Network Optimization Report of GSM New-build

Network Optimization Report Template


of GSM Target Network for (Telecom
Circle XX Target Area/Main Cities /Zonal
Town/Main Road/Wereda Towns)

Huawei Technologies Co., Ltd.


December 26, 2015
2015-12-26

Page 1 of 26

Network Optimization Report of GSM New-build

Contents
1

Introduction ......................................................................................................................... 5
1.1
Purpose .................................................................................................................................... 5
1.2
Network Optimization Procedure ............................................................................................ 5
1.3
Scope ....................................................................................................................................... 6
1.4
Test protocol ............................................................................................................................ 6
Network Topology............................................................................................................... 7
2.1
BSC distribution (will be customized according to real scenario) .......................................... 7
2.2
Cluster distribution in case of big cities .................................................................................. 8
Target Area Information & Drive Test Route ..................................................................... 9
3.1
Target Area and Drive Test Route Drawing ............................................................................ 9
3.2
Target Area Site List................................................................................................................ 9
3.3
Target Area Site Engineering Parameter ............................................................................... 10
Drive Test & OSS KPI ...................................................................................................... 11
4.1
Drive Test KPI (threshold value will be same as like ED7 A11a-1a3) ................................. 11
4.2
OSS KPI (the threshold value should be same like ED-7 A16a-1a)...................................... 13
Drive Test Methodology.................................................................................................... 14
5.1
Call Setup Success Rate ........................................................................................................ 14
5.2
Call Setup Time ..................................................................................................................... 14
5.3
Call completion rate............................................................................................................... 14
5.4
Call Drop Rate ....................................................................................................................... 14
5.5
PDP Context Activation Success Rate .................................................................................. 14
5.6
PDP Context Activation Time ............................................................................................... 15
5.7
FTP EDGE Downlink Throughput according to C/I on BCCH TRX ................................... 15
5.8
FTP EDGE Uplink Throughput according to C/I on BCCH TRX ........................................ 15
5.9
PS Session Termination Success Rate ................................................................................... 15
5.10 Round Trip Time ................................................................................................................... 16
5.11 SDCCH_DROP_RATE ......................................................................................................... 16
5.12 SDCCH_SETUP_BLOCKING_RATE ................................................................................. 16
Drive Test Plot................................................................................................................... 17
6.1
Route & Target Area Information ......................................................................................... 17
6.2
Short Call Best Server BCCH Plot ........................................................................................ 18
6.3
RxLev Coverage Plot............................................................................................................. 18
6.4
RxQual Coverage Plot ........................................................................................................... 19
6.5
Download Throughput Plot ................................................................................................... 20
6.6
Upload Throughput Plot ........................................................................................................ 21
Optimization Actions Undertaken ..................................................................................... 22
7.1
RF adjustment ........................................................................................................................ 22
7.2
Parameter optimization .......................................................................................................... 23
7.3
Thematic Optimization .......................................................................................................... 23
Attachment ........................................................................................................................ 24
8.1
Engineering parameter table and RF tuning record table ...................................................... 24

2015-12-26

Page 2 of 26

Network Optimization Report of GSM New-build

8.2
Radio parameter optimization record table............................................................................ 24
8.3
Frequency optimization record table ..................................................................................... 24
8.4
Neighbor list optimization record table ................................................................................. 24
Certificate of Network Optimization Target Area Report ................................................. 25

2015-12-26

Page 3 of 26

Network Optimization Report of GSM New-build


Document Version Control and Modification Tracking
Version

2015-12-26

Editor

Modification made

Date

Page 4 of 26

Network Optimization Report of GSM New-build

1 Introduction
1.1

Purpose
The scope of work delivered by Huawei RNO Team on the Network Performance Improvement and

Roll-out Project was a successful achievement. The activities that were implemented during the course of
this program are listed below

Frequency Planning for New Sites

Frequency Retune on Worse Cell List

Neighbors Optimization

Radio Parameter Settings

Correction of Inconsistency Data in the network

Worse Cell Optimization

Alarm monitoring and troubleshooting

Swapped feeder Rectification on New Sites

All activities are properly implemented during the Target Areas roll out and optimization period.
The Target of the Key Performance Indicator (KPI) is to achieve the threshold listed in chapter 4.
Huawei is intended to provide Ethio Telecom a comprehensive view of the subject Target Area
performance and status within the network to which it has been integrated. This document forms the
formal Final Target Area Acceptance deliverable with-respect-to the subject Target Area.

