Name of Sub-Project :Spring Development

Sub-project Type
:Water System Level 2 (Public Goods)
Barangay/s
Municipality
Province
Region

Cambalidio
Libmanan
Camarines Sur
V

I - DESIGN OF RESERVOIR:
A. Reason for installing a reservoir
To balance the supply and demand in the system.
Supply
=
0.93 lps.
Demand
=
0.838 lps.
B. Location of the reservoir
=

above service area

Reason for choosing the location.


The reservoir is lower than the spring and generally higher than the distribution areas.
It is also near to the service area for easy maintenance.
C. Capacity of the reservoir
Criteria:
Particular
Number of Household
Average Household Member
Total Population
Average Population Growth Rate
Growth rate factor
Design Lifespan
Design Population
Average Daily Water Demand
per Capita per Day
PCWC
Average Daily Demand (ADD)
Average Demand per Second

Description
Actual number of household beneficiaries
(No. of HH)(Ave. HH Member)
Percent annualy
1+Growth rate^lifespan
No. of years
PP(1+GR)^Life Span
Ave. daily consumption per capita
average demand per day
ADD/24x60x60)
(Design population)(ADW DCD)
ADD/24x60x60)

Data
155
5
775.00
3
1.557967
15
1,207.42
60

1) By rule of thumb

2) Theoretical

=
=
=

1/4 (ADD)
18.11 cu.m.
(Demand-Supply)(Ave. day)

3) Supply

(Supply)(Ave. day)

4) Adopted result
Reservoir capacity

18.11 cu.m.

5) Reason for adoption


-

Use an average reservoir capacity which could meet the demand of the future generation.
satisfy and hourly variations in the consumption rate
to provide for repair of pipes (particularly, the transmission) without interruption of service

6) Reservoir dimension
Dimension

Use 2 units reservoir @


18.11 ^1/3

20 cu.m. capacity each

2.63 m. 3
use

Length
Breadth
Height
Freeboard
Dead vol. Ht.
Actual reservoir capacity

=
=
=
0.20
0.10
=

Note: Computed dimension is INSIDE DIMENSION.

3.00 m.
3.00 m.
2.50 m.
Check:
19.80
22.50 cu.m.

Years
No.
Liter

0.000694
72,445 Liter
0.838 LPS

Reservoir capacity:

Reservoir capacity

Unit
HH
No.
No.
%

Name of Sub-Project :Construction of Water System Level 2


Sub-project Type
:Water System Level 2 (Public Goods)
Barangay/s
Municipality
Province
Region

Poblacion
Rapu-Rapu
Albay
V

I - DESIGN OF RESERVOIR:
A. Reason for installing a reservoir
To balance the supply and demand in the system.
Supply
=
10.2 lps.
Demand
=
9.229 lps.
B. Location of the reservoir
=

34 meters above service area

Reason for choosing the location.


The reservoir is lower than the spring and generally higher than the distribution areas.
It is also near to the service area for easy maintenance.
C. Capacity of the reservoir
Criteria:
Particular
Number of Household
Average Household Member
Total Population
Average Population Growth Rate
Growth rate factor
Design Lifespan
Design Population
Average Daily Water Demand
per Capita per Day
PCWC
Average Daily Demand (ADD)

Description
Actual number of household beneficiarie

Average Demand per Second

ADD/24x60x60)

(No. of HH)(Ave. HH Member)


Percent annualy
1+Growth rate^lifespan
No. of years
PP(1+GR)^Life Span
Ave. daily consumption per capita
average demand per day
ADD/24x60x60)
(Design population)(ADW DCD)

Data
853
6
5,118.00
3
1.557967
15
7,973.68
100
0.001157
797,368
9.229

Reservoir capacity:
1) By rule of thumb
Reservoir capacity
2) Theoretical

=
=
=

1/4 (ADD)
199.34 cu.m.
(Demand-Supply)(Ave. day)

3) Supply

(Supply)(Ave. day)

4) Adopted result
Reservoir capacity

199.34 cu.m.

5) Reason for adoption


-

Use an average reservoir capacity which could meet the demand of the future generation.
satisfy and hourly variations in the consumption rate
to provide for repair of pipes (particularly, the transmission) without interruption of service

6) Reservoir dimension
Dimension

Use 2 units reservoir @


199.34 ^1/3

20 cu.m. capacity each

5.84 m. 3
use

Length
Breadth
Height
Freeboard
Dead vol. Ht.
Actual reservoir capacity

=
=
=
0.20
0.10
=

Note: Computed dimension is INSIDE DIMENSION.

7.00 m.
7.00 m.
2.50 m.
Check:
107.80
122.50 cu.m.

