I - DESIGN OF RESERVOIR:
A. Reason for installing a reservoir
To balance the supply and demand in the system.
Supply
=
0.93 lps.
Demand
=
0.838 lps.
B. Location of the reservoir
=
Description
Actual number of household beneficiaries
(No. of HH)(Ave. HH Member)
Percent annualy
1+Growth rate^lifespan
No. of years
PP(1+GR)^Life Span
Ave. daily consumption per capita
average demand per day
ADD/24x60x60)
(Design population)(ADW DCD)
ADD/24x60x60)
Data
155
5
775.00
3
1.557967
15
1,207.42
60
1) By rule of thumb
2) Theoretical
=
=
=
1/4 (ADD)
18.11 cu.m.
(Demand-Supply)(Ave. day)
3) Supply
(Supply)(Ave. day)
4) Adopted result
Reservoir capacity
18.11 cu.m.
Use an average reservoir capacity which could meet the demand of the future generation.
satisfy and hourly variations in the consumption rate
to provide for repair of pipes (particularly, the transmission) without interruption of service
6) Reservoir dimension
Dimension
2.63 m. 3
use
Length
Breadth
Height
Freeboard
Dead vol. Ht.
Actual reservoir capacity
=
=
=
0.20
0.10
=
3.00 m.
3.00 m.
2.50 m.
Check:
19.80
22.50 cu.m.
Years
No.
Liter
0.000694
72,445 Liter
0.838 LPS
Reservoir capacity:
Reservoir capacity
Unit
HH
No.
No.
%
Poblacion
Rapu-Rapu
Albay
V
I - DESIGN OF RESERVOIR:
A. Reason for installing a reservoir
To balance the supply and demand in the system.
Supply
=
10.2 lps.
Demand
=
9.229 lps.
B. Location of the reservoir
=
Description
Actual number of household beneficiarie
ADD/24x60x60)
Data
853
6
5,118.00
3
1.557967
15
7,973.68
100
0.001157
797,368
9.229
Reservoir capacity:
1) By rule of thumb
Reservoir capacity
2) Theoretical
=
=
=
1/4 (ADD)
199.34 cu.m.
(Demand-Supply)(Ave. day)
3) Supply
(Supply)(Ave. day)
4) Adopted result
Reservoir capacity
199.34 cu.m.
Use an average reservoir capacity which could meet the demand of the future generation.
satisfy and hourly variations in the consumption rate
to provide for repair of pipes (particularly, the transmission) without interruption of service
6) Reservoir dimension
Dimension
5.84 m. 3
use
Length
Breadth
Height
Freeboard
Dead vol. Ht.
Actual reservoir capacity
=
=
=
0.20
0.10
=
7.00 m.
7.00 m.
2.50 m.
Check:
107.80
122.50 cu.m.
Unit
HH
No.
No.
%
Years
No.
Liter
Liter
86400
TS1
TS2
TS3
TS4
TS5
TS 6
TS 7
TS 8
TS 9
TS 10
TS 11
TS 12
6
10
12
15
17
15
11
16
16
16
12
12
158
LPS
HH Pob.
HH Ilaya
544
309
853
=
=
=
=
=
=
752.70
10.20 LPS
150.00 mm
0.0826fLQ^2/D^5 ; where f=
1.70
0.23
=
=
=
=
=
=
22.90
4.00 LPS
100.00 mm
0.0826fLQ^2/D^5 ; where f=
0.06
0.26
=
=
=
=
=
=
374.40
3.68 LPS
100.00 mm
0.0826fLQ^2/D^5 ; where f=
0.84
0.22
=
=
=
=
=
=
384.30
3.38 LPS
100.00 mm
0.0826fLQ^2/D^5 ; where f=
0.73
0.19
=
=
=
=
=
=
386.80
2.95 LPS
100.00 mm
0.0826fLQ^2/D^5 ; where f=
0.56
0.14
=
=
=
=
=
=
773.40
2.08 LPS
75.00 mm
0.0826fLQ^2/D^5 ; where f=
2.34
0.30
=
=
=
=
=
=
858.60
1.76 LPS
75.00 mm
0.0826fLQ^2/D^5 ; where f=
1.85
0.22
=
=
=
1882.30
1.43 LPS
75.00 mm
0.02
0.02
0.02
0.02
0.02
0.02
0.02
8
hf
hf
hf per 100 m
=
=
=
0.0826fLQ^2/D^5 ; where f=
2.69
0.14
=
=
=
=
=
=
18.60
4.00 LPS
63.00 mm
0.0826fLQ^2/D^5 ; where f=
0.50
2.67
=
=
=
=
=
=
29.30
3.68 LPS
63.00 mm
0.0826fLQ^2/D^5 ; where f=
0.66
2.25
=
=
=
=
=
=
21.30
3.38 LPS
50.00 mm
0.0826fLQ^2/D^5 ; where f=
1.29
6.04
=
=
=
=
=
=
18.30
2.95 LPS
63.00 mm
0.0826fLQ^2/D^5 ; where f=
0.26
1.45
=
=
=
=
=
=
16.30
2.52 LPS
50.00 mm
0.0826fLQ^2/D^5 ; where f=
0.55
3.35
=
=
=
=
=
=
19.20
2.08 LPS
50.00 mm
0.0826fLQ^2/D^5 ; where f=
0.44
2.29
=
=
=
=
=
=
26.20
1.49 LPS
38.00 mm
0.0826fLQ^2/D^5 ; where f=
1.21
4.61
###
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
=
=
=
=
=
=
306.60
1.16 LPS
50.00 mm
0.0826fLQ^2/D^5 ; where f=
2.19
0.72
=
=
=
=
=
=
127.20
3.27 LPS
100.00 mm
0.0826fLQ^2/D^5 ; where f=
0.23
0.18
=
=
=
=
=
=
385.60
2.81 LPS
100.00 mm
0.0826fLQ^2/D^5 ; where f=
0.50
0.13
=
=
=
=
=
=
287.20
2.41 LPS
100.00 mm
0.0826fLQ^2/D^5 ; where f=
0.27
0.10
=
=
=
=
=
=
11.10
3.27 LPS
50.00 mm
0.0826fLQ^2/D^5 ; where f=
0.63
5.66
=
=
=
=
=
=
19.40
2.81 LPS
50.00 mm
0.0826fLQ^2/D^5 ; where f=
0.81
4.18
=
=
=
=
=
=
#REF!