1.2

Network Optimization Procedure


RNP

Initial Tuning

RNO

RNP
Preparation
RNO
Preparation
Tuning
Preparation

Network

Optimization of
Traffic Statistics
KPIs

Evaluation

Site RF Survey

Parameters
audit
Equipment
Installation
Commissioning &
Implementation
DT test

Detail Design

Network
Tuning&
troubleshooting

Color Indicator of

Coverage
Performance
Optimization

Care for VIP


and Hotspot
Areas

RF
Troubleshooting

Accepta
nce

Huawei & Ethio


Responsibility
Ethio
Telecom
Telecom
Huawei

2015-12-26

Page 5 of 26

Network Optimization Report of GSM New-build

Radio network optimization aims to improve network performance and maximize the benefit of the
existing network resources through parameter collection, data analysis, parameter adjustment, and
necessary technical means after site integrated and expansion.

Single site verification


To verify the functionality of sites, for example site installation, basic functions of the cell. SSV were

done from the first Target Area site on air

Target Area RF optimization


To control interference & pilot pollution, and optimize coverage & 3G neighbor lists.

Services test & Para. Optimization, Trouble shooting


The parameter optimization and troubleshooting were done along all the project phase. During the

project some key issues which effect 2G network quality were solved. For example, SDCCH call drop
issue, SDCCH congestion issue, 2G Call drop issue and so on.
The detail test method, optimization action and result are showed in the following report content.

1.3

Scope

This document will show in sections:

1.4

i.

Target area information & DT Route

ii.

DT KPI&OSS KPI

iii.

DT Result Plots

iv.

Optimization Actions Undertaken

v.

Attachments

vi.

Certificate of Network Optimization Target Area Report

Test protocol
i.

The test tools should use: Nemo outdoor, Actix.

ii.

Total drive test distance depend on each Target Area.

iii.

Average speed should not more than 40 km/h for town, 60km/h for high way.

iv.

All drive test measurement should be done in car with mobile terminals (Phone and data card).

v.

Rx-Level should be tested by idle mode locked on G900. RX_Qual should be based on long call.

vi.

Coverage Test:
Nemo and mobile terminals for main cities, main roads and Wereda Towns;
Considering finishing the project as per the PIP, Probe and mobile terminals will be used for
isolated sites. One sample isolated site can be selected by ET per circle to make the
comparison test between Probe and Nemo.

2015-12-26

Page 6 of 26

Network Optimization Report of GSM New-build

2 Network Topology
2.1

BSC distribution (will be customized according to real scenario)

2015-12-26

Page 7 of 26

Network Optimization Report of GSM New-build

2.2

Cluster distribution in case of big cities

2015-12-26

Page 8 of 26

Network Optimization Report of GSM New-build

3 Target Area Information & Drive Test Route


3.1

Target Area and Drive Test Route Drawing

3.2

Target Area Site List


Huawei

ID

2015-12-26

Longitude

Latitude

Configuration

Page 9 of 26

Network Optimization Report of GSM New-build

3.3

Target Area Site Engineering Parameter


Huawei ID

2015-12-26

Cell ID

BCCH

Height

Azimuth

Tilt(M/E)

Page 10 of 26

Network Optimization Report of GSM New-build

4 Drive Test & OSS KPI


4.1

Drive Test KPI (threshold value will be same as like ED7 A11a-1a3)

Service

Items

Threshold

Optimized
Value

Comment

Call Setup Counter


GSMCallSetupFailRF Counter
Call Setup Success Rate *

>98%
MOC90% of successful

Voice

calls <5s

Call Setup Time *

MTC90% of successful
calls <5s

Call completion rate

Call Drop Rate for continuous


calls *

>97.5%
2 drops per hour of voice
call or Static <=0.6%

PDP Context Activation

>98%

Success Rate *
PDP Context Activation Time

<3s

*
> 140 kbps for C/I >20 dB
FTP EDGE Downlink
> 60 kbps for 10 dB < C/I <
Throughput according to C/I
on BCCH TRX *

