Tradesman
Hours
Labourer
Hours
Unit
m2
0.12
m2
0.08
m2
0.12
Mesh
Walls
Bar Reinforcement, placing and fixing
6mm-12mm stirrups
tonne
30.00
tonne
18.00
tonne
20.00
tonne
20.00
PRODUCTION RATES
Production Rates
Building Constants
Task / Description
Slabs/Foundations, steelfixing, 6mm
Slabs/Foundations, steelfixing, 8mm
Slabs/Foundations, steelfixing, 10mm
Slabs/Foundations, steelfixing, 12mm
Slabs/Foundations, steelfixing, 16mm
Slabs/Foundations, steelfixing, 20mm
Slabs/Foundations, steelfixing, 25mm
Slabs/Foundations, steelfixing, 32mm
Slabs/Foundations, steelfixing, 40mm
Slabs/Foundations, steelfixing, 50mm
Beams/Columns, steelfixing, 6mm
Beams/Columns, steelfixing, 8mm
Beams/Columns, steelfixing, 10mm
Beams/Columns, steelfixing, 12mm
Beams/Columns, steelfixing, 16mm
Beams/Columns, steelfixing, 20mm
Beams/Columns, steelfixing, 25mm
Beams/Columns, steelfixing, 32mm
Beams/Columns, steelfixing, 40mm
Beams/Columns, steelfixing, 50mm
Walls, steelfixing, 6mm
Walls, steelfixing, 8mm
Walls, steelfixing, 10mm
Walls, steelfixing, 12mm
Walls, steelfixing, 16mm
Walls, steelfixing, 20mm
Walls, steelfixing, 25mm
Walls, steelfixing, 32mm
Walls, steelfixing, 40mm
Walls, steelfixing, 50mm
Staircases, steelfixing, 6mm
Staircases, steelfixing, 8mm
Staircases, steelfixing, 10mm
Staircases, steelfixing, 12mm
Staircases, steelfixing, 16mm
Staircases, steelfixing, 20mm
Staircases, steelfixing, 25mm
Concrete Work
Slow
Ave
Fast
Units
40.3
28.2
22.5
16.9
12.0
9.2
6.9
5.7
5.3
5.2
55.4
38.8
29.5
23.4
16.6
12.4
9.9
6.8
6.1
6.1
41.2
29.2
22.7
17.6
12.4
9.4
7.4
7.0
6.4
5.3
48.9
34.4
26.6
20.9
14.6
11.3
8.6
38.4
26.9
20.6
16.3
11.5
8.6
6.7
5.5
5.1
4.9
52.8
37.0
28.4
22.4
15.8
11.9
9.2
6.6
5.9
5.9
40.8
28.6
22.0
17.3
12.2
9.2
7.2
6.8
6.1
5.1
48.0
33.6
25.8
20.4
14.4
10.8
8.4
36.5
25.8
20.1
15.4
10.9
8.2
6.5
5.2
4.9
4.6
50.6
35.1
26.9
21.9
15.1
11.3
8.7
6.2
5.6
5.6
39.1
27.4
21.2
16.9
11.8
8.7
7.0
6.4
5.9
4.8
45.5
31.9
24.3
19.5
13.8
10.5
8.2
hrs/tonne
hrs/tonne
hrs/tonne
hrs/tonne
hrs/tonne
hrs/tonne
hrs/tonne
hrs/tonne
hrs/tonne
hrs/tonne
hrs/tonne
hrs/tonne
hrs/tonne
hrs/tonne
hrs/tonne
hrs/tonne
hrs/tonne
hrs/tonne
hrs/tonne
hrs/tonne
hrs/tonne
hrs/tonne
hrs/tonne
hrs/tonne
hrs/tonne
hrs/tonne
hrs/tonne
hrs/tonne
hrs/tonne
hrs/tonne
hrs/tonne
hrs/tonne
hrs/tonne
hrs/tonne
hrs/tonne
hrs/tonne
hrs/tonne
Concrete Mixing
Concrete Placement
Expansion joint
Formwork
Reinforcement
Scaffolding
Surface Finishes
Waterstops
Demolition
Electrical
Engineering
Excavation
Foundation
Plant Productions
Road and Rail
Tunneling & Mining
WE RECOMMEND
Post Tensioning
Slow
Ave
Fast
Task / Description
48.0
Units
hrs
120.0
hrs
Comments
# ILAVARASAN
2014-03-22 12:34
http://www.methvin.org/construction-production-rates/concrete-work/reinforcement
22/12/2015
Reinforcement
Page 2 of 2
POWER OF METHVIN
or
FAQs Project Proverbs Glossary Contact Us Management System Home Help Manual Login Register
http://www.methvin.org/construction-production-rates/concrete-work/reinforcement
22/12/2015