Sie sind auf Seite 1von 198

15 Storey Building of A Type' Project in Baghdad

AllworkswillbedoneinkeepingwithIraqitechnicalspecifications(IGTS/1993)andasperthe
Allmaterialswillbesubjecttolaboratorytests.

Maps/graphswillbethebasisincaseofdifference/variationbetweenplansandbillsofquantitie
Cableswillbelaidoncabletraysincorridorsandunderthefalseceilingforcables,NYYtype.

Allelectricalworksshouldbetestedwiththeofficialapprovalofsupervisingengineerandresid

AllworkswillbedoneinKeepingwiththeconditionsofthecivilengineering-withtwoparts,f

S.No.

Details

Unity

8 Section Eight: Electrical works/all electrical works will be done using plastic pipes and the price w
accessories.
8.1
Supplymaterials,installationofmaindistribution
No.
boards(S.B.A)ofthetypethatmaybefixedonground
andthecutoutswillbeofLegrandtypeofHGand
FrenchABB.
Metalcabinetmadeofmetalplates,2.5mm

8.2

thickness,antirustpaintedinGreycolour.
Maincutoutthreephase,500Ampere,one
Distributionroadswithneutralizerandearthcapable
of800Ampere.
Sub-cutout,threephase,63Ampere,24
Supplyofmaterials,installationandtestingofmain No.
distributionbondofthetypethatmaybefixedonthe
groundandthecutoutsofLegrandconsistingofMG
andFrenchABB.
Metalcabinetmadeofmetalplatesof2.5mm

8.3

thicknessandanti-rustpaintedinGrey.
Maincutout,threephase,500Ampere,one.
Distributionroadswithneutralizerandearth,
capacity800Ampere.
Sub-cutout,threephase,63Ampere,16.
Sub-cutout,threephase,25Ampere,8
Supplyofmaterials,installationandtestingofmain No.
distributionboard(S.B.C)ofthetypethatmaybefixed
ongroundandcutoutswillbeFrenchLegrand
consistingofMGandABB.
Metalcabinetmadeofmetalplates,2.5mm

thicknessanti-rustpaintedinGrey.
Maincutout,threephase,400Ampere,one

Distributionroadswithneutralizerandearth,

8.4

capacity800Ampere.
Sub-cutout,threephase,63Ampere,20.
Supplyofmaterials,installationandtestingof
distributionboard(DB)oforiginalEnglishCropteri
typewith18,threephaseasperapprovalof
supervisingengineer

No.

8.5 Supplyofmaterials,layingandinstallationthroughcagesorlayingthem
underroomfloorinsideplasticpipesorthroughmanholes80X80cm,
interredwithsoil.Thepricewillincludelayingofpipeinappropriatesize
forthepassageoffeedercablewithallotheraccessoriesorlayingthemon
cabletraysincorridorsandunderthesecondaryceilingsofthecables,
NYYtype,foreignmade,asperthegraphandinstructionsofsupervising
engineerinthefollowingsizes.

Cable4X120mm2MT200
Cable4X10mm2MT3000
8.6 Supplyofmaterialsandmakinglighting,points,itincludeslay/extending
wiresof(1X1.5)mm2+(2.5X1)mm2insideplasticpipesfrom
distributionboardstotheswitchpointsandextendingwire(without
No.
A)Supplyofmaterials,fixingandtestingoflighting
fixtures(60X60)ofthetypethatmaybefixedinthe
secondaryceiling,Turkishmade,aspertheapprovalof
thesupervisingengineer.
B)Supplyofmaterials,fixingandtestingoflighting No.
fixtures(spotlight18watt)ofthetypethatmaybe
fixedinthesecondaryceiling,Turkishmade,asperthe
C)Supplyofmaterials,fixingofceilingplatewith36 No.
wattbulbasperapprovalofsupervisingengineer.
D)Supplyofmaterials,fixingandtestingoflighting No.
fixtures(sportlight18wattofthetypefixedthe
secondaryceiling,Turkishmade,asperapprovalof
supervisingengineer.
E)Supplyofmaterials,fixingandtestingoflighting No.
Bracket18wattofwalltype,Turkishmade,asper
approvalofsupervisingengineer.
F)Supplyofmaterials,fixingandtestingoflighting No.
fixturesBracket18wattofwalltype,Turkish,asper
approvalofsupervisingengineer.

8.7 Supplyofmaterials,makingcompleteblockswitchpoints,including
No.
layingwire(1.1.5)+(2.5X1)2mm2insideplasticpipesfromdistribution
boardtoswitchwithswitchof13Asize,cropetry,boxedandallthe
materialrequiredinthework.
8.8 Supplyofmaterials,makingcompleteblockswitchpointincludinglaying No.
wiremm2(1X1.5)+(2.5X1)2insideplasticpipesfromdistributionboard
toswitchwithswitchesof13Asize,cropetrytype,boxes,andallthe
materialsrequiredinthework
8.9 Supplyofmaterialsandmakinggyserpointsorswitchpoint25ampere No.
includinglayingwiremm2(1X2.5)+(1X4)2,foreignmadeinsideplastic
pipesinappropriatesize,fromdistributionboardtothepointwithswitch
25ampere,MKtype.
8.1 Supplyofmaterials,makingcompletefanpointincludinglayingcable
insideplasticpipestothepointwithswitchofforeignmake.

No.

8.11 Supplyofmaterials,fixingandtestingofexhaustfanof12inchsize,
Malaysian,withmakinganexhaustpointusingwireofmm2(1X2.5)2
sizeinsideplasticpipeswiththeceilingasperapprovalofsupervising
engineer.

No.

8.12 Supplyofmaterials,providingcompleteeachsystemincludingthreepits No.


of1.5metredepthandthedimensionsof40X40cmandbuildingwith
brick-withbidofconcertboard,liftable,asperthemeasurementsgivenin
theattachedplan.Ineachofthem,coal,saltandsoftsandwillbeputand
arodof50mm,length1.5metremadeofIron-coppercoatedwillbefixed,
endswillbetiedwitheachotherwithcopperwireof70mm2extendingto
theearthpointindistributionboardortransformer,underthesupervision
anddirectivesofsupervisingengineer.

8.13 Supplyofmaterialsandfixingatelephoneexchangeof300lines,external No.


andinternal,Panasonic.
8.14 Supplyofmaterialsandmakingacompletetelephonepointincluding
layingtelephonecable2piersinsideplasticpipesfromexchangetothe
pointwithswitchandbox,andllothermaterialsrequiredinthework.

No.

8.15 SupplyofmaterialsandmakingacompleteTVpointincludinglaying
cableinsideplasticpipestothepointwithswitchofaforeignmake.

No.

8.16 Supplyofmaterialsandinstallationofanti-lighteningsystemincluding
layingacopperwireof70mm2diameterfromearthpointtothesystem,
rodwithtaperedhead-Turkishcoveringthebuildingarea,asper
engineeringspecifications,pricealsoincludesmakingeach.

Total

8.17 Supplyofmaterialsandfixingacompletebellpoint
8.18 Supplyandinstallationoffirealarmasperengineeringspecifications
including:

No.

A)FireIndicationsystem9Zone
B)Smokedetector
C)Bell
D)Glassbreak

No.
No.
No.
No.
8.19 SupplyofmaterialsandfixingelectricalliftsOTISorconorMitsubishi, No.
completewithIronmotorbasenon-local,withcompletesafetysystem,
includesallancilliaryworkasperengineeringspecificationsforten
persons.
8.2 Supplyofmaterialsandfixingelectricaldoor,complete,foreignmake,
withnonlocalmotorandacompetesafetysystem,includesallthe
ancilliaryworksandperspecifications.

No.

8.21 Supplyofmaterialsandasplitpointlayingwireof4X4mmsizewithall No.


therequirementsofwork.
Total sum of Section Eight (Electrical Works)

2
3
4

Material cost
500A TP MCCB 50KA - 1 NO
Bus Bar 4 Nos of 500A rating
Earthing Point
315A TP MCCB 25KA
32A TPN MCB
16A TPN MCB
32A DP MCB
Digital panel meter for Amp, Volt, power factor and other parameter flush
mounting of size 96 x96 mm
Indicatoras lamp assy
Material cost
FABRICATION COST(35% OF Material cost )
Internal wiring complete
Basic cost
Tpt and C&F @ 20%

32453.00
6394.00
115
25656.50
1397.25
1397.25
701.50
23000.00
287.5

3125

5
6
7

Labour and T&P charges @ 15%


Contractors Profit @ 25%
Rates for each No

IGTS/1993)andasperthedirectivesofthesupervisingengineering.

plansandbillsofquantities.
ngforcables,NYYtype.
rvisingengineerandresidentengineerdepartmentaftercompletionofworks.
ineering-withtwoparts,firstandsecond,andalsotheconditionsofelectricalandmechanicalworks.

Quantity Price US$

Amount

stic pipes and the price will include boxes, wires and all the
1 4,694,940.00 4,694,940.00

60

2430
300

600

60

600

1770

480

480

420

240

1
240

300

60

5
630
30
30
2

420

ectrical Works)

LS

Nos
RM
Nos
Nos
Nos
Nos
Nos
Nos

1
1.2
2
1
6
2
3
1

32453.00
7672.80
230.00
25656.50
8383.50
2794.50
2104.50
23000.00

Nos

862.50
103157.30
56736.52
3125.00
163018.82
32603.76

55%
1
0.2

0.15
0.25
Say
Say

24452.82
40754.70
260830.10
260830.00
4,694,940.00

12 Storey Building, of B Type' Project in Baghdad

AllworkswillbedoneinkeepingwithIraqitechnicalspecifications(IGTS/1993)andasperth
Allmaterialswillbesubjecttolaboratorytests.
Maps/graphswillbethebasisincaseofdifference/variationbetweenplansandbillsofquantiti
Cableswillbelaidoncabletraysincorridorsandunderthefalseceilingforcables,NYYtype.
Allelectricalworksshouldbetestedwiththeofficialapprovalofsupervisingengineerandresid
AllworkswillbedoneinKeepingwiththeconditionsofthecivilengineering-withtwoparts,f

S.No.

Details

Unity

8 Section Eight: Electrical works/all electrical works will be done using plastic files and the cost wi
and all accessories.
8.1 Supplyofmaterials,fixingandtestingofmaindistributionboard(SBA),tobe
No.
fixedongroundandthecutoutswillbeFrenchLegrandconsistingofMGor
ABB.
Metalcabinetmadeofmetallicplats-thickness2.5mm,
anti-rustpaintedinGrey.
Maincutout,threephase,250Ampere,one.
Distributionrodswithneutralizerandearthingofthe
capacityof500Ampere.
Sub-cutout,threephase,40Ampere,20.
8.2 Supplyofmaterials,fixingandtestingofmaindistributionboard(SBB),tobe No.
fixedongroundandthecutoutswillbeFrenchLegrandconsistingofMGor
ABB.
MetalCabinetmadeofmetallicplats,thickness2.5mm,
anti-rustpaintedinGrey.
Maincutout,threephase,250Ampere,one
Distributionrodswithneutralizerandearthingofthe
capacityof500Amperecurrent.
Sub-cutout,threephase,40Ampere,20.
8.3 Supplyofmaterials,fixingandtestingofmaindistributionboard(SBC),tobe No.
fixedongroundandthecutoutswillbeFrenchLegrandconsistingofMGor
ABB.
MetalCabinetmadeofmetallicplats,thickness2.5mm,
anti-rustpaintedinGrey.
Maincutout,threephase,250Ampere,one
Distributionrodswithneutralizerandearthingofthe
capacityof500Amperecurrent.

Sub-cutout,threephase,40Ampere,No.5.
Sub-cutout,threephase,25AmpereNo.8
8.4 Supplyofmaterials,fixingandtestingofmaindistributionboard(DB),
No.
croptoryoriginalEnglishwith16(threephase),asperapprovalofsupervising
engineer.
8.5 Supplyofmaterials,layingandfixingthemthroughcagesorextendingthem
belowthefloorofroom,insideplasticpipesorthroughmainholes(80X80)cm,
tobeinternedwithsoilandthecostincludeslayinginpipesofappropriate
measurementforthepassageoffeedercablewithallotheraccessoriesorlaying
themoncabletraysinthecorridorsandunderthesecondarysealingforcables,
andYYTypeforeignmade,asperthegraphandinstructionsofsupervising
engineer,inthefollowingdimensions/sizes:

Cable,size4X120mm2
Cable,size4X10mm2

MT
MT
8.6 Supplyofmaterialsandmakinglightingpoints,includinglayingwireofthe
size1X1.5mm2+2.5X1mm2,insideplasticpipesfromdistributionboardto
thepoints(switches),layingwire(withoutcapillarity)fromswitchtothepoints
oflightingwithswitchesandboxeswiththeapprovalofsupervisingengineer,
andwhateverothermaterialsrequiredinthework.

A)supplyofmaterials,fixingandtestingfixturesof
lighting(60X60),ofthetypethatmaybefixedinthe
secondarysealing,Turkishmadeasperapprovalof
supervisingengineer.
B)Supplyofmaterials,fixingandtestingoffixturesof
lighting(Spotlight18watt)tobefixedinthesecondary
sealing,Turkishmade,asperapprovalofsupervising
engineer.
C)Supplyofmaterialsandfixingofsealingplatewithbulb
36wattasperapprovalofsupervisingengineer.

D)Supplyofmaterials,fixingandtestingoflighting
fixtures(spotlight18watt),tobefixedinthesecondary
sealing,Turkishmake,asperapprovalofsupervising
engineer.
E)Supplyofmaterials,fixingandtestingoflighting
fixturesbracket18wattofwalltype,Turkishmade,asper
approvalofsupervisingengineer.
F)Supplyofmaterial,fixingandtestingoflightingfixturesNo.
bracket18wattofwalltype,Turkishmadeasper
supervisingengineer.

No.

No.
No.

No.

No.
8.7 Supplyofmaterialsandmakingacompleteblockswitchpointincludinglaying No.
wire1X1.5mm2+2.5X1mm2,insideplasticpipes,fromdistributionboardto
theswitchwithswitchesof13Asize,croptarytypeandboxes,andallother
materialsthatmayberequiredinthework.
8.8 Supplyofmaterialsandmakingofcompleteblockswitchpointincluding
No.
layingwire,1X1.5mm2+2.5X1mm2insideplasticpipes/tubesfrom
distributionboardtotheswitchwithswitchesofthesize13A,croptarytypeand
boxes,andallthatisrequiredinthework.
8.9 Supplyofmaterialsandmakingageyserpointorswitchpoint25Ampere
No.
includinglayingwire1X2.5mm2+1X4mm2,foreignmake,insideplastic
pipes,inappropriatesizefromdistributionboardtothepoint,withswitches25
Ampere,MKtype.

Supplyofmaterialsandmakingacompletefanpoint
includinglayingcable,insideplasticpipes,tothepointwith
switchesofforeignmake.

No.
8.1 Supplymaterial,fixingandtestingofexhaustfanof12inchessize,Malaysian, No.
fromthepointofexhaust,usingwire1X2.5mm2,insideplasticpipewiththe
sealing,asperapprovalofsupervisingengineer.
8.11 SupplyofmaterialsandprovidingacompleteearthingsystemincludingmakingNo.
threepitsof1.5meterdepthandthedimensionsof40X40cm,buildinginbricks
withliftableconcretelid,aspermeasurementsgivenintheenclosedplan,in
eachofthesepitsamixofcoal,saltandsoftsandwillbeput,arodof50mm
diameterand1.5meterheightmaidofcoppercoatedIronwillbeinstalled.
Thereendswillbetiedwithacopperwireof70mm2extendingtothepointof
earthingindistributionboardsorthetransformer,underthesupervisionand
directivesofsupervisingengineer.

