Sie sind auf Seite 1von 263

MECHANISMS AND CONTROL OF WATER INFLOW TO WELLS IN GAS

RESERVOIRS WITH BOTTOM-WATER DRIVE

A Dissertation
Submitted to the Graduate Faculty of the
Louisiana State University and
Agricultural and Mechanical College
in Partial fulfillment of the
requirements for the degree of
Doctor of Philosophy
in
The Craft & Hawkins Department of Petroleum Engineering

by
Miguel Armenta
B.S. Petroleum Engineering, Universidad Industrial de Santander, Colombia, 1985
M. Environmental Development, Pontificia Universidad Javeriana, Colombia, 1996
December 2003

ACKNOWLEDGMENTS

To God, my best and inseparable friend, for you are the glory, honor and
recognition.
To my wife, Chechy, and my children Andrea and Miguel, for giving me so much
love and support. Without you, getting this important step in my life, my PhD, has no
meaning. You are my inspiration and my strength.
To my parents, El Viejo Migue and La Nia Dorita, you are my source of beliefs.
You taught and gave me the determination and tools to reach my dreams with honesty
and hard work.
To my advisor, Dr. Andrew Wojtanowicz, for his guidance and challenging
comments. Without that motivation, this research would have been poor; however, facing
the challenges four different technical papers have been already published and presented
from this research.
To Dr. Christopher White for helping me with such honesty and unselfishness.
You were my lifesaver at my hardest time during my research. I knew I could always
count on you.
To Dr. Zaki Bassiouni, chairman of the Craft & Hawking Petroleum Engineering
Department, for giving me the right comments and advise at the right time.
To the rest of Craft & Hawking Petroleum Engineering Department faculty
members, Dr. John Smith, Dr. Julius Langlinais, Dr. Dandina Rao, and Dr. John
McMullan, from each one of you I learned many important things not only for my
professional life, but also for my personal life. I will always have you in my mind and
heart.
ii

To my friends in Baton Rouge: Patricio & Maquica, Jose & Ericka, Juan &
Joanne, Fernando & Sabina, Jaime & Luz Edith, Alvaro & Tonya, Doa Luz & Dr.
Narses, Jorge & Ana Maria, Nicolas & Solange, and La Pili. All of you are angels sent by
God to help me during my crisis-time; you, however, did not know your mission. God
bless you.

iii

TABLE OF CONTENTS
ACKNOWLEDGEMENTS.ii
LIST OF TABLES..vii
LIST OF FIGURES....viii
NOMENCLATURE...xiv
ABSTRACT...xvii
CHAPTER 1 INTRODUCTION 1
1.1 Background and Purpose.....1
1.2 Statement of Research Problem.......4
1.3 Significance and Contribution of this Research...5
1.4 Research Method and Approach......6
1.5 Work Program Logic...8
CHAPTER 2 LITERATURE REVIEW...11
2.1 Critical Velocity.11
2.2 Critical Rate for Water Coning..13
2.3 Techniques Used in Solving Water Loading 16
2.3.1 Tubing Lift Improvement..16
2.3.1.1. Chemical Injection.16
2.3.1.2. Physical Modification....18
2.3.1.3. Thermal..19
2.3.1.4. Mechanical. ...20
2.3.2 Bottom Liquid Removal...21
2.3.2.1. Pumps.22
2.3.2.2. Swabbing23
2.3.2.3. Plungers..24
2.3.2.4. Downhole Gas Water Separation...27
CHAPTER 3 MECHANISTIC COMPARISON OF WATER CONING IN OIL
AND GAS WELLS..30
3.1 Vertical Equilibrium......30
3.2 Analytical Comparison of Water Coning in Oil and Gas Wells before Water
Breakthrough .....31
3.3 Analytical Comparison of Water Coning in Oil and Gas Wells after Water
Breakthrough .....32
3.4 Numerical Simulation Comparison of Water Coning in Oil and Gas Wells after
Water Breakthrough ......37
3.5 Discussion about Water Coning in Oil-Water and Gas-Water Systems....41
CHAPTER 4 EFFECTS INCREASING BOTTOM WATER INFLOW TO GAS
WELLS.........43
4.1 Effect of Vertical Permeability......44
iv

4.2 Aquifer Size Effects..............47


4.3 Non-Darcy Flow Effect.....49
4.3.1 Analytical Model.......50
4.3.2 Numerical Model.......55
4.4 Effect of Perforation Density.........57
4.5 Effect of Flow behind Casing .......58
4.5.1 Cement Leak Model.......59
4.5.1.1 Effect of Leak Size and Length.64
4.5.1.2 Diagnosis of Gas Well with Leaking Cement...67
CHAPTER 5 EFFECT OF NON-DARCY FLOW ON WELL PRODUCTIVITY
IN TIGHT GAS RESERVOIRS...69
5.1 Non-Darcy Flow Effect in Low-Rate Gas Wells...70
5.2 Field Data Analysis....73
5.3 Numerical Simulator Model......76
5.3.1 Volumetric Gas Reservoir......78
5.3.2 Water Drive Gas Reservoir........80
5.4 Results and Discussion......85
CHAPTER 6 WELL COMPLETION LENGTH OPTIMIZATION IN GAS
RESERVOIRS WITH BOTTOM WATER .....87
6.1 Problem Statement.....87
6.2 Study Approach.........88
6.2.1 Reservoir Simulation Model..88
6.2.1.1 Factors Considered..89
6.2.1.2 Responses Considered.90
6.2.2 Statistical Methods.91
6.2.2.1 Experimental Design91
6.2.2.2 Statistical Analyses..91
6.2.2.3 Linear Regression Models...92
6.2.2.4 Analysis of Variance93
6.2.2.5 Monte Carlo Simulation..93
6.2.3 Optimization..94
6.2.4 Workflow...94
6.3 Results and Discussion..96
6.3.1 Linear Models96
6.3.2 Sensitivities (ANOVA)..98
6.3.3 Monte Carlo Simulation...103
6.3.4 Optimization107
6.4 Implications For Water-Drive Gas Wells108
CHAPTER 7 DOWNHOLE WATER SINK WELL COMPLETIONS IN GAS
RESERVOIR WITH BOTTOM WATER......110
7.1 Alternative Design of DWS for Gas Wells..110
7.1.1 Dual Completion without Packer.....111
7.1.2 Dual Completion with Packer......112
7.1.3 Dual Completion with a Packer and Gravity Gas-Water
Separation....113
v

7.2 Comparison of Conventional Wells and DWS Wells..115


7.2.1 Reservoir Simulator Model......115
7.2.2 Reservoir Parameters Selection.......117
7.2.3 Conventional Wells Completion Length.....118
7.2.4 Gas Recovery and Production Time Comparison....122
7.2.5 Reservoir Candidates for DWS Application....124
7.3 Comparison of DWS and DGWS....126
7.3.1 DWS and DGWS Simulation Model...126
7.3.2 DWS vs. DGWS Comparison Results ....127
7.3.3 Discussion About the Packer for DWS Wells.....131
CHAPTER 8 DESIGN AND PRODUCTION OF DWS GAS WELLS......133
8.1 Effect of Top Completion Length....134
8.2 Effect of Water-Drainage Rate from the Bottom Completion.....137
8.3 Effect of Separation between the Two Completions...139
8.4 Effect of Bottom Completion Length......141
8.5 DWS Operational Conditions for Gas Wells...143
8.5.1 Effect of Bottom Hole Flowing Pressure at the Bottom
Completion......149
8.6 When to Install DWS in Gas Wells.....153
8.7 Recommended DWS Operational Conditions in Gas Wells...156
CHAPTER 9 CONCLUSIONS AND RECOMMENDATIONS......158
9.1 Conclusions......158
9.2 Recommendations........161
REFERENCES...163
APPENDIX-A ANALYTICAL COMPARISON OF WATER CONING IN OIL
AND GAS WELLS.....175
APPENDIX-B EXAMPLE ECLIPSE DATA DECK FOR COMPARISON OF
WATER CONING IN OIL AND GAS WELLS AFTER WATER
BREAKTHROUGH ..181
APPENDIX-C EXAMPLE ECLIPSE DATA DECK FOR EFFECT OF
VERTICAL PERMEABILITY ON WATER CONING....190
APPENDIX-D ANALYTICAL MODEL FOR NON-DARCY EFFECT IN LOW
PRODUCTIVITY GAS RESERVOIRS.......213
APPENDIX-E EXAMPLE IMEX DATA DECK FOR NON-DARCY FLOW IN
LOW PRODUCTIVITY GAS RESERVOIRS........215
APPENDIX-F EXAMPLE ECLIPSE DATA DECK FOR COMPARISON OF
CONVENTIONAL WELLS AND DWS WELLS.......227
VITA.......245
vi

