Beruflich Dokumente
Kultur Dokumente
Edificios Comerciales
Propietario: a
Ubicacion: b
Ingeniero Proyectista: c
Metodo de diseo: Esfuerzos Ultimos
Valores estndar de Diseo:
- Instituto de Ingeniera de Tailandia (W.s.t.) para edificios de hormign armado.
- Instituto de Ingeniera de Tailandia (W.s.t.) para edificios de acero.
- American Concrete Institute (ACI 318-99).
Unidades de Diseo:
Unidad de longitud.
Peso.
Esfuerzo
Flexion
Momento
Corte
Temperatura
=
=
=
=
=
=
=
Metros (m).
Kilogramos (kg).
Kilogramos por metro cuadrado (KSC).
Kg m (kg-m).
Kg m (kg-m).
Kilogramos (kg).
Grado Celsius
Date :
Slap No :
Floor :
12/21/2015
Design Parameters :
=
=
=
=
=
=
=
=
2,400
2,040,000
1,200
210
0.375
2,400
78.75
2.20E+05
n = Es/Ec
k = 1/(1+fs/(n*fc))
j = 1-k/3
R = 0.5*fc*k*j (ksc)
=
=
=
=
9
0.371
0.876
12.811
240
50
150
=
=
=
=
286
=
=
=
1.30
0.10
0.03
92.95
440
=
=
=
0.065
541
2,732
>
>
93
286
Ok
Ok
Reinforcement :
Main Steel
Main Bar
As-main (sq.cm/m)
Spacing of Main Bar (m)
=
=
=
Temp. Steel
Temp. Bar
As-min and As-temp (sq.cm/m)
Spacing of Temp. Bar (m)
RB9
1.36
0.254
=
=
=
RB9
2.50
0.254
Checking :
Min. Thickness (m)
Bonding Main (cm)
=
=
0.10
11.11
>
>
0.06
4.57
Ok
Ok
RB9 @ 0.254 m.
RB9 @ 0.254 m.
t = 0.1 m.
L = 1.3 m.
Engineer:
Licence:
c
0
file:///var/www/apps/conversion/tmp/scratch_7/298942639.xls 06:05:22
Date :
Slap No :
Floor :
12/21/2015
Design Parameters :
=
=
=
=
=
=
=
=
2,400
2,040,000
1,200
173
0.375
2,400
64.88
2.00E+05
n = Es/Ec
k = 1/(1+fs/(n*fc))
j = 1-k/3
R = 0.5*fc*k*j (ksc)
=
10
= 0.351
= 0.883
= 10.051
2 Ways Slab
A = 3 m.
Input Data :
Case of Slab
3 edge discontinuous
Thickness, t (m)
Concrete Covering (m)
=
=
0.12
0.025
=
=
=
=
288
40
300
XXXXXXXXXXXXXXXXXXXXX
B = 4.8 m.
Short Span, A (m)
Long Span, B (m)
Ratio m = A/B
628
3.00
4.80
0.63
=
=
=
Moment Analysis :
Short Span
M-disc.
M-con.
M+
Long Span
M-disc.
M-con.
M+
Coeff.
M=Cws2 (kg-m)
d (m)
As (sq.cm/m)
Mr (kg-m)
0.044
0.088
0.066
248.69
497.38
373.03
0.090
0.090
0.090
2.61
5.22
3.91
814.13
814.13
814.13
DB10 @ 0.3 m.
DB10 @ 0.15 m.
DB10 @ 0.201 m.
0.029
0.058
0.044
163.91
327.82
248.69
0.080
0.080
0.080
1.93
3.87
2.93
643.26
643.26
643.26
DB10 @ 0.3 m.
RB9 @ 0.164 m.
DB10 @ 0.268 m.
Checking :
Min. Thickness (m)
Shearing :
=
0.12
>
0.087
Ok
DB10 @ 0.3 m.
DB10 @ 0.3 m.
DB10 @ 0.201 m.
DB10 @ 0.268 m.
VA = WS/3 (kg/m)
628
VB = (WS/3)*((3-m^2)/2) (kg/m)
817
DB10 @ 0.15 m.
RB9 @ 0.164 m.
S h o rt S p a n = A
Engineer:
Licence:
c
0
file:///var/www/apps/conversion/tmp/scratch_7/298942639.xls 06:05:22
Date :
Beam No :
Floor :
12/21/2015
Moment Analysis :
Mr (kg-m)
=
4,000
2,040,000
1,700
210
0.375
2,400
78.75
2.20E+05
Input Data :
Case of Beam
Width, B (m)
Depth, D (m)
Clear Span Length, L (m)
Centroil of Bars, d' (m)
Effective Depth, d (m)
Concrete Covering (m)
Maximum Moment, Mmax (kg-m)
Compression Area
Tension Area
=
9
= 0.294
= 0.902
= 10.449
=
=
=
0.50
30
0.80
4,403
>
>
>
>
0.23
8.20
0.12
Ok
Ok
Ok
900
Single.
Beam Dim.
0.2 x 0.5 m.
1' st Layer
2-DB12
DRAWING
Checking :
Minimum Depth
Narrow Beam
Deep Beams
=
=
=
=
=
=
=
=
2' nd Layer
3' rd Layer
Vc (kg)
3,858
Vt (kg)
0.00
Spacing (cm)
10.60
Spacing (cm)
2.73
2,400
0.5
1,200
V' (kg)
0
FBD
2 nd Layer
1 st Layer
3-DB12 + 1-RB12
Stirrup
1-DB10 @ 0.3 m.
Engineer:
License:
At/s (sq.cm)
0.00
Asc (sq.cm)
0.00
c
0
=
=
1
1,600
0
Bar
Spacing (m)
0.300
SFD
BMD
3 rd Layer
DIAGRAM
As' (sq.cm)
Required
Provided
1' st Layer
2' nd Layer
0.00
2.26
3' rd Layer
As (sq.cm)
Required
Provided
3 rd Layer
2 nd Layer
3.21
4.52
1 st Layer
Shear & Torsion Analysis :
Yeild Stress of Stirrup,fy (ksc)
=
Factor
=
Allowable Stress of Steel,fv (ksc)
=
file:///var/www/apps/conversion/tmp/scratch_7/298942639.xls 06:05:22
Date :
Col. No :
Floor :
12/21/2015
4,000
2,040,000
=
=
=
210
1,600
2.20E+05
Input :
Bx (m)
Ty (m)
Column Length, L (m)
Column Load, Pcol (kg)
Moment X, Mx (kg-m)
Moment Y, My (kg-m)
Main Bars Steel Type :
=
=
=
=
=
=
x
DRAWING
Constant :
Yeild Stress, fy (ksc)
Elastic Modulus of Steel, Es (ksc)
DB20
RB6
Max=10
Max=10
Solve:
Ratio L/r
Type of Column
0.30
0.40
3.00
45,000
2,000
1,500
12
Bars
Column Dimension
0.3 x 0.4 m.
Main Bars
12 - DB20 mm.
Stirrup
P
a
Mx
x
Pg = 3.142%
=
=
=
=
=
4
Bars
4
Bars
0.025
My
10.00
Short Col.
Engineer:
Licence:
c
0
Spacing of Stirrup :
RB6 mm. @ 0.288 m.
Interaction Diagram
X-Axis
Y-Axis
120000
120000
100000
100000
80000
80000
60000
60000
40000
40000
20000
20000
0
0
2000
4000
6000
8000
10000
20000
20000
0
0
2000
4000
6000
8000
10000
12/21/2015
Date :
Slap No :
Floor :
Cantilever Slab Design
Constant :
=
=
=
=
=
=
=
=
Input Data :
Case of Slab
2,400
2,040,000
1,200
210
0.375
2,400
78.75
2.20E+05
Cantilever
=
=
=
1.20
0.12
0.03
=
=
=
=
=
=
288
432
100
x = 0.9 m.
W = 820 kg/m
n = Es/Ec
k = 1/(1+fs/(n*fc))
j = 1-k/3
R = 0.5*fc*k*j (ksc)
t = 0.12 m.
L = 1.2 m.
=
=
=
=
820
0
0.90
9
0.371
0.876
12.811
=
=
590
984
=
=
=
0.084
903.95
3,530.10
>
>
590.40
984.00
Ok
Ok
Reinforcement :
Main Steel
Main Bar
As-main (sq.cm/m)
Temp. Steel
=
=
=
RB12
6.68
0.169
Temp. Bar
As-min and As-temp (sq.cm/m)
=
=
=
RB12
3.00
0.300
Checking :
Min. Thickness (m)
Bonding Main (cm)
=
=
0.12
22.28
>
>
0.12
12.15
Engineer:
Licence:
Ok
Ok
c
0
file:///var/www/apps/conversion/tmp/scratch_7/298942639.xls 06:05:22
Date :
Column :
Floor :
12/21/2015
Column-Spiral Design
Constant :
4,000
4,000
1,600
173
0.30
2.00
2.00
0.030
DIA. = 0.3 m.
Input :
Main Bars :
Ratio L/D
6.67
Type of Column
Short Col.
Reduction Factor : R
1.00
Pcon=R(0.25*Ag*fc') (Tons)
30.57
As (cm2)
6
As (cm2)
RB12
DB12
RB15
DB16
RB19
DB20
DB25
DB28
DB32
As (cm2)
8
%
6 - DB16 mm.
7
%
DRAWING
As (cm2)
9
%
As (cm2)
10
%
As (cm2)
6.79
0.96%
7.92
1.12%
9.05
1.28%
10.18
1.44%
11.31
1.60%
6.79
0.96%
7.92
1.12%
9.05
1.28%
10.18
1.44%
11.31
1.60%
10.60
1.50%
12.37
1.75%
14.14
2.00%
15.90
2.25%
17.67
2.50%
12.06
1.71%
14.07
1.99%
16.08
2.27%
18.10
2.56%
20.11
2.84%
17.01
2.41%
19.85
2.81%
22.68
3.21%
25.52
3.61%
28.35
4.01%
18.85
2.67%
21.99
3.11%
25.13
3.56%
28.27
4.00%
31.42
4.45%
29.45
4.17%
34.36
4.86%
39.27
5.56%
44.18
6.25%
49.09
6.94%
36.95
5.23%
43.10
6.10%
49.26
6.97%
55.42
7.84%
61.58
8.71%
48.25
6.83%
56.30
7.96%
64.34
9.10%
72.38
10.24%
80.42
11.38%
Engineer:
Licence:
c
0
Date :
Column :
Floor :
12/21/2015
Column-Tied Design
Constant :
4,000
1,600
210
B = 0.5 m.
Input :
Column Width, Bx (m)
0.50
0.50
6.00
12.00
Main Bars :
Ratio L/B
12.00
Type of Column
Short Col.
Reduction Factor : R
1.00
Pcon=R(0.85*Ag*0.25*fc') (Tons)
111.56
As (cm2)
4
As (cm2)
RB12
DB12
RB15
DB16
RB19
DB20
DB25
DB28
DB32
As (cm2)
8
%
4 - DB12 mm.
6
%
DRAWING
T = 0.5 m.
As (cm2)
10
%
As (cm2)
12
%
As (cm2)
4.52
0.18%
6.79
0.27%
9.05
0.36%
11.31
0.45%
13.57
0.54%
4.52
0.18%
6.79
0.27%
9.05
0.36%
11.31
0.45%
13.57
0.54%
7.07
0.28%
10.60
0.42%
14.14
0.57%
17.67
0.71%
21.21
0.85%
8.04
0.32%
12.06
0.48%
16.08
0.64%
20.11
0.80%
24.13
0.97%
11.34
0.45%
17.01
0.68%
22.68
0.91%
28.35
1.13%
34.02
1.36%
12.57
0.50%
18.85
0.75%
25.13
1.01%
31.42
1.26%
37.70
1.51%
19.63
0.79%
29.45
1.18%
39.27
1.57%
49.09
1.96%
58.90
2.36%
24.63
0.99%
36.95
1.48%
49.26
1.97%
61.58
2.46%
73.89
2.96%
32.17
1.29%
48.25
1.93%
64.34
2.57%
80.42
3.22%
96.51
3.86%
Engineer:
Licence:
c
0
Date :
Foot No. :
Grid Line :
12/21/2015
Design Parameters :
=
=
=
=
=
=
=
=
4,000
2,040,000
1,700
210
0.375
2,400
65.00
2.20E+05
Input Data :
Section of Pile, Dp (m)
Pile Safe Load, Ps (kg)
D1 (m)
D1 >= Dp
=
=
=
0.26
32,000
0.30
n = Es/Ec
k = 1/(1+fs/(n*fc))
j = 1-k/3
R = 0.5*fc*k*j (ksc)
=
=
=
=
9
0.256
0.915
7.610
Wc
Lc
0.30
0.46
=
=
=
0.25
0.4
=
=
=
=
=
0.80
1.50
0.55
x 0.25
0.05
75,000
15%
0.23
OK
D1=
OK
D2 =
0.80
OK
3 # 6-DB16 mm.
0.95
L = 1.50
86,250
TRUE
Checking:
T=
0.55
Load to Pile
Pa =
Punching Shear
D2 =
Vp =
26,291
<
32,000 kg
0.80
4.72
>
<
0.58
7.72
OK
ksc
OK
0.00
<
4.20
ksc
OK
OK
32 /
Beam Shear
Vb =
Area of Steel
As =
12.06
>
10.32
cm2
OK
Engineer:
Licence:
c
0
0.30
Date :
Stair No :
Floor :
12/21/2015
Design Parameters :
=
=
=
=
=
=
=
=
2,400
2,040,000
1,200
210
0.375
2,400
78.75
2.20E+05
Input Data :
Concrete Covering (m)
0.025
=
=
=
0.140
0.150
0.250
2.000
Thickness, t (m)
h (m)
s (m)
Flight Span Length, L (m)
=
=
=
=
=
=
=
n = Es/Ec
k = 1/(1+fs/(n*fc))
j = 1-k/3
R = 0.5*fc*k*j (ksc)
=
=
=
=
9
0.371
0.876
12.811
Rake = 30.96
L = 2 m.
364
50
300
714
357
714
1000
713.92
500
0
-500
=
=
=
0.110
1,550
4,623
Main Bar
As-main (sq.cm/m)
Spacing of Main Bar (m)
=
=
=
RB9
3.09
0.182
Temp. Bar
As-min and As-temp (sq.cm/m)
Spacing of Temp. Bar (m)
=
=
=
RB9
3.50
0.182
Reinforcement :
-713.92
-1000
0
SFD (kg)
400
6
300
200
100
0
0
0.5
1.5
BMD (kg-m)
Checking :
Moment (kg-m)
Shear (kg)
Bonding Main (cm)
Min Thickness (m)
=
=
=
1,550
4,623
15.56
0.14
>
>
>
>
357
714
6.73
0.08
Ok
Ok
Ok
Ok
Engineer:
Licence:
c
0
2.5
Date :
Stair No :
Floor :
12/21/2015
Design Parameters :
=
=
=
=
=
=
=
=
4,000
2,040,000
1,700
210
0.375
2,400
78.75
2.20E+05
Input Data :
Concrete Covering (m)
0.030
=
=
=
0.140
0.150
0.250
2.000
1.000
Thickness, t (m)
h (m)
s (m)
Flight Span Length, FL (m)
=
=
=
=
=
=
=
=
n = Es/Ec
k = 1/(1+fs/(n*fc))
j = 1-k/3
R = 0.5*fc*k*j (ksc)
S
t
h
Rake = 30.96
364
50
300
714
796
1066
=
9
= 0.294
= 0.902
= 10.449
FL = 2 m
LaL = 1 m
713.92 kg/m
686 kg/m
1066.23 kg/m
1047.61
kg/m
1500
2
1000
500
0
-500
=
=
=
0.104
4,371
1,087
-1000
-1500
0
0.5
1.5
2.5
3.5
2.5
3.5
SFD (kg)
Reinforcement :
Main Bar
As-main (sq.cm/m)
Spacing of Main Bar (m)
=
=
=
DB12
4.99
0.227
Temp. Bar
As-min and As-temp (sq.cm/m)
Spacing of Temp. Bar (m)
=
=
=
RB9
2.52
0.252
900
800
700
600
500
400
300
200
100
0
796.2
0.5
Checking :
Moment (kg)
Shear (kg)
Bonding Main (cm)
Min Thickness (m)
1.5
BMD (kg-m)
=
=
=
1,086.70
4,370.60
16.64
0.14
>
>
>
>
796.20
1,066.23
4.55
0.120
Ok
Ok
Ok
Ok
Engineer:
Licence:
c
0
RC_2003.5.0507
Gracias
Gracias a los maestros. University of Technology.
Dotar de conocimientos. En ingeniera civil as.
Gracias a los Panas que me inspiran.
Comenzar a desarrollar este Spreedsheet.
Por ltimo, quiero sealar a los Profesores
Referencias.
1 El diseo de la estructura de ranura.
WSD por el Prof. Dr. Cho revista Can.
2 El diseo de la estructura de ranura.
Por WSD Dr.Sataporn coche Bhopal.
3 Diseo de edificios de hormign armado.
Las ecuaciones se ha fundido.
4 Los cimientos sobre pilotes tres www.tumc
Las ecuaciones se ha fundido.
Fecha: 27/04/2007
e-mail:
mynameismo@gmail.com
History
R1 = 3/04/2003
R2 = 12/08/2003
R3 = 25/11/2003
R4 = 23/03/2005
R5 = 25/05/2007
ura de ranura.
ho revista Can.
ura de ranura.
coche Bhopal.
hormign armado.
undido.
otes tres www.tumcivil.com.
undido.
3/04/2003
12/08/2003
25/11/2003
23/03/2005
25/05/2007