#REF!
LPS
#REF!
mm
0.0826fLQ^2/D^5 ; where f=
#REF!
#REF!
=
=
=
=
#REF!
#REF!
LPS
#REF!
mm
0.0826fLQ^2/D^5 ; where f=
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
###
hf
hf per 100 m
=
=
#REF!
=
=
=
=
=
=
#REF!
#REF!
LPS
#REF!
mm
0.0826fLQ^2/D^5 ; where f=
#REF!
#REF!
=
=
=
=
=
=
#REF!
#REF!
LPS
#REF!
mm
0.0826fLQ^2/D^5 ; where f=
#REF!
#REF!
=
=
=
=
=
=
#REF!
#REF!
LPS
#REF!
mm
0.0826fLQ^2/D^5 ; where f=
#REF!
#REF!
=
=
=
=
=
=
#REF!
#REF!
LPS
#REF!
mm
0.0826fLQ^2/D^5 ; where f=
#REF!
#REF!
=
=
=
=
=
=
#REF!
#REF!
LPS
#REF!
mm
0.0826fLQ^2/D^5 ; where f=
#REF!
#REF!
=
=
=
=
=
=
#REF!
#REF!
LPS
#REF!
mm
0.0826fLQ^2/D^5 ; where f=
#REF!
#REF!
=
=
=
=
=
=
###
#REF!
0.02
0.02
0.02
0.02
0.02
0.02
#REF!
#REF!
LPS
#REF!
mm
0.0826fLQ^2/D^5 ; where f=
#REF!
#REF!
#REF!
0.02
Discharge (Q)
### d
hf
hf
hf per 100 m
=
=
=
=
=
#REF!
LPS
#REF!
mm
0.0826fLQ^2/D^5 ; where f=
#REF!
#REF!
=
=
=
=
=
=
#REF!
#REF!
LPS
#REF!
mm
0.0826fLQ^2/D^5 ; where f=
#REF!
#REF!
=
=
=
=
=
=
9.20
2.41 LPS
31.00 mm
0.0826fLQ^2/D^5 ; where f=
3.08
33.44
=
=
=
=
=
=
0.00
- LPS
- mm
0.0826fLQ^2/D^5 ; where f=
#DIV/0!
#DIV/0!
=
=
=
=
=
=
0.00
- LPS
- mm
0.0826fLQ^2/D^5 ; where f=
#DIV/0!
#DIV/0!
=
=
=
=
=
=
0.00
- LPS
- mm
0.0826fLQ^2/D^5 ; where f=
#DIV/0!
#DIV/0!
=
=
=
=
=
=
0.00
- LPS
- mm
0.0826fLQ^2/D^5 ; where f=
#DIV/0!
#DIV/0!
=
=
=
=
=
0.00
- LPS
- mm
0.0826fLQ^2/D^5 ; where f=
#DIV/0!
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
###
hf per 100 m
#DIV/0!
=
=
=
=
=
=
0.00
- LPS
- mm
0.0826fLQ^2/D^5 ; where f=
#DIV/0!
#DIV/0!
=
=
=
=
=
=
0.00
- LPS
- mm
0.0826fLQ^2/D^5 ; where f=
#DIV/0!
#DIV/0!
=
=
=
=
=
=
0.00
- LPS
- mm
0.0826fLQ^2/D^5 ; where f=
#DIV/0!
#DIV/0!
=
=
=
=
=
=
0.00
- LPS
- mm
0.0826fLQ^2/D^5 ; where f=
#DIV/0!
#DIV/0!
=
=
=
=
=
=
0.00
- LPS
- mm
0.0826fLQ^2/D^5 ; where f=
#DIV/0!
#DIV/0!
