Be sure that all senior management has taken the 24-hour Management
for Results course offered by the Instituto de Desenvolvimento
Gerencial.
Begin work. During this time reconvene your name-in-the-hat group and
study again chapters 1 - 7. When the ideas are applied in practice, the
level of understanding improves considerably. See for yourself.
After 8 months resume the study of the book. Together with your namein-the-hat group study up to Chapter 13.
At the end of the 16 months get back to your name-in-the-hat group and
go through to the end of the book. I can guarantee you that by that time
your management may already be classified as "World Class."
UNDERSTAND
YOUR WORK
MANAGE TO
IMPROVE RESULTS
MANAGE TO
SUSTAIN RESULTS
MONITOR
RESULTS
ELIMINATE
ABNORMALITIES
STANDARDIZE
PUTTING THE
HOUSE IN ORDER
2ND PHASE
1ST PHASE
UNDERSTANDING
YOUR WORK
IMPROVE
IMPROVE
MAINTENANCE
PRACTICE PROBLEM
SOLVING
12
10
IMPROVE
MONITORING
13
11
3RD PHASE
HUMAN
RESOURCES
ASSURE
QUALITY
14
FUTURE
OPERATIONAL
OPERATION
SUPERVISION
MANAGEMENT
Figure 1.1: Functions of people within an organization and its relation to the method.
FUNCTIONS
MANAGERIAL
DIRECTION
SITUATION
OPERATION
SUPERVISION
MANAGEMENT
DIRECTION
FUNCTIONS
MANAGERIAL
OPERATIONAL
NORMAL
* Reports abnormalities.
OCCURRENCE OF ABNOMALITIES
Table 1.1: Type of Work Carried Out Through Each Function(2), (3).
TYPE
TOP MANAGEMENT
TOP DOWN
MANAGEMENT
- IMPORTANT RELATIONSHIP
ROUTINE
MANAGEMENT
MANAGEMENT
BY POLICY
MODE
CROSSFUNCTIONAL
MANAGEMENT
CONTROL ITEMS:
CORRETIVE ACTION:
METHOD:
5S
DEFINITION OF
FLOWCHARTS
ABNORMALITY
REPORT
PDCA
TRAINING
A PRIORITY
PROBLEM
IDENTIFICATION
OF CHRONIC
ABNORMALITIES
PROCESS EVALUATION
(Dispersion evaluation)
PROCESS
IMPROVEMENT
(Dispersion reduction)
CORRECTIVE
ACTION
TWO EASY
PROBLEMS
RESEARCH OF
BENCHMARK
VALUES
DEFINITION OF
PRIORITY
CONTROL ITEMS
ACTION PLAN
FULL UTILIZATION
OF PDCA
C D
A S
FULL
UTILIZATION
OF SDCA
QUALITY
ASSURANCE
(Reliability)
PRODUCTIVITY
GAINS
C D
A P
IDENTIFICATION OF
PRIORITY PROBLEMS
GRAPHS
CONTROL ITEMS
TABLE
Figure 2.3: Basic Outline for the Improvement of Daily Work Routine Management.
STANDARDIZATION
ELIMINATION
OF
ABNORMALITIES
ORGANIZATION
OF YOUR
MANAGEMENT
DESCRIPTION
OF BUSINESS
GOAL
IDENTIFICATION
5S
DAILY WORK
ROUTINE
MANAGEMENT
Exemplary
Daily Work Routine Management
HUMANISM
METHOD
475
BETTER
455
* GOAL (425)
400
Time
(380) BENCHMARK
Company Y, Inc.
feel can contribute; those who are on top of the subject. This is a process of
knowledge collection.
3 Hold a meeting, visiting, if possible, the location where the subject occurs.
Have available: plenty of flip-chart paper, masking tape, magic markers of
several colors, post-it notes, etc.
4 At the meeting, state first your long-range goal (one in which you surpass the
best in the world). Then, state the goal to be reached within one year at the
most. Clearly explain how much the company will earn per year after it reaches
the goal. Put all this on flip-chart paper affixed to the wall. Print in very large,
colored letters to help people remember. Discuss these numbers with the
people in the meeting. How many families could be supported with the saving
from this waste reduction?
5 Define the groups problem. Write: OUR PROBLEM IS TOO MANY INVOICING
ERRORS (for example).
6 Now ask the group: WHY DO WE HAVE SO MANY INVOICING ERRORS? (for
example). At this point you have two alternatives: either you can distribute
post-it note paper and have each one write down a cause of the problem or
simply say what he or she thinks is the cause of the problem. The leader of
the meeting writes down each cause on the flip-chart sheets affixed to the
wall of the room. Do not forget to ask why? a number of times.
8 Now, for EACH CAUSE that remains after the cleanup process, discus with the
group one or more COUNTERMEASURES. Write on the flip-chart sheets only
those countermeasures that are agreed upon by all. Place these
countermeasures in the 5W 1H format. Presto! You have an ACTION PLAN, as
shown in Table 3.2.
06/30
Paul
3. Train personnel
In this column
place a name, and
not a group or an
acronym. It must be
the name of the
person in charge
08/31
John
In this column
place the
countermeasures
that came out of
brainstorming
(See Table 3.1)
08/31
(WHEN)
TIME
Mike
PERSON
RESPONSIBLE
(WHO)
(WHAT)
COUNTERMEASURES
To prevent
stoppages
To train them in
new procedures
Rolling
mill
Training
center and
work area
To prevent sleeve
breakage
Rolling
mill
PROCEDURE
(HOW)
JUSTIFICATION*
(WHY)
(WHERE)
LOCATION
OPERATIONS
Product
Merchandise
or Service
PROCESS
STEEL
REFINED
FURNACE
PREPARED
TRANSPORT
SCRAP
PREPARED
PROCESS
FLOWCHART
16
8
4
8
Assembly
Casting
Operation
Refining
Operation
Booth Operation
Platform
Operation
Adjustment
Crane Operation
Priority level
of the task
Prepare the
Tower
OPERATIONS
Number of
people assigned
to the task
Table 4.1: Priorization for Standardization (this table is a simulation and does not depict an actual case.
It merely serves as an instructive example).
Customer
Product
Process
Engineering Engineering
PRODUCTION
Manager
Supervisor
Operator
Needs
Product
specification
and design
Process
specification
Standard
operational
procedure
Trains the
supervisor
Trains the
operator and
checks
compliance
with standard
Implements
quality
assurance
complying
with standard
Idea for new
standard
operational
procedure
Approves
Approves
STANDARD RESTAURANT
INC.
STANDARD
OPERATIONAL
PROCEDURE
Standard: RP-C-03
Established: 03.24.94
Revised: 04.08.1994
MATERIAL REQUIRED
KETTLE
FILTER HOLDER
GROUND COFFEE
CONNECTOR
COFFEE MEASURER
STANDARD CUP
THERMOS BOTTLE
HEAT-RESISTANT GLOVE
PAPER FILTER
CRITICAL ACTIVITIES
01 - CHECK HOW MANY PEOPLE WILL DRINK COFFEE.
02 - PLACE WATER TO BOIL IN KETTLE (1 STANDARD CUP/PERSON).
03 - PLACE GROUND COFFEE IN PAPER FILTER (1 COFFEE MEASURE/PERSON).
04 - WASH THE THERMOS BOTTLE.
05 - PLACE FILTER ON TOP OF THERMOS BOTTLE, USING CONNECTOR.
06 - WHEN THE WATER BEGINS TO BOIL, POUR A LITTLE OVER THE GROUND COFFEE TO MOISTEN IT
THOROUGHLY.
07 - AFTER 30 SECONDS, POUR THE REST OF THE WATER IN THE FILTER.
08 - WHEN ALL THE WATER HAS PERCOLATED, REMOVE FILTER AND CLOSE THE THERMOS BOTTLE.
HANDLING OF MATERIAL
01 - AFTER EACH BREWING, WASH ALL EQUIPMENT, DRY AND STORE.
02 - GROUND COFFEE SHOULD ALWAYS BE KEPT IN A CLOSED CONTAINER.
EXPECTED RESULTS
01 - COFFEE AVAILABLE IS ALWAYS FRESH (MAXIMUM OF ONE HOUR AFTER BREWING).
02 - COFFEE AT CORRECT STRENGTH (NEITHER TOO WEAK NOR TOO STRONG).
CORRECTIVE ACTIONS
IN CASE THERE ARE COMPLAINTS THAT THE COFFEE IS TOO WEAK OR TOO STRONG, CHECK TO
SEE IF THE CORRECT AMOUNT OF WATER AND THE CORRECT AMOUNT OF GROUND COFFEE WAS
USED, OR IF THERE WAS A CHANGE IN THE QUALITY OF THE GROUND COFFEE. IF IN DOUBT,
CONSULT THE SUPERVISOR.