Unit
HH
No.
No.
%
Years
No.
Liter

Liter

86400

TS1
TS2
TS3
TS4
TS5
TS 6
TS 7
TS 8
TS 9
TS 10
TS 11
TS 12

6
10
12
15
17
15
11
16
16
16
12
12

158

LPS
HH Pob.
HH Ilaya

544
309
853

Total Length of Pipe


Discharge (Q)
1 d
hf
hf
hf per 100 m

=
=
=
=
=
=

752.70
10.20 LPS
150.00 mm
0.0826fLQ^2/D^5 ; where f=
1.70
0.23

Total Length of Pipe


Discharge (Q)
2 d
hf
hf
hf per 100 m

=
=
=
=
=
=

22.90
4.00 LPS
100.00 mm
0.0826fLQ^2/D^5 ; where f=
0.06
0.26

Total Length of Pipe


Discharge (Q)
3 d
hf
hf
hf per 100 m

=
=
=
=
=
=

374.40
3.68 LPS
100.00 mm
0.0826fLQ^2/D^5 ; where f=
0.84
0.22

Total Length of Pipe


Discharge (Q)
4 d
hf
hf
hf per 100 m

=
=
=
=
=
=

384.30
3.38 LPS
100.00 mm
0.0826fLQ^2/D^5 ; where f=
0.73
0.19

Total Length of Pipe


Discharge (Q)
5 d
hf
hf
hf per 100 m

=
=
=
=
=
=

386.80
2.95 LPS
100.00 mm
0.0826fLQ^2/D^5 ; where f=
0.56
0.14

Total Length of Pipe


Discharge (Q)
6 d
hf
hf
hf per 100 m

=
=
=
=
=
=

773.40
2.08 LPS
75.00 mm
0.0826fLQ^2/D^5 ; where f=
2.34
0.30

Total Length of Pipe


Discharge (Q)
7 d
hf
hf
hf per 100 m

=
=
=
=
=
=

858.60
1.76 LPS
75.00 mm
0.0826fLQ^2/D^5 ; where f=
1.85
0.22

Total Length of Pipe


Discharge (Q)
8 d

=
=
=

1882.30
1.43 LPS
75.00 mm

0.02

0.02

0.02

0.02

0.02

0.02

0.02

8
hf
hf
hf per 100 m

=
=
=

0.0826fLQ^2/D^5 ; where f=
2.69
0.14

Total Length of Pipe


Discharge (Q)
9 d
hf
hf
hf per 100 m

=
=
=
=
=
=

18.60
4.00 LPS
63.00 mm
0.0826fLQ^2/D^5 ; where f=
0.50
2.67

Total Length of Pipe


Discharge (Q)
### d
hf
hf
hf per 100 m

=
=
=
=
=
=

29.30
3.68 LPS
63.00 mm
0.0826fLQ^2/D^5 ; where f=
0.66
2.25

Total Length of Pipe


Discharge (Q)
11 d
hf
hf
hf per 100 m

=
=
=
=
=
=

21.30
3.38 LPS
50.00 mm
0.0826fLQ^2/D^5 ; where f=
1.29
6.04

Total Length of Pipe


Discharge (Q)
### d
hf
hf
hf per 100 m

=
=
=
=
=
=

18.30
2.95 LPS
63.00 mm
0.0826fLQ^2/D^5 ; where f=
0.26
1.45

Total Length of Pipe


Discharge (Q)
### d
hf
hf
hf per 100 m

=
=
=
=
=
=

16.30
2.52 LPS
50.00 mm
0.0826fLQ^2/D^5 ; where f=
0.55
3.35

Total Length of Pipe


Discharge (Q)
### d
hf
hf
hf per 100 m

=
=
=
=
=
=

19.20
2.08 LPS
50.00 mm
0.0826fLQ^2/D^5 ; where f=
0.44
2.29

Total Length of Pipe


Discharge (Q)
### d
hf
hf
hf per 100 m

=
=
=
=
=
=

26.20
1.49 LPS
38.00 mm
0.0826fLQ^2/D^5 ; where f=
1.21
4.61

###

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

Total Length of Pipe


Discharge (Q)
### d
hf
hf
hf per 100 m

=
=
=
=
=
=

306.60
1.16 LPS
50.00 mm
0.0826fLQ^2/D^5 ; where f=
2.19
0.72

Total Length of Pipe


Discharge (Q)
### d
hf
hf
hf per 100 m

=
=
=
=
=
=

127.20
3.27 LPS
100.00 mm
0.0826fLQ^2/D^5 ; where f=
0.23
0.18

Total Length of Pipe


Discharge (Q)
### d
hf
hf
hf per 100 m

=
=
=
=
=
=

385.60
2.81 LPS
100.00 mm
0.0826fLQ^2/D^5 ; where f=
0.50
0.13

Total Length of Pipe


Discharge (Q)
### d
hf
hf
hf per 100 m

=
=
=
=
=
=

287.20
2.41 LPS
100.00 mm
0.0826fLQ^2/D^5 ; where f=
0.27
0.10

Total Length of Pipe


Discharge (Q)
### d
hf
hf
hf per 100 m

=
=
=
=
=
=

11.10
3.27 LPS
50.00 mm
0.0826fLQ^2/D^5 ; where f=
0.63
5.66

Total Length of Pipe


Discharge (Q)
### d
hf
hf
hf per 100 m

=
=
=
=
=
=

19.40
2.81 LPS
50.00 mm
0.0826fLQ^2/D^5 ; where f=
0.81
4.18

Total Length of Pipe


Discharge (Q)
### d
hf
hf
hf per 100 m

=
=
=
=
=
=

#REF!
#REF!
LPS
#REF!
mm
0.0826fLQ^2/D^5 ; where f=
#REF!
#REF!

Total Length of Pipe


Discharge (Q)
### d
hf

=
=
=
=

#REF!
#REF!
LPS
#REF!
mm
0.0826fLQ^2/D^5 ; where f=

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

###
hf
hf per 100 m

=
=

#REF!

Total Length of Pipe


Discharge (Q)
### d
hf
hf
hf per 100 m

=
=
=
=
=
=

#REF!
#REF!
LPS
#REF!
mm
0.0826fLQ^2/D^5 ; where f=
#REF!
#REF!

Total Length of Pipe


Discharge (Q)
### d
hf
hf
hf per 100 m

=
=
=
=
=
=

#REF!
#REF!
LPS
#REF!
mm
0.0826fLQ^2/D^5 ; where f=
#REF!
#REF!

Total Length of Pipe


Discharge (Q)
### d
hf
hf
hf per 100 m

=
=
=
=
=
=

#REF!
#REF!
LPS
#REF!
mm
0.0826fLQ^2/D^5 ; where f=
#REF!
#REF!

Total Length of Pipe


Discharge (Q)
### d
hf
hf
hf per 100 m

=
=
=
=
=
=

#REF!
#REF!
LPS
#REF!
mm
0.0826fLQ^2/D^5 ; where f=
#REF!
#REF!

Total Length of Pipe


Discharge (Q)
### d
hf
hf
hf per 100 m

=
=
=
=
=
=

#REF!
#REF!
LPS
#REF!
mm
0.0826fLQ^2/D^5 ; where f=
#REF!
#REF!

Total Length of Pipe


Discharge (Q)
### d
hf
hf
hf per 100 m

=
=
=
=
=
=

#REF!
#REF!
LPS
#REF!
mm
0.0826fLQ^2/D^5 ; where f=
#REF!
#REF!

Total Length of Pipe


Discharge (Q)
### d
hf
hf
hf per 100 m

=
=
=
=
=
=

Total Length of Pipe

###

#REF!

0.02

0.02

0.02

0.02

0.02

0.02

#REF!
#REF!
LPS
#REF!
mm
0.0826fLQ^2/D^5 ; where f=
#REF!
#REF!
#REF!

0.02

Discharge (Q)
### d
hf
hf
hf per 100 m

=
=
=
=
=

#REF!
LPS
#REF!
mm
0.0826fLQ^2/D^5 ; where f=
#REF!
#REF!

Total Length of Pipe


Discharge (Q)
### d
hf
hf
hf per 100 m

=
=
=
=
=
=

#REF!
#REF!
LPS
#REF!
mm
0.0826fLQ^2/D^5 ; where f=
#REF!
#REF!

Total Length of Pipe


Discharge (Q)
### d
hf
hf
hf per 100 m

=
=
=
=
=
=

9.20
2.41 LPS
31.00 mm
0.0826fLQ^2/D^5 ; where f=
3.08
33.44

Total Length of Pipe


Discharge (Q)
### d
hf
hf
hf per 100 m

=
=
=
=
=
=

0.00
- LPS
- mm
0.0826fLQ^2/D^5 ; where f=
#DIV/0!
#DIV/0!

Total Length of Pipe


Discharge (Q)
### d
hf
hf
hf per 100 m

=
=
=
=
=
=

0.00
- LPS
- mm
0.0826fLQ^2/D^5 ; where f=
#DIV/0!
#DIV/0!

