KW load calculated on the basis of load of points as indicated here under.
iii)
Three phase distribution system shall be carried out for the buildings having load above 10 KW calculated on the basis of load of
points as indicated here under.
iv) Separate SDBs shall be provided for L&F and Power loads as per site requirements.
v)
Each SDB shall be provided with RCCB 100 mA with incoming DP MCB.
vi) Each Distribution Board and Sub Distribution board shall be designed based on the requirement of load as per site conditions and
considering 25% additional circuits (minimum- 1 No.) as spare (MCB) on outgoing and minimum 50% additional load on Incoming
(for future requirements)
vii) Approval for design shall be obtained from the Engineer, prior to ordering boards on the basis of sample calculation for assessment
of electrical load, circuits and wattage of points as indicated below.
Page 12 of 40
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
A) Sample Calculation for Assessment of Electrical load, Circuits and wattage of points
A-1) Wattage of points
Light Point /Call Bell
point
60 Watts.
Ceiling
Fan Point
100
Watts.
Exh. Fan
Point
200 watts
Light Plug
point
Power plug
point
5A
15A
100 Watts
500 Watts
Geyser
PP 32A
Point
1500 Watts
2000 Watts
Page 13 of 40
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
A-2) Sample Calculation for Assessment of Electrical load and Circuits:Building with load as detailed here under
LIGHT & FAN CIRCUIT
Wattage of points
No. of points
Total watts
Total Load
Nos. of points
permitted in a
circuit
No. of circuits
Total circuits
POWER CIRCUIT
Light Point
/Call Bell
point
Ceiling
Exh. Fan
Fan Point
Point
Light Plug
point
5A
60 Watts.
100 Watts
500 Watts
1500 Watts
2000 Watts
25
1500
10
4
1000
800
3800 watts
5
500
4
2000
1
1500
2
4000
3 Nos
1 No
1 No
2 Circuits
4 Circuits
1 Circuit
8 Nos
5 Circuits
Geyser
Point
PP 32A
Air Conditioner Point
/Water Cooler
7500 watts
7 Circuits
Distribution Board
Power plug
point
15A
1 No
2 Circuits
7 Circuits
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
A-3) Size/s of single core (copper conductor) cable for point wiring, circuit wiring and sub main wiring, circuits, Sub Distribution Board/s,
etc.for buildings, offices etc.
1.5
sq.mm
2.5
sq.
mm
1.5 sq.
mm
2.5
sq.
mm
PP32
A
(ACP/
WC)
4
6
6sq
sq
sq.
mm
mm mm
4
6
sq
sq.
mm mm
Minimu
m size
of main
wiring
cable
G.I.pipe
Earth
Electrode
6sq
mm
continuous
earth
Minimum
size of
Sub main
wiring
cable
For
L&F
and
5A Plug
For
For
For
32A.
10
15A.
Geyser (AC/WC sq.mm
Plug
etc)
2.5
sq.mm
4
4 sq.
sq.
mm
mm
6 sq.
mm
10 sq.
mm
2.5 sq.
mm
16
sq.mm
16 sq.
Mm
16 sq.
mm
4
4 sq.
sq.
mm
mm
6 sq.
mm
10 sq.
mm
(i)
One No. for
Each single Phase
SDB/DB
(ii) two Nos. for each
three phase SDB/DB
Page 15 of 40
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
Nos. of points
No.of circuits permited in a
permitted in a circuit
Distribution Board
Light
Point/Fan
PP32A For L&F
For
For 32A
Point/Call
PP
For
PP5A
GP (ACP/ and 5A
15 A
(AC/WC
Bell point/
15A
Geyeser
WC) plug
plug
etc)
PP5A
etc.
8 Nos.
4 Nos 1 No 1 No 1 No
12 Nos.
12 Nos
10
sq.mm
16
sq.mm
Abbreviations
LP
Light point
PP5A
FP
PP15A
CBP
PP32A
Air Conditioner/Water cooler point with Industrial type iron clad plug
(ACP/WC) 32 amps & 20A DP MCB in metal clad box
EFP
GP
Geyser point
Page 16 of 40
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
ITEM NO.33006: Supply, installation, testing and commissioning of street light luminary with prewired T-5
energy efficient tubes.
The item price includes labour & cost of all materials including cost of FR PVC insulated multistranded single core copper
conductor cable, earthing etc. Luminary shall be provided on the bracket of pole / on wall / as required. For provision of luminary
on wall, G.I.Pipe bracket is payable under G.I.Pipe item on measurement of length basis. It also includes
33006 (i): Fitting & arrangement shall be similar to Havell's Cat. Ref. No. LHRT05228033, complete with T-5 tubes, electronic
ballast etc.
33006 (ii): Fitting & arrangement shall be similar to Havell's Cat. Ref. No. LHRT05128032, complete with T-5 tubes, electronic
ballast etc.
33006 (iii): Fitting & arrangement shall be similar to Havell's Cat. Ref. No. LHRT15214040, complete with T-5 tubes, electronic
ballast etc.
Page 17 of 40
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
33006 (iv): Fitting & arrangement shall be similar to Havell's Cat. Ref. No. LHRT18414040, complete with T-5 tubes, electronic
ballast etc.