LIST OF TABLES
Table 3.1 Gas, Water, and Oil Properties Used for the Numerical Simulator Model...38
Table 5.1 Data Used for the Analytical Model..71
Table 5.2 Rock Properties and Flow Rates Data for Wells A-6, A-7, and A-8 from Brar
& Aziz (1978).74
Table 5.3 Flow Rate and Values of a and b for Gas Wells with Multi-flow Tests....75
Table 5.4 Gas and Water Properties Used for the Numerical Simulator Model77
Table 6.1 Factor Descriptions89
Table 6.2 Factor Descriptions Including Box-Tidwell Power Coefficients..97
Table 6.3 Linear Sensitivity Estimates For Models Without Factors Interactions...99
Table 6.4 Transformed, Scaled Model for the Box-Cox Transform of Net Present
Value..100
Table 6.5 Parameters for Beta Distributions of Factors...104
Table 6.6 Monte Carlo Sensitivity Estimates..105
Table 8.1 Operation Conditions for Top Completion Length Evaluation...136
Table 8.2 Operation Conditions for Water-Drained Rate Evaluation..137
Table 8.3 Operation Conditions for Evaluation of Separation Between The
Completions...139
Table 8.4 Operation Conditions for Different Bottom Completion Length....142
Table 8.5 Operation Conditions for Different Top Completion Length, Bottom
Completion Length, and Water-Drained Rate.......145
Table 8.6 Operation Conditions for Evaluation of Different Constant Bottomhole
Flowing Pressure at The Bottom Completion149
Table 8.7 Operation Conditions for When to Install DWS in Low Productivity Gas
Well....153

vii

LIST OF FIGURES
Figure 1.1 Gas Rate and Water Rate History for an Actual Gas Well2
Figure 1.2 Gas Recovery Factor and Water Rate History for an Actual Gas Well.2
Figure 3.1 Theoretical Model Used to Compare Analytically Water Coning in Oil and
Gas Wells before Breakthrough.......31
Figure 3.2 Theoretical Model Used to Compare Analytically Water Coning in Oil and
Gas Wells after Breakthrough..........33
Figure 3.3 Shape of the Gas-Water and Oil-Water Contact for Total Perforation....36
Figure 3.4 Numerical Model Used for Comparison of Water Coning in Oil-Water and
Gas-Water Systems......37
Figure 3.5 Numerical Comparison of Water Coning in Oil-Water and Gas-Water
Systems after 395 Days of Production.....39
Figure 3.6 Zoom View around the Wellbore to Watch Cone Shape for the Numerical
Model after 395 Days of Production........40
Figure 4.1 Numerical Reservoir Model Used to Investigate Mechanisms Improving
Water Coning/Production (Vertical Permeability and Aquifer Size)......44
Figure 4.2 Distribution of Water Saturation after 395 days of Gas Production....45
Figure 4.3 Water Rate versus Time for Different Values of Permeability Anisotropy....46
Figure 4.4 Distribution of Water Saturation after 1124.8 days of Gas Production..48
Figure 4.5 Water Rate versus Time for Different Values of Aquifer Size...49
Figure 4.6 Analytical Model Used to Investigate the Effect of Non-Darcy in Water
Production.......50
Figure 4.7 Skin Components at the Well for a Single Perforation for the Analytical
Model Used to Investigate Non-Darcy Flow Effect in Water Production...52
Figure 4.8 Water-Gas Ratio versus Gas Recovery Factor for Total Penetration of Gas
Column without Skin and Non-Darcy Effect......53
Figure 4.9 Water-Gas Ratio versus Gas Recovery Factor for Total Penetration of Gas
Column Including Mechanical Skin Only.......53
viii

Figure 4.10 Water-Gas Ratio versus Gas Recovery Factor for Total Penetration of Gas
and Water Columns, Skin and Non-Darcy Effect Included........54
Figure 4.11 Water-Gas Ratio versus Gas Recovery Factor for Wells Completed Only
through Total Perforation the Gas Column with Combined Effects of Skin
and Non-Darcy............55
Figure 4.12 Gas Rate versus Time for the Numerical Model Used to Evaluate the Effect
of Non-Darcy Flow in Water Production.....56
Figure 4.13 Water Rate versus Time for the Numerical Model Used to Evaluate the
Effect of Non-Darcy Flow in Water Production......57
Figure 4.14 Effect of Perforation Density on Water-Gas Ratio for a Well Perforating in
the Gas Column, Skin and Non-Darcy Effect Included.......58
Figure 4.15 Cement Channeling as a Mechanism Enhancing Water Production in Gas
Wells........59
Figure 4.16 Modeling Cement Leak in Numerical Simulator ......60
Figure 4.17 Relationship between Channel Diameter and Equivalent Permeability in the
First Grid for the Leaking Cement Model.......62
Figure 4.18 Values of Radial and Vertical Permeability in the Simulators First Grid to
Represent a Channel in the Cemented Annulus..........63
Figure 4.19 Effect of Leak Length: Behavior of Water Production Rate with and
without a Channel in the Cemented Annulus.........64
Figure 4.20 Effect of Channel Size: Behavior of Water Production Rate for a Channel
in the Cemented Annulus above the Initial Gas-Water Contact.........65
Figure 4.21 Effect of Channel Size: Behavior of Water Production Rate for a Channel
in the Cemented Annulus throughout the Gas Zone Ending in the Water
Zone66
Figure 5.1 Fraction of Pressure Drop Generated by N-D Flow for a Gas Well Flowing
from a Reservoir with Permeability 100 md.......71
Figure 5.2 Fraction of Pressure Drop Generated by N-D Flow for a Gas Well Flowing
from a Reservoir with Permeability 10 md......72
Figure 5.3 Fraction of Pressure Drop Generated by N-D Flow for a Gas Well Flowing
from a Reservoir with Permeability 1 md........73

ix

Figure 5.4 Fraction of Pressure Drop Generated by N-D Flow for Wells A-6, A-7, and
A-8; from Brar & Aziz (1978).....74
Figure 5.5 Fraction of Pressure Drop Generated by N-D Flow for Gas WellsField
Data..76
Figure 5.6 Sketch Illustrating the Simulator Model Used to Investigate N-D Flow.77
Figure 5.7 Gas Rate Performance with and without N-D Flow for a Volumetric Gas
Reservoir .....78
Figure 5.8 Cumulative Gas Recovery Performance with and without N-D Flow for a
Volumetric Gas Reservoir.......79
Figure 5.9 Fraction of Pressure Drop Generated by Non-Darcy Flow for Gas Wells
Simulator Model..........79
Figure 5.10 Gas Rate Performances with N-D (Distributed in the Reservoir and
Assigned to the Wellbore) and without N-D Flow for a Gas Water-Drive
Reservoir..80
Figure 5.11 Gas Recovery Performances with N-D (Distributed in the Reservoir and
Assigned to the Wellbore) and without N-D Flow for a Gas Water-Drive
Reservoir..81
Figure 5.12 Water Rate Performances With N-D (Distributed in the Reservoir and
Assigned to the Wellbore) and without N-D Flow for a Gas Water-Drive
Reservoir..82
Figure 5.13 Flowing bottom hole pressure performances with N-D (distributed in the
reservoir and assigned to the wellbore) and without N-D flow...82
Figure 5.14 Pressure performances in the first simulator grid (before completion) with
ND (distributed in the reservoir and assigned to the wellbore) and without
N-D flow.........83
Figure 5.15 Pressure distribution on the radial direction at the lower completion layer
after 126 days of production (Wells produced at constant gas rate of 8.0
MMSCFD) with ND (distributed in the reservoir and assigned to the
wellbore) and without N-D flow.84
Figure 6.1 Flow diagram for the workflow used for the study..95
Figure 6.2 Effect of Permeability and Initial Reservoir Pressure on Net Present
Value......101
Figure 6.3 Effect of Permeability and Completion Length on Net Present Value..102
x

Figure 6.4 Effect of Gas Price and Completion Length on Net Present Value.102
Figure 6.5 Effect of Discount Rate and Gas Price on Net Present Value..103
Figure 6.6 Beta Distribution Used for Monte Carlo Simulation104
Figure 6.7 Monte Carlo Simulation of the Net Present Value105
Figure 6.8 Optimization of Net Present Value Considering Uncertainty in Reservoir
and Economic Factors (two cases) ...106
Figure 6.9 Optimal Completion Length Calculated from the Transformed Model and
a Response Model Computed from Local Optimization...108
Figure 6.10 Relative Loss of Net Present Values If Completion Length Is Not
Optimized...109
Figure 7.1 Dual Completion without Packer...111
Figure 7.2 Dual Completion with Packer....113
Figure 7.3 Dual Completion with a Packer and Gravity Gas-Water Separation.....114
Figure 7.4 Simulation Model of Gas Reservoir for DWS Evaluation.116
Figure 7.5 Gas Recovery for Different Completion Length in Gas Reservoirs with
Subnormal Initial Pressure.....119
Figure 7.6 Gas Recovery for Different Completion Length in Gas Reservoirs with
Normal Initial Pressure..........119
Figure 7.7 Gas Recovery for Different Completion Length in Gas Reservoirs with
Abnormal Initial Pressure..........120
Figure 7.8 Flowing Bottom Hole Pressure versus Time (Normal Initial Pressure; 50%
Penetration).......120
Figure 7.9 Gas Rate versus Time (Normal Initial Pressure; 50% Penetration)...121
Figure 7.10 Gas Recovery and Total Production Time for Conventional and DWS
Wells for Different Initial Reservoir Pressure and Permeability 1 md..122
Figure 7.11 Gas Recovery and Total Production Time for Conventional and DWS
Wells for Different Initial Reservoir Pressure and Permeability 10 md....123
Figure 7.12 Gas Recovery and Total Production Time for Conventional and DWS
Wells for Different Initial Reservoir Pressure and Permeability 100 md..124
xi

Figure 7.13 Gas Rate History for Conventional and DWS Wells (Subnormal Reservoir
Pressure and Permeability 1 md).......125
Figure 7.14 Flowing Bottom Hole Pressure History for Conventional and DWS Wells
(Subnormal Reservoir Pressure and Permeability 1 md)...125
Figure 7.15 Gas Recovery and Production Time Ratio (PTR) for Conventional, DWS,
and DGWS Wells...128
Figure 7.16 Gas Recovery versus Time for DWS, DGWS, and Conventional Wells.129
Figure 7.17 Gas Rate History for DWS-2, DGWS-1, and Conventional Wells..130
Figure 7.18 Water Rate History for DWS-2, DGWS-1, and Conventional Wells..130
Figure 7.19 Bottom hole flowing pressure history for DWS-2, DGWS-1, and
conventional wells..131
Figure 8.1 Factors Used to Evaluate DWS Performance .......133
Figure 8.2 Gas Recovery Factor for Different Length ff The Top Completion..134
Figure 8.3 Total Production Time for Different Length of The Top Completion. .135
Figure 8.4 Gas Recovery Factor for Different Water-Drained Rate...138
Figure 8.5 Total Production Time for Different Water-Drained Rate.....138
Figure 8.6 Gas Recovery Factor for Different Separation Distance Between The
Completions. .140
Figure 8.7 Total Production Time for Different Separation Distance Between The
Completions ..141
Figure 8.8 Gas Recovery Factor for Evaluation of Different Length at The Bottom
Completion.....142
Figure 8.9 Total Production Time for Evaluation of Different Length at The Bottom
Completion 143
Figure 8.10 Gas Recovery for Different Lengths of Top, and Bottom Completions and
Maximum Water Drained. The Two Completions Are Together. Reservoir
Permeability Is 1 md..146
Figure 8.11 Total Production Time for Different Lengths of Top and Bottom
Completions and Maximum Water Drained. The Two Completions Are
Together. Reservoir Permeability Is 1 md 146
xii

