You are here: Home / Primavera P6 / Primavera P6 Database Connection Configuration Details
Tweet
Share
0
Share
https://tensix.com/2013/03/primaverap6databaseconnectionconfigurationdetails/
1/6
11/26/2015
PrimaveraP6DatabaseConnectionConfigurationDetails|TenSixConsulting
5. Click Next.
6. In the Configure ORACLE Connection dialog, verify or enter the following Oracle Connection String.
https://tensix.com/2013/03/primaverap6databaseconnectionconfigurationdetails/
2/6
11/26/2015
PrimaveraP6DatabaseConnectionConfigurationDetails|TenSixConsulting
7. In the Enter Public Login Information dialog, enter the following information.
https://tensix.com/2013/03/primaverap6databaseconnectionconfigurationdetails/
3/6
11/26/2015
PrimaveraP6DatabaseConnectionConfigurationDetails|TenSixConsulting
10. If the public username and password are correct you will see the following dialog:
11. Click Finish.
If the public username and/or password are incorrect, you will be returned to the Select or Create
Alias dialog where you can repeat the process with the correct database login credentials.