33006 (v): Fitting & arrangement shall be similar to Havell's Cat. Ref. No. LHRT18424034, complete with T-5 tubes, electronic
ballast etc. OR similar to Bajaj Cat Ref No BGEST 85 RF CFL FG E40 complete with 85W CFL as required by Railway.
CFL luminary shall be Integral, powder coated die-cast aluminium housing, pot optics reflector with full glass cover, accessories
complete.
ITEM NO.33007: Supply, installation, testing and commissioning of Metal Halide/HPSV Street light luminary
with lamp.
The item price includes labour & cost of all materials including cost of Metal halide/HPSV street light luminary complete with
lamp, FR PVC insulated multistranded single core copper conductor cable earthing etc.
Luminary shall be provided on the bracket of pole / on wall / as required. For provision of luminary on wall, G.I.Pipe bracket is
payable under G.I.Pipe item on measurement of length basis.
33007(i) Fitting & arrangement shall be similar to Crompton cat. ref MHSGN1107IH.
33007(i) Fitting & arrangement shall be similar to Crompton cat. ref MHSG2115IH/FG.
ITEM NO 33008: Supply, installation, testing and commissioning of A.C. ceiling fan. (Without Regulator)
The item price includes supply & erection cost of all materials including cost of 230V A.C. ceiling fan having 3/4 blades, double
ball bearing, copper wound motor, suitably sized down rod, canopies and capacitor etc complete with all accessories including
fixing phenolic laminated sheet cover on the fan box, FR PVC insulated multistranded single/three core copper conductor cable
wiring and connecting with earthing system etc. Fan should have ISI mark and as per IS-374/1979, min 3 star energy rating
issued by BEE.
Fan point wiring is covered under item 33003.
Page 18 of 40
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
ITEM NO 33009: Supply, installation, testing and commissioning of stepped type, electronic fan regulator on
the existing phenolic laminated sheet.
The item price includes labour & cost of all materials including cost of stepped type, electronic regulator 300W and connecting
cables etc.
ITEM NO 33010: Supplying, installation, testing and commissioning of 11-23 watts, compact fluorescent lamp
complete with electronic ballast
The item price includes labour & cost of all materials including cost of compact fluorescent lamp of suitable wattage complete
with electronic ballast of approved make etc as advised by Engineer.
ITEM NO 33012: Supply, installation, testing and commissioning of stationary vertical storage type drinking
water cooler complete with Supply and installation of Auto Voltage Corrector.
The item price includes labour & cost of self contained drinking water cooler 150 liters capacity (cooling capacity 150 Lts. per
hour) water cooler [conforming to IS-1475 (part-1)/2001, ISI marked, min 3 star rated], suitable for operation on 230 volts+/-10%,
50Hz, AC supply system complete with all connected standard fittings, accessories etc. and 5KVA , wall mounted, I.C. controlled
electronic auto-voltage corrector conforming to relevant IS (latest version), suitable for operation on single phase 180 to 260
volts, 50Hz incoming AC supply and output 200 to 230 volts A.C. supply, complete with time delay relay, voltmeter, instant start
provision with push button switch, connection to earthing system etc as required.
Page 19 of 40
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
ITEM NO 33013 (a), (b):Supplying, installation, testing and commissioning of LT Switch Boards different
capacities
The item price includes labour & cost of all materials including cost of LT switch board, connection of cables for incoming and
outgoing etc. LT switch board shall be cubical type, wall mounted, dust & vermin proof, conforming to IS:8623 (latest version). LT
switch board shall be suitable for operation on 3 phase, 4 wire, 415 volt, AC supply system, fabricated with 16 SWG M.S. sheet,
powder coated and complete with inter connections, instrument connections with copper conductor cable, copper bus bars
200/250 amps. (as per capacity of switch board 63/125A), CT's, voltmeter, ammeter, LED type indication lights, cable glands,
earthing studs etc.
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
ITEM NO.33020: Supply, installation, testing and commissioning of automatic changeover panel complete.
The item price includes labour & cost of all materials including cost of automatic changeover panel complete as per RDSO
specification No.TI/SPC/PSI/CLS/0023 with amendment No.3 dated 21.03.07 or latest, connections as required.
Note: Make of panel shall be on the approved list of manufacturers issued by RDSO/Lucknow.
Quantity
G.I.Flat clamp of
50x50x6mm with G.I.bolts &
nuts etc
STL
Jn. box
EE
1No.
2 Nos.
1No.
1No.
1No.
Page 21 of 40
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
Abbreviations
STL
2X24W street light T5 luminary complete with T5 tube OR CFL fitting with CFL. Luminary shall be powder
coated die-cast aluminium housing, pot optics reflector with full glass cover, accessories for 85W CFL
similar to Bajaj Cat Ref No BGEST 85 RF CFL FG E40 as required by Railway.
Jn. Box
M.S. junction box (1-phase 230 volts) complete with wiring including following:-
EE
MCB SP 6 A
4 Nos. 100A copper bus bars for looping 3 cables
Connection to earthing system with GI wire
ITEM NO.33022: Supply, installation, testing and commissioning of 100/250/500 KVA Power Distribution
Transformer, fencing and foundation
The item price includes labour & cost of all materials including cost of Transformer, erection testing and commissioning as p er
standard code of practice.