8.12 Supplyofmaterialsandinstallationoftelephoneexchangeof300lines,
externalandinternal,fromPanasonic.

No.

8.13 Supplyofmaterialsandmakingacompletetelephonepointincludinglayingof No.


cablefortelephonetwopare,insideplastic.
8.14 SupplyofmaterialsandmakingacompleteTVpointincludinglayingcablein No.
plasticpipestoapoint,withswitches,foreignmake.
8.15 Supplyofmaterialsandinstallationofanti-lighteningsystem,itincludeslaying Total
acopperwireof70mm2diameterfromtheearthingpointtothesystem.
Arodwithtaperedhead,Turkish,coveringthebuildingareaandasper
engineerspecifications.Priceincludesprovidingtheearthing.
8.16 Supplyofmaterialsandfixingacompletebellpoint.
No.
8.17 Supplyandinstallationoffirealarmsystem,asperengineeringspecifications.
A)Fireindicators,9Zone
B)Smokedetectors
C)Bell
D)Brakingtheglass

No.
No.
No.
No.

8.18 SupplyofmaterialsandinstallationofelectricsliftsOTSorconorMitsubishi, No.


completewithIronmotorbasefromnon-localoriginwithcompletesafety
system,includingallaccessoriesoftheworkasperengineeringspecifications,
for10persons.
8.19 Supplyofmaterialsandinstallingworksforelectricaldoors,foreignmake,
completewithnonlocalmotorwithcompletesafetysystem,includingall
accessoriesofworkasperspecifications.
8.2 Supplyofmaterialsandmakingsplitpoints,layingwire4X4mm,withallthe
requisitesofwork.
Total Amounts of Section Eight (electrical work)

No.

No.

TS/1993)andasperthedirectivesofthesupervisingengineering.

nsandbillsofquantities.
forcables,NYYtype.
isingengineerandresidentengineerdepartmentaftercompletionofworks.
eering-withtwoparts,firstandsecond,andalsotheconditionsofelectricalandmechanicalworks.

Quantity

Price US$ Amount

c files and the cost will include boxes, wires


1

48

150
2500

1656

192
528

48

336
1176

336

336

288
192

1
192

240

48

3
408
24
24

288

12 Storey Building, of C Type' Project in Baghdad

AllworkswillbedoneinkeepingwithIraqitechnicalspecifications(IGTS/1993)andasperth
Allmaterialswillbesubjecttolaboratorytests.
Maps/graphswillbethebasisincaseofdifference/variationbetweenplansandbillsofquantiti
Cableswillbelaidoncabletraysincorridorsandunderthefalseceilingforcables,NYYtype.
Allelectricalworksshouldbetestedwiththeofficialapprovalofsupervisingengineerandresid
AllworkswillbedoneinKeepingwiththeconditionsofthecivilengineering-withtwoparts,f

S.No.

Details

Unity

Quantity

8 Section Eight: Electrical works/all electrical works will be done using plastic pipes and the cost wi
boxes, wires and all accessories.
8.1 Supplyofmaterials,fixingandtestingofmaindistributionboard
No.
1
(SBA),tobefixedongroundandthecutoutswillbeFrench
LegrandconsistingofMGorABB.
Metalcabinetmadeofmetallicplats-
thickness2.5mm,anti-rustpaintedinGrey.
Maincutout,threephase,250Ampere,
one.
Distributionrodswithneutralizerand
earthingofthecapacityof500Ampere.
Sub-cutout,threephase,40Ampere,20.

8.2 Supplyofmaterials,fixingandtestingofmaindistributionboard No.


(SBB),tobefixedongroundandthecutoutswillbeFrench
LegrandconsistingofMGorABB.
MetalCabinetmadeofmetallicplats,
thickness2.5mm,anti-rustpaintedinGrey.
Maincutout,threephase,250Ampere,one
Distributionrodswithneutralizerand
earthingofthecapacityof500Ampere
current.
Sub-cutout,threephase,40Ampere,20.

8.3 Supplyofmaterials,fixingandtestingofmaindistributionboard No.


(SBC),tobefixedongroundandthecutoutswillbeFrench
LegrandconsistingofMGorABB.

MetalCabinetmadeofmetallicplats,
thickness2.5mm,anti-rustpaintedinGrey.
Maincutout,threephase,250Ampere,one
Distributionrodswithneutralizerand
earthingofthecapacityof500Ampere
current.
Sub-cutout,threephase,40Ampere,5in
No..
Sub-cutout,threephase,25Ampere8in
No.
8.4 Supplyofmaterials,fixingandtestingofdistributionboard
No.
(DB),croptoryoriginalEnglishwith16(threephase),asper
approvalofsupervisingengineer.

48

8.5 Supplyofmaterials,layingandfixingthemthroughcagesor
extendingthembelowthefloorofroom,insideplasticpipesor
throughmainholes(80X80)cm,tobeinternedunderthesoiland
thecostincludeslayinginpipesofappropriatemeasurementfor
thepassageoffeedercablewithallotheraccessoriesorlaying
themoncabletraysinthecorridorsandunderthesecondary
sealingforcables,andYYTypeforeignmade,asperthegraph
andinstructionsofsupervisingengineer,inthefollowing
dimensions/sizes:

Cable,size4X120mm2
MT
Cable,size4X10mm2
MT
8.6 Supplyofmaterialsandmakinglightingpoints,includinglaying
wireofthesize1X1.5mm2+2.5X1mm2,insideplasticpipes
fromdistributionboardtothepoints(switches),layingwire
(withoutcapillarity)fromswitchtothepointsoflightingwith
switchesandboxeswiththeapprovalofsupervisingengineer,
andwhateverothermaterialsrequiredinthework.

150
2500

A)supplyofmaterials,fixingandtesting
No.
fixturesoflighting(60X60),ofthetypethat
maybefixedinthesecondarysealing,
Turkishmadeasperapprovalofsupervising
engineer.

B)Supplyofmaterials,fixingandtestingof No.
fixturesoflighting(Spotlight18watt)tobe
fixedinthesecondarysealing,Turkishmade,
asperapprovalofsupervisingengineer.

1606

C)Supplyofmaterialsandfixingofsealing No.
platewithbulb36wattasperapprovalof
supervisingengineer.

192

D)Supplyofmaterials,fixingandtestingof No.
lightingfixtures(spotlight18watt),tobe
fixedinthesecondarysealing,Turkishmake,
asperapprovalofsupervisingengineer.

432

E)Supplyofmaterials,fixingandtestingof No.
lightingfixturesbracket18wattofwalltype,
Turkishmade,asperapprovalofsupervising
engineer.

48

F)Supplyofmaterial,fixingandtestingof No.
lightingfixturesbracket18wattofwalltype,
Turkishmadeaspersupervisingengineer.

192

8.7 Supplyofmaterialsandmakingacompleteblockswitchpoint No.


includinglayingwire1X1.5mm2+2.5X1mm2,insideplastic
pipes,fromdistributionboardtotheswitchwithswitchesof13A
size,croptarytypeandboxes,andallothermaterialsthatmaybe
requiredinthework.

1080

8.8 Supplyofmaterialsandmakingofcompleteblockswitchpoint No.


includinglayingwire,1X1.5mm2+2.5X1mm2insideplastic
pipes/tubesfromdistributionboardtotheswitchwithswitches
ofthesize13A,croptarytypeandboxes,andallthatisrequired
inthework.

288

8.9 Supplyofmaterialsandmakingageyserpointorswitchpoint25 No.


Ampereincludinglayingwire1X2.5mm2+1X4mm2,foreign
make,insideplasticpipes,inappropriatesizefromdistribution
boardtothepoint,withswitches25Ampere,MKtype.

336

SupplyofmaterialsandmakingacompleteNo.
fanpointincludinglayingcable,insideplastic
pipes,tothepointwithswitchesofforeign
make.

288

8.1 Supplymaterial,fixingandtestingofexhaustfanof12inches No.


size,Malaysian,fromthepointofexhaust,usingwire
1X2.5mm2,insideplasticpipewiththesealing,asperapproval
ofsupervisingengineer.

144

8.11 Supplyofmaterialsandprovidingacompleteearthingsystem No.


includingmakingthreepitsof1.5meterdepthandthe
dimensionsof40X40cm,buildinginbrickswithliftableconcrete
lid,aspermeasurementsgivenintheenclosedplan,ineachof
thesepitsamixofcoal,saltandsoftsandwillbeput,arodof
50mmdiameterand1.5meterheightmadeofcoppercoatedIron
willbeinstalled.Theirendswillbetiedwithacopperwireof
70mm2extendingtothepointofearthingindistributionboards
orthetransformer,underthesupervisionanddirectivesof
supervisingengineer.

8.12 Supplyofmaterialsandinstallationoftelephoneexchangeof
300lines,externalandinternal,fromPanasonic.

No.

8.13 Supplyofmaterialsandmakingacompletetelephonepoint
includinglayingofcablefortelephonetwopare,insideplastic
pipesfromexchangetothepoint,withswitchandboxandall
othermaterialrequiredinthework.

No.

192

8.14 SupplyofmaterialsandmakingacompleteTVpointincluding No.


layingcableinplasticpipestoapoint,withswitches,foreign
make.

240

8.15 Supplyofmaterialsandinstallationofanti-lighteningsystem,it Total


includeslayingacopperwireof70mm2diameterfromthe
earthingpointtothesystem.

8.15

Total

No.

48

No.
No.
No.
No.

3
408
24
24

8.18 SupplyofmaterialsandinstallationofelectricliftsOTSorcon No.


orMitsubishi,completewithIronmotorbasefromnon-local
originwithcompletesafetysystem,includingallaccessoriesof
theworkasperengineeringspecifications,for10persons.

8.19 Supplyofmaterialsandinstallingworksforelectricaldoors,
foreignmake,completewithnonlocalmotorwithcomplete
safetysystem,includingallaccessoriesofworkasper
specifications.

No.

8.2 Supplyofmaterialsandmakingsplitpoints,layingwire4X4mm,No.
withalltherequisitesofwork.

288

Arodwithtaperedhead,Turkish,coveringthebuildingareaand
asperengineerspecifications.Priceincludesprovidingthe
earthing.
8.16 Supplyofmaterialsandfixingacompletebellpoint.
8.17 Supplyandinstallationoffirealarmsystem,asperengineering
specifications,asperfollowing:
A)Fireindicators,9Zone
B)Smokedetectors
C)Bell
D)Brakingtheglass

12 Storey building, Type C project in Baghdad

GTS/1993)andasperthedirectivesofthesupervisingengineering.

plansandbillsofquantities.
ngforcables,NYYtype.
rvisingengineerandresidentengineerdepartmentaftercompletionofworks.
neering-withtwoparts,firstandsecond,andalsotheconditionsofelectricalandmechanicalworks.

Price US$ Amount

tic pipes and the cost will include

ad

Bill of Quantities, Building A, Al-Zafarania Project, 15 Stories X 4 Flats (With an A

1.AllSectionsinthebillsofquantitiespertaintosupplyandtransportofmaterials,worksandfixation,testingandop
2.Allmaterialsorworksshouldconformtothegeneraltechnicalspecifications.Theyaresubjecttotheapprovalofth
3.Thecontractorshouldappointspecialistengineertosupervisework.
4.Contractorshouldtakestepstoensuresafetyofareasadjacenttotheworkandshouldnotinterrupt/damageanyser
5.ContractorshouldcleanuptherubblestooutsidethesiteandinareaspermittedbytheMunicipality.
6.Allquantitiesaresubjecttoincreaseordecreaseandtheywouldpreciselybedeterminedasperthesitecapacity/req
7.Contractorshouldsubmitexecutiveplansofallnecessaryworksandasperdirectiveoftheconsultanttoobtainapp
8.Useofanti-salinecementforallconcreteworksbelowhumidityresistantlevel.
9.Allironworksshouldbepaintedwithananti-rustcoatbeforefixingandafterthatoilpointshouldprecede.
10.Contractorshouldsubmitcataloguesofallmachineriesandequipmentswhichwouldbeusedforallspecialization
11.Oncompletionofworks,thecontractorwouldsubmitcolourplansofalltheworksexecuted/ascompleted.

S.No.

Details

Unity

Shedule1, Works for preparing the site

Schedule 2, Earth works

Observation: Level of road will be taken as 0.0 and level for finishing the building f
directives
of the consultant engineer
Supplyofmaterialsandequipmentsforprotectionofworks,
Total
networksofobviousandunderneathservices,alsopropertiesof
materialsandmachineriesforprotection,lightingguidance
signsasperlawsandinstructions.Contractorshouldcoordinate
hisworkswithotherdepartmentsandsectionswithregardto
theexistingserviceswithconcernedauthoritiesresponsiblefor
them.Contractorwillbearresponsibilityofanydamages/harms
thathemaycausetothenetworkofobviousandunderneath
services.

Supplyofmaterialsandcarryingouttheworksofcleaning,
preparingandamendingsiteplanwiththeremovalofupper
layerofsoilandtransportingittotheareaspermittedby
concernedauthorities.Theworkincludesremovalofall
obstructions.

Total

1 Contractorshouldcompleteallworksasperdimensions
indicatedinplanandaspertechnicalspecificationsofwork.
Coastwillincludechargesforequipmentsandmachines
contractorrequiresfortheexecutionofworkwithremovalof
accesssoilresultingformworkwhichcannotbeusedatthe
worksiteandtransportthemtotheplacesapprovedby
concernedauthoritiesandasperguidanceofresidentengineer,
andprovidesupporttothesidesofexcavationincaseof
necessity.Theworkwillalsoincludeallfieldandlaboratory
testsasperspecifications.Earthworkswillbeprovidedfrom
thepull-outsmeantfortests.

a)

1 Earth Excavations
Excavationsuntilthefinallevelwithdepthnotlessthen2mtr., m3
includedinprice.Thesidesupportforthesoilreducingground
waterleveliffound,andallthatisrequiredforworktoprepared
thematbase,inkeepingwithplansandtechnicalspecifications,
includedinthepricefillinguparoundfoundationswithgood
rollingofthefoundationsfloorstillthedensityrequiredin
plans.

2 Pebbles
Supplyofnecessaryequipmenttospreadtheprimarylayersof m2
boulders,thickness25cm,withasperincloseplans,properly
rollingasperdirectivesofsupervisingengineerandengineering
specifications.

Supply of necessary equipment to spread a layer of plaster,m3


thickness0.5m,typeB,withCalifornianstrengthnotlessthen
35% under the mat base of the building with sprinkling and
goodrollingtillreachingthelevelofrollingnotlessthen95%
and on the levels of the thickness of one layer not less then
25cm, as per enclosed plans and directives of supervising
engineerandengineeringspecifications.

b)

PesticidesTreatment:TheworkincludessupplyofDoorspanor Total
choloridene,mixingitwithwaterandsprinklingwiththeratio
of10ltd./m2underthefloors,sidesoffoundations,under
pathwaysandalltheplacespestscouldpenetratefromtothe
inside,oranymaterialwithsimilarefficacyasperthe
instructionofthecompany.