APPROVED:
WORKER
WORKER
WORKER
SUPERVISOR
MANAGER
NAME OF
OPERATION
AIR PRESSURE OF
PNEUMATIC
SCREWDRIVER
NOTE
TIGHTENING THE
SMALL SCREWS
CRITICAL ACTIVITY 3
TIGHTENING THE
LARGE SCREWS
CRITICAL ACTIVITY 2
PLACING OF REAR
COVER IN GROOVES
CRITICAL ACTIVITY 1
IMPORTANT
POINTS
AUTHORIZED BY:
3 kg/cm - 4kg/cm
FINAL ASSEMBLY
NAME OF PROCESS:
CHECKED BY:
FRONT VIEW
PREPARED BY:
Joo
Praxedes
Teles
Fiuza
Antenor
Pereira
Manoel
Vargas
Dornelles
Souza
Augusto
Workers
Section:
Months
Company X, Inc.
MONTHS
Supervisor:
Read
Worker
Supervisor
NO
Read
Section Chief
OBSERVATIONS
Read
YES
CRITICAL STEPS
Company X, Inc.
REPORTS
OCCURRENCE OF
ABNORMALITY
WORKER
WHY?
TRAINING?
FOOLPROOF?
NO
PROCESS ENGINEERING
STAFF
PDCA
MANAGER
MAKES ABNORMALITY
REPORT
ACTS UPON
IMMEDIATE CAUSE
CONDUCT ABNORMALITY
ANALYSIS AT SITE
YES
CHECKS COMPLIANCE
WITH STANDARDS
AUTHORIZES REMOVAL
OF SYMPTOM
SUPERVISOR
Remove symptom
Is there
a standard
procedure?
No
Yes
Is the
standard
procedure
appropriate
?
No
The operators
have difficulty in
understanding it
It is not in a
usable form
Yes
2
Rewrite the
standard to conform
to the current work
method
No
The operators
do not understand
the standard
Was
the standard
operational
procedure being
followed
?
5
Train the operators
in the standard
Offer technical
training to the
operators or reassign
them in other work
It is not practical
or does not
produce good
results
4
3
Rewrite the standard
using diagrams and
figures for easy
understanding
Yes
The operators
do not feel the
need to
follow the standard
7
Instruct and orient
the operators to
follow the standard
Work conditions
are inadequate
9
Improve work
conditions
Improve work
methods,
introducing foolproof mechanisms
NO
YES
92
Production
Losses
in 1993.
(tons/day)
420
93
240
M A M
100
300
O N
Losses
from
Stops
Losses
from
Defects
Decline
in
Rhythm
120
200
80
40
20
Losses from
Unforeseen
Breakage
200
80
Losses from
Tool
Replacement
100
20
Losses from
Intermittent
Stops
65
10
4
20
ce
Losses from
Breakage in
the Roller
120
sc
G
u
id
re e
w
Losses from
Scrap
100
ive
Losses from
Production
Start
50
30
20
50
20
Losses in
Roller
Lines
rs
19
Figure 5.5: Pareto Analysis in Preparation for the Current Situation Report (simulation).
Sto
ps
De
fec
ts
D
Sp eclin
ee e
d in
U
Br nfor
ea es
ka ee
g n
To e
Re ol
pla
c
em
en
t
n
Ro
lle
r
Ro
l
l
e
rL
ine
Cy
R lin
e
pla der
ce
G me
Re uide nt
p
lac
em
G
Sc
rap
Pr
Sta odu
rt ctio
In
L ter
o
sse mitt
en
s
t
D
Sp eclin
ee e
d in
na
Fu
r
en
t
uid
eb
r
ea
ka
ge
Po
w
e
r lo
ss
Lu
b
r
ica
tio
n
GOAL
(380)
rs
Dr
Cr
ac
ks
Production
Losses in 500
tons/day
he
Ot
ng
BETTER
Sc
ali
Ha
rd
n
ar
ing
kle
s
en
Di
es
s
Re
s
r
p
W
ar
sio
n
Ot
h
Be
ce
ne
Tu
r
W
rin
ist
an
he
M
ing
60
11
15
gs
Ot
ot
or
s
rs
he
Ot
er
s
rin
Be
a
1000
le
Ax
n=5
50
UCL = 45,69
40
LC = 29.86
30
20
LCL = 14,03
60
UCL = 58,04
40
20
xx x x
x
x
x
x
x x
x
x x x x
x
x
LC = 27.44
x
10
15
20
25
Control Card X - R
Figure 6.1: Control Card (UCL = Upper Control Limit; LCL = Lower Control Limit).
24
18
12
24
LSL (15)
USL (25)
(20)
Value sought
(Standard goal)
Figure 6.2: Sequential Graph (USL = Upper Specification Limit; LSL = Lower Specification Limit).
Time
necessary to
make up a 15
hotel room,
in minutes 10
20
25
LSL
140
USL
160
180
Figure 6.3: Histogram (USL = Upper Specification Limit; LSL = Lower Specification Limit).
Energy Consumption
ICN IC-R-93-01-14
Dimension: Cost
400
500
00
475
01
455
02
*
(380)
BENCHMARK
COMPANY Y, INC.
GOAL (425)
BETTER
XX Company, Inc.
(kWh/t)
PROCESS
RAW
MATERIALS
EQUIPMENT
RESULTS
450
INFORMATION
n=2
LSC = 449,79
LC = 406,31
X 400
LIC = 362,84
350
100
LSC = 75,55
ENVIRONMENTAL
CONDITIONS
50
PEOPLE
PROCEDURES
LC = 23,13
R
0
10 11 12
ABNORMALITY REPORT
(OPERATOR)
- 5 SENSES REMOVAL OF SYMPTOM
(OPERATOR/SUPERVISOR)
COUNTERMEASURES
AGAINST
IMMEDIATE CAUSES
day
YES
OK
?
NO
SPECIAL
CAUSE
?
COMMON
(CHRONIC)
ABNORMALITY ANALYSIS
(SUPERVISOR)
ABNORMALITY REPORT
(SUPERVISOR)
ADDITIONAL
COUNTER MEASURES
(MANAGER)
DAILY REVIEW
(MANAGER)
SUPPLIERS
PROCEDURES
EQUIPMENT
PEOPLE
INFORMATION
CHECK
ITEMS
CONTROL
ITEMS
(ENDS)
RESULTS
RESPONSIBILITY
CUSTOMERS
EMPLOYEES
STOCKHOLDERS
NEIGHBORS
OBJECTIVE
PEOPLES
SATISFACTION
TOTAL QUALITY
GOALS
ENVIRONMENTHAL
CONDITIONS
RAW
MATERIALS
AUTHORITY
Draw graphs for your control items (See Figures 6.1, 6.2,
6.3, and 6.4). Standardize your graphs.
10
PRODUCTION/
DISTRIBUTION GRID
PRODUCT SUPPLY
ORDER
WAGON PROJECT
FEEDBACK
- 5 COMPUTERS
- 2 TERMINALS
- 4 PRINTERS
- 8 TELEPHONES
- 6 CALCULATORS
- FAX AND XEROX MACHINES
EQUIPMENTS
- HUGO - MANAGER
- MARX - PROJECT DRAFT
- FORTUNATO - DISTRIBUTION/RECEPTION DESK
- JOS DOMINGOS PRICES
- BERNARDO - PURCHASE
- ELIANE - DISTRIB./RECEP. DESK
- WALTER - DISTRIB./RECEP. DESK
- ALESSANDRO - DISTRIB./RECEP. DESK
- SAULO - DISTRIB./RECEP. DESK
- VAGNER - DISTRIB./RECEP. DESK
- 2 TRAINEES - TO BE DEFINED
PEOPLE
MISSION
PCPD
PLANNING AND
CONTROL OF PRODUCTION
AND DISTRIBUTION
BUSINESS
BUSINESS
BOTTLE LOAN
AUTHORIZED
PRODUCTS DISTRIBUTED
BOTTLING/MANUFACTURE
PROJECT
PRODUCT
- COMMERCIAL D.
- COMMERCIAL D.
- FINANCE D.
- COMMERCIAL D.
- FINANCE D.
- COMMERCIAL D.
- INDUSTRIAL DIR.
- INDUSTRIAL D.
- GENERAL M.
- COMMERCIAL D.
- GENERAL M.
- INDUSTRIAL D.
- GENERAL M.
- INDUSTRIAL D.
- GENERAL M.
- INDUSTRIAL D.
- GENERAL M.
- INDUSTRIAL D.