Extra payment shall be made for construction of foundation for transformer, providing fencing enclosure and Iron Gate (if
directed by the employer).
Requirements shall be as per details given here under:(i) Foundation
M10 grade cement concrete foundation shall be constructed with 20 mm coarse aggregate The size of foundation shall be as
per approved drawing based on size of transformer but shall not be less than 2 x1.5 mt (Length x breadth) and 600mm above
ground level duly plastered and finished surface. Curing shall be done as per code applicable. Excavation shall be done
complying with Code of Safety as per IS 3764/1992(Latest Version).
Page 22 of 40
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
(ii) Fencing
Fabrication of enclosure for housing transformer shall be made in rectangular formation as required with M.S. Angle iron
50x50x8mm spaced at about 2 meters and 12 SWG GI wire mesh GI wire shall be cut according to size and welded with the
angle frame. MS strip not less than 15x3mm size shall be provided and welded above GI wire along the angle frame to hold the
GI wire mesh. Height of enclosure shall be 2 meter above ground level. The portion of MS angle to be grouted in foundation
shall be 500mm.
The fencing panels shall be erected on foundation constructed of size 200mmx200mmx500mm deep with cement, & concrete of
M10 grade.
(iii ) Iron Gate
Iron gate shall be fabricated with 50mm x 50mm x 8mm MS angle iron frame with iron grill etc.as approved. The size of the gate
shall be 2mt (height) x 3.5mt (width ) and fabricated in two parts of 1.75 mt each. Gate shall be provided with sliding Lockable
bolt with Pad lock.
Gate shall be fixed on channels of size not less than100x50mm, weighing 7.90 Kg per meter with bolts & Nuts and welded.
Channels shall be erected on foundation constructed of size 300mmx300mmx500mm deep with cement, concrete M10 grade
Complete enclosure including Gate and angles (except galvanized portion) shall be painted with approved shade enamel paint
over two coats of red oxide primer.
Installation shall be as per IS 10028 (Pt. II/1981) Latest Version.
Drawing of the enclosure with Iron Gate etc. shall be got approved from the Engineer.
ITEM NO.33023: Supply, installation, testing and commissioning of 3 pole 11 KV, 400 amps Gang Operated
Switch complete with drop out fuses etc.
The item price includes labour & cost of all materials including cost of 3 poles 11 KV, 400amps. Gang Operated Switch complete
with drop out fuses, operation system, clamps, connections with ACSR conductor, sleeves, etc. as required. All the materials
used for manufacturing Gang Operated Switch shall conform to IS-2544, IS-5340 (Part-III) and IS-9921 (Part-I to V).
ITEM NO.33024: Supply, installation, testing and commissioning of 11 KV 3 Panel HT Vacuum Circuit Breaker
board and end termination etc.
Page 23 of 40
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
The item price includes labour & cost of all material including cost of 11 KV 3 Panel (one incoming and two outgoings) HT
VCB board, conforming to IS:13118/1991 & IS:3427/97, erection, testing, commissioning as per RVNL specifications. VCB panel
shall be 11kV, 350MVA, 630 Amps, draw out type, manually operated, 3 panel HT VCB board comprising of 1 No. Incoming: 3
Pole, Vacuum Circuit Breaker complete with PT, relays, electronic metering devices including ammeter, voltmeter, frequency
meter, power factor meter and trivector meter (with 30 minutes integration) for maximum demand indicator of suitable range for
unbalanced loads, clustered LED type indication lights, double ratio copper wound current transformer (ratio 80/40/5A -- for
500KVA & 60/30/5A for 250 KVA) and 2 Nos. Outgoing: 3 Pole, Vacuum Circuit Breaker complete with relays, Digital Ammeter,
LED type Indication light, double ratio copper wound current transformer ( ratio 60/30/5A -- for 500KVA & 30/15/5A for 250 KVA)
complete.
ITEM NO.33025 & 33026: Supply, installation, testing and commissioning of LT Switch board.
The item price includes labour & cost of all material including cost of LT Switch board, erection, connections of cables, testing,
and commissioning etc. as per RVNL specifications. LT panel shall be cubical type, floor mounted, dust & vermin proof, multi-tier
construction, fabricated with 2mm thick CRCA sheet with base MS channel 100x50x7.5mm (nominal size), and powder coated.
The LT switchboard shall conform to IS:8623 (latest version) and shall be suitable for operation on 3 phase, 4 wire, 415 volt, AC
supply system. The switch board shall be complete with inter connections, instrument connections with copper conductor cable,
copper bus bars, front operated switchgears, selector switches, ammeter, voltmeter etc. on each incoming and ammeter on each
outgoing with LED type indication lights, cable glands, earthing studs etc. Each panel shall be in segregated compartment.
Page 24 of 40
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
Stand for holding of fire buckets shall be free standing, manufactured with MS angle frame 50x50x6mm with base angle frame ,
shade and hanging arrangements for buckets as per approved drawing.