Schedule 3, concrete works


1 Alltheworkswillbedoneaspertechnicalspecifications,
dimensionsandformsgiveninplans,thecoastwillincludeall
materialsrequiredinthework,machinery,equipment,molds
andadditionalmaterialsasperinstructionsofsupervising
engineer.
2 Anti-salinecementwillbeusedforalltheworks,belowanti
humiditylevel.Reinforcementwillbedoneasperconstruction
plansandinstructionofsupervisingengineer.
3 Priceofsectionspertainingtoconcretewillincludeall
necessarytestsasprovidedinthecontract.
4 Contractorshouldsubmitsamplesofallmaterialsmeanttobe
supplied,forapprovalbeforesupply
Lean concrete, strength 15 mica pascal
A
Non-reinforcedconcretestrength15n/mm2usinganti-saline
cement,theworkwillincludemixingantihumiditychemicalas
perdirectiveofthemanufacturingcompany,andtechnical
specifications.
-AntihumiditylayerDPC,dimensions240X150mmforthe
wallsofthebuilding.

MT
B

Leanconcreteundermatbaseusinganti-salinecementthickness100mm.

m2

Reinforce concrete, strength 25 mica pascal


B
Reinforcedconcreteusingnormalcementforbridges.

m3

m3

Reinforcedconcreteusingnormalcementstaircasesandcoat
yards.

Reinforcedconcreteforceilingsofallfloorsusingnormal
cement,thickness200mm.

m3

Reinforcedconcreteusingnormalcementforscreensand
refractors,thickness200mm,height120cm.

m3

Reinforce concrete, strength 35 mica pascal


A
Reinforcedconcreteusinganti-salinecementforfoundationsof m3
allthebuildingsincludingthepriceofacoatwithtar(30-20,
externally).
Reinforcedconcreteusingnormalcement,workincludesall
m3
worksofmold,reinforcementironforpillars,wallsandwallsof
lifts,coastincludesacoatoftar(30-20externallyandall
concretepartstouchingsoil.
Schedule 4, Constructions Works
Allworkswillbedoneinkeepingwithdimensionsindicatedin
plansandaspertechnicalspecificationsandinstructionsof
supervisingengineer.
1 Costincludessupplyofallnecessarymaterialsforthework,it
alsoincludestools,equipmentandscaffoldingrequiredby
contractorforexecutionofwork.
2 Completedworkswillbeencircledwithconstructioninblocks
asperindicateddimensions.
3 Coastwillincludesectionsallnecessarytestsofmaterials.
4 Contractorshouldsubmitsamplesofallmaterialsmeanttobe
supplied,forapprovalbeforesupply.
Brick work 24X12X8cm using cement mortar1:3, as per dimensions indicated and plans.
A
Constructionwithsolidblocks40X20X15cmbelowantim3
humiditylevelforallfloorsandasperdimensionsindicatedin
plans,usingnormalcementwiththethicknessof24cmfor
walls.
B

Constructionwithbricks24X12X8cmaboveanti-humiditylevelm2
forallfloorsandasperdimensionsindicatedinplans,using
normalcementandwiththickness12cmforinternal
intersectionsofbathsandbathconveniences.

Schedule 5, finishing works

1 Allworkswillbedoneinkeepingwithspecificationsand
samplesapprovedbysupervisingengineer.
2 Coastwillincludeworksofplasteretc.fixingmetalin
areasofjoiningblockwallswithpillarsandconcretebridges
(beams)forplasterandalsoclosingallelectricalpipepassages
orsanitarypipes,iffound,withmetalclutchesandcement-sand
mortarwithproperlysprinklingwaterandsprinklingallwalls
andceilingswithcementmortarbeforestartingplasterworks.

3 Coastincludesallsectionsfornecessarytestsforallmaterials.
4 Contractorshouldsubmitsamplesofallmaterialsmeanttobe
supplied,forapprovalbeforesupply.
POP plaster
A

Supplyofmaterialsandplasteringinternalwallsandceilings
withPOPusing..,coastwillinclude.
-Soakingwithcementmortar,ratio1:1.
-LayerofnormalPOPwiththicknessnotlessthen2cmusing
-layeroftechnicalPOP(fermented)forlastlayer.

m2

Emollient with cement material


A
Supplyofmaterialsincludesworkforprovidingalayerofsoft m2
emollientforexternalwallsandscreensfrominside,external
ceilingsandforplacesindicatedinplansusingrulers,coast
includesshockingwithcementmortar1:1.
Paint
A

Wrap-up works

Supplyofmaterialsandplasticpaint,3layersofinternaland
externalwalls,andinternalandexternalceilingsasperplans
andtechnicalspecifications

m2

Supplyofmaterialsandcarryingoutwrap-upwithceramic,
m2
IranianorTurkishonly,cement-sand(3:1)mortarwithsoaking
asperplansandtechnicalspecificationsinthewallsof
bathroomsandkitchens
Schedule 6, metal works
1 Metalworkswillbedoneinkeepingwithplansandtechnical
specifications.
2 Samplesofallironworkssectionswillbemadetopresentthem
tosupervisingengineer,beforestartofwork.
3 Costincludesallnecessarymaterialstoworkswitchlock,
handlesetc.andglass,thickness4cmforthespacesnotless
then0.5mtr.sq.andthickness6mmforthespacesnot
exceeding0.5m2andanti-flynetsforthemoving.
4 Locationalspotdimensionswillbetakenforconfirmingthe
preparationandtoworkaccordingly.
5 Costofsection,anti-rustpaintonelayerforallironworksis
included,alsooilpaint,threelayers.
6 Supplyofdoorswithswitchkeys,threeforeachdoor.
Metal works
Windows and Doors PVC
PVCwindowsanddoublenormalglass,thickness,6mm,with
anti-flynetwiththeremobileframes,asperplansandtechnical
specifications.
-Windows,dimensions1.5X2m2
-Windows,dimensions1.5X1.5m2
-Windowsdimensions0.5X0.5m2
-Windowsdimensions1.5X1m2
-Doordimensions2.0X1m2
-Doordimensions2.0X0.8m2

B-Irondoorswithframecapsplatefromtwosides,work
includesallrequirementsoffixingthem,locksofgoodforeign
quality(switchtype)handlesetc.andnormalglassof6mmas
perarchitecturalplansandtechnicalspecifications.

m2
m2
m2
m2
No.
No.

-Maingate,dimensions2.4X2m2
-Gate,dimensions2.0X1m2

No.
No.

C- Fencingworks:Supplyofmaterialsandworksto
manufacturefencesofgalleonsteel,asperdirectivesof
supervisingengineer.
-Atthealleviations,heightof600mm
MT
-Supplyofmaterialsandworkinginternalfencingforstaircase,MT
height850mm,asperplanandtechnicalspecifications.

3 Costincludesallnecessarymaterialsforworkincludingswitch
lockshandlesetc.
4 Cost of the section includes paint in Supertwo Demloc, three
coats.
Doors with white wood structure with two layer compression,
oneofthemthinironsheetandtheotheristheusualybackone,
fromtwosides,thickness3mmforonelayerwithframeofteak
wood.TheworksalsoincludespaintwithSupertwoDemlocin
threecoatswithalltherequirementoffixingthemandlocksof
switchtypewithhandlesetc.andusualglassofthickness6mm,
asperarchitecturalplansandtechnicalspecifications.

a.Door,dimensions1X2.0m2

Schedule 8, leveling works

No.

1 Theworkswillbedoneinkeepingwithplans,technical
specificationsanddirectivesofsupervisingengineer.
2 Requiredcolours,notspecifiedinplansorthelists,willbe
determinedbysupervisingengineer.
3 Contractorwillsubmitsamplesforapprovalbeforeexecuting
works.
4 Theyshouldsucceedsinlaboratorytests.
a)Supplyofmaterialsandworkfor
M2
levelingfloorswithporcelene,40X40cm,
IranianorTurkishonly,withthehelpof
cementplussandmortaronalayerofloose
concrete,costincludesporingoflayerfor
thegroundfloorasperdirectivesof
supervisingengineer.

b)Baysandstairs30X120cm

No.

c)Supplyofmaterialsandfixingofmarble MT
skirtingusingcement+sandmortar,ratio
3:1,withsoakingandallthatisrequiredin
thework,dimensions10X40cm

d)Supplyofmaterialsandworkforthe
m2
levelingofbathfloorswithceramic,Iranian
orTurkishonly,usingcement+Sandmortar
ratio1:3withsoakingofjointswithwhite
cementandasperdirectivesofsupervising
engineer.

Schedule 9, Secondary Ceilings


1 Samplesanddimensionswillbeselectedbysupervising
engineer,asperplans.
2 Costwillincludepaintofsecondaryceilingwithrequired
paints.

B.Supplyofmaterialsandmakingsecondaryceilingsofgood m2
qualityinregulardimensionsusingplasticboard,asperplans,
costincludesallmetalstructurescarryingthem.Andalso
accessoriesforfixing,wrappingandpaintingthem,asperplans
andtechnicalspecifications.

Schedule 10, Roof Works and Extension Joint


1 Beforestartofworksforprotectionfromhumidity(antihumidityworks)theterraceswillcleanedupproperly.
2 Workincludesallmaterialsandtoolsrequiredforthework,as
pertechnicalspecifications.
3 Italsoincludesnecessarysuccessfultests.
Surfacing of Terraces
Spreading first layer of flincoat tar material (prim coat), thenm2
spreadingalayerofmembraneof4mmthickness,(bituminous
water proof membrane), stenthing by plastic fibers, ensuring
inter-twin of 10cm between sections while fixing, using hotweldthenplacingalayerofnylonofmembranethenalayerof
stir-pour (thermalinsulation), thickness5cm,density 35kg/m3,
then undertaking the works of leveling with Cashy Mozaneek
using cement + sand mortar and also providing appropriate
depression(1%)towardstheopeningfordrainageofrainwater
close to the outlet, thickness should not be less then 8cm, and
the cost includes making extension joint for every 3X3m, for
the entire terrace space and filling those joints with poly
sulphide, properly and it should succeed laboratory tests. Cost
includestakingupperipheriesandmakingconcertskirting,as
perplansandtechnicalspecifications.

Schedule 11, Works of Passages/ Pathways


Works of passages:
A.
Supplyofmaterialsandworksformakingpassagesaroundthe
buildingsasperfollowingspecifications:

-Excavationofthefoundationofsupportwallsforwalk,width
40cmanddepthof60cm.
-Spreadingofpebblesthickness20cm,togetherwiththe
sprinklingwithwaterandproperrolling.
-Poringoffoundation,thickness20cm,width40cm,usingantisalinecementC20.
-Constructionwithsolidblocks,width20cm,usingcement
+sandmortar(3:1ratio)togetherwithwaxing,heightvarying,
asperlevelsindicatedinthearchitecturalplans.
-Soillevelingtogetherwithspreadofalayerofpebbles,20cm,
sprinklingandproperrollingoftheareacoveredbetweenthe
sportwallandedgeofthebuilding.
-Poringofpathway,usingpolishedconcreteof10cmthickness, m2
C20andwidthof1mtr.,usinganti-salinecementalsomaking
jointsofextensionforeverytwosq.mtr.,inlengththenfilling
thejointswiththecementmortarandsprinklingpesticides
belowtheporinglevelasperdirectivesofsupervisingengineer.

Total of estimated cost of construction works.

Flats (With an Area of 200sq. Meters Each Flat)

ixation,testingandoperation,andasperdirectivesoftheconsultant.
cttotheapprovaloftheconsultantbeforesupplyorexecutionandallsamplesshouldbedeliveredofficiallytotheresidentengin

errupt/damageanyservicenetworks.

erthesitecapacity/requirement.
onsultanttoobtainapprovalfromhim.

houldprecede.
dforallspecializations.
d/ascompleted.

Quantity

Price IQD Amount


IQD

nishing the building floor will be as per


1

2350

9922
2.8.1
2.26.1
2.25

157.50
46.25
112.40
316.15
Add 14% 44.26
360.41
Add 25% 90.10
450.51
say
451.00

1200

13992
16.3.3
16.4

1354.00
425.05
1779.05
Add 14% 249.07
2028.12
Add 25% 507.03
2535.15
say
636

600

15048

2481.6

380
1200

600
60

14740

2595
33

1750

1125

3200

5400

22993

8140

38600

6471

180
810
45
111
195
180

1
16

158
85

420

10665

240
8644

780

9800

875

146

ficiallytotheresidentengineerandhisformalapprovalshouldbeobtained.

Bill of Quantities, Building B, Al-Zafarania Project, 12 Stories X 4 Flats (With an A

1.AllSectionsinthebillsofquantitiespertaintosupplyandtransportofmaterials,worksandfixation,testingandop
2.Allmaterialsorworksshouldconformtothegeneraltechnicalspecifications.Theyaresubjecttotheapprovalofth
3.Thecontractorshouldappointspecialistengineertosupervisework.
4.Contractorshouldtakestepstoensuresafetyofareasadjacenttotheworkandshouldnotinterrupt/damageanyser
5.ContractorshouldcleanuptherubblestooutsidethesiteandinareaspermittedbytheMunicipality.
6.Allquantitiesaresubjecttoincreaseordecreaseandtheywouldpreciselybedeterminedasperthesitecapacity/req
7.Contractorshouldsubmitexecutiveplansofallnecessaryworksandasperdirectiveoftheconsultanttoobtainapp
8.Useofanti-salinecementforallconcreteworksbelowhumidityresistantlevel.
9.Allironworksshouldbepaintedwithananti-rustcoatbeforefixingandafterthatoilpointshouldprecede.
10.Contractorshouldsubmitcataloguesofallmachineriesandequipmentswhichwouldbeusedforallspecialization
11.Oncompletionofworks,thecontractorwouldsubmitcolourplansofalltheworksexecuted/ascompleted.

S.No.

Details
Shedule1, works for preparing the site

Observation: Level of road will be taken as 0.0 and level for finishing the building floor will
Supplyofmaterialsandequipmentsforprotectionofworks,networks
ofobviousandunderneathservices,alsopropertiesofmaterialsand
machineriesforprotection,lightingguidancesignsasperlawsand
instructions.Contractorshouldcoordinatehisworkswithother
departmentsandsectionswithregardtotheexistingserviceswith
concernedauthoritiesresponsibleforthem.Contractorwillbear
responsibilityofanydamages/harmsthathemaycausetothenetwork
ofobviousandunderneathservices.

Supplyofmaterialsandcarryingouttheworksofcleaning,preparing
andamendingsiteplanwiththeremovalofupperlayerofsoiland
transportingittotheareaspermittedbyconcernedauthorities.The
workincludesremovalofallobstructions.

Schedule 2, Earth works

1 Contractorshouldcompleteallworksasperdimensionsindicatedin
planandaspertechnicalspecificationsofwork.Coastwillinclude
chargesforequipmentsandmachinescontractorrequiresforthe
executionofworkwithremovalofaccesssoilresultingformwork
whichcannotbeusedattheworksiteandtransportthemtotheplaces
approvedbyconcernedauthoritiesandasperguidanceofresident
engineer,andprovidesupporttothesidesofexcavationincaseof
necessity.Theworkwillalsoincludeallfieldandlaboratorytestsasper
specifications.Earthworkswillbeprovidedfromthepull-outsmeant
fortests.

