PROJECT MANAGEMENT

GENERAL BID SLATES (GBS)


PREQUALIFICATION QUESTIONNAIRE
PART-B
Electrical Systems Group
Electrical & Instrumentation
Cathodic Protection & Transmission Lines

Contents
Instructions: GBS Experience Section .......................................................................................................... 2
Area Of Expertise .......................................................................................................................................... 3
Exhibit F: Summary Of Work Experience ..................................................................................................... 4
Exhibit G: Human Resources ........................................................................................................................ 7
Exhibit H: Equipment................................................................................................................................... 38

Saudi Aramco: Public


Saudi Aramco Prequalification Questionnaire, General Bid Slates (GBS). Version: March 2015

Saudi Aramco Prequalification Questionnaire General Bid Slates (GBS) Part - B

INSTRUCTIONS: GBS EXPERIENCE SECTION


Part B of the Prequalification Questionnaire (PQQ) supplements Part A and requests information specific to the scope of work of
the General Bid Slate (GBS) including relevant work experience, human resources, and equipment.
Saudi Aramco manages 15 Project GBS which are categorized into 7 groups. Each group has a unique Part B questionnaire.
This Part B of the PQQ for the Electrical Systems Group is for companies requesting prequalification for the Electrical &
Instrumentation GBS and the Cathodic Protection & Transmission Lines GBS. You will have an opportunity to identify areas of
specialized expertise on these GBS, as well as your companys financial capacity for these projects.
You are required to provide detailed experience and construction resource information for each GBS listed below that you are
requesting prequalification under. The Prequalification Evaluation Team (PQET) will use the information submitted in the Exhibits
of this Part B to verify that you possess the required experience, and resources to be part of the GBS.

Saudi Aramco: Public


Page 2 of 40

Saudi Aramco Prequalification Questionnaire General Bid Slates (GBS) Part - B

AREA OF EXPERTISE
Identify Areas of Expertise/Specialty
#

General Bid Slate

1)

Electrical Systems & Instrumentation:

a)

Electrical
Substations

b)

Electrical
Transmission Lines

2)

Cathodic Protection & Transmission Lines:

a)

Cathodic Protection
& Transmission
Lines

Saudi Aramco: Public


Page 3 of 40

Description of Scope of Work

Construction of: Electrical Substations, Power distribution grids,


installation of transformers and circuit breakers/ switchgear, and
all associated instrumentation and interconnections.
Construction of: power transmission lines, and all associated site
preparation and earth works.
Construction of galvanic anodes, Impressed Current Cathodic
Protection (ICCP) system installation, power transmission lines,
and all associated site preparation and earth works.

Company
Specialty?
(Yes/No)

YES
NO

NO

Value of
Largest Project
Completed
(in USD)

Saudi Aramco Prequalification Questionnaire General Bid Slates (GBS) Part - B

EXHIBIT F: SUMMARY OF WORK EXPERIENCE


Projects Completed and Ongoing
List all completed and ongoing projects within the last 10 years, which are related to selected GBS(s) scope of work.
Project Type

Project
Title

Contract
Value in
US $

Award
Date

Completion
Date

Status
(Completed
/Ongoing)

LSTK/
LSPB/
other

Prime or
SubContract

Location
(Country &
City)

Electrical
Substations

Sadaba

11,100,250

Nov 8,
2007

June 2008

Completed

LSTK

Prime

Spain, Aragon

Electrical
Substations

Espejo I

5,600,000

Dec,
2007

June 2008

Completed

LSTK

Prime

Spain,
Andalucia

Electrical
Substations

Lucaiena

3,000,000

2009

Completed

LSTK

Prime

Spain,
Andalucia

Electrical
Substations

Espejo II

6,540,075

February
2009

Completed

LSTK

Prime

Spain,
Andalucia

Electrical
Substations

Espejo III

5,000,000

2009

Completed

LSTK

Prime

Spain,
Andalucia

Electrical
Substations

Sevilla PV

3,500,000

Nov,
2007

April 2008

Completed

LSTK

Prime

Spain,
Andalucia

Electrical
Substations

Cordoba
PV

8,000,000

Oct,
2007

September
2008

Completed

LSTK

Prime

Spain,
Andalucia

Electrical
Substations

Parque FV
Ciudad
Real

10,000,000

2008

Completed

LSTK

Prime

Spain, Ciudad
Real

Electrical
Substations

Almonacid
PV Plant

5,600,000

Dec 10,
2007

July 2008

Completed

LSTK

Prime

Spain, Aragon

Electrical
Substations

Seat Al
Sol 5

1,943,040

May 16,
2012

November
2012

Completed

LSTK

Prime

Spain,
Cataluna

Electrical
Substations

Seat Al
Sol 6

852,580

May 16,
2012

November
2012

Completed

LSTK

Prime

Spain,
Cataluna

Electrical
Substations

Frio
Limpio

446

July 10,
2012

December
2012

Completed

LSTK

Prime

Spain, Aragon

Electrical
Substations

Planta
Fotovoltai
ca
Curbans

32,952,560

Feb, 5
,2010

September
2011

Completed

LSTK

Prime

France,
Hautes Alpes

Electrical
Substations

Batilly
Fotovoltai
que

10,372,000

June 6,
2011

December
2011

Completed

LSTK

Prime

France,
Creuse

Electrical
Substations

PV
Panameric
ana

20,000,000

July 6,
2012

December
2012

Completed

LSTK

Prime

Peru, Tacna

Saudi Aramco: Public


Page 4 of 40

July ,
2008

Saudi Aramco Prequalification Questionnaire General Bid Slates (GBS) Part - B


Complete the following form for each ongoing project or projects completed in the last ten (10) years. Duplicate the below form
for each project. Provide copies of completion certificates, performance evaluation reports (signed/stamped by client) and copies
of the contract showing signature pages, contract value, type, scope of work and contract duration. A project will not be
considered as part of your experience if above back-up documents are not provided.
GBS
Specialty