Details of items are as under:
i) Fire extinguisher, dry chemical powder type (ISI marked) suitable for electric fire,10kg capacity - 2 Nos
ii) Rubber mat (ISI marked) non-skid type suitable for 11kV AC supply of size 3600x1000x25mm - 2 nos
iii) 6 nos. GI fire buckets of 10 Ltrs. capacity (24 gauge) duly fitted on MS angle 50x50x6mm stand, shade and filled
with clean dry ordinary sand -1set
iv) First Aid Box (ISI marked) complete with medicines of approved make - 1 set
v) Electric shock treatment chart (large size) with aluminum frame and laminated as approved. - 2 Nos.
vi) 11kV/415 Volt danger plates conforming to relevant IS. - 8 Nos.
vii) Schematic diagram of HT/LT installation on white hylem sheet with aluminium frame of size 1200x600 mm.
computer printed and suitably laminated - 1 No.
viii) Data of transformer on white hylum sheet with aluminum frame of size 900x600mm. - 2 Nos
ITEM NO. 33030: Supply, installation, testing & commissioning of DG set with acoustic enclosure with all
other accessories etc.
The item price includes labour & cost of all materials including cost of DG set with acoustic enclosure , AMF panel and all other
accessories, construction of plinth with materials as per OEM recommendations and approved drawing, first filling of lubricating
oil, supply of High speed Diesel oil required for testing, commissioning at site etc as per details given in RVNL specifications. DG
set shall be complete with diesel engine, copper wound alternator, battery set, anti-vibration pads, fuel tank and all other
Page 25 of 40
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
accessories/equipments/protective devices etc and AMF control panel conforming to relevant IS, fabricated with CRCA, 16 SWG
sheet, powder coated and comprising of incoming 4 pole, MCCB 50kA, copper bus-bars, 4 pole, heavy duty contactors,
multifunction panel meter for display of current and voltage on phases and lines, power factor, frequency, kWH, MD etc, LED
indications lights including connections with single core 1.1 kV grade LT XLPE insulated copper conductor control cable
between LT panel, AMF panel and alternator for auto and manual operation etc.
ITEM NO. 33031: Supply, installation, testing and commissioning of 125 KVAR APFC Panel.
The item price includes Supply, erection, testing & commissioning of 125 kVAR (10x12.5) Automatic Power Factor Controller
panel (capacitor bank) complete with low loss capacitors similar to MD-XL type of L&T make, 250 amp MCCB incomer
(Ics=100%Icu), with auto and manual option, suitable for 3 phase, 415 Volt, 50 Hz AC supply & switching ratio1:2:3:4, conforming
to relevant IS (latest version). APFC Panel shall be similar to L&T make cat.ref.A1256A10CMM. APFC panel shall be connected
with the main panel as per site requirement.
Cable for providing connections are payable under relevant BOQ item.
ITEM NO.33032: Earthing with 3 meter long, 50 mm dia G.I. Pipe class 'B' earthing electrode:
The item price includes labour & cost of all materials including cost of GI pipe, masonry enclosure, cover plate with lifting handle,
charcoal/coke and salt, etc.
Earthing shall be in conformity to IS 3043/1987 (Latest Version) and as per approved drawing. Excavation shall be done
complying with Code of Safety as per IS 3764/1992(Latest Version). Earth resistance shall not be greater than 5 ohm in normal
soil and 8 ohm in rocky area.
ITEM NO. 33033 Earthing with 600mmx600mmx6mm thick G.I. earth plate
The item price includes labour & cost of all material including cost of supply of GI earth Plate, masonry enclosure, cover plate
with lifting handle, G. I. watering pipe, charcoal or coke and salt etc.The price shall also cover erection including digging of
earth pit in any kind of soil at the specified location. The work shall also cover the earth treated to obtain earth resistan ce of less
than 1 ohm. Connection of earth electrode should be made by providing GI clamps nuts, bolts.
Page 26 of 40
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
Work shall be in conformity to IS 3043/1987 (Latest Version) and as per approved drawing. Excavation shall be done complying
with Code of Safety as per IS 3764/1992. Earth resistance shall not be greater than 1 ohm in normal soil and 2 ohm in rocky
area.
Payment of G.I.strips to be laid for connections are payable under relevant BOQ item
ITEM NO. 33034 : Earthing with 600mmx600mmx3mm thick copper plate earth plate
The item price includes labour & cost of all material including cost of supply of copper earth Plate, masonry enclosure, cover
plate with lifting handle, G. I. watering pipe, charcoal or coke and salt etc. The price shall also cover erection including digging
of earth pit in any kind of soil at the specified location. The work shall also cover the earth treated to obtain earth resistance of
less than 1 ohm. Connection of earth electrode should be made by providing cadmium plated brass bolts & nuts. Earth resistance
shall not be greater than 1 ohm in normal soil and 2 ohm in rocky area.
Work shall be in conformity to IS 3043/1987 (Latest Version) and as per approved drawing. Excavation shall be done complying
with Code of Safety as per IS 3764/1992
Payment of copper strips to be laid for connections are payable under relevant BOQ item.
ITEM NO. 33035 (i&ii): Supply and laying of G.I. strip below ground or surface/in recess.
The item price includes labour & cost of all materials including cost of G.I. strip on surface or recess or digging in ground/making
chase in wall/floor and making good the damages, connections including soldering/riveting etc as required.