Total Length of Pipe


Discharge (Q)
### d
hf
hf
hf per 100 m

=
=
=
=
=
=

0.00
- LPS
- mm
0.0826fLQ^2/D^5 ; where f=
#DIV/0!
#DIV/0!

Total Length of Pipe


Discharge (Q)
### d
hf
hf
hf per 100 m

=
=
=
=
=
=

0.00
- LPS
- mm
0.0826fLQ^2/D^5 ; where f=
#DIV/0!
#DIV/0!

Total Length of Pipe


Discharge (Q)
### d
hf
hf

=
=
=
=
=

0.00
- LPS
- mm
0.0826fLQ^2/D^5 ; where f=
#DIV/0!

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

###

hf per 100 m

#DIV/0!

Total Length of Pipe


Discharge (Q)
### d
hf
hf
hf per 100 m

=
=
=
=
=
=

0.00
- LPS
- mm
0.0826fLQ^2/D^5 ; where f=
#DIV/0!
#DIV/0!

Total Length of Pipe


Discharge (Q)
### d
hf
hf
hf per 100 m

=
=
=
=
=
=

0.00
- LPS
- mm
0.0826fLQ^2/D^5 ; where f=
#DIV/0!
#DIV/0!

Total Length of Pipe


Discharge (Q)
### d
hf
hf
hf per 100 m

=
=
=
=
=
=

0.00
- LPS
- mm
0.0826fLQ^2/D^5 ; where f=
#DIV/0!
#DIV/0!

Total Length of Pipe


Discharge (Q)
### d
hf
hf
hf per 100 m

=
=
=
=
=
=

0.00
- LPS
- mm
0.0826fLQ^2/D^5 ; where f=
#DIV/0!
#DIV/0!

Total Length of Pipe


Discharge (Q)
### d
hf
hf
hf per 100 m

=
=
=
=
=
=

0.00
- LPS
- mm
0.0826fLQ^2/D^5 ; where f=
#DIV/0!
#DIV/0!

Total Length of Pipe


Discharge (Q)
### d
hf
hf
hf per 100 m

=
=
=
=
=
=

0.00
- LPS
- mm
0.0826fLQ^2/D^5 ; where f=
#DIV/0!
#DIV/0!

Total Length of Pipe


Discharge (Q)
### d
hf
hf
hf per 100 m

=
=
=
=
=
=

0.00
- LPS
- mm
0.0826fLQ^2/D^5 ; where f=
#DIV/0!
#DIV/0!

Total Length of Pipe


Discharge (Q)

=
=

###

0.00
- LPS

0.02

0.02

0.02

0.02

0.02

0.02

0.02

### d
hf
hf
hf per 100 m

=
=
=
=

- mm
0.0826fLQ^2/D^5 ; where f=
#DIV/0!
#DIV/0!

Total Length of Pipe


Discharge (Q)
### d
hf
hf
hf per 100 m

=
=
=
=
=
=

0.00
- LPS
- mm
0.0826fLQ^2/D^5 ; where f=
#DIV/0!
#DIV/0!

Total Length of Pipe


Discharge (Q)
### d
hf
hf
hf per 100 m

=
=
=
=
=
=

0.00
- LPS
- mm
0.0826fLQ^2/D^5 ; where f=
#DIV/0!
#DIV/0!

0.02

0.02

0.02

II -PIPELINE DESIGN ANALYSIS:


A. Pipeline Design Input/Output
Pipeline
Section
Node
from
to
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
33
34

2
Res (C)
1
1
2
2
8
9
10
1
2
7
8
9
10
11
12
4
5
4
5
6

3
1
ts2
2
ts3
3
9
10
11
ts2
ts3
ts7
ts8
ts9
ts10
ts11
ts12
5
6
ts4
ts5
ts6

Section
Length

Household
Served

Peak
Flow

(m)

(no.)

(lps)

4
752.70
18.60
22.90
29.30
374.40
384.30
386.80
773.40
858.60
1,882.30
21.30
18.30
16.30
19.20
26.20
306.60
127.20
385.60
287.20
11.10
19.40
9.20

5
158
148
136
136
125
109
77
65
53
125
109
93
77
55
43
121
104
89
121
104
89
0

6
10.2
4.00311
3.67853
3.67853
3.38101
2.94824
2.0827
1.75812
1.43355
3.38101
2.94824
2.51547
2.0827
1.48764
1.16307
3.27281
2.813
2.40728
3.27281
2.813
2.40728
0

Available
Pipe
Pipe
Head
Diameter Diameter
(Hr+elev.h) Option
(m)

(mm)

(mm)

7
8
12.45
100.7
1.20
52.8
6.35
38.1
6.30
40.1
6.24
64.7
5.71
62.7
4.55
57.1
7.30
55.8
5.24
56.1
(18.66) #VALUE!
(61.06) #VALUE!
(62.34) #VALUE!
5.96
28.7
6.16
25.8
5.72
25.2
4.76
64.7
2.82
56.8
2.57
67.8
2.59
72.2
2.31
36.3
4.80
32.9
(17.66)
0.0

9
100
19
50
19
50
75
75
75
50
50
50
50
50
50
50
50
75
75
75
75
50
50

35
36
37
38
39
B. Pipeline Analysis
Branch Node

No. of Household

Total Headloss

Available Head

Res (C)

158

1.7036329

<

12.45

ts2

148

0.04924

<

1.20

136

0.0511912

<

6.35

ts3

136

0.0553311

<

6.30

125

0.5376141

<

6.24

109

1.1604524

<

5.71

10

77

0.8323168

<

4.55

10

11

65

1.106449

<

7.30

ts2

53

22.903053

<

5.24

10

ts3

125

42.398035

<

(18.66)

11

ts7

109

1.2871567

<

(61.06)

12

ts8

93

0.2647788

<

(62.34)

13

ts9

77

0.545237

<

5.96

14

10

ts10

55

0.4402653

<

6.16

15

11

ts11

43

1.2089004

<

5.72

16

12

ts12

121

2.1925063

<

4.76

17

104

0.2250814

<

2.82

18

89

0.5040638

<

2.57

19

ts4

121

0.2749453

<

2.59

20

ts5

104

0.6285293

<

2.31

21

ts6

89

0.8115218

<

4.80

22

#REF!

#REF!

#REF!

#REF!

<

#REF!

23

#REF!

#REF!

#REF!

#REF!

<

#REF!

24

#REF!

#REF!

#REF!

#REF!

<

#REF!

25

#REF!

#REF!

#REF!

#REF!

<

#REF!

26

#REF!

#REF!

#REF!

#REF!

<

#REF!

27

#REF!

#REF!

#REF!

#REF!

<

#REF!

28

#REF!