Select one or more GBS specialty related to the scope of work of this project.
GBS Specialty
1
Electrical Substations
Choose an item.
2
Choose an item.
3

Contract Info

Title: SADABA

Number:

Award Date: 2007

Contract Value (US$): 11,100,250

Contractual Completion Date: June 2008

Actual Completion Date: June 2008

Planned % Complete:

Actual % Complete:

Value of Supplied Material (US$): X

Value of Subcontracts (US$):

Client's
Company
Info

Client Name: Parques FV Del Espartal


Client Address: Spain, Aragon
Representative Name/Tel & Email:

Contract
Type

Primary Subcontractor

Designer

LSTK Detailed Design was done: In-House Design Office Outsourced Not LSTK

Scope of
Work

Projects Location: Spain, Aragon Country: Spain City: Aragon

LSTK LSPB Unit Rate Construction Management Others, specify: _______________________

Projects Brief Description (related to your scope of work only) :

Saudi Aramco: Public


Page 5 of 40

Sole Contractor Consortium JV, with share %:

Saudi Aramco Prequalification Questionnaire General Bid Slates (GBS) Part - B


Subcontracts

If applicable, list your main four (4) subcontracts under this project:
Scope of Work
Value US$
1

Subcontractor Name

2
3
4
Human
Resources

Provide human resources details for this project:


1
2
3
4
5
6
7
8
9
10
11

Number of Resources

Position
Management & Administration
Project Cost & Scheduling
Project Managers
Senior Design Engineers
Design Engineers
Project Engineers
Procurement Personnel
Quality Department Personnel
Construction Supervisors
Construction Skilled Labor
Construction Unskilled Labor
Total

Saudi Aramco: Public


Page 6 of 40

Saudi Aramco Prequalification Questionnaire General Bid Slates (GBS) Part - B


Complete the following form for each ongoing project or projects completed in the last ten (10) years. Duplicate the below form
for each project. Provide copies of completion certificates, performance evaluation reports (signed/stamped by client) and copies
of the contract showing signature pages, contract value, type, scope of work and contract duration. A project will not be
considered as part of your experience if above back-up documents are not provided.
GBS
Specialty

Select one or more GBS specialty related to the scope of work of this project.
GBS Specialty
Choose an item.
1
Choose an item.
2
Choose an item.
3

Contract Info

Title: ESPEJO I

Number:

Award Date: Dec, 2007

Contract Value (US$): 5,600,000

Contractual Completion Date: June 2008

Actual Completion Date: June 2008

Planned % Complete: X

Actual % Complete: X

Value of Supplied Material (US$): X

Value of Subcontracts (US$): X

Client's
Company
Info

Client Name: IDECON


Client Address: Spain, Andalucia
Representative Name/Tel & Email:

Contract
Type

Primary Subcontractor

Designer

LSTK Detailed Design was done: In-House Design Office Outsourced Not LSTK

Scope of
Work

Projects Location: Spain, Andalucia Country: Spain City: Andalucia

LSTK LSPB Unit Rate Construction Management Others, specify: _______________________

Projects Brief Description (related to your scope of work only) :

Saudi Aramco: Public


Page 7 of 40

Sole Contractor Consortium JV, with share %:

Saudi Aramco Prequalification Questionnaire General Bid Slates (GBS) Part - B


Subcontracts

If applicable, list your main four (4) subcontracts under this project:
Scope of Work
Value US$
1

Subcontractor Name

2
3
4
Human
Resources

Provide human resources details for this project:


1
2
3
4
5
6
7
8
9
10
11

Number of Resources

Position
Management & Administration
Project Cost & Scheduling
Project Managers
Senior Design Engineers
Design Engineers
Project Engineers
Procurement Personnel
Quality Department Personnel
Construction Supervisors
Construction Skilled Labor
Construction Unskilled Labor
Total

Saudi Aramco: Public


Page 8 of 40

Saudi Aramco Prequalification Questionnaire General Bid Slates (GBS) Part - B


Complete the following form for each ongoing project or projects completed in the last ten (10) years. Duplicate the below form
for each project. Provide copies of completion certificates, performance evaluation reports (signed/stamped by client) and copies
of the contract showing signature pages, contract value, type, scope of work and contract duration. A project will not be
considered as part of your experience if above back-up documents are not provided.
GBS
Specialty

Select one or more GBS specialty related to the scope of work of this project.
GBS Specialty
Choose an item.
1
Choose an item.
2
Choose an item.
3

Contract Info

Title: LUCAIENA

Number:

Award Date: X

Contract Value (US$): 3,000,000

Contractual Completion Date: 2009

Actual Completion Date: 2009

Planned % Complete: X

Actual % Complete: X

Value of Supplied Material (US$): X

Value of Subcontracts (US$): X

Client's
Company
Info

Client Name: FIRST SOLAR


Client Address: Spain, Andalucia
Representative Name/Tel & Email:

Contract
Type

Primary Subcontractor

Designer

LSTK Detailed Design was done: In-House Design Office Outsourced Not LSTK

Scope of
Work

Projects Location: Spain, Andalucia Country: Spain City: Andalucia

LSTK LSPB Unit Rate Construction Management Others, specify: _______________________

Projects Brief Description (related to your scope of work only) :

Saudi Aramco: Public


Page 9 of 40

Sole Contractor Consortium JV, with share %:

Saudi Aramco Prequalification Questionnaire General Bid Slates (GBS) Part - B


Subcontracts

If applicable, list your main four (4) subcontracts under this project:
Scope of Work
Value US$
1