ITEM NO. 33035 (iii): Supply and laying copper strip on surface or in recess or in 50 mm dia G.I. pipe
The item price includes labour & cost of all materials including cost of copper strip on surface or recess or digging in ground 0.50
meter below ground/ making suitable holding arrangements on transformer /D.G. Set end, making good the damages,
Connections of strip including soldering/riveting etc as required.
Rates for G.I.pipe are payable separately under relevant BOQ item.
Page 27 of 40
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
ITEM NO.33037 (I & II) : Supply and erection of high mast system complete with accessories,
The item price includes labour & cost of Supply, erection, testing & commissioning of hot dipped galvanised (inside & outside),
16m high mast system (in two sections), complete with accessories, foundation bolts with nuts, washers, anchor plates &
templates etc. manufactured from special steel, head frame, 2-point suspension system with steel wire rope 6mm dia (7/19
construction), double drum winch, galvanised lantern carriage arrangement suitable for 9 luminaries symmetrically arranged &
control gear boxes and lighting finial etc. The mast shall have integral type power tool at the base compartment for its rais ing and
lowering operation, twin dome aviation obstruction lights with 100 watt lamp, control panel etc. High mast shall be supplied
complete with 2x400 watts MH luminaries (degree of protection IP-65) with control gear boxes, MH lamps, multi core flexible
copper conductor cable of suitable rating, connection with earthing system etc. as required.
Control panel shall consist of:
(a) 1X63 A TPN MCB for incoming supply
Page 28 of 40
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
(b) 3X32 A SPN MCB for outgoing (50% lighting, 100% lighting, motor)
(c) Automatic timer with contactor for controlling above lights of suitable capacity.
(d) 1 no multi plug socket 16A
High mast shall be provided with fencing panel of size 2Mx2Mx1.5M in square shape for protection of erected high mast tower
wherever required as directed by Engineer. The cost shall also include construction of foundation as per recommendation of
manufacturer and approved drawing and its fixing arrangements etc.
Note: Pipe electrode earthing is payable extra under relevant SOR.
ITEM NO 33038
(i) to (iv): Supply, laying, testing and commissioning of 33 /11 KV XLPE (E) insulated,
armoured aluminium conductor cable.
The item price includes the cost of supply of cable conforming to IS:7098/Pt.II/85 and all other materials including bricks, sand
and cement. The item price also includes laying of cable, , miscellaneous works such as digging of trench, provision of suitable
clamps as per site requirements and testing & commissioning. Laying of cable shall cover all type of pipes, horizontally or
vertically, underground, on wall or in air or under the Railway track/road. It also includes coordination for arranging shut down
from state Electricity authorities and returning/ transporting of released materials to state electricity authorities.
In substation area, laying of cable includes construction of suitable trench. Trench shall be filled with dry sand up to 300 mm
above cable after laying. U frame shall be manufactured with MS angle 50x50x6mm & grouted vertical in floor for holding cab le
on transformer and HT panel end. Cable shall be held vertical with clamps of MS flat 50x6mm at two places on frame on
transformer and panel side. Painting of U frames and clamps shall be done with approved shade paint.
The cable shall be laid as per RVNLs technical specifications.
The cost of GI/RCC/HDPE pipe and cable route markers is payable under separate BOQ items.
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
ITEM NO 33042: Supplying and erection of pre-stressed, cement concrete (PSCC) double pole structure 9-11
meters long complete with galvanized stay set, anti climbing devices and fixing of Danger
plates on the erected pole.
The item price includes coordination with SEB/concerned authorities, labour & cost of all materials including cost of prestressed, cement concrete (PSCC)/RSJ (As per site requirement) double pole structure(H-pole) 9-11 meters long, 4 nos. channel
cross arms & 2 nos cross bracing angles, clamps, bolts, nuts etc. including erection, casting of foundation , muffing etc. The item
price also includes supply and erection of galvanized stay set with 19/20 mm dia x1.8 meters long stay rod, anchor plate of size
45cm.x45cm x 7.5mm thick, thimble, stay clamp of galvanised MS flat 50 x 6 mm, turn buckle (20mmx600 mm), 7/4.00 mm dia G
I stay wire conforming to IS 2141-1968, 11KV strain insulators etc. including digging of pit, casting of foundation for poles & stays
with cement, concrete M10 grade and refilling, supply and erection of anti climbing devices, and danger plates on the erected
poles. Above items are for guidelines purpose. The entire work has to be done in coordination and as per standards of concern ed
State Electricity Board.
ITEM NO. 33043:Supply and erection of 11 KV Porcelain Disc insulators complete with galvanized iron
hardware etc. including terminating with 11KV/ 33 KV overhead conductors as required.
The item price includes labour & cost of all materials including cost of 11 KV porcelain Disc insulators complete with galvanized
iron hardware, terminations with overhead with PG clamps, dismantling of materials transporting and handing over to concerned
authorities wherever required, etc.
ITEM NO. 33044: (i): Supply and laying of RCC Hume pipe under the Railway track /Road.
The item price includes labour & cost of all materials including cost of RCC Hume pipe, ISI marked, NP-4 class, digging of trench,
laying of pipe and back filling of trench with excavated earth etc.