=
=
=
=
=
=
0.00
- LPS
- mm
0.0826fLQ^2/D^5 ; where f=
#DIV/0!
#DIV/0!
=
=
=
=
=
=
0.00
- LPS
- mm
0.0826fLQ^2/D^5 ; where f=
#DIV/0!
#DIV/0!
=
=
###
0.00
- LPS
0.02
0.02
0.02
0.02
0.02
0.02
0.02
### d
hf
hf
hf per 100 m
=
=
=
=
- mm
0.0826fLQ^2/D^5 ; where f=
#DIV/0!
#DIV/0!
=
=
=
=
=
=
0.00
- LPS
- mm
0.0826fLQ^2/D^5 ; where f=
#DIV/0!
#DIV/0!
=
=
=
=
=
=
0.00
- LPS
- mm
0.0826fLQ^2/D^5 ; where f=
#DIV/0!
#DIV/0!
0.02
0.02
0.02
2
Res (C)
1
1
2
2
8
9
10
1
2
7
8
9
10
11
12
4
5
4
5
6
3
1
ts2
2
ts3
3
9
10
11
ts2
ts3
ts7
ts8
ts9
ts10
ts11
ts12
5
6
ts4
ts5
ts6
Section
Length
Household
Served
Peak
Flow
(m)
(no.)
(lps)
4
752.70
18.60
22.90
29.30
374.40
384.30
386.80
773.40
858.60
1,882.30
21.30
18.30
16.30
19.20
26.20
306.60
127.20
385.60
287.20
11.10
19.40
9.20
5
158
148
136
136
125
109
77
65
53
125
109
93
77
55
43
121
104
89
121
104
89
0
6
10.2
4.00311
3.67853
3.67853
3.38101
2.94824
2.0827
1.75812
1.43355
3.38101
2.94824
2.51547
2.0827
1.48764
1.16307
3.27281
2.813
2.40728
3.27281
2.813
2.40728
0
Available
Pipe
Pipe
Head
Diameter Diameter
(Hr+elev.h) Option
(m)
(mm)
(mm)
7
8
12.45
100.7
1.20
52.8
6.35
38.1
6.30
40.1
6.24
64.7
5.71
62.7
4.55
57.1
7.30
55.8
5.24
56.1
(18.66) #VALUE!
(61.06) #VALUE!
(62.34) #VALUE!
5.96
28.7
6.16
25.8
5.72
25.2
4.76
64.7
2.82
56.8
2.57
67.8
2.59
72.2
2.31
36.3
4.80
32.9
(17.66)
0.0
9
100
19
50
19
50
75
75
75
50
50
50
50
50
50
50
50
75
75
75
75
50
50
35
36
37
38
39
B. Pipeline Analysis
Branch Node
No. of Household
Total Headloss
Available Head
Res (C)
158
1.7036329
<
12.45
ts2
148
0.04924
<
1.20
136
0.0511912
<
6.35
ts3
136
0.0553311
<
6.30
125
0.5376141
<
6.24
109
1.1604524
<
5.71
10
77
0.8323168
<
4.55
10
11
65
1.106449
<
7.30
ts2
53
22.903053
<
5.24
10
ts3
125
42.398035
<
(18.66)
11
ts7
109
1.2871567
<
(61.06)
12
ts8
93
0.2647788
<
(62.34)
13
ts9
77
0.545237
<
5.96
14
10
ts10
55
0.4402653
<
6.16
15
11
ts11
43
1.2089004
<
5.72
16
12
ts12
121
2.1925063
<
4.76
17
104
0.2250814
<
2.82
18
89
0.5040638
<
2.57
19
ts4
121
0.2749453
<
2.59
20
ts5
104
0.6285293
<
2.31
21
ts6
89
0.8115218
<
4.80
22
#REF!
#REF!
#REF!
#REF!
<
#REF!
23
#REF!
#REF!
#REF!
#REF!
<
#REF!
24
#REF!
#REF!
#REF!
#REF!
<
#REF!
25
#REF!
#REF!
#REF!
#REF!
<
#REF!
26
#REF!
#REF!
#REF!
#REF!
<
#REF!
27
#REF!
#REF!
#REF!
#REF!
<
#REF!
28
#REF!
#REF!
#REF!
#REF!
<
#REF!
29
#REF!
#REF!
#REF!
#REF!
<
#REF!
30
#REF!
#REF!
#REF!
#REF!
<
#REF!
31
#REF!
#REF!
#REF!
#REF!
<
#REF!
32
#REF!
#REF!
#REF!
#REF!
<
#REF!
33
<
34
<
35
<
36
<
37
<
38
39
0
0
0
0
0
0
0
0
<
<
(17.66)
Hr = Residual head
Column Description:
Column
1
2-3
4
5
6
Description
Pipe section under consideration
Node section under consideration
Length of pipe section under consideration (meter)
Number of household served
Computed Peak Flow (liter per second)
7
8
9
10
11
Actual Headloss
Formula:
Column 6:
PF
PF
Where:
PF
GRF
N
PCWC
= Peak flow.
= Growth rate factor.
= Total number of household served by the pipe section.
