Beruflich Dokumente
Kultur Dokumente
Column 2
solenoid
Column1
solenoid
Column1
solenoid
Col 1
Col 2
Page 1
FPD
Sulfur only
Column 1 60 meter
MXT1 .53mm 5 mic.
Column 2 15 meter
RTX Q-Plot .53mm
FID
Hydrocarbons
Col 1
arated by
FPD and FID
overlaid
MultiGas#3
Instructions
Page 2
Col 1
solenoid
FPD
Sulfur only
Col 2
QPlot .53mm ).
Col 2
Col 1
Solenoid
turns off
and valve
rotates to
Load at
10.00
minutes,
just after
propane
Page 3
HayD
col 1
TCD detector
Oven temperature 40C for 10 minutes then
20C/min to 200C
Col 2
13X
Solenoid on at .9
minutes
Col 2
13X
This would be a good time ( .9 minutes ) to activate the stop-flow solenoid. Just after the Methane
migrates onto Column2 but before the CO2 and
heavier peaks
HayD
col 1
Solenoid
off
MultiGas#3
Instructions
Page 4
Col 1
TCD detector
Col 2
Solenoid on at .9
minutes
Col 2
Col 1
Solenoid
off
MultiGas#3
Instructions
Page 5
Col 1
TCD detector
Col 2
Solenoid on at .9
minutes
Col 2
Col 1
Zoom in
Solenoid
off
MultiGas#3
Instructions
Page 6
Col 1
HayD
the
TCD detector
Col 2
MS13X
Solenoid on at .9
minutes
Zoom in
Col 2
MS13X
Col 1
HayD
Solenoid
Off at 4.00
MultiGas#3
Instructions
Page 7
Col 1
TCD detector
Col 2
The gap in the chromatogram between the combined
O2, N2 and CO peak and the Methane peak is a good
place to actuate the Stop-Flow solenoid
Solenoid on at 1.5
minutes
Col 2
Col 1
Solenoid
Off at 4.00
MultiGas#3
Instructions
Page 8
Stop-Flow Solenoid
MultiGas#3
Instructions
Page 9
MultiGas#3
Instructions
Page 10
Ethane
MultiGas#3
Instructions
Page 11
MultiGas#3
Instructions
Page 12
MultiGas#3
Instructions
Page 13
MultiGas#3
Instructions
Page 14