CLIENTS
Figure 8.2: Description of the Production and Distribution Planning and Control Business of Company S.
LOGISTICS M.
SHIPPING COMPANY
ES. COMMERCIAL D.
CVRD
RESALES
SHIPPING COMPANIES
PRICE TABLE
COMMERCIAL D.
OTHER UNITS
REMOVAL SCHEDULE
LEGISLATION
PRICE POLICY
COMMERCIAL D.
COMMERCIAL Ds.
/ UNITS
COMMERCIAL D.
MARKETING BOARD
FINANCE BOARD
FINANCE BOARD
MARKETING BOARD
TOP MANAGEMENT
INDUSTRIAL D.
ORDERS
INDUSTRIAL D.
INPUTS
PRODUCTION CAPACITY/
(BOT. + MANUF.)
SUPPLIERS
Personnel
Environmental
Procedures
conditions
PEOPLE
PRODUCTS
OF EMPLOYEES
OF NEIGHBORS
OF CUSTOMERS
RIGHT TIME
RIGHT QUANTITY
MORALE
SAFETY
DELIVERY
RIGHT PLACE
INSTRINSIC QUALITY
Information
Equipment
Raw
materials
Table 8.3: Method for Determining Control Items in Daily Work Routine
Management at all Hierarchical Levels.
(See Figure 8.4)
Who are the (internal and external) customers for each product?
What are our customers needs? Ask each one in person.
Cost Control Items: What is the cost sheet for each product? (Make
one yourself, even if in approximate figures. Do not wait for the Costs
Department, nor should you be afraid of committing errors). What is
the unit cost of the product?
Morale Control Items: What is the turnover in our team? What is the
absentee rate? What is the number of shop steward complaints?
What is the number of health unit visits? What is the number of
suggestions? Etc.
Company
Manufacture
Equipment and
Services Made
Available
Manufacture
Manufacture/
Sales
Production
Planned
Production
Supplied
(Dir./ Indir. Mat.)
External
Clients
Products
delivered to
clients
Obeying Restrictions
from Manufacture
Quantity/Deadline
Quality (Released)
Cost
Quantity/Deadline
Quality (Released)
Supply Flexibility
Low Acquisition Cost
Stocks
Quantity
Models
Deadline
Deadline
Product as ordered
Quantity (volume) of Correct Billing
Product Integrity
Cost of Deliveries
Needs
Control Item
Figure 8.4: Example of a sequence for defining the Control Items of a Logistics Director.
Logistics
Mission
Clients
Products
SALES
PRODUCT
(OR
FUNCTION)
ETC.
MARKET
SHARE OF
PRODUCT X
CONTROL
ITEM
PORCENTAGE
OF SALES
OVER TOTAL
SALES OF A
SIMILAR
PRODUCT
UNIT OF
MEASUREMENT
PRIORITY
(A, B, C)
WHEN TO ACT
CONTROL
FREQUENCY
CALL A
MEETING OF
MANAGERS,
SALES PEOPLE
OF THE AREA
AND OF
TECHNICAL
ASSISTANCE.
DETERMINE
CAUSES AND
TAKE ACTION.
HOW TO ACT
METHOD
NUMBER OF
COMPLAINTS
PER MONTH
10
20
95
M J J A S O N D
94
*
THEORETICALLY ATTAINABLE VALUE
IN THIS CASE IS ZERO
Goal Line
J F M A M J J A S O N D J F M A
AVERAGE
VALUE (16)
BETTER
GOAL
(8)
YOUR PROCESS
92
93
94
J F M J J A S O N D
1,0
2,0
3,0
4,0
RESULTS
GOAL
PROBLEM
FOR 1994
TOTAL
PROBLEM
2 Give a piece of paper to each of the participants and ask them to list the main
problems in your managerial area.
3 Collect the opinions and screen the problems, examining each problem with
everyone present. Select those that are undesirable results (the excluded
suggestions should be kept for future action).
4 If the group so wishes, distribute more paper and have the participants list
additional problems.
6 Among the controllable problems, select those that can be most easily
solved in the short term (around 3 months) and use PDCA to solve them. This
is equivalent to on-the-job training in the PDCA method.
7 The problems that depend for their solution on other managerial units
should be treated within a crossfunctional relationship.
8 When problems brought up are vital for the company and their solution
depends on the organization, the board should set up a committee and a
crossfunctional work group to solve them.
7
CONCLUSION
STANDARDIZATION
CHECKING
EXECUTION
ACTION PLAN
IDENTIFICATION OF PROBLEM
PHASE
FLOW
CHART
PDCA
OBJECTIVE
Conclude
Gerson
Responsible
WHO
5/20/94
4/15/94
Time
WHEN
91
Bar rolling
Location
WHERE
Goal
0,6
To prevent
sleeve
breakage
Reason
WHY
Procedure
HOW
93
Problem
Present Situation
92
3 Regulate injectors
2 Change rollers
Countermeasure
WHAT
PLANNING PHASE
(This may take a
number of months
or be done at one
meeting, depending
on the complexity
of the problem)
PLAN EXECUTION
Set of countermeasures- 5W 1H
ACTION PLAN
Causes
Small
Problem
Defect
index %
CONTROL ITEM
PAST
PRESENT
The results
PRESENT
Problem points
PRESENT
Proposal (plan)
to resolve problem
points
FUTURE
6 CHECK
5 EXECUTE
4 ACTION PLAN
D
E
What you
wanted to do
PLANNED
7 Standardize
Good Result
RESULTS
3 NEW ANALYSIS
What was
bad? Why?
PROBLEM
POINTS
PROPOSAL
V
X
T
U
NEW
ACTION
PLAN
What should
be done
about the
poor results
8 CONCLUDE
What you
did
EXECUTED
Figure 9.2: Stages in Setting up a Three-Generation Report, showing the solution of a problem
through several PDCA rounds.
WHY
PRODUCTION
LEVEL IS LOW
3 ANALYZE
2 OBSERVE
1. Conducted
successfully.
2. Transport time
reduced.
3. Maintained at the
end of the period.
4. Analysis done.
5. Flowchart time
reduced from the
total lead time.
2. Rationalize the
transport of raw
liquid.
4. Identify bottleneck in
the flowchart.
EXECUTED
PLANNED
(Month)
2 4 6 8 10 12
2.000
1.000
0
2.000
1.000
0
(Month)
(Month)
2 4 6 8 10 12
3.000
3.000
2 4 6 8 10 12
4.000
4.000
Control graph of
index achieved with
planned charge
(Month)
2 4 6 8 10 12
Objective: 3,678t/year
Actual result: 4,419t/year
Achieved: 114,0%
100
98
102
(%)
Objective: 100%/year
Actual result: 100,3%/year
Achieved: 100,3%
Objective: 2,060t/year
Actual result: 1,450t/year
Achieved: 70,4%
Graph of the
evolution of
production volume
2.000
4.000
6.000
Objective: 5,936t/year
Actual result: 5.870t/year
Achieved: 98,9%
RESULTS
PROBLEM POINTS
THREE-GENERATION REPORT
SECTOR: Refined Material Production
DATE: 09/30/92
(ton)
precision of sales
forecast. (Other
divisions).
Resp.: Sales Division
Deadline: Annual
meeting 12/12/92.
combined production
with the lot volume.
Resp.: John
Deadline: 11/30/92
. If possible, resort to
PROPOSAL
Upper
Management
DIVISION
Reports,
Documents or
Division Department Section Staff and
Standards
Manager Manager
Manager Supervision
Basic Standard
Managerial
Theory
Corporation Analysis
Managerial Resources Analysis
External Factors Analysis
Medium Term
Planning Standard
Establishment of Basic
Work and Organizational
Goals
List of Shared
Functions
Control Cards
Companys
Standardization
Manual
Work Standardization
P-D-C-A
CHECK
Standard process
Flowchart
EXECUTION
Monthly
Report
Monthly
Report
Abnormality
Report
Monthly
Report
Top Management
Diagnosis
(monthly) (A)
Business Report
Diagnosis A
Report
Organization
Chart
Control Items
Table
Diagnosis B
Report
List of Vital
Problems
INGOT
CASTING
PLATFORM
OPERATOR
TOWER
OPERATOR
CONTROL
PANEL
OPERATOR
INJECTION
STANDARD
BS-5201
BETWEEN
1570 and 1600C
BETWEEN
2 and 3 m/min
CARBON
IN LADLE
CASTING
TEMPERATURE
CASTING
SPEED
BETWEEN
0,45 - 0,56%
100%
(ABSENCE
OF
BLISTERS,
CRACKS
AND FAULTS
CARBON
CONTENT
SURFACE
QUALITY
SHIFT
FOREMAN
SHIFT
FOREMAN
SHIFT
FOREMAN
LEADER
PO-583
CONTINUOUS
RECORD
AM-031
VELOCITY
GAUGE
CORRECTION
STANDARD
BS-6881
RUN
SHEET
THERMOCOUPLE
AX-32
CORRECTION
STANDARD
BS-7318
RUN
SHEET
RUN
SHEET
LEADER
LEADER
CORRECTION
STANDARD
BS-7318
CORRECTION
STANDARD
BS-7318
WHO TO
SEEK OUT
WHAT TO
DO
CORRECTIVE
ACTION
X-RAYS
FLOW
METER
AS-536
RUN
SHEET
PRESSURE
GAUGE
AS-432
ALL RUNS
ALL RUNS
ALL RUNS
RUN
SHEET
RECORD
TIMER
MEASURING
INSTRUMENT
ALL RUNS
BLOW
OPERATOR
BETWEEN
1 and 1,5 Nm3/t
DISCHARGE
ALL RUNS
BLOW
OPERATOR
BETWEEN 2
and 2,5 atm.