#REF!

#REF!

#REF!

<

#REF!

29

#REF!

#REF!

#REF!

#REF!

<

#REF!

30

#REF!

#REF!

#REF!

#REF!

<

#REF!

31

#REF!

#REF!

#REF!

#REF!

<

#REF!

32

#REF!

#REF!

#REF!

#REF!

<

#REF!

33

<

34

<

35

<

36

<

37

<

38
39

0
0

0
0

0
0

0
0

<
<

(17.66)

Hr = Residual head

Column Description:
Column
1
2-3
4
5
6

Description
Pipe section under consideration
Node section under consideration
Length of pipe section under consideration (meter)
Number of household served
Computed Peak Flow (liter per second)

7
8
9
10

Difference in elevation between nodes under consideration (meter)


Computed Pipe Diameter (mm), using the Darcy Weisbach Formula
Nominal Diameter available in the market (mm)
Headloss per 100 meters (refer to table 9.2)

11

Actual Headloss

Formula:
Column 6:
PF
PF

= 2.5 x average flow


= 2.5 x GRF x N x Average Household Size x PCWC / 86,400

Where:
PF
GRF
N
PCWC

= Peak flow.
= Growth rate factor.
= Total number of household served by the pipe section.
= Per capita water consumption.

Simplifying:

Column 8:
HF
D^5

= f (L)(Q)^2/D^5
= f (L)(Q)^2/HF

HF

= Headloss or the difference in elevation between the pipe in


consideration.
= Coefficient of friction (approximately 0.02 for G.I. pipe).
= Length of pipe section in consideration.
= Water discharge.
=Pipe diameter (mm).

Where:

F
L
Q
D
Simplifying:
D^5

= (0.00165(L)(Q/1000)^2/HF)(1000)
(mm)
= (0.00165(Column 4)(Column 6/1000)^2/(Column 7))(1000)

Column 10:
From table 9.2, (interpolate when necessary).
Column 11:
Actual Headloss

= (Headloss per 100 M)(Section Length)/100

= (Column 10)(Column 4)/100

Headloss
Actual
per
Headloss
100 m.
(m)

Node
A
1

(m)

10
0.226336
0.264731
0.223542
0.188843
0.143594
0.301965
0.21518
0.143063
2.667488
2.252459
6.042989
1.446879
3.345012
2.293049
4.614123
0.715103
0.176951
0.130722
0.095733
5.662426
4.183102
0

11
1.703633
0.04924
0.051191
0.055331
0.537614
1.160452
0.832317
1.106449
22.90305
42.39803
1.287157
0.264779
0.545237
0.440265
1.2089
2.192506
0.225081
0.504064
0.274945
0.628529
0.811522
0

Hr

Remarks

10.75

ok

1.15

ok

6.30

ok

6.24

ok

5.71

ok

4.55

ok

3.71

ok

6.19

ok

(17.66)

ok

2
3
7
8
9
10
11

4
5
6

Elev
46.1
31.65
31.3
30.45
28.4
24.1
24.1
24.1
24.06
24.1
24.1
24.05
24.1
24.09
24.1
24
24
24.1
23.96
23.96
24
23.98
23.95

Section

Length

a to 1
752.70
1 to ts2
18.60
1 to 2
22.90
2 to ts3
29.30
2 to 3
374.40
3 to 7
384.30
7 to 8
386.80
8 to 9
773.40
9 to 10
858.60
10 to 11 1,882.30
7 to ts7
21.30
8 to ts8
18.30
9 to ts9
16.30
9 to ts10
19.20
10 to ts11
26.20
11 to ts12
306.60
3 to 4
127.20
4 to 5
385.60
5 to 6
287.20
4 to ts4
11.10
5 to ts5
19.40
6 to ts6
9.20

HH
158
148

148
136
136
125
109
77
65
53
125
109

93
77
55
43
121
104
89
121
104
89

(61.06)

ok

(62.34)

ok

(62.61)

ok

5.41

ok

5.72

ok

4.51

ok

2.57

ok

2.59

ok

2.06

ok

2.32

ok

1.69

ok

3.98

ok

#REF!

ok

#REF!

ok

#REF!

ok

#REF!

ok

#REF!

ok

#REF!

ok

#REF!

ok

#REF!

ok

#REF!

ok

#REF!

ok

#REF!

ok

(17.66)

ok

ok

ok

ok

ok

ok
ok

(m)

Schematic Diagram of
POBLACION, RAPU-RAPU, ALBAY

31.3
28.4
24
23.98
23.95
24.05
18.3

1 to ts2
2 to ts3
4 to ts4
5 to ts5
6 to ts6
7 to ts7
8 to ts8

18.60
29.30
11.10
19.40
9.20
21.30
18.30

148

-22
-37
-54
-69
#VALUE!
109

E
I
N

S'

38 mm
31 mm

m
m
m

1 1/2 "
1 1/4 "

II -PIPELINE DESIGN ANALYSIS:


A. Pipeline Design Input/Output
Pipeline
Section
Node
from
to
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
33
34

2
Res (C)
1
2
3
7
8
9
10
1
2
7
8
9
10
11
12
3
4
5
4
5
6

3
1
2
3
7
8
9
10
11
ts2
ts3
ts7
ts8
ts9
ts10
ts11
ts12
4
5
6
ts4
ts5
ts6

Section
Length

Household
Served

Peak
Flow

(m)

(no.)

(lps)

4
752.70
22.90
374.40
384.30
386.80
773.40
858.60
1,882.30
18.60
29.30
21.30
18.30
16.30
19.20
26.20
306.60
127.20
385.60
287.20
11.10
19.40
9.20

5
158
148
136
125
109
77
65
53
148
136
125
109
93
77
55
43
121
104
89
121
104
89

6
10.2
4.00311
3.67853
3.38101
2.94824
2.0827
1.75812
1.43355
4.00311
3.67853
3.38101
2.94824
2.51547
2.0827
1.48764
1.16307
3.27281
2.813
2.40728
3.27281
2.813
2.40728

Available
Pipe
Pipe
Head
Diameter Diameter
(Hr+elev.h) Option
(m)
7
12.45
1.20
6.35
5.51
4.79
4.23
1.90
6.51
3.79
2.29
1.63
0.34
4.48
4.69
4.25
3.29
1.35
1.10
1.12
0.84
2.15
3.29

(mm)

(mm)

8
100.7
55.0
66.7
66.6
65.0
66.6
74.6
62.8
41.9
49.1
47.7
59.8
32.8
31.1
29.5
46.1
69.9
85.6
75.5
47.2
41.2
30.6

9
150
100
100
100
100
75
75
75
63
63
50
63
50
50
38
50
100
100
100
50
50
31

35
36
37
38
39
B. Pipeline Analysis
Branch Node

No. of Household

Total Headloss

Available Head

Res (C)

158

1.7036329

<

12.45

148

0.0606235

<

1.20

136

0.8369422

<

6.35

125

0.7257252

<

5.51

109

0.5554197

<

4.79

77

2.3353992

<

4.23

10

65

1.8475368

<

1.90

10

11

53

2.6928743

<

6.51

ts2

148

0.4961528

<

3.79

10

ts3

136

0.6599705

<

2.29

11

ts7

125

1.2871567

<

1.63

12

ts8

109

0.2647788

<

0.34

13

ts9

93

0.545237

<

4.48

14

10

ts10

77

0.4402653

<

4.69

15

11

ts11

55

1.2089004

<

4.25

16

12

ts12

43

2.1925063

<

3.29

17

121

0.2250814

<

1.35

18

104

0.5040638

<

1.10

19

89

0.2749453

<

1.12

20

ts4

121

0.6285293

<

0.84

21

ts5

104

0.8115218

<

2.15

22

ts6

89

<

3.29

23

#REF!