Subcontractor Name

2
3
4
Human
Resources

Provide human resources details for this project:


1
2
3
4
5
6
7
8
9
10
11

Number of Resources

Position
Management & Administration
Project Cost & Scheduling
Project Managers
Senior Design Engineers
Design Engineers
Project Engineers
Procurement Personnel
Quality Department Personnel
Construction Supervisors
Construction Skilled Labor
Construction Unskilled Labor
Total

Saudi Aramco: Public


Page 10 of 40

Saudi Aramco Prequalification Questionnaire General Bid Slates (GBS) Part - B


Complete the following form for each ongoing project or projects completed in the last ten (10) years. Duplicate the below form
for each project. Provide copies of completion certificates, performance evaluation reports (signed/stamped by client) and copies
of the contract showing signature pages, contract value, type, scope of work and contract duration. A project will not be
considered as part of your experience if above back-up documents are not provided.
GBS
Specialty

Select one or more GBS specialty related to the scope of work of this project.
GBS Specialty
Choose an item.
1
Choose an item.
2
Choose an item.
3

Contract Info

Title: ESPEJO II

Number:

Award Date: July , 2008

Contract Value (US$): 6,540,075

Contractual Completion Date: February 2009

Actual Completion Date: February 2009

Planned % Complete: X

Actual % Complete: X

Value of Supplied Material (US$): X

Value of Subcontracts (US$): X

Client's
Company
Info

Client Name: IDECON


Client Address: Spain, Andalucia
Representative Name/Tel & Email:

Contract
Type

Primary Subcontractor

Designer

LSTK Detailed Design was done: In-House Design Office Outsourced Not LSTK

Scope of
Work

Projects Location: Spain, Andalucia Country: Spain City: Andalucia

LSTK LSPB Unit Rate Construction Management Others, specify: _______________________

Projects Brief Description (related to your scope of work only) :

Saudi Aramco: Public


Page 11 of 40

Sole Contractor Consortium JV, with share %:

Saudi Aramco Prequalification Questionnaire General Bid Slates (GBS) Part - B


Subcontracts

If applicable, list your main four (4) subcontracts under this project:
Scope of Work
Value US$
1

Subcontractor Name

2
3
4
Human
Resources

Provide human resources details for this project:


1
2
3
4
5
6
7
8
9
10
11

Number of Resources

Position
Management & Administration
Project Cost & Scheduling
Project Managers
Senior Design Engineers
Design Engineers
Project Engineers
Procurement Personnel
Quality Department Personnel
Construction Supervisors
Construction Skilled Labor
Construction Unskilled Labor
Total

Saudi Aramco: Public


Page 12 of 40

Saudi Aramco Prequalification Questionnaire General Bid Slates (GBS) Part - B


Complete the following form for each ongoing project or projects completed in the last ten (10) years. Duplicate the below form
for each project. Provide copies of completion certificates, performance evaluation reports (signed/stamped by client) and copies
of the contract showing signature pages, contract value, type, scope of work and contract duration. A project will not be
considered as part of your experience if above back-up documents are not provided.
GBS
Specialty

Select one or more GBS specialty related to the scope of work of this project.
GBS Specialty
Choose an item.
1
Choose an item.
2
Choose an item.
3

Contract Info

Title: ESPEJO III

Number:

Award Date: X

Contract Value (US$): 5,000,000

Contractual Completion Date: 2009

Actual Completion Date: 2009

Planned % Complete: X

Actual % Complete: X

Value of Supplied Material (US$): X

Value of Subcontracts (US$): X

Client's
Company
Info

Client Name: IDECON


Client Address: Spain, Andalucia
Representative Name/Tel & Email:

Contract
Type

Primary Subcontractor

Designer

LSTK Detailed Design was done: In-House Design Office Outsourced Not LSTK

Scope of
Work

Projects Location: Spain, Andalucia Country: Spain City: Andalucia

LSTK LSPB Unit Rate Construction Management Others, specify: _______________________

Projects Brief Description (related to your scope of work only) :

Saudi Aramco: Public


Page 13 of 40

Sole Contractor Consortium JV, with share %:

Saudi Aramco Prequalification Questionnaire General Bid Slates (GBS) Part - B


Subcontracts

If applicable, list your main four (4) subcontracts under this project:
Scope of Work
Value US$
1

Subcontractor Name

2
3
4
Human
Resources

Provide human resources details for this project:


1
2
3
4
5
6
7
8
9
10
11

Number of Resources

Position
Management & Administration
Project Cost & Scheduling
Project Managers
Senior Design Engineers
Design Engineers
Project Engineers
Procurement Personnel
Quality Department Personnel
Construction Supervisors
Construction Skilled Labor
Construction Unskilled Labor
Total

Saudi Aramco: Public


Page 14 of 40

Saudi Aramco Prequalification Questionnaire General Bid Slates (GBS) Part - B


Complete the following form for each ongoing project or projects completed in the last ten (10) years. Duplicate the below form
for each project. Provide copies of completion certificates, performance evaluation reports (signed/stamped by client) and copies
of the contract showing signature pages, contract value, type, scope of work and contract duration. A project will not be
considered as part of your experience if above back-up documents are not provided.
GBS
Specialty

Select one or more GBS specialty related to the scope of work of this project.
GBS Specialty
Choose an item.
1
Choose an item.
2
Choose an item.
3

Contract Info

Title: SEVILLA PV

Number:

Award Date: November 2007

Contract Value (US$): 3,500,000

Contractual Completion Date: April 2008

Actual Completion Date: April 2008

Planned % Complete: X

Actual % Complete:X

Value of Supplied Material (US$): X

Value of Subcontracts (US$): X

Client's
Company
Info

Client Name: SEMI


Client Address: Spain, Andalucia
Representative Name/Tel & Email:

Contract
Type

Primary Subcontractor

Designer

LSTK Detailed Design was done: In-House Design Office Outsourced Not LSTK

Scope of
Work

Projects Location: Spain, Andalucia Country: Spain City: Andalucia

LSTK LSPB Unit Rate Construction Management Others, specify: _______________________

Projects Brief Description (related to your scope of work only) :

Saudi Aramco: Public


Page 15 of 40

Sole Contractor Consortium JV, with share %:

Saudi Aramco Prequalification Questionnaire General Bid Slates (GBS) Part - B


Subcontracts

If applicable, list your main four (4) subcontracts under this project:
Scope of Work
Value US$
1

Subcontractor Name

2
3
4
Human
Resources

Provide human resources details for this project:


1
2
3
4
5
6
7
8
9
10
11

Number of Resources

Position
Management & Administration
Project Cost & Scheduling
Project Managers
Senior Design Engineers
Design Engineers
Project Engineers
Procurement Personnel
Quality Department Personnel
Construction Supervisors
Construction Skilled Labor
Construction Unskilled Labor
Total

Saudi Aramco: Public


Page 16 of 40

Saudi Aramco Prequalification Questionnaire General Bid Slates (GBS) Part - B


Complete the following form for each ongoing project or projects completed in the last ten (10) years. Duplicate the below form
for each project. Provide copies of completion certificates, performance evaluation reports (signed/stamped by client) and copies
of the contract showing signature pages, contract value, type, scope of work and contract duration. A project will not be
considered as part of your experience if above back-up documents are not provided.
GBS
Specialty

Select one or more GBS specialty related to the scope of work of this project.
GBS Specialty
Choose an item.
1
Choose an item.
2
Choose an item.
3

Contract Info

Title: CORDOBA PV

Number:

Award Date: October, 2007

Contract Value (US$): 8,000,000

Contractual Completion Date: September 2008

Actual Completion Date: September 2008

Planned % Complete: X

Actual % Complete:X

Value of Supplied Material (US$): X

Value of Subcontracts (US$): X

Client's
Company
Info

Client Name: SEMI


Client Address: Spain, Andalucia
Representative Name/Tel & Email:

Contract
Type

Primary Subcontractor

Designer

LSTK Detailed Design was done: In-House Design Office Outsourced Not LSTK

Scope of
Work

Projects Location: Spain, Andalucia Country: Spain City: Andalucia

LSTK LSPB Unit Rate Construction Management Others, specify: _______________________

Projects Brief Description (related to your scope of work only) :

Saudi Aramco: Public


Page 17 of 40

Sole Contractor Consortium JV, with share %:

Saudi Aramco Prequalification Questionnaire General Bid Slates (GBS) Part - B


Subcontracts

If applicable, list your main four (4) subcontracts under this project:
Scope of Work
Value US$
1

Subcontractor Name

2
3
4
Human
Resources

Provide human resources details for this project:


1
2
3
4
5
6
7
8
9
10
11

Number of Resources

Position
Management & Administration
Project Cost & Scheduling
Project Managers
Senior Design Engineers
Design Engineers
Project Engineers
Procurement Personnel
Quality Department Personnel
Construction Supervisors
Construction Skilled Labor
Construction Unskilled Labor
Total

Saudi Aramco: Public


Page 18 of 40

Saudi Aramco Prequalification Questionnaire General Bid Slates (GBS) Part - B


Complete the following form for each ongoing project or projects completed in the last ten (10) years. Duplicate the below form
for each project. Provide copies of completion certificates, performance evaluation reports (signed/stamped by client) and copies
of the contract showing signature pages, contract value, type, scope of work and contract duration. A project will not be
considered as part of your experience if above back-up documents are not provided.
GBS
Specialty

Select one or more GBS specialty related to the scope of work of this project.
GBS Specialty
Choose an item.
1
Choose an item.
2
Choose an item.
3

Contract Info

Title: PARQUE FV CIUDAD REAL

Number:

Award Date: X

Contract Value (US$): 10,000,000

Contractual Completion Date: 2008

Actual Completion Date: 2008

Planned % Complete: X

Actual % Complete:X

Value of Supplied Material (US$): X

Value of Subcontracts (US$): X

Client's
Company
Info

Client Name: RENOVALIA


Client Address: Spain, Ciudad Real
Representative Name/Tel & Email:

Contract
Type

Primary Subcontractor

Designer

LSTK Detailed Design was done: In-House Design Office Outsourced Not LSTK

Scope of
Work

Projects Location: Spain, Ciudad Real Country: Spain City: Ciudad Real

LSTK LSPB Unit Rate Construction Management Others, specify: _______________________

Projects Brief Description (related to your scope of work only) :

Saudi Aramco: Public


Page 19 of 40

Sole Contractor Consortium JV, with share %:

Saudi Aramco Prequalification Questionnaire General Bid Slates (GBS) Part - B


Subcontracts

If applicable, list your main four (4) subcontracts under this project:
Scope of Work
Value US$
1

Subcontractor Name

2
3
4
Human
Resources

Provide human resources details for this project:


1
2
3
4
5
6
7
8
9
10
11

Number of Resources

Position
Management & Administration
Project Cost & Scheduling
Project Managers
Senior Design Engineers
Design Engineers
Project Engineers
Procurement Personnel
Quality Department Personnel
Construction Supervisors
Construction Skilled Labor
Construction Unskilled Labor
Total

Saudi Aramco: Public


Page 20 of 40

Saudi Aramco Prequalification Questionnaire General Bid Slates (GBS) Part - B


Complete the following form for each ongoing project or projects completed in the last ten (10) years. Duplicate the below form
for each project. Provide copies of completion certificates, performance evaluation reports (signed/stamped by client) and copies
of the contract showing signature pages, contract value, type, scope of work and contract duration. A project will not be
considered as part of your experience if above back-up documents are not provided.
GBS
Specialty

Select one or more GBS specialty related to the scope of work of this project.
GBS Specialty
Choose an item.
1
Choose an item.
2
Choose an item.
3

Contract Info

Title: ALMONACID PV PLANT

Number:

Award Date: December 10, 2007

Contract Value (US$): 5,600,000

Contractual Completion Date: July 2008

Actual Completion Date: July 2008

Planned % Complete: X

Actual % Complete:X

Value of Supplied Material (US$): X

Value of Subcontracts (US$): X

Client's
Company
Info

Client Name: PAGOLA, S.A.


