Presentation On
Relief Measures & Damage Assessment
due to
Heavy Rains on the 26th July 2005
First_report_ChitaleComm.
Description of Disaster
Nature of event
Very heavy rainfall started at 1430 hrs on the 26th July 2005.
994 mm of rainfall measured at Santacruz Meteorological Centre for a period
of 24 hrs starting 0830 hrs on the 26th July, 2005.
Excessive rain resulted in waterlogging in several suburbs.
Mithi River overflowed and consequently led to water logging of Western
Express Highway.
Additionally, heavy rains at Raigad, Thane and Konkan region resulted in
Dahisar and Poisar River overflowing, compounding waterlogging problem.
There were 6 instances of landslide on 26th, 3 on 27th, one each on 28th,
30th and 1st August respectively
Description of Disaster
Overall Assessment of Impact
Estimated loss of life
As many as 445 people lost their lives in the flashfloods and the landslides and
194 persons have so far died of various deluge related illnesses.
Description of Disaster
Overall Assessment of Impact
Effect on train services
Heavy rains led to railway tracks being submerged and consequent stoppage of
services on central (main and harbour lines) and western railways around 4:30
pm on the 26th July.
Damage to infrastructure
The heavy deluge caused significant damages to the municipal
infrastructure. A summary of the major damages is as follows:
Water supply
Pumping stations at Deonar, Chunabhatti and Shiv Tekdi were submerged in
flood water affecting pumps, motors and control panels. More over pipelines at
Goregaon and Kandivli were affected due to washing out of roads.
Sewerage
Severe damage was caused to 10 pumping stations and surrounding structures.
These included Sewage Pumping Plants at Versova, New Versova, Goregaon,
Malad, Saki Naka, Kherwadi, Jai Bharat, Dunccon, Kalina and Brahmanwadi.
Roads
951 Roads suffered moderate to severe damages.
L Ward, Kurla
L Ward, Kurla
N Ward, Ghatkoper
N Ward, Ghatkoper
Carcasses
A total of 16307 carcasses were disposed of including those of 15000 sheep
and goats (mainly from Deonar) and 1307 buffaloes (mainly from Goregaon,
Kandivli and Andheri), in a massive operation involving 27 cranes, 87
dumpers and 24 JCBs spread primarily over three days between 27th and
30th July 2005.
Treatment measures
In view of the fact that lacs of people had to wade through dirty waters on
the 26th and 27th of July 2005 there were apprehensions of major outbreak of
leptospirosis which requires early diagnosis and treatment in all suspected
cases, for reducing the risk of mortality.
MCGM therefore decided to provide comprehensive healthcare services
though 130 odd specially constituted medical teams that have treated over 3
lac patients virtually at their door steps through health camps and outreach
program.
Sewerage
Immediately after the receding of floodwater, restoration programme was
taken up at all the pumping stations which included dewatering of flooded
premises and then repairs of pumps on a war footing. All the pumps have
been operationalised.
Damage Assessment
Items
10
14
16
Urban
Development
Total
10,83,000
10,83,000
1,52,90,000
1,52,90,000
29,08,000
29,08,000
1,82,92,375
1,82,92,375
Items
18
19
20
22
Urban Development
Total
13,38,000
13,38,000
3,55,87,200
3,55,87,200
45,000
45,000
8,96,000
8,96,000
7,54,39,575
7,54,39,575
1,14,62,454
82,80,000
47,30,000
25,18,14,000
Abattoir
3,54,50,000
Education Department
13,00,000
Gardens
18,64,480
Roads
Waste Management and Drainage
Systems
191,13,64,296
Sewerage Operations
1,36,66,032
Solid Waste
9,04,42,670
14,49,01,000
247,52,74,932
Damaged item
in physical terms
( units such as
Km, number etc)
Moderate
4 Bridges
15.55
Severe
1Bridge
10.00
Moderate
Moderate
125 RM 250 SM
5.25
Moderate
50Rm
3.75
Coumpound Wall
Moderate
70 R M
3.50
Compound wall
Moderate
80 Rm
3.50
Moderate
Compound wall 50
R.K.etc.
3.00
Moderate
50 RM 200 SM
2.70
50 RM 100 SM
2.50
Total
losses
Rs in Laks
7.00
Moderate
50 RM 200 SM
2.50
Moderate
70 RM
2.10
Moderate
Moderate
2.00
20 RM 100 SM
Damaged item in
physical terms ( units
such as Km, number etc)
Moderate
Lumpsum
2000
Internal road and drains of the Ghatkopar Yard office of Water Works Section
Severe
300 R.M.
60
Severe
2.0 KM
Severe
16.0 KM
37
severe
60 Nos
30
Moderate
22
severe
500 Cu.M
20
severe
RB 250 Cu.M
Concrete 250 Cu.M
20
Severe
3.5 KM
Severe
Severe
130 RM
Construction of Toe wall and retaining 'wall in stages. (Specialized job @ odd
location)
severe
50 R.M
fencing etc.
Total losses
(Rs in Laks)
39.4
19
18.76
15
15
Level of damage
(Severe, moderate)
Severe/Moderate
lot
527.00
Moderate
21,546 hours
70.07
Severe/Moderate
13 Nos.
61.60
Severe
lot
Severe/Moderate
211 Nos.
41.33
Moderate
41.28
Severe
16300 MT
32.82
Severe
537 Shifts
Moderate
16,700 Nos
8.96
Severe
lot
8.85
Severe/Moderate
25 Nos
7.20
Moderate
70 Nos.
Moderate
lot
(Rs in Laks)
60.70
29.97
7.00
5.75
Damaged item in
physical terms ( units
such as Km, number
etc)
Total losses
Rs in Laks
Severe
1 KM
250.00
Heavy
15000 c.m.
100.00
Severe
0.3 KM
75.00
Severe
0.2 KM
62.00
Severe
0.4 KM
Severe
0.25 KM
54.88
Mithi River
Severe
0.08 KM
41.48
Severe
0.04 KM
34.00
Severe
0.1 KM
31.00
Severe
0.12 KM
30.00
Severe
0.1 KM
Severe
0.11 KM
24.15
Vasari Hill
Severe
0.075 KM
23.25
Severe
0.075 KM
23.25
Severe
0.09 KM
60.00
25.00
22.50
Damaged item in
physical terms ( units
such as Km, number
etc)
Severe
2000000 R.M
2100.00
Severe
81600 Sq M
571.20
Moderate
113847 Sq M
455.39
Moderate
98868 Sq M
395.47
L.U.Gadkari Marg
Severe
44520 Sq M
311.64
Lane marking
Severe
180000 Sq M
300.00
Moderate
68400 Sq M
273.60
Severe
28800 Sq M
201.60
Moderate
46800 Sq M
187.20
Severe
24750 Sq M
173.25
Moderate
24000 Sq M
168.00
Moderate
41850 Sq M
167.40
Moderate
40950 Sq M
163.80
L B S Marg
Moderate
37350 Sq M
149.40
Damaged Item
M.G.Road
Gorai Village Rd.
Akurli road
Total losses
Rs in Laks
Damaged item in
physical terms
(units such as Km,
number etc)
Total losses
Rs in Laks
L.S.
90.00
L.S.
7.60
Building damage such as collapsing of wall, damage to the doors and partitions and painting, electrical wiring etc.
L.S.
3.00
3.00
1 No.
3.00
Store articles damaged/missing such as coconut oil, engine oil. Diesel, soaps, etc.
L.S.
2.80
Civil repair Works - Walls, Doors Partitions painting and electirc wring
LS
2.20
2.15
Store Article Damage - Lub oils, Deisel and verious cleaning meterials
Refurbishing of Choke Removal Machines - 1 No.
1 No.
Refurbishing of Jetting Machines-1,Choke Machines-6,OKC Machines- 8,Compressor with motor- 1, Air Compressors7, Air blowers- 3, Welding Machine- 1, Portable pumps- 6, Poinger drilling machine-1, Heavy duty drill Machine-1,
Battery charger-1,
1 No.
2.00
1.72
1.66
L.S.
LS
1.20
Replacement of Office Automation System such as EPABX system , wireless, P.Cs., telephone instruments, etc.
L.S.
1.05
1.50
Total losses
Rs in Laks
68.00
47.30
Lift 1, Pump 1,
25.50
S.K.Patil Hospital
1 Compd wall
130 Mt Length
5.00
4.00
2 walls
3.75
6 Generator
1 No.
3.00
1 X-ray M/c
Units
2.05
Sion Hospital
Electrical Items
0.72
9 Pager -15
15 Nos
0.45
full set
0.40
10 M.S.Cabin furniture
full set
0.40
3 Computer CPU
2 Nos
0.30
14 Linen
0.30
Appointment of Consultants
The Corporation therefore thought of studying the whole SWD system
M/s.Watson Hawksley International Pvt. Ltd. Appointed as consultant in
the year 1989
The consultant surveyed the existing drains & nallas
The city and suburbs area SWD Network is divided into 121 chachments
Consultants studied deficiencies, identified difficulties in cleaning and
maintenance.
They reviewed design criteria and prepared a master plan for
augmentation of SWD system
The consultants submitted their final report in the year 1993
It is popularly known as BRIMSTOWAD Report
Phase I
Phase II
Phase III
Total
2005-2006
2006-2007
2007-2008
Rs.
Rs.
Rs.
Rs.
350 Cr
400 Cr
450 Cr
1200 Cr
Phase I : 2005-2006
Sr
Nature of Work
Block Estimates
Rs. 25.00 Cr
Rs. 15.00 Cr
Rs 50.00 Cr
Rs. 40.00 Cr
Rs. 120.00 Cr
Rs. 40.00 Cr
Rs. 60.00 Cr
TOTAL
Rs. 350.00 Cr
Phase II : 2006-2007
Sr
Nature of Work
Block Estimates
Rs. 5.00 Cr
Rs. 10.00 Cr
Rs. 80.00 Cr
Rs. 30.00 Cr
Rs. 25.00 Cr
Rs. 25.00 Cr
Rs. 30.00 Cr
Contd..
Phase II : 2006-2007
Sr
Nature of Work
Block Estimates
Rs. 30.00 Cr
Rs. 15.00 Cr
Rs. 15.00 Cr
Rs. 10.00 Cr
Rs. 125.00 Cr
Rs. 400.00 Cr
Nature of Work
Block Estimates
Rs. 10.00 Cr
Rs. 10.00 Cr
Rs. 5.00 Cr
Rs. 5.00 Cr
Rs. 25.00 Cr
Rs. 10.00 Cr
Rs. 10.00 Cr
Rs. 5.00 Cr
Rs. 20.00 Cr
Rs. 10.00 Cr
Nature of Work
Block Estimates
Rs. 5.00 Cr
Rs. 5.00 Cr
Rs. 5.00 Cr
Rs. 15.00 Cr
Rs. 20.00 Cr
Rs. 60.00 Cr
Rs. 15.00 Cr
Rs. 65.00 Cr
Rs. 140.00 Cr
Rs. 450.00 CR