#REF!

#REF!

#REF!

<

#REF!

24

#REF!

#REF!

#REF!

#REF!

<

#REF!

25

#REF!

#REF!

#REF!

#REF!

<

#REF!

26

#REF!

#REF!

#REF!

#REF!

<

#REF!

27

#REF!

#REF!

#REF!

#REF!

<

#REF!

28

#REF!

#REF!

#REF!

#REF!

<

#REF!

29

#REF!

#REF!

#REF!

#REF!

<

#REF!

30

#REF!

#REF!

#REF!

#REF!

<

#REF!

31

#REF!

#REF!

#REF!

#REF!

<

#REF!

32

#REF!

#REF!

#REF!

#REF!

<

#REF!

33

ts6

89

<

3.29

34

<

35

<

36

<

37

<

38
39

0
0

0
0

0
0

0
0

<
<

Hr = Residual head

Column Description:
Column
1
2-3
4
5
6

Description
Pipe section under consideration
Node section under consideration
Length of pipe section under consideration (meter)
Number of household served
Computed Peak Flow (liter per second)

7
8
9
10

Difference in elevation between nodes under consideration (meter)


Computed Pipe Diameter (mm), using the Darcy Weisbach Formula
Nominal Diameter available in the market (mm)
Headloss per 100 meters (refer to table 9.2)

11

Actual Headloss

Formula:
Column 6:
PF
PF

= 2.5 x average flow


= 2.5 x GRF x N x Average Household Size x PCWC / 86,400

Where:
PF
GRF
N
PCWC

= Peak flow.
= Growth rate factor.
= Total number of household served by the pipe section.
= Per capita water consumption.

Simplifying:

Column 8:
HF
D^5

= f (L)(Q)^2/D^5
= f (L)(Q)^2/HF

HF

= Headloss or the difference in elevation between the pipe in


consideration.
= Coefficient of friction (approximately 0.02 for G.I. pipe).
= Length of pipe section in consideration.
= Water discharge.
=Pipe diameter (mm).

Where:

F
L
Q
D
Simplifying:
D^5

= (0.00165(L)(Q/1000)^2/HF)(1000)
(mm)
= (0.00165(Column 4)(Column 6/1000)^2/(Column 7))(1000)

Column 10:
From table 9.2, (interpolate when necessary).
Column 11:
Actual Headloss

= (Headloss per 100 M)(Section Length)/100

= (Column 10)(Column 4)/100

Headloss
Actual
per
Headloss
100 m.
(m)

(m)

10
0.226336
0.264731
0.223542
0.188843
0.143594
0.301965
0.21518
0.143063
2.667488
2.252459
6.042989
1.446879
3.345012
2.293049
4.614123
0.715103
0.176951
0.130722
0.095733
5.662426
4.183102
0

11
1.703633
0.060623
0.836942
0.725725
0.55542
2.335399
1.847537
2.692874
0.496153
0.65997
1.287157
0.264779
0.545237
0.440265
1.2089
2.192506
0.225081
0.504064
0.274945
0.628529
0.811522
0

Hr

Remarks

10.75

ok

1.14

ok

5.51

ok

4.79

ok

4.23

ok

1.90

ok

0.05

ok

3.82

ok

3.29

ok

Node
A
1
2
3
7
8
9
10
11

4
5
6

Elev
46.1
31.65
30.45
24.1
24.1
24.1
24.06
24.1
24.1
31.3
28.4
24.05
24.1
24.09
24.1
24
24
24.1
23.96
23.96
24
23.98
23.95

Section

Length

a to 1
752.70
1 to 2
22.90
2 to 3
374.40
3 to 7
384.30
7 to 8
386.80
8 to 9
773.40
9 to 10
858.60
10 to 11 1,882.30
1 to ts2
18.60
2 to ts3
29.30
7 to ts7
21.30
8 to ts8
18.30
9 to ts9
16.30
9 to ts10
19.20
10 to ts11
26.20
11 to ts12
306.60
3 to 4
127.20
4 to 5
385.60
5 to 6
287.20
4 to ts4
11.10
5 to ts5
19.40
6 to ts6
9.20

HH
158
148
136
125
109
77
65
53
148

136
125
109

93
77
55
43
121
104
89
121
104
89

1.63

ok

0.34

ok

0.08

ok

3.94

ok

4.25

ok

3.04

ok

1.10

ok

1.12

ok

0.59

ok

0.84

ok

0.21

ok

1.33

ok

3.29

ok

#REF!

ok

#REF!

ok

#REF!

ok

#REF!

ok

#REF!

ok

#REF!

ok

#REF!

ok

#REF!

ok

#REF!

ok

#REF!

ok

3.29

ok

ok

ok

ok

ok

ok
ok

(m)

Schematic Diagram of
POBLACION, RAPU-RAPU, ALBAY

31.3
28.4
24
23.98
23.95
24.05
18.3

1 to ts2
2 to ts3
4 to ts4
5 to ts5
6 to ts6
7 to ts7
8 to ts8

18.60
29.30
11.10
19.40
9.20
21.30
18.30

148

-22
-37
-54
-69
#VALUE!
109

E
I
N

S'

38 mm
31 mm

26.20 m
9.20 m
35.40 m

1 1/2 "
1 1/4 "

Q
LPS
0.01
0.02
0.03
0.04
0.05
0.06
0.07
0.08
0.09
0.1
0.11
0.12
0.14
0.15
0.16
0.18
0.20
0.25
0.30
0.40
0.50
0.60
0.70
0.80
1.00
1.20
1.40
1.50
1.60
1.80
2.00
2.50
3.00
3.50
4.00
4.50
5.00
6.00
7.00
8.00
10.00

PIPE SIZE (mm)


