The Designer shall meet with the Client, Architect, and other parties designated by the
Client to ascertain requirements of the Project and shall review the understanding of such
requirements with the project team.
The Designer shall review the Project site plan, Project Criteria, Project Program, and
Preliminary Drawings and Specifications. The Designer will also review applicable
requirements necessary for the various project functions and operations, such as those
for projected personnel, space, furniture, furnishings and equipment, operating
procedures, budget, and functional relationships.
Upon review, Designer shall recommend any changes to the client and project team, and
collaborate with team to implement such changes, if any.
This phase shall be considered complete upon submission of above mentioned items.
Written authorization will be required from the Client to proceed to the Schematic Design
Phase.
Schematic Design
The Designer shall review the program, project schedules and budgets furnished by the
Client to ascertain the requirements and design directives for the development of
Schematic Design for the project.
The Designer shall prepare schematic floor plans, decorative lighting, material and
furniture selections, color schemes, interior renderings, or other documents, which in the
opinion of the Designer, are necessary to describe the schematic design concept and
direction of the project.
This phase shall be considered complete upon submission of above mentioned
documents. Written authorization will be required from the Client to proceed to the
Design Development Phase.
Design Development
Title Sheet
Include building image
Include phase of work
Include issue date
G SERIES
G1: Index of Drawings
Include list of drawings from SSM
Include column for issue date
Include 2-3 blank columns for revisions
G2: Abreviations/Symbols/ Notes (EN)
G3: Abreviations/Symbols/ Notes (CH)
Moulding Schedule
Include profile of each moulding type with an MO code
Show composition of each moulding with a hatch
Do not show finish codes for mouldings - they will be on the elevs/details
K SERIES
Key plans for any sheets which do NOT fit on a sheet at 1:100
Include all N.I.C. hatching
Include location of plan sheets
Include walls, doors, stairs, windows
Include millwork, plumbing fixtures
Include room names
Include grid lines
Include room type names for GRs
100 SERIES
Floor Plans (typ scale 1:100) to include:
Include all N.I.C. hatching
Include walls, doors, stairs, windows
Include millwork, plumbing fixtures
Include ceiling lines, dashed
Include room names
Include grid lines
Include elevation tags
Include notes about items supplied by others
Include notes about feature walls, etc
Include tags for major details provided
Include blank finish codes for millwork, clarify with text as needed
200 SERIES
Floor Finish Plans (typ scale 1:100) to include:
Include all N.I.C. hatching
Include walls, stairs, windows
Include millwork and plumbing fixtures that touch the floor only
Include room names
Include grid lines
Include floor pattern
Include floor transition lines
Include blank finish codes for flooring, clarify with text as needed
Include dimension of typical STONE flooring sizes, not for wood flooring or tile
For installed carpet, include note to refer to FF&A plan
Do not show area rugs that overlay another installed floor finish
Include ceiling lines, dashed, IF the ceiling design relates to the floor pattern
300 SERIES
FF&A Plans (typ scale 1:100) to include:
Include all N.I.C. hatching
Include walls, doors, stairs, windows
Include millwork, plumbing fixtures
Include all furniture, drapery & plants
Include all FF&A sconces, floor lamps, and ceiling fixtures
Include all area rugs with blank C codes
Include all inset carpeting edge lines with blank C codes
Include all artwork with notes regarding supplied by others
Construction Documents
Title Sheet
Include building image
Include phase of work
Include issue date
G SERIES
G1: Index of Drawings
Include list of drawings from SSM
Include column for issue date
Include 2-3 blank columns for revisions
G2: Abreviations/Symbols/ Notes (EN)
G3: Abreviations/Symbols/ Notes (CH)
Moulding Schedule
Include profile of each moulding type with an MO code
Show composition of each moulding with a hatch
Do not show finish codes for mouldings - they will be on the elevs/details
Door Types:
Include front and back elevations of each door type
Include dimensions, specify which dimensions vary and are by arch.
Include finish codes
Hard Finish Schedule
Import from Specsources at HF Spec completion
K SERIES
Key plans for any sheets which do NOT fit on a sheet at 1:100
Include all N.I.C. hatching
Include location of plan sheets
Include walls, doors, stairs, windows
Include millwork, plumbing fixtures
Include room names
Include grid lines
Include room type names for GRs
100 SERIES
Floor Plans (typ scale 1:100) to include:
Include all N.I.C. hatching
Include walls, doors, stairs, windows
Include millwork, plumbing fixtures
Include ceiling lines, dashed
Include room names
Include grid lines
Include elevation tags
Include notes about items supplied by others
Include notes about feature walls, etc
Include tags for enlarged plans and details
Include finish codes for millwork
Include door type tags
Include dimensions ONLY to position items we own
DO dimension millwork, plumbing fixture placement, etc.
DO NOT dimension columns, arch walls and door openings
200 SERIES
Floor Finish Plans (typ scale 1:100) to include:
Include all N.I.C. hatching
Include walls, stairs, windows
Include millwork and plumbing fixtures that touch the floor only
Include room names
Include grid lines
Include floor pattern
Include floor transition lines
Include finish codes for flooring, clarify with text as needed
Include dimension of typical STONE flooring sizes, not for wood flooring or tile
Include start locations for floor patterns
Planters
Mirrors
Shower Curtains
Pillows
Decorative Accessories (Screens, Vases, etc)
Cushion
Illumincated Mirror
Makeup/Shaving Mirror
Umbrella
Ceiling Fan
AR ARTWORK
General Artwork
Bed Throw
Bed Skirt
Coverlet/Bedspread
Duvet
Bed Pillows
General Carpet
BD BEDDING
C CARPET
Axminster Carpet
Area Carpet
Carpet Pad
CH SEATING
Upholstered
Task Chair
Upholstered Ottoman
Non-Upholstered
Banquettes/Booths
DL DECORATIVE LIGHTING
Lamps
Pendants/Chandeliers
Wall Sconce
General Fabric
Blackout Fabric
Leather
Trim
General Tables
General Casegoods
Restaurant Table
Specialty Table
Vanity
Headboard
F FABRIC
TC TABLES &
CASEGOODS
Desk
Restaurant Table Base
CT CEILING TILE
Acoustical Ceiling Tile
Specialty Ceiling System
G GLAZING
Mirror
Synthetic Glazing
Glass
H HARDWARE
Door Hardware
Cabinet Hardware
Transition Strip
Miscellaneous Hardware
L LAMINATE
Laminate
M METALS
Metal Finish
MA MASONRY
Concrete
Brick
Terrazzo Flooring
P PAINT
Paint
Specialty Paint
R RESILIENT FLOORING
VCT Flooring
Rubber Flooring
Resilient Wall Base
Cork Flooring
S STONE
Stone Slab
Stone Tile
SS SOLID SURFACE
Solid Surface
Wallcovering
Upholstered Wall Panel
Conference Table
W WALLCOVERING
WT WINDOW TREATMENTS
T TILE
Floor Tile
Wall Tile
WD WOOD
Solid Wood
Wood Veneer
Melamine
WF WOOD FLOORING
Hardwood Flooring
Engineered Wood Flooring
Wood Sports Flooring
WA WATER FEATURE
Custom Water Feature
Stock Water Feature
Performance Specifications
The Performance Specification is a document that is intended to supplement the Drawings and Specifications. It details minimum
requirements for construction quality assurance.
It should be issued with every set of Construction Documents (including Mock Up Room sets) prepared by DiLeonardo
International.
The Performance Specification is divided into construction divisions and sections which follow the Construction Specification
Institute (CSI) standard numbering system. This allows our specifications to coordinate with most industry standard specs
produced by Architects, Engineers, and other Consultants.
Project Managers are responsible for identifying which specification sections apply to their jobs. Each specification section is
written generically and DOES NOT need to be edited for each individual project. Only these sections should be released to
clients.
Project Coordinators are responsible for compiling the sections for each job and filling in the project name and issue date prior to
printing. Performance Specification deliverables should be produced digitally (in pdf format) and in a double-sided hard copy (in
a 3-ring binder).
For more information, see documents Using the Performance Spec and Performance Spec Section List.
Construction Administration
Requests for Information (RFI)
Submittals
Include Shop Drawings, Samples, Cuttings for Approval, & Product Data
Submitted by the General Contractor, Subcontractor, or Product Rep
Should be logged in Newforma when recieved
Physical Samples and Cuttings for Approval should be photographed, with the photo
logged into Newforma
All Submittals should be stamped with a physical or virtual stamp after review
DI should respond to Shop Drawings within 5 business days, but aim for 2 business days
DI should respond to all other Submittals within 2 business days
Generated by DI to modify drawings or specs, and formalize the change for the external
project team
May be the result of an Owner request, Value Engineering, Correction of an Error, etc.
Can include SKs or Spec Revisions as attachments
Should be generated in Newforma and issued through Newforma
Sketches (SK)
Spec Revisions
Field Reports
Should be completed and issued each time DI visits a site, either for MUR or full
construction
Templates exist on the HIVE in both English and Chinese versions for Site Reports
Photos can be included to document conditions that need review or action.
Field reports should be issued to the owner or client after each site visit to record our
observations
Reminder: DI is not responsible for means and methods of construction. Field reports
should be straightforward and only comment on what is visible on site, and the
conformance with the design documents issued by DI
Punch/Snag List