Prior to start of excavation works under track/road, proper permission shall be obtained from the concerned authorities.
Page 30 of 40
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
ITEM NO. 33044 (ii): Supply and laying RCC Hume pipe under the Railway tracks with trench less method.
The item price includes labour & cost of all material including cost of RCC Hume pipe ISI marked, NP-4 class, making trench with
trenchless method with suitable machines etc and making good the damages..
Prior to start of works, proper permission shall be obtained from the concerned authorities.
Due care should be taken to avoid damage to tracks alignment, existing cables, pipes or other such installations during
Drilling/Boring. Horizontal distance of the proposed trench from the existing and proposed electric mast shall not be less than
5.0 meters and shall be away from the track joints.
ITEM NO. 33045 (I & II):Supply, installation, testing & commissioning of Submersible pump set, control panel
etc
The item price includes labour & cost of all material including cost of Submersible pump set ISI marked and min 3 star energy
rating with control panel, cable etc suitable for supplying water at required head and discharge as per site conditions and as
directed by Engineer. The horse power of the motor is approximate. Suitable motor has to be installed keeping in view the site
conditions. However, all items required for the safe and efficient operation whether stated or not, shall be deemed to be included.
Control panel shall be wall mounted cubicle type, dust & vermin proof, suitable for operation on 415 volts AC supply system, with
degree of protection not less than IP 54, fabricated with 16SWG thick CRCA sheet steel, duly powder coated.
Details of accessories etc are as under:1
Cable ties for clamping of flat cable to pipe at every 1 mtr interval through out the
length.
Page 31 of 40
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
3
BCH/L&T make Cubicle type, weather proof control panel with degree of
protection not less than IP54, complete with the following :-
i)
ii)
iii)
iv)
v)
system as approved by
ITEM NO. 33046:Co-ordination/ Liaisoning and chasing with State Electricity Board authorities for availing
New Electric Connection / augmentation of load/modification of crossings etc.
The item price includes cost for Co-ordination/Liasoning /chasing with State Electricity Board authorities for various activities
involved for availing new connections, augmentation of loads, including collection of estimates for New connections, addition al
load & crossings modifications, arranging payment from RVNL, depositing payment to SEB's authority, release of load & other
connected works etc.as required.
Note: Payments made for application forms will be reimbursed by RVNL on proof of documents.
Page 32 of 40
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
ITEM NO. 33047: Design and preparation of working & completion drawings of the installations.
The item price includes cost for design of electrical works and preparation of working & completion drawings of the installat ions
covered under general electrical services work of the complete project including internal electrification of quarters, level
crossings, station buildings, offices, buildings, Power line crossings, Power supply distribution arrangements of stations with
platform lightings, sub stations, Electrification of Sub stations building, etc as required on Auto Cad & arranging approval from
competent authority.
On award of contract, survey of all the installations (Excluding Power line crossings which are covered under other BOQ item)
shall be carried out and drawings indicating existing & proposed works, schematic layout /arrangements etc. shall be prepared on
Auto Cad based on Zonal Railways and SEBs norms & requirements and shall be got approved from the competent authorities
i.e. RVNL/Zonal Railways/SEBs etc. as required. All the drawings shall be speaking with conventional signs and symbols.
After completion of entire work, as executed drawings shall be prepared and supplied while handing over the completed works to
the Zonal Railways.
Design and Drawings will be the property of Railways.
Following drawings shall be prepared and submitted.
WORKING DRAWINGS
1
Soft Copy
Hard Copy
Three set of each drawing of not less than A-3 size on RTF (Re-producible Tracing Film) and four
sets on paper
Page 33 of 40
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
COMPLETION DRAWINGS
1
Soft Copy
Hard Copy
Three set of each drawing of not less than A-3 size on RTF (Re-producible Tracing Film) and four
sets on paper.
NOTES:
1) Drawing for all HT installations are to be got approved from the Chief Electrical Engineer of the zonal railway in his capacity as
Electrical Inspector to Govt.of India.
2) Drawings for LT/11kV/33kV crossings of State Utility Company, that are being modified, are to be got approved from the
concerned Utility Company, prior to taking up the work.
ITEM NO. 33048 : Conducting check survey for the existing LT, HT and EHT Power line Electrical crossings on
the section and measurements of clearances to identify modification required/not required
The item price includes cost for conducting check survey of complete section for all the existing LT, HT and EHT Power line
Electrical crossings, power lines running parallel to track from the proposed track route and requiring modification keeping in
view Regulations for Electrical crossing of Railway Track 1987 and IRSOD-2004 with latest amendments , measurements of
horizontal distances of structures (up to next two structures on each side) from the existing & proposed tracks etc, vertical
clearances of lowest conductors & guard wires from existing & proposed rail level, angle of crossings, height and type of
towers/poles, preparation of list of crossings requiring modification & list of crossings not requiring modifications etc. (Height/
clearances shall be accurate with zero tolerances)
Measurements shall be recorded on a format as approved and be submitted considering all aspects including details required as
indicated above. Proposal for modification arrangement of infringing power line crossing shall also be submitted.