= Per capita water consumption.
Simplifying:
Column 8:
HF
D^5
= f (L)(Q)^2/D^5
= f (L)(Q)^2/HF
HF
Where:
F
L
Q
D
Simplifying:
D^5
= (0.00165(L)(Q/1000)^2/HF)(1000)
(mm)
= (0.00165(Column 4)(Column 6/1000)^2/(Column 7))(1000)
Column 10:
From table 9.2, (interpolate when necessary).
Column 11:
Actual Headloss
Headloss
Actual
per
Headloss
100 m.
(m)
Node
A
1
(m)
10
0.226336
0.264731
0.223542
0.188843
0.143594
0.301965
0.21518
0.143063
2.667488
2.252459
6.042989
1.446879
3.345012
2.293049
4.614123
0.715103
0.176951
0.130722
0.095733
5.662426
4.183102
0
11
1.703633
0.04924
0.051191
0.055331
0.537614
1.160452
0.832317
1.106449
22.90305
42.39803
1.287157
0.264779
0.545237
0.440265
1.2089
2.192506
0.225081
0.504064
0.274945
0.628529
0.811522
0
Hr
Remarks
10.75
ok
1.15
ok
6.30
ok
6.24
ok
5.71
ok
4.55
ok
3.71
ok
6.19
ok
(17.66)
ok
2
3
7
8
9
10
11
4
5
6
Elev
46.1
31.65
31.3
30.45
28.4
24.1
24.1
24.1
24.06
24.1
24.1
24.05
24.1
24.09
24.1
24
24
24.1
23.96
23.96
24
23.98
23.95
Section
Length
a to 1
752.70
1 to ts2
18.60
1 to 2
22.90
2 to ts3
29.30
2 to 3
374.40
3 to 7
384.30
7 to 8
386.80
8 to 9
773.40
9 to 10
858.60
10 to 11 1,882.30
7 to ts7
21.30
8 to ts8
18.30
9 to ts9
16.30
9 to ts10
19.20
10 to ts11
26.20
11 to ts12
306.60
3 to 4
127.20
4 to 5
385.60
5 to 6
287.20
4 to ts4
11.10
5 to ts5
19.40
6 to ts6
9.20
HH
158
148
148
136
136
125
109
77
65
53
125
109
93
77
55
43
121
104
89
121
104
89
(61.06)
ok
(62.34)
ok
(62.61)
ok
5.41
ok
5.72
ok
4.51
ok
2.57
ok
2.59
ok
2.06
ok
2.32
ok
1.69
ok
3.98
ok
#REF!
ok
#REF!
ok
#REF!
ok
#REF!
ok
#REF!
ok
#REF!
ok
#REF!
ok
#REF!
ok
#REF!
ok
#REF!
ok
#REF!
ok
(17.66)
ok
ok
ok
ok
ok
ok
ok
(m)
Schematic Diagram of
POBLACION, RAPU-RAPU, ALBAY
31.3
28.4
24
23.98
23.95
24.05
18.3
1 to ts2
2 to ts3
4 to ts4
5 to ts5
6 to ts6
7 to ts7
8 to ts8
18.60
29.30
11.10
19.40
9.20
21.30
18.30
148
-22
-37
-54
-69
#VALUE!
109
E
I
N
S'
38 mm
31 mm
m
m
m
1 1/2 "
1 1/4 "
2
Res (C)
1
2
3
7
8
9
10
1
2
7
8
9
10
11
12
3
4
5
4
5
6
3
1
2
3
7
8
9
10
11
ts2
ts3
ts7
ts8
ts9
ts10
ts11
ts12
4
5
6
ts4
ts5
ts6
Section
Length
Household
Served
Peak
Flow
(m)
(no.)
(lps)
4
752.70
22.90
374.40
384.30
386.80
773.40
858.60
1,882.30
18.60
29.30
21.30
18.30
16.30
19.20
26.20
306.60
127.20
385.60
287.20
11.10
19.40
9.20
5
158
148
136
125
109
77
65
53
148
136
125
109
93
77
55
43
121
104
89
121
104
89
6
10.2
4.00311
3.67853
3.38101
2.94824
2.0827
1.75812
1.43355
4.00311
3.67853
3.38101
2.94824
2.51547
2.0827
1.48764
1.16307
3.27281
2.813
2.40728
3.27281
2.813
2.40728
Available
Pipe
Pipe
Head
Diameter Diameter
(Hr+elev.h) Option
(m)
7
12.45
1.20
6.35
5.51
4.79
4.23
1.90
6.51
3.79
2.29
1.63
0.34
4.48
4.69
4.25
3.29
1.35
1.10
1.12
0.84
2.15
3.29
(mm)
(mm)
8
100.7
55.0
66.7
66.6
65.0
66.6
74.6
62.8
41.9
49.1
47.7
59.8
32.8
31.1
29.5
46.1
69.9
85.6
75.5
47.2
41.2
30.6
9
150
100
100
100
100
75
75
75
63
63
50
63
50
50
38
50
100
100
100
50
50
31
35
36
37
38
39
B. Pipeline Analysis
Branch Node
No. of Household
Total Headloss
Available Head
Res (C)
158
1.7036329
<
12.45
148
0.0606235
<
1.20
136
0.8369422
<
6.35
125
0.7257252
<
5.51
109
0.5554197
<
4.79
77
2.3353992
<
4.23
10
65
1.8475368
<
1.90
10
11
53
2.6928743
<
6.51
ts2
148
0.4961528
<
3.79
10
ts3
136
0.6599705
<
2.29
11
ts7
125
1.2871567
<
1.63
12
ts8
109
0.2647788
<
0.34
13
ts9
93
0.545237
<
4.48
14
10
ts10
77
0.4402653
<
4.69
15
11
ts11
55
1.2089004
<
4.25
16
12
ts12
43
2.1925063
<
3.29
17
121
0.2250814
<
1.35
18
104
0.5040638
<
1.10
19
89
0.2749453
<
1.12
20
ts4
121
0.6285293
<
0.84
21
ts5
104
0.8115218
<
2.15
22
ts6
89
<
3.29
23
#REF!