1 Earth Excavations
Excavationsuntilthefinallevelwithdepthnotlessthen2mtr.,included
inprice.Thesidesupportforthesoilreducinggroundwaterlevelif
found,andallthatisrequiredforworktopreparedthematbase,in
keepingwithplansandtechnicalspecifications,includedintheprice
fillinguparoundfoundationswithgoodrollingofthefoundations
floorstillthedensityrequiredinplans.

2 Pebbles
Supplyofnecessaryequipmenttospreadtheprimarylayersofboulders,
thickness25cm,withasperincloseplans,properlyrollingasper
directivesofsupervisingengineerandengineeringspecifications.

a)

Supply of necessary equipment to spread a layer of plaster, thickness


0.5m,typeB,withCalifornianstrengthnotlessthen35%underthemat
base of the building with sprinkling and good rolling till reaching the
levelofrollingnotlessthen95%andonthelevelsofthethicknessof
one layer not less then 25cm, as per enclosed plans and directives of
supervisingengineerandengineeringspecifications.

b)

PesticidesTreatment:TheworkincludessupplyofDoorspanor
choloridene,mixingitwithwaterandsprinklingwiththeratioof10
ltd./mtr.sq.underthefloors,sidesoffoundations,underpathwaysand
alltheplacespestscouldpenetratefromtotheinside,oranymaterial
withsimilarefficacyaspertheinstructionofthecompany.

Schedule 3, concrete works

1 Alltheworkswillbedoneaspertechnicalspecifications,dimensions
andformsgiveninplans,thecoastwillincludeallmaterialsrequiredin
thework,machinery,equipment,moldsandadditionalmaterialsasper
instructionsofsupervisingengineer.
2 Anti-salinecementwillbeusedforalltheworks,belowantihumidity
level.Reinforcementwillbedoneasperconstructionplansand
instructionofsupervisingengineer.
3 Priceofsectionspertainingtoconcretewillincludeallnecessarytests
asprovidedinthecontract.
4 Contractorshouldsubmitsamplesofallmaterialsmeanttobesupplied,
forapprovalbeforesupply
Lean concrete, strength 15 mica pascal
A
Non-reinforcedconcretestrength15n/mm2usinganti-salinecement,
theworkwillincludemixingantihumiditychemicalasperdirectiveof
themanufacturingcompany,andtechnicalspecifications.
-AntihumiditylayerDPC,dimensions200X150mmforthewallsof
thebuilding.

Leanconcreteundermatbaseusinganti-salinecement-thickness
100mm.

Reinforce concrete, strength 25 mica pascal


B
Reinforcedconcreteusingnormalcementforbridges.
C
Reinforcedconcreteusingnormalcementstaircasesandcoatyards.
D

Reinforcedconcreteforceilingsofallfloorsusingnormalcement,
thickness200mm.

Reinforcedconcreteusingnormalcementforscreensandrefractors,
thickness200mm,height120cm.

Reinforce concrete, strength 35 mica pascal


A
Reinforcedconcreteusinganti-salinecementforfoundationsofallthe
buildingsincludingthepriceofacoatwithtar(30-20,externally).

Reinforcedconcreteusingnormalcement,workincludesallworksof
mold,reinforcementironforpillars,wallsandwallsoflifts,coast
includesacoatoftar(30-20externallyandallconcretepartstouching
soil.
Schedule for, constructions works
Allworkswillbedoneinkeepingwithdimensionsindicatedinplans
andaspertechnicalspecificationsandinstructionsofsupervising
engineer.
1 Costincludessupplyofallnecessarymaterialsforthework,italso
includestools,equipmentandscaffoldingrequiredbycontractorfor
executionofwork.
2 Completedworkswillbeencircledwithconstructioninblocksasper
indicateddimensions.
3 Coastwillincludesectionsallnecessarytestsofmaterials.
4 Contractorshouldsubmitsamplesofallmaterialsmeanttobesupplied,
forapprovalbeforesupply.
Brick work 24X12X8cm using cement mortar1:3, as per dimensions indicated and plans.
A
Constructionwithsolidblocks40X20X15cmbelowanti-humiditylevel
forallfloorsandasperdimensionsindicatedinplans,usingnormal
cementwiththethicknessof24cmforwalls.
B

Constructionwithbricks24X12X8cmaboveanti-humiditylevelforall
floorsandasperdimensionsindicatedinplans,usingnormalcement
andwiththickness12cmforinternalintersectionsofbathsandbath
conveniences.

Schedule 5, finishing works


1 Allworkswillbedoneinkeepingwithspecificationsandsamples
approvedbysupervisingengineer.
2 Coastwillincludeworksofplasteretc.fixingmetalinareasof
joiningblockwallswithpillarsandconcretebridges(beams)forplaster
andalsoclosingallelectricalpipepassagesorsanitarypipes,iffound,
withmetalclutchesandcement-sandmortarwithproperlysprinkling
waterandsprinklingallwallsandceilingswithcementmortarbefore
startingplasterworks.

3 Coastincludesallsectionsfornecessarytestsforallmaterials.

4 Contractorshouldsubmitsamplesofallmaterialsmeanttobesupplied,
forapprovalbeforesupply.
POP plaster
A

SupplyofmaterialsandplasteringinternalwallsandceilingswithPOP
using..,coastwillinclude.
-Soakingwithcementmortar,ratio1:1.
-LayerofnormalPOPwiththicknessnotlessthen2cmusing
-layeroftechnicalPOP(fomented)forlastlayer.

Emollient with cement material


A
Supplyofmaterialsincludesworkforprovidingalayerofsoft
emollientforexternalwallsandscreensfrominside,externalceilings
andforplacesindicatedinplansusingrulers,coastincludesshocking
withcementmortar1:1.
Paint
A

Supplyofmaterialsandplasticpaint,3layersofinternalandexternal
walls,andinternalandexternalceilingsasperplansandtechnical
specifications

Wrap-up works
Supplyofmaterialsandcarryingoutwrap-upwithceramic,Iranianor
Turkishonly,cement-sand(3:1)mortarwithsoakingasperplansand
technicalspecificationsinthewallsofbathroomsandkitchens
Schedule 6, metal works
1 Metalworkswillbedoneinkeepingwithplansandtechnical
specifications.
2 Samplesofallironworkssectionswillbemadetopresentthemto
supervisingengineer,beforestartofwork.
3 Costincludesallnecessarymaterialstoworkswitchlock,handlesetc.
andglass,thickness4cmforthespacesnotlessthen0.5mtr.sq.and
thickness6mmforthespacesnotexceeding0.5m2andanti-flynetsfor
themoving.
4 Locationalspotdimensionswillbetakenforconfirmingthepreparation
andtoworkaccordingly.
5 Costofsection,anti-rustpaintonelayerforallironworksisincluded,
alsooilpaint,threelayers.
6 Supplyofdoorswithswitchkeys,threeforeachdoor.

Metal works
Windows and Doors PVC
PVCwindowsanddoublenormalglass,thickness,6mm,withanti-fly
netwiththeremobileframes,asperplansandtechnicalspecifications.
-Windows,dimensions1.5X1.5m2
-Windows,dimensions1.5X2m2
-Windowsdimensions1.5X1m2
-Windowsdimensions0.5X0.5m2
-Doordimensions2.0X0.8m2
-Doordimensions2.0X1m2

B-Irondoorswithframecapsplatefromtwosides,workincludesall
requirementsoffixingthem,locksofgoodforeignquality(switchtype)
handlesetc.andnormalglassof6mmasperarchitecturalplansand
technicalspecifications.

-Maingate,dimensions2.4X2m2
-Gate,dimensions1X2m2

C- Fencingworks:Supplyofmaterialsandworkstomanufacture
fencesofgalleonsteel,asperdirectivesofsupervisingengineer.
-Atthealleviations,heightof600mm
-Supplyofmaterialsandworkinginternalfencingforstaircase,height
850mm,asperplanandtechnicalspecifications.

3 Costincludesallnecessarymaterialsforworkincludingswitchlocks
handlesetc.
4 Cost of the section includes paint in Supertwo Demloc, three coats.

Doors with white wood structure with two layer compression, one of
them thin iron sheet and the other is the usualy back one, from two
sides,thickness3mmforonelayerwithframeofteakwood.Theworks
also includes paint with Supertwo Demloc in three coats with all the
requirementoffixing them andlocksof switchtype with handlesetc.
and usual glass of thickness 6mm, as per architectural plans and
technicalspecifications.

a.Door,dimensions1X2.0

Schedule 8, leveling works


1 Theworkswillbedoneinkeepingwithplans,technicalspecifications
anddirectivesofsupervisingengineer.
2 Requiredcolours,notspecifiedinplansorthelists,willbedetermined
bysupervisingengineer.
3 Contractorwillsubmitsamplesforapprovalbeforeexecutingworks.
4 Theyshouldsucceedsinlaboratorytests.
a)Supplyofmaterialsandworkforlevelingfloors
withporcelene,40X40cm,IranianorTurkishonly,
withthehelpofcementplussandmortaronalayer
oflooseconcrete,costincludesporingoflayerfor
thegroundfloorasperdirectivesofsupervising
engineer.

b)Baysandstairs30X120cm
c)Supplyofmaterialsandfixingofmarble
skirtingusingcement+sandmortar,ratio3:1,with
soakingandallthatisrequiredinthework,
dimensions10X40cm

d)Supplyofmaterialsandworkforthelevelingof
bathfloorswithceramic,IranianorTurkishonly,
usingcement+Sandmortarratio1:3withsoakingof
jointswithwhitecementandasperdirectivesof
supervisingengineer.

Schedule 9, Secondary Ceilings


1 Samplesanddimensionswillbeselectedbysupervisingengineer,as
perplans.
2 Costwillincludepaintofsecondaryceilingwithrequiredpaints.

B.Supplyofmaterialsandmakingsecondaryceilingsofgoodquality
inregulardimensionsusingplasticboard,asperplans,costincludesall
metalstructurescarryingthem.Andalsoaccessoriesforfixing,
wrappingandpaintingthem,asperplansandtechnicalspecifications.

Schedule 10, Roof Works and Extension Joint


1 Beforestartofworksforprotectionfromhumidity(anti-humidity
works)theterraceswillcleanedupproperly.
2 Workincludesallmaterialsandtoolsrequiredforthework,asper
technicalspecifications.
3 Italsoincludesnecessarysuccessfultests.
Surfacing of Terraces

Spreadingfirstlayerofflincoattarmaterial(primcoat),thenspreading
a layer of membrane of 4mm thickness, (bituminous water proof
membrane), stenthing by plastic fibers, ensuring inter-twin of 10cm
between sections while fixing, using hot-weld then placing a layer of
nylon of membrane then a layer of stir-pour (thermal insulation),
thickness5cm,density35kg/m3,thenundertakingtheworksofleveling
withCashyMozaneekusingcement+sandmortarandalsoproviding
appropriate depression (1%) towards the opening for drainage of rain
waterclosetotheoutlet,thicknessshouldnotbelessthen8cm,andthe
cost includes making extension joint for every 3X3m, for the entire
terracespaceandfillingthosejointswithpolysulphide,properlyandit
shouldsucceedlaboratorytests.Costincludestakingupperipheriesand
makingconcertskirting,asperplansandtechnicalspecifications.

Schedule 11, Works of Passages/ Pathways


Works of passages:
A.
Supplyofmaterialsandworksformakingpassagesaroundthe
buildingsasperfollowingspecifications:
-Excavationofthefoundationofsupportwallsforwalk,width40cm
anddepthof60cm.
-Spreadingofpebblesthickness20cm,togetherwiththesprinkling
withwaterandproperrolling.
-Poringoffoundation,thickness20cm,width40cm,usinganti-saline
cementC20.
-Constructionwithsolidblocks,width20cm,usingcement+sand
mortar(3:1ratio)togetherwithwaxing,heightvarying,asperlevels
indicatedinthearchitecturalplans.
-Soillevelingtogetherwithspreadofalayerofpebbles,20cm,
sprinklingandproperrollingoftheareacoveredbetweenthesportwall
andedgeofthebuilding.
-Poringofpathway,usingpolishedconcreteof10cmthickness,C20
andwidthof1mtr.,usinganti-salinecementalsomakingjointsof
extensionforeverytwosq.mtr.,inlengththenfillingthejointswiththe
cementmortarandsprinklingpesticidesbelowtheporinglevelasper
directivesofsupervisingengineer.

Total of estimated cost of construction works.

ories X 4 Flats (With an Area of 150sq. Meters Each Flat)

s,worksandfixation,testingandoperation,andasperdirectivesoftheconsultant.
Theyaresubjecttotheapprovaloftheconsultantbeforesupplyorexecutionandallsamplesshouldbedeliveredofficiallytothe

shouldnotinterrupt/damageanyservicenetworks.
dbytheMunicipality.
eterminedasperthesitecapacity/requirement.
ectiveoftheconsultanttoobtainapprovalfromhim.

hatoilpointshouldprecede.
hwouldbeusedforallspecializations.
worksexecuted/ascompleted.

Unity

Quantity

Price IQD

Amount IQD

or finishing the building floor will be as per directives of the consultant engineer
Total
1

Total

1,000,000.00

500,000.00

m3

1800

7,200,000.00

Sq.Mtr.

900

18,000,000.00

m3

450

9,000,000.00

1,000,000.00

Total

MT

310

5,580,000.00

Sq.Mtr.

900

18,000,000.00

m3
m3

390
40

163,800,000.00
12,000,000.00

m3

1615

503,880,000.00

m3

28

8,400,000.00

m3

1185

355,500,00.00

m3

865

311,400,000.00

d and plans.
m3

2050

348,500,000.00

m2

3360

604,800,000.00

m2

14903

178,836,000.00

m2

5621

67,452,000.00

m2

20350

61,050,000.00

m2

5200

104,000,000.00

m2
m2
m2
m2
No.
No.

563
148
162
36
144
144

76,005,000.00
26,640,000.00
14,580,000.00
540,000.00
17,280,000.00
21,600,000.00

No.
No.

1
13

360,000.00
1,950,000.00

MT
MT

386
70

11,580,000.00
2,450,000.00

No.

288

43,200,000.00

M2

6553

78,636,000.00

No.

192

5,760,000.00

MT

5108

30,648,000.00

m2

550

11,000,000.00

m2

6000

72,000,000.00

m2

670

20,100,000.00

m2

ated cost of construction works.

135

3,375,000.00

esshouldbedeliveredofficiallytotheresidentengineerandhisformalapprovalshouldbeobtained.

Bill of Quantities, Building C, Al-Zafarania Project, 12 Stories X 4 Flats (With an A


General observations

1.AllSectionsinthebillsofquantitiespertaintosupplyandtransportofmaterials,worksandfixation,testingandop
2.Allmaterialsorworksshouldconformtothegeneraltechnicalspecifications.Theyaresubjecttotheapprovalofth
3.Thecontractorshouldappointspecialistengineertosupervisework.
4.Contractorshouldtakestepstoensuresafetyofareasadjacenttotheworkandshouldnotinterrupt/damageanyser
5.ContractorshouldcleanuptherubblestooutsidethesiteandinareaspermittedbytheMunicipality.
6.Allquantitiesaresubjecttoincreaseordecreaseandtheywouldpreciselybedeterminedasperthesitecapacity/req
7.Contractorshouldsubmitexecutiveplansofallnecessaryworksandasperdirectiveoftheconsultanttoobtainapp
8.Useofanti-salinecementforallconcreteworksbelowhumidityresistantlevel.
9.Allironworksshouldbepaintedwithananti-rustcoatbeforefixingandafterthatoilpointshouldprecede.
10.Contractorshouldsubmitcataloguesofallmachineriesandequipmentswhichwouldbeusedforallspecialization
11.Oncompletionofworks,thecontractorwouldsubmitcolourplansofalltheworksexecuted/ascompleted.