Client Address: Spain, Aragon
Representative Name/Tel & Email:

Contract
Type

Primary Subcontractor

Designer

LSTK Detailed Design was done: In-House Design Office Outsourced Not LSTK

Scope of
Work

Projects Location: Spain, Aragon Country: Spain City: Aragon

LSTK LSPB Unit Rate Construction Management Others, specify: _______________________

Projects Brief Description (related to your scope of work only) :

Saudi Aramco: Public


Page 21 of 40

Sole Contractor Consortium JV, with share %:

Saudi Aramco Prequalification Questionnaire General Bid Slates (GBS) Part - B


Subcontracts

If applicable, list your main four (4) subcontracts under this project:
Scope of Work
Value US$
1

Subcontractor Name

2
3
4
Human
Resources

Provide human resources details for this project:


1
2
3
4
5
6
7
8
9
10
11

Number of Resources

Position
Management & Administration
Project Cost & Scheduling
Project Managers
Senior Design Engineers
Design Engineers
Project Engineers
Procurement Personnel
Quality Department Personnel
Construction Supervisors
Construction Skilled Labor
Construction Unskilled Labor
Total

Saudi Aramco: Public


Page 22 of 40

Saudi Aramco Prequalification Questionnaire General Bid Slates (GBS) Part - B


Complete the following form for each ongoing project or projects completed in the last ten (10) years. Duplicate the below form
for each project. Provide copies of completion certificates, performance evaluation reports (signed/stamped by client) and copies
of the contract showing signature pages, contract value, type, scope of work and contract duration. A project will not be
considered as part of your experience if above back-up documents are not provided.
GBS
Specialty

Select one or more GBS specialty related to the scope of work of this project.
GBS Specialty
Choose an item.
1
Choose an item.
2
Choose an item.
3

Contract Info

Title: SEAT AL SOL 5

Number:

Award Date: May 16, 2012

Contract Value (US$): 1,943,040

Contractual Completion Date: November 2012

Actual Completion Date: November 2012

Planned % Complete: X

Actual % Complete:X

Value of Supplied Material (US$): X

Value of Subcontracts (US$): X

Client's
Company
Info

Client Name: GESTAMP SOLAR


Client Address: Spain, Cataluna
Representative Name/Tel & Email:

Contract
Type

Primary Subcontractor

Designer

LSTK Detailed Design was done: In-House Design Office Outsourced Not LSTK

Scope of
Work

Projects Location: Spain, Cataluna Country: Spain City: Cataluna

LSTK LSPB Unit Rate Construction Management Others, specify: _______________________

Projects Brief Description (related to your scope of work only) :

Saudi Aramco: Public


Page 23 of 40

Sole Contractor Consortium JV, with share %:

Saudi Aramco Prequalification Questionnaire General Bid Slates (GBS) Part - B


Subcontracts

If applicable, list your main four (4) subcontracts under this project:
Scope of Work
Value US$
1

Subcontractor Name

2
3
4
Human
Resources

Provide human resources details for this project:


1
2
3
4
5
6
7
8
9
10
11

Number of Resources

Position
Management & Administration
Project Cost & Scheduling
Project Managers
Senior Design Engineers
Design Engineers
Project Engineers
Procurement Personnel
Quality Department Personnel
Construction Supervisors
Construction Skilled Labor
Construction Unskilled Labor
Total

Saudi Aramco: Public


Page 24 of 40

Saudi Aramco Prequalification Questionnaire General Bid Slates (GBS) Part - B


Complete the following form for each ongoing project or projects completed in the last ten (10) years. Duplicate the below form
for each project. Provide copies of completion certificates, performance evaluation reports (signed/stamped by client) and copies
of the contract showing signature pages, contract value, type, scope of work and contract duration. A project will not be
considered as part of your experience if above back-up documents are not provided.
GBS
Specialty

Select one or more GBS specialty related to the scope of work of this project.
GBS Specialty
Choose an item.
1
Choose an item.
2
Choose an item.
3

Contract Info

Title: SEAT AL SOL 6

Number:

Award Date: May 16, 2012

Contract Value (US$): 852,580

Contractual Completion Date: November 2012

Actual Completion Date: November 2012

Planned % Complete: X

Actual % Complete:X

Value of Supplied Material (US$): X

Value of Subcontracts (US$): X

Client's
Company
Info

Client Name: GESTAMP SOLAR


Client Address: Spain, Cataluna
Representative Name/Tel & Email:

Contract
Type

Primary Subcontractor

Designer

LSTK Detailed Design was done: In-House Design Office Outsourced Not LSTK

Scope of
Work

Projects Location: Spain, Cataluna Country: Spain City: Cataluna

LSTK LSPB Unit Rate Construction Management Others, specify: _______________________

Projects Brief Description (related to your scope of work only) :

Saudi Aramco: Public


Page 25 of 40

Sole Contractor Consortium JV, with share %:

Saudi Aramco Prequalification Questionnaire General Bid Slates (GBS) Part - B


Subcontracts

If applicable, list your main four (4) subcontracts under this project:
Scope of Work
Value US$
1

Subcontractor Name

2
3
4
Human
Resources

Provide human resources details for this project:


1
2
3
4
5
6
7
8
9
10
11

Number of Resources

Position
Management & Administration
Project Cost & Scheduling
Project Managers
Senior Design Engineers
Design Engineers
Project Engineers
Procurement Personnel
Quality Department Personnel
Construction Supervisors
Construction Skilled Labor
Construction Unskilled Labor
Total

Saudi Aramco: Public


Page 26 of 40

Saudi Aramco Prequalification Questionnaire General Bid Slates (GBS) Part - B


Complete the following form for each ongoing project or projects completed in the last ten (10) years. Duplicate the below form
for each project. Provide copies of completion certificates, performance evaluation reports (signed/stamped by client) and copies
of the contract showing signature pages, contract value, type, scope of work and contract duration. A project will not be
considered as part of your experience if above back-up documents are not provided.
GBS
Specialty

Select one or more GBS specialty related to the scope of work of this project.
GBS Specialty
Choose an item.
1
Choose an item.
2
Choose an item.
3

Contract Info

Title: FRIO LIMPIO

Number:

Award Date: July 10,2012

Contract Value (US$): 446

Contractual Completion Date: December 2012

Actual Completion Date: December 2012

Planned % Complete: X

Actual % Complete:X

Value of Supplied Material (US$): X

Value of Subcontracts (US$): X

Client's
Company
Info

Client Name: SOLAVANTI, S.L.


Client Address: Spain, Aragon
Representative Name/Tel & Email:

Contract
Type

Primary Subcontractor

Designer

LSTK Detailed Design was done: In-House Design Office Outsourced Not LSTK

Scope of
Work

Projects Location: Spain, Aragon Country: Spain City: Aragon

LSTK LSPB Unit Rate Construction Management Others, specify: _______________________

Projects Brief Description (related to your scope of work only) :

Saudi Aramco: Public


Page 27 of 40

Sole Contractor Consortium JV, with share %:

Saudi Aramco Prequalification Questionnaire General Bid Slates (GBS) Part - B


Subcontracts

If applicable, list your main four (4) subcontracts under this project:
Scope of Work
Value US$
1

Subcontractor Name

2
3
4
Human
Resources

Provide human resources details for this project:


1
2
3
4
5
6
7
8
9
10
11

Number of Resources

Position
Management & Administration
Project Cost & Scheduling
Project Managers
Senior Design Engineers
Design Engineers
Project Engineers
Procurement Personnel
Quality Department Personnel
Construction Supervisors
Construction Skilled Labor
Construction Unskilled Labor
Total

Saudi Aramco: Public


Page 28 of 40

Saudi Aramco Prequalification Questionnaire General Bid Slates (GBS) Part - B


Complete the following form for each ongoing project or projects completed in the last ten (10) years. Duplicate the below form
for each project. Provide copies of completion certificates, performance evaluation reports (signed/stamped by client) and copies
of the contract showing signature pages, contract value, type, scope of work and contract duration. A project will not be
considered as part of your experience if above back-up documents are not provided.
GBS
Specialty

Select one or more GBS specialty related to the scope of work of this project.
GBS Specialty
Choose an item.
1
Choose an item.
2
Choose an item.
3

Contract Info

Title: PLANTA FOTOVOLTAICA CURBANS

Number:

Award Date: Feb, 5 ,2010

Contract Value (US$): 32,952,560

Contractual Completion Date: September 2011

Actual Completion Date: September 2011

Planned % Complete: X

Actual % Complete:X

Value of Supplied Material (US$): X

Value of Subcontracts (US$): X

Client's
Company
Info

Client Name: GDF


Client Address: France, Hautes Alpes
Representative Name/Tel & Email:

Contract
Type

Primary Subcontractor

Designer

LSTK Detailed Design was done: In-House Design Office Outsourced Not LSTK

Scope of
Work

Projects Location: France, Hautes Alpes Country: France City: Hautes Alpes

LSTK LSPB Unit Rate Construction Management Others, specify: _______________________

Projects Brief Description (related to your scope of work only) :

Saudi Aramco: Public


Page 29 of 40

Sole Contractor Consortium JV, with share %:

Saudi Aramco Prequalification Questionnaire General Bid Slates (GBS) Part - B


Subcontracts

If applicable, list your main four (4) subcontracts under this project:
Scope of Work
Value US$
1

Subcontractor Name

2
3
4
Human
Resources

Provide human resources details for this project:


1
2
3
4
5
6
7
8
9
10
11

Number of Resources

Position
Management & Administration
Project Cost & Scheduling
Project Managers
Senior Design Engineers
Design Engineers
Project Engineers
Procurement Personnel
Quality Department Personnel
Construction Supervisors
Construction Skilled Labor
Construction Unskilled Labor
Total

Saudi Aramco: Public


Page 30 of 40

Saudi Aramco Prequalification Questionnaire General Bid Slates (GBS) Part - B


Complete the following form for each ongoing project or projects completed in the last ten (10) years. Duplicate the below form
for each project. Provide copies of completion certificates, performance evaluation reports (signed/stamped by client) and copies
of the contract showing signature pages, contract value, type, scope of work and contract duration. A project will not be
considered as part of your experience if above back-up documents are not provided.
GBS
Specialty

Select one or more GBS specialty related to the scope of work of this project.
GBS Specialty
Choose an item.
1
Choose an item.
2
Choose an item.
3

Contract Info

Title: BATILLY FOTOVOLTAIQUE

Number:

Award Date: June 6, 2011

Contract Value (US$): 10,372,000

Contractual Completion Date: December 2011

Actual Completion Date: December 2011

Planned % Complete: X

Actual % Complete:X

Value of Supplied Material (US$): X

Value of Subcontracts (US$): X

Client's
Company
Info

Client Name: GESTAMP SOLAR


Client Address: France, Creuse
Representative Name/Tel & Email:

Contract
Type

Primary Subcontractor

Designer

LSTK Detailed Design was done: In-House Design Office Outsourced Not LSTK

Scope of
Work

Projects Location: France, Creuse Country: France City: Creuse

LSTK LSPB Unit Rate Construction Management Others, specify: _______________________

Projects Brief Description (related to your scope of work only) :

Saudi Aramco: Public


Page 31 of 40

Sole Contractor Consortium JV, with share %:

Saudi Aramco Prequalification Questionnaire General Bid Slates (GBS) Part - B


Subcontracts

If applicable, list your main four (4) subcontracts under this project:
Scope of Work
Value US$
1

Subcontractor Name

2
3
4
Human
Resources

Provide human resources details for this project:


1
2
3
4
5
6
7
8
9
10
11

Number of Resources

Position
Management & Administration
Project Cost & Scheduling
Project Managers
Senior Design Engineers
Design Engineers
Project Engineers
Procurement Personnel
Quality Department Personnel
Construction Supervisors
Construction Skilled Labor
Construction Unskilled Labor
Total

Saudi Aramco: Public


Page 32 of 40

Saudi Aramco Prequalification Questionnaire General Bid Slates (GBS) Part - B


Complete the following form for each ongoing project or projects completed in the last ten (10) years. Duplicate the below form
for each project. Provide copies of completion certificates, performance evaluation reports (signed/stamped by client) and copies
of the contract showing signature pages, contract value, type, scope of work and contract duration. A project will not be
considered as part of your experience if above back-up documents are not provided.
GBS
Specialty

Select one or more GBS specialty related to the scope of work of this project.
GBS Specialty
Choose an item.
1
Choose an item.
2
Choose an item.
3

Contract Info

Title: PV AMERICANA

Number:

Award Date: June 6, 2011

Contract Value (US$): 20,000,000

Contractual Completion Date: December 2012

Actual Completion Date: December 2012

Planned % Complete: X

Actual % Complete:X

Value of Supplied Material (US$): X

Value of Subcontracts (US$): X

Client's
Company
Info

Client Name: GESTAMP SOLAR


Client Address: Peru, Tacna
Representative Name/Tel & Email:

Contract
Type

Primary Subcontractor

Designer

LSTK Detailed Design was done: In-House Design Office Outsourced Not LSTK

Scope of
Work

Projects Location: Peru, Tacna Country: Peru City: Tacna

LSTK LSPB Unit Rate Construction Management Others, specify: _______________________

Projects Brief Description (related to your scope of work only) :

Saudi Aramco: Public


Page 33 of 40

Sole Contractor Consortium JV, with share %:

Saudi Aramco Prequalification Questionnaire General Bid Slates (GBS) Part - B


Subcontracts

If applicable, list your main four (4) subcontracts under this project:
Scope of Work
Value US$
1

Subcontractor Name

2
3
4
Human
Resources

Provide human resources details for this project:


1
2
3
4
5
6
7
8
9
10
11

Number of Resources

Position
Management & Administration
Project Cost & Scheduling
Project Managers
Senior Design Engineers
Design Engineers
Project Engineers
Procurement Personnel
Quality Department Personnel
Construction Supervisors
Construction Skilled Labor
Construction Unskilled Labor
Total

Saudi Aramco: Public


Page 34 of 40

Saudi Aramco Prequalification Questionnaire General Bid Slates (GBS) Part - B

EXHIBIT G: HUMAN RESOURCES


1.1

Project Management Key Personnel


Provide information of companys key project management personnel in the table below and provide copies of
educational academic degrees and resumes for each management personnel:
Name

Job Title

Years with
Company

Total Experience
Years in
Discipline

Jose Luis Celorrio

General Manager

12

24

Jose Igancio del Barrio

Project Controls
Manager

Construction Manager

Engineering Manager

Alona Ibisate

QA/QC Manager

Mrs. Raquel Bueno

Safety Manager

Jose Ruiz Sanjoaquin

Procurement Manager

Pre-commissioning Manager

Education: Graduate,
Undergrad., Diploma

1.2

Project Construction Workforce


In the tables below, provide numbers of resources In-Kingdom (IK) and/or Out-of-Kingdom (OOK). Provide scanned
copies of IK Labor Office approved block visas and General Organization for Social Insurance (GOSI) Certificates,
which is mandatory for your IK resources.

1.2.1

Provide numbers of your company project management personnel in the table below.
No

Title

Current Number of Resources


IK
OOK

Number of unused
block visas for work IK

1
Project Engineers
2
Cost Engineers
3
Estimators
4
Schedules /Planners
Sub Total
1.2.2

Provide numbers of your company engineering and construction field personnel.


#

Title

1
2
3
4
5
6
7
8
9

Civil Engineers
Mechanical Engineers
Electrical Engineers
Process & Control Engineers
Instrumentation & Control Engineers
Communications Engineers
QA/QC Engineer
Control System Engineers
Superintendent (Piping/Mech.)

Saudi Aramco: Public


Page 35 of 40

Current Number of Resources


IK

OOK

Number of unused
block visas for work IK

Saudi Aramco Prequalification Questionnaire General Bid Slates (GBS) Part - B

Title

Current Number of Resources


IK
OOK

Number of unused
block visas for work IK

10 Superintendent (Civil)
11 Superintendent (Elect. /Instr.)
12 Foremen/Supr. (Piping/Mech.)
13 Foremen/Supr. (Civil)
14 Foremen/Supr. (Elect/Instrument)
15 Safety Engineers
16 Others (Specify)
Sub Total
1.2.3

In the table below, provide numbers of skilled/ craft personnel resources.


#

Skilled Labor Specialty

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

Masons
Carpenters
Surveyors
Iron Workers
Pipe Fitters
Mech. technicians
Elect. Technicians
Steel Fixers
Painters
Millwrights
Painters
Scaffolders
Sand Blasters
Structural Steel Fabricator
Welders Structural
Welders Piping
Pipe Fabricators
Riggers
Electricians (LV/HV)
Instr. & Control Technicians
Certified Cable Splicers
NDT Technicians
Cathodic Protection Technicians
Side Booms Operators
Rock Breakers
Light Crane Operators
Heavy Crane Operators
Bulldozer Operator
Grader Operators

Saudi Aramco: Public


Page 36 of 40

Current Number of Resources


IK
OOK

Number of unused
block visas for work IK

Saudi Aramco Prequalification Questionnaire General Bid Slates (GBS) Part - B

Skilled Labor Specialty

Current Number of Resources


IK
OOK

Number of unused
block visas for work IK

30 Backhoe/Excavator Operator
31 Truck Drivers
32 Others (Specify)
Subtotal

1.2.4

In the table below, provide numbers of unskilled/ labors personnel resources.


#

Unskilled Labors

Laborers

Saudi Aramco: Public


Page 37 of 40

Current Number of Resources


IK
OOK

Number of unused
block visas for work IK

Saudi Aramco Prequalification Questionnaire General Bid Slates (GBS) Part - B

EXHIBIT H: EQUIPMENT
Construction Equipment
Equipment Types: in the table below, provide information about company currently owned and leased equipment relevant to the
scope of work of the GBS you are requested to be prequalified for. Equipment types may be lifting such as cranes, tower cranes
etc., transportation equipment such as trucks, civil work equipment such as excavators and leveling etc.
Equipment Type
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39

Hammer Drill
Hammer Drill
Hammer Milwaukee
Cordless Hammer Drill Hilti TE6A
Rotary Hammer
Fence
Truck Iveco ML120E18Bas
Crane Palfinger PK 15002 SE
Hydraulic Pressure Pipe Bender Vas CH4 MOD 8
Generator Set
Angle Grinder Bosch 230 1900
Generator G-5000
Floor Saw Lux-13
Rotary Hammer Hilti TE 6S
Rotary Hammer Hilti TE 6C
Magnetic Base Drill
Generator M 2,25 Gasoline
Jointing Kit
Cordless Drill 12V Hilti or Battery
Generator M 25 Gasoline
Kit Hilti
Ditect Fastening System Tools
Cable Stripper
Hydraulic Pump
Cable Stripper
Hydraulic Pump
Coil Support
Coil Support
Reel Stand
RDSI Tester Analyzer
TV Cable Inc. Tester Analyzer
Tester for Cable Quality
Professional Kit Fujikura
Tachymeter TC1105
Set HP-Calan 3010R
Set Calan 3010R
Site Master 25 MHZ 4GHZ
Laser Rot PR16
Plotter HP Desingjet 105

Saudi Aramco: Public


Page 38 of 40

Current Number of Units


1
1
2
15
6
60
1
1
1
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Saudi Aramco Prequalification Questionnaire General Bid Slates (GBS) Part - B

Equipment Type
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85

Digitizing Tablet
Digital Camera Mavicva F
Digital Camera Mavicva M
Digital Camera Sony Mavi
Plotter HP Desingjet 105
Plotter Canon BJ W-3000
Plotter IPF500
FO Slices Machine
Reflectometer
Wiring Certification
Sound Level Meter
Multi Gas Detector
Laser Detector
ADSL-ISDN Meter
ADSL Meter. Module ISDN
ADSL Meter. Module ADSL
Field Meter mediamax
Sweep Analyzer CATV Agilent
Impedance Meter
Cable Tester
Cable Explorer TDR
Field Meter cablrlab
Sweep Analyzer
Measuring Forward and Contact Systems Meter
ELCB Tester
Earth Meter
Thermal Graphic Camera
Torque Wrench
Torque Wrench
Clamp Meter
Clamp Meter
Process Meter Multifunction
Process Meter Multifunction
Insulation Tester
Power Supply
Process Meter Multifunction
Insulation Tester High Voltage Mkoban 0775823 (MG-146-2) 9053087
Insulation Tester Koban KRA 2550 0775032 (9676789)
Process Multimeter 11950345
Process Multimeter 12250490
Process Multimeter 10780329
Process Multimeter 12220664
Process Multimeter 13130271
Process Multimeter 98540130
High Voltage Insulation Tester Koban KRA 2804 (8951976)
Insulation Tester Koban KRA 2550 9053087

Saudi Aramco: Public


Page 39 of 40

Current Number of Units


1
2
1
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Saudi Aramco Prequalification Questionnaire General Bid Slates (GBS) Part - B

Equipment Type
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100

Process Multimeter 12220664


Process Multimeter Fluke. 289 15460280
Thermal Graphical Camera
Thickness Meter
Measuring Forward and Contact Systems Meter
Hart Emerson 475 Communicator
Multi Gas Detector. Drugger X-AM 2000 (8318911)
Hexafasic Tester
Megaohmeter
Network Analyzer
Dynamometer
Total Station
Digital Tellurometer
Portable Turbidity Meter
Turbidity Meter

Current Number of Units


1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Equipment Maintenance: Describe or attach your equipment maintenance/fleet management program and your
companys maintenance facilities, including the size of each facility and number of maintenance technicians.

Equipment Maintenance/Fleet Management Program:

Saudi Aramco: Public


Page 40 of 40