Page 34 of 40
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
ITEM NO. 33049 : Supply, erection, testing & commissioning of outdoor type, single side and double side
Glow sign board /Pictorial signage board with suspension/ mounting arrangement.
The item price includes Supply, installation, testing & commissioning of outdoor type, single side, /Double side Glow sign
boards/Pictorial signage boards with suspension /side mounting/wall mounting type arrangements as required, complete
including internal wiring with 2x1.5sq mm FR PVC insulated, multistrand, copper conductor single core cable on surface PVC
conduit, earthing with 1.5 sq mm FR PVC insulated multi strand copper conductor single core cable conforming to IS 694(lat est
version) etc, acrylic sheet of thickness not less than 4mm on front side, G.I /Aluminium Sheet of 24 SWG on all 5 / 4 sides with
louvers etc.as required. Depth of board shall not be less than 200mm. Erection arrangement shall be as approved by Railways.
Matter to be written / displayed on signboards shall be got approved before manufacturing of board. Glow sign board shall have
degree of protection not less than IP 54.
Prewired 1x28 watts T-5 surface type Luminary complete with electronic ballast etc. shall be provided. Provision of Nos. of
luminary shall be based on one No.28 watts T-5, surface type luminary per 8 Sq. ft area.
Note: 1. Boards of smaller dimensions/area which may not accommodate 28 watt luminary shall be provided with 1x14
watt luminary per 4 sq.feet area.
2. Payment for Double sided glow sign board shall be made @ 150% of the total rate of single sided glow sign
boards.
Wiring shall conform to relevant IS and code of practice as applicable.
ITEM NO. 33050: Supply, installation, testing & commissioning of Silicon rectifier battery charging set 200
Amps capacity including connections.
The item price includes labour & cost of all materials including cost of battery charging set as per RVNL tech specifications.
Payment for L.T. cable shall be made under relevant BOQ item. .
ITEM NO. 33051: Supply, erection, testing and commissioning of weather proof, outdoor type, dust and
vermin, floor mounted, 110 volts battery charging point.
110 V DC battery charging points shall be manufactured as per RVNL technical specification OR as per approved Drawing of
Zonal Railway / RVNL.
Page 35 of 40
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
The item price includes labour & cost of all material including cost of Fabrication, supply, installation, testing and commissioning
of cubicle type, weather proof, outdoor type, dust & vermin proof, 110 volts Battery charging point conforming to IS 8623 (latest
version) with degree of protection not less than IP54. Battery Charging point shall be suitable for operation on 150 volts DC
supply system and fabricated with 14 SWG galvanised MS sheet, M.S. channel size 100x50mm (weight 7.914kg/metre)
1200mm long, powder coated, inter-connections with single core, PVC insulated, multi stranded, copper conductor cable of size
10 sqmm, 3 nos. aluminum bus bar of size 25x10mm, complete with one no. MCB DP 63 Amps (DC series) 10kA, including
vertical grouting of channel 300mm deep in ground for erection with cement concrete M10 grade as per standard drawing of
zonal railway/as approved by the Engineer. .
ITEM NO. 33052: Supply, erection, testing & commissioning of weather proof, dust & vermin proof, Precooling point
The item price includes labour & cost of all material including cost of Fabrication, supply, installation, testing and commissioning
of cubicle type, weather proof, outdoor type, dust & vermin proof, pre- cooling point conforming to IS 8623 (latest version) with
degree of protection not less than IP54. Pre-cooling point shall be manufactured with 3.15mm CRCA sheet with 4 pedestals (on
corners) of M.S. angle size 65x65x8mm (900mm long) with base frame of M.S. angle size 40x40x5mm, duly powder coated
including vertical grouting of MS. angles 300mm deep in ground for erection with cement concrete M10 grade as per standard
drawing of zonal railway/as approved by the Engineer. Pre-cooling point shall be complete including following:.
i)
ii)
iii)
iv)
v)
vi)
vi)
The connections from bus bars to MCCB and from MCCB to the feeding terminal (Iron Clad Sockets) shall be done with single
core, copper conductor cable of suitable rating with suitably sized galvanized MS bolts, nuts and washers.
Page 36 of 40
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
Fluorescent screen printed indication plates on the front shall be provided for clear indication of 415 Volts, AC pre-cooling point.
Pre cooling points shall be manufactured as per RVNL technical specification OR as per approved Drawing of Zonal Railway /
RVNL.
ITEM NO. 33054 (i): Dismantling of erected pole and its associated overhead conductor, GI wire, cross arms
brackets, insulators, Stay, luminary.
The item price includes cost of labour for dismantling of erected pole and its associated overhead conductor, GI wire, cross arms
brackets, insulators, Stay, luminary etc as are at site including stocking , transporting and handing over released material to
concerned official as instructed and if required making temporary arrangements as per instructions of the engineer.
Page 37 of 40
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
ITEM NO. 33055 (i&II): Providing temporary wiring/cabling arrangements for lights & fans with stand by
D.G.Sets.
The item price includes labour & cost of all materials required for temporary arrangements in adequate quantity distributed over
entire station area as decided by the engineer including wiring, cabling, luminaries with lamps, Pedestal fans, cost of
consumables for replacement, deployment of staff for maintaining temporary arrangements during pre/post/during non interlocking period as required, arrangement of DG sets for Power supply to temporary installations including operation and
Supply of required Diesel oil, lube oil,, provision of earthing arrangement as required.