BLOW
PRESSURE
ALL RUNS
BLOW
OPERATOR
BETWEEN 2,5
and 3 min.
ARGON
BLOW TIME
MEASUREMENT
(TIME/FREQ)
COMPOSITION
AND
TEMPERATURE
VARIATIONS
DURING
THE RUN
LESS THAN
3%
PERSON
RESPONSIBLE
HOMOGENEITY
STANDARD
VALUE
CHECKING METHOD
WHO WHEN WHERE HOW
CONTROL
PARAMETER
LADLE
METALURGY
WHAT
CONTROL
LEVEL
VALUE
ASSURED
QUALITY
CHARACTERISTIC
NAME OF
OPERATION
PROCESS
FLOWCHART
PROCESS
QUALITY
ASSURANCE
Flowchart
Name
PROCESS
QUALITY
ASSURANCE
CONTROL
LEVEL
CHECKING METHOD
CORRECTIVE
ACTION
MEANS
QUALITY
CHARACTERISTICS
END
FLOWCHART
20 0,1 mm
40 - 60
HARDNESS
DIAMETER
SURFACE
QUALITY
HEAT
TREATMENT
BENDING
19,9
45
99
20,1 mm
55 HR
1,02
1,35
0,65
Cpk
101 mm
HISTOGRAM
100 1 mm
LENGTH
CUT
45 - 55 HR
VALUE
ESTABLISHED BY
ENGINEERING
QUALITY
CHARACTERISTICS
QUALITY ASSURANCE
NAME OF
OPERATION
PROCESS
RESULT
PROCESS
RAW
MATERIALS
EQUIPMENT
RESULTS
450
INFORMATION
n=2
LSC = 449,79
LC = 406,31
X 400
LIC = 362,84
350
100
LSC = 75,55
ENVIRONMENTAL
CONDITIONS
50
PEOPLE
LC = 23,13
PROCEDURES
R
0
9 10 11 12
MAINTAIN
DIAGNOSIS/
TRAINING
(Supervisor)
ABNORMALITY REPORT
(Operator)
5 Senses
SPECIAL
REMOVAL OF SYMPTOM
(Operator/Supervisor)
COUNTERMEASURES
AGAINST IMMEDIATE
CAUSES
YES
Day
OK
?
NO
CAUSE
?
COMMON
(CHRONIC)
ABNORMALITY ANALYSIS
(Supervisor)
ABNORMALITY REPORT
(Supervisor)
ADDITIONAL
COUNTERMEASURES
(Manager)
DAILY REVIEW
(Manager)
PERIODIC REVIEW
(Pareto Analysis)
Identification of Chronic
Abnormalities
(Manager)
COUNTERMEASURES
AGAINST
ROOT CAUSES
TREATMENT OF CHRONIC
PROBLEMS
(Manager)
A P
Problem-Solving
C D
Method
(QC Story)
People
Environmental
Conditions
Procedures
Information
Product
Equipment
Interruptions cause
variations and defects.
The machinery should not
stop. Maintenance for
maximum reliability and
availability. Maintenance
should be audited.
Raw
materials
4 Environmental conditions
should be specified: dust,
temperature, humidity, etc.
(A)
LSL
USL
LSL
USL
Nonconformity
High Dispersion
Low Dispersion
(B)
Temperature
Hardness
Time
P
D
A
C
IMPLEMENTATION OF
QUALITY ASSURANCE
QUALITY ASSURANCE
PROJECT
Figure 11.3: Relationships Among Planning, Execution, and Auditing Functions in Quality Assurance.
QUALITY AUDIT
(Internal or external)
QUALITY CHECK
CORRECTIVE ACTIONS
FOR THE PLANNING,
EXECUTION, AND
AUDITING PROCESSES
Customers
CARRYING
OUT
QUALITY
QUALITY
PLANNING
A P
C D
ENGINEERING
SPECIFICATION
OF MATERIALS
PROCESS
DESIGN
PRODUCT
DESIGN
CUSTOMER
NEEDS
STANDARDS
A
SUPPLIERS
CUSTOMERS
AUDIT OF
SUPPLIERS
QUALITY
CONTROL SYSTEM
PROCESS
AUDIT
PRODUCT
AUDIT
QUALITY
ASSURANCE
C
CUSTOMER
COMPLAINTS
AND CLAIMS
NONCONFORMITY
REPORT
COMPANY B
AUDITOR
AUDITEE
POSITION
JOHN SMITH
WILLIAM WALKER
FURNACE OPERATOR
QUESTIONNAIRE:
1
2
3
4
5
6
7 - IN ACCORDANCE WITH THE S.O.P., ARE THE MAIN ITEMS BEING FOLLOWED IN TERMS OF:
7.1 - LOCATION FOR SIGNS
( ) YES (x) NO 7.6 - _____________________________
7.2 - USE OF EPIS? __________ (x) YES ( ) NO 7.7 - _____________________________
7.3 - _______________________ ( ) YES ( ) NO 7.8 - _____________________________
7.4 - _______________________ ( ) YES ( ) NO 7.9 - _____________________________
7.5 - _______________________ ( ) YES ( ) NO 7.10 - _____________________________
(x) YES
(x) YES
(x) YES
(x) YES
(x) YES
(
(
(
(
(
) NO
) NO
) NO
) NO
) NO
(x) YES
(x) YES
(x) YES
( ) YES
( ) YES
(
(
(
(
(
) NO
) NO
) NO
) NO
) NO
(
(
(
(
(
(
(
(
(
(
) NO
) NO
) NO
) NO
) NO
) YES
) YES
) YES
) YES
) YES
(x) YES ( ) NO
(x) YES ( ) NO
( ) YES (x) NO
OBSERVATIONS: ________________________________________________________________________________________
______________________________________________________________________________________________________
______________________________________________________________________________________________________
______________________________________________________________________________________________________
FOLLOW-UP METHOD
CONTROL
ITEMS OF
THE CHIEF
Reduce to 10
cases/year
CHART
AND
HIST.
Tensile strength
Number of client
complaints
QUALITY
COST
SOUZA
TELLES
TRAJANO
TELLES
AGUIAR
B
A
C
C
B
TIMETABLE
20 b /
min
0.1%
Coil loading
rate
Scrap
rate
Low relationship
Lack of relationship
Medium relationship
CAPTION:
94%
JANUARY
50%
NOVEMBER
Availability of the
roller
SEPTEMBER
OCTOBER
Production losses
from broken bearings
CHECK
ITEMS
OF THE
CHIEF
GOALS
Figure 12.1: Process of deployment of the policies and their introduction into the annual action plan
from the first managerial level.
ANNUAL
ACTION PLAN
OF THE FIRST
MANAGERIAL
LEVEL
2. Reduce bearing
breakage
3. Increase coil loading
rhythm
PROJECTS
GOALS
OF THE
CHIEF
PRIORITY
RESPONSIBLE
METHOD FOR
REACHING THESE
GOALS
MAY
ANNUAL GOALS OF
THE MANAGERS
APRIL
METHOD FOR
REACHING THESE
GOALS
FEBRUARY
MARCH
ANNUAL GOALS OF
THE DIRECTORS
JUNE
METHOD FOR
REACHING THESE
GOALS
JULY
AUGUST
ANNUAL GOALS OF
THE CEO
DECEMBER
TRACKING METHOD
SUPERVISORS
CONTROL
ITEMS
5. Reduce packaging
losses
1. Reduce rolling-mill
stoppage
2. Reduce sleeve
breakage
3. Increase spool
exchange speed
AND
HIST.
GRAPH.