20 dB
> 25 kbps for C/I < 10 dB
> 70 kbps for C/I >20 dB

EDGE

FTP EDGE Uplink Throughput


> 30 kbps for 10 dB < C/I <
according to C/I on BCCH
20 dB

TRX *

> 10 kbps for C/I < 10 dB

PS Session Termination
Success Rate

>98%

*
1460 Byte Ping: <2500ms ;
5 packet loss

Round Trip Time


8 Byte Ping: <800ms ; 5
packet loss
GSMSDCCHCallDrop
GSMSDCCHAssigned
Mobility

SDCCH_SETUP_BLOCKING

0.5%

_RATE *
SDCCH Drop Rate *

2015-12-26

0.5%

Page 11 of 26

Network Optimization Report of GSM New-build


2G-3G HO Success Rate for

>98%

CS Calls
2G-3G Reselection Success

>95%

Rate for PS Calls


2G HO Success Rate for CS

>98%

Calls *
>-84 dBm for urban,
Coverage

RX_ Level for 95% of samples

>-94 dbm for suburban

>-99 dbm for road


>-104 dbm for rural

RX_Qual (for 85% of

0 to 4

samples) *

Note:
1. According to purchased service BoQ, all sites should be Optimized (initial tuning SSV and
optimization).
2. The final optimized value to be evaluated against the above target threshold value.
3. If the optimized value doesnt reach the threshold value, it should be justified and agreed as per the
justification (e.g. coverage, traffic model, etc.) stated in the comment column and accepted by ET.
4. For isolated site if there is a drive test route, optimization will be done in such a way and both SSV and
coverage optimization will be done together. The coverage will be optimized to the maximum possible
coverage/interference for the target area.
5. For isolated site if there is no drive test route, some target area around the site will be selected and
both SSV and coverage optimization will be done together. The coverage will be optimized to the
maximum possible coverage/interference for the target area.
6. The optimization report for isolated sites will be only tested and generated for the coverage test (RX_
Level

and RX_Qual). For isolated sites, there is no pass criteria.

7. 2G HO Success Rate for CS Calls is only applicable for Wereda towns.


8. Considering finishing the project as per the PIP, optimization will be done for the above most important
KPIs marked with stars for Wereda Towns. In addition, one Wereda town sample will be selected per
circle to be optimized and tested for all items according to the purchased license.
9. The Wereda Town is the administration center of the Wereda and the list will be provided by ET
regional office and agreed by 2 parties.
10. Considering finishing the project as per the PIP, main cities with site number less than 5, the stationary
test is not applicable.
11. Main Road DT is focused on mobility and connectivity, hot spot stationary test is not applicable.
12. If the main road sites cross the POs, the main road DT will be performed at last PO with all the sites
and only SSV acceptance in the previous PO.

2015-12-26

Page 12 of 26

Network Optimization Report of GSM New-build

4.2 OSS KPI (the threshold value should be same like ED-7 A16a-1a)
OSS target KPI should be according to Appendix A16a - 1a - Performance KPIs for
RAN-UTRAN-LTE - Ed7 shown as below (Average of 7 days of 2/12/2014-8/12/2014):
KPIs
Name

Day Busy

Night Busy

Hour

Hour

(10:00-11:00)

(21:00-22:00)

Threshold

Comment

CS
K3014:Traffic Volume on TCH(Erl)
2G Call Setup Success Rate_SLA

>98%

2G Call completion rate_SLA (>97%)

>97%

2G Call Drop Rate for continuous


<=1%
calls_SLA
2G SDCCH_

0.5%

SETUP_BLOCKING_RATE_SLA
2G SDCCH_DROP_RATE_SLA

0.5%

PS
2G Call Setup Success Rate - Data_SLA
2G Average EDGE throughput per data

97%
38Kbps

TS - DL_SLA
2G Average GPRS throughput per data

12Kbps

TS - DL_SLA
2G Lost connections Rate Data_SLA

5%

2G PS Session Termination Success


>98%
Rate_SLA

Note

1. The OSS KPIs are applicable when the counters are more than 500 in busy hour.
2. If the optimized value doesnt reach the threshold value, it should be justified and agreed as per the
justification (e.g. coverage, traffic model, etc.) stated in the comment column and accepted by ET.
3. Both day busy hour and night busy hour OSS KPI will be put in the above table. The day busy hour is
used for acceptance. The night busy hour is used for optimization reference.
4. If the main road sites cross the POs, the main road OSS KPI will be performed at last PO with all the
sites and only SSV acceptance in the previous PO.

2015-12-26

Page 13 of 26

Network Optimization Report of GSM New-build

5 Drive Test Methodology


5.1

Call Setup Success Rate


1. GSM network is in normal operation, relative parameters are well planned and optimized.
2. DT route is predetermined.
3. Set call model parameters: Destination Number = 118, Originate Mode = GSM, Call Type = Call by

Call, Setup Timeout = 30s, Call Duration = 120s, Test/Exceptional Interval = 15s, Call Start Mode = Idle
Mode, Call Mode = Infinite

5.2

Call Setup Time


1. GSM network is in normal operation, relative parameters are well planned and optimized.
2. DT route is predetermined.
3. Set call model parameters: Destination Number (call setup time MOC) =118, Destination Number

(call setup time MTC) =MTC Number, Originate Mode = GSM, Call Type = Call by Call, Setup Timeout =
30s, Call Duration = 120s, Test/Exceptional Interval = 15s, Call Start Mode = Idle Mode, Call Mode =
Infinite

5.3

Call completion rate


1. GSM network is in normal operation, relative parameters are well planned and optimized.
2. DT route is predetermined.
3. Set call model parameters: Destination Number = 118, Originate Mode = GSM, Call Type = Call by

Call, Setup Timeout = 30s, Call Duration = 120s, Test/Exceptional Interval = 15s, Call Start Mode = Idle
Mode, Call Mode = Infinite

5.4

Call Drop Rate


1. GSM network is in normal operation, relative parameters are well planned and optimized.
2. DT route is predetermined.
3. Set call model parameters: Destination Number = 118, Originate Mode = GSM, Call Type =

Continuous Call, Setup Timeout = 30s, Test/Exceptional Interval = 15s, Call Start Mode = Idle Mode, Call
Mode = Infinite

5.5

PDP Context Activation Success Rate


1. EDGE network is in normal operation, relative parameters are well planned and optimized.
2. DT route is predetermined.
3. SIM card is subscribed to provide 256Kbps or higher download rate.
4. Mobile EDGE Class = Class 10 (up to 4 TS on DL, up to 2 TS on UL)
5. FTP Server predetermined.
6. Set call model parameters: Initiate EDGE PDP context activation (Traffic Class = Background),

Mode = FTP upload & FTP download, Remote File Size: 500k & 2Mb. Initiate EDGE PDP context
2015-12-26

Page 14 of 26

Network Optimization Report of GSM New-build

deactivation. Test Interval = 15s.Repeat = Infinite

5.6

PDP Context Activation Time


1. EDGE network is in normal operation, relative parameters are well planned and optimized.
2. DT route is predetermined.
3. SIM card is subscribed to provide 256Kbps or higher download rate.
4. Mobile EDGE Class = Class 10 (up to 4 TS on DL, up to 2 TS on UL)
5. FTP Server predetermined.
6. Set call model parameters: Initiate EDGE PDP context activation (Traffic Class = Background),

Mode = FTP upload & FTP download, Remote File Size: 500k & 2Mb. Initiate EDGE PDP context
deactivation. Test Interval = 15s.Repeat = Infinite

5.7

FTP EDGE Downlink Throughput according to C/I on BCCH TRX


1. EDGE network is in normal operation, relative parameters are well planned and optimized.
2. DT route is predetermined.
3. SIM card is subscribed to provide 256Kbps or higher download rate.
4. Mobile EDGE Class = Class 10 (up to 4 TS on DL, up to 2 TS on UL)
5. FTP Server predetermined.
6. Set call model parameters: Initiate EDGE PDP context activation (Traffic Class = Background),

Download Mode = FTP, Remote File Size: 2Mb. Initiate EDGE PDP context deactivation. Test Interval =
15s.Repeat = Infinite

5.8

FTP EDGE Uplink Throughput according to C/I on BCCH TRX


1. EDGE network is in normal operation, relative parameters are well planned and optimized.
2. DT route is predetermined.
3. SIM card is subscribed to provide 256Kbps or higher download rate.
4. Mobile EDGE Class = Class 10 (up to 4 TS on DL, up to 2 TS on UL)
5. FTP Server predetermined.
6. Set call model parameters: Initiate EDGE PDP context activation (Traffic Class = Background/

Interactive Preferable). Upload Mode = FTP, Local File Size: 500kb. Initiate EDGE PDP context
deactivation. Test Interval = 15s, Repeat = Infinite