D.G. Sets including spare DG set should be of suitable capacity as decided by Engineer in charge to meet the load required
during non interlocking period.
Work of temporary wiring installation shall comply with latest code of practices and IE. Rules.
After completion of requirements of non interlocking work, installation shall be dismantled and material shall be taken away from
the site as directed by the Engineer.
NOTE: Normal power supply, if spare load is available, may be used up to sanctioned load with prior approval free of cost.
Item No.33056 (a): Supply, installation, testing and commissioning of 2.0Tonne window type A.C.unit (3 star
rating) complete with Supply and installation of Auto Voltage Corrector.
The item price includes labour & cost of Supply, installation, testing and commissioning of window type A.C.Unit ISI marked and
min 3 star energy rated conforming to IS-1391 Pt-I/1992 (amdt 1,2), complete with LCD display cordless remote (for control of
functions, on/off, timer, selecting fan speed (three speeds) and setting up of temperature), rotary compressor, 3/3 speed
cooling/fan, air ventilator, air bacteria filter, condensor (type - GOLD), suitable for 1-phase 230 10% voltage AC supply including
supply & installation of 5 KVA, wall mounted, I.C. controlled electronic auto voltage corrector conforming to relevant IS (latest
version), suitable for operation on single phase 180 to 260 volts, 50 Hz incoming AC supply and output 200 to 230 volts A.C
supply, with time delay relay, voltmeter, instant start provision with push button switch, earthing etc as required.
Page 38 of 40
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
NOTE: AC unit shall be fixed in the space available and shall be provided with the frame in approved manner (polished hard
wood or other material as approved).
Item No. 33056 (b): Supply, installation, testing, & commissioning of Split type, 1.5 Tonne Cap. AC unit (5star
rating) complete with Supply and installation of Auto Voltage Corrector.
The item price includes of Supply, installation, testing and commissioning of split type A.C.Unit ISI marked and 5 star energy
rated conforming to IS-1391 Pt-II/1992 (amdt 1), complete with LCD display, cordless remote [for control of functions, on/off,
timer, selecting fan speed (three speeds) and setting up of temperature], rotary compressor, 3/3 speed cooling/fan, air ventilator,
air bacteria filter, condensor (type - GOLD), suitable for 1-phase 230 10% voltage AC supply complete with stand (as approved)
for fixing outdoor unit, provision of rubber pads below the outdoor unit, heavy duty PVC flexible pipe (ISI marked) for drain,
interconnecting cable and refrigerant copper pipes with thermal insulation, including supply & installation of 5 KVA, wall mounted,
I.C. controlled electronic auto voltage corrector conforming to relevant IS (latest version), suitable for operation on single phase
180 to 260 volts, 50 Hz incoming AC supply and output 200 to 230 volts A.C supply, with time delay relay, voltmeter, instant start
provision with push button switch, earthing etc as required.
The item price also includes labour & cost of extra copper refrigerant pipes with insulation as required (in addition to standard
length supplied with the unit), electric cable for connection etc as required
Item No.33058:Supply, installation, testing & commissioning of cubical type, Mast mounted, dust & vermin
proof, L.T control switch board for AT.
Item price includes supply, installation, testing & commissioning of L.T control switch board for AT. Switch board shall be cubical
type mast mouted, dust & vermin proof, conforming to IS:8623 (latest version), suitable for operation on single phase, 2 wire, 415
Page 39 of 40
Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE
volt, AC supply system, fabricated with 16 SWG, CRCA sheet, powder coated and complete with inter connections with copper
conductor cable, copper bus bars in bus chamber, clustered LED type indication lights, cable glands for incoming and outgoing
clamping with mast with 50x50x6 mm MS flat clamps, earth studs etc., complete with TPN MCCB, copper busbars etc. as per
details given in RVNL tech specifications.
Item. NS -1: Supply, installation, testing & commissioning of control and distribution panel for colour light
signal.
Item price includes supply, installation, testing & commissioning of L.T control and distribution panel for colour light signalling
supply in 25 KV AC traction system as per RDSO tech. Specification No. TI/SPC/CLS/0023 ( latest amendment) for
5 KVA AT
Item NS- 2 : Supply, installation, testing & commissioning of fabricated double door distribution board for non
emergency load.
Item price includes supply, installation, testing & commissioning of fabricated double door distribution board confirming to IS
13031, IS 8623 with degree of protection not less than IP 42 aas per IS 13947/Pt. 1/1993 with power coated finish for non
emergency load with MCBs etc.
Item NS-3: Supply, installation, testing & commissioning of energy efficient 1x14 watt T-5 type light fitting.
Item price includes supply, installation, testing & commissioning of Lumanariry with lamp (Rod ) 1x14 watt T-5 type light
complete in all respect with clear Polycorbonate cover with high frequency warm start electronic ballast and wide input voltage
range with IP -65 protection to be fixed fitting including connection from light point with 3x1.5 sqmm FRP insulated copper
conductor single core cable etc.
Page 40 of 40