13
19
0.1
0.4
0.8
0.11
1.4
0.19
2.1
0.3
3
0.41
4
0.5
5
0.65
6.3
0.82
7.6
1.06
9.1
1.18
10.7
1.5
2
2.1
2.5
3.1
3.8
5.8

25

0.1
0.13
0.17
0.22
0.26
0.31
0.36
0.48
0.55
0.62
0.77
0.94
1.42
2
3.4
5.1
7.2

31

0.11
0.13
0.17
0.18
0.22
0.27
0.32
0.48
0.67
1.15
1.74
2.4
3.2
4.1
6.3
8.8

FRICTION HEAD LOSS IN METERS PER 100 METERS


PLASTIC PIPE - PVC, PE, PB C = 50
TABLE 9.1
FRICTION HEAD LOSS IN PLASTIC PIPES

38

0.101
0.131
0.2
0.23
0.47
0.71
1
1.33
1.7
2.6
3.6
4.4
4.9
5.5
7.35
8.4

50

0.12
0.18
0.25
0.33
0.42
0.64
0.89
1.2
1.35
1.52
1.88
2.3
3.5
4.95
6.95
9.2
11.85

63

0.11
0.14
0.21
0.3
0.4
0.44
0.51
0.64
0.77
1.2
1.65
2.19
3
3.6
4.5
6.2
8.6

75

100

0.089
0.124
0.165
0.187
0.211
0.262
0.32
0.48
0.68
0.9
1.15
1.43
1.74
2.44
3.2
4.15
6.5

0.079
0.119
0.166
0.221
0.284
0.353
0.429
0.6
0.8
1.2
1.55

Q
LPS
0.01
0.02
0.03
0.04
0.05
0.06
0.07
0.08
0.09
0.10
0.11
0.12
0.14
0.15
0.16
0.18
0.20
0.25
0.30
0.40
0.50
0.60
0.70
0.80
1.00
1.20
1.40
1.50
1.60
1.80
2.00
2.50
3.00
3.50
4.00
4.50
5.00
6.00
7.00
8.00
10.00

PIPE SIZE (mm)


13
19
0.2
0.8
1.6
0.22
2.8
0.38
4.2
0.6
6
0.82
8
1
10
1.3
12.6
1.64
15.2
2.12
18.2
2.36
21.4
3
4
4.2
5
6.2
7.6
11.6

25

0.2
0.26
0.34
0.44
0.52
0.62
0.72
0.96
1.1
1.24
1.54
1.88
2.84
4
6.8
10.2
14.4

31

0.15
0.18
0.22
0.26
0.34
0.36
0.44
0.54
0.64
0.96
1.34
2.3
3.48
4.8
6.4
8.2
12.6
17.6

FRICTION HEAD LOSS IN METERS PER 100 METERS


GALVANIZED IRON PIPE (GIP)
TABLE 9.2

38

0.13
0.15
0.16
0.202
0.262
0.4
0.46
0.94
1.42
2
2.66
3.4
5.2
7.2
8.8
9.8
11
14.7
16.8

50

0.7
0.1
0.14
0.24
0.36
0.5
0.66
0.84
1.28
1.78
2.4
2.7
3.04
3.76
4.6
7
9.9
13.9
18.4
23.7

63

0.12
0.17
0.22
0.28
0.42
0.6
0.8
0.88
1.02
1.28
1.54
2.4
3.3
4.38
6
7.2
9
12.4
17.2

75

100

0.7
0.91
0.117
0.177
0.248
0.33
0.374
0.422
0.524
0.64
0.96
1.36
1.8
2.3
2.86
3.48
4.88
6.4
8.3
13

0.104
0.129
0.157
0.238
0.332
0.442
0.368
0.706
0.858
1.2
1.6
2.4
3.1

FRICTION HEAD LOSS IN GI PIPES

150

Interpolation
2.10
0.388
0.15 x
0.154
0.40
x=
x=

0.06
0.09
0.11
0.14
0.21

2.50
0.16

x-y, y = O5
0.01
0.00385 + O5
0.15385

150

0.12
0.17
0.22
0.28
0.42

Barangay Poblacion
Municipality of Rapu-Rapu
Province of Albay

SUB-PROJECT BILL OF QUANTITIES


ITEM
NO.
I

ITEM DESCRIPTION

QUANTITY

UNIT

No. of
Crew/
Labor

RATE PER
DAY/ UNIT
COST

TOTALMATERIALS

CLEARING AND GRUBBING


Sand Filter

225.00

sq.m.

Length

15.00

Width

15.00

Pipe Lines

1,359.30

sq.m.

Length

2,718.60

Width

0.50

TOTAL

1,584.30

m
sq.m.

A. Materials
Bolo

6.00

pcs

0.00

Fabricated Trench Digger

2.00

pcs

0.00

Hoe

2.00

units

0.00

4.00

day/s

B. Labor
Productivity Rate:
40.00 sq.m./day
Common Laborer

10.00

TOTAL FOR CLEARING AND GRUBBING

0.00
Unit Cost

II

0.00
0.00

EXCAVATION
Sand Filter

36.00

cu.m.

Length

12.00

Width

10.00

Depth

0.30

Pipe Trench

8.50

cu.m.

Length

35.40

Width

0.30

Depth

0.80

TOTAL

44.50

cu.m.

Shovel

10.00

pcs

0.00

Pick Matoe

10.00

pcs

0.00

Wheel barrow

2.00

units

0.00

# 100 Nylon String

0.25

kilos

0.00

25.00

day/s

A. Materials

B. Labor
Excavation
Productivity Rate:
2.50 cu.m./manday
Common Laborer
TOTAL FOR EXCAVATION

0.00

BACKFILLING
Pipe Trench

8.50

cu.m.

Length

35.40

Width

0.30

Depth

0.80

Labor

0.00
0.00

Unit Cost
III

20.00

Productivity Rate:
2.00 cu.m./ man-day
Common Laborer

30.00
TOTAL FOR BACKFILLING

day/s

20.00

0.00
0.00

Unit Cost

0.00

IV

CONCRETE WORKS
Sand Filter
Walls

24.00

cu.m.

Height

2.00

Length

80.00

Thickness

0.15

Floor

21.00

cu.m.

Length

14.00

Width

10.00

Thickness

0.15

Slab

2.00

cu.m.

Length

2.00

Width

10.00

Thickness

0.10

Footing (9 units)

1.80

cu.m.

Length

1.00

Width

1.00

Thickness

0.20

Footing Tie Beam1

3.36

cu.m.

Length

7.00

Width

0.30

Thickness

0.40

Footing Tie Beam2

3.15

cu.m.

Length

5.00

Width

0.30

Thickness

0.35

Columns

2.43

cu.m.

Height

3.00

Width

0.30

Thickness

0.30

Roof Beam1

3.36

cu.m.

Length

7.00

Width

0.30

Thickness

0.40

Roof Beam2

3.60

cu.m.