#REF!
#REF!
#REF!
<
#REF!
24
#REF!
#REF!
#REF!
#REF!
<
#REF!
25
#REF!
#REF!
#REF!
#REF!
<
#REF!
26
#REF!
#REF!
#REF!
#REF!
<
#REF!
27
#REF!
#REF!
#REF!
#REF!
<
#REF!
28
#REF!
#REF!
#REF!
#REF!
<
#REF!
29
#REF!
#REF!
#REF!
#REF!
<
#REF!
30
#REF!
#REF!
#REF!
#REF!
<
#REF!
31
#REF!
#REF!
#REF!
#REF!
<
#REF!
32
#REF!
#REF!
#REF!
#REF!
<
#REF!
33
ts6
89
<
3.29
34
<
35
<
36
<
37
<
38
39
0
0
0
0
0
0
0
0
<
<
Hr = Residual head
Column Description:
Column
1
2-3
4
5
6
Description
Pipe section under consideration
Node section under consideration
Length of pipe section under consideration (meter)
Number of household served
Computed Peak Flow (liter per second)
7
8
9
10
11
Actual Headloss
Formula:
Column 6:
PF
PF
Where:
PF
GRF
N
PCWC
= Peak flow.
= Growth rate factor.
= Total number of household served by the pipe section.
= Per capita water consumption.
Simplifying:
Column 8:
HF
D^5
= f (L)(Q)^2/D^5
= f (L)(Q)^2/HF
HF
Where:
F
L
Q
D
Simplifying:
D^5
= (0.00165(L)(Q/1000)^2/HF)(1000)
(mm)
= (0.00165(Column 4)(Column 6/1000)^2/(Column 7))(1000)
Column 10:
From table 9.2, (interpolate when necessary).
Column 11:
Actual Headloss
Headloss
Actual
per
Headloss
100 m.
(m)
(m)
10
0.226336
0.264731
0.223542
0.188843
0.143594
0.301965
0.21518
0.143063
2.667488
2.252459
6.042989
1.446879
3.345012
2.293049
4.614123
0.715103
0.176951
0.130722
0.095733
5.662426
4.183102
0
11
1.703633
0.060623
0.836942
0.725725
0.55542
2.335399
1.847537
2.692874
0.496153
0.65997
1.287157
0.264779
0.545237
0.440265
1.2089
2.192506
0.225081
0.504064
0.274945
0.628529
0.811522
0
Hr
Remarks
10.75
ok
1.14
ok
5.51
ok
4.79
ok
4.23
ok
1.90
ok
0.05
ok
3.82
ok
3.29
ok
Node
A
1
2
3
7
8
9
10
11
4
5
6
Elev
46.1
31.65
30.45
24.1
24.1
24.1
24.06
24.1
24.1
31.3
28.4
24.05
24.1
24.09
24.1
24
24
24.1
23.96
23.96
24
23.98
23.95
Section
Length
a to 1
752.70
1 to 2
22.90
2 to 3
374.40
3 to 7
384.30
7 to 8
386.80
8 to 9
773.40
9 to 10
858.60
10 to 11 1,882.30
1 to ts2
18.60
2 to ts3
29.30
7 to ts7
21.30
8 to ts8
18.30
9 to ts9
16.30
9 to ts10
19.20
10 to ts11
26.20
11 to ts12
306.60
3 to 4
127.20
4 to 5
385.60
5 to 6
287.20
4 to ts4
11.10
5 to ts5
19.40
6 to ts6
9.20
HH
158
148
136
125
109
77
65
53
148
136
125
109
93
77
55
43
121
104
89
121
104
89
1.63
ok
0.34
ok
0.08
ok
3.94
ok
4.25
ok
3.04
ok
1.10
ok
1.12
ok
0.59
ok
0.84
ok
0.21
ok
1.33
ok
3.29
ok
#REF!
ok
#REF!
ok
#REF!
ok
#REF!
ok
#REF!
ok
#REF!
ok
#REF!
ok
#REF!
ok
#REF!
ok
#REF!
ok
3.29
ok
ok
ok
ok
ok
ok
ok
(m)
Schematic Diagram of
POBLACION, RAPU-RAPU, ALBAY
31.3
28.4
24
23.98
23.95
24.05
18.3
1 to ts2
2 to ts3
4 to ts4
5 to ts5
6 to ts6
7 to ts7
8 to ts8
18.60
29.30
11.10
19.40
9.20
21.30
18.30
148
-22
-37
-54
-69
#VALUE!