5.9

PS Session Termination Success Rate


1. EDGE network is in normal operation, relative parameters are well planned and optimized.
2. DT route is predetermined.
3. SIM card is subscribed to provide 256Kbps or higher download rate.
4. Mobile EDGE Class = Class 10 (up to 4 TS on DL, up to 2 TS on UL)
5. FTP Server predetermined.
6. Set call model parameters: Initiate EDGE PDP context activation (Traffic Class = Background),

Mode = FTP upload & FTP download, Remote File Size: 500k & 2Mb. Initiate EDGE PDP context
deactivation. Test Interval = 15s.Repeat = Infinite
2015-12-26

Page 15 of 26

Network Optimization Report of GSM New-build

5.10 Round Trip Time


1. EDGE network is in normal operation, relative parameters are well planned and optimized.
2. DT route is predetermined.
3. Make sure that the UE supports uplink extended TBF if the network supports this function.
4. Ping IP address predetermined.
5. Hotspots predetermined.
6. Set call model parameters: Initiate EDGE PDP context activation, Packet Size: 8 Byte & 1460 Byte,
Initiate EDGE PDP context deactivation, Test Interval = 1s, Test count = 200

5.11 SDCCH_DROP_RATE
1. GSM network is in normal operation, relative parameters are well planned and optimized.
2. DT route is predetermined.
3. Set call model parameters: Destination Number = 118, Originate Mode = GSM, Call Type = Call by
Call, Setup Timeout = 30s, Call Duration = 120s, Test/Exceptional Interval = 15s, Call Start Mode = Idle
Mode, Call Mode = Infinite

5.12 SDCCH_SETUP_BLOCKING_RATE
1. GSM network is in normal operation, relative parameters are well planned and optimized.
2. DT route is predetermined.
3. Set call model parameters: Destination Number = 118, Originate Mode = GSM, Call Type = Call by
Call, Setup Timeout = 30s, Call Duration = 120s, Test/Exceptional Interval = 15s, Call Start Mode = Idle
Mode, Call Mode = Infinite

2015-12-26

Page 16 of 26

Network Optimization Report of GSM New-build

6 Drive Test Plot


6.1

Route & Target Area Information

2015-12-26

Page 17 of 26

Network Optimization Report of GSM New-build

6.2

Short Call Best Server BCCH Plot

6.3

RxLev Coverage Plot

2015-12-26

Page 18 of 26

Network Optimization Report of GSM New-build

6.4

RxQual Coverage Plot

2015-12-26

Page 19 of 26

Network Optimization Report of GSM New-build

6.5

Download Throughput Plot

2015-12-26

Page 20 of 26

Network Optimization Report of GSM New-build

6.6

Upload Throughput Plot

2015-12-26

Page 21 of 26

Network Optimization Report of GSM New-build

7 Optimization Actions Undertaken


7.1

RF adjustment
Site ID

2015-12-26

Cell ID

Azimuth

Mechanical + Electrical

Purpose

Page 22 of 26

Network Optimization Report of GSM New-build

7.2

Parameter optimization
BSC/R
NC

7.3

Cell ID

MML

Parameter Name

Current

Proposed

Modification

Value

Value

Reason

Thematic Optimization
Site ID

2015-12-26

LLD Configuration

Current Configuration

Page 23 of 26

Network Optimization Report of GSM New-build

8 Attachment
8.1

Engineering parameter table and RF tuning record table

Engineering
RF tuning record
parameter table(cluster11).xls
table(cluster11).xls

8.2

Radio parameter optimization record table

Radio parameter
optimization record table(Cluster11).xls

8.3

Frequency optimization record table

NONE

8.4

Neighbor list optimization record table

NONE

2015-12-26

Page 24 of 26

Network Optimization Report of GSM New-build

9 Certificate of Network Optimization Target Area Report


It is hereby agreed that the Target Area named below meet the specifications, the drive test and OSS
performance criteria with preconditions to be satisfied under Additional Information. Ethio Telecom and
Huawei, by signing this paper, confirm that the Target Area has been successfully giving service as per
main contract agreement.
Target Area Name

Date of Operation

: DD/MM/YYYY

Additional Information

Site List:
Index

2015-12-26

Site ID

Site Name

Page 25 of 26

Network Optimization Report of GSM New-build

On behalf of Huawei

On behalf of Ethio Telecom

Originator.

Approved by..

Signature..

Signature..

Date

..

2015-12-26

Date

..

Page 26 of 26