Length

5.00

Width

0.30

Thickness

0.40

Apron

16.80

cu.m.

Length

56.00

Width

2.00

Thickness

0.15

Retro Fitting of Reservoir and Intake Box

0.30

cu.m.

18.63

cu.m.

100.43

cu.m.

Communal TapStand
TOTAL VOLUME FOR CONCRETE
A. Materials
Portland Cement

950

bags

0.00

60

cu.m.

0.00

Crushed Gravel (3/4)

105

cu.m.

0.00

Water Proofing Compound

950

bags

0.00

pcs

0.00

Construction Pail

10

pcs

0.00

Empty Cement Sacks

60

pcs

0.00

Washed Sand

Water Drum

B. Labor
Productivity Rate:
3.50 cu.m/gang/day

Skilled Laborer

24

days

4.00

0.00

Unskilled Laborer

24

days

10.00

0.00

C. Equipment
Capability Output:
31.50 bags/ day for mixer
3.50 cu.m./ day for vibrator
1 Bagger Concrete Mixer

24

days

1.00

0.00

1 Concrete Vibrator

24

days

1.00

0.00

D. Hauling
Portland Cement
Washed Sand
Crushed Gravel (3/4)
Miscellaneous

950

bags

0.00

60

cu.m.

0.00

105

cu.m.

0.00

lot

0.00

1
TOTAL FOR CONCRETING WORKS

0.00
Unit Cost

0.00

RSB WORKS
Floor (12 mm bars spaced at .15 meters bothways)

1,866.67

12mm

Wall (12 mm bars spaced at .15 meters bothways)

2,133.33

12mm

343.92

12mm

Slab (12 mm bars spaced at .15 meters for main reinforcement)


(12 mm bars spaced at .25 meters for temperature bars)
Footing (16 mm bars)

90.00

16mm

112.00

16mm

154.00

10mm

168.00

16mm

165.00

10mm

162.00

16mm

148.50

10mm

112.00

16mm

154.00

10mm

168.00

16mm

165.00

10mm

560.00

10mm

30.00

12mm

438.00

10mm

16 mm

893.20

1,409.77

kgs

12 mm

4,811.31

4,274.05

kgs

10 mm

1,962.95

1,210.49

kgs

Footing Tie Beam1(16 mm main bars and 10mm Stirrups)


Footing Tie Beam2(16 mm main bars and 10mm Stirrups)
Column(16 mm main bars and 10 mm ties)
Roof Beam1(16 mm main bars and 10mm Stirrups)
Roof Beam2(16 mm main bars and 10mm Stirrups)
Apron (10 mm bars spaced at .4 meters bothways)
Retro fitting of Reservoir and Intake Box
Communal TapStands (10 mm dia. Def. bars)
Summary:

A. Materials

6,894.30

kgs

16 mm dia. Def bars

1,409.77

kgs

0.00

12 mm dia. Def bars

4,274.05

kgs

0.00

10 mm dia. Def bars

1,210.49

kgs

0.00

Ga. 16 tie wire

130.00

kgs

0.00

Hacksaw Blade

10.00

pcs

0.00

Skilled Laborer

42.00

days

2.00

0.00

Unskilled Laborer

42.00

days

2.00

0.00

42.00

days

2.00

0.00

16 mm dia. Def bars

1,409.77

kgs

0.00

12 mm dia. Def bars

4,274.05

kgs

0.00

10 mm dia. Def bars

1,210.49

kgs

0.00

130.00

kgs

0.00

B. Labor
Productivity Rate:
80.00 kgs./gang/day (1 gang = 1 skilled,1 unskilled)
with bar cutter

C. Equipment
Capability Output:
80.00 kgs/day
Bar Cutter
D. Hauling

Ga. 16 tie wire

TOTAL FOR RSB WORKS

0.00
Unit Cost

0.00

VI

FORM WORKS
Sand Filter
Walls

320.00

Height

2.00

Length

80.00

Slab

20.00

sq.m.

Length

2.00

Width

10.00

Footing Tie Beam1

22.40

sq.m.

Length

7.00

Thickness

0.40

21.00

sq.m.

Length

5.00

Thickness

0.35

Columns

16.80

sq.m.

Height

3.00

Width

0.30

Thickness

0.30

30.80

sq.m.

Length

7.00

Width

0.30

Thickness

0.40

33.00

sq.m.

Length

5.00

Width

0.30

Thickness

0.40

Retro Fitting of Reservoir and Intake Box

5.00

sq.m.

469.00

sq.m.

Footing Tie Beam2

Roof Beam1

Roof Beam2

TOTAL AREA FOR FORMWORKS

sq.m.
m

A. Materials
1/4" Marine Plywood

95.00

pcs

0.00

2 x 3 x 12 coco lumber

360.00

pcs

0.00

2 x 2 x 12 coco lumber

510.00

pcs

0.00

4" CW Nail

35.00

kilos

0.00

3" CW Nail

25.00

kilos

0.00

2" CW Nail

13.00

kilos

0.00

5.00

kilos

0.00

Skilled Laborer

16.00

days

2.00

0.00

Unskilled Laborer

16.00

days

4.00

0.00

1 1/2" CW Nail
B. Labor
Productivity Rate:
30.00 sq.m./gang/day

TOTAL FOR FORMWORKS

0.00
Unit Cost

VII

0.00

TRANSMISSION PIPELINES
775.60

Ln.m.

A. Materials
6" Dia. HDPE pipe SDR 9

752.70 meters

0.00

4" Dia. HDPE pipe SDR 9

22.90 meters

0.00

6" Dia. Mechanical Gate Valve with flange

1.00

set

0.00

6" Dia. GI Flange

2.00

pcs

0.00

6" Dia. GI Pipe

1.00

pc

0.00

6" Dia. GI 90 deg. Elbow

2.00

pcs

0.00

6" Dia. HDPE Flange

2.00

pcs

0.00

11.00

pcs

0.00

4" Dia. Mechanical Gate Valve with flange

4.00

pcs

0.00

4" Dia. GI Flange

1.00

pc

0.00

4" Dia. HDPE flange

1.00

pc

0.00

4" Dia. GI Pipe

4" Dia. GI 90 deg elbow

8.00

pcs

0.00

4" Dia. GI Tee

2.00

pcs

0.00

Skilled Laborer

20.00

days

2.00

0.00

Unskilled Laborer

20.00

days

4.00

0.00

Note: All connections are butt fused


B. Labor
Installation of Pipelines
Productivity Rate:
90.00 ln.m./ day

C. Equipment
Capability Output:
90.00 ln.m./ day
Butt Fusion Machine

20.00

days

1.00

D. Hauling
6" Dia. HDPE pipe SDR 9

#REF! meters

#REF!

4" Dia. HDPE pipe SDR 9

#REF! meters

#REF!