Figure 8.12 Gas Recovery for Different Lengths of Top, and Bottom Completions and
Maximum Water Drained. The Two Completions Are Together. Reservoir
Permeability Is 10 md ...147
Figure 8.13 Total Production Time for Different Lengths of Both Completions and
Maximum Water Drained. The Two Completions Are Together. Reservoir
Permeability Is 10 md ...148
Figure 8.14 Gas Recovery for Different Constant BHP at The Bottom Completion..150
Figure 8.15 Total Production Time for Evaluation of Different Constant BHP at The
Bottom Completion ...150
Figure 8.16 Flowing Bottomhole Pressure History at The Top, and Bottom Completion
for Two Different Constant BHP at The Bottom Completion (100 psia, and
200 psia). Permeability Is 1 md ....151
Figure 8.17 Average Reservoir for Two Different Constant BHP at The Bottom
Completion (100 psia, and 200 psia). Permeability Is 1 md .152
Figure 8.18 Gas Recovery for Different Times of Installing DWS.....154
Figure 8.19 Total Production Time for Different Times of Installing DWS...154
Figure 8.20 Cumulative Gas Recovery for Different Times of Installing DWS.
Reservoir Permeability Is 10 md.......156

xiii

NOMENCLATURE

Darcy flow coefficient, (psia2-cp)/(MMscf-D) for calculation in terms of


pseudopressure or psia2/(MMscf-D) for calculations in terms of pressure
squared

drainage area of well, ft2

Non-Darcy flow coefficient, (psia2-cp)/(MMscf-D)2 for calculation in


terms of pseudopressure or psia2/(MMscf-D)2 for calculations in terms of
pressure squared

Bw

water formation volume factor, reservoir barrels per surface barrels

CA

factor of well drainage area

Non-Darcy flow coefficient, day/Mscf

dp

pressure derivative, psia

dL

length derivative, ft

fraction of pressure drop generated by Non-Darcy flow effect,


dimensionless

net formation thickness, ft

hg

thickness of gas, ft

hpre

perforated interval, ft

hw

thickness of water, ft

permeability, millidarcies

kd

altered reservoir permeability, millidarcies

kdp

crashed zone permeability, millidarcies


xiv

kH

horizontal permeability, millidarcies

kg

gas permeability, millidarcies

kV

vertical permeability, millidarcies

kw

water permeability, millidarcies

length, ft

Lp

length of perforation, ft

apparent molecular weight, lbm/lbm-mol

np

number of perforations

pressure, psia

Pe

reservoir pressure at the boundary, psia

pp( p ) =

average reservoir pseudopressure, psia2/cp

pp( p wf )=

flowing bottom hole pseudopressure, psia2/cp

pp

difference of average reservoir and flowing bottom hole pseudopressure,

psia2/cp
Pw

flowing bottom hole pressure, psia

gas rate, MMscfd

Qg

gas flow rate, Mscfd

Qw

water flow rate, barrel/day

qg

gas flow rate, Mscfd

qw

water flow rate, barrel/day

rd

altered reservoir radius, ft

rdp

crashed zone radius, ft

re

outer radius, ft

rp

radius of perforation, ft
xv

rw

wellbore radius, ft

skin factor, dimensionless

skin factor, dimensionless

Sd

skin factor representing mud filtrate invasion

Sdp

skin factor representing perforation density

Spp

skin factor due to partial penetration

temperature, oR

Tsc

temperature at standard conditions, oR

velocity, ft per second

gas-water or oil-water interface thickness, ft

ye

water thickness at the boundary, ft

gas deviation factor

turbulent factor, 1/ ft

turbulent factor for reservoir, 1/ ft

dp

turbulent factor for crashed zone, 1/ ft

density, lbm/ft3

pressure derivative, psia

radius derivative, ft

porosity

specific gravity of gas (air = 1.0)

viscosity, centipoises

viscosity of gas, centipoises

viscosity of water, centipoises

xvi

ABSTRACT

Water inflow may cease production of gas wells, leaving a significant amount of
gas in the reservoir. Conventional technologies of gas well dewatering remove water
from inside the wellbore without controlling water at its source. This study addresses
mechanisms of water inflow to gas wells and a new completion method to control it.
In a vertical oil well, the water cone top is horizontal, but in a gas well, the
gas/water interface tends to bend downwards. It could be economically possible to
produce gas-water systems without water breakthrough.
Non-Darcy flow effect (NDFE), vertical permeability, aquifer size, density of
well perforation, and flow behind casing increase water coning/inflow to wells in
homogeneous gas reservoirs with bottom water. NDFE is important in low-productivity
gas reservoirs with low porosity and permeability. Also, NDFE should be considered in
the reservoir (outside the well) to describe properly gas wells performance.
A particular pattern of water rate in a gas well with leaking cement is revealed.
The pattern might be used to diagnose the leak. The pattern explanation considers cement
leak flow hydraulics. Water production depends on leak properties.
Advanced methods at parametric experimental design and statistical analysis of
regression, variance, with uncertainty (Monte Carlo) were used building economic model
at gas wells with bottom water. Completion length optimization reveled that penetrating
80% of the gas zone gets the maximum net present value.
The most promising Downhole Water Sink (DWS) installation in gas wells
includes dual completion with an isolating packer and gravity gas-water separation at the
xvii

bottom completion. In comparison to Downhole Gas/Water Separation wells, the DWS


wells would recover about the same amount of gas but much sooner.
The best DWS completion design should comprise a short top completion
penetrating 20% - 40% of the gas zone, a long bottom completion penetrating the
remaining gas zone, and vigorous pumping of water at the bottom completion. Being as
close as practically possible the two completions are only separated by a packer. DWS
should be installed early after water breakthrough.

xviii

CHAPTER 1
INTRODUCTION
1.1

Background and Purpose


Water production kills gas wells, leaving a significant amount of gas in the

reservoir. One study of large sample gas wells revealed that the original reserves figures
had to be reduced by 20% for water problems alone (National Energy Board of Canada,
1995).
Gas demand in the US increased 16% during the last decade, but gas production
increased only 4.5% during the same period (Energy Information Administration, 2001).
The demand for natural gas is projected to increase at an average annual rate of 1.8%
between 2001 and 2025 (Energy Information Administration, 2003).
Water production is one of the two recurring problems of critical concern in the
oil and gas industry (Inikori, 2002). Many gas reservoirs are water driven. Water supplies
an extra mechanism to produce the gas reservoir, but it can create production problems in
the wellbore. These water production problems are more critical in low productivity gas
wells. More than 97% of the gas wells in the United Stated produce at low gas rates.
Eight areas account for 81.7 % of the United States dry natural gas proved reserves:
Texas, Gulf of Mexico Federal Offshore, Wyoming, New Mexico, Oklahoma, Colorado,
Alaska, and Louisiana (EIA, 2001). These areas had 144,326 producing gas wells in
1996, but only 366 wells (0.25%) produced more than 12.8 MMscfd (EIA, 2000).
Figures 1.1 and 1.2 show actual field data from a well located in a gas reservoir
with bottom water drive where water production affected the well performance.

1800

250

1500

200

1200

150

900

100

600

50

300
0

D
ec
Ja -97
Fen-9
8
M b-9
ar 8
Ap -98
M r-9
a 8
Ju y-98
n
Ju -98
Au l-9
8
Seg-9
p 8
O -98
ct
N -9
o 8
D v-9
ec 8
Ja -98
Fen-9
9
M b-9
ar 9
Ap -99
M r-9
ay 9
Ju -99
n
Ju -99
Au l-9
9
Seg-9
9
p99

Gas Rate (Mscf/d)

Water Rate (Stb/d)

300

Time (days)
Water Rate

Figure 1.1

Gas Rate

Gas rate and water rate history for an actual gas well.

Figure 1.1 shows the history of gas and water rate. Water production begins after
eleven months of gas production. Water production increases rapidly, reducing gas rate

30

250

25

200

20

150

15

100

10

50

Recovery Factor (%)

300

D
ec
Ja -97
n
Fe -9
b 8
M -98
a
Apr-98
M r-9
ay 8
Ju -98
n
Ju -98
Au l-9
8
Seg-9
p 8
O -98
c
N t-9
ov 8
D -9
ec 8
Ja -98
n
Fe -99
b
M -99
ar
Ap -99
M r-9
ay 9
Ju -99
n
Ju -99
Au l-9
9
Seg-9
9
p99

Water Rate (Stb/d)

and killing the well after seven months of water production.

Time (days)
Water Rate

Figure 1.2

Gas Recovery Factor

Gas recovery factor and water rate history for an actual gas well.

Figure 1.2 shows gas recovery factor and water rate history. The final recovery
for the well is 28% at the moment when production stopped. This well died because of
the liquid loading inside the wellbore.
Liquid loading happens when the gas does not have enough energy to carry the
water out of the wellbore. Water accumulates at the bottom of the well, generating
backpressure in the reservoir and blocking gas inflow.
It is well known that water coning occurs in oil and gas reservoirs, with the water
drive mechanism, when the well is produced above the critical rate. Water coning is
responsible for the early water breakthrough into the wellbore. Water coning has been
studied extensively for oil reservoirs. However, only a few studies of water coning in gas
wells have been reported in the literature. Most of the studies assume that water coning in
gas and oil wells is the same phenomenon, and correlation developed for oil-water system
could be used for gas-water systems.
The obvious solution for water coning problems is to produce the well below the
critical rate; this solution, however, has become uneconomical for oil wells because of
the low value for the critical rate. A correlation for critical rate in gas wells has not been
published, yet, to the authors knowledge.
Different well dewatering technologies have been used to control water loading
problem in gas wells (pumping units, liquid diverters, gas lifts, soap injections, flow
controllers, swabbing, coiled tubing/nitrogen, venting, plunger lift, and one small
concentric tubing string). All of them would reduce liquid-loading without controlling
water inflow. Recently, a new technology of Downhole Water Sink (DWS) has been
develop and successfully used to control water production/coning in oil wells. DWS
3

controls water inflow to the well, by reversing water coning with a second bottom
completion. That drains water from under the top completion.
The purpose of this research is to evaluate the performance of the DWS
technology controlling water production-problems in gas wells. Design and operation of
DWS gas wells is also addressed. Moreover, Identification of unique mechanisms
improving water production in gas reservoirs, and completion length optimization for
conventional gas wells are also approached.
1.2

Statement of Research Problem


In response to economic and environmental concerns, in-situ injection of water in

the same gas well, without lifting the water to surface, has become a new technology
knows as Downhole Gas-Water Separation (DGWS). Similarly to all the other
technologies use to solve liquid-loading in gas wells, DGWS does not consider the wellreservoir interaction solving water production problem, either.
Therefore, new technologies that consider both, the well and the reservoir,
component of the water problem production in gas wells are needed. These technologies,
not only have to improve gas production/recovery from the reservoir, but have to reduce
the amount of water produced at the surface, too.
In the past, water coning in gas wells has not received much attention from
researcher in the petroleum industry. The reason for that probably is the general feeling
that the problem is of minimal importance or even does not exist because of the high gas
mobility compared with the water mobility. Therefore, few studies have been done
addressing reservoir mechanisms increasing water coning/production in gas reservoir.
The low gas price experienced during the last decade reduced the interest in gas well
problems at the United States. This low gas price environment, however, has slowly
4

changed since the beginning of this century due to increases in gas demand and reduction
in gas supply, pushing people trying to explain, understand and solve gas
production/recovery problems. One such attempt includes the pilot work conducted for
the research described herein.
1.3

Significance and Contribution of This Research


The significance of this research stems from the following six studies:

First, the research presents analytical and numerical evidence that the water
coning is different in gas wells than in oil wells.

Second, this research identifies vertical permeability, aquifer size, Non-Darcy


flow effect (N-D), density of perforation, and flow behind casing as unique
mechanisms improving water coning in gas wells.

Third, the research presents a new perspective for N-D flow in gas reservoirs,
showing that very well accepted statements in the oil and gas industry about this
phenomenon are not correct (Non Darcy flow is not important in gas wells
flowing at low rates. Non-Darcy flow coefficient applied only to the well bore
properly represents N-D flow throughout the reservoir).

Fourth, this research presents a new procedure to identify flow behind casing
(channeling in the cemented annulus) in gas wells.

Fifth, the optimum completion length in gas wells for the maximum net present
value is presented. Reservoir and economic parameters affecting water production
in gas reservoir are prioritized.

Finally, the research presents an evaluation for DWS in gas reservoirs, identifying
the reservoir conditions where the technology could be successful. The best way

to operate DWS in gas reservoirs, considering different completion/production


parameters, is identified, too.
1.4

Research Method and Approach


This research uses two existing commercial numerical simulators (Eclipse 100,

and IMEX) and a radial grid model to study water coning mechanisms and DWS
evaluation in gas reservoirs. Two commercial numerical simulators are used during the
study because the first simulator used for this research (Eclipse 100) does not properly
represent N-D in gas reservoirs. N-D flow is identified as an important phenomenon.
Another simulator (IMEX) is also used. Analytical models are built to support procedures
and results for different mechanisms that increase water coning in gas reservoirs. Field
data are used to confirm analytical and numerical results from the N-D flow effect
analysis. Statistical analyses are performed with the numerical simulation results from the
analysis of mechanisms affecting water coning/production in gas wells.
Because of the very nature of this first pilot research of DWS in gas reservoir,
several different types of approaches, studies, and evaluations are performed.
Analytical and numerical approaches are used to identify similarities and
differences between water coning in gas and oil wells (Chapter 3). The analysis is
focused on the amount of fluid produced, under the same production conditions, from the
oil-water and gas-water system, and the shape of the interface (oil-water and gas-water)
around the wellbore for both systems. One new analytical model, to investigate gas-water
and oil-water interface shape, is developed following Muskat (1982) procedure. The
results from the analytical model are compared with results from a numerical reservoir
simulator model built with similar characteristics. Another analytical model is built to
investigate the amount of fluid produced from both systems.
6

Qualitative studies identifying mechanisms increasing water coning/productions


in gas wells are conducted using numerical and analytical models (Chapter 4). Vertical
permeability, aquifer size, Non-Darcy flow effect, perforation density, and flow behind
casing are evaluated. Analytical models are constructed to confirm the results from the
numerical reservoir simulator models. Moreover, one analytical model is developed to
enhance the capability of reservoir simulator representing the phenomena of flow behind
casing in gas wells because the reservoir simulator does not include the annulus space
between the casing and the wellbore wall in its modeling. A new procedure identifying
flow behind casing in gas wells, using water production field data, is presented.
Analytical and numerical models are used to identify and quantify the importance
of Non Darcy flow effect in low productivity gas reservoirs. The results from the models
are compared with actual field data (Chapter 5). Recommendations on the correct way of
modeling Non Darcy flow in gas reservoir using numerical reservoir simulators are
included.
Feasibility studies of DWS in gas wells are done using reservoir numerical
models (Chapter 6). The studies compare final gas recovery for conventional gas wells
and DWS gas wells. Quantitative comparison of final gas recovery between two different
technologies solving water production problems in gas wells is made, too [One
technology solves the problem in the wellbore (DGWS), and the other one solves the
problem in the reservoir (DWS)]. Modeling DWS, and DGWS wells in commercial
numerical simulator brings several challenges because of the inability of the reservoir
simulator to perform dual completed well with two-different bottom hole condition and
two different tubing performance model at the same well. Model modifications (e.g., two

wells in the same location with different completion length, two tubing performance
models for the same well, etc) are made to evaluate DWS and DGWS wells performance.
Sensitivity studies of mechanisms increasing water coning/production in gas wells
are conducted using analysis of variance. Three different linear regression models,
without interaction among the factors, for ultimate cumulative gas production, net present
value and peak gas rate are built and evaluated using numerical reservoir simulation
results. One linear regression model for the discount cash flow, considering interaction
among the eight factors, is built and evaluated (Chapter 7). Horizontal permeability,
aquifer size, permeability anisotropy, initial reservoir pressure, length of completion, gas
price, water disposal cost, and discount rate are the factors considered for the analysis.
Optimization of Net Present Value with respect to completion length in gas reservoir with
bottom-water drive, using the response model from the statistical model and the direct
result from the simulator, was done, too.
Qualification of the most important operational factors affecting DWS
performance in gas reservoir is done using numerical reservoir simulator model (Chapter
8). The analysis includes length-of-top completion, length-of-bottom completion,
drained-water rate, separation between the top-and the bottom-completion, and the time
to install DWS technology. Recommendations on how to use DWS effectively in gas
reservoirs are included.
1.5

Work Program Logic


The dissertation is divided into nine chapters. The introduction chapter presents

an overview of the problem of water production in gas wells explaining the necessity for
new technologies to solve the problem. It also presents a concise statement about the lack

of attention about the problem and ends with a presentation of the relevance of this study
and its approach.
Chapter two presents a literature review of scientific research into water loading
theory and different technologies used to solve water production problems in gas wells.
Chapter three gives a comparison of water coning in oil and gas wells with
specific focus on the interface oil-water and gas-water shape, and the amount of fluid
produced in both system at the same operational conditions.
Chapter four gives a qualitative analysis about different mechanisms increasing
water coning/production in gas reservoir with bottom-water drive. Vertical permeability,
aquifer size, Non-Darcy flow effect, perforation density, and flow behind casing were the
mechanisms evaluated. Chapter four ends with a new procedure to identify flow behind
casing in gas wells using water production data.
Chapter five takes an overview of the Non-Darcy effect phenomena in low
productivity gas wells. The well assumption that setting Non-Darcy flow at the wellbore
properly represents the phenomena is revised. Chapter five ends with a recommendation
about the correct way of modeling Non Darcy flow in gas reservoir using numerical
reservoir simulators.
Chapter six has the statistical evaluation of completion length optimization in gas
wells for maximum net present value. The analysis includes sensitivity studies for
reservoir and economical factors. Horizontal permeability, aquifer size, permeability
anisotropy, initial reservoir pressure, length of completion, gas price, water disposal cost,
and discount rate were the factor considered for the analysis.
Chapter seven includes the feasibility study of DWS in gas reservoirs.
Comparisons of final cumulative gas recovery in conventional and DWS wells are
9

performed. The study includes a comparison between two different technologies solving
water production problems in gas wells for the same gas reservoir [one technology solves
the problem in the wellbore (DGWS), and the other one solve the problem into the
reservoir (DWS)].
Chapter eight reviews the operational parameters involved in DWS performance
in gas reservoirs giving recommendation about the way to use the technology. Chapter
nine provides conclusions from this research work, including recommendations for future
research.

10

CHAPTER 2
LITERATURE REVIEW

Liquid loading or accumulation in gas wells occurs when the gas phase does not
provide adequate energy for the continuous removal of liquids from the wellbore. The
accumulation of liquid will impose an additional back pressure on the formation, which
can restrict well productivity (Ikoku, 1984). The limited gas flow velocity for upward
liquid-drop movement is the critical velocity.
2.1

Critical Velocity
Turner, Hubbard, and Dukler (1969) analyzed two physical models for removal of

gas well liquids: the liquid droplet and the liquid film models. A comparison of these two
models with field data led to the conclusion that the onset of load up could be predicted
adequately with the droplet model, but that a 20% adjustment of the equation upward was
necessary. Equation 2.1 shows Turner et al. correlation.
vt =

1.912 1 / 4 ( L g ) 1 / 4

1g / 2

.(2.1)

Where vt is critical velocity (ft/sec), is interfacial tension (dynes/cm), L is


liquid-phase density (lbm/ft3), and g is gas phase density (lbm/ft3).
Turner et al. equation (Eqn. 2.1) calculating gas critical velocity has gained
widespread industry acceptance because of its close agreement with field data, and it is
widely referenced in the literature (Hutlas & Granberry, 1972; Libson & Henry, 1980;
Ikoku, 1984; Beggs, 1985; Upchurch, 1987; Bizanti & Moonesas, 1989; Smith, 1990;
Elmer, 1995).

11

Coleman et al. (1991), using a different set of field data, conclude that the 20%
adjustment of Turners equation is not needed. They found that the critical flow rate
required to keep low pressure gas wells unloaded can be predicted adequately with the
Turner et al. (1969) liquid-droplet model without the 20% upward adjustment. Equation
2.2 shows Coleman et al. (1991) correlation.
vt =

1.593 1 / 4 ( L g ) 1 / 4

1g / 2

.(2.2)

Where vt is critical velocity (ft/sec), is interfacial tension (dynes/cm), L is


liquid-phase density (lbm/ft3), and g is gas phase density (lbm/ft3).
Nosseir et al. (2000) explained the difference between Turner et al. (1969) and
Coleman et al. (1991) results because both of them ignored flow regime conditions for
their data set. Flow regime considerations directly affect the shape of the drag coefficient
and hence the critical velocity equation. They found that most of the Turner et al. (1969)
data set fall in the highly turbulent region where NRE exceeds a value of 200,000, and the
drag coefficient acquires a value of 0.2. Most of the Coleman et al. (1991) data set,
however, falls in the region where 104< NRE <2*105 corresponding drag coefficient of
0.44. Nosseir et al. (2000) derived two analytical equations describing the flow regimes
for each set of data. Equations 2.3 and 2.4 show Nosseir et al. (2000) correlations.
For transition flow regime (104 < NRe < 2*105):
vg =

14.6 0.35 ( L g ) 0.21

0.134 g0.426

(2.3)

For highly turbulent flow regime (NRe > 2*105):


vg =

21.3 0.25 ( L g ) 0.25

g0.5

(2.4)

12

Where vg is gas critical velocity (ft/sec), is interfacial tension (dynes/cm), L is


liquid-phase density (lbm/ft3), is gas viscosity (lbm/ft/sec), and g is gas phase density
(lbm/ft3).
Sutton et al. (2003) evaluates gas well performance at Subcritical rates. They
evaluated six different models describing the presence of a static liquid column in the
wellbore with field data from 15 wells. They concluded that the model proposed by
Hasan and Kabir (1985) offers the best approach for simulating this phenomenon.
2.2

Critical Rate for Water Coning


Water coning happens on the vicinity of the well when water moves up from the

free water level in a vertical direction. Production from a well causes a pressure sink at
the completion. If the wellbore pressure is higher than the gravitational forces resulting
from the density difference between gas and water, then water coning occurs. Equation
2.5 shows the basic correlation between pressure in the wellbore and at the well vicinity
for coning.
p p well = 0.433( w g )h g w (2.5)

Where p is average reservoir pressure (psi), pwell is the flowing bottom hole
pressure (psi), w is water specific gravity, g is gas specific gravity, and hg-w is the
vertical distance from the bottom of the wells completion to the gas/water contact (ft).
Critical rate is defined as the maximum rate at which oil/gas is produced without
production of water (Joshi, 1991). The critical rate for oil-water systems has been
discussed for several authors developing different correlations to calculate that rate. For
gas-water system, however, no correlation has been published calculating critical rate,
yet. One possible reason for the low interest in critical rate for gas-water system could be
the general feeling that water coning in gas wells is less important than in oil wells.
13

Muskat (1982), for example, discussing about water coning problem said: water coning
will be much more readily suppressed and will involve less serious difficulties for wells
producing from gas zones than for wells producing oilthe critical-pressure differential
for water coning will be probably grater by a factor of at least four in gas wells than in oil
wells. Joshy (1991) presets an excellent discussion about critical rate in oil wells. He
included analytical and empirical correlation to calculate critical rate. The correlations
include: Craft and Hawking method (1959), Meyer, and Garder method (1954), Chaperon
method (1986), Schols method (1972), and Hoyland, Papatzacos and Skjaeveland method
(1986). Joshy presents equations and example calculation for each method, concluding
that the critical rate calculated for each method is different. He said that there is no right
or wrong critical correlation, and each one should make decision about which correlation
could be used for specific field applications. Meyer, and Garder correlation (1954), and
Schols correlation (1972) are shown here as examples of critical rate equations for oilwater system (Eqns. 2.6 and 2.7).
Meyer and Garder correlation (1954):
qc =

0.001535( w o )k (h 2 D 2 )
o Bo ln(re / rw )

(2.6)

Where: qc is critical oil rate (STB/D), w is water density (gm/cc), o is oil density
(gm/cc), k is formation permeability (md), h is oil zone thickness (ft), D is completion
interval thickness (ft), o is oil viscosity (cp), Bo is oil formation volume factor
(bbl/STB), re is external drainage radius (ft), and rw is wellbore radius (ft).
Schols correlation (1972):
qo =

( w o )k o (h 2 h p2 )
h

* 0.432 +

2049 o B o
ln(re / rw ) re

14

0.14

(2.7)

Where: qo is critical oil rate (STB/D), w is water density (gm/cc), o is oil density
(gm/cc), ko is effective oil permeability (md), h is oil zone thickness (ft), hp is completion
interval thickness (ft), o is oil viscosity (cp), Bo is oil formation volume factor
(bbl/STB), re is external drainage radius (ft), and rw is wellbore radius (ft).
Water coning supplies the liquid source for liquid loading in gas wells. Liquid
loading begins when wells start producing gas flowing below the critical velocity in the
wellbore. Different concepts and techniques have been used to solve water-loading
problems in gas wells.
Trimble and DeRose (1976) discussed that Mustak-Wyckoff (1935) theory for
critical rates in oil wells could be modified to calculate critical rate for gas wells. The
procedure could give an approximate idea about the gas critical rate for quick field
calculations. The modified Muskat-Wyckoff (1935) equation presented by Trimble and
DeRose (1976) is:
0.000703k g h( p e2 p w2 ) b
r
b
1 + 7 w cos ...(2.8)
qg =
zT R g ln(re / rw )
2b
2h
h

Where: qg is gas flow rate (Msc/d), kg is effective gas permeability (md), h is gas
zone thickness (ft), pe is reservoir pressure at drainage radius (psia), pw is wellbore
pressure at drainage radius (psia), g is gas viscosity at reservoir conditions (cp), z is gas
compressibility factor, TR is reservoir temperature (oR), re is external drainage radius (ft),
rw is wellbore radius (ft), and b is footage perforated (ft).
Equations 2.8 and 2.9 are combined, and solved graphically following MuskatWyckoff (1935) procedure, calculating minimum drawdown preventing water coning.
w D
gh D
= 1
1 ..(2.9)

p
h
w e

15

Where: w is potential at well radius (psi), D is potential at well radius and depth
D (psi), e is potential at drainage radius (psi), g is difference in hydrostatic gradient at
reservoir conditions between the gas and water (psi/ft), p is pressure drawdown (psia), h
is gas zone thickness (ft), and D is distance from formation to cone surface at r (ft).
Trimble and DeRose (1976) procedure combined gas flow equation (Eqn. 2.8)
with oil graphical solution for Eqn 2.9. Changes in oil density and viscosity with respect
to pressure are negligible. Gas properties (density, and viscosity), however, strongly
depend on pressure; therefore, the previous procedure should be used as a reference with
limitations.
2.3

Techniques Used in Solving Water Loading

Techniques used in solving water loading in gas wells could be classified as:

Tubing lift improvement:


-

Chemical injection

Physical modification

Thermal

Mechanical

Bottom liquid removal:


-

2.3.1

Mechanical

Tubing Lift Improvement

2.3.1.1 Chemical Injection


Chemicals are injected in gas wells with liquid loading problems to prolong the
extracting period and enhance wells productivity. Foam agents are used to carry the
water out of the well. The objective of using foaming agents is to create a molecular bond
between the gas and the liquid phases and to maintain its foam stability for a useful
16

period of time so that the accumulated liquid is transported to the surface in a foamed,
slurry state (Neves & Brimhall, 1989).
Chemical composition, concentration, temperature, water salinity, presence of
condensate oil, and hydrogen sulfide are factors controlling foaming agent performance
(Xu & Yang, 1995).
Foam lift uses reservoir energy to carry out the water, reducing the critical
velocity. The most common application of foam lift is in the form of a soap stick. The
soap bar (1-inch diameter, 1-foot long) is dropped inside the tubing and foam is generated
by fluid mixing and agitation with the surfactant dissolved from the soap bar (Saleh, and
Al-Jamaey, 1997).
Surfactant concentrations are difficult to gauge and control when the surfactant is
dumped into the annulus or the tubing (Lea, and Tighe, 1983).
Other applications include injection of surfactant through the annulus from the
wellhead, or downhole injection using a capillary string inside the tubing.
Libson and Henry (1980) reported successful results injecting foaming agent into
the casing annulus in very low permeability gas wells located in the Intermediate Shelf
area of Southwest Texas. After 10 days of injecting a foaming agent to the wellhead, the
gas rate increased from 142 Mscfd to 664 Mscfd, and water rate increased from 0.8 bwpd
to 3.2 bwpd.
Placing a capillary string through the producing tubing foam is injected downhole
in front of the perforations. Vosika (1983) reported foam injection an economic success
in four wells at the Great Green River Basing, Wyoming. Average gas rates increase
more than doubled when the foam agent was injected in conjunction with the methanol
used to solve traditional freezing problems.
17

Silverman et al. (1997), and Awadzi et al. (1999) reported liquid loading success
in gas wells located in the Cotton Valley formation in East Texas using the capillary
technique. Gas rate increments in four wells went from 28.2% to 676.3%.
Surfactant injection could increase corrosion. Campbell et al. (2001) reported a
chemical mixture between the foaming agent and corrosion inhibitor to improve liquid
lifting without increasing corrosion in the wellbore.
2.3.1.2 Physical Modification
Physical modification of the wellbore has been done to increase gas velocity. Gas
velocity is increased, reducing the gas-flow area to improve gas carry capacity. A small
concentric tubing string and tubing collar insert have been proposed to improve gas
velocity. These methods of producing marginal gas wells are also viewed as a temporary
solution to liquid loading. As time elapses and the reservoir pressure declines, the smaller
diameter tubing string eventually loads up with liquids. At this point, another method
must be employed to help combat the accumulation of liquid in the wellbore (Neves &
Brimhall, 1989).
Hutlas and Grandberry (1972) reported success using a 1-in tubing string in
northwestern Oklahoma and the Texas Panhandle. Running a 1-in tubing string inside the
production tubing increased gas rate more than 100% in four wells.
Libson and Henry (1980) reported that gas rate increased by 50 Mscfd per
installation in the Intermediate Shelf area of southwest Texas when a 1.90-in tubing was
installed in a 2 3/8-in production tubing.
One-in tubing string run inside 2 7/8-in production tubing increased gas rate,
decreasing field annual decline, in seven wells, two sour gas fields, at the Edward Reef in
Texas (Weeks, 1982).
18

Yamamoto & Christiansen (1999) and Putra & Christiansen (2001) reported
laboratory data for tubing collar inserts increasing liquid lifting. The tubing collar inserts
are restrictions installed inside the tubing string. The restrictions alter flow mechanisms
and liquid could be lifted by gas flowing below the critical velocity; the effect could be
reduced due to the pressure drop across the restriction (Yamamoto and Christiansen,
1999). Parameters affecting the tubing collars inserts include: insert geometric shape, size
and spacing of the inserts, gas and liquid flow rates, and pressure drop across the insert
(Putra and Christiansen, 2001).
Installing concentric coiled tubing is another technique used to increase gas
velocity. An estimated 15,000 wells have coiled tubing installed in them as velocity or
siphon strings. The coiled string consists of either steel or plastic tubing (Scott and
Hoffman, 1999).
Adams and Marsili (1992) presented the design and installation for a 20,500-ft
coiled tubing velocity string in the Gomez Field, Pecos County, Texas. One 1 -in coiled
tubing string was installed in a 4 -in production tubing, solving liquid loading problems
and increasing gas production more than two-fold.
Elmer (1995) discussed the combined application of small tubing string with
some extra gas production through the casing/tubing annulus. The small tubing string
always flowed above the critical velocity, and some gas, due to extra reservoir production
capacity, was produced up to the annulus. Gas production increased 33% in two wells
and 91% in another well when this production strategy was used.
2.3.1.3 Thermal
Pigott et al. (2002) presented the first successful application of wellbore heating
to prevent fluid condensation and eliminate liquid loading in low-pressure, low19

productivity gas wells. The application was in the Carthage Field. A heater cable installed
around the tubing string increased wellbore temperature, avoiding liquid condensation.
The heating technique alone increased gas production more than 100%. However,
combination of the heating technique with a compressor increased gas production more
than three-fold. Water-drive gas reservoirs are not good candidates to install the heating
technique because of the high amount of energy needed to increase wellbore temperature.
Gas wells with low liquid ratio (1 to 8 bbls/MMcf) and liquid loading problems due to
condensations are good candidates to apply the heater technique. Currently the major
limitation to widespread application of this technique is the comparatively high operating
cost. The average cost to operate the well is $5,000/month. This compares to an average
operating cost of $1,200/month in offset wells (Pigott et al., 2002).
2.3.1.4 Mechanical
Gas lift has been used to improve tubing lifting capacity. Gas lift systems inject
high-pressure gas from the casing tubing annulus through valves into liquids in the tubing
to reduce their density and move them to the surface (Lea, Winkler, and Snyder, 2003).
Gas lift may be used to removed water continuously or intermittently. Gas lift
could be used in conjunction with plunger lift and surface liquid diverters to improve its
overall efficiency (Neves & Brimhall; 1989). Gas lift could be combined with a small
concentric string (siphon string), too (Lea, & Tigher; 1983).
The main disadvantage of the gas lift method solving liquid loading is that it
would not operate efficiently to the abandonment pressure of the well. The optimum
operational efficiency is obtained when the water-lift ratio is in the range from 1.5 to 3
Mscf/bbl of water lifted. The efficiency of the gas lift technique declines in low-

20

productivity gas wells producing in excess of 8 bwpd due to the large amount of gas
needed (Melton & Cook, 1964).
Hutlas & Granberry (1972) presented four gas wells where gas rate was increased
from 50% to more than 100% when a combined gas lift liquid-diverter system was
installed to solve liquid loading problems. The wells were located in north-western
Oklahoma and the Texas Panhandle in high-pressure fields at depths ranging from 5,100
to 8,600 ft.
Stephenson et al.

(2000) presented successful installation of gas lift for

dewatering gas wells at the Box Church Field a high water-cut gas reservoir located in
Texas. Soap sticks, swabbing, and coiled tubing/nitrogen had been used at the field try to
solve liquid loading, but these techniques provided only a short-term solution to the
problem. A 50% increase in the average gas rate of the field was reported after the
combined mechanism of gas-lift with compressor was installed in four high water-cut
(more than 200 bbl/MMscf) wells.
Gas lift had been used for dewatering gas wells down-dip increasing and
accelerating gas recovery in wells located up-dip in the same reservoir (Girardi et al,
2001; Aguilera et al 2002) using a co-production strategy (Arcaro & Bassiouni, 1987).
Some field tests have been done to use Coproduction of gas and water as a
secondary gas recovery technique for abandoned water-out wells with limited success
(Rogers, 1984; Randolph et al, 1991).
2.3.2

Bottom Liquid Removal


Pumps, plunger, swabbing, and gas injection using coiled tubing have been used

to remove liquid from the bottom of the well after the gas is flowing below the critical
rate.
21

2.3.2.1 Pumps
Pumping systems used to solve liquid loading in gas wells include: beam
pumping, progressive-cavity pumping, and jet pumping. The main advantage of pumping
is that they do not depend on the reservoir energy or on the gas velocity for liquid lifting
(Hutlas & Granberry, 1972).
Down-hole pumps do have application in gas wells producing high liquid rateover 30 bwdp (Lea & Tigher, 1983).
Beam pumping comprises a motor-driven surface system lifting sucker rods
within the tubing string to operate a downhole-reciprocating pump. The liquid is pumped
up the tubing and the gas is produced out the annulus (Libson & Henry, 1980).
Melton & Cook (1964) reported that beam units were the most efficient as well as
economical method of solving liquid loading problems in low-pressure shallow gas wells
producing between 12 and 15 bwpd on the Panhandle in the Hugton and Greenwood
fields.
Hutlas & Granberry (1972) presented a successful installation of beam units at the
Hugoton field, Kansas solving water-loading problems in gas wells. Gas rate increased
from 50% to more than 100% in four wells after the beam unit was installed.
Libson & Henry (1980) explained that production increased when beam units
were installed in low-gas rate wells (less than 40 Mscf/d) with liquid production between
10 to 40 bwpd at the intermediate Shelf area of southwest Texas, in Sutton County.
Henderson (1984) described the technical challenge of installing a beam pump
unit to solve liquid loading problems at 16,850 ft in the Pyote Gas Unit 14-1 well at the
Block 16 (Ellengurger) field located in Ward Co., Texas. The pump removed 70 bfpd,
increasing gas production at the well from 20 to 450 Mscfd.
22

Progressing-cavity pumping systems are based on a surface-driven rotating a rod


string which, in turn, drives a downhole rotor operating within an elastomeric stator (Lea,
Winkler & Snyder; 2003). Progressive Cavity pumps have been used extensively in the
United States for the dewatering of methane coaled-bed wells (Mills & Gaymard, 1996).
There are nearly one thousand methane pumps operating in coal basins across the
United States (predominately in the Black Warrior, Appalachian, San Juan and Raton
Basins) because of the pumps ability to adjust from high water rate, often encounter
during initial production, as well as low water rates experienced as the coal seams begin
to water out. Progressive Cavity pumps can lift water with high contents of coal fines,
sand particles, and some gaseous fluid (Klein, 1991).
Hebert (1989) discussed the technical limitation of rod pumps in dewatering coalbed wells.
A current jet pump system utilizes concentric tubing string for power fluid and
produced fluid in an open power fluid system. The gas is produced from the casing
annulus. The system allows near complete drawdown since the jet suction pressure is
claimed to be capable of being reduced to near the water vapor pressure at depth that is
usually lower than the casing sales pressure (Lea & Tighe, 1983).
2.3.2.2 Swabbing
Swabbing fluids from a well consists of lowering a swabbing tool down the
tubing and physically lifting the fluids to the surface. The objective is merely to lift the
liquids from the wellbore until the reservoir energy is able to overcome the remaining
hydrostatic head and flow on its own. Swabbing is a very costly procedure that must be
repeated every time the well loads up and with more frequency as the bottomhole
pressure declines. For this reason, swabbing is viewed as only a temporary solution to
23

liquid loading problems and should only be used during the initial stage of liquid loading
where the well will naturally flow for a long period of time. This method is also
applicable in cases where a well is loaded up with kill fluid following a workover or
when a well has loaded up because it was shut-in for an abnormal period of time (Neves
& Brimhal, 1989; Stephenson et al., 2000).
2.3.2.3 Plungers
The principle of the plunger is basically the use of a free piston acting as a
mechanical interface between the formation and the produced liquids, greatly increasing
the wells lifting efficiency (Beauregard & Ferguson, 1982).
Operation of the system is initialized by closing in the flowline and allowing
formation gas to accumulate in the casing annulus through natural separation. The
annulus acts primarily as a reservoir for storage of this gas. After pressure builds up in
the casing to a certain value, the flowline is opened. The rapid transfer of gas from the
formation creates a high, instantaneous velocity that causes pressure drop across the
plunger and the liquid. The plunger then moves upward with all of the liquids in the
tubing above it (Beauregard & Ferguson, 1982). The gas stored in the tubing-casing
annulus expands, providing the energy required to lift the liquid. As the plunger
approaches the surface, the liquid is produced into the flowline. Additional gas
production is allowed after the plunger reaches the surface. After some time, the flowline
is closed, the buildup stage starts again, and the plunger falls to the bottom of the well,
starting a new cycle (Wiggins et al, 1999).
Beeson et al. (1956) developed empirical correlations for 2-in and 2 -in plungers
based on data from 145 wells at the Ventura field in California. The data correlated and

24

application charts are still used in the industry as feasibility criteria to select well
applying plunger lift.
Ferguson and Beauregard (1985) include some practical guidelines to the
selection of plunger lift.
Some static models for plunger lift installations have been proposed and are
widely accepted for design due to their simplicity (Wiggins et al, 1999).
Foss & Gaul (1965) made a force balance on the plunger to determine minimum
casinghead pressure to drive a liquid slug up to the surface. They also worked out the
volume of gas required in each cycle, and the minimum amount of time per cycle based
on estimates for plunger rise and fall velocities. They used an 85 well data set for some
parameters of the model.
Hacksma (1972) used the Foss & Gaul (1965) model to show how to calculate the
minimum gas-liquid ratio required for operation and the optimum gas-liquid ratio that
yields maximum production.
Abercrombie (1980) reworked the Foss & Gaul (1965) model, considering a
smaller plunger fall velocity in the gas.
Dynamic models have also been published to describe the phenomena of a
plunger life cycle. Each dynamic model made different assumptions, and different
experimental and field data were used to prove the validity of each one.
Lea (1982) presented a dynamic model that predicts, at each step, casinghead
pressure, plunger position, and plunger velocity until the slug surfaces. The results
indicated lower operating pressure and lower gas requirement than the static models.

25

White (1982) experimentally evaluated liquid fallback in a reduced scale


apparatus. He concluded that 10% of the initial liquid column fallback for each plunger
run. He included some recommendations to design a hybrid plunger-gas lift system.
Rosina (1983) developed a dynamic model similar to that of Lea (1982), but
taking into account liquid fallback. He also conducted experiments to verify the
prediction of his model.
Mower et al. (1985) conducted a laboratory investigation on gas slippage and
liquid fallback for commercial plungers. They proposed a modified Foss & Gaul (1965)
model incorporating these effects. The model was then adjusted to fit field data from four
wells.
Avery and Evans (1988) proposed a dynamic model for the entire plunger cycle,
incorporating the reservoir performance. They assumed that each cycle started as soon as
the plunger arrived at the bottom.
Marcano and Chacin (1992) presented another dynamic model for the full cycle.
Liquid fallback through plunger was considered according to Mower et al.s (1985)
empirical data.
Hernandez et al. (1993) conducted experiments to evaluate liquid fallback and
plunger rise velocity.
Gasbarri and Wiggins presented a dynamic model including a reservoir model.
Their model incorporated frictional effect of the liquid slug and the expanding gas above
and below the plunger and considered separator and flowline effect.
Maggard et al. (2000) developed another dynamic model considering a transient
reservoir performance. They concluded that assuming a stabilized reservoir model is a
conservative assumption for plunger lift behavior.
26

Optimization of plunger has been presented based on experimental and simulator


studies. Baruzzi & Alhanti (1995) recommend no perfect seal plunger during buildup
because it obstructs the passage of liquid and gas above the plunger.
Wiggins et al. (1999) suggested that optimum production rates would be achieved
by allowing the well to produce as long as possible prior to shut in. Excessive gas
production periods, however, run the risk of killing the well by building a liquid slug that
is too long to be lifted by the remaining energy stored in the annulus.
Schwall (1989) reported gas production increases of 50 to 100% after plunger lift
installation on gas wells with gas-liquid ratio ranges from 3 Mscf/bbl to 20 Mscf/bbl, and
gas rate between 15 Mscfd and 54 Mscfd located in the South Burns Chapel Field in
northern West Virginia.
Brady & Morrow (1994) evaluated the performance of plunger lift for 130 lowpressure, tight-sand gas wells located in Ochiltree County, Texas. They concluded that
the total daily production rate increase attributed to the plunger lift was nearly 70 Mscfd
per well, and an incremental 32 Bcf of gross gas reserves are directly attributable to
plunger lift installation.
Schneider and Mackey (2000) presented results in which initial gas production
increased 85% after the wells located in the Eumont gas play at New Mexico were
converted to plunger lift from beam pumps.
2.3.2.4 Downhole Gas Water Separation
Downhole Gas Water Separation (DGWS) are devices that separate gas from
water at the bottom of gas wells. The separated water is reinjected into a non-productive
interval, while the gas is produced to the surface (Rudlop & Miller, 2001).

27

Nichols & Marsh (1997) explained that several available commercial


configurations or devices have been reported to be suitable for re-injecting water into a
lower zone within a gas producing well:

A conventional insert pump with a bypass sub

A specially designed insert pump with displaces on the downstroke

Progressive cavity pumps

Electrical submersible pumps

Grubb and Duval (1992) presented a new water disposal tool called a Seating
Nipple Bypass. The bypass tool allows liquid to be lifted up the tubing in the usual way;
however, small drain holes permit the liquid to bypass down past the pump to a point in
the tubing string below the pump intake. A packer provides hydraulic isolation between
production and injection intervals. When the liquid head is sufficiently high, it will then
flow into the disposal zone. The bypass tool was tested in seven well in the Oklahoma
Panhandle and Southwest Kansas, some of which were temporarily abandoned before the
installation. A conventional beam-pumping unit lifted the water. The tool proved
successful in five wells. One well produced 348 Mscfd without water after the installation
and 300 Mscfd and 300 bwpd before the installation.
Klein & Thompson (1992) explained the design criteria and field installation
results for a closed-loop downhole injection system used in a water flooding oil well. The
pumping system consisted of a sucker rod driven progressing cavity pump installed
below the bottom packer. Water from the water source zone entered the pump through a
perforated sub in the tubing string above the pump and was pumped into the lower
injection zone. The pump was able to inject water at its maximum rate-180 bpd- without

28

any mechanical problems. They concluded that the system could be used for dewatering
gas wells.
Nichols & Marsh (1997) presented the results for the DGWS installation in a well
in central Alberta, Canada. A bypass tool with a conventional insert pump and gas
powered beam pumping unit was used. With the DGWS system operating, surface
production rates were 777 Mscfd gas and 195 bwpd; without the DGWS, production was
565 Mscfd gas and 440 bwpd. In this installation, wellbore diameter limited the pump
size and its flow capacity.
Rudolph and Miller (2001) reviewed 53 wells with various DGWS installations.
Gas production increased in 29 wells, decreased in 13 wells, and did not change in 11
wells. They concluded that DGWS could work in a low rate water producing gas well
with competent cement sheath, low pressure, and a high-injectivity disposal zone below
the producing interval.
Water rate at the surface was successfully cut from 32 bbls/d to zero while gas production
increased from 300 Mscfd to 400 Mscfd when a DGWS system (Reverse flow injection
pump) was installed in a well at Hugoton Field, Oklahoma (E&P Environment, 2001).