109
E
I
N
S'
38 mm
31 mm
26.20 m
9.20 m
35.40 m
1 1/2 "
1 1/4 "
Q
LPS
0.01
0.02
0.03
0.04
0.05
0.06
0.07
0.08
0.09
0.1
0.11
0.12
0.14
0.15
0.16
0.18
0.20
0.25
0.30
0.40
0.50
0.60
0.70
0.80
1.00
1.20
1.40
1.50
1.60
1.80
2.00
2.50
3.00
3.50
4.00
4.50
5.00
6.00
7.00
8.00
10.00
25
0.1
0.13
0.17
0.22
0.26
0.31
0.36
0.48
0.55
0.62
0.77
0.94
1.42
2
3.4
5.1
7.2
31
0.11
0.13
0.17
0.18
0.22
0.27
0.32
0.48
0.67
1.15
1.74
2.4
3.2
4.1
6.3
8.8
38
0.101
0.131
0.2
0.23
0.47
0.71
1
1.33
1.7
2.6
3.6
4.4
4.9
5.5
7.35
8.4
50
0.12
0.18
0.25
0.33
0.42
0.64
0.89
1.2
1.35
1.52
1.88
2.3
3.5
4.95
6.95
9.2
11.85
63
0.11
0.14
0.21
0.3
0.4
0.44
0.51
0.64
0.77
1.2
1.65
2.19
3
3.6
4.5
6.2
8.6
75
100
0.089
0.124
0.165
0.187
0.211
0.262
0.32
0.48
0.68
0.9
1.15
1.43
1.74
2.44
3.2
4.15
6.5
0.079
0.119
0.166
0.221
0.284
0.353
0.429
0.6
0.8
1.2
1.55
Q
LPS
0.01
0.02
0.03
0.04
0.05
0.06
0.07
0.08
0.09
0.10
0.11
0.12
0.14
0.15
0.16
0.18
0.20
0.25
0.30
0.40
0.50
0.60
0.70
0.80
1.00
1.20
1.40
1.50
1.60
1.80
2.00
2.50
3.00
3.50
4.00
4.50
5.00
6.00
7.00
8.00
10.00
25
0.2
0.26
0.34
0.44
0.52
0.62
0.72
0.96
1.1
1.24
1.54
1.88
2.84
4
6.8
10.2
14.4
31
0.15
0.18
0.22
0.26
0.34
0.36
0.44
0.54
0.64
0.96
1.34
2.3
3.48
4.8
6.4
8.2
12.6
17.6
38
0.13
0.15
0.16
0.202
0.262
0.4
0.46
0.94
1.42
2
2.66
3.4
5.2
7.2
8.8
9.8
11
14.7
16.8
50
0.7
0.1
0.14
0.24
0.36
0.5
0.66
0.84
1.28
1.78
2.4
2.7
3.04
3.76
4.6
7
9.9
13.9
18.4
23.7
63
0.12
0.17
0.22
0.28
0.42
0.6
0.8
0.88
1.02
1.28
1.54
2.4
3.3
4.38
6
7.2
9
12.4
17.2
75
100
0.7
0.91
0.117
0.177
0.248
0.33
0.374
0.422
0.524
0.64
0.96
1.36
1.8
2.3
2.86
3.48
4.88
6.4
8.3
13
0.104
0.129
0.157
0.238
0.332
0.442
0.368
0.706
0.858
1.2
1.6
2.4
3.1
150
Interpolation
2.10
0.388
0.15 x
0.154
0.40
x=
x=
0.06
0.09
0.11
0.14
0.21
2.50
0.16
x-y, y = O5
0.01
0.00385 + O5
0.15385
150
0.12
0.17
0.22
0.28
0.42
Barangay Poblacion
Municipality of Rapu-Rapu
Province of Albay
ITEM DESCRIPTION
QUANTITY
UNIT
No. of
Crew/
Labor
RATE PER
DAY/ UNIT
COST
TOTALMATERIALS
225.00
sq.m.
Length
15.00
Width
15.00
Pipe Lines
1,359.30
sq.m.
Length
2,718.60
Width
0.50
TOTAL
1,584.30
m
sq.m.
A. Materials
Bolo
6.00
pcs
0.00
2.00
pcs
0.00
Hoe
2.00
units
0.00
4.00
day/s
B. Labor
Productivity Rate:
40.00 sq.m./day
Common Laborer
10.00
0.00
Unit Cost
II
0.00
0.00
EXCAVATION
Sand Filter
36.00
cu.m.
Length
12.00
Width
10.00
Depth
0.30
Pipe Trench
8.50
cu.m.