S.No.

Details

Unity

Shedule1, works for preparing the site

Observation: Level of road will be taken as 0.0 and level for finishing the building floor will be as p
of
the consultant engineer
Supplyofmaterialsandequipmentsforprotectionofworks,
Total
networksofobviousandunderneathservices,alsopropertiesof
materialsandmachineriesforprotection,lighting,guidancesignsas
perlawsandinstructions.Contractorshouldcoordinatehisworks
withotherdepartmentsandsectionswithregardtotheexisting
serviceswithconcernedauthoritiesresponsibleforthem.Contractor
willbearresponsibilityofanydamages/harmsthathemaycauseto
thenetworkofobviousandunderneathservices.

Supplyofmaterialsandcarryingouttheworksofcleaning,
Total
preparingandamendingsiteplanwiththeremovalofupperlayerof
soilandtransportingittotheareaspermittedbyconcerned
authorities.Theworkincludesremovalofallobstructions.

Schedule 2, Earth works

1 Contractorshouldcompleteallworksasperdimensionsindicatedin
planandaspertechnicalspecificationsofwork.Coastwillinclude
chargesforequipmentsandmachinescontractorrequiresforthe
executionofworkwithremovalofaccesssoilresultingformwork
whichcannotbeusedattheworksiteandtransportthemtothe
placesapprovedbyconcernedauthoritiesandasperguidanceof
residentengineer,andprovidesupporttothesidesofexcavationin
caseofnecessity.Theworkwillalsoincludeallfieldandlaboratory
testsasperspecifications.Earthworkswillbeprovidedfromthe
pull-outsmeantfortests.

1 Earth Excavations
Excavationsuntilthefinallevelwithdepthnotlessthen2mtr.,
m3
includedinprice.Thesidesupportforthesoilreducingground
waterleveliffound,andallthatisrequiredforworktopreparedthe
matbase,inkeepingwithplansandtechnicalspecifications,
includedinthepricefillinguparoundfoundationswithgoodrolling
ofthefoundationsfloorstillthedensityrequiredinplans.

2 Pebbles
Supplyofnecessaryequipmenttospreadtheprimarylayersof
m2
boulders,thickness25cm,withasperincloseplans,properlyrolling
asperdirectivesofsupervisingengineerandengineering
specifications.

a)

Supplyofnecessaryequipmenttospreadalayerofplaster,thicknessm3
0.5m,typeB,withCalifornianstrengthnotlessthen35%underthe
mat base of the building with sprinkling and good rolling till
reachingthelevelofrollingnotlessthen95%andonthelevelsof
thethicknessofonelayernotlessthen25cm,asperenclosedplans
and directives of supervising engineer and engineering
specifications.

b)

PesticidesTreatment:TheworkincludessupplyofDoorspanor
Total
choloridene,mixingitwithwaterandsprinklingwiththeratioof10
liters./mtr.sq.underthefloors,sidesoffoundations,under
pathwaysandalltheplacespestscouldpenetratefromtotheinside,
oranymaterialwithsimilarefficacyaspertheinstructionofthe
company.

Schedule 3, Concrete Works


1 Alltheworkswillbedoneaspertechnicalspecifications,
dimensionsandformsgiveninplans,thecoastwillincludeall
materialsrequiredinthework,machinery,equipment,moldsand
additionalmaterialsasperinstructionsofsupervisingengineer.
2 Anti-salinecementwillbeusedforalltheworks,belowanti
humiditylevel.Reinforcementwillbedoneasperconstruction
plansandinstructionofsupervisingengineer.
3 Priceofsectionspertainingtoconcretewillincludeallnecessary
testsasprovidedinthecontract.
4 Contractorshouldsubmitsamplesofallmaterialsmeanttobe
supplied,forapprovalbeforesupply
Lean concrete, strength 15 mica pascal
A
Non-reinforcedconcretestrength15n/mm2usinganti-salinecement,
theworkwillincludemixingantihumiditychemicalasperdirective
ofthemanufacturingcompany,andtechnicalspecifications.
-AntihumiditylayerDPC,dimensions240X150mmforthewallsof
thebuilding.

MT
B

Leanconcreteundermatbaseusinganti-salinecement-thickness
100mm.

m2

Reinforce concrete, strength 25 mica pascal


B
Reinforcedconcreteusingnormalcementforbridges.

m3

Reinforcedconcreteusingnormalcementstaircasebaysandcoat
yards.

m3

Reinforcedconcreteforceilingsofallfloorsusingnormalcement, m3
thickness200mm.

Reinforcedconcreteusingnormalcementforscreensandrefractors, m3
thickness200mm,height120cm.

Reinforce concrete, strength 35 mica pascal


A
Reinforcedconcreteusinganti-salinecementforfoundationsofall m3
thebuildingsincludingthepriceofacoatwithtar(30-20,
externally).

Reinforcedconcreteusingnormalcement,workincludesallmold m3
works,reinforcementironforpillars,wallsandwallsoflifts,coast
includesacoatoftar(30-20externallyandallconcreteparts
touchingsoil.
Schedule 4, Constructions Works
Allworkswillbedoneinkeepingwithdimensionsindicatedin
plansandaspertechnicalspecificationsandinstructionsof
supervisingengineer.
1 Costincludessupplyofallnecessarymaterialsforthework,italso
includestools,equipmentandscaffoldingrequiredbycontractorfor
executionofwork.
2 Completedworkswillbeencircledwithconstructioninblocksas
perindicateddimensions.
3 Coastwillincludesectionsallnecessarytestsofmaterials.
4 Contractorshouldsubmitsamplesofallmaterialsmeanttobe
supplied,forapprovalbeforesupply.
Brick work 24X12X8cm using cement mortar1:3, as per dimensions indicated and plans.
A
Constructionwithsolidblocks40X20X15cmbelowanti-humidity m3
levelforallfloorsandasperdimensionsindicatedinplans,using
normalcementwiththethicknessof24cmforwalls.
B

Constructionwithbricks24X12X8cmaboveanti-humiditylevelfor m2
allfloorsandasperdimensionsindicatedinplans,usingnormal
cementandwiththickness12cmforinternalintersectionsofbaths
andbathconveniences.

Schedule 5, Finishing works


1 Allworkswillbedoneinkeepingwithspecificationsandsamples
approvedbysupervisingengineer.
2 Coastwillincludeworksofplasteretc.fixingmetalinareasof
joiningblockwallswithpillarsandconcretebridges(beams)for
plasterandalsoclosingallelectricalpipepassagesorsanitarypipes,
iffound,withmetalclutchesandcement-sandmortarwithproperly
sprinklingwaterandsprinklingallwallsandceilingswithcement
mortarbeforestartingplasterworks.

3 Coastincludesallsectionsfornecessarytestsforallmaterials.

4 Contractorshouldsubmitsamplesofallmaterialsmeanttobe
supplied,forapprovalbeforesupply.
POP plaster
A
Supplyofmaterialsandplasteringinternalwallsandceilingswith
POPusing..,coastwillinclude.
-Soakingwithcementmortar,ratio1:1.
-LayerofnormalPOPwiththicknessnotlessthen2cmusingrulers
-layeroftechnicalPOP(fermented)forlastlayer.
m2
Emollient with Cement material
A
Supplyofmaterialsincludesworkforprovidingalayerofsoft
m2
emollientforexternalwallsandscreensfrominside,external
ceilingsandforplacesindicatedinplansusingrulers,coastincludes
shockingwithcementmortar1:1.
Paint
A

Supplyofmaterialsandplasticpaint,3layersofinternaland
externalwalls,andinternalandexternalceilingsasperplansand
technicalspecifications

m2

Wrap-up works
Supplyofmaterialsandcarryingoutwrap-upwithceramic,Iranian m2
orTurkishonly,cement-sand(3:1)mortarwithsoakingasperplans
andtechnicalspecificationsinthewallsofbathroomsandkitchens
Schedule 6, metal works
1 Metalworkswillbedoneinkeepingwithplansandtechnical
specifications.
2 Samplesofallironworkssectionswillbemadetopresentthemto
supervisingengineer,beforestartofwork.
3 Costincludesallnecessarymaterialstoworkswitchlock,handles
etc.andglass,thickness4cmforthespacesnotlessthen0.5mtr.sq.
andthickness6mmforthespacesnotexceeding0.5m2andanti-fly
netsforthemoving.
4 Locationalspotdimensionswillbetakenforconfirmingthe
preparationandtoworkaccordingly.
5 Costofsection,anti-rustpaintonelayerforallironworksis
included,alsooilpaint,threelayers.

6 Supplyofdoorswithswitchkeys,threeforeachdoor.
Metal works
PVC Windows/Doors
PVCwindowsanddoublenormalglass,thickness,6mm,withantiflynetwiththeremobilepartsofdoor/frames,asperplansand
technicalspecifications.
-Windows,dimensions1.5X2m2
-Windows,dimensions1.5X1.5m2
-Windowsdimensions0.5X0.5m2
-Windowsdimensions1.5X1m2
-Gate/Doordimensions2.0X1m2
-Gate/Doordimensions2.0X0.8m2

m2
m2
m2
m2
No.
No.

B-Irondoorswithframecapsplatefromtwosides,workincludes
allrequirementsoffixingthem,locksofgoodforeignquality
(switchtype)handlesetc.andnormalglassof6mmasper
architecturalplansandtechnicalspecifications.

-Maingate,dimensions2.4X2m2
-Gate,dimensions1X2m2

No.
No.

C- Fencingworks:Supplyofmaterialsandworkstomanufacture
fencesofgalleonsteel,asperdirectivesofsupervisingengineer.
-Atalleviations,heightof600mm
MT
-Supply of materials and working internal fencing for stair case,MT
height850mm,asperplanandtechnicalspecifications.

1.Allwoodworkswillbecarriedoutasperplansandtechnicalspecifications.
2.Samplesofallwoodworkswillbemadeforpresentationtosupervisingengineer,beforestartofwork.
3.Costincludesallnecessarymaterialsforworkincludingswitchlocksandhandlesetc.

4.CostofthesectionincludespaintingSupertwoDemloc,threecoats.
Doorswithwhitewoodstructurewithtwolayercompression,oneofthemthinironsheetandtheotheristheusu
fromtwosides,thickness3mmforonelayerwithframeofteakwood.TheworksalsoincludespaintwithSupertw
a.Door,dimensions1X2.0No.288
Schedule 8, leveling works
1 Theworkswillbedoneinkeepingwithplans,technical
specificationsanddirectivesofsupervisingengineer.
2 Requiredcolours,notspecifiedinplansorthelists,willbe
determinedbysupervisingengineer.
3 Contractorwillsubmitsamplesforapprovalbeforeexecuting
works.
4 Theyshouldsucceedsinlaboratorytests.
a)Supplyofmaterialsandworkforleveling M2
floorswithporcelene,40X40cm,Iranianor
Turkishonly,withthehelpofcementplussand
mortaronalayeroflooseconcrete,costincludes
poringoflayerforthegroundfloorasper
directivesofsupervisingengineer.

b)Baysandstairs30X120cm
c)Supplyofmaterialsandfixingofmarble
skirtingusingcement+sandmortar,ratio3:1,
withsoakingandallthatisrequiredinthework,
dimensions10X40cm
d)SupplyofmaterialsandworkforthelevelingNo.
ofbathfloorswithceramic,IranianorTurkish
only,usingcement+Sandmortarratio1:3with
soakingofjointswithwhitecementandasper
directivesofsupervisingengineer.

MT

m2
Schedule 9, Secondary Ceilings

1 Samplesanddimensionswillbeselectedbysupervisingengineer,as
perplans.
2 Costwillincludepaintofsecondaryceilingwithrequiredpaints.

B.Supplyofmaterialsandmakingsecondaryceilingsofgood
m2
qualityinregulardimensionsusingplasticboard,asperplans,cost
includesallmetalstructurescarryingthem.Andalsoaccessoriesfor
fixing,wrappingandpaintingthem,asperplansandtechnical
specifications.

Schedule 10, Roof Works and Extension Joint


1 Beforestartofworksforprotectionfromhumidity(anti-humidity
works)theterraceswillcleanedupproperly.
2 Workincludesallmaterialsandtoolsrequiredforthework,asper
technicalspecifications.
3 Italsoincludesnecessarysuccessfultests.
Surfacing of Terraces
Spreading first layer of flincoat tar material (prim coat), thenm2
spreadingalayerofmembraneof4mmthickness,(bituminouswater
proofmembrane),stenthingbyplasticfibers,ensuringinter-twinof
10cmbetweensectionswhilefixing,usinghot-weldthenplacinga
layer of nylon of membrane then a layer of stir-pour (thermal
insulation), thickness 5cm, density 35kg/m3, then undertaking the
worksoflevelingwithCashyMozaneekusingcement+sandmortar
andalsoprovidingappropriatedepression(1%)towardstheopening
fordrainageofrainwaterclosetotheoutlet,thicknessshouldnotbe
less then 8cm, and the cost includes making extension joint for
every3X3m,fortheentireterracespaceandfillingthosejointswith
polysulphide,properlyanditshouldsucceedlaboratorytests.Cost
includes taking up peripheries and making concert skirting, as per
plansandtechnicalspecifications.

Schedule 11, Works of Passages/ Pathways


Works of passages:
A.
Supplyofmaterialsandworksformakingpassagesaroundthe
buildingsasperfollowingspecifications:

-Excavationofthefoundationofsupportwallsforwalk,width
40cmanddepthof60cm.
-Spreadingofpebblesthickness20cm,togetherwiththe
sprinklingwithwaterandproperrolling.
-Poringoffoundation,thickness20cm,width40cm,usingantisalinecementC20.
-Constructionwithsolidblocks,width20cm,usingcement+sand
mortar(3:1ratio)togetherwithwaxing,heightvarying,asperlevels
indicatedinthearchitecturalplans.

-Soillevelingtogetherwithspreadofalayerofpebbles,20cm,
sprinklingandproperrollingoftheareacoveredbetweenthesport
wallandedgeofthebuilding.

-Poringofpathway,usingpolishedconcreteof10cmthickness,C20m2
andwidthof1mtr.,usinganti-salinecementalsomakingjointsof
extensionforeverytwosq.mtr.,inlengththenfillingthejointswith
thecementmortarandsprinklingpesticidesbelowtheporinglevel
asperdirectivesofsupervisingengineer.

Total of estimated cost of construction works.

ries X 4 Flats (With an Area of 125sq. Meters Each Flat)

worksandfixation,testingandoperation,andasperdirectivesoftheconsultant.
eyaresubjecttotheapprovaloftheconsultantbeforesupplyorexecutionandallsamplesshouldbedeliveredofficiallytothere

houldnotinterrupt/damageanyservicenetworks.
bytheMunicipality.
erminedasperthesitecapacity/requirement.
tiveoftheconsultanttoobtainapprovalfromhim.

atoilpointshouldprecede.
wouldbeusedforallspecializations.
rksexecuted/ascompleted.

Quantity

Price IQD Amount


IQD

ng the building floor will be as per directives


1

1500

750

375

275
750

390
40
1425
25

990

865

and plans.
1820

3000

13255
5226

18481

4000

144
540
24
105
108
96

1
13

386
70

,beforestartofwork.

setc.

ronsheetandtheotheristheusualybackone,
salsoincludespaintwithSupertwoDemlocin

88

5443

192

4434

360

5120

595

works.

125

deliveredofficiallytotheresidentengineerandhisformalapprovalshouldbeobtained.

Mechanical

1.AllSectionsinthebillsofquantitiespertaintosupplyandtransportofmaterials,worksandfixation,testingan
2.Allmaterialsorworksshouldconformtothegeneraltechnicalspecifications.Theyaresubjecttotheapproval
3.Thecontractorshouldappointspecialistengineertosupervisework.
4.Contractorshouldtakestepstoensuresafetyofareasadjacenttotheworkandshouldnotinterrupt/damageany
5.ContractorshouldcleanuptherubblestooutsidethesiteandinareaspermittedbytheMunicipality.
6.Allquantitiesaresubjecttoincreaseordecreaseandtheywouldpreciselybedeterminedasperthesitecapacity
7.Contractorshouldsubmitexecutiveplansofallnecessaryworksandasperdirectiveoftheconsultanttoobtain
8.Useofanti-salinecementforallconcreteworksbelowhumidityresistantlevel.
9.Allironworksshouldbepaintedwithananti-rustcoatbeforefixingandafterthatoilpointshouldprecede.
10.Contractorshouldsubmitcataloguesofallmachineriesandequipmentswhichwouldbeusedforallspecializa
11.Oncompletionofworks,thecontractorwouldsubmitcolourplansofalltheworksexecuted/ascompleted.

S.No.

Details

Unity

Mechanical works -Air Conditioning System


1 Supplyandfixingwallsplit,KoreanorTurkish,capacity24000btu, No.
withallnecessaryaccessoriesandasperdirectivesofsupervising
engineer.
2 Supplyandfixingwallsplit,KoreanorTurkish,capacity18000btu, No.
withallnecessaryaccessoriesandasperdirectivesofsupervising
engineer.
3 Supplyandfixingwallsplit,KoreanorTurkish,capacity12000btu, No.
withallnecessaryaccessoriesandasperdirectivesofsupervising
engineer.
4 Supplyandfixingadditionalgaspipesasperdirectivesof
supervisingengineer.

MT

5 SupplyandfixingofcompressorwaterdrainagepipesforAC's,size MT
1,CPVCtype,asperdirectivesofSupervisingengineer.
TOTAL

PE Pipe for 100 Rmt.


Sr.No.
Description
Material

Unit

1 90 mm HDPE Pipe PN 2.5


2 Coupling

Rmt
Nos

Labour
1 Fitter
2 labour

Nos
Nos
Total

Add 2% Contengencies

Add OH & Profit 25%


G.Total
Rate Per/Rmt.
Rate Per/Rmt. In IQD
CPVC Pipe for 100 Rmt.
Sr.No.
Description
Material
1 25 mm CPVC Pipe
2 Coupling

Rmt
Nos

Labour
1 Fitter
2 labour

Nos
Nos

Unit

Total
Add 2% Contengencies

Add OH & Profit 25%


G.Total
Rate Per/Rmt.
Rate Per/Rmt. In IQD

als,worksandfixation,testingandoperation,andasperdirectivesoftheconsultant.
.Theyaresubjecttotheapprovaloftheconsultantbeforesupplyorexecutionandallsamplesshouldbedeliveredofficiallytoth

dshouldnotinterrupt/damageanyservicenetworks.
edbytheMunicipality.
determinedasperthesitecapacity/requirement.
irectiveoftheconsultanttoobtainapprovalfromhim.

rthatoilpointshouldprecede.
chwouldbeusedforallspecializations.
eworksexecuted/ascompleted.

Quantity

Price IQD

Amount IQD

48

1023026.07

49105251.5625

144

871796.13

125538643.125

96

702774.43

67466345.625

1500

6,345.98

9518972.58

4300

5,881.27

25289445.9285

276,918,658.82

Qty

Rate

Amount

100.00
17.00

168.00
42.00

16,800.00
714.00

1.00
1.00

2,240.00
1,600.00

2,240.00
1,600.00
21,354.00
427.08

5,338.50
27,119.58
271.20
6,345.98

Qty

Rate

Amount

100.00
17.00

153.00
38.25

15,300.00
650.25

1.00
1.00

2,240.00
1,600.00

2,240.00
1,600.00
19,790.25
395.81

4,947.56
25,133.62
251.34
5,881.27

50

dbedeliveredofficiallytotheresidentengineerandhisformalapprovalshouldbeobtained.

Cost of AC 2 Ton

661.25

760437.50

Accessories & Installation

33.06

38021.88

Contingencies @ 2.5%

17.36

19961.48

177.92

204605.21

889.59

###

Contractors Profit & OH @ 25%

Total

Cost of AC 1.5 Ton

563.50

648025.00

Accessories & Installation

28.18

32401.25

Contingencies @ 2.5%

14.79

17010.66

151.62

174359.23

Contractors Profit & OH @ 25%

Total

758.08 871796.13

Cost of AC 1.0 Ton

454.25

522387.50

Accessories & Installation

22.71

26119.38

Contingencies @ 2.5%

11.92

13712.67

122.22

140554.89

611.11

702774.43

Contractors Profit & OH @ 25%

Total

Mechanical

1.AllSectionsinthebillsofquantitiespertaintosupplyandtransportofmaterials,worksandfixation,testingan
2.Allmaterialsorworksshouldconformtothegeneraltechnicalspecifications.Theyaresubjecttotheapproval
3.Thecontractorshouldappointspecialistengineertosupervisework.
4.Contractorshouldtakestepstoensuresafetyofareasadjacenttotheworkandshouldnotinterrupt/damageany
5.ContractorshouldcleanuptherubblestooutsidethesiteandinareaspermittedbytheMunicipality.
6.Allquantitiesaresubjecttoincreaseordecreaseandtheywouldpreciselybedeterminedasperthesitecapacity
7.Contractorshouldsubmitexecutiveplansofallnecessaryworksandasperdirectiveoftheconsultanttoobtain
8.Useofanti-salinecementforallconcreteworksbelowhumidityresistantlevel.
9.Allironworksshouldbepaintedwithananti-rustcoatbeforefixingandafterthatoilpointshouldprecede.
10.Contractorshouldsubmitcataloguesofallmachineriesandequipmentswhichwouldbeusedforallspecializa
11.Oncompletionofworks,thecontractorwouldsubmitcolourplansofalltheworksexecuted/ascompleted.

S.No.

Details
Mechanical works water drainage system
Internal works
1 FixingandsupplyofEasterntoilet,Turkish,withall
necessaryaccessoriesasperdirectivesofsupervising
engineer.

Unity

Quantity

No.

48

FixingandsupplyofWesterntoilet,Turkish,withall
necessaryaccessoriesasperdirectivesofsupervising
engineer.

No.

48

2 Fixingandsupplyofcompleteassembly,4inch,asper
directivesofsupervisingengineer.

No.

240

3 SupplyandfixingofwaterdrainagepipesUPVC,size4 MT
inch,EgyptianSharieftype,withallnecessaryaccessories
asperdirectivesofsupervisingengineer.

11150

4 SupplyandfixingwaterdrainagepipesUPVC,3inch,
MT
EgyptianSharieftype,withallnecessaryaccessoriesasper
directivesofsupervisingengineer.

400

5 SupplyandfixingwaterdrainagepipesUPVC,Size2inch, MT
EgyptianSharieftype,withallnecessaryaccessoriesasper
directivesofsupervisingengineer.

575

6 SupplyandfixingwaterdrainagepipesUPVC,size6inch, MT
EgyptianSharieftype,withallnecessaryaccessoriesasper
directivesofsupervisingengineer.

300

7 Septic,size2X5X5mtr.,withallnecessaryexcavationand No.
pouringworksasperdirectivesofsupervisingengineer.
8 Supplyandfixingplasticmanhole40X40cmasper
directivesofsupervisingengineer.

No.

10

TOTAL

UPVC Pipe for 100 Rmt.


Sr.No.
Description
Material
1 110 mm, 4' UPVC
2 Accessories

Rmt
Nos

100.00
17.00

Labour
1 Fitter
2 labour

Nos
Nos

1.00
1.00

Unit

Qty

Total
Add 2% Contengencies

Add OH & Profit 25%


G.Total
Rate Per/Rmt.
Rate Per/Rmt. In IQD

Wall Mounted W.C with 6.5 litres P.V.C Flush Tank


Sr.
no
A)

Item

Unit

Quantity

Materials:
W.C
6.5 litres PVC flush Tank

Nos
Nos

1.00
1.00

Clamp

Nos

4.00

Sub-Total of Material (M)

B)

Labour:
Plumber
Mistry

Each
Each

1
0.5

Helper

Each

Sub-Total of Labour (L)


C)

Total (M+L)
Add for Sundries & Contingencies
Add W.C & Electricity

2.00%
1.00%

Add for OH & C.P

25.00%

Total Amt.
Cost Per No (Rs.)

Eastern W.C with 6.5 litres P.V.C Flush Tank


Sr.
no
A)

Item

Unit

Quantity

Materials:
W.C
6.5 litres PVC flush Tank

Nos
Nos

1.00
1.00

Clamp

Nos

4.00

Labour:
Plumber
Mistry

Each
Each

1
0.5

Helper

Each

Sub-Total of Material (M)

B)

Sub-Total of Labour (L)


C)

Total (M+L)
Add for Sundries & Contingencies
Add W.C & Electricity
Add for OH & C.P
Total Amt.
Cost Per No (Rs.)

2.00%
1.00%
25.00%

TYPE OF WORK
BRICK WALL
BRICK WALL
BAFFLE WALL
BRICKWORK
CONCRETE (1:2:4)

EXCAVATION

PVC PIPE

Add 2% Contengencies

Add OH & Profit 25%


Rate In IQD

SEPTIC TANK
L
W
5
5
3

0.21
0.21
0.21

5.5

5.5

0.05

worksandfixation,testingandoperation,andasperdirectivesoftheconsultant.
eyaresubjecttotheapprovaloftheconsultantbeforesupplyorexecutionandallsamplesshouldbedeliveredofficiallytothere

houldnotinterrupt/damageanyservicenetworks.
bytheMunicipality.
erminedasperthesitecapacity/requirement.
tiveoftheconsultanttoobtainapprovalfromhim.

atoilpointshouldprecede.
wouldbeusedforallspecializations.
rksexecuted/ascompleted.

Price IQD

Amount IQD

283345.92

13600604.16

448081.92

21507932.16

13,719.46

152972015.6835

9,506.05

3802418.1

5,261.65

3025446.562125

29240.951805

8772285.5415

4,419,749.90

8839499.8005

40250

402500
212,922,702

Rate

40,600.00
1,725.50

UPVC Pipe for 100 Rmt.


Sr.No.
Description
Material
1 90 mm, 3' UPVC
2 Accessories

2,240.00
1,600.00

Labour
1 Fitter
2 labour

Amount
406.00
101.50

2,240.00
1,600.00

46,165.50
923.31

11,541.38

Rate
(Rs.)

Total
Add 2% Contengencies

Add OH & Profit 25%

58,630.19
586.30

G.Total
Rate Per/Rmt.

13,719.46

Rate Per/Rmt. In IQD

Amount.
(Rs.)

8500.00
1500.00

8500.00
1500.00

125.00

500.00
10000.00

2,240.00
2,240.00

2240.00
1120.00

1600.00

1600.00
4960.00
14960.00
299.20
149.60
3740.00
19148.80
448081.92

Rate
(Rs.)

Amount.
(Rs.)

3000.00
1500.00

3000.00
1500.00

125.00

500.00
4500.00

2,240.00
2,240.00

2240.00
1120.00

1600.00

1600.00
4960.00
9460.00
189.20
94.60
2365.00
12108.80
283345.92

VOLUME RATE
COST
1
2.1
1
2.1
1
0.945
5.145
5166
1
18.75
5743.5

2
2
1.5
0.75

TOTAL COST IN Rs

60.5

26579.07
107690.625

944

57112

150

1200
192581.695
3,851.63

245,541.66
4,419,749.90

eliveredofficiallytotheresidentengineerandhisformalapprovalshouldbeobtained.

Unit

Qty

Rate

Amount

UPVC Pipe for 100 Rmt.


Sr.No.

Rmt
Nos

100.00
17.00

270.00
67.50

27,000.00
1,147.50

1
2

Nos
Nos

1.00
1.00

2,240.00
1,600.00

2,240.00
1,600.00

1
2

31,987.50
639.75

7,996.88
40,624.13
406.24
9,506.05

UPVC Pipe for 100 Rmt.


Description
Material
63 mm, 2' UPVC
Accessories

Unit

Labour
Fitter
labour
Total
Add 2% Contengencies

Add OH & Profit 25%

Qty

Rate

Amount

Rmt
Nos

100.00
17.00

133.00
33.25

13,300.00
565.25

Nos
Nos

1.00
1.00

2,240.00
1,600.00

2,240.00
1,600.00
17,705.25
354.11

4,426.31

G.Total
Rate Per/Rmt.

22,485.67
224.86

Rate Per/Rmt. In IQD

5,261.65

UPVC Pipe for 100 Rmt.


Sr.No.
Description
Material
1 160 mm, 6' UPVC
2 Accessories

Rmt
Nos

100.00
17.00

907.00
226.75

90,700.00
3,854.75

Labour
1 Fitter
2 labour

Nos
Nos

1.00
1.00

2,240.00
1,600.00

2,240.00
1,600.00

Unit

Total

Qty

Rate

Amount

98,394.75

Add 2% Contengencies

1,967.90

Add OH & Profit 25%

24,598.69

G.Total
Rate Per/Rmt.

124,961.33
1,249.61

Rate Per/Rmt. In IQD

29,240.95

Mechanical

1.AllSectionsinthebillsofquantitiespertaintosupplyandtransportofmaterials,worksandfixation,testingan
2.Allmaterialsorworksshouldconformtothegeneraltechnicalspecifications.Theyaresubjecttotheapproval
3.Thecontractorshouldappointspecialistengineertosupervisework.
4.Contractorshouldtakestepstoensuresafetyofareasadjacenttotheworkandshouldnotinterrupt/damageany
5.ContractorshouldcleanuptherubblestooutsidethesiteandinareaspermittedbytheMunicipality.
6.Allquantitiesaresubjecttoincreaseordecreaseandtheywouldpreciselybedeterminedasperthesitecapacity
7.Contractorshouldsubmitexecutiveplansofallnecessaryworksandasperdirectiveoftheconsultanttoobtain
8.Useofanti-salinecementforallconcreteworksbelowhumidityresistantlevel.
9.Allironworksshouldbepaintedwithananti-rustcoatbeforefixingandafterthatoilpointshouldprecede.
10.Contractorshouldsubmitcataloguesofallmachineriesandequipmentswhichwouldbeusedforallspecializa
11.Oncompletionofworks,thecontractorwouldsubmitcolourplansofalltheworksexecuted/ascompleted.

S.No.

Details

Unity

Mechanical works water supply system


1 Supplyandfixingawashbasin,Turkish,size65cm,withmixerand
No.
waterdrainagehosewithcompleteaccessoriesasperdirectivesof
supervisingengineer.
3 Fixingandsupplyofshower,Turkish,80X80cm,withmixerandall
accessoriesasperdirectivesofsupervisingengineer.

No.

4 Fixingandsupplyofhandwash,Turkish,withallaccessoriesasper
directivesofsupervisingengineer.

No.

