AllworkswillbedoneinkeepingwithIraqitechnicalspecifications(IGTS/1993)andasperthe
Allmaterialswillbesubjecttolaboratorytests.
Maps/graphswillbethebasisincaseofdifference/variationbetweenplansandbillsofquantitie
Cableswillbelaidoncabletraysincorridorsandunderthefalseceilingforcables,NYYtype.
Allelectricalworksshouldbetestedwiththeofficialapprovalofsupervisingengineerandresid
AllworkswillbedoneinKeepingwiththeconditionsofthecivilengineering-withtwoparts,f
S.No.
Details
Unity
8 Section Eight: Electrical works/all electrical works will be done using plastic pipes and the price w
accessories.
8.1
Supplymaterials,installationofmaindistribution
No.
boards(S.B.A)ofthetypethatmaybefixedonground
andthecutoutswillbeofLegrandtypeofHGand
FrenchABB.
Metalcabinetmadeofmetalplates,2.5mm
8.2
thickness,antirustpaintedinGreycolour.
Maincutoutthreephase,500Ampere,one
Distributionroadswithneutralizerandearthcapable
of800Ampere.
Sub-cutout,threephase,63Ampere,24
Supplyofmaterials,installationandtestingofmain No.
distributionbondofthetypethatmaybefixedonthe
groundandthecutoutsofLegrandconsistingofMG
andFrenchABB.
Metalcabinetmadeofmetalplatesof2.5mm
8.3
thicknessandanti-rustpaintedinGrey.
Maincutout,threephase,500Ampere,one.
Distributionroadswithneutralizerandearth,
capacity800Ampere.
Sub-cutout,threephase,63Ampere,16.
Sub-cutout,threephase,25Ampere,8
Supplyofmaterials,installationandtestingofmain No.
distributionboard(S.B.C)ofthetypethatmaybefixed
ongroundandcutoutswillbeFrenchLegrand
consistingofMGandABB.
Metalcabinetmadeofmetalplates,2.5mm
thicknessanti-rustpaintedinGrey.
Maincutout,threephase,400Ampere,one
Distributionroadswithneutralizerandearth,
8.4
capacity800Ampere.
Sub-cutout,threephase,63Ampere,20.
Supplyofmaterials,installationandtestingof
distributionboard(DB)oforiginalEnglishCropteri
typewith18,threephaseasperapprovalof
supervisingengineer
No.
8.5 Supplyofmaterials,layingandinstallationthroughcagesorlayingthem
underroomfloorinsideplasticpipesorthroughmanholes80X80cm,
interredwithsoil.Thepricewillincludelayingofpipeinappropriatesize
forthepassageoffeedercablewithallotheraccessoriesorlayingthemon
cabletraysincorridorsandunderthesecondaryceilingsofthecables,
NYYtype,foreignmade,asperthegraphandinstructionsofsupervising
engineerinthefollowingsizes.
Cable4X120mm2MT200
Cable4X10mm2MT3000
8.6 Supplyofmaterialsandmakinglighting,points,itincludeslay/extending
wiresof(1X1.5)mm2+(2.5X1)mm2insideplasticpipesfrom
distributionboardstotheswitchpointsandextendingwire(without
No.
A)Supplyofmaterials,fixingandtestingoflighting
fixtures(60X60)ofthetypethatmaybefixedinthe
secondaryceiling,Turkishmade,aspertheapprovalof
thesupervisingengineer.
B)Supplyofmaterials,fixingandtestingoflighting No.
fixtures(spotlight18watt)ofthetypethatmaybe
fixedinthesecondaryceiling,Turkishmade,asperthe
C)Supplyofmaterials,fixingofceilingplatewith36 No.
wattbulbasperapprovalofsupervisingengineer.
D)Supplyofmaterials,fixingandtestingoflighting No.
fixtures(sportlight18wattofthetypefixedthe
secondaryceiling,Turkishmade,asperapprovalof
supervisingengineer.
E)Supplyofmaterials,fixingandtestingoflighting No.
Bracket18wattofwalltype,Turkishmade,asper
approvalofsupervisingengineer.
F)Supplyofmaterials,fixingandtestingoflighting No.
fixturesBracket18wattofwalltype,Turkish,asper
approvalofsupervisingengineer.
8.7 Supplyofmaterials,makingcompleteblockswitchpoints,including
No.
layingwire(1.1.5)+(2.5X1)2mm2insideplasticpipesfromdistribution
boardtoswitchwithswitchof13Asize,cropetry,boxedandallthe
materialrequiredinthework.
8.8 Supplyofmaterials,makingcompleteblockswitchpointincludinglaying No.
wiremm2(1X1.5)+(2.5X1)2insideplasticpipesfromdistributionboard
toswitchwithswitchesof13Asize,cropetrytype,boxes,andallthe
materialsrequiredinthework
8.9 Supplyofmaterialsandmakinggyserpointsorswitchpoint25ampere No.
includinglayingwiremm2(1X2.5)+(1X4)2,foreignmadeinsideplastic
pipesinappropriatesize,fromdistributionboardtothepointwithswitch
25ampere,MKtype.
8.1 Supplyofmaterials,makingcompletefanpointincludinglayingcable
insideplasticpipestothepointwithswitchofforeignmake.
No.
8.11 Supplyofmaterials,fixingandtestingofexhaustfanof12inchsize,
Malaysian,withmakinganexhaustpointusingwireofmm2(1X2.5)2
sizeinsideplasticpipeswiththeceilingasperapprovalofsupervising
engineer.
No.
No.
8.15 SupplyofmaterialsandmakingacompleteTVpointincludinglaying
cableinsideplasticpipestothepointwithswitchofaforeignmake.
No.
8.16 Supplyofmaterialsandinstallationofanti-lighteningsystemincluding
layingacopperwireof70mm2diameterfromearthpointtothesystem,
rodwithtaperedhead-Turkishcoveringthebuildingarea,asper
engineeringspecifications,pricealsoincludesmakingeach.
Total
8.17 Supplyofmaterialsandfixingacompletebellpoint
8.18 Supplyandinstallationoffirealarmasperengineeringspecifications
including:
No.
A)FireIndicationsystem9Zone
B)Smokedetector
C)Bell
D)Glassbreak
No.
No.
No.
No.
8.19 SupplyofmaterialsandfixingelectricalliftsOTISorconorMitsubishi, No.
completewithIronmotorbasenon-local,withcompletesafetysystem,
includesallancilliaryworkasperengineeringspecificationsforten
persons.
8.2 Supplyofmaterialsandfixingelectricaldoor,complete,foreignmake,
withnonlocalmotorandacompetesafetysystem,includesallthe
ancilliaryworksandperspecifications.
No.
2
3
4
Material cost
500A TP MCCB 50KA - 1 NO
Bus Bar 4 Nos of 500A rating
Earthing Point
315A TP MCCB 25KA
32A TPN MCB
16A TPN MCB
32A DP MCB
Digital panel meter for Amp, Volt, power factor and other parameter flush
mounting of size 96 x96 mm
Indicatoras lamp assy
Material cost
FABRICATION COST(35% OF Material cost )
Internal wiring complete
Basic cost
Tpt and C&F @ 20%
32453.00
6394.00
115
25656.50
1397.25
1397.25
701.50
23000.00
287.5
3125
5
6
7
IGTS/1993)andasperthedirectivesofthesupervisingengineering.
plansandbillsofquantities.
ngforcables,NYYtype.
rvisingengineerandresidentengineerdepartmentaftercompletionofworks.
ineering-withtwoparts,firstandsecond,andalsotheconditionsofelectricalandmechanicalworks.
Amount
stic pipes and the price will include boxes, wires and all the
1 4,694,940.00 4,694,940.00
60
2430
300
600
60
600
1770
480
480
420
240
1
240
300
60
5
630
30
30
2
420
ectrical Works)
LS
Nos
RM
Nos
Nos
Nos
Nos
Nos
Nos
1
1.2
2
1
6
2
3
1
32453.00
7672.80
230.00
25656.50
8383.50
2794.50
2104.50
23000.00
Nos
862.50
103157.30
56736.52
3125.00
163018.82
32603.76
55%
1
0.2
0.15
0.25
Say
Say
24452.82
40754.70
260830.10
260830.00
4,694,940.00
AllworkswillbedoneinkeepingwithIraqitechnicalspecifications(IGTS/1993)andasperth
Allmaterialswillbesubjecttolaboratorytests.
Maps/graphswillbethebasisincaseofdifference/variationbetweenplansandbillsofquantiti
Cableswillbelaidoncabletraysincorridorsandunderthefalseceilingforcables,NYYtype.
Allelectricalworksshouldbetestedwiththeofficialapprovalofsupervisingengineerandresid
AllworkswillbedoneinKeepingwiththeconditionsofthecivilengineering-withtwoparts,f
S.No.
Details
Unity
8 Section Eight: Electrical works/all electrical works will be done using plastic files and the cost wi
and all accessories.
8.1 Supplyofmaterials,fixingandtestingofmaindistributionboard(SBA),tobe
No.
fixedongroundandthecutoutswillbeFrenchLegrandconsistingofMGor
ABB.
Metalcabinetmadeofmetallicplats-thickness2.5mm,
anti-rustpaintedinGrey.
Maincutout,threephase,250Ampere,one.
Distributionrodswithneutralizerandearthingofthe
capacityof500Ampere.
Sub-cutout,threephase,40Ampere,20.
8.2 Supplyofmaterials,fixingandtestingofmaindistributionboard(SBB),tobe No.
fixedongroundandthecutoutswillbeFrenchLegrandconsistingofMGor
ABB.
MetalCabinetmadeofmetallicplats,thickness2.5mm,
anti-rustpaintedinGrey.
Maincutout,threephase,250Ampere,one
Distributionrodswithneutralizerandearthingofthe
capacityof500Amperecurrent.
Sub-cutout,threephase,40Ampere,20.
8.3 Supplyofmaterials,fixingandtestingofmaindistributionboard(SBC),tobe No.
fixedongroundandthecutoutswillbeFrenchLegrandconsistingofMGor
ABB.
MetalCabinetmadeofmetallicplats,thickness2.5mm,
anti-rustpaintedinGrey.
Maincutout,threephase,250Ampere,one
Distributionrodswithneutralizerandearthingofthe
capacityof500Amperecurrent.
Sub-cutout,threephase,40Ampere,No.5.
Sub-cutout,threephase,25AmpereNo.8
8.4 Supplyofmaterials,fixingandtestingofmaindistributionboard(DB),
No.
croptoryoriginalEnglishwith16(threephase),asperapprovalofsupervising
engineer.
8.5 Supplyofmaterials,layingandfixingthemthroughcagesorextendingthem
belowthefloorofroom,insideplasticpipesorthroughmainholes(80X80)cm,
tobeinternedwithsoilandthecostincludeslayinginpipesofappropriate
measurementforthepassageoffeedercablewithallotheraccessoriesorlaying
themoncabletraysinthecorridorsandunderthesecondarysealingforcables,
andYYTypeforeignmade,asperthegraphandinstructionsofsupervising
engineer,inthefollowingdimensions/sizes:
Cable,size4X120mm2
Cable,size4X10mm2
MT
MT
8.6 Supplyofmaterialsandmakinglightingpoints,includinglayingwireofthe
size1X1.5mm2+2.5X1mm2,insideplasticpipesfromdistributionboardto
thepoints(switches),layingwire(withoutcapillarity)fromswitchtothepoints
oflightingwithswitchesandboxeswiththeapprovalofsupervisingengineer,
andwhateverothermaterialsrequiredinthework.
A)supplyofmaterials,fixingandtestingfixturesof
lighting(60X60),ofthetypethatmaybefixedinthe
secondarysealing,Turkishmadeasperapprovalof
supervisingengineer.
B)Supplyofmaterials,fixingandtestingoffixturesof
lighting(Spotlight18watt)tobefixedinthesecondary
sealing,Turkishmade,asperapprovalofsupervising
engineer.
C)Supplyofmaterialsandfixingofsealingplatewithbulb
36wattasperapprovalofsupervisingengineer.
D)Supplyofmaterials,fixingandtestingoflighting
fixtures(spotlight18watt),tobefixedinthesecondary
sealing,Turkishmake,asperapprovalofsupervising
engineer.
E)Supplyofmaterials,fixingandtestingoflighting
fixturesbracket18wattofwalltype,Turkishmade,asper
approvalofsupervisingengineer.
F)Supplyofmaterial,fixingandtestingoflightingfixturesNo.
bracket18wattofwalltype,Turkishmadeasper
supervisingengineer.
No.
No.
No.
No.
No.
8.7 Supplyofmaterialsandmakingacompleteblockswitchpointincludinglaying No.
wire1X1.5mm2+2.5X1mm2,insideplasticpipes,fromdistributionboardto
theswitchwithswitchesof13Asize,croptarytypeandboxes,andallother
materialsthatmayberequiredinthework.
8.8 Supplyofmaterialsandmakingofcompleteblockswitchpointincluding
No.
layingwire,1X1.5mm2+2.5X1mm2insideplasticpipes/tubesfrom
distributionboardtotheswitchwithswitchesofthesize13A,croptarytypeand
boxes,andallthatisrequiredinthework.
8.9 Supplyofmaterialsandmakingageyserpointorswitchpoint25Ampere
No.
includinglayingwire1X2.5mm2+1X4mm2,foreignmake,insideplastic
pipes,inappropriatesizefromdistributionboardtothepoint,withswitches25
Ampere,MKtype.
Supplyofmaterialsandmakingacompletefanpoint
includinglayingcable,insideplasticpipes,tothepointwith
switchesofforeignmake.
No.
8.1 Supplymaterial,fixingandtestingofexhaustfanof12inchessize,Malaysian, No.
fromthepointofexhaust,usingwire1X2.5mm2,insideplasticpipewiththe
sealing,asperapprovalofsupervisingengineer.
8.11 SupplyofmaterialsandprovidingacompleteearthingsystemincludingmakingNo.
threepitsof1.5meterdepthandthedimensionsof40X40cm,buildinginbricks
withliftableconcretelid,aspermeasurementsgivenintheenclosedplan,in
eachofthesepitsamixofcoal,saltandsoftsandwillbeput,arodof50mm
diameterand1.5meterheightmaidofcoppercoatedIronwillbeinstalled.
Thereendswillbetiedwithacopperwireof70mm2extendingtothepointof
earthingindistributionboardsorthetransformer,underthesupervisionand
directivesofsupervisingengineer.
8.12 Supplyofmaterialsandinstallationoftelephoneexchangeof300lines,
externalandinternal,fromPanasonic.
No.
No.
No.
No.
No.
No.
No.
TS/1993)andasperthedirectivesofthesupervisingengineering.
nsandbillsofquantities.
forcables,NYYtype.
isingengineerandresidentengineerdepartmentaftercompletionofworks.
eering-withtwoparts,firstandsecond,andalsotheconditionsofelectricalandmechanicalworks.
Quantity
48
150
2500
1656
192
528
48
336
1176
336
336
288
192
1
192
240
48
3
408
24
24
288
AllworkswillbedoneinkeepingwithIraqitechnicalspecifications(IGTS/1993)andasperth
Allmaterialswillbesubjecttolaboratorytests.
Maps/graphswillbethebasisincaseofdifference/variationbetweenplansandbillsofquantiti
Cableswillbelaidoncabletraysincorridorsandunderthefalseceilingforcables,NYYtype.
Allelectricalworksshouldbetestedwiththeofficialapprovalofsupervisingengineerandresid
AllworkswillbedoneinKeepingwiththeconditionsofthecivilengineering-withtwoparts,f
S.No.
Details
Unity
Quantity
8 Section Eight: Electrical works/all electrical works will be done using plastic pipes and the cost wi
boxes, wires and all accessories.
8.1 Supplyofmaterials,fixingandtestingofmaindistributionboard
No.
1
(SBA),tobefixedongroundandthecutoutswillbeFrench
LegrandconsistingofMGorABB.
Metalcabinetmadeofmetallicplats-
thickness2.5mm,anti-rustpaintedinGrey.
Maincutout,threephase,250Ampere,
one.
Distributionrodswithneutralizerand
earthingofthecapacityof500Ampere.
Sub-cutout,threephase,40Ampere,20.
MetalCabinetmadeofmetallicplats,
thickness2.5mm,anti-rustpaintedinGrey.
Maincutout,threephase,250Ampere,one
Distributionrodswithneutralizerand
earthingofthecapacityof500Ampere
current.
Sub-cutout,threephase,40Ampere,5in
No..
Sub-cutout,threephase,25Ampere8in
No.
8.4 Supplyofmaterials,fixingandtestingofdistributionboard
No.
(DB),croptoryoriginalEnglishwith16(threephase),asper
approvalofsupervisingengineer.
48
8.5 Supplyofmaterials,layingandfixingthemthroughcagesor
extendingthembelowthefloorofroom,insideplasticpipesor
throughmainholes(80X80)cm,tobeinternedunderthesoiland
thecostincludeslayinginpipesofappropriatemeasurementfor
thepassageoffeedercablewithallotheraccessoriesorlaying
themoncabletraysinthecorridorsandunderthesecondary
sealingforcables,andYYTypeforeignmade,asperthegraph
andinstructionsofsupervisingengineer,inthefollowing
dimensions/sizes:
Cable,size4X120mm2
MT
Cable,size4X10mm2
MT
8.6 Supplyofmaterialsandmakinglightingpoints,includinglaying
wireofthesize1X1.5mm2+2.5X1mm2,insideplasticpipes
fromdistributionboardtothepoints(switches),layingwire
(withoutcapillarity)fromswitchtothepointsoflightingwith
switchesandboxeswiththeapprovalofsupervisingengineer,
andwhateverothermaterialsrequiredinthework.
150
2500
A)supplyofmaterials,fixingandtesting
No.
fixturesoflighting(60X60),ofthetypethat
maybefixedinthesecondarysealing,
Turkishmadeasperapprovalofsupervising
engineer.
B)Supplyofmaterials,fixingandtestingof No.
fixturesoflighting(Spotlight18watt)tobe
fixedinthesecondarysealing,Turkishmade,
asperapprovalofsupervisingengineer.
1606
C)Supplyofmaterialsandfixingofsealing No.
platewithbulb36wattasperapprovalof
supervisingengineer.
192
D)Supplyofmaterials,fixingandtestingof No.
lightingfixtures(spotlight18watt),tobe
fixedinthesecondarysealing,Turkishmake,
asperapprovalofsupervisingengineer.
432
E)Supplyofmaterials,fixingandtestingof No.
lightingfixturesbracket18wattofwalltype,
Turkishmade,asperapprovalofsupervising
engineer.
48
F)Supplyofmaterial,fixingandtestingof No.
lightingfixturesbracket18wattofwalltype,
Turkishmadeaspersupervisingengineer.
192
1080
288
336
SupplyofmaterialsandmakingacompleteNo.
fanpointincludinglayingcable,insideplastic
pipes,tothepointwithswitchesofforeign
make.
288
144
8.12 Supplyofmaterialsandinstallationoftelephoneexchangeof
300lines,externalandinternal,fromPanasonic.
No.
8.13 Supplyofmaterialsandmakingacompletetelephonepoint
includinglayingofcablefortelephonetwopare,insideplastic
pipesfromexchangetothepoint,withswitchandboxandall
othermaterialrequiredinthework.
No.
192
240
8.15
Total
No.
48
No.
No.
No.
No.
3
408
24
24
8.19 Supplyofmaterialsandinstallingworksforelectricaldoors,
foreignmake,completewithnonlocalmotorwithcomplete
safetysystem,includingallaccessoriesofworkasper
specifications.
No.
8.2 Supplyofmaterialsandmakingsplitpoints,layingwire4X4mm,No.
withalltherequisitesofwork.
288
Arodwithtaperedhead,Turkish,coveringthebuildingareaand
asperengineerspecifications.Priceincludesprovidingthe
earthing.
8.16 Supplyofmaterialsandfixingacompletebellpoint.
8.17 Supplyandinstallationoffirealarmsystem,asperengineering
specifications,asperfollowing:
A)Fireindicators,9Zone
B)Smokedetectors
C)Bell
D)Brakingtheglass
GTS/1993)andasperthedirectivesofthesupervisingengineering.
plansandbillsofquantities.
ngforcables,NYYtype.
rvisingengineerandresidentengineerdepartmentaftercompletionofworks.
neering-withtwoparts,firstandsecond,andalsotheconditionsofelectricalandmechanicalworks.
ad
1.AllSectionsinthebillsofquantitiespertaintosupplyandtransportofmaterials,worksandfixation,testingandop
2.Allmaterialsorworksshouldconformtothegeneraltechnicalspecifications.Theyaresubjecttotheapprovalofth
3.Thecontractorshouldappointspecialistengineertosupervisework.
4.Contractorshouldtakestepstoensuresafetyofareasadjacenttotheworkandshouldnotinterrupt/damageanyser
5.ContractorshouldcleanuptherubblestooutsidethesiteandinareaspermittedbytheMunicipality.
6.Allquantitiesaresubjecttoincreaseordecreaseandtheywouldpreciselybedeterminedasperthesitecapacity/req
7.Contractorshouldsubmitexecutiveplansofallnecessaryworksandasperdirectiveoftheconsultanttoobtainapp
8.Useofanti-salinecementforallconcreteworksbelowhumidityresistantlevel.
9.Allironworksshouldbepaintedwithananti-rustcoatbeforefixingandafterthatoilpointshouldprecede.
10.Contractorshouldsubmitcataloguesofallmachineriesandequipmentswhichwouldbeusedforallspecialization
11.Oncompletionofworks,thecontractorwouldsubmitcolourplansofalltheworksexecuted/ascompleted.
S.No.
Details
Unity
Observation: Level of road will be taken as 0.0 and level for finishing the building f
directives
of the consultant engineer
Supplyofmaterialsandequipmentsforprotectionofworks,
Total
networksofobviousandunderneathservices,alsopropertiesof
materialsandmachineriesforprotection,lightingguidance
signsasperlawsandinstructions.Contractorshouldcoordinate
hisworkswithotherdepartmentsandsectionswithregardto
theexistingserviceswithconcernedauthoritiesresponsiblefor
them.Contractorwillbearresponsibilityofanydamages/harms
thathemaycausetothenetworkofobviousandunderneath
services.
Supplyofmaterialsandcarryingouttheworksofcleaning,
preparingandamendingsiteplanwiththeremovalofupper
layerofsoilandtransportingittotheareaspermittedby
concernedauthorities.Theworkincludesremovalofall
obstructions.
Total
1 Contractorshouldcompleteallworksasperdimensions
indicatedinplanandaspertechnicalspecificationsofwork.
Coastwillincludechargesforequipmentsandmachines
contractorrequiresfortheexecutionofworkwithremovalof
accesssoilresultingformworkwhichcannotbeusedatthe
worksiteandtransportthemtotheplacesapprovedby
concernedauthoritiesandasperguidanceofresidentengineer,
andprovidesupporttothesidesofexcavationincaseof
necessity.Theworkwillalsoincludeallfieldandlaboratory
testsasperspecifications.Earthworkswillbeprovidedfrom
thepull-outsmeantfortests.
a)
1 Earth Excavations
Excavationsuntilthefinallevelwithdepthnotlessthen2mtr., m3
includedinprice.Thesidesupportforthesoilreducingground
waterleveliffound,andallthatisrequiredforworktoprepared
thematbase,inkeepingwithplansandtechnicalspecifications,
includedinthepricefillinguparoundfoundationswithgood
rollingofthefoundationsfloorstillthedensityrequiredin
plans.
2 Pebbles
Supplyofnecessaryequipmenttospreadtheprimarylayersof m2
boulders,thickness25cm,withasperincloseplans,properly
rollingasperdirectivesofsupervisingengineerandengineering
specifications.
b)
PesticidesTreatment:TheworkincludessupplyofDoorspanor Total
choloridene,mixingitwithwaterandsprinklingwiththeratio
of10ltd./m2underthefloors,sidesoffoundations,under
pathwaysandalltheplacespestscouldpenetratefromtothe
inside,oranymaterialwithsimilarefficacyasperthe
instructionofthecompany.
MT
B
Leanconcreteundermatbaseusinganti-salinecementthickness100mm.
m2
m3
m3
Reinforcedconcreteusingnormalcementstaircasesandcoat
yards.
Reinforcedconcreteforceilingsofallfloorsusingnormal
cement,thickness200mm.
m3
Reinforcedconcreteusingnormalcementforscreensand
refractors,thickness200mm,height120cm.
m3
Constructionwithbricks24X12X8cmaboveanti-humiditylevelm2
forallfloorsandasperdimensionsindicatedinplans,using
normalcementandwiththickness12cmforinternal
intersectionsofbathsandbathconveniences.
1 Allworkswillbedoneinkeepingwithspecificationsand
samplesapprovedbysupervisingengineer.
2 Coastwillincludeworksofplasteretc.fixingmetalin
areasofjoiningblockwallswithpillarsandconcretebridges
(beams)forplasterandalsoclosingallelectricalpipepassages
orsanitarypipes,iffound,withmetalclutchesandcement-sand
mortarwithproperlysprinklingwaterandsprinklingallwalls
andceilingswithcementmortarbeforestartingplasterworks.
3 Coastincludesallsectionsfornecessarytestsforallmaterials.
4 Contractorshouldsubmitsamplesofallmaterialsmeanttobe
supplied,forapprovalbeforesupply.
POP plaster
A
Supplyofmaterialsandplasteringinternalwallsandceilings
withPOPusing..,coastwillinclude.
-Soakingwithcementmortar,ratio1:1.
-LayerofnormalPOPwiththicknessnotlessthen2cmusing
-layeroftechnicalPOP(fermented)forlastlayer.
m2
Wrap-up works
Supplyofmaterialsandplasticpaint,3layersofinternaland
externalwalls,andinternalandexternalceilingsasperplans
andtechnicalspecifications
m2
Supplyofmaterialsandcarryingoutwrap-upwithceramic,
m2
IranianorTurkishonly,cement-sand(3:1)mortarwithsoaking
asperplansandtechnicalspecificationsinthewallsof
bathroomsandkitchens
Schedule 6, metal works
1 Metalworkswillbedoneinkeepingwithplansandtechnical
specifications.
2 Samplesofallironworkssectionswillbemadetopresentthem
tosupervisingengineer,beforestartofwork.
3 Costincludesallnecessarymaterialstoworkswitchlock,
handlesetc.andglass,thickness4cmforthespacesnotless
then0.5mtr.sq.andthickness6mmforthespacesnot
exceeding0.5m2andanti-flynetsforthemoving.
4 Locationalspotdimensionswillbetakenforconfirmingthe
preparationandtoworkaccordingly.
5 Costofsection,anti-rustpaintonelayerforallironworksis
included,alsooilpaint,threelayers.
6 Supplyofdoorswithswitchkeys,threeforeachdoor.
Metal works
Windows and Doors PVC
PVCwindowsanddoublenormalglass,thickness,6mm,with
anti-flynetwiththeremobileframes,asperplansandtechnical
specifications.
-Windows,dimensions1.5X2m2
-Windows,dimensions1.5X1.5m2
-Windowsdimensions0.5X0.5m2
-Windowsdimensions1.5X1m2
-Doordimensions2.0X1m2
-Doordimensions2.0X0.8m2
B-Irondoorswithframecapsplatefromtwosides,work
includesallrequirementsoffixingthem,locksofgoodforeign
quality(switchtype)handlesetc.andnormalglassof6mmas
perarchitecturalplansandtechnicalspecifications.
m2
m2
m2
m2
No.
No.
-Maingate,dimensions2.4X2m2
-Gate,dimensions2.0X1m2
No.
No.
C- Fencingworks:Supplyofmaterialsandworksto
manufacturefencesofgalleonsteel,asperdirectivesof
supervisingengineer.
-Atthealleviations,heightof600mm
MT
-Supplyofmaterialsandworkinginternalfencingforstaircase,MT
height850mm,asperplanandtechnicalspecifications.
3 Costincludesallnecessarymaterialsforworkincludingswitch
lockshandlesetc.
4 Cost of the section includes paint in Supertwo Demloc, three
coats.
Doors with white wood structure with two layer compression,
oneofthemthinironsheetandtheotheristheusualybackone,
fromtwosides,thickness3mmforonelayerwithframeofteak
wood.TheworksalsoincludespaintwithSupertwoDemlocin
threecoatswithalltherequirementoffixingthemandlocksof
switchtypewithhandlesetc.andusualglassofthickness6mm,
asperarchitecturalplansandtechnicalspecifications.
a.Door,dimensions1X2.0m2
No.
1 Theworkswillbedoneinkeepingwithplans,technical
specificationsanddirectivesofsupervisingengineer.
2 Requiredcolours,notspecifiedinplansorthelists,willbe
determinedbysupervisingengineer.
3 Contractorwillsubmitsamplesforapprovalbeforeexecuting
works.
4 Theyshouldsucceedsinlaboratorytests.
a)Supplyofmaterialsandworkfor
M2
levelingfloorswithporcelene,40X40cm,
IranianorTurkishonly,withthehelpof
cementplussandmortaronalayerofloose
concrete,costincludesporingoflayerfor
thegroundfloorasperdirectivesof
supervisingengineer.
b)Baysandstairs30X120cm
No.
c)Supplyofmaterialsandfixingofmarble MT
skirtingusingcement+sandmortar,ratio
3:1,withsoakingandallthatisrequiredin
thework,dimensions10X40cm
d)Supplyofmaterialsandworkforthe
m2
levelingofbathfloorswithceramic,Iranian
orTurkishonly,usingcement+Sandmortar
ratio1:3withsoakingofjointswithwhite
cementandasperdirectivesofsupervising
engineer.
B.Supplyofmaterialsandmakingsecondaryceilingsofgood m2
qualityinregulardimensionsusingplasticboard,asperplans,
costincludesallmetalstructurescarryingthem.Andalso
accessoriesforfixing,wrappingandpaintingthem,asperplans
andtechnicalspecifications.
-Excavationofthefoundationofsupportwallsforwalk,width
40cmanddepthof60cm.
-Spreadingofpebblesthickness20cm,togetherwiththe
sprinklingwithwaterandproperrolling.
-Poringoffoundation,thickness20cm,width40cm,usingantisalinecementC20.
-Constructionwithsolidblocks,width20cm,usingcement
+sandmortar(3:1ratio)togetherwithwaxing,heightvarying,
asperlevelsindicatedinthearchitecturalplans.
-Soillevelingtogetherwithspreadofalayerofpebbles,20cm,
sprinklingandproperrollingoftheareacoveredbetweenthe
sportwallandedgeofthebuilding.
-Poringofpathway,usingpolishedconcreteof10cmthickness, m2
C20andwidthof1mtr.,usinganti-salinecementalsomaking
jointsofextensionforeverytwosq.mtr.,inlengththenfilling
thejointswiththecementmortarandsprinklingpesticides
belowtheporinglevelasperdirectivesofsupervisingengineer.
ixation,testingandoperation,andasperdirectivesoftheconsultant.
cttotheapprovaloftheconsultantbeforesupplyorexecutionandallsamplesshouldbedeliveredofficiallytotheresidentengin
errupt/damageanyservicenetworks.
erthesitecapacity/requirement.
onsultanttoobtainapprovalfromhim.
houldprecede.
dforallspecializations.
d/ascompleted.
Quantity
2350
9922
2.8.1
2.26.1
2.25
157.50
46.25
112.40
316.15
Add 14% 44.26
360.41
Add 25% 90.10
450.51
say
451.00
1200
13992
16.3.3
16.4
1354.00
425.05
1779.05
Add 14% 249.07
2028.12
Add 25% 507.03
2535.15
say
636
600
15048
2481.6
380
1200
600
60
14740
2595
33
1750
1125
3200
5400
22993
8140
38600
6471
180
810
45
111
195
180
1
16
158
85
420
10665
240
8644
780
9800
875
146
ficiallytotheresidentengineerandhisformalapprovalshouldbeobtained.
1.AllSectionsinthebillsofquantitiespertaintosupplyandtransportofmaterials,worksandfixation,testingandop
2.Allmaterialsorworksshouldconformtothegeneraltechnicalspecifications.Theyaresubjecttotheapprovalofth
3.Thecontractorshouldappointspecialistengineertosupervisework.
4.Contractorshouldtakestepstoensuresafetyofareasadjacenttotheworkandshouldnotinterrupt/damageanyser
5.ContractorshouldcleanuptherubblestooutsidethesiteandinareaspermittedbytheMunicipality.
6.Allquantitiesaresubjecttoincreaseordecreaseandtheywouldpreciselybedeterminedasperthesitecapacity/req
7.Contractorshouldsubmitexecutiveplansofallnecessaryworksandasperdirectiveoftheconsultanttoobtainapp
8.Useofanti-salinecementforallconcreteworksbelowhumidityresistantlevel.
9.Allironworksshouldbepaintedwithananti-rustcoatbeforefixingandafterthatoilpointshouldprecede.
10.Contractorshouldsubmitcataloguesofallmachineriesandequipmentswhichwouldbeusedforallspecialization
11.Oncompletionofworks,thecontractorwouldsubmitcolourplansofalltheworksexecuted/ascompleted.
S.No.
Details
Shedule1, works for preparing the site
Observation: Level of road will be taken as 0.0 and level for finishing the building floor will
Supplyofmaterialsandequipmentsforprotectionofworks,networks
ofobviousandunderneathservices,alsopropertiesofmaterialsand
machineriesforprotection,lightingguidancesignsasperlawsand
instructions.Contractorshouldcoordinatehisworkswithother
departmentsandsectionswithregardtotheexistingserviceswith
concernedauthoritiesresponsibleforthem.Contractorwillbear
responsibilityofanydamages/harmsthathemaycausetothenetwork
ofobviousandunderneathservices.
Supplyofmaterialsandcarryingouttheworksofcleaning,preparing
andamendingsiteplanwiththeremovalofupperlayerofsoiland
transportingittotheareaspermittedbyconcernedauthorities.The
workincludesremovalofallobstructions.
1 Contractorshouldcompleteallworksasperdimensionsindicatedin
planandaspertechnicalspecificationsofwork.Coastwillinclude
chargesforequipmentsandmachinescontractorrequiresforthe
executionofworkwithremovalofaccesssoilresultingformwork
whichcannotbeusedattheworksiteandtransportthemtotheplaces
approvedbyconcernedauthoritiesandasperguidanceofresident
engineer,andprovidesupporttothesidesofexcavationincaseof
necessity.Theworkwillalsoincludeallfieldandlaboratorytestsasper
specifications.Earthworkswillbeprovidedfromthepull-outsmeant
fortests.
1 Earth Excavations
Excavationsuntilthefinallevelwithdepthnotlessthen2mtr.,included
inprice.Thesidesupportforthesoilreducinggroundwaterlevelif
found,andallthatisrequiredforworktopreparedthematbase,in
keepingwithplansandtechnicalspecifications,includedintheprice
fillinguparoundfoundationswithgoodrollingofthefoundations
floorstillthedensityrequiredinplans.
2 Pebbles
Supplyofnecessaryequipmenttospreadtheprimarylayersofboulders,
thickness25cm,withasperincloseplans,properlyrollingasper
directivesofsupervisingengineerandengineeringspecifications.
a)
b)
PesticidesTreatment:TheworkincludessupplyofDoorspanor
choloridene,mixingitwithwaterandsprinklingwiththeratioof10
ltd./mtr.sq.underthefloors,sidesoffoundations,underpathwaysand
alltheplacespestscouldpenetratefromtotheinside,oranymaterial
withsimilarefficacyaspertheinstructionofthecompany.
1 Alltheworkswillbedoneaspertechnicalspecifications,dimensions
andformsgiveninplans,thecoastwillincludeallmaterialsrequiredin
thework,machinery,equipment,moldsandadditionalmaterialsasper
instructionsofsupervisingengineer.
2 Anti-salinecementwillbeusedforalltheworks,belowantihumidity
level.Reinforcementwillbedoneasperconstructionplansand
instructionofsupervisingengineer.
3 Priceofsectionspertainingtoconcretewillincludeallnecessarytests
asprovidedinthecontract.
4 Contractorshouldsubmitsamplesofallmaterialsmeanttobesupplied,
forapprovalbeforesupply
Lean concrete, strength 15 mica pascal
A
Non-reinforcedconcretestrength15n/mm2usinganti-salinecement,
theworkwillincludemixingantihumiditychemicalasperdirectiveof
themanufacturingcompany,andtechnicalspecifications.
-AntihumiditylayerDPC,dimensions200X150mmforthewallsof
thebuilding.
Leanconcreteundermatbaseusinganti-salinecement-thickness
100mm.
Reinforcedconcreteforceilingsofallfloorsusingnormalcement,
thickness200mm.
Reinforcedconcreteusingnormalcementforscreensandrefractors,
thickness200mm,height120cm.
Reinforcedconcreteusingnormalcement,workincludesallworksof
mold,reinforcementironforpillars,wallsandwallsoflifts,coast
includesacoatoftar(30-20externallyandallconcretepartstouching
soil.
Schedule for, constructions works
Allworkswillbedoneinkeepingwithdimensionsindicatedinplans
andaspertechnicalspecificationsandinstructionsofsupervising
engineer.
1 Costincludessupplyofallnecessarymaterialsforthework,italso
includestools,equipmentandscaffoldingrequiredbycontractorfor
executionofwork.
2 Completedworkswillbeencircledwithconstructioninblocksasper
indicateddimensions.
3 Coastwillincludesectionsallnecessarytestsofmaterials.
4 Contractorshouldsubmitsamplesofallmaterialsmeanttobesupplied,
forapprovalbeforesupply.
Brick work 24X12X8cm using cement mortar1:3, as per dimensions indicated and plans.
A
Constructionwithsolidblocks40X20X15cmbelowanti-humiditylevel
forallfloorsandasperdimensionsindicatedinplans,usingnormal
cementwiththethicknessof24cmforwalls.
B
Constructionwithbricks24X12X8cmaboveanti-humiditylevelforall
floorsandasperdimensionsindicatedinplans,usingnormalcement
andwiththickness12cmforinternalintersectionsofbathsandbath
conveniences.
3 Coastincludesallsectionsfornecessarytestsforallmaterials.
4 Contractorshouldsubmitsamplesofallmaterialsmeanttobesupplied,
forapprovalbeforesupply.
POP plaster
A
SupplyofmaterialsandplasteringinternalwallsandceilingswithPOP
using..,coastwillinclude.
-Soakingwithcementmortar,ratio1:1.
-LayerofnormalPOPwiththicknessnotlessthen2cmusing
-layeroftechnicalPOP(fomented)forlastlayer.
Supplyofmaterialsandplasticpaint,3layersofinternalandexternal
walls,andinternalandexternalceilingsasperplansandtechnical
specifications
Wrap-up works
Supplyofmaterialsandcarryingoutwrap-upwithceramic,Iranianor
Turkishonly,cement-sand(3:1)mortarwithsoakingasperplansand
technicalspecificationsinthewallsofbathroomsandkitchens
Schedule 6, metal works
1 Metalworkswillbedoneinkeepingwithplansandtechnical
specifications.
2 Samplesofallironworkssectionswillbemadetopresentthemto
supervisingengineer,beforestartofwork.
3 Costincludesallnecessarymaterialstoworkswitchlock,handlesetc.
andglass,thickness4cmforthespacesnotlessthen0.5mtr.sq.and
thickness6mmforthespacesnotexceeding0.5m2andanti-flynetsfor
themoving.
4 Locationalspotdimensionswillbetakenforconfirmingthepreparation
andtoworkaccordingly.
5 Costofsection,anti-rustpaintonelayerforallironworksisincluded,
alsooilpaint,threelayers.
6 Supplyofdoorswithswitchkeys,threeforeachdoor.
Metal works
Windows and Doors PVC
PVCwindowsanddoublenormalglass,thickness,6mm,withanti-fly
netwiththeremobileframes,asperplansandtechnicalspecifications.
-Windows,dimensions1.5X1.5m2
-Windows,dimensions1.5X2m2
-Windowsdimensions1.5X1m2
-Windowsdimensions0.5X0.5m2
-Doordimensions2.0X0.8m2
-Doordimensions2.0X1m2
B-Irondoorswithframecapsplatefromtwosides,workincludesall
requirementsoffixingthem,locksofgoodforeignquality(switchtype)
handlesetc.andnormalglassof6mmasperarchitecturalplansand
technicalspecifications.
-Maingate,dimensions2.4X2m2
-Gate,dimensions1X2m2
C- Fencingworks:Supplyofmaterialsandworkstomanufacture
fencesofgalleonsteel,asperdirectivesofsupervisingengineer.
-Atthealleviations,heightof600mm
-Supplyofmaterialsandworkinginternalfencingforstaircase,height
850mm,asperplanandtechnicalspecifications.
3 Costincludesallnecessarymaterialsforworkincludingswitchlocks
handlesetc.
4 Cost of the section includes paint in Supertwo Demloc, three coats.
Doors with white wood structure with two layer compression, one of
them thin iron sheet and the other is the usualy back one, from two
sides,thickness3mmforonelayerwithframeofteakwood.Theworks
also includes paint with Supertwo Demloc in three coats with all the
requirementoffixing them andlocksof switchtype with handlesetc.
and usual glass of thickness 6mm, as per architectural plans and
technicalspecifications.
a.Door,dimensions1X2.0
b)Baysandstairs30X120cm
c)Supplyofmaterialsandfixingofmarble
skirtingusingcement+sandmortar,ratio3:1,with
soakingandallthatisrequiredinthework,
dimensions10X40cm
d)Supplyofmaterialsandworkforthelevelingof
bathfloorswithceramic,IranianorTurkishonly,
usingcement+Sandmortarratio1:3withsoakingof
jointswithwhitecementandasperdirectivesof
supervisingengineer.
B.Supplyofmaterialsandmakingsecondaryceilingsofgoodquality
inregulardimensionsusingplasticboard,asperplans,costincludesall
metalstructurescarryingthem.Andalsoaccessoriesforfixing,
wrappingandpaintingthem,asperplansandtechnicalspecifications.
Spreadingfirstlayerofflincoattarmaterial(primcoat),thenspreading
a layer of membrane of 4mm thickness, (bituminous water proof
membrane), stenthing by plastic fibers, ensuring inter-twin of 10cm
between sections while fixing, using hot-weld then placing a layer of
nylon of membrane then a layer of stir-pour (thermal insulation),
thickness5cm,density35kg/m3,thenundertakingtheworksofleveling
withCashyMozaneekusingcement+sandmortarandalsoproviding
appropriate depression (1%) towards the opening for drainage of rain
waterclosetotheoutlet,thicknessshouldnotbelessthen8cm,andthe
cost includes making extension joint for every 3X3m, for the entire
terracespaceandfillingthosejointswithpolysulphide,properlyandit
shouldsucceedlaboratorytests.Costincludestakingupperipheriesand
makingconcertskirting,asperplansandtechnicalspecifications.
s,worksandfixation,testingandoperation,andasperdirectivesoftheconsultant.
Theyaresubjecttotheapprovaloftheconsultantbeforesupplyorexecutionandallsamplesshouldbedeliveredofficiallytothe
shouldnotinterrupt/damageanyservicenetworks.
dbytheMunicipality.
eterminedasperthesitecapacity/requirement.
ectiveoftheconsultanttoobtainapprovalfromhim.
hatoilpointshouldprecede.
hwouldbeusedforallspecializations.
worksexecuted/ascompleted.
Unity
Quantity
Price IQD
Amount IQD
or finishing the building floor will be as per directives of the consultant engineer
Total
1
Total
1,000,000.00
500,000.00
m3
1800
7,200,000.00
Sq.Mtr.
900
18,000,000.00
m3
450
9,000,000.00
1,000,000.00
Total
MT
310
5,580,000.00
Sq.Mtr.
900
18,000,000.00
m3
m3
390
40
163,800,000.00
12,000,000.00
m3
1615
503,880,000.00
m3
28
8,400,000.00
m3
1185
355,500,00.00
m3
865
311,400,000.00
d and plans.
m3
2050
348,500,000.00
m2
3360
604,800,000.00
m2
14903
178,836,000.00
m2
5621
67,452,000.00
m2
20350
61,050,000.00
m2
5200
104,000,000.00
m2
m2
m2
m2
No.
No.
563
148
162
36
144
144
76,005,000.00
26,640,000.00
14,580,000.00
540,000.00
17,280,000.00
21,600,000.00
No.
No.
1
13
360,000.00
1,950,000.00
MT
MT
386
70
11,580,000.00
2,450,000.00
No.
288
43,200,000.00
M2
6553
78,636,000.00
No.
192
5,760,000.00
MT
5108
30,648,000.00
m2
550
11,000,000.00
m2
6000
72,000,000.00
m2
670
20,100,000.00
m2
135
3,375,000.00
esshouldbedeliveredofficiallytotheresidentengineerandhisformalapprovalshouldbeobtained.
1.AllSectionsinthebillsofquantitiespertaintosupplyandtransportofmaterials,worksandfixation,testingandop
2.Allmaterialsorworksshouldconformtothegeneraltechnicalspecifications.Theyaresubjecttotheapprovalofth
3.Thecontractorshouldappointspecialistengineertosupervisework.
4.Contractorshouldtakestepstoensuresafetyofareasadjacenttotheworkandshouldnotinterrupt/damageanyser
5.ContractorshouldcleanuptherubblestooutsidethesiteandinareaspermittedbytheMunicipality.
6.Allquantitiesaresubjecttoincreaseordecreaseandtheywouldpreciselybedeterminedasperthesitecapacity/req
7.Contractorshouldsubmitexecutiveplansofallnecessaryworksandasperdirectiveoftheconsultanttoobtainapp
8.Useofanti-salinecementforallconcreteworksbelowhumidityresistantlevel.
9.Allironworksshouldbepaintedwithananti-rustcoatbeforefixingandafterthatoilpointshouldprecede.
10.Contractorshouldsubmitcataloguesofallmachineriesandequipmentswhichwouldbeusedforallspecialization
11.Oncompletionofworks,thecontractorwouldsubmitcolourplansofalltheworksexecuted/ascompleted.
S.No.
Details
Unity
Observation: Level of road will be taken as 0.0 and level for finishing the building floor will be as p
of
the consultant engineer
Supplyofmaterialsandequipmentsforprotectionofworks,
Total
networksofobviousandunderneathservices,alsopropertiesof
materialsandmachineriesforprotection,lighting,guidancesignsas
perlawsandinstructions.Contractorshouldcoordinatehisworks
withotherdepartmentsandsectionswithregardtotheexisting
serviceswithconcernedauthoritiesresponsibleforthem.Contractor
willbearresponsibilityofanydamages/harmsthathemaycauseto
thenetworkofobviousandunderneathservices.
Supplyofmaterialsandcarryingouttheworksofcleaning,
Total
preparingandamendingsiteplanwiththeremovalofupperlayerof
soilandtransportingittotheareaspermittedbyconcerned
authorities.Theworkincludesremovalofallobstructions.
1 Contractorshouldcompleteallworksasperdimensionsindicatedin
planandaspertechnicalspecificationsofwork.Coastwillinclude
chargesforequipmentsandmachinescontractorrequiresforthe
executionofworkwithremovalofaccesssoilresultingformwork
whichcannotbeusedattheworksiteandtransportthemtothe
placesapprovedbyconcernedauthoritiesandasperguidanceof
residentengineer,andprovidesupporttothesidesofexcavationin
caseofnecessity.Theworkwillalsoincludeallfieldandlaboratory
testsasperspecifications.Earthworkswillbeprovidedfromthe
pull-outsmeantfortests.
1 Earth Excavations
Excavationsuntilthefinallevelwithdepthnotlessthen2mtr.,
m3
includedinprice.Thesidesupportforthesoilreducingground
waterleveliffound,andallthatisrequiredforworktopreparedthe
matbase,inkeepingwithplansandtechnicalspecifications,
includedinthepricefillinguparoundfoundationswithgoodrolling
ofthefoundationsfloorstillthedensityrequiredinplans.
2 Pebbles
Supplyofnecessaryequipmenttospreadtheprimarylayersof
m2
boulders,thickness25cm,withasperincloseplans,properlyrolling
asperdirectivesofsupervisingengineerandengineering
specifications.
a)
Supplyofnecessaryequipmenttospreadalayerofplaster,thicknessm3
0.5m,typeB,withCalifornianstrengthnotlessthen35%underthe
mat base of the building with sprinkling and good rolling till
reachingthelevelofrollingnotlessthen95%andonthelevelsof
thethicknessofonelayernotlessthen25cm,asperenclosedplans
and directives of supervising engineer and engineering
specifications.
b)
PesticidesTreatment:TheworkincludessupplyofDoorspanor
Total
choloridene,mixingitwithwaterandsprinklingwiththeratioof10
liters./mtr.sq.underthefloors,sidesoffoundations,under
pathwaysandalltheplacespestscouldpenetratefromtotheinside,
oranymaterialwithsimilarefficacyaspertheinstructionofthe
company.
MT
B
Leanconcreteundermatbaseusinganti-salinecement-thickness
100mm.
m2
m3
Reinforcedconcreteusingnormalcementstaircasebaysandcoat
yards.
m3
Reinforcedconcreteforceilingsofallfloorsusingnormalcement, m3
thickness200mm.
Reinforcedconcreteusingnormalcementforscreensandrefractors, m3
thickness200mm,height120cm.
Reinforcedconcreteusingnormalcement,workincludesallmold m3
works,reinforcementironforpillars,wallsandwallsoflifts,coast
includesacoatoftar(30-20externallyandallconcreteparts
touchingsoil.
Schedule 4, Constructions Works
Allworkswillbedoneinkeepingwithdimensionsindicatedin
plansandaspertechnicalspecificationsandinstructionsof
supervisingengineer.
1 Costincludessupplyofallnecessarymaterialsforthework,italso
includestools,equipmentandscaffoldingrequiredbycontractorfor
executionofwork.
2 Completedworkswillbeencircledwithconstructioninblocksas
perindicateddimensions.
3 Coastwillincludesectionsallnecessarytestsofmaterials.
4 Contractorshouldsubmitsamplesofallmaterialsmeanttobe
supplied,forapprovalbeforesupply.
Brick work 24X12X8cm using cement mortar1:3, as per dimensions indicated and plans.
A
Constructionwithsolidblocks40X20X15cmbelowanti-humidity m3
levelforallfloorsandasperdimensionsindicatedinplans,using
normalcementwiththethicknessof24cmforwalls.
B
Constructionwithbricks24X12X8cmaboveanti-humiditylevelfor m2
allfloorsandasperdimensionsindicatedinplans,usingnormal
cementandwiththickness12cmforinternalintersectionsofbaths
andbathconveniences.
3 Coastincludesallsectionsfornecessarytestsforallmaterials.
4 Contractorshouldsubmitsamplesofallmaterialsmeanttobe
supplied,forapprovalbeforesupply.
POP plaster
A
Supplyofmaterialsandplasteringinternalwallsandceilingswith
POPusing..,coastwillinclude.
-Soakingwithcementmortar,ratio1:1.
-LayerofnormalPOPwiththicknessnotlessthen2cmusingrulers
-layeroftechnicalPOP(fermented)forlastlayer.
m2
Emollient with Cement material
A
Supplyofmaterialsincludesworkforprovidingalayerofsoft
m2
emollientforexternalwallsandscreensfrominside,external
ceilingsandforplacesindicatedinplansusingrulers,coastincludes
shockingwithcementmortar1:1.
Paint
A
Supplyofmaterialsandplasticpaint,3layersofinternaland
externalwalls,andinternalandexternalceilingsasperplansand
technicalspecifications
m2
Wrap-up works
Supplyofmaterialsandcarryingoutwrap-upwithceramic,Iranian m2
orTurkishonly,cement-sand(3:1)mortarwithsoakingasperplans
andtechnicalspecificationsinthewallsofbathroomsandkitchens
Schedule 6, metal works
1 Metalworkswillbedoneinkeepingwithplansandtechnical
specifications.
2 Samplesofallironworkssectionswillbemadetopresentthemto
supervisingengineer,beforestartofwork.
3 Costincludesallnecessarymaterialstoworkswitchlock,handles
etc.andglass,thickness4cmforthespacesnotlessthen0.5mtr.sq.
andthickness6mmforthespacesnotexceeding0.5m2andanti-fly
netsforthemoving.
4 Locationalspotdimensionswillbetakenforconfirmingthe
preparationandtoworkaccordingly.
5 Costofsection,anti-rustpaintonelayerforallironworksis
included,alsooilpaint,threelayers.
6 Supplyofdoorswithswitchkeys,threeforeachdoor.
Metal works
PVC Windows/Doors
PVCwindowsanddoublenormalglass,thickness,6mm,withantiflynetwiththeremobilepartsofdoor/frames,asperplansand
technicalspecifications.
-Windows,dimensions1.5X2m2
-Windows,dimensions1.5X1.5m2
-Windowsdimensions0.5X0.5m2
-Windowsdimensions1.5X1m2
-Gate/Doordimensions2.0X1m2
-Gate/Doordimensions2.0X0.8m2
m2
m2
m2
m2
No.
No.
B-Irondoorswithframecapsplatefromtwosides,workincludes
allrequirementsoffixingthem,locksofgoodforeignquality
(switchtype)handlesetc.andnormalglassof6mmasper
architecturalplansandtechnicalspecifications.
-Maingate,dimensions2.4X2m2
-Gate,dimensions1X2m2
No.
No.
C- Fencingworks:Supplyofmaterialsandworkstomanufacture
fencesofgalleonsteel,asperdirectivesofsupervisingengineer.
-Atalleviations,heightof600mm
MT
-Supply of materials and working internal fencing for stair case,MT
height850mm,asperplanandtechnicalspecifications.
1.Allwoodworkswillbecarriedoutasperplansandtechnicalspecifications.
2.Samplesofallwoodworkswillbemadeforpresentationtosupervisingengineer,beforestartofwork.
3.Costincludesallnecessarymaterialsforworkincludingswitchlocksandhandlesetc.
4.CostofthesectionincludespaintingSupertwoDemloc,threecoats.
Doorswithwhitewoodstructurewithtwolayercompression,oneofthemthinironsheetandtheotheristheusu
fromtwosides,thickness3mmforonelayerwithframeofteakwood.TheworksalsoincludespaintwithSupertw
a.Door,dimensions1X2.0No.288
Schedule 8, leveling works
1 Theworkswillbedoneinkeepingwithplans,technical
specificationsanddirectivesofsupervisingengineer.
2 Requiredcolours,notspecifiedinplansorthelists,willbe
determinedbysupervisingengineer.
3 Contractorwillsubmitsamplesforapprovalbeforeexecuting
works.
4 Theyshouldsucceedsinlaboratorytests.
a)Supplyofmaterialsandworkforleveling M2
floorswithporcelene,40X40cm,Iranianor
Turkishonly,withthehelpofcementplussand
mortaronalayeroflooseconcrete,costincludes
poringoflayerforthegroundfloorasper
directivesofsupervisingengineer.
b)Baysandstairs30X120cm
c)Supplyofmaterialsandfixingofmarble
skirtingusingcement+sandmortar,ratio3:1,
withsoakingandallthatisrequiredinthework,
dimensions10X40cm
d)SupplyofmaterialsandworkforthelevelingNo.
ofbathfloorswithceramic,IranianorTurkish
only,usingcement+Sandmortarratio1:3with
soakingofjointswithwhitecementandasper
directivesofsupervisingengineer.
MT
m2
Schedule 9, Secondary Ceilings
1 Samplesanddimensionswillbeselectedbysupervisingengineer,as
perplans.
2 Costwillincludepaintofsecondaryceilingwithrequiredpaints.
B.Supplyofmaterialsandmakingsecondaryceilingsofgood
m2
qualityinregulardimensionsusingplasticboard,asperplans,cost
includesallmetalstructurescarryingthem.Andalsoaccessoriesfor
fixing,wrappingandpaintingthem,asperplansandtechnical
specifications.
-Excavationofthefoundationofsupportwallsforwalk,width
40cmanddepthof60cm.
-Spreadingofpebblesthickness20cm,togetherwiththe
sprinklingwithwaterandproperrolling.
-Poringoffoundation,thickness20cm,width40cm,usingantisalinecementC20.
-Constructionwithsolidblocks,width20cm,usingcement+sand
mortar(3:1ratio)togetherwithwaxing,heightvarying,asperlevels
indicatedinthearchitecturalplans.
-Soillevelingtogetherwithspreadofalayerofpebbles,20cm,
sprinklingandproperrollingoftheareacoveredbetweenthesport
wallandedgeofthebuilding.
-Poringofpathway,usingpolishedconcreteof10cmthickness,C20m2
andwidthof1mtr.,usinganti-salinecementalsomakingjointsof
extensionforeverytwosq.mtr.,inlengththenfillingthejointswith
thecementmortarandsprinklingpesticidesbelowtheporinglevel
asperdirectivesofsupervisingengineer.
worksandfixation,testingandoperation,andasperdirectivesoftheconsultant.
eyaresubjecttotheapprovaloftheconsultantbeforesupplyorexecutionandallsamplesshouldbedeliveredofficiallytothere
houldnotinterrupt/damageanyservicenetworks.
bytheMunicipality.
erminedasperthesitecapacity/requirement.
tiveoftheconsultanttoobtainapprovalfromhim.
atoilpointshouldprecede.
wouldbeusedforallspecializations.
rksexecuted/ascompleted.
Quantity
1500
750
375
275
750
390
40
1425
25
990
865
and plans.
1820
3000
13255
5226
18481
4000
144
540
24
105
108
96
1
13
386
70
,beforestartofwork.
setc.
ronsheetandtheotheristheusualybackone,
salsoincludespaintwithSupertwoDemlocin
88
5443
192
4434
360
5120
595
works.
125
deliveredofficiallytotheresidentengineerandhisformalapprovalshouldbeobtained.
Mechanical
1.AllSectionsinthebillsofquantitiespertaintosupplyandtransportofmaterials,worksandfixation,testingan
2.Allmaterialsorworksshouldconformtothegeneraltechnicalspecifications.Theyaresubjecttotheapproval
3.Thecontractorshouldappointspecialistengineertosupervisework.
4.Contractorshouldtakestepstoensuresafetyofareasadjacenttotheworkandshouldnotinterrupt/damageany
5.ContractorshouldcleanuptherubblestooutsidethesiteandinareaspermittedbytheMunicipality.
6.Allquantitiesaresubjecttoincreaseordecreaseandtheywouldpreciselybedeterminedasperthesitecapacity
7.Contractorshouldsubmitexecutiveplansofallnecessaryworksandasperdirectiveoftheconsultanttoobtain
8.Useofanti-salinecementforallconcreteworksbelowhumidityresistantlevel.
9.Allironworksshouldbepaintedwithananti-rustcoatbeforefixingandafterthatoilpointshouldprecede.
10.Contractorshouldsubmitcataloguesofallmachineriesandequipmentswhichwouldbeusedforallspecializa
11.Oncompletionofworks,thecontractorwouldsubmitcolourplansofalltheworksexecuted/ascompleted.
S.No.
Details
Unity
MT
5 SupplyandfixingofcompressorwaterdrainagepipesforAC's,size MT
1,CPVCtype,asperdirectivesofSupervisingengineer.
TOTAL
Unit
Rmt
Nos
Labour
1 Fitter
2 labour
Nos
Nos
Total
Add 2% Contengencies
Rmt
Nos
Labour
1 Fitter
2 labour
Nos
Nos
Unit
Total
Add 2% Contengencies
als,worksandfixation,testingandoperation,andasperdirectivesoftheconsultant.
.Theyaresubjecttotheapprovaloftheconsultantbeforesupplyorexecutionandallsamplesshouldbedeliveredofficiallytoth
dshouldnotinterrupt/damageanyservicenetworks.
edbytheMunicipality.
determinedasperthesitecapacity/requirement.
irectiveoftheconsultanttoobtainapprovalfromhim.
rthatoilpointshouldprecede.
chwouldbeusedforallspecializations.
eworksexecuted/ascompleted.
Quantity
Price IQD
Amount IQD
48
1023026.07
49105251.5625
144
871796.13
125538643.125
96
702774.43
67466345.625
1500
6,345.98
9518972.58
4300
5,881.27
25289445.9285
276,918,658.82
Qty
Rate
Amount
100.00
17.00
168.00
42.00
16,800.00
714.00
1.00
1.00
2,240.00
1,600.00
2,240.00
1,600.00
21,354.00
427.08
5,338.50
27,119.58
271.20
6,345.98
Qty
Rate
Amount
100.00
17.00
153.00
38.25
15,300.00
650.25
1.00
1.00
2,240.00
1,600.00
2,240.00
1,600.00
19,790.25
395.81
4,947.56
25,133.62
251.34
5,881.27
50
dbedeliveredofficiallytotheresidentengineerandhisformalapprovalshouldbeobtained.
Cost of AC 2 Ton
661.25
760437.50
33.06
38021.88
Contingencies @ 2.5%
17.36
19961.48
177.92
204605.21
889.59
###
Total
563.50
648025.00
28.18
32401.25
Contingencies @ 2.5%
14.79
17010.66
151.62
174359.23
Total
758.08 871796.13
454.25
522387.50
22.71
26119.38
Contingencies @ 2.5%
11.92
13712.67
122.22
140554.89
611.11
702774.43
Total
Mechanical
1.AllSectionsinthebillsofquantitiespertaintosupplyandtransportofmaterials,worksandfixation,testingan
2.Allmaterialsorworksshouldconformtothegeneraltechnicalspecifications.Theyaresubjecttotheapproval
3.Thecontractorshouldappointspecialistengineertosupervisework.
4.Contractorshouldtakestepstoensuresafetyofareasadjacenttotheworkandshouldnotinterrupt/damageany
5.ContractorshouldcleanuptherubblestooutsidethesiteandinareaspermittedbytheMunicipality.
6.Allquantitiesaresubjecttoincreaseordecreaseandtheywouldpreciselybedeterminedasperthesitecapacity
7.Contractorshouldsubmitexecutiveplansofallnecessaryworksandasperdirectiveoftheconsultanttoobtain
8.Useofanti-salinecementforallconcreteworksbelowhumidityresistantlevel.
9.Allironworksshouldbepaintedwithananti-rustcoatbeforefixingandafterthatoilpointshouldprecede.
10.Contractorshouldsubmitcataloguesofallmachineriesandequipmentswhichwouldbeusedforallspecializa
11.Oncompletionofworks,thecontractorwouldsubmitcolourplansofalltheworksexecuted/ascompleted.
S.No.
Details
Mechanical works water drainage system
Internal works
1 FixingandsupplyofEasterntoilet,Turkish,withall
necessaryaccessoriesasperdirectivesofsupervising
engineer.
Unity
Quantity
No.
48
FixingandsupplyofWesterntoilet,Turkish,withall
necessaryaccessoriesasperdirectivesofsupervising
engineer.
No.
48
2 Fixingandsupplyofcompleteassembly,4inch,asper
directivesofsupervisingengineer.
No.
240
3 SupplyandfixingofwaterdrainagepipesUPVC,size4 MT
inch,EgyptianSharieftype,withallnecessaryaccessories
asperdirectivesofsupervisingengineer.
11150
4 SupplyandfixingwaterdrainagepipesUPVC,3inch,
MT
EgyptianSharieftype,withallnecessaryaccessoriesasper
directivesofsupervisingengineer.
400
5 SupplyandfixingwaterdrainagepipesUPVC,Size2inch, MT
EgyptianSharieftype,withallnecessaryaccessoriesasper
directivesofsupervisingengineer.
575
6 SupplyandfixingwaterdrainagepipesUPVC,size6inch, MT
EgyptianSharieftype,withallnecessaryaccessoriesasper
directivesofsupervisingengineer.
300
7 Septic,size2X5X5mtr.,withallnecessaryexcavationand No.
pouringworksasperdirectivesofsupervisingengineer.
8 Supplyandfixingplasticmanhole40X40cmasper
directivesofsupervisingengineer.
No.
10
TOTAL
Rmt
Nos
100.00
17.00
Labour
1 Fitter
2 labour
Nos
Nos
1.00
1.00
Unit
Qty
Total
Add 2% Contengencies
Item
Unit
Quantity
Materials:
W.C
6.5 litres PVC flush Tank
Nos
Nos
1.00
1.00
Clamp
Nos
4.00
B)
Labour:
Plumber
Mistry
Each
Each
1
0.5
Helper
Each
Total (M+L)
Add for Sundries & Contingencies
Add W.C & Electricity
2.00%
1.00%
25.00%
Total Amt.
Cost Per No (Rs.)
Item
Unit
Quantity
Materials:
W.C
6.5 litres PVC flush Tank
Nos
Nos
1.00
1.00
Clamp
Nos
4.00
Labour:
Plumber
Mistry
Each
Each
1
0.5
Helper
Each
B)
Total (M+L)
Add for Sundries & Contingencies
Add W.C & Electricity
Add for OH & C.P
Total Amt.
Cost Per No (Rs.)
2.00%
1.00%
25.00%
TYPE OF WORK
BRICK WALL
BRICK WALL
BAFFLE WALL
BRICKWORK
CONCRETE (1:2:4)
EXCAVATION
PVC PIPE
Add 2% Contengencies
SEPTIC TANK
L
W
5
5
3
0.21
0.21
0.21
5.5
5.5
0.05
worksandfixation,testingandoperation,andasperdirectivesoftheconsultant.
eyaresubjecttotheapprovaloftheconsultantbeforesupplyorexecutionandallsamplesshouldbedeliveredofficiallytothere
houldnotinterrupt/damageanyservicenetworks.
bytheMunicipality.
erminedasperthesitecapacity/requirement.
tiveoftheconsultanttoobtainapprovalfromhim.
atoilpointshouldprecede.
wouldbeusedforallspecializations.
rksexecuted/ascompleted.
Price IQD
Amount IQD
283345.92
13600604.16
448081.92
21507932.16
13,719.46
152972015.6835
9,506.05
3802418.1
5,261.65
3025446.562125
29240.951805
8772285.5415
4,419,749.90
8839499.8005
40250
402500
212,922,702
Rate
40,600.00
1,725.50
2,240.00
1,600.00
Labour
1 Fitter
2 labour
Amount
406.00
101.50
2,240.00
1,600.00
46,165.50
923.31
11,541.38
Rate
(Rs.)
Total
Add 2% Contengencies
58,630.19
586.30
G.Total
Rate Per/Rmt.
13,719.46
Amount.
(Rs.)
8500.00
1500.00
8500.00
1500.00
125.00
500.00
10000.00
2,240.00
2,240.00
2240.00
1120.00
1600.00
1600.00
4960.00
14960.00
299.20
149.60
3740.00
19148.80
448081.92
Rate
(Rs.)
Amount.
(Rs.)
3000.00
1500.00
3000.00
1500.00
125.00
500.00
4500.00
2,240.00
2,240.00
2240.00
1120.00
1600.00
1600.00
4960.00
9460.00
189.20
94.60
2365.00
12108.80
283345.92
VOLUME RATE
COST
1
2.1
1
2.1
1
0.945
5.145
5166
1
18.75
5743.5
2
2
1.5
0.75
TOTAL COST IN Rs
60.5
26579.07
107690.625
944
57112
150
1200
192581.695
3,851.63
245,541.66
4,419,749.90
eliveredofficiallytotheresidentengineerandhisformalapprovalshouldbeobtained.
Unit
Qty
Rate
Amount
Rmt
Nos
100.00
17.00
270.00
67.50
27,000.00
1,147.50
1
2
Nos
Nos
1.00
1.00
2,240.00
1,600.00
2,240.00
1,600.00
1
2
31,987.50
639.75
7,996.88
40,624.13
406.24
9,506.05
Unit
Labour
Fitter
labour
Total
Add 2% Contengencies
Qty
Rate
Amount
Rmt
Nos
100.00
17.00
133.00
33.25
13,300.00
565.25
Nos
Nos
1.00
1.00
2,240.00
1,600.00
2,240.00
1,600.00
17,705.25
354.11
4,426.31
G.Total
Rate Per/Rmt.
22,485.67
224.86
5,261.65
Rmt
Nos
100.00
17.00
907.00
226.75
90,700.00
3,854.75
Labour
1 Fitter
2 labour
Nos
Nos
1.00
1.00
2,240.00
1,600.00
2,240.00
1,600.00
Unit
Total
Qty
Rate
Amount
98,394.75
Add 2% Contengencies
1,967.90
24,598.69
G.Total
Rate Per/Rmt.
124,961.33
1,249.61
29,240.95
Mechanical
1.AllSectionsinthebillsofquantitiespertaintosupplyandtransportofmaterials,worksandfixation,testingan
2.Allmaterialsorworksshouldconformtothegeneraltechnicalspecifications.Theyaresubjecttotheapproval
3.Thecontractorshouldappointspecialistengineertosupervisework.
4.Contractorshouldtakestepstoensuresafetyofareasadjacenttotheworkandshouldnotinterrupt/damageany
5.ContractorshouldcleanuptherubblestooutsidethesiteandinareaspermittedbytheMunicipality.
6.Allquantitiesaresubjecttoincreaseordecreaseandtheywouldpreciselybedeterminedasperthesitecapacity
7.Contractorshouldsubmitexecutiveplansofallnecessaryworksandasperdirectiveoftheconsultanttoobtain
8.Useofanti-salinecementforallconcreteworksbelowhumidityresistantlevel.
9.Allironworksshouldbepaintedwithananti-rustcoatbeforefixingandafterthatoilpointshouldprecede.
10.Contractorshouldsubmitcataloguesofallmachineriesandequipmentswhichwouldbeusedforallspecializa
11.Oncompletionofworks,thecontractorwouldsubmitcolourplansofalltheworksexecuted/ascompleted.
S.No.
Details
Unity
No.
4 Fixingandsupplyofhandwash,Turkish,withallaccessoriesasper
directivesofsupervisingengineer.
No.
5 Supplyandfixingofwatergyser,200liters,SyrianorTurkish,withall No.
accessoriesandasperdirectivesofsupervisingengineer.
6 Fixingandsupplyofanklewalve(anglelock)Vetra,asperdirectivesofNo.
supervisingengineer.
7 SupplyandfixingBDRpipesof20mm,ItalianorGermanwithall
necessaryaccessoriesaftertestingunder8barpressure,asper
directivesofsupervisingengineer.
MT
8 SupplyandfixingofPPRpipes,25mmsize,ItalianorGermanwithall MT
necessaryaccessorieswithtestingunder8barpressure,asper
directivesofsupervisingengineer.
9 SupplyandfixingPPRpipes,32mmsize,ItalianorGermanwithall
necessaryaccessorieswithtestingunder8barpressure,asper
directivesofsupervisingengineer.
MT
10 SupplyandfixingGalvanisepipes,50mm,ItalianorGermanwithall
allnecessaryaccessorieswithtestingunder8barpressure,asper
directivesofsupervisingengineer.
MT
11 SupplyandfixingGalvanisepipes,65mm,sizeItalianorGermanwith MT
allnecessaryaccessorieswithtestingunder8barpressure,asper
directivesofsupervisingengineer.
12 SupplyandfixingGalvanisewatertank,modular,thicknessofthe
section4mm,Turkishorigin,size2cubicmeterwithallnecessary
accessoriesasperdirectivesofsupervisingengineer.
No.
13 SupplyandfixingGalvanisewatertank,modular,thicknessofthe
section4mm,Turkishorigin,size83cubicmeterwithallnecessary
accessoriesasperdirectivesofsupervisingengineer.
No.
14 Fixingandsupplyofwaterpump,ItalianorEuropeanorigin,12cubic No.
meter/hourhead,50mwithelectricboardwithallaccessories.
15 Fixingandsupplyofwaterpump,ItalianorEuropeanorigin,16cubic No.
meter/hourhead,45mwithelectricboardwithallaccessories.
Total
Description
Details of cost for one no.
MATERIAL:
Vitreous china flat back wash basin 630x450 mm
15 mm C.P. brass tap
C.P. brass waste 32 mm
C.I. bracket for wash basin and sinks
Red lead, white lead and gasket
Cement, sand and grit etc.
Painting of brackets, fittings etc.
Carriage of materials
LABOUR:
Fitter (grade 1)
Mason (brick layer) 1 st class
Beldar
TOTAL
Add Water Charges @ 1%
TOTAL
Unit
each
each
each
pair
L.S.
L.S.
L.S.
L.S.
day
day
day
Description
Details of cost for one no.
MATERIAL:
Unit
each
LS
Description
Details of cost for one no.
MATERIAL:
Angle Valve
Carriage of materials and fixing charges
TOTAL
Add Water Charges @ 1%
TOTAL
Add CPOH @ 25%
Cost of each
Say
Unit
each
LS
Unit
Rmt
Nos
Labour
1 Fitter
2 labour
Nos
Nos
Total
Add 2% Contengencies
Description
Unit
Material
1 25 mm PPR Pipe
2 Coupling
Rmt
Nos
Labour
1 Fitter
2 labour
Nos
Nos
Total
Add 2% Contengencies
Rmt
Nos
Labour
1 Fitter
Nos
Unit
2 labour
Nos
Total
Add 2% Contengencies
Unit
Rmt
Nos
Labour
1 Fitter
2 labour
Nos
Nos
Total
Add 2% Contengencies
Unit
Rmt
2 Coupling
Nos
Labour
1 Fitter
2 labour
Nos
Nos
Total
Add 2% Contengencies
worksandfixation,testingandoperation,andasperdirectivesoftheconsultant.
heyaresubjecttotheapprovaloftheconsultantbeforesupplyorexecutionandallsamplesshouldbedeliveredofficiallytothere
houldnotinterrupt/damageanyservicenetworks.
bytheMunicipality.
erminedasperthesitecapacity/requirement.
ctiveoftheconsultanttoobtainapprovalfromhim.
atoilpointshouldprecede.
wouldbeusedforallspecializations.
orksexecuted/ascompleted.
Quantity
Price IQD
Amount IQD
er supply system
96
393055
37733240.4505056
48
72504
3480212.736
96
274811
26381900.4505056
48
1089152
52279299.072
672
68901
46301359.104
1400
7,337.37
10272323.88
21000
9,072.31
190518531.84
1800
13,037.88
23468185.728
200
40,796.87
8159374.08
350
50,710.80
17748778.32
12
1,878,196.32
22538355.84
60,981,560.64
60981560.64
1,519,998.48
3039996.96
1,664,142.48
3328284.96
506,231,404
Quantity Rate
Amount
1
2
1
1
16.12
13.39
26.91
13.52
14000
325
104
91
2.314
2.314
2.314
2.314
14000
650
104
91
37.30
30.98
62.27
31.29
0.33
0.33
0.67
2240
1920
1600
739.2
633.6
1072
17451.64116
17.45
17469.09280116
21836.36600145
21836
393055
Quantity Rate
Amount
1
8.06
640
320
Quantity Rate
Amount
1
8.06
Qty
640
2579.2
3219.2
3.22
3222.4192
4028.024
4028
72504
480
320
Rate
480
2579.2
3059.2
3.06
3062.2592
3827.824
3828
68901
Amount
100.00
17.00
200.00
50.00
20,000.00
850.00
1.00
1.00
2,240.00
1,600.00
2,240.00
1,600.00
24,690.00
493.80
6,172.50
31,356.30
313.56
7,337.37
Qty
Rate
Amount
100.00
17.00
256.00
64.00
25,600.00
1,088.00
1.00
1.00
2,240.00
1,600.00
2,240.00
1,600.00
30,528.00
610.56
7,632.00
38,770.56
387.71
9,072.31
Qty
Rate
Amount
100.00
17.00
384.00
96.00
38,400.00
1,632.00
1.00
2,240.00
2,240.00
1.00
1,600.00
1,600.00
43,872.00
877.44
10,968.00
55,717.44
557.17
13,037.88
Qty
Rate
Amount
100.00
17.00
1,280.00
320.00
128,000.00
5,440.00
1.00
1.00
2,240.00
1,600.00
2,240.00
1,600.00
137,280.00
2,745.60
34,320.00
174,345.60
1,743.46
40,796.87
Qty
100.00
Rate
1,600.00
Amount
160,000.00
17.00
400.00
6,800.00
1.00
1.00
2,240.00
1,600.00
2,240.00
1,600.00
170,640.00
3,412.80
42,660.00
216,712.80
2,167.13
50,710.80
consultant.
utionandallsamplesshouldbedeliveredofficiallytotheresidentengineerandhisformalapprovalshouldbeobtained.
Description
Details of cost for one no.
MATERIAL:
Vitreous china flat back wash basin 630x450 mm
15 mm C.P. brass tap
C.P. brass waste 32 mm
C.I. bracket for wash basin and sinks
Red lead, white lead and gasket
Cement, sand and grit etc.
Painting of brackets, fittings etc.
Carriage of materials
LABOUR:
Fitter (grade 1)
Mason (brick layer) 1 st class
Beldar
TOTAL
Add Water Charges @ 1%
TOTAL
Unit
Quantity Rate
each
each
each
pair
L.S.
L.S.
L.S.
L.S.
1
2
1
1
16.12
13.39
26.91
13.52
8750
325
104
91
2.314
2.314
2.314
2.314
0.33
0.33
0.67
2240
1920
1600
day
day
day
Description
Details of cost for one no.
MATERIAL:
Unit
Quantity Rate
each
LS
1
8.06
Description
Details of cost for one no.
MATERIAL:
Galvanized Water Tank 2 cum
Carriage of materials and fixing charges
TOTAL
Add Water Charges @ 1%
TOTAL
Add CPOH @ 25%
Cost of each
Say
Unit
Quantity Rate
each
LS
1
8.06
Description
Unit
Quantity Rate
43200
640
57600
3200
each
LS
TOTAL
Add Water Charges @ 1%
TOTAL
Add CPOH @ 25%
Cost of each
Say
2656000
8.06
6400
Description
Unit
Quantity Rate
each
LS
28800
8.06
4800
TOTAL
Add Water Charges @ 1%
TOTAL
Add CPOH @ 25%
Cost of each
Say
Description
Unit
Quantity Rate
each
LS
TOTAL
Add Water Charges @ 1%
TOTAL
Add CPOH @ 25%
Cost of each
Say
35200
8.06
4800
uldbeobtained.
Amount
8750
650
104
91
37.30
30.98
62.27
31.29
739.2
633.6
1072
12201.64
12.20
12213.84
15267.3
15267
274811
Amount
43200
5158.4
48358.4
48.36
48406.76
60508.45
60508
1089152
Amount
57600
25792
83392
83.39
83475.39
104344.2
104344
1878196
Amount
2656000
51584
2707584
2707.58
2710292
3387864
3387864
###
Amount
28800
38688
67488
67.49
67555.49
84444.36
84444
1519998
Amount
35200
38688
73888
73.89
73961.89
92452.36
92452
1664142
Mechanical
1.AllSectionsinthebillsofquantitiespertaintosupplyandtransportofmaterials,worksandfixation,testingan
2.Allmaterialsorworksshouldconformtothegeneraltechnicalspecifications.Theyaresubjecttotheapproval
3.Thecontractorshouldappointspecialistengineertosupervisework.
4.Contractorshouldtakestepstoensuresafetyofareasadjacenttotheworkandshouldnotinterrupt/damageany
5.ContractorshouldcleanuptherubblestooutsidethesiteandinareaspermittedbytheMunicipality.
6.Allquantitiesaresubjecttoincreaseordecreaseandtheywouldpreciselybedeterminedasperthesitecapacity
7.Contractorshouldsubmitexecutiveplansofallnecessaryworksandasperdirectiveoftheconsultanttoobtain
8.Useofanti-salinecementforallconcreteworksbelowhumidityresistantlevel.
9.Allironworksshouldbepaintedwithananti-rustcoatbeforefixingandafterthatoilpointshouldprecede.
10.Contractorshouldsubmitcataloguesofallmachineriesandequipmentswhichwouldbeusedforallspecializa
Oncompletionofworks,thecontractorwouldsubmitcolourplansofalltheworksexecuted/ascompleted.
S.No.
Details
Mechanical works -Fire Fighting System
Internal works
1 Supplyandfixingfirefightingcabinetwithextinguisherof6kg
size,firehoselengthwillbe30mtr.,size1,withallnecessary
accessoriesasperdirectivesofsupervisingengineer.
Unity
Quantity
No.
30
2 Supplyandfixingofsteelcarbonpipes,size2.5inch,Ukrainian, MT
capacity12barpressure,withcoating
externally..
150
3 Supplyandfixingsteelcarbonpipes,size1inch,Ukrainian,with MT
thestrengthof12barpressurewithcoatingexternallywithGrey
andbrightredpaintwithallnecessaryaccessoriesandasper
directivesofsupervisingengineer.
600
4 Supplyandfixingfirepumpworkingon3levels(GUKYpump+ No.
ELEpumpandgaspump)45cubicmeter/hourand100mtrhead,
AmericanorTurkish,designedasperAmericancodeNFPAwith
allthenecessaryaccessories.
Total
Description
Details of cost for one no.
MATERIAL:
Extinguisher of 6kg size
6 kg steel fire extinguisher cabinet
Unit
each
each
Quantity
1
1
Fire Hose 30 m
Carriage of materials and fixing charges
TOTAL
Add Water Charges @ 1%
TOTAL
Add CPOH @ 25%
Cost of each
Say
each
LS
Unit
Labour
1 Fitter
2 labour
1
8.06
Qty
Rmt
Nos
100.00
17.00
Nos
Nos
1.00
1.00
Total
Add 2% Contengencies
Unit
Qty
Rmt
Nos
100.00
17.00
Nos
Nos
1.00
1.00
Total
Add 2% Contengencies
Description
Details of cost for one no.
MATERIAL:
Unit
Quantity
1
8.06
sandfixation,testingandoperation,andasperdirectivesoftheconsultant.
subjecttotheapprovaloftheconsultantbeforesupplyorexecutionandallsamplesshouldbedeliveredofficiallytotheresident
notinterrupt/damageanyservicenetworks.
Municipality.
edasperthesitecapacity/requirement.
ftheconsultanttoobtainapprovalfromhim.
ointshouldprecede.
beusedforallspecializations.
ascompleted.
Price IQD
Amount IQD
2162746
64882367.55
39,867.44
5980115.9925
16,631.68
9979007.22
29,350,601.28
29350601.28
110,192,092
Rate
Amount
56250
4048
56250
4048
9936
3200
Rate
9936
25792
96026
96.03
96122.026
120152.5325
120153
2162746
Amount
1,250.00
312.50
125,000.00
5,312.50
2,240.00
1,600.00
2,240.00
1,600.00
134,152.50
2,683.05
33,538.13
170,373.68
1,703.74
39,867.44
Rate
Amount
500.00
125.00
50,000.00
2,125.00
2,240.00
1,600.00
2,240.00
1,600.00
55,965.00
1,119.30
13,991.25
71,075.55
710.76
16,631.68
Rate
Amount
1200000
12800
1200000
103168
1303168
1303.17
1304471.168
1630588.96
1630589
29350601
eliveredofficiallytotheresidentengineerandhisformalapprovalshouldbeobtained.
Mechanical
1.AllSectionsinthebillsofquantitiespertaintosupplyandtransportofmaterials,worksandfixation,testingan
2.Allmaterialsorworksshouldconformtothegeneraltechnicalspecifications.Theyaresubjecttotheapproval
3.Thecontractorshouldappointspecialistengineertosupervisework.
4.Contractorshouldtakestepstoensuresafetyofareasadjacenttotheworkandshouldnotinterrupt/damageany
5.ContractorshouldcleanuptherubblestooutsidethesiteandinareaspermittedbytheMunicipality.
6.Allquantitiesaresubjecttoincreaseordecreaseandtheywouldpreciselybedeterminedasperthesitecapacity
7.Contractorshouldsubmitexecutiveplansofallnecessaryworksandasperdirectiveoftheconsultanttoobtain
8.Useofanti-salinecementforallconcreteworksbelowhumidityresistantlevel.
9.Allironworksshouldbepaintedwithananti-rustcoatbeforefixingandafterthatoilpointshouldprecede.
10.Contractorshouldsubmitcataloguesofallmachineriesandequipmentswhichwouldbeusedforallspecializa
11.Oncompletionofworks,thecontractorwouldsubmitcolourplansofalltheworksexecuted/ascompleted.
S.No.
Details
Unity
Total
No.
ndfixation,testingandoperation,andasperdirectivesoftheconsultant.
ubjecttotheapprovaloftheconsultantbeforesupplyorexecutionandallsamplesshouldbedeliveredofficiallytotheresidenten
tinterrupt/damageanyservicenetworks.
unicipality.
asperthesitecapacity/requirement.
heconsultanttoobtainapprovalfromhim.
ntshouldprecede.
usedforallspecializations.
uted/ascompleted.
Quantity
Price IQD
Amount IQD
24
2162746
51905894.04
125
39,867.44
4983429.99375
450
16,631.68
7484255.415
29,350,601.28
29350601.28
93,724,181
ciallytotheresidentengineerandhisformalapprovalshouldbeobtained.
Mechanical
1.AllSectionsinthebillsofquantitiespertaintosupplyandtransportofmaterials,worksandfixation,testingan
2.Allmaterialsorworksshouldconformtothegeneraltechnicalspecifications.Theyaresubjecttotheapproval
3.Thecontractorshouldappointspecialistengineertosupervisework.
4.Contractorshouldtakestepstoensuresafetyofareasadjacenttotheworkandshouldnotinterrupt/damageany
5.ContractorshouldcleanuptherubblestooutsidethesiteandinareaspermittedbytheMunicipality.
6.Allquantitiesaresubjecttoincreaseordecreaseandtheywouldpreciselybedeterminedasperthesitecapacity
7.Contractorshouldsubmitexecutiveplansofallnecessaryworksandasperdirectiveoftheconsultanttoobtain
8.Useofanti-salinecementforallconcreteworksbelowhumidityresistantlevel.
9.Allironworksshouldbepaintedwithananti-rustcoatbeforefixingandafterthatoilpointshouldprecede.
10.Contractorshouldsubmitcataloguesofallmachineriesandequipmentswhichwouldbeusedforallspecializa
Oncompletionofworks,thecontractorwouldsubmitcolourplansofalltheworksexecuted/ascompleted
S.No.
Details
Unity
No.
3 Fixingandsupplyofshower,Turkish,80X80cm,withmixerandall
accessoriesasperdirectivesofsupervisingengineer.
No.
4 Fixingandsupplyofhandwash,Turkish,withallaccessoriesasper
directivesofsupervisingengineer.
No.
5 Supplyandfixingofwatergyser,200liters,SyrianorTurkish,withall
accessoriesandasperdirectivesofsupervisingengineer.
No.
6 Fixingandsupplyofanklewalve(anglelock)Vetra,asperdirectivesof No.
supervisingengineer.
7 SupplyandfixingBDRpipesof20mm,ItalianorGermanwithall
MT
necessaryaccessoriesaftertestingunder8barpressure,asperdirectives
ofsupervisingengineer.
8 SupplyandfixingofBDRpipes,25mmsize,ItalianorGermanwithall MT
necessaryaccessorieswithtestingunder8barpressure,asperdirectives
ofsupervisingengineer.
9 SupplyandfixingBDRpipes,32mmsize,ItalianorGermanwithall
MT
necessaryaccessorieswithtestingunder8barpressure,asperdirectives
ofsupervisingengineer.
10 SupplyandfixingGalvanisepipes,50mm,ItalianorGermanwithallall MT
necessaryaccessorieswithtestingunder8barpressure,asperdirectives
ofsupervisingengineer.
11 SupplyandfixingGalvanisepipes,65mm,sizeItalianorGermanwithall MT
allnecessaryaccessorieswithtestingunder8barpressure,asper
directivesofsupervisingengineer.
12 SupplyandfixingGalvanisewatertank,modular,thicknessofthesection No.
4mm,Turkishorigin,size2cubicmeterwithallnecessaryaccessoriesas
perdirectivesofsupervisingengineer.
13 SupplyandfixingGalvanisewatertank,modular,thicknessofthesectionNo.
4mm,Turkishorigin,size95cubicmeterwithallnecessaryaccessoriesas
perdirectivesofsupervisingengineer.
14 Fixingandsupplyofwaterpump,ItalianorEuropeanorigin,16cubic
meter/hourhead,60mwithelectricboardwithallaccessories.
No.
15 Fixingandsupplyofwaterpump,ItalianorEuropeanorigin,30cubic
meter/hourhead,45mwithelectricboardwithallaccessories.
No.
Total
Description
Details of cost for one no.
MATERIAL:
Turkish 80X180cm bath tub
Carriage of materials and fixing charges
TOTAL
Add Water Charges @ 1%
TOTAL
Add CPOH @ 25%
Cost of each
Say
Unit
each
LS
worksandfixation,testingandoperation,andasperdirectivesoftheconsultant.
yaresubjecttotheapprovaloftheconsultantbeforesupplyorexecutionandallsamplesshouldbedeliveredofficiallytotheresi
uldnotinterrupt/damageanyservicenetworks.
ytheMunicipality.
minedasperthesitecapacity/requirement.
veoftheconsultanttoobtainapprovalfromhim.
oilpointshouldprecede.
ouldbeusedforallspecializations.
uted/ascompleted
Quantity
Price IQD
Amount IQD
r supply system
180
393055
70749825.844698
60
3150357
189021432.6
60
72504
4350265.92
180
274811
49466063.344698
60
1089152
65349123.84
1200
68901
82680998.4
2100
7,337.37
15408485.82
3000
9,072.31
27216933.12
2500
13,037.88
32594702.4
250
40,796.87
10199217.6
300
50,710.80
15213238.56
16
1,878,196.32
30051141.12
70,128,794.74
70128794.736
1,747,998.25
3495996.504
2,579,420.84
5158841.688
671,085,061
Quantity Rate
1
8.06
Amount
62500
9600
62500
77376
139876
139.88
140015.876
175019.845
175020
3150357
bedeliveredofficiallytotheresidentengineerandhisformalapprovalshouldbeobtained.
Mechanical
1.AllSectionsinthebillsofquantitiespertaintosupplyandtransportofmaterials,worksandfixation,testingan
2.Allmaterialsorworksshouldconformtothegeneraltechnicalspecifications.Theyaresubjecttotheapproval
3.Thecontractorshouldappointspecialistengineertosupervisework.
4.Contractorshouldtakestepstoensuresafetyofareasadjacenttotheworkandshouldnotinterrupt/damageany
5.ContractorshouldcleanuptherubblestooutsidethesiteandinareaspermittedbytheMunicipality.
6.Allquantitiesaresubjecttoincreaseordecreaseandtheywouldpreciselybedeterminedasperthesitecapacity
7.Contractorshouldsubmitexecutiveplansofallnecessaryworksandasperdirectiveoftheconsultanttoobtain
8.Useofanti-salinecementforallconcreteworksbelowhumidityresistantlevel.
9.Allironworksshouldbepaintedwithananti-rustcoatbeforefixingandafterthatoilpointshouldprecede.
10.Contractorshouldsubmitcataloguesofallmachineriesandequipmentswhichwouldbeusedforallspecializa
Oncompletionofworks,thecontractorwouldsubmitcolourplansofalltheworksexecuted/ascompleted.
S.No.
Details
Unity
No.
3 SupplyandfixingofwaterdrainagepipesUPVC,size4inch,EgyptianSharief MT
type,withallnecessaryaccessoriesasperdirectivesofsupervisingengineer.
4 SupplyandfixingwaterdrainagepipesUPVC,3inch,EgyptianSharieftype, MT
withallnecessaryaccessoriesasperdirectivesofsupervisingengineer.
5 SupplyandfixingwaterdrainagepipesUPVC,Size2inch,EgyptianSharief MT
type,withallnecessaryaccessoriesasperdirectivesofsupervisingengineer.
6 SupplyandfixingwaterdrainagepipesUPVC,size6inch,EgyptianSharief MT
type,withallnecessaryaccessoriesasperdirectivesofsupervisingengineer.
7 Septic,size2X5X5mtr.,withallexcavationandpouringasperdirectivesof
supervisingengineer.
No.
8 Supplyandfixingplasticmainhole40X40cmasperdirectivesofsupervising No.
engineer.
TOTAL
andfixation,testingandoperation,andasperdirectivesoftheconsultant.
subjecttotheapprovaloftheconsultantbeforesupplyorexecutionandallsamplesshouldbedeliveredofficiallytotheresident
otinterrupt/damageanyservicenetworks.
Municipality.
dasperthesitecapacity/requirement.
theconsultanttoobtainapprovalfromhim.
ointshouldprecede.
beusedforallspecializations.
scompleted.
Quantity
Price IQD
Amount IQD
60
283345.92
17000755.2
120
448081.92
53769830.4
300
0.00
1500
13719.46
20579194.935
500
9506.05
4753022.625
750
5261.65
3946234.64625
900
29240.95
26316856.6245
4419749.90
8839499.8005
18
40250.00
724500
135,929,894.23
dofficiallytotheresidentengineerandhisformalapprovalshouldbeobtained.
Mechanical
1.AllSectionsinthebillsofquantitiespertaintosupplyandtransportofmaterials,worksandfixation,testingan
2.Allmaterialsorworksshouldconformtothegeneraltechnicalspecifications.Theyaresubjecttotheapproval
3.Thecontractorshouldappointspecialistengineertosupervisework.
4.Contractorshouldtakestepstoensuresafetyofareasadjacenttotheworkandshouldnotinterrupt/damageany
5.ContractorshouldcleanuptherubblestooutsidethesiteandinareaspermittedbytheMunicipality.
6.Allquantitiesaresubjecttoincreaseordecreaseandtheywouldpreciselybedeterminedasperthesitecapacity
7.Contractorshouldsubmitexecutiveplansofallnecessaryworksandasperdirectiveoftheconsultanttoobtain
8.Useofanti-salinecementforallconcreteworksbelowhumidityresistantlevel.
9.Allironworksshouldbepaintedwithananti-rustcoatbeforefixingandafterthatoilpointshouldprecede.
10.Contractorshouldsubmitcataloguesofallmachineriesandequipmentswhichwouldbeusedforallspecializa
11.Oncompletionofworks,thecontractorwouldsubmitcolourplansofalltheworksexecuted/ascompleted.
S.No.
Details
Unity
No.
No.
3 Supplyandfixingadditionalgaspipesasperdirectivesofsupervisingengineer. MT
4 SupplyandfixingofcompressorwaterdrainagepipesforAC's,size1,CPVC MT
type,asperdirectivesofSupervisingengineer.
TOTAL
andfixation,testingandoperation,andasperdirectivesoftheconsultant.
ubjecttotheapprovaloftheconsultantbeforesupplyorexecutionandallsamplesshouldbedeliveredofficiallytotheresidente
otinterrupt/damageanyservicenetworks.
Municipality.
asperthesitecapacity/requirement.
heconsultanttoobtainapprovalfromhim.
intshouldprecede.
eusedforallspecializations.
cuted/ascompleted.
Quantity
Price IQD
Amount IQD
60
1023026.07
61381564.453125
360
871796.13
313846607.8125
1800
6345.98
11422767.096
4800
5881.27
28230079.176
414,881,018.54
officiallytotheresidentengineerandhisformalapprovalshouldbeobtained.
414,881,018.54
135,929,894.23
671085061.497396
93724180.72875
110192092.0425
506231404.061011
212922702.007625
276,918,658.82
2,421,885,011.93
2,105,986.97
134,783,165.88
6,071.31
564.04