SOUZA
TELLES
TRAJANO
TELLES
AGUIAR
PRIORITY
B
A
C
C
B
50%
20 b /
min
0,1%
Production losses
by sleeve breakage
Spool charge rate
Waste rate
No relation
Weak realtion
Average relation
KEY:
94%
NOVERMBER
DECEMBER
Rolling-mill
availability
SUPERVISORS
CHECK ITEMS
CRONOGRAMA
GRAPH
Number of customer
complains
PROJECTS
COST
JANUARY
FEBRUARY
MARCH
APRIL
MAY
JUNE
JULY
AUGUST
QUALITY
SEPTEMBER
OCTOBER
SUPERVISORS
GOALS
PERSON
RESPONSABILE
Reduce to
10 cases/year
Attain 100% of
specifications
Tensile strength
GOALS
FIRST
MANAGERIAL
LEVEL
SENIOR
MANAGER
DIRECTOR
PRESIDENT
ANNUAL
ACTION PLAN
A P
C D
PROJECT B GOALS
FIRST
MANAGERIAL
LEVEL POLICY
A P
C D
PROJECT A GOALS
SENIOR MANAGERS
POLICY
DIRECTORS
POLICY
PRESIDENTS
POLICY
ACTION PLAN
PROJECT B
ACTION PLAN
PROJECT A
SUPERVISORS
WORKERS
SUPERVISORS
SUPERVISORS
TECHNICAL
SUPPORT
FIRST MANAGERIAL
LEVEL
SUGGESTIONS
SYSTEM
A P
C D
Figure 13.1: Continuous Improvement Activities carried out in the Basic Managerial Units.
QUALITY
CONTROL
CIRCLES
A P
C D
ATTAIN
MANAGERIAL
GOALS
A P
C D
...
HUMAN NEEDS
SIMULTANEITY
OF NEEDS
SELF-REALIZATION
Realization of your own potential,
self-development, creativity,
self-expression
SELF-REALIZATION
EGO OR ESTEEM
Self-confidence, independence,
reputation, etc.
SECURITY
Protection for yourself and
your family.
Stability at home and at work.
PHYSIOLOGICAL
Survival, food, clothing, and
shelter.
HUMAN GROWTH
SENSE OF BELONGING
Feelings of being accepted,
friendship, association, feeling of
belonging to the group.
EGO OR ESTEEM
SENSE OF
BELONGING
SECURITY
PHYSIOLOGICAL
MEANS
WASTE
WASTE
MEANS
MEANS
INCONSISTENCY
GOAL
GOAL
GOAL
"END
PRODUCT
MEANS
INSUFFICIENCY
INSUFFICIENCY
GOAL
INCONSISTENCY
PROCEDURES
ENVIRONMENTAL
CONDITIONS
PEOPLE
"MEANS
INFORMATION
EQUIPMENT
RAW
MATERIAL
PROCESS
GOAL
ORIGIN OF
PROBLEMS
P R O C E S S
HUMAN
RESOURCES
RAW
MATERIALS
EQUIPMENT
utilized?
layout?
project?
right time?
WASTE
supervision?
suppliers?
INSUFFICIENCY
INCONSISTENCY
MARKET RESEARCH
Identification of
consumer needs
Product
- Better
- Cheaper
Design of new
product
Survival
- Safer
- Faster Delivery
- Easier Maintenance
Design of new
process
Definition
Satisfied
customer
Process
- Easier
- Better
- With less dispersion
- Cheaper
Production
- Faster
- Safer
Technical
assistance
A P
C D
DRASTIC
IMPROVEMENTS
A P
C D
SUCCESSIVE
IMPROVEMENTS
CONTINUOUS IMPROVEMENT
ACTION
PLAN
DEFINE
GOALS
ACT IN THE PROCESS
ACCORDING TO
THE RESULTS
A P
C D
CHECK THE
EFECTS OF
THE WORK
DONE
DETERMINE
THE METHODS
TO REACH THE
GOALS
EDUCATE
AND TRAIN
EXECUTE
WORK
CHECK
DO
STANDARD GOAL:
Standard Quality, Standard Cost, etc.
DO:
Comply with the S.O.P.
CHECK:
Confirm the effectiveness of the S.O.P.
SUSTAIN
450
n=2
UCL = 449,79
LC = 406,31
X 400
LCL = 362,84
350
100
UCL = 75,55
50
YES
EFECTIVE
?
NO
LC = 23,13
R
0
9 10 11 12
Day
CORRECTIVE ACTION:
Removal of the symptom.
Act on the cause.
MANAGEMENT TO IMPROVE
IMPROVEMENT GOAL
PROBLEM:
Identification of the problem.
PHENOMENON ANALYSIS:
Break down the problem in smaller problems.
PROCESS ANALYSIS:
Detection of main causes of each smaller problems.
ACTION PLAN:
Countermeasures against main causes of each
smaller problem.
DO:
Execute the Action Plan.
CHECK:
Confirm the Actions Effectiveness.
BETTER
NO
EFECTIVE
?
Number of
complaints per
month
GOAL
YES
92
93
94
STANDARDIZATION:
Definitive elimination of causes.
CONCLUSION:
Review of activities and planning for future tasks.
A S
C D
PRODUCTS
STANDARDIZATION
A P
C D
ANNUAL
GOALS
MAINTAINS
IMPROVES
Figure A.4: PDCA applied with the goals of maintaining and improving.
CORRECTIVE
ACTION
PERIODIC
REVIEW OF
PRIORITY
CHRONIC
PROBLEMS
PRIORITY
CHRONIC
PROBLEMS
(KAIZEN)
"EXISTING PROCESS
TIME
C D
A P
"EXISTING PROCESS
INNOVATION
(KAIKAKU)
"NEW PROCESS
C D
A P
Figure A.5: Combination of Cycles for Sustaining and for Improving which make up Continuous Improvement.
LEVEL OF
RESULT
C D
A S
CONTROL
SHIFT ABNORMALITY
ANALYSIS REPORT
COMPANY B
SHIFT: 3
CREW
NUMBER: ___/___
DATE: 03/15/12
Error in calculating amount added, lack of stop control in standard operational procedure.
Operators carelessness.
Labor
Environment
Operators carelessness
in regard to graphite
residue in cannon
Lack of stop
control in standard
operational procedure
Method
Raw material
ROOT CAUSE(S):
WHO
WHEN
Jason
Immediately
Furnace
operator
When recarburizing
the runs
Cid
Immediate
4
6
Section:
Shift:
OP Number:
Control
Shift abnormality
analysis report
COMPANY "E"
2
1
N:
____/____
3
Date:____/____/____
C.C.:
Crew:
8
Description of OP:
Machine/Line:
Operator:
Detected by:
10
11
12
13
Time:
Investigation of Causes:
Raw material
Equipment
Information
14
15
16
Abnormality
20
17
18
19
Environmental
Conditions
Personnel
Procedures
Probable cause:
21
22
Action Plan
What to do
23
Who
How to do it
When
24
25
26
Additional Information:
27
Supervisors comments:
28
29
Supervisors signature
COMPANY "C"
Unit:
Shift:
CORPORTATE
Date:
03/15/12
Management Area/Department
Department/Sector:
FINANCIAL MANAGEMENT
BILLINGS CREDIT
1. IDENTIFICATION
Abnormality:
Unwarranted collection
Removal of Symptom:
Location:
Operator:
2. OBSERVATION
Billings
Type:
Customers complaint
Symptom:
Protest
Negative File
CUSTOMER
BANK
- Direct payment
NOTARY
- Didnt honor
instruction
3. ANALYSIS
UNJUSTIFIED
COLLECTION
BILLINGS
- Delay in delivering
invoice
- Delay in delivering
- Error due date
merchandise
INVOICING
LACK OF STANDARD
PROCEDURE
TRANSPORT
03/31/12
04/08/12
Moacir
Moacir/Cludia
Cludia
6. CHECK
4. ACTION PLAN - 5W 1H
5. ACTION
9. GAINS (US$)
7. STANDARDIZATION
8. CONCLUSION
Occurrence of the
abnormalities
COMPANY X, INC.
Name of the
Machine
ENT-86814
Control Chart
Number
Name of the
Process
Pre-Test
Lot Number
Quality
Characteristic
Electrical behavior
(oscillation)
Operator
Inspector
20-2-Tuu-A3-2
February 15
5:00 p.m
Akemi Yoshikawa
Detected by
LM = 0,3
Tabuchi
Investigation of the
Cause
In the past, the position of the cam was determined in relation to the groove on
the axle shaft (that is, by dimension C). To improve efficiency, the welding guide
for the cam was determined by dimension B.
Owing to burrs and other irregularities at the
Cam
Rotor
Dimension B
Weld
axle end of the rotor axle, this increased the
Dimension C
variation in dimension C, causing obstruction
Burr
of the chassis by the cam and altering
Interference
electrical oscillation.
Chassi
Dimension A
When
?
Who
?
When
?
When
?
When
?
February 16
Tabuchi
Day/Month
Day/Month
When
?
Emergency Action
February 17
The investigation requires
that the case be sent to the
technical department.
(UTU - 014)
1
2
Who
?
Tabuchi
When?
February 17
Checked
by?
Tokuno
Actions to prevent
recurrence
Prevention of recurrence
During the rotor assembly process, control the axle by cam dimension
(dimension B) with an X - R control chart (after February 17)
Confirmation of the
efect of the action
to prevent
recurrence
Emergency
action
9 10 11 14 15
When
?
March 8
The X - R control chart for the dimension of the weld of the rotor/cam was also
discontinued.
Who
?
Tokuno
Change in the dimensions of the part where the chassis enters in contact
with the cam (Dimension A) from 5.5 to 6.5 mm.
Regulation Division
MP Warehouse, Production Section,
Assembly Crew UHF
When
?
February 28
Who
?
Confirmation
of details
of the action
Tokuno
Aoki
Checking
Section
Chief
Supervisor
Leader
Aoki
Tokuno
Tabuchi
~
~
Shipment
Packaging
Packaging Process
Finishing Process
PROCESS
PRODUCTION
BOARD
CIRCUIT
PRINTED
TOTAL PROCESS
Flux coating
Corrosion prevention
Water wash
Inspection of process
Printing Process
MACRO FLOWCHART
FLOWCHART
GROUPED PROCESS
SINGLE PROCESS
Symbol
Meaning
Meeting
or
Action
Checking
Request by
board
Partnerships
Constitution
Merge
Incorporation
Transformation
Alteration
COMPANY C
Documents prepared
for commerce board
federal treasury
Payment
documents
provided
Documents sent
to commerce
board
Documents received
from commerce
board
INC
Documents prepared
for publishing
Payment
made
IOSEC sent
for publishing
DOE publications
received
LTD.
INC.
LTD.
Documents for
federal treasury
prepared
Payment
bill provided
Document to state
treasury sent
Document from
state treasury
received
Charter
provided
Documents
distributed and
original filed
END
Transport
Planned
stock
Unplanned
stock
Quantity
inspection
Quality
inspection
Composite
Symbol
Meaning
Shield
Legs
Shield
Armature
Inductor
Axle
Ventilator
Clamp
A
Clamp
B
Perforation
and contraction
of the area
Work on
external
diameter
st
Perforation
Dimensions
and return
Dimensions
and return
~
Folding
1st package/time
1 winding/time
Winding
Perforation
st
1 part/time
Drillingand
contraction
of the area
Initial
work
Drilling
1st part/time
Final
work
Drilling
Armature
Dimensions
and return
Dimensions
and return
Hole of
class
Drilling
Drilling
Dimensions
For 1 motor
a time
Armature
Rotor
1st part/turn
Quantity
dimensions
Dimensions
Clamp
B
Grinding
Clamp
A
240 parts/
time
Output
dimensions
240 parts/
time
Pre-treatment
4 parts
Weld
Pre-treatment
15 parts/
pallet
4 parts/
hanger
Shield
legs
Insertion of
bearing
Painting
240 parts/
each time
Voltage
polarity
Loading
24 parts/
pallet
~
=
Shield
50 parts/
pallet
Nest
Axle
Insertion of
axle
Reception
inspection
1 part/time
Cover
Work on
external
diameter
240 parts/
time
Finish
Weld
15 parts/
pallet
Coupling
Screws
Remove from
box
Washers
Remove from
box
Dimensions
of connection
Balancing
15 parts/
pallet
Rotor
Assembling
Nuts
24 parts/
pallet
Rolling
24 parts/
pallet
Rolling Insertion
Remove from
box
Assembling
1 part
Clamp B
Inductor Inductor
Shield
Ventilator
Bearing
Box for
Packaging
Painting
1 part
# of final inspection completion
Axle
Clamp
Rotor
Shield Leg
Execute.
C
NO
SUCCESS
YES
Standardize.
PDCA
Phenomenon Analysis
7
Conclusion
Standardization
(Was prevention of
recurrence effective?)
Checking
Execution
Action Plan
Process Analysis
OBJECTIVE
Problem identification
PHASE
FLOWCHART
Tracing history
of the problem
Selecting the
problem
Assigning
responsibilities
Doing a
Pareto analysis
Showing current
losses and
viable gains
Tasks
Flow
IJKL
EFGH
M A
J
A
Better
Assignment of responsibilities
ABCD
Pareto
analysis
Present
Appoint the person or group that will be in charge. Designate the group
leader.
A problem is the undesirable result of a job (be sure the problem chosen
is the most important, based on facts and data). For example: loss of
production owing to equipment stoppage, overdue payments,
percentage of defective parts, etc.
Graphs
Photographs
Observations
Tools Utilized
Losses
Flow
Timetable,
budget and goal
Discovery of the
characteristics of the
problem by means of
observation on site
Important
recommendation:
the more time you
spend here, the
easier it will be
to solve the
problem. Dont skip
this part!
Discovery of the
characteristics of the
problem by means of
the gathering of data.
Break down the
problem into smaller
problems.
Tasks
IJKL
EFGH
F
PHASE
Analysis
Action Plan
Execution
Check
Standardization
Conclusion
1
ABCD
PRIORITIZING
Choose the most important themes
and go back
PARETO CHARTS
CHECK LIST
STRATIFICATION
PARETO ANALYSIS
Tools
Employed
Make a timetable as a reference. This timetable should be updated for each phase.
Make a budget.
Define a goal to be reached.
Should not be done in the office, but at the site of the event itself for the gathering
of supplementary information that cannot be obtained in the form of numerical data.
Use a video camera and photographs.
Observations
No
No
Yes
Consistency test
of root cause
Analysis of most
probable causes
(hypothesis
verification)
Yes
Screening of most
probable causes
Definition of
contributing
causes
(for each smaller
problem)
Tasks
Flow
B
D
B C D
10
20
100%
Based on the results of the experiments, you will confirm or not confirm
the existence of a relationship between the problem (effect) and the most
probable causes (hypothesis).
More probable causes: the number of causes listed in the previous task must be
reduced by elimination of the less-probable causes. Based on data collected
during the observation process, take advantage also of suggestions based on
the experience of the group and hierarchical seniors; also, based upon
information collected during observation, prioritize the most probable causes.
Be careful with cross effects: problems that result from two or more factors
simultaneously. Pay special attention to these.
Setting up a work group: involve all those who can contribute to the
identification of the causes. Meetings should be participatory.
Cause-and-effect diagram: write down the largest possible number of
causes. Set up a cause-and-effect relation between the causes listed.
Construct the cause-and-effect diagram placing the more generally based
causes on the larger branches, and secondary and tertiary causes, etc., on
the smaller branches.
Observations
Tools Utilized
Designing
of an action
strategy
Carrying out
the action
Training
Designing of
an action plan
for recurrence
prevention and
revision of the
timetable and
final budget
Tasks
Flow
NEI
WHAT
STANDARD
AXLE
FLOOR
PIN
Training techniques
EDU
TO CHANGE
TO CHANGE
RUI
WHO
ELI
TO CLEAN
TASK
TO MEASURE
Observations
!
!
!
!
!
! Make sure that actions are being taken on the root causes and
not on their effects.
! Make sure that the actions proposed do not produce secondary
effects; if these do occur, take action against them.
! Propose diferent solutions, analyze the effectiveness and cost of
each; choose the best.
Phase 5 - Execution
ow?
Who? H hy?
?W
Where hat?
W
When?
Tools Utilized
Checking whether
the problem
persists
Listing secondary
effects
Was recurrence
prevention
effective?
Comparing
results
Tasks
Flow
BEFORE
C
E
A
D
Analyze
BEFORE
MONTHS
Checking
Better
LIC
LC
LSC
AFTER
A S O N D
Action
J F M A M J J
AFTER
Observations
Phase 6 - Checking
Tools Utilized
Defects
Communication
Education and
training
Development
or alteration of
standard
Monitoring
utilization
of the standard
Tasks
Flow
A P
C D
Tools Utilized
Observations
Avoid possible confusion: set up the beginning date for new systems
and the areas to be impacted, so that the standard may be applied at
all necessary locations, at the same time and by all involved.
Phase 7 - Standardization
Tasks
Listing of
remaining
problems
Planning for
attacking
remaining
problems
Reflection
Flow
3
More
complete
check sheets
Improve the
timetable
Improve
cause and effect
diagram
Observations
Analysis of results.
Graphic representations.
Tools Utilized
Phase 8 - Conclusion
Processes
Secondary
classification
Secondary
pressure
Painting of
base
Carbon
impregnation
Carbon
impregnation
Surface
treatment
Inspection
upon
receipt
Sample
Control
Item
Zeta
Micro
meter
Visual
Measurement
instrument
Thermal
resistance
Resistance to
solvents
Resistance to
vibration
Useful life of
charge
External
dimensions
Solderability
Eletrical
resistance
Thermal
impact
By
lot
Paint
preparation
by lot
By
lot
Test
Gravitometer
Standard
meter
Vacuum
meter
Thermocouple
CR-AC
Resistance
of lid
Specific
weight
Membrane
resistance
By
carbon
impregTemperature
nated
lot
Degree of
vacuum
By
Concentration
measurer
of liquid:
treated
Chronotime
lot
External
appearance By road
lot
External
dimensions
Standard
operational
procedure
RZ-11-08
IP-20-43
RP-00-33
RP-00-11
RP-00-22
Card
record
Card
record
Continuous
record
Continuous
record
X-R
X-R
Record
Main process
Processing of
raw materials
- Low Correlation
- Medium Correlation
- High Correlation
Production
Monthly department
Monthly
Flowchart
Responsible
party
Superv.
Superv.
Superv.
Superv.
Superv.
Superv.
Monthly Management
Monthly
Name of raw
materials
Pig Iron
Technology
Department
Pig Iron
Production
Department
Sinter Production
Department
Andrade Mine
Production
Department
Steel Area
Maintenance
Department
UGB
Steel Production
Department
Steel Production
Management
Client Technical
Support
Department
Technology and
Process Automation
Department
Utility
Department
Supply
Department
Logistics and
Production Planning
Department
Programming,
Logistics and
Supply
Management
Maintenance
Engineering
Department
Maintenance, Utilities
and Environment
Engineering
Management
Metallurgy and
Quality Assurance
Department
Technical
Management
Finance
Support
02 Rolled Steel
Production
Department
01 Rolled Steel
Production
Department
Rolled Steel
Production
Management
General Management
Joo Monlevade Steel Mill
Logistics, Utility
and Supply
Department
Department of
Production for
Civil Construction
Rod
Department
Human Resources
and Total Quality
Management
From left to right: Vidigal, Joaquim, Andr Fernando, Ansio, Jlio, Marco Antnio.
*SOBREMETAL
AFIN
GRHQ
DEUT
DLPP
DTAP
*DMAC
*MAGNESITA
Supplier Development
Plan (P.D.F)
DSUM
*DGUS
GCIM
DMGQ
Suppliers
2 - Mixers
2 - Converters
1 - Pot Grate Furnace
1 - Continuous Ingot Casting
Machine
1 - Neutral gas
blowing-in station
6 - Traveler Crane
11 - Steel / Pig Iron Ladles
13 - Distributor
Equipment
XYZ
People
Mission
Production of
Billets
Business
Business
GGJM
GPGU
AFIN
GRHQ
DMGQ
GPLA
Roller 2
Roller 1
Production
scheduling
Clients
Information
155X155 mm
9 a 12.20 m
Chemical analysis
according to Belgos
steel table
Billets
Products
Figure G.2: Definition of the BMU Business (Steel Production Department - DPAC).
Metallics Transportation
Metallic Cutting
Metalic Residue Treatment
Refractories
Maintenance Services
Corrective
Preventive
Predictive
Production Program
Automation System
Power
Fluids
Treated Water
Total Quality Consultancy
Safety Consultancy
HR Management
Instrument Gage Service
Financial Support
Assemb. VG. Distributors
Sulfur print
Inputs
TECHNICAL STANDARD
GGJM - GPAC - DPAC
Page: 01/02
Rev.: 01
Code: SEP280
Date: 11/21/01
1 - Objetive
This standard sets the casting procedures to ensure the specified quality characteristics required during the
application of the following steels: XYZ and ABC
2 - Responsible
Supervisor or monitor
Activitities
Tolerance
What to do
Why?
Stability of temperature
in the distributor
Maximum X minutes
Divide MLC
Free
As O2
Cast normally
Mark in the running record
Act according to the
standard
Amepa system on
automatic with an X%
sensitivity
Y tons
8 - Steel remaining in
the distributor
X tons
9 - Number of sequential
runs
Maximum = X runs or
Y minutes
10 - Temperature
11 - Centralization of the
submerged valve
12 - Submerged valve
immersion depth
(15 cm)
X to Y cm
Record of Alterations
What changed
Minimum billet length
Why?
Who
When
ABC
11/21/2001
Checkd by:
XYZ
Approved by:
KZY
Budget
Reduce 10% in relation to 2000
65%
Zero Infraction record
Complaints
Corporate Climate
Environment
Budget
Goals
Operational Profit
Control Items
Environment
(Infraction Record)
Organizational Climate
Client Complaints
Operational Profits
Zero
Organizational Climate
Number of Accidents
Client Complaints
Storehouse Stock
Goal
Storehouse Stock
DGA
Client Complaints
Organizational Climate
Number of Accidents
Goals
Control Items
Cost of
Billet
Cost of Wire
Rod
- Cost of Ferroalloy
- Cost of Refractories
- Yield
- Cons. of Fluxing Agents
- Cons. of Power
Additional Cost
of Billet
Department
Head
Daily
Running
Casting Yield
Reblowing Rate
Running
Running
Sequence
Every 3 days
Mg O in Slag
Slag Splash
Sequential Runs
Electrode Consumption
Running
Running
Fe O in Slag
Frequency
Control Item
Supervisor / Operator
Figure G.7: Deployment of Control Items from the Manager to the Operator.
Steel Mill
Management
General
Management
kg/t
0.02
0.04
0.06
0.08
0.10
0.12
0.14
0.16
0.18
Apr
Goal
June
Oct
Sep
Benchmark
Nov
July
Done
Aug
May
March
Feb
Jan
2000
0.20
2001
Dec
1999
0.01
0.04
0.02
0.06
0.02
0.06
0.04
June
July
August
September
October
November
December
0.08
0.08
0.08
0.08
0.12
0.12
0.12
0.12
0.18
0.02
May
0.15
1999
0.10
April
0.15
0.15
0.11
March
0.15
2000
0.13
February
0.15
0.06
0.12
January
Goal
2001
Actual
Month
Measurement Unit: %
Benchmark: 0.01
Annual Goal: 0.10
Page: 01/01
Rev.: 07
Date: 03/18/2002
SYSTEM STANDARD
Usina de Monlevade
PREVENTIVE MAINTENANCE
PDCA
Phase
Round
People Involved/Responsibility
Management Record
Where When
Material
Coordenator Supervisor Operational
JO surveys
generated by
the system
STE 079
SAP
(W004)
JO inspection
programs
STE 079
SAP
(W007)
Print service
JO
STE 079
SAP
(W019)
Deliver Jos to
operationals
Prepare the
tools
Move to
the area
Request client
autorization
Clients
SEM 036
OSS
Authorize
the
inspection
DRI 254
Consignment
Map
DRI 254
Consignment
Map
OSS e
SEN 036
Job
Order
Inspect
equipment
10
OSS
Job
Order
11
Communicate
with client (end
of inspection)
DRI 254
Consignment
Map
Deliver JO to
Supervisor
12
13
Create JO rec.
Maint. Prog. for
equipt. With
answer of bad
condition code
SET 079
14
SET 045
15
Deliver JOs to
coordinator
16
17
Prepated by:
SAP
(AC05A,
W010)
Job
Order
Wait for
Scheduled
Maintenance
Checked by:
Approved by:
Desulfurized molten
pig iron
Transportation of the
hot-metal transfer car
Tilting of the
hot-metal transfer car
Slag
scraped
Thermal and chemical
sampling
Yes
LD?
Pig iron tumbled
into converter
No
Pig iron tumbled
into mixer
Transport the
ladle
Mixer covered
Combustion in the
mixers controlled
Control the stock and
moving of molten
pig iron
Figure G.10: Flowchart for the Molten Pig Iron Reception and Storage Process.
Flow
Internal and
surface defects
Internal defects
Surface defects
Surface defects
Billet cutting
Sulfur print
Transportation of the
billet to the yard
Casting
Internal and
surface defects
Internal defects
X Ton
Weight of steel
on distributor
Internal defects
>X%
Free opening
rate
Y Rate
Internal defects
NA
When
Every run
Visual
Crack
pattern
X veins per
run
Ingotman
Ingotman
Ruler
Probe
Not applicable
SEP XXX
SEP XXX
Inspection
Report
SEP XXX
SEP XXX
SEP XXX
SEP XXX
MLC
Report
Supervisor of
MLC
Supervisor of
MLC
MLC
Report
Supervisor of
MLC
SEP XXX
Tachogenerator Supervisor of
MLC
Flux valves
SEP XXX
Supervisor of
MLC
Whole sequence
Every run
Every run
SEP XXX
Supervisor of
MLC
Larry car
scale
Immersion
pyrometer
SEP XXX
SEP XXX
What to do
Supervisor
Supervisor
Supervisor
Supervisor
Supervisor
Supervisor
Supervisor
Supervisor
Supervisor
Supervisor
Supervisor
Who to
look for
Corrective Action
Ladle area
repoirt
Supervisor at
ladle furnace
Record
How
Page: 01/01
Rev.: 12
Date: 03/12/1999
Not applicable
Immersion
pyrometer
Gage
instrument
Gauge
instrument
Ingotman
Automated
system
Ingotman
Every run
Every run
Ingotman
Supervisor
X per run
Every run
Every run
Every run
Ingotman
Ingotman
Ingotman
Ingotman
Person
Measurement
Responsible (hour/freq.)
Who
Check Method
Visual standard
Standard
Level
variation
Flow powder
X m/min
Speed
Spray
program
Temperature
Temperature
X Rate
Internal and
surface defects
Placement of ladles in
the MLC tower
Standard
value
Value
ensured
Control
Parameter
Control
Level
Quality
characteristics
Quality
Ensured
Process Name
Process
Desulfurized molten
pig iron
Transportation of the
hot-metal transfer car
Tilting of the
hot-metal transfer car
Slag
scraped
CRITICAL
TASK
No
Pig iron tumbled
into mixer
Transport the
ladle
Mixer covered
Combustion in the
mixers controlled
Control the stock and
moving of molten
pig iron
Figure G.12: Critical Process Flowchart.
Page.: 01/01
Rev.: 04
Code: SFT089
Date: 09/17/1999
STANDARD OPERATIONAL
PROCEDURE
2 - Notch drilling
1 - Tilt the furnace to the tapping side and position it at the desired angle.
2 - Fill the projection machine with enough of the desired concrete.
3 - Position the projection lance facing the furnace.
4 - Regulate the projection machine with pressure of x kgf/cm2.
5 - Project the concrete until the notch is filled up.
6 - Pull the hoses back and store them.
7 - Clean the area.
8 - After finishing the projection wait X min and release the furnace for loading.
1 - PPE must be worn. Boots with steel tips, leggins, safety goggles, helmet,
scrape glove, ear mufflers.
2 - Residues generated should be collected as instructed onto collecting containers.
3 - Do not walk and/or stay under suspended loads.
Checked by:
Approved by:
From left to right: Gilvnio, Edmar, Ronildo, Jlio, Maurilo, Wilson, Csar.
Renato
Renato
Helvio
Helvio
Jlio
Coupling practice
J F M A M J J A S O N D
Renato
Jlio
Helvio
Tapping operation
TREIN.
Helvio
AUDIT.
STANDARD
IMPROVE
MAINTAIN
Training and
Execution
Manager to
operator
Control
Items
Standards
Execution of
the plan
5S Program
A S
C D
Norm
Auditing
Follow-Up
Charts
Visual
Management
Anomaly
Analysis
Project
Auditing
Critical Analysis
Meeting
A P
C D
CEDAC - Participation
of operators in the
projects
SHAKEDOWN
Three Generation
Report
Projects
Goals
0.00
Average 00
98
197
295
394
492
590
689
787
886
984
Feb
Scrap
465
Aug
July
June
May
Apr
Oct
Nov
Reclassification
77.5
Dec
Sep
7.75
15.5
23.25
31
38,75
46,5
54,25
62
69,75
77,5
44
88
VGDIST
56.6
26
RM
IN
40,1
A P
C D
AL
20,5
CU
25.4
IB
16
CE
PIG
Reclassification
10.1
4.8
AO
1.1
EV
3.6 3.5 3.2 2.7 1.4 1.3 1.3 0.4 0.2 0.2
Deviation
AG
26.2
48.647.9
39.631.2 27
24 22.5 21.5
16.616.1 12 10.810.3
9.9
85.5
A P
C D
TI
Deviation
441,2
132
176
220
264
308
652
AE
440
EP
IN
396
VGDIST
1.00
RO
RO
STL
1.1
60.3
TI
46.5
96.2
TU
93
A P
C D
PA
139.5
153,2
NB
186
AG
2.00
Average 01
A P
C D
DTA
232.5
AL
2,53
AQ
Tons/month
Tons/month
Tonelada/ms
A P
C D
CE
279
JUN
2.7
VA
325.5
OC
3.00
AO
Scrap
EXT
Average 99
Tons/Mmnth
VARVEL
372
PS
465
VIN
418.5
SG
DTB
2,8
GF
4.00
MR
March
Jan
Suggestions: 174
Ideas implemented: 56
Participants: 69
Raw material
Machine
Deviation
of reclassification
due to opening
Insufficient amount
of sand in the valve
Burst of metallic
body of the porous plug
Method
During the deployment of GPAC policies the shakedown done for the quality dimension showed that one of the
characteristics affecting billet deviation and reclassification was the opening of the drawer valve of the ladle with oxygen.
So the CEDAC (cause-and-effect diagram with addition of cards) project was launched.
50
100
150
Fev
Mar
Abr
Mai
Jun
Ago
Month
Jul
Before
Set
After
Out Nov
Dez
Actual
Goal
Conclusions:
- The actions implemented so far have reduced by 40%
the amount of deviation and reclassification of billets by
opening with oxygen, thus reaching the result expected.
- The high level of participation of the staff is acknowledge.
174 cards for possible cause and possible solution were
presented.
Proposed actions:
- Review ladle cycle standard
- Develop a more resilient metallic carcass
- Ensure that the duct is clean
- Have a meeting with supplier and improve quality of sand
used
- Create a standard for laddle heating time
- Increase amount of sand according to the lifespan of
the ladle
- Avoid anticipating runs for mlc tower
200
250
300
350
Results:
Vladimir
Vladimir
Vladimir
Vladimir
Renato
Vladimir
Vidigal
Vladimir
Vidigal
Vladimir
Vidigal
Status
Delayed
Vladimir
Vidigal
Concluded
Who
To do
S O N D
When (2001)
F M A M J J A
12
6
10
20
30
40
50
60
70
80
90
100
2 Castability
Propositions
Date: 11/12/2001
1 Schedule
10
20
30
40
50
54
Program
60
Castability
70
Eletromec.
Defect
80
Distributor Ref.
Restriction
Done/Result
Obstruction
Planned
Others
Control
Items
Improve
10% in rel.
to last survey
Organizational
climate
XXX kg/t
Specific
Consumption
According to
Budget
Billet
Cost
According to
Budget
Billet
Production
Marco Antnio/Roberto
Roberto
Roberto
Augusto/Roberto
Caption:
Augusto/Roberto
Marco Antnio
Marco Antnio
Marco Antnio
Marco Antnio/Roberto
Marco Antnio
Marco Antnio
Wllerson
Reponsible
MLC Standard
Project Goal
Bad Quality
Index
Projects
Reduce 5%
in relation to
2001
Reach
200ppm last
Quarter
Drilling
Index
Goals
Zero
Number of
accidents
Rolling
Steel Mill
Blast Furnace
Shift
1
Code:
ABNORMALITY REPORT
Crew
3
Date:
4
01/31/2002
Participants
Adalton, Ronaldo, Mrcio Miranda, Antnio, Altair, Joo Bosco and Lucas Motta.
Abnormality
Stop of the V6 at the junction of 1015L with P926A due to obstruction after casting ~3m.
Operational Procedures
SLT 001
NO
Note
-
Brainstorming
Non observance of the deficiency in
heating of valve V6
Placement of long tube without the
distributor being 100% full
Coupling time
of 11 minutes.
Refractory breakage in vein 6
valve
Mention the abnormality: Stop in V6 at the junction of 1015L with P926A due to obstruction after casting ~3m.
Why did it happen? Non observance in the deficiency of valve V6 heating.
Why did it happen? Standard SLT001 (inspection every 15 minutes after air opening) was not followed.
Action Plan/Standardization
What?
Recycle ingotmen in standard SLT001 - activity number 3
(distributor heating)
Recycle ingotmen in standard SLT001 - activity number 10
(MLC startup)
Who?
When?
Adalton
01/31/2002 - OK!
Adalton
01/31/2002 - OK!
Final Assessment:
A general maintenance of the preheating station of the distributors is scheduled, which will contribute for
solving the heating problem.