5 Supplyandfixingofwatergyser,200liters,SyrianorTurkish,withall No.
accessoriesandasperdirectivesofsupervisingengineer.
6 Fixingandsupplyofanklewalve(anglelock)Vetra,asperdirectivesofNo.
supervisingengineer.
7 SupplyandfixingBDRpipesof20mm,ItalianorGermanwithall
necessaryaccessoriesaftertestingunder8barpressure,asper
directivesofsupervisingengineer.

MT

8 SupplyandfixingofPPRpipes,25mmsize,ItalianorGermanwithall MT
necessaryaccessorieswithtestingunder8barpressure,asper
directivesofsupervisingengineer.
9 SupplyandfixingPPRpipes,32mmsize,ItalianorGermanwithall
necessaryaccessorieswithtestingunder8barpressure,asper
directivesofsupervisingengineer.

MT

10 SupplyandfixingGalvanisepipes,50mm,ItalianorGermanwithall
allnecessaryaccessorieswithtestingunder8barpressure,asper
directivesofsupervisingengineer.

MT

11 SupplyandfixingGalvanisepipes,65mm,sizeItalianorGermanwith MT
allnecessaryaccessorieswithtestingunder8barpressure,asper
directivesofsupervisingengineer.
12 SupplyandfixingGalvanisewatertank,modular,thicknessofthe
section4mm,Turkishorigin,size2cubicmeterwithallnecessary
accessoriesasperdirectivesofsupervisingengineer.

No.

13 SupplyandfixingGalvanisewatertank,modular,thicknessofthe
section4mm,Turkishorigin,size83cubicmeterwithallnecessary
accessoriesasperdirectivesofsupervisingengineer.

No.

14 Fixingandsupplyofwaterpump,ItalianorEuropeanorigin,12cubic No.
meter/hourhead,50mwithelectricboardwithallaccessories.
15 Fixingandsupplyofwaterpump,ItalianorEuropeanorigin,16cubic No.
meter/hourhead,45mwithelectricboardwithallaccessories.
Total

Description
Details of cost for one no.
MATERIAL:
Vitreous china flat back wash basin 630x450 mm
15 mm C.P. brass tap
C.P. brass waste 32 mm
C.I. bracket for wash basin and sinks
Red lead, white lead and gasket
Cement, sand and grit etc.
Painting of brackets, fittings etc.
Carriage of materials
LABOUR:
Fitter (grade 1)
Mason (brick layer) 1 st class
Beldar
TOTAL
Add Water Charges @ 1%
TOTAL

Unit

each
each
each
pair
L.S.
L.S.
L.S.
L.S.
day
day
day

Add CPOH @ 25%


Cost of each
Say

Description
Details of cost for one no.
MATERIAL:

Unit

Shower rose C.P.brass for 80x80 cm inlet 150 mm


dia
Carriage of materials and fixing charges
TOTAL
Add Water Charges @ 1%
TOTAL
Add CPOH @ 25%
Cost of each
Say

each
LS

Description
Details of cost for one no.
MATERIAL:
Angle Valve
Carriage of materials and fixing charges
TOTAL
Add Water Charges @ 1%
TOTAL
Add CPOH @ 25%
Cost of each
Say

Unit

each
LS

Pipe for 100 Rmt.


Sr.No.
Description
Material
1 20 mm Pipe
2 Coupling

Unit
Rmt
Nos

Labour
1 Fitter
2 labour

Nos
Nos
Total

Add 2% Contengencies

Add OH & Profit 25%


G.Total
Rate Per/Rmt.
Rate Per/Rmt. In IQD

PPR Pipe for 100 Rmt.


Sr.No.

Description

Unit

Material
1 25 mm PPR Pipe
2 Coupling

Rmt
Nos

Labour
1 Fitter
2 labour

Nos
Nos
Total

Add 2% Contengencies

Add OH & Profit 25%


G.Total
Rate Per/Rmt.
Rate Per/Rmt. In IQD

PPR Pipe for 100 Rmt.


Sr.No.
Description
Material
1 32 mm PPR Pipe
2 Coupling

Rmt
Nos

Labour
1 Fitter

Nos

Unit

2 labour

Nos
Total

Add 2% Contengencies

Add OH & Profit 25%


G.Total
Rate Per/Rmt.
Rate Per/Rmt. In IQD
Galvanised Pipe for 100 Rmt.
Sr.No.
Description
Material
1 50 mm Galvanised Pipe
2 Coupling

Unit
Rmt
Nos

Labour
1 Fitter
2 labour

Nos
Nos
Total

Add 2% Contengencies

Add OH & Profit 25%


G.Total
Rate Per/Rmt.
Rate Per/Rmt. In IQD

Galvanised Pipe for 100 Rmt.


Sr.No.
Description
Material
1 65 mm Galvanised Pipe

Unit
Rmt

2 Coupling

Nos

Labour
1 Fitter
2 labour

Nos
Nos
Total

Add 2% Contengencies

Add OH & Profit 25%


G.Total
Rate Per/Rmt.
Rate Per/Rmt. In IQD

worksandfixation,testingandoperation,andasperdirectivesoftheconsultant.
heyaresubjecttotheapprovaloftheconsultantbeforesupplyorexecutionandallsamplesshouldbedeliveredofficiallytothere

houldnotinterrupt/damageanyservicenetworks.
bytheMunicipality.
erminedasperthesitecapacity/requirement.
ctiveoftheconsultanttoobtainapprovalfromhim.

atoilpointshouldprecede.
wouldbeusedforallspecializations.
orksexecuted/ascompleted.

Quantity

Price IQD

Amount IQD

er supply system
96

393055

37733240.4505056

48

72504

3480212.736

96

274811

26381900.4505056

48

1089152

52279299.072

672

68901

46301359.104

1400

7,337.37

10272323.88

21000

9,072.31

190518531.84

1800

13,037.88

23468185.728

200

40,796.87

8159374.08

350

50,710.80

17748778.32

12

1,878,196.32

22538355.84

60,981,560.64

60981560.64

1,519,998.48

3039996.96

1,664,142.48

3328284.96

506,231,404

Quantity Rate

Amount

1
2
1
1
16.12
13.39
26.91
13.52

14000
325
104
91
2.314
2.314
2.314
2.314

14000
650
104
91
37.30
30.98
62.27
31.29

0.33
0.33
0.67

2240
1920
1600

739.2
633.6
1072
17451.64116
17.45
17469.09280116

21836.36600145
21836
393055

Quantity Rate

Amount

1
8.06

640
320

Quantity Rate

Amount

1
8.06

Qty

640
2579.2
3219.2
3.22
3222.4192
4028.024
4028
72504

480
320

Rate

480
2579.2
3059.2
3.06
3062.2592
3827.824
3828
68901

Amount

100.00
17.00

200.00
50.00

20,000.00
850.00

1.00
1.00

2,240.00
1,600.00

2,240.00
1,600.00
24,690.00
493.80

6,172.50
31,356.30
313.56
7,337.37

Qty

Rate

Amount

100.00
17.00

256.00
64.00

25,600.00
1,088.00

1.00
1.00

2,240.00
1,600.00

2,240.00
1,600.00
30,528.00
610.56

7,632.00
38,770.56
387.71
9,072.31

Qty

Rate

Amount

100.00
17.00

384.00
96.00

38,400.00
1,632.00

1.00

2,240.00

2,240.00

1.00

1,600.00

1,600.00
43,872.00
877.44

10,968.00
55,717.44
557.17
13,037.88

Qty

Rate

Amount

100.00
17.00

1,280.00
320.00

128,000.00
5,440.00

1.00
1.00

2,240.00
1,600.00

2,240.00
1,600.00
137,280.00
2,745.60

34,320.00
174,345.60
1,743.46
40,796.87

Qty
100.00

Rate
1,600.00

Amount
160,000.00

17.00

400.00

6,800.00

1.00
1.00

2,240.00
1,600.00

2,240.00
1,600.00
170,640.00
3,412.80

42,660.00
216,712.80
2,167.13
50,710.80

consultant.
utionandallsamplesshouldbedeliveredofficiallytotheresidentengineerandhisformalapprovalshouldbeobtained.

Description
Details of cost for one no.
MATERIAL:
Vitreous china flat back wash basin 630x450 mm
15 mm C.P. brass tap
C.P. brass waste 32 mm
C.I. bracket for wash basin and sinks
Red lead, white lead and gasket
Cement, sand and grit etc.
Painting of brackets, fittings etc.
Carriage of materials
LABOUR:
Fitter (grade 1)
Mason (brick layer) 1 st class
Beldar
TOTAL
Add Water Charges @ 1%
TOTAL

Unit

Quantity Rate

each
each
each
pair
L.S.
L.S.
L.S.
L.S.

1
2
1
1
16.12
13.39
26.91
13.52

8750
325
104
91
2.314
2.314
2.314
2.314

0.33
0.33
0.67

2240
1920
1600

day
day
day

Add CPOH @ 25%


Cost of each
Say

Description
Details of cost for one no.
MATERIAL:

Unit

Quantity Rate

Geyser 200 liters


Carriage of materials and fixing charges
TOTAL
Add Water Charges @ 1%
TOTAL
Add CPOH @ 25%
Cost of each
Say

each
LS

1
8.06

Description
Details of cost for one no.
MATERIAL:
Galvanized Water Tank 2 cum
Carriage of materials and fixing charges
TOTAL
Add Water Charges @ 1%
TOTAL
Add CPOH @ 25%
Cost of each
Say

Unit

Quantity Rate

each
LS

1
8.06

Description

Unit

Quantity Rate

43200
640

57600
3200

Details of cost for one no.


MATERIAL:
Galvanized Water Tank 83 cum

each

Carriage of materials and fixing charges

LS

TOTAL
Add Water Charges @ 1%
TOTAL
Add CPOH @ 25%
Cost of each
Say

2656000

8.06

6400

Description

Unit

Quantity Rate

Details of cost for one no.


MATERIAL:
Pump 12 cum/hr

each

Carriage of materials and fixing charges

LS

28800

8.06

4800

TOTAL
Add Water Charges @ 1%
TOTAL
Add CPOH @ 25%
Cost of each
Say
Description

Unit

Quantity Rate

Details of cost for one no.


MATERIAL:
Pump 16 cum/hr

each

Carriage of materials and fixing charges

LS

TOTAL
Add Water Charges @ 1%
TOTAL
Add CPOH @ 25%
Cost of each
Say

35200

8.06

4800

uldbeobtained.

Amount

8750
650
104
91
37.30
30.98
62.27
31.29
739.2
633.6
1072
12201.64
12.20
12213.84

15267.3
15267
274811

Amount

43200
5158.4
48358.4
48.36
48406.76
60508.45
60508
1089152

Amount

57600
25792
83392
83.39
83475.39
104344.2
104344
1878196
Amount

2656000
51584
2707584
2707.58
2710292
3387864
3387864
###

Amount

28800
38688
67488
67.49
67555.49
84444.36
84444
1519998
Amount

35200
38688
73888
73.89
73961.89
92452.36
92452
1664142

Mechanical

1.AllSectionsinthebillsofquantitiespertaintosupplyandtransportofmaterials,worksandfixation,testingan
2.Allmaterialsorworksshouldconformtothegeneraltechnicalspecifications.Theyaresubjecttotheapproval
3.Thecontractorshouldappointspecialistengineertosupervisework.
4.Contractorshouldtakestepstoensuresafetyofareasadjacenttotheworkandshouldnotinterrupt/damageany
5.ContractorshouldcleanuptherubblestooutsidethesiteandinareaspermittedbytheMunicipality.
6.Allquantitiesaresubjecttoincreaseordecreaseandtheywouldpreciselybedeterminedasperthesitecapacity
7.Contractorshouldsubmitexecutiveplansofallnecessaryworksandasperdirectiveoftheconsultanttoobtain
8.Useofanti-salinecementforallconcreteworksbelowhumidityresistantlevel.
9.Allironworksshouldbepaintedwithananti-rustcoatbeforefixingandafterthatoilpointshouldprecede.
10.Contractorshouldsubmitcataloguesofallmachineriesandequipmentswhichwouldbeusedforallspecializa
Oncompletionofworks,thecontractorwouldsubmitcolourplansofalltheworksexecuted/ascompleted.

S.No.

Details
Mechanical works -Fire Fighting System
Internal works
1 Supplyandfixingfirefightingcabinetwithextinguisherof6kg
size,firehoselengthwillbe30mtr.,size1,withallnecessary
accessoriesasperdirectivesofsupervisingengineer.

Unity

Quantity

No.

30

2 Supplyandfixingofsteelcarbonpipes,size2.5inch,Ukrainian, MT
capacity12barpressure,withcoating
externally..

150

3 Supplyandfixingsteelcarbonpipes,size1inch,Ukrainian,with MT
thestrengthof12barpressurewithcoatingexternallywithGrey
andbrightredpaintwithallnecessaryaccessoriesandasper
directivesofsupervisingengineer.

600

4 Supplyandfixingfirepumpworkingon3levels(GUKYpump+ No.
ELEpumpandgaspump)45cubicmeter/hourand100mtrhead,
AmericanorTurkish,designedasperAmericancodeNFPAwith
allthenecessaryaccessories.

Total

Description
Details of cost for one no.
MATERIAL:
Extinguisher of 6kg size
6 kg steel fire extinguisher cabinet

Unit

each
each

Quantity

1
1

Fire Hose 30 m
Carriage of materials and fixing charges
TOTAL
Add Water Charges @ 1%
TOTAL
Add CPOH @ 25%
Cost of each
Say

each
LS

Steel Pipe for 100 Rmt.


Sr.No.
Description
Material
1 2.5' Carbon Steel Pipe
2 Coupling

Unit

Labour
1 Fitter
2 labour

1
8.06

Qty

Rmt
Nos

100.00
17.00

Nos
Nos

1.00
1.00

Total
Add 2% Contengencies

Add OH & Profit 25%


G.Total
Rate Per/Rmt.
Rate Per/Rmt. In IQD

Steel Pipe for 100 Rmt.


Sr.No.
Description
Material
1 1' Carbon Steel Pipe
2 Coupling
Labour
1 Fitter
2 labour

Unit

Qty

Rmt
Nos

100.00
17.00

Nos
Nos

1.00
1.00

Total
Add 2% Contengencies

Add OH & Profit 25%


G.Total
Rate Per/Rmt.
Rate Per/Rmt. In IQD

Description
Details of cost for one no.
MATERIAL:

Unit

Fire pump working on 3 levels (GUKY pump + ELE pump


and gas pump)
each
Carriage of materials and fixing charges
LS
TOTAL
Add Water Charges @ 1%
TOTAL
Add CPOH @ 25%
Cost of each
Say

Quantity

1
8.06

sandfixation,testingandoperation,andasperdirectivesoftheconsultant.
subjecttotheapprovaloftheconsultantbeforesupplyorexecutionandallsamplesshouldbedeliveredofficiallytotheresident

notinterrupt/damageanyservicenetworks.
Municipality.
edasperthesitecapacity/requirement.
ftheconsultanttoobtainapprovalfromhim.

ointshouldprecede.
beusedforallspecializations.
ascompleted.

Price IQD

Amount IQD

2162746

64882367.55

39,867.44

5980115.9925

16,631.68

9979007.22

29,350,601.28

29350601.28

110,192,092

Rate

Amount

56250
4048

56250
4048

9936
3200

Rate

9936
25792
96026
96.03
96122.026
120152.5325
120153
2162746

Amount

1,250.00
312.50

125,000.00
5,312.50

2,240.00
1,600.00

2,240.00
1,600.00
134,152.50
2,683.05

33,538.13
170,373.68
1,703.74
39,867.44

Rate

Amount
500.00
125.00

50,000.00
2,125.00

2,240.00
1,600.00

2,240.00
1,600.00

55,965.00
1,119.30

13,991.25
71,075.55
710.76
16,631.68

Rate

Amount

1200000
12800

1200000
103168
1303168
1303.17
1304471.168
1630588.96
1630589
29350601

eliveredofficiallytotheresidentengineerandhisformalapprovalshouldbeobtained.

Mechanical

1.AllSectionsinthebillsofquantitiespertaintosupplyandtransportofmaterials,worksandfixation,testingan
2.Allmaterialsorworksshouldconformtothegeneraltechnicalspecifications.Theyaresubjecttotheapproval
3.Thecontractorshouldappointspecialistengineertosupervisework.
4.Contractorshouldtakestepstoensuresafetyofareasadjacenttotheworkandshouldnotinterrupt/damageany
5.ContractorshouldcleanuptherubblestooutsidethesiteandinareaspermittedbytheMunicipality.
6.Allquantitiesaresubjecttoincreaseordecreaseandtheywouldpreciselybedeterminedasperthesitecapacity
7.Contractorshouldsubmitexecutiveplansofallnecessaryworksandasperdirectiveoftheconsultanttoobtain
8.Useofanti-salinecementforallconcreteworksbelowhumidityresistantlevel.
9.Allironworksshouldbepaintedwithananti-rustcoatbeforefixingandafterthatoilpointshouldprecede.
10.Contractorshouldsubmitcataloguesofallmachineriesandequipmentswhichwouldbeusedforallspecializa
11.Oncompletionofworks,thecontractorwouldsubmitcolourplansofalltheworksexecuted/ascompleted.

S.No.

Details

Unity

Mechanical works -Fire Fighting System


Internal works
1 Supplyandfixingfirefightingcabinetwithextinguisherof6kgsize,firehose No.
lengthwillbe30mtr.,size1,withallnecessaryaccessoriesasperdirectivesof
supervisingengineer.
2 Supplyandfixingofsteelcarbonpipes,size2.5inch,Ukrainian,capacity12bar MT
pressure,withcoatingexternallyinGreyandbrightredwithallnecessary
accessoriesasperdirectivesofsupervisingengineer.
3 Supplyandfixingsteelcarbonpipes,size1inch,Ukrainian,withthestrengthof MT
12barpressurewithcoatingexternallywithGreyandbrightredpaintwithall
necessaryaccessoriesandasperdirectivesofsupervisingengineer.
4 Supplyandfixingfirepumpworkingon3levels(GUKYpump+ELEpump
andgaspump)34cubicmeter/hourand80mtrhead,AmericanorTurkish,
designedasperAmericancodeNFPAwithallthenecessaryaccessories.

Total

No.

ndfixation,testingandoperation,andasperdirectivesoftheconsultant.
ubjecttotheapprovaloftheconsultantbeforesupplyorexecutionandallsamplesshouldbedeliveredofficiallytotheresidenten

tinterrupt/damageanyservicenetworks.
unicipality.
asperthesitecapacity/requirement.
heconsultanttoobtainapprovalfromhim.

ntshouldprecede.
usedforallspecializations.
uted/ascompleted.

Quantity

Price IQD

Amount IQD

24

2162746

51905894.04

125

39,867.44

4983429.99375

450

16,631.68

7484255.415

29,350,601.28

29350601.28

93,724,181

ciallytotheresidentengineerandhisformalapprovalshouldbeobtained.

Mechanical

1.AllSectionsinthebillsofquantitiespertaintosupplyandtransportofmaterials,worksandfixation,testingan
2.Allmaterialsorworksshouldconformtothegeneraltechnicalspecifications.Theyaresubjecttotheapproval
3.Thecontractorshouldappointspecialistengineertosupervisework.
4.Contractorshouldtakestepstoensuresafetyofareasadjacenttotheworkandshouldnotinterrupt/damageany
5.ContractorshouldcleanuptherubblestooutsidethesiteandinareaspermittedbytheMunicipality.
6.Allquantitiesaresubjecttoincreaseordecreaseandtheywouldpreciselybedeterminedasperthesitecapacity
7.Contractorshouldsubmitexecutiveplansofallnecessaryworksandasperdirectiveoftheconsultanttoobtain
8.Useofanti-salinecementforallconcreteworksbelowhumidityresistantlevel.
9.Allironworksshouldbepaintedwithananti-rustcoatbeforefixingandafterthatoilpointshouldprecede.
10.Contractorshouldsubmitcataloguesofallmachineriesandequipmentswhichwouldbeusedforallspecializa
Oncompletionofworks,thecontractorwouldsubmitcolourplansofalltheworksexecuted/ascompleted

S.No.

Details

Unity

Mechanical works water supply system


1 Supplyandfixingawashbasin,Turkish,size65cm,withmixerandwater No.
drainagehosewithcompleteaccessoriesasperdirectivesofsupervising
engineer.
2 Fixingandsupplyofbathtub,Turkish,80X180cm,withmixerandall
accessoriesasperdirectivesofsupervisingengineer.

No.

3 Fixingandsupplyofshower,Turkish,80X80cm,withmixerandall
accessoriesasperdirectivesofsupervisingengineer.

No.

4 Fixingandsupplyofhandwash,Turkish,withallaccessoriesasper
directivesofsupervisingengineer.

No.

5 Supplyandfixingofwatergyser,200liters,SyrianorTurkish,withall
accessoriesandasperdirectivesofsupervisingengineer.

No.

6 Fixingandsupplyofanklewalve(anglelock)Vetra,asperdirectivesof No.
supervisingengineer.
7 SupplyandfixingBDRpipesof20mm,ItalianorGermanwithall
MT
necessaryaccessoriesaftertestingunder8barpressure,asperdirectives
ofsupervisingengineer.
8 SupplyandfixingofBDRpipes,25mmsize,ItalianorGermanwithall MT
necessaryaccessorieswithtestingunder8barpressure,asperdirectives
ofsupervisingengineer.

9 SupplyandfixingBDRpipes,32mmsize,ItalianorGermanwithall
MT
necessaryaccessorieswithtestingunder8barpressure,asperdirectives
ofsupervisingengineer.
10 SupplyandfixingGalvanisepipes,50mm,ItalianorGermanwithallall MT
necessaryaccessorieswithtestingunder8barpressure,asperdirectives
ofsupervisingengineer.
11 SupplyandfixingGalvanisepipes,65mm,sizeItalianorGermanwithall MT
allnecessaryaccessorieswithtestingunder8barpressure,asper
directivesofsupervisingengineer.
12 SupplyandfixingGalvanisewatertank,modular,thicknessofthesection No.
4mm,Turkishorigin,size2cubicmeterwithallnecessaryaccessoriesas
perdirectivesofsupervisingengineer.
13 SupplyandfixingGalvanisewatertank,modular,thicknessofthesectionNo.
4mm,Turkishorigin,size95cubicmeterwithallnecessaryaccessoriesas
perdirectivesofsupervisingengineer.
14 Fixingandsupplyofwaterpump,ItalianorEuropeanorigin,16cubic
meter/hourhead,60mwithelectricboardwithallaccessories.

No.

15 Fixingandsupplyofwaterpump,ItalianorEuropeanorigin,30cubic
meter/hourhead,45mwithelectricboardwithallaccessories.

No.

Total

Description
Details of cost for one no.
MATERIAL:
Turkish 80X180cm bath tub
Carriage of materials and fixing charges
TOTAL
Add Water Charges @ 1%
TOTAL
Add CPOH @ 25%
Cost of each
Say

Unit

each
LS

worksandfixation,testingandoperation,andasperdirectivesoftheconsultant.
yaresubjecttotheapprovaloftheconsultantbeforesupplyorexecutionandallsamplesshouldbedeliveredofficiallytotheresi

uldnotinterrupt/damageanyservicenetworks.
ytheMunicipality.
minedasperthesitecapacity/requirement.
veoftheconsultanttoobtainapprovalfromhim.

oilpointshouldprecede.
ouldbeusedforallspecializations.
uted/ascompleted

Quantity

Price IQD

Amount IQD

r supply system
180

393055

70749825.844698

60

3150357

189021432.6

60

72504

4350265.92

180

274811

49466063.344698

60

1089152

65349123.84

1200

68901

82680998.4

2100

7,337.37

15408485.82

3000

9,072.31

27216933.12

2500

13,037.88

32594702.4

250

40,796.87

10199217.6

300

50,710.80

15213238.56

16

1,878,196.32

30051141.12

70,128,794.74

70128794.736

1,747,998.25

3495996.504

2,579,420.84

5158841.688

671,085,061

Quantity Rate

1
8.06

Amount

62500
9600

62500
77376
139876
139.88
140015.876
175019.845
175020
3150357

bedeliveredofficiallytotheresidentengineerandhisformalapprovalshouldbeobtained.

Mechanical

1.AllSectionsinthebillsofquantitiespertaintosupplyandtransportofmaterials,worksandfixation,testingan
2.Allmaterialsorworksshouldconformtothegeneraltechnicalspecifications.Theyaresubjecttotheapproval
3.Thecontractorshouldappointspecialistengineertosupervisework.
4.Contractorshouldtakestepstoensuresafetyofareasadjacenttotheworkandshouldnotinterrupt/damageany
5.ContractorshouldcleanuptherubblestooutsidethesiteandinareaspermittedbytheMunicipality.
6.Allquantitiesaresubjecttoincreaseordecreaseandtheywouldpreciselybedeterminedasperthesitecapacity
7.Contractorshouldsubmitexecutiveplansofallnecessaryworksandasperdirectiveoftheconsultanttoobtain
8.Useofanti-salinecementforallconcreteworksbelowhumidityresistantlevel.
9.Allironworksshouldbepaintedwithananti-rustcoatbeforefixingandafterthatoilpointshouldprecede.
10.Contractorshouldsubmitcataloguesofallmachineriesandequipmentswhichwouldbeusedforallspecializa
Oncompletionofworks,thecontractorwouldsubmitcolourplansofalltheworksexecuted/ascompleted.

S.No.

Details

Unity

Mechanical works water drainage system


Internal works
1 FixingandsupplyofEasterntoilet,Turkish,withallnecessaryaccessoriesas No.
perdirectivesofsupervisingengineer.
FixingandsupplyofWesterntoilet,Turkish,withallnecessaryaccessoriesas No.
perdirectivesofsupervisingengineer.
2 Fixingandsupplyofcompleteassembly,4inch,asperdirectivesof
supervisingengineer.

No.

3 SupplyandfixingofwaterdrainagepipesUPVC,size4inch,EgyptianSharief MT
type,withallnecessaryaccessoriesasperdirectivesofsupervisingengineer.
4 SupplyandfixingwaterdrainagepipesUPVC,3inch,EgyptianSharieftype, MT
withallnecessaryaccessoriesasperdirectivesofsupervisingengineer.
5 SupplyandfixingwaterdrainagepipesUPVC,Size2inch,EgyptianSharief MT
type,withallnecessaryaccessoriesasperdirectivesofsupervisingengineer.
6 SupplyandfixingwaterdrainagepipesUPVC,size6inch,EgyptianSharief MT
type,withallnecessaryaccessoriesasperdirectivesofsupervisingengineer.
7 Septic,size2X5X5mtr.,withallexcavationandpouringasperdirectivesof
supervisingengineer.

No.

8 Supplyandfixingplasticmainhole40X40cmasperdirectivesofsupervising No.
engineer.

TOTAL

andfixation,testingandoperation,andasperdirectivesoftheconsultant.
subjecttotheapprovaloftheconsultantbeforesupplyorexecutionandallsamplesshouldbedeliveredofficiallytotheresident

otinterrupt/damageanyservicenetworks.
Municipality.
dasperthesitecapacity/requirement.
theconsultanttoobtainapprovalfromhim.

ointshouldprecede.
beusedforallspecializations.
scompleted.

Quantity

Price IQD

Amount IQD

60

283345.92

17000755.2

120

448081.92

53769830.4

300

0.00

1500

13719.46

20579194.935

500

9506.05

4753022.625

750

5261.65

3946234.64625

900

29240.95

26316856.6245

4419749.90

8839499.8005

18

40250.00

724500

135,929,894.23

dofficiallytotheresidentengineerandhisformalapprovalshouldbeobtained.

Mechanical

1.AllSectionsinthebillsofquantitiespertaintosupplyandtransportofmaterials,worksandfixation,testingan
2.Allmaterialsorworksshouldconformtothegeneraltechnicalspecifications.Theyaresubjecttotheapproval
3.Thecontractorshouldappointspecialistengineertosupervisework.
4.Contractorshouldtakestepstoensuresafetyofareasadjacenttotheworkandshouldnotinterrupt/damageany
5.ContractorshouldcleanuptherubblestooutsidethesiteandinareaspermittedbytheMunicipality.
6.Allquantitiesaresubjecttoincreaseordecreaseandtheywouldpreciselybedeterminedasperthesitecapacity
7.Contractorshouldsubmitexecutiveplansofallnecessaryworksandasperdirectiveoftheconsultanttoobtain
8.Useofanti-salinecementforallconcreteworksbelowhumidityresistantlevel.
9.Allironworksshouldbepaintedwithananti-rustcoatbeforefixingandafterthatoilpointshouldprecede.
10.Contractorshouldsubmitcataloguesofallmachineriesandequipmentswhichwouldbeusedforallspecializa
11.Oncompletionofworks,thecontractorwouldsubmitcolourplansofalltheworksexecuted/ascompleted.

S.No.

Details

Unity

Mechanical works -Air Conditioning System


1 Supplyandfixingwallsplit,KoreanorTurkish,capacity24000btu,withall
necessaryaccessoriesandasperdirectivesofsupervisingengineer.
2 Supplyandfixingwallsplit,KoreanorTurkish,capacity18000btu,withall
necessaryaccessoriesandasperdirectivesofsupervisingengineer.

No.

No.

3 Supplyandfixingadditionalgaspipesasperdirectivesofsupervisingengineer. MT
4 SupplyandfixingofcompressorwaterdrainagepipesforAC's,size1,CPVC MT
type,asperdirectivesofSupervisingengineer.
TOTAL

andfixation,testingandoperation,andasperdirectivesoftheconsultant.
ubjecttotheapprovaloftheconsultantbeforesupplyorexecutionandallsamplesshouldbedeliveredofficiallytotheresidente

otinterrupt/damageanyservicenetworks.
Municipality.
asperthesitecapacity/requirement.
heconsultanttoobtainapprovalfromhim.

intshouldprecede.
eusedforallspecializations.
cuted/ascompleted.

Quantity

Price IQD

Amount IQD

60

1023026.07

61381564.453125

360

871796.13

313846607.8125

1800

6345.98

11422767.096

4800

5881.27

28230079.176

414,881,018.54

officiallytotheresidentengineerandhisformalapprovalshouldbeobtained.

414,881,018.54
135,929,894.23
671085061.497396
93724180.72875
110192092.0425
506231404.061011
212922702.007625
276,918,658.82
2,421,885,011.93
2,105,986.97
134,783,165.88
6,071.31
564.04

Das könnte Ihnen auch gefallen