Contents
Instructions: GBS Experience Section .......................................................................................................... 2
Area Of Expertise .......................................................................................................................................... 3
Exhibit F: Summary Of Work Experience ..................................................................................................... 4
Exhibit G: Human Resources ........................................................................................................................ 7
Exhibit H: Equipment................................................................................................................................... 38
AREA OF EXPERTISE
Identify Areas of Expertise/Specialty
#
1)
a)
Electrical
Substations
b)
Electrical
Transmission Lines
2)
a)
Cathodic Protection
& Transmission
Lines
Company
Specialty?
(Yes/No)
YES
NO
NO
Value of
Largest Project
Completed
(in USD)
Project
Title
Contract
Value in
US $
Award
Date
Completion
Date
Status
(Completed
/Ongoing)
LSTK/
LSPB/
other
Prime or
SubContract
Location
(Country &
City)
Electrical
Substations
Sadaba
11,100,250
Nov 8,
2007
June 2008
Completed
LSTK
Prime
Spain, Aragon
Electrical
Substations
Espejo I
5,600,000
Dec,
2007
June 2008
Completed
LSTK
Prime
Spain,
Andalucia
Electrical
Substations
Lucaiena
3,000,000
2009
Completed
LSTK
Prime
Spain,
Andalucia
Electrical
Substations
Espejo II
6,540,075
February
2009
Completed
LSTK
Prime
Spain,
Andalucia
Electrical
Substations
Espejo III
5,000,000
2009
Completed
LSTK
Prime
Spain,
Andalucia
Electrical
Substations
Sevilla PV
3,500,000
Nov,
2007
April 2008
Completed
LSTK
Prime
Spain,
Andalucia
Electrical
Substations
Cordoba
PV
8,000,000
Oct,
2007
September
2008
Completed
LSTK
Prime
Spain,
Andalucia
Electrical
Substations
Parque FV
Ciudad
Real
10,000,000
2008
Completed
LSTK
Prime
Spain, Ciudad
Real
Electrical
Substations
Almonacid
PV Plant
5,600,000
Dec 10,
2007
July 2008
Completed
LSTK
Prime
Spain, Aragon
Electrical
Substations
Seat Al
Sol 5
1,943,040
May 16,
2012
November
2012
Completed
LSTK
Prime
Spain,
Cataluna
Electrical
Substations
Seat Al
Sol 6
852,580
May 16,
2012
November
2012
Completed
LSTK
Prime
Spain,
Cataluna
Electrical
Substations
Frio
Limpio
446
July 10,
2012
December
2012
Completed
LSTK
Prime
Spain, Aragon
Electrical
Substations
Planta
Fotovoltai
ca
Curbans
32,952,560
Feb, 5
,2010
September
2011
Completed
LSTK
Prime
France,
Hautes Alpes
Electrical
Substations
Batilly
Fotovoltai
que
10,372,000
June 6,
2011
December
2011
Completed
LSTK
Prime
France,
Creuse
Electrical
Substations
PV
Panameric
ana
20,000,000
July 6,
2012
December
2012
Completed
LSTK
Prime
Peru, Tacna
July ,
2008
Select one or more GBS specialty related to the scope of work of this project.
GBS Specialty
1
Electrical Substations
Choose an item.
2
Choose an item.
3
Contract Info
Title: SADABA
Number:
Planned % Complete:
Actual % Complete:
Client's
Company
Info
Contract
Type
Primary Subcontractor
Designer
LSTK Detailed Design was done: In-House Design Office Outsourced Not LSTK
Scope of
Work
If applicable, list your main four (4) subcontracts under this project:
Scope of Work
Value US$
1
Subcontractor Name
2
3
4
Human
Resources
Number of Resources
Position
Management & Administration
Project Cost & Scheduling
Project Managers
Senior Design Engineers
Design Engineers
Project Engineers
Procurement Personnel
Quality Department Personnel
Construction Supervisors
Construction Skilled Labor
Construction Unskilled Labor
Total
Select one or more GBS specialty related to the scope of work of this project.
GBS Specialty
Choose an item.
1
Choose an item.
2
Choose an item.
3
Contract Info
Title: ESPEJO I
Number:
Planned % Complete: X
Actual % Complete: X
Client's
Company
Info
Contract
Type
Primary Subcontractor
Designer
LSTK Detailed Design was done: In-House Design Office Outsourced Not LSTK
Scope of
Work
If applicable, list your main four (4) subcontracts under this project:
Scope of Work
Value US$
1
Subcontractor Name
2
3
4
Human
Resources
Number of Resources
Position
Management & Administration
Project Cost & Scheduling
Project Managers
Senior Design Engineers
Design Engineers
Project Engineers
Procurement Personnel
Quality Department Personnel
Construction Supervisors
Construction Skilled Labor
Construction Unskilled Labor
Total
Select one or more GBS specialty related to the scope of work of this project.
GBS Specialty
Choose an item.
1
Choose an item.
2
Choose an item.
3
Contract Info
Title: LUCAIENA
Number:
Award Date: X
Planned % Complete: X
Actual % Complete: X
Client's
Company
Info
Contract
Type
Primary Subcontractor
Designer
LSTK Detailed Design was done: In-House Design Office Outsourced Not LSTK
Scope of
Work
If applicable, list your main four (4) subcontracts under this project:
Scope of Work
Value US$
1
Subcontractor Name
2
3
4
Human
Resources
Number of Resources
Position
Management & Administration
Project Cost & Scheduling
Project Managers
Senior Design Engineers
Design Engineers
Project Engineers
Procurement Personnel
Quality Department Personnel
Construction Supervisors
Construction Skilled Labor
Construction Unskilled Labor
Total
Select one or more GBS specialty related to the scope of work of this project.
GBS Specialty
Choose an item.
1
Choose an item.
2
Choose an item.
3
Contract Info
Title: ESPEJO II
Number:
Planned % Complete: X
Actual % Complete: X
Client's
Company
Info
Contract
Type
Primary Subcontractor
Designer
LSTK Detailed Design was done: In-House Design Office Outsourced Not LSTK
Scope of
Work
If applicable, list your main four (4) subcontracts under this project:
Scope of Work
Value US$
1
Subcontractor Name
2
3
4
Human
Resources
Number of Resources
Position
Management & Administration
Project Cost & Scheduling
Project Managers
Senior Design Engineers
Design Engineers
Project Engineers
Procurement Personnel
Quality Department Personnel
Construction Supervisors
Construction Skilled Labor
Construction Unskilled Labor
Total
Select one or more GBS specialty related to the scope of work of this project.
GBS Specialty
Choose an item.
1
Choose an item.
2
Choose an item.
3
Contract Info
Number:
Award Date: X
Planned % Complete: X
Actual % Complete: X
Client's
Company
Info
Contract
Type
Primary Subcontractor
Designer
LSTK Detailed Design was done: In-House Design Office Outsourced Not LSTK
Scope of
Work
If applicable, list your main four (4) subcontracts under this project:
Scope of Work
Value US$
1
Subcontractor Name
2
3
4
Human
Resources
Number of Resources
Position
Management & Administration
Project Cost & Scheduling
Project Managers
Senior Design Engineers
Design Engineers
Project Engineers
Procurement Personnel
Quality Department Personnel
Construction Supervisors
Construction Skilled Labor
Construction Unskilled Labor
Total
Select one or more GBS specialty related to the scope of work of this project.
GBS Specialty
Choose an item.
1
Choose an item.
2
Choose an item.
3
Contract Info
Title: SEVILLA PV
Number:
Planned % Complete: X
Actual % Complete:X
Client's
Company
Info
Contract
Type
Primary Subcontractor
Designer
LSTK Detailed Design was done: In-House Design Office Outsourced Not LSTK
Scope of
Work
If applicable, list your main four (4) subcontracts under this project:
Scope of Work
Value US$
1
Subcontractor Name
2
3
4
Human
Resources
Number of Resources
Position
Management & Administration
Project Cost & Scheduling
Project Managers
Senior Design Engineers
Design Engineers
Project Engineers
Procurement Personnel
Quality Department Personnel
Construction Supervisors
Construction Skilled Labor
Construction Unskilled Labor
Total
Select one or more GBS specialty related to the scope of work of this project.
GBS Specialty
Choose an item.
1
Choose an item.
2
Choose an item.
3
Contract Info
Title: CORDOBA PV
Number:
Planned % Complete: X
Actual % Complete:X
Client's
Company
Info
Contract
Type
Primary Subcontractor
Designer
LSTK Detailed Design was done: In-House Design Office Outsourced Not LSTK
Scope of
Work
If applicable, list your main four (4) subcontracts under this project:
Scope of Work
Value US$
1
Subcontractor Name
2
3
4
Human
Resources
Number of Resources
Position
Management & Administration
Project Cost & Scheduling
Project Managers
Senior Design Engineers
Design Engineers
Project Engineers
Procurement Personnel
Quality Department Personnel
Construction Supervisors
Construction Skilled Labor
Construction Unskilled Labor
Total
Select one or more GBS specialty related to the scope of work of this project.
GBS Specialty
Choose an item.
1
Choose an item.
2
Choose an item.
3
Contract Info
Number:
Award Date: X
Planned % Complete: X
Actual % Complete:X
Client's
Company
Info
Contract
Type
Primary Subcontractor
Designer
LSTK Detailed Design was done: In-House Design Office Outsourced Not LSTK
Scope of
Work
Projects Location: Spain, Ciudad Real Country: Spain City: Ciudad Real
If applicable, list your main four (4) subcontracts under this project:
Scope of Work
Value US$
1
Subcontractor Name
2
3
4
Human
Resources
Number of Resources
Position
Management & Administration
Project Cost & Scheduling
Project Managers
Senior Design Engineers
Design Engineers
Project Engineers
Procurement Personnel
Quality Department Personnel
Construction Supervisors
Construction Skilled Labor
Construction Unskilled Labor
Total
Select one or more GBS specialty related to the scope of work of this project.
GBS Specialty
Choose an item.
1
Choose an item.
2
Choose an item.
3
Contract Info
Number:
Planned % Complete: X
Actual % Complete:X
Client's
Company
Info
Contract
Type
Primary Subcontractor
Designer
LSTK Detailed Design was done: In-House Design Office Outsourced Not LSTK
Scope of
Work
If applicable, list your main four (4) subcontracts under this project:
Scope of Work
Value US$
1
Subcontractor Name
2
3
4
Human
Resources
Number of Resources
Position
Management & Administration
Project Cost & Scheduling
Project Managers
Senior Design Engineers
Design Engineers
Project Engineers
Procurement Personnel
Quality Department Personnel
Construction Supervisors
Construction Skilled Labor
Construction Unskilled Labor
Total
Select one or more GBS specialty related to the scope of work of this project.
GBS Specialty
Choose an item.
1
Choose an item.
2
Choose an item.
3
Contract Info
Number:
Planned % Complete: X
Actual % Complete:X
Client's
Company
Info
Contract
Type
Primary Subcontractor
Designer
LSTK Detailed Design was done: In-House Design Office Outsourced Not LSTK
Scope of
Work
If applicable, list your main four (4) subcontracts under this project:
Scope of Work
Value US$
1
Subcontractor Name
2
3
4
Human
Resources
Number of Resources
Position
Management & Administration
Project Cost & Scheduling
Project Managers
Senior Design Engineers
Design Engineers
Project Engineers
Procurement Personnel
Quality Department Personnel
Construction Supervisors
Construction Skilled Labor
Construction Unskilled Labor
Total
Select one or more GBS specialty related to the scope of work of this project.
GBS Specialty
Choose an item.
1
Choose an item.
2
Choose an item.
3
Contract Info
Number:
Planned % Complete: X
Actual % Complete:X
Client's
Company
Info
Contract
Type
Primary Subcontractor
Designer
LSTK Detailed Design was done: In-House Design Office Outsourced Not LSTK
Scope of
Work
If applicable, list your main four (4) subcontracts under this project:
Scope of Work
Value US$
1
Subcontractor Name
2
3
4
Human
Resources
Number of Resources
Position
Management & Administration
Project Cost & Scheduling
Project Managers
Senior Design Engineers
Design Engineers
Project Engineers
Procurement Personnel
Quality Department Personnel
Construction Supervisors
Construction Skilled Labor
Construction Unskilled Labor
Total
Select one or more GBS specialty related to the scope of work of this project.
GBS Specialty
Choose an item.
1
Choose an item.
2
Choose an item.
3
Contract Info
Number:
Planned % Complete: X
Actual % Complete:X
Client's
Company
Info
Contract
Type
Primary Subcontractor
Designer
LSTK Detailed Design was done: In-House Design Office Outsourced Not LSTK
Scope of
Work
If applicable, list your main four (4) subcontracts under this project:
Scope of Work
Value US$
1
Subcontractor Name
2
3
4
Human
Resources
Number of Resources
Position
Management & Administration
Project Cost & Scheduling
Project Managers
Senior Design Engineers
Design Engineers
Project Engineers
Procurement Personnel
Quality Department Personnel
Construction Supervisors
Construction Skilled Labor
Construction Unskilled Labor
Total
Select one or more GBS specialty related to the scope of work of this project.
GBS Specialty
Choose an item.
1
Choose an item.
2
Choose an item.
3
Contract Info
Number:
Planned % Complete: X
Actual % Complete:X
Client's
Company
Info
Contract
Type
Primary Subcontractor
Designer
LSTK Detailed Design was done: In-House Design Office Outsourced Not LSTK
Scope of
Work
Projects Location: France, Hautes Alpes Country: France City: Hautes Alpes
If applicable, list your main four (4) subcontracts under this project:
Scope of Work
Value US$
1
Subcontractor Name
2
3
4
Human
Resources
Number of Resources
Position
Management & Administration
Project Cost & Scheduling
Project Managers
Senior Design Engineers
Design Engineers
Project Engineers
Procurement Personnel
Quality Department Personnel
Construction Supervisors
Construction Skilled Labor
Construction Unskilled Labor
Total
Select one or more GBS specialty related to the scope of work of this project.
GBS Specialty
Choose an item.
1
Choose an item.
2
Choose an item.
3
Contract Info
Number:
Planned % Complete: X
Actual % Complete:X
Client's
Company
Info
Contract
Type
Primary Subcontractor
Designer
LSTK Detailed Design was done: In-House Design Office Outsourced Not LSTK
Scope of
Work
If applicable, list your main four (4) subcontracts under this project:
Scope of Work
Value US$
1
Subcontractor Name
2
3
4
Human
Resources
Number of Resources
Position
Management & Administration
Project Cost & Scheduling
Project Managers
Senior Design Engineers
Design Engineers
Project Engineers
Procurement Personnel
Quality Department Personnel
Construction Supervisors
Construction Skilled Labor
Construction Unskilled Labor
Total
Select one or more GBS specialty related to the scope of work of this project.
GBS Specialty
Choose an item.
1
Choose an item.
2
Choose an item.
3
Contract Info
Title: PV AMERICANA
Number:
Planned % Complete: X
Actual % Complete:X
Client's
Company
Info
Contract
Type
Primary Subcontractor
Designer
LSTK Detailed Design was done: In-House Design Office Outsourced Not LSTK
Scope of
Work
If applicable, list your main four (4) subcontracts under this project:
Scope of Work
Value US$
1
Subcontractor Name
2
3
4
Human
Resources
Number of Resources
Position
Management & Administration
Project Cost & Scheduling
Project Managers
Senior Design Engineers
Design Engineers
Project Engineers
Procurement Personnel
Quality Department Personnel
Construction Supervisors
Construction Skilled Labor
Construction Unskilled Labor
Total
Job Title
Years with
Company
Total Experience
Years in
Discipline
General Manager
12
24
Project Controls
Manager
Construction Manager
Engineering Manager
Alona Ibisate
QA/QC Manager
Safety Manager
Procurement Manager
Pre-commissioning Manager
Education: Graduate,
Undergrad., Diploma
1.2
1.2.1
Provide numbers of your company project management personnel in the table below.
No
Title
Number of unused
block visas for work IK
1
Project Engineers
2
Cost Engineers
3
Estimators
4
Schedules /Planners
Sub Total
1.2.2
Title
1
2
3
4
5
6
7
8
9
Civil Engineers
Mechanical Engineers
Electrical Engineers
Process & Control Engineers
Instrumentation & Control Engineers
Communications Engineers
QA/QC Engineer
Control System Engineers
Superintendent (Piping/Mech.)
OOK
Number of unused
block visas for work IK
Title
Number of unused
block visas for work IK
10 Superintendent (Civil)
11 Superintendent (Elect. /Instr.)
12 Foremen/Supr. (Piping/Mech.)
13 Foremen/Supr. (Civil)
14 Foremen/Supr. (Elect/Instrument)
15 Safety Engineers
16 Others (Specify)
Sub Total
1.2.3
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
Masons
Carpenters
Surveyors
Iron Workers
Pipe Fitters
Mech. technicians
Elect. Technicians
Steel Fixers
Painters
Millwrights
Painters
Scaffolders
Sand Blasters
Structural Steel Fabricator
Welders Structural
Welders Piping
Pipe Fabricators
Riggers
Electricians (LV/HV)
Instr. & Control Technicians
Certified Cable Splicers
NDT Technicians
Cathodic Protection Technicians
Side Booms Operators
Rock Breakers
Light Crane Operators
Heavy Crane Operators
Bulldozer Operator
Grader Operators
Number of unused
block visas for work IK
Number of unused
block visas for work IK
30 Backhoe/Excavator Operator
31 Truck Drivers
32 Others (Specify)
Subtotal
1.2.4
Unskilled Labors
Laborers
Number of unused
block visas for work IK
EXHIBIT H: EQUIPMENT
Construction Equipment
Equipment Types: in the table below, provide information about company currently owned and leased equipment relevant to the
scope of work of the GBS you are requested to be prequalified for. Equipment types may be lifting such as cranes, tower cranes
etc., transportation equipment such as trucks, civil work equipment such as excavators and leveling etc.
Equipment Type
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
Hammer Drill
Hammer Drill
Hammer Milwaukee
Cordless Hammer Drill Hilti TE6A
Rotary Hammer
Fence
Truck Iveco ML120E18Bas
Crane Palfinger PK 15002 SE
Hydraulic Pressure Pipe Bender Vas CH4 MOD 8
Generator Set
Angle Grinder Bosch 230 1900
Generator G-5000
Floor Saw Lux-13
Rotary Hammer Hilti TE 6S
Rotary Hammer Hilti TE 6C
Magnetic Base Drill
Generator M 2,25 Gasoline
Jointing Kit
Cordless Drill 12V Hilti or Battery
Generator M 25 Gasoline
Kit Hilti
Ditect Fastening System Tools
Cable Stripper
Hydraulic Pump
Cable Stripper
Hydraulic Pump
Coil Support
Coil Support
Reel Stand
RDSI Tester Analyzer
TV Cable Inc. Tester Analyzer
Tester for Cable Quality
Professional Kit Fujikura
Tachymeter TC1105
Set HP-Calan 3010R
Set Calan 3010R
Site Master 25 MHZ 4GHZ
Laser Rot PR16
Plotter HP Desingjet 105
Equipment Type
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
Digitizing Tablet
Digital Camera Mavicva F
Digital Camera Mavicva M
Digital Camera Sony Mavi
Plotter HP Desingjet 105
Plotter Canon BJ W-3000
Plotter IPF500
FO Slices Machine
Reflectometer
Wiring Certification
Sound Level Meter
Multi Gas Detector
Laser Detector
ADSL-ISDN Meter
ADSL Meter. Module ISDN
ADSL Meter. Module ADSL
Field Meter mediamax
Sweep Analyzer CATV Agilent
Impedance Meter
Cable Tester
Cable Explorer TDR
Field Meter cablrlab
Sweep Analyzer
Measuring Forward and Contact Systems Meter
ELCB Tester
Earth Meter
Thermal Graphic Camera
Torque Wrench
Torque Wrench
Clamp Meter
Clamp Meter
Process Meter Multifunction
Process Meter Multifunction
Insulation Tester
Power Supply
Process Meter Multifunction
Insulation Tester High Voltage Mkoban 0775823 (MG-146-2) 9053087
Insulation Tester Koban KRA 2550 0775032 (9676789)
Process Multimeter 11950345
Process Multimeter 12250490
Process Multimeter 10780329
Process Multimeter 12220664
Process Multimeter 13130271
Process Multimeter 98540130
High Voltage Insulation Tester Koban KRA 2804 (8951976)
Insulation Tester Koban KRA 2550 9053087
Equipment Type
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
Equipment Maintenance: Describe or attach your equipment maintenance/fleet management program and your
companys maintenance facilities, including the size of each facility and number of maintenance technicians.