Length
35.40
Width
0.30
Depth
0.80
TOTAL
44.50
cu.m.
Shovel
10.00
pcs
0.00
Pick Matoe
10.00
pcs
0.00
Wheel barrow
2.00
units
0.00
0.25
kilos
0.00
25.00
day/s
A. Materials
B. Labor
Excavation
Productivity Rate:
2.50 cu.m./manday
Common Laborer
TOTAL FOR EXCAVATION
0.00
BACKFILLING
Pipe Trench
8.50
cu.m.
Length
35.40
Width
0.30
Depth
0.80
Labor
0.00
0.00
Unit Cost
III
20.00
Productivity Rate:
2.00 cu.m./ man-day
Common Laborer
30.00
TOTAL FOR BACKFILLING
day/s
20.00
0.00
0.00
Unit Cost
0.00
IV
CONCRETE WORKS
Sand Filter
Walls
24.00
cu.m.
Height
2.00
Length
80.00
Thickness
0.15
Floor
21.00
cu.m.
Length
14.00
Width
10.00
Thickness
0.15
Slab
2.00
cu.m.
Length
2.00
Width
10.00
Thickness
0.10
Footing (9 units)
1.80
cu.m.
Length
1.00
Width
1.00
Thickness
0.20
3.36
cu.m.
Length
7.00
Width
0.30
Thickness
0.40
3.15
cu.m.
Length
5.00
Width
0.30
Thickness
0.35
Columns
2.43
cu.m.
Height
3.00
Width
0.30
Thickness
0.30
Roof Beam1
3.36
cu.m.
Length
7.00
Width
0.30
Thickness
0.40
Roof Beam2
3.60
cu.m.
Length
5.00
Width
0.30
Thickness
0.40
Apron
16.80
cu.m.
Length
56.00
Width
2.00
Thickness
0.15
0.30
cu.m.
18.63
cu.m.
100.43
cu.m.
Communal TapStand
TOTAL VOLUME FOR CONCRETE
A. Materials
Portland Cement
950
bags
0.00
60
cu.m.
0.00
105
cu.m.
0.00
950
bags
0.00
pcs
0.00
Construction Pail
10
pcs
0.00
60
pcs
0.00
Washed Sand
Water Drum
B. Labor
Productivity Rate:
3.50 cu.m/gang/day
Skilled Laborer
24
days
4.00
0.00
Unskilled Laborer
24
days
10.00
0.00
C. Equipment
Capability Output:
31.50 bags/ day for mixer
3.50 cu.m./ day for vibrator
1 Bagger Concrete Mixer
24
days
1.00
0.00
1 Concrete Vibrator
24
days
1.00
0.00
D. Hauling
Portland Cement
Washed Sand
Crushed Gravel (3/4)
Miscellaneous
950
bags
0.00
60
cu.m.
0.00
105
cu.m.
0.00
lot
0.00
1
TOTAL FOR CONCRETING WORKS
0.00
Unit Cost
0.00
RSB WORKS
Floor (12 mm bars spaced at .15 meters bothways)
1,866.67
12mm
2,133.33
12mm
343.92
12mm
90.00
16mm
112.00
16mm
154.00
10mm
168.00
16mm
165.00
10mm
162.00
16mm
148.50
10mm
112.00
16mm
154.00
10mm
168.00
16mm
165.00
10mm
560.00
10mm
30.00
12mm
438.00
10mm
16 mm
893.20
1,409.77
kgs
12 mm
4,811.31
4,274.05
kgs
10 mm
1,962.95
1,210.49
kgs
A. Materials
6,894.30
kgs
1,409.77
kgs
0.00
4,274.05
kgs
0.00
1,210.49
kgs
0.00
130.00
kgs
0.00
Hacksaw Blade
10.00
pcs
0.00
Skilled Laborer
42.00
days
2.00
0.00
Unskilled Laborer
42.00
days
2.00
0.00
42.00
days
2.00
0.00
1,409.77
kgs
0.00
4,274.05
kgs
0.00
1,210.49
kgs
0.00
130.00
kgs
0.00
B. Labor
Productivity Rate:
80.00 kgs./gang/day (1 gang = 1 skilled,1 unskilled)
with bar cutter
C. Equipment
Capability Output:
80.00 kgs/day
Bar Cutter
D. Hauling
0.00
Unit Cost
0.00
VI
FORM WORKS
Sand Filter
Walls
320.00
Height
2.00
Length
80.00
Slab
20.00
sq.m.
Length
2.00
Width
10.00
22.40
sq.m.
Length
7.00
Thickness
0.40
21.00
sq.m.
Length
5.00
Thickness
0.35
Columns
16.80
sq.m.
Height
3.00
Width
0.30
Thickness
0.30
30.80
sq.m.
Length
7.00
Width
0.30
Thickness
0.40
33.00
sq.m.
Length
5.00
Width
0.30
Thickness
0.40
5.00
sq.m.
469.00
sq.m.