6" Dia. Mechanical Gate Valve with flange

1.00

set

0.00

6" Dia. GI Flange

2.00

pcs

0.00

6" Dia. GI Pipe

1.00

pc

0.00

6" Dia. GI 90 deg. Elbow

2.00

pcs

0.00

6" Dia. HDPE Flange

2.00

pcs

0.00

4" Dia. GI Pipe

11.00

pcs

0.00

Miscellaneous

1.00

lot

TOTAL FOR TRANSMISSION LINES


Unit Cost
VIII

0.00
#REF!
#REF!

DISTRIBUTION PIPELINES
#REF!

ln.m.

A. Materials
4" dia. HDPE pipe SDR 11

1,145.50

0.00

3" dia. HDPE pipe SDR 11

#REF!

#REF!

2 1/2" dia. HDPE pipe SDR 11

#REF!

#REF!

2" dia HDPE pipe SDR 11

#REF!

#REF!

1 1/2" dia HDPE pipe SDR 11

26.20

0.00

1 1/4" dia HDPE pipe SDR 11

9.20

0.00

2" dia. Compression Coupling

4.00

pcs

0.00

1 1/2" dia. Compression Coupling

1.00

pc

0.00

1 1/4" dia. Compression Coupling

10.00

pcs

0.00

4" dia. HDPE Compression Tee

2.00

pcs

0.00

4" x 3" dia. HDPE Reducing Coupling

5.00

pcs

0.00

3" x 2 1/2" HDPE Reducing Coupling

2.00

pcs

0.00

3" x 2" HDPE Reducing Coupling

3.00

pc

0.00

3" x 2" HDPE Reducing Tee

2.00

pcs

0.00

2" x 1 1/2" HDPE Reducing Coupling

5.00

pcs

0.00

1 1/2" 90 deg HDPE Elbow Coupling

4.00

pcs

0.00

2" dia. HDPE Tee

2.00

pc

0.00

2" x 1 1/4" dia. HDPE Reducing Coupling

2.00

pc

0.00

2" x 1 1/4" dia. Saddle Clamp

4.00

pcs

0.00

1 1/2" x 1 1/4" dia. Saddle Clamp

8.00

pcs

0.00

2 1/2" dia. HDPE Elbow Coupling

1.00

pc

0.00

2 1/2" x 2" dia. HDPE Reducing Coupling

1.00

pc

0.00

1 1/2" dia. HDPE Tee

3.00

pc

0.00

1 1/2" x 1 1/4" dia. HDPE Reducing Coupling

5.00

pc

0.00

1 1/4" 90 deg HDPE Elbow Coupling

3.00

pc

0.00

1 1/4" dia. HDPE Tee

3.00

pc

0.00

4" x 1/2" Saddle Clamp

7.00

pcs

0.00

3" x 1/2" Saddle Clamp

2.00

pcs

0.00

2 1/2" x 1/2"Saddle Clamp

2.00

pcs

0.00

2" x 1/2" Saddle Clamp

6.00

pcs

0.00

1 1/2" x 1/2" Saddle Clamp

9.00

pcs

0.00

1 1/4" x 1/2" Saddle Clamp

20.00

pcs

0.00

100.00

0.00

1/2" dia. HDPE pipe SDR 13.5


" dia. x 6.0m G.I. Pipe S-40

20

pcs

0.00

" dia.HDPE to G.I. Adapter (Male Adapter)

46

pcs

0.00

" dia.Bronze Faucet

46

pcs

0.00

" dia.G.I. Gate Valve

46

pcs

0.00

" dia.G.I. Ball Valve

46

pcs

0.00

" dia. G.I. Union Patente

46

pcs

0.00

" dia. x 12" G.I. Nipple

92

pcs

0.00

" x 90 deg G.I. elbow

92

pcs

0.00

" G.I. Coupling

46

pcs

0.00

Water Meter

46

pcs

0.00

Teflon Tape

100

pcs

0.00

** Note: Pipe connections for size 2 1/2" and up are butt fused
: All dimentions are taken from the inside diameter

B. Labor (INCLUDES HAULING OF MATERIALS)


Pipe Laying
Productivity Rate:
90.00 li.m./gang/day
Skilled Laborer

36.00

day/s

2.00

0.00
###

Unskilled Laborer

36.00

day/s

4.00

0.00
###

Skilled Laborer

10.00

days

5.00

0.00

Unskilled Laborer

10.00

days

5.00

Installation of Pipe Fittings for TapStands


Productivity Rate:
1.00 Tapstand/gang/day

IX

0.00

TOTAL FOR DISTRIBUTION PIPELINES

#REF!

Unit Cost

#REF!

ROOF and ROOF FRAMING WORKS


256.00

sq.m.

A. Materials
2" x 1/4" Angle Bar

100.00

pcs.

0.00

1.00

sheet

0.00

16mm dia. Plain bar

24.00

pcs.

0.00

16mm dia. Turnbuckle

24.00

pcs

0.00

1.00

box

0.00

12mm dia. Plain bar (sag rods)

45.00

pcs

0.00

6" x 2" Ga 16 purlins

55.00

pcs

0.00

3,400.00

pcs

0.00

1.00

gal

0.00

sq.m.

0.00

6.00

pcs

0.00

12.00

pcs

0.00

4.00

gal

0.00

Skilled Laborer

20.00

days

2.00

0.00

Unskilled Laborer

20.00

days

4.00

0.00

Welding Machine

15.00

days

1.00

0.00

Acetelyn Cutter

15.00

days

1.00

0.00

5.00

days

1.00

0.00

15.00

days

1.00

0.00

1.00

lot

1/4" thk MS Plate (4' x 8')

6011 Welding Rods

2" tek screw


Roof Sealant
.44 mm Thk GI Long Span Pre-Painted Roof Sheet

256.00

45 cm x 3 m. Ridge Roll
23 cm. X 5 cm. X 2 cm. X 15 cm. X 3 m. Flashing
Epoxy Primer
B. Labor
Productivity Rate:
13.00 sq.m./gang/day

C. Equipment

Electric Drill
Electric Grinder
D. Hauling
Lump Sum

0.00

TOTAL FOR ROOF AND ROOF FRAMING WORKS

0.00

Unit Cost
X

Project Supervision

180.00
TOTAL FOR PROJECT SUPERVISION

days

1.00

0.00
###
0.00

DIRECT COST
Material Cost

#REF!
###

Labor Cost

0.00

Equipment Cost

0.00

Hauling Cost

#REF!
Sub-Total A

0.00

PROJECT SUPERVISION

#REF!

INDIRECT COST
Pre-Engineering

#REF!

Contractor's Profit

#REF!

Tax

#REF!

OCM

#REF!

TOTAL ESTIMATED COST

Prepared by:

#REF!

Approved by: