Beruflich Dokumente
Kultur Dokumente
Project
st
: AL FAHAD I 3B+G+1 Floor+21 Typical Residential Floor +Duplex (23/24)+ Roof on plot C-008-026
Client
Subject
Meeting No.
: 31
Khalifa Al Fahad
Cont.
: 20/10/15, 02:00PM
Next Meeting
: 27/10/15, 10:00AM
Contractor
ATTENDEES:Name
Organization
Title
Somu Jacob
Organic
MEP Manager
Ahmed Elbatreek
Organic
Asst. PM
Raja Jagadeesan
Organic
Elect. Eng.
Raja Antony
Organic
Mech. Eng.
Alaa Gamal
KAFC
PM
Hamdi
KAFC
CM
Mohamed
Maghamry
KAFC
Sr.Elect. Eng.
Diaa Alobaid
Jelfastar
Mobile
Mech. Eng.
Item
Action
By
Subject/Action
Action
Latest
by
Rev Date
The minutes of the meeting were read and accepted as a true record of the events.
1.0
1.1
2
2.1
3
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
4
4.1
4.2
Scope of Work
Execution, Completion of Al Fahad 1
Info.
Program
KAFC to provide a program showing completion of MEP
activities, Authority connections of all services, T&C.
KAFC
27.10.15
KAFC
13.04.15
27.10.15
KAFC
13.04.15
27.10.15
KAFC
13.04.15
27.10.15
KAFC
08.06.15
27.10.15
KAFC /
ACE
KAFC /
Organic
KAFC
KAFC
11.05.15
27.10.15
18.05.15
27.10.15
Urgent
24.08.15
27.10.15
27.10.15
KAFC /
ACE
27.07.15
27.10.15
KAFC
27.07.15
27.10.15
Submittals
KAFC to provide updated Authority status log urgently. KAFC
informed that they are preparing the same.
Btu meter installation drawing to be produced and it shall be
coordinated with M/s Empower. M/s Empower to approve
installation details of Btu meters. KAFC informed that they will
try to get sample Btu meter from Empower at the earliest.
KAFC to rectify and resubmit SS and RMU room for DEWA
inspection at the earliest. KAFC will resubmit for inspection by
next week.
Chilled water pump room seems to be too congested consider
resizing the room if possible.
KAFC informed that DCD review for smoke management
system is in progress. KAFC requested client involvement.
KAFC informed that DEWA estimate is not yet paid. KAFC to
follow up with client for the DEWA estimate payment.
KAFC to find a solution for the Empower opening in B1.
KAFC to propose suitable 3rd party for testing and
commissioning works at the earliest.
KAFC informed that they have tried to upload DEWA Water
application, but rejected by DEWA since an active application
from ACE is pending in system.
KAFC to submit swimming pool pump room layout drawing.
Site Progress
KAFC to restart regular workshops with all parties to sort out
coordination or site problems.
KAFC to protect all final fix items. KAFC informed that they
have locked all apartments from 2 to 10 and is under control.
Info
Info.
4.3
4.4
KAFC
27.10.15
Item
Subject/Action
4.5
4.6
4.7
4.8
4.9
4.10
4.11
4.12
5
5.1
6
6.1
Action
By
Action
Latest
by
KAFC
27.10.15
KAFC
27.07.15
KAFC
27.10.15
KAFC
27.07.15
Info.
KAFC
Urgent
KAFC /
Organic
KAFC
27.10.15
KAFC
20.04.15
Rev Date
27.10.15
27.10.15
Urgent
17.08.15
Next meeting.
Next meeting will be at 10:00 AM Tuesday 27th October 2015.
Info.