Roof Beam1
Roof Beam2
sq.m.
m
A. Materials
1/4" Marine Plywood
95.00
pcs
0.00
2 x 3 x 12 coco lumber
360.00
pcs
0.00
2 x 2 x 12 coco lumber
510.00
pcs
0.00
4" CW Nail
35.00
kilos
0.00
3" CW Nail
25.00
kilos
0.00
2" CW Nail
13.00
kilos
0.00
5.00
kilos
0.00
Skilled Laborer
16.00
days
2.00
0.00
Unskilled Laborer
16.00
days
4.00
0.00
1 1/2" CW Nail
B. Labor
Productivity Rate:
30.00 sq.m./gang/day
0.00
Unit Cost
VII
0.00
TRANSMISSION PIPELINES
775.60
Ln.m.
A. Materials
6" Dia. HDPE pipe SDR 9
752.70 meters
0.00
22.90 meters
0.00
1.00
set
0.00
2.00
pcs
0.00
1.00
pc
0.00
2.00
pcs
0.00
2.00
pcs
0.00
11.00
pcs
0.00
4.00
pcs
0.00
1.00
pc
0.00
1.00
pc
0.00
8.00
pcs
0.00
2.00
pcs
0.00
Skilled Laborer
20.00
days
2.00
0.00
Unskilled Laborer
20.00
days
4.00
0.00
C. Equipment
Capability Output:
90.00 ln.m./ day
Butt Fusion Machine
20.00
days
1.00
D. Hauling
6" Dia. HDPE pipe SDR 9
#REF! meters
#REF!
#REF! meters
#REF!
1.00
set
0.00
2.00
pcs
0.00
1.00
pc
0.00
2.00
pcs
0.00
2.00
pcs
0.00
11.00
pcs
0.00
Miscellaneous
1.00
lot
0.00
#REF!
#REF!
DISTRIBUTION PIPELINES
#REF!
ln.m.
A. Materials
4" dia. HDPE pipe SDR 11
1,145.50
0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
26.20
0.00
9.20
0.00
4.00
pcs
0.00
1.00
pc
0.00
10.00
pcs
0.00
2.00
pcs
0.00
5.00
pcs
0.00
2.00
pcs
0.00
3.00
pc
0.00
2.00
pcs
0.00
5.00
pcs
0.00
4.00
pcs
0.00
2.00
pc
0.00
2.00
pc
0.00
4.00
pcs
0.00
8.00
pcs
0.00
1.00
pc
0.00
1.00
pc
0.00
3.00
pc
0.00
5.00
pc
0.00
3.00
pc
0.00
3.00
pc
0.00
7.00
pcs
0.00
2.00
pcs
0.00
2.00
pcs
0.00
6.00
pcs
0.00
9.00
pcs
0.00
20.00
pcs
0.00
100.00
0.00
20
pcs
0.00
46
pcs
0.00
46
pcs
0.00
46
pcs
0.00
46
pcs
0.00
46
pcs
0.00
92
pcs
0.00
92
pcs
0.00
46
pcs
0.00
Water Meter
46
pcs
0.00
Teflon Tape
100
pcs
0.00
** Note: Pipe connections for size 2 1/2" and up are butt fused
: All dimentions are taken from the inside diameter
36.00
day/s
2.00
0.00
###
Unskilled Laborer
36.00
day/s
4.00
0.00
###
Skilled Laborer
10.00
days
5.00
0.00
Unskilled Laborer
10.00
days
5.00
IX
0.00
#REF!
Unit Cost
#REF!
sq.m.
A. Materials
2" x 1/4" Angle Bar
100.00
pcs.
0.00
1.00
sheet
0.00
24.00
pcs.
0.00
24.00
pcs
0.00
1.00
box
0.00
45.00
pcs
0.00
55.00
pcs
0.00
3,400.00
pcs
0.00
1.00
gal
0.00
sq.m.
0.00
6.00
pcs
0.00
12.00
pcs
0.00
4.00
gal
0.00
Skilled Laborer
20.00
days
2.00
0.00
Unskilled Laborer
20.00
days
4.00
0.00
Welding Machine
15.00
days
1.00
0.00
Acetelyn Cutter
15.00
days
1.00
0.00
5.00
days
1.00
0.00
15.00
days
1.00
0.00
1.00
lot
256.00
45 cm x 3 m. Ridge Roll
23 cm. X 5 cm. X 2 cm. X 15 cm. X 3 m. Flashing
Epoxy Primer
B. Labor
Productivity Rate:
13.00 sq.m./gang/day
C. Equipment
Electric Drill
Electric Grinder
D. Hauling
Lump Sum
0.00
0.00
Unit Cost
X
Project Supervision
180.00
TOTAL FOR PROJECT SUPERVISION
days
1.00
0.00
###
0.00
DIRECT COST
Material Cost
#REF!
###
Labor Cost
0.00
Equipment Cost
0.00
Hauling Cost
#REF!
Sub-Total A
0.00
PROJECT SUPERVISION
#REF!
INDIRECT COST
Pre-Engineering
#REF!
Contractor's Profit
#REF!
Tax
#REF!
OCM
#REF!
Prepared by:
#REF!
Approved by: