Transportation of Transformer- main body

Hazard Identification
No.

Work Activity

Hazard

Conducted by :
Designation :
Approved by:
Designation :
Revision :

Vigines
Mechanical Engineer
SC Low
Executive Director
1

Risk Analysis

Risk Control

Cause / Effect

Existing Risk Control


(If any)

Likelihood

Severity

Risk

Counter Measures

Personnel injury / tools &


material damage

Driver had valid license. Permit


to work (PTW) to ensure
suitable road access for
machinery & workers ;
Insurance

2A
Manageable

Develop policies, procedures practices and guidelines, in consultation with


employees to mitigate the risk.
Provide training instruction and supervision about the hazard.

Mobilize of
tools,vehicle,equipment
& materials to site

Road accident

Parking the
tools,vehicle,equipment
& materials at the site

Placed the tools &


materials at the
wrong area

Block the emergency


Supervisor / PTW competent
route.Tool &
person to verify actual site/lay
materials,equipment missing
down with owner.

1D
Acceptable

Follow instruction from client - placed the tools,vehicle,equipment &


material on the site.

To start the work

Work without permit

Uncontrolled work - may Existing client PTW system for


cause incident
all work - competent person
(expose to multiple hazard)
system

1E
Acceptable

The project had been awarded by client, and no work witout permission
from the client

All item / equipment to be


checked by competent person at
the main gate or prior start the
work

1C
Acceptable

Illegal item
equipment brought to
work area

Use of unsafe equipment

Not familiar with the


work to be
performed, area &
associated hazard

Expose to high risk that


lead to any injury

Client Safety Induction Training.


Every work must be supervised
by supervisor

Damage to property and


may cause serious injury

Signalman / Supervisor is
available to guide the rigger &
only he will give the instruction.
To stop work if heavy rain

Loading of cargo onto Heavy cargo (Risk


trailer for transportation
to slips)

Page 1

Develop policies, procedures practices and guidelines, in consultation with


employees to mitigate the risk.
Provide training instruction and supervision about the hazard.

2C
Acceptable

3B
Manageable

Develop policies, procedures practices and guidelines, in consultation with


employees to mitigate the risk.
Provide training instruction and supervision about the hazard.
PERSONAL PROTECTIVE EQUIPMENT (PPE)
Personal equipment designed to protect the individual from the
hazard

Hazard Identification
No.

10

Work Activity

Hazard

Risk Analysis

Risk Control

Cause / Effect

Existing Risk Control


(If any)

Likelihood

Severity

Risk

Counter Measures

Cargo slips / Personnel


Injury

The shackle/turnbuckles/wire
rope and other equipment are
checked periodically as part of
maintenance program. Check
equipment prior to delivery to
the job site and check again
before use.Ensure correct
shackle/wire rope is used at the
correct location

2C
Acceptable

The supervisor had to be double check for lashing.

Property damage

Supervisor or driver's attendant


to ensure there are personnel at
all side of the trailer (back,front
and sides) to give signal to
driver. Escort while transport
inside the plant

3C
Manageable

Develop policies, procedures practices and guidelines, in consultation with


employees to mitigate the risk.
Provide training instruction and supervision about the hazard.
PERSONAL PROTECTIVE EQUIPMENT (PPE)
Personal equipment designed to protect the individual from the hazard

Lashing the cargo

Lashing wire snaps,


shackles and
turnbuckles give
away or slipped

Transportation inland
(Inside the plant)

Trailer hit the road


curve or other thing
or fell into pothole
during reversing /
maneuvering

During Transportation

Route survey is done atleast 1


Trailer hit the over
Electrocution, Expose to
month earlier to determine all
head power lines
high risk on personnel
the obsturction along the
(TNB), Telekom
injury and cargo damage. proposed route. All the approval
poles, Traffic lights,
Damages on other
should be acquired from
Over head bridges infrastructure- road surface, appropriate authorities to do the
Trees and any other
traffic light , over head
modification along the roadphysical obstruction, power line's poles, Telekom dismantling poles, widen the
Unsuitable road
poles, over head bridges
road and and bridge capacity
condition
and etc
calculation prior cargo
movement
Before unloading / loading the
cargo there is to ensure only
designated personnel are
allowed in the lifting area with
barricade tape

3B
Manageable

Develop policies, procedures practices and guidelines, in consultation with


employees to mitigate the risk.
Provide training instruction and supervision about the hazard.
The job
schedule must be verified to prevent any high risk on the contract and
work schedule plans. Safety meeting should be conducted oftenly to
review and any near-miss incident or potential threat, ensure bridges are
cleared during cargo movement except relevant staff. Extensive route
survey to identify route feasibility& alternative route and obstruction along
the route ( eg : overhead bridges and etc. We will obtain escort service
from traffic police to control overall public movement & safety

2B
Manageable

Barricade tape & warning signboard on the job site to warn other
personnel not to enter the critical area

3B
Manageable

Develop policies, procedures practices and guidelines, in consultation with


employees to mitigate the risk.
Provide training instruction and supervision about the hazard.
The job
schedule must be verified to prevent any high risk on the contract and
work schedule plans

3B
Manageable

Lay steel plates, compact the ground crusher run

On site security

Other personnel
enter the job site

Work schedules plan

Rushing hours /
Delays

Exposed to high risk on


Journey management planning to
personnel injury and cargo
avoid traffics
damage

Jackdown cargo

load not placed in a stable


Check the ground suitability
position and its not properly
before jacking down the cargo
restrained

Load & unload

Exposed to high risk that


lead to any injury

Page 2