Sie sind auf Seite 1von 2

INTERNATIONAL GENERAL

CERTIFICATE

Candidates observation
sheet

IGC3 THE HEALTH AND


SAFETY PRACTICAL APPLICATION
Sheet number of _____
Student name jjjjj____________________________________

Student number __________________

Place inspected _____________________________________

Date of inspection ___ / _____ / _____

Observations

Control measures

Hazards and Consequences

Immediate and Longer-term actions


Immediate measure:
People should be provided with
sunglasses to avoid harmful effects
on eyes.
Long term measure:
Rest shades; adequate cold water
should be provided in the work area

Hazard:
People are working in open
area (Hot environment) to
construct parking lot.
Consequence:
Risk of Heat stress leading to
ill health.

2. Location:
Parking area
Hazard:
Dust is generating during
excavation to construct
parking lot.
Consequence:
Risk of Inhalation of dust
leading to ill health

Immediate measure:
People should be provided with
correct type of dusts masks/
respirators.
Long term measure:
Competent person should supervise
the task.

Timescale

Immediately

1 day

Immediate

1 day

INTERNATIONAL GENERAL
CERTIFICATE

Candidates observation
sheet

IGC3 THE HEALTH AND


SAFETY PRACTICAL APPLICATION
Sheet number of _____
Student name jjjjj____________________________________

Student number __________________

Place inspected _____________________________________

Date of inspection ___ / _____ / _____

Das könnte Ihnen auch gefallen