29

CHAPTER 3
MECHANISTIC COMPARISON OF WATER CONING IN OIL AND GAS
WELLS
Water coning in gas wells has been understood as a phenomenon similar to that in
oil well. In contrast to oil wells, relatively few studies have been reported on aspects of
water coning in gas wells.
Muskat (1982) believed that the physical mechanism of water coning in gas wells
is identical to that for oil wells; moreover, he said that water coning would cause less
serious difficulties for wells producing from gas zones than for wells producing oil.
Trimble and DeRose (1976) supported Muskats theory with water coning data
and simulation for Todhunters Lake Gas field. They calculated water-free production
rates using the Muskat-Wyckof (1935) model for oil wells in conjunction with the graph
presented by Arthurs (1944) for coning in homogeneous oil sand. The results were
compared with a field study with a commercial numerical simulator showing that the
rates calculated with the Muskat-Wyckof theory were 0.7 to 0.8 those of the coning
numerical model for a 1-year period.
The objective of this study is to compare water coning in gas-water and oil-water
systems. Analytical and numerical models are used to identify possible differences and
similarities between both systems.
3.1

Vertical Equilibrium
A hydrocarbon-water system is in vertical equilibrium when the pressure

drawdown around the wellbore is smaller than the pressure gradient generated by the
density contrast between the hydrocarbon and water at the hydrocarbon-water interface.
Equation 3.1 shows the pressure gradient for gas-water system.
30

p = 0.433( w g )h g w (3.1)

Where p is pressure gradient (psia), w is water specific gravity, g is gas specific


gravity, and hg-w is the vertical distance from the reference level to the gas-water
interface, normally from the bottom of the wells completion to the gas/water contact (ft).
Vertical equilibrium concept is the base for critical rates calculations. Critical
rate, in gas-water systems, is defined as the maximum rate at which gas wells are
produced without production of water.
3.2

Analytical Comparison of Water Coning in Oil and Gas Wells before Water
Breakthrough
Two hydrocarbon systems, oil and gas, in vertical equilibrium with bottom water

are considered to compare water coning in oil and gas wells before breakthrough. The
two systems have the same reservoir properties and thickness, and are perforated at the
top of the producing zone.

well

rw= 0.5 ft
K= 100 md
=0.2
P=2000 psi
T= 112 oF

20 ft
Oil
= 1.0 cp
= 0.8 gr/cc

50 ft

w=0.56 cp
w= 1.02 gr/cc

Gas
0.017 cp
0.1 gr/cc

water
re= 1000 ft

Figure 3.1
Theoretical model used to compare analytically water coning in oil and
gas wells before breakthrough.

31

Figure 3.1 shows a sketch of the reservoir system including the properties and
dimensions. The mathematical calculations are included in Appendix A.
A pressure drawdown needed to generate the same static water cone below the
penetrations, and the fluid rate for each system was calculated. For the system of oil and
water and a cone height of 20 ft, a pressure drawdown equal to 2 psi is needed, and the
oil production rate is 6.7 stb/d. In the case of a gas-water system, for the same 20 ft
height of water cone 8 psi pressure drop is needed, and the gas production rate of 1.25
MMscfd.
From this first simple analysis it is evident that it is possible to have a stable water cone
of any given height in the two systems (oil-water and gas-water). For the same cone
height in vertical equilibrium, pressure drop in the gas-water system is four times greater
than the pressure drop in the oil-water system. There is a big difference in the fluids
production rate for gas-water and oil-water system. On the basis of British Thermal Units
(BTU), the energy content of one Mscf of natural gas is about 1/6 of the energy content
of one barrel of oil (Economides, 2001). For this example, the 1.25 MMscf are equivalent
to the BTU content of 208 barrels of oil. Therefore, for the same water cone height, it
would be economically possible to produce gas-water systems at the gas rate below
critical. However, in most cases it would not be not economically possible to produce oilwater systems without water breakthrough.
3.3

Analytical Comparison of Water Coning in Oil and Gas Wells after Water
Breakthrough
The objective is to compare the shape of oil-water and gas-water interfaces at the

wellbore after water breakthrough. After the water breakthrough, there is a stratified
inflow of oil or gas with the water covering the bottom section of the well completion.
Again, two systems having the same reservoir properties and thickness are compared (oil32

water and gas-water). Both systems are totally penetrated. An equation describing
interface shape was derived using the assumptions of Muskat (1982). Figure 2 shows a
sketch of the theoretical model, and Appendix A gives the derivation and mathematical
computations.
In reality the resulting equations will not describe perfectly the inflow at the well.
However, they are useful to compare the coning phenomenon in oil-water and gas-water
systems.
well

oil / gas

Pw

Pe
ye

y=?

water

Figure 3.2
Theoretical model used to compare analytically water coning in oil and
gas wells after breakthrough.
The resulting equations for the water coning analysis are:
For the oil-water system the interface height is described as,
y=

h
a
+ 1
b

(3.1)

here a, and b are constants described as, a =


a h ye
=
b
ye

Qo o
2kh

b=

Qw w
.
2kh

.(3.2)

33

For the gas-water system the interface height is represented as,


y=

hp
(3.3)
[(a / b) + p ]

here a, b, and p are calculated using: a =

Qg g
2kh

b=

Qw w
, and
2kh

a [1 ( y e / h)]
=
* p e (3.4)
b
( y e / h)

ln

re 1
a p + a / b
.(3.5)
= p e p ln e
r b
b p + a / b

From Equation 3.1 it becomes obvious that when the wells inflow of oil and water
is stratified so the upper and bottom sections of completion produce oil and water
respectively, under steady state flow conditions the interface between the two fluids is
constant and perpendicular to the wellbore because the parameter describing the interface
height are all constant and depends on the system geometry.
For the gas-water system, nevertheless, the interface height depends on the
geometry of the system, and the pressure distribution in the reservoir (Equation 3.3).
In order to demonstrate the model for gas-water systems describing the interface
between gas-water, one example was solved.
The system data are as follow: pe = 2000 psi

re = 2000 ft

rw = 0.4 ft
Bw = 1.0

h = 50 ft

ye = 40 ft

w = 0.498 cp

k = 100 md

= 0.25

g = 0.017 cp

The procedure is as follows:


1. Assuming a value for the pressure drawdown (300 psi).
2. Calculating the flowing bottom hole pressure ( p w = p e p = 2000 300 = 1700) ,
assuming that pw is constant along the wellbore.
34

3. Computing the water flow rate (Qw) using Darcys law equation (Kraft and
Hawkins, 1991):
Qw =

0.00708khw ( p e p w ) 0.00708 * 100 * 40 * (2000 1700)


=
= 2000
0.498 * 1.0 * ln(2000 / 0.4)
w Bw ln(re / rw )

4. Calculating a/b, using EquationA-16 in Appendix A:

[1 (40 / 50)]* 2000 = 500 , which is constant for the system


a 1 ( y e / h)
=
pe =
b
( y e / h)
(40 / 50)
and independent for the gas rate.
5. Finding Qg, from Equation A-15 in Appendix A:
a Qg g
=
b Qw w

500 =

Q g * 0.017 * 5.615
2000 * 0.498

Qg = 5.22 MMscf/d

Note that WGR is constant for the system and depends only on the system geometry
(ye, h) and pressure drive (pe).
6. Computing 1/b, using Equation A-17 in Appendix A:
r
ln e
1
rw
=
b
a p e + ( a / b)
( p e p w ) ln

b p w + ( a / b)

6000
ln

1
=
= 0.031
b
2000 + 500
(2000 1700) (500) ln

1700 + 500

7. Assuming pressure values between pe and pw, radii r and the gas-water profile y are
calculated, using Equations A-14 and A-18 respectively in Appendix A. This is the
gas-water interface profile. The equation used to calculate pressure distribution in
the reservoir is:

35

ln

re 1
a p + a / b

= p e p ln e
r b
b p + a / b

ln

2000 + 500
6000

= 0.0312000 p 500 ln
r
p + 500

The equation used to calculate the gas-water interface profile (height) is:
y=

hp

[(a / b) + p ]

y=

50 * p
[500 + p]

(Note that this pressure distribution does not depend on values of flow rate but only on
their ratio.)
Repeating the same procedure for the oil-water system:
From Equation A-22 in Appendix A:

a (h y e ) (50 40)
=
=
= 0.25
40
b
ye

Using Equation A-26 in Appendix A: y =

h
50
=
= 40
a (0.25 + 1)
+ 1
b

For the oil-water system y remains constant ( y = 40) and independent from radius.

Fluids Interface Height


(ft)

Fluids Interface Height (y) vs radii (r)


40.2
40.0
39.8
39.6
39.4
39.2
39.0
38.8
38.6
38.4
0

500

1000

1500

2000

2500

Radii (ft)
gas-water system

Figure 3.3

oil-water system

Shape of the gas-water and oil-water contact for total perforation.


36

Figure 3.3 shows the resulting profiles of the fluid interface in gas-water and oilwater systems. After breakthrough, the oil-water interface at the wells completion is
horizontal, while the gas-water interface tends to cone into the water. For this example
the total length of the gas cone is 1.4 ft.
3.4

Numerical Simulation Comparison of Water Coning in Oil and Gas Wells


after Water Breakthrough

One numerical simulator model was built to confirm the previous finding about
the cone shape around the wellbore. Figure 3.4 shows the numerical model with its
properties. Table 3.1 shows fluids properties used, and Appendix B contains Eclipse data
deck for the models.

k= 10 md
=0.25
Pinitial=2300 psi

SGgas= 0.6
APIoil=
T= 110 oF

Well, rw= 3.3 in


Top: 5000 ft

100 layers
of 0.5 ft thick

9 layers 5 ft
thick, and one
layer 550 ft
thick.

Gas
or
Oil

50 ft

600 ft

Water (W)
5000 ft

Figure 3.4
Numerical model used for comparison of water coning in oil-water and
gas-water systems.

37

Table 3.1

Gas, water and oil properties used for the numerical simulator model
Gas Deviation Factor and Viscosity (Gas-water model)
Press Z
100 0.989
300 0.967
500 0.947
700 0.927
900 0.908
1100 0.891
1300 0.876
1500 0.863
1700 0.853
1900 0.845
2100 0.840
2300 0.837
2500 0.837
2700 0.839
3200 0.844

Visc
0.0122
0.0124
0.0126
0.0129
0.0133
0.0137
0.0141
0.0146
0.0151
0.0157
0.0163
0.0167
0.0177
0.0184
0.0202

Gas and Water Relative Permeability (Gas-water model)


Sg
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70

Krg
0.000
0.000
0.020
0.030
0.081
0.183
0.325
0.900

Pc
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Sw
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0

Krw
0.000
0.035
0.076
0.126
0.193
0.288
0.422
1.000

Pc
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Oil and Water Relative Permeability (Oil-water model)


Sw Krw Krow Pcow
0.27 0.000 0.900 0
0.35 0.012 0.596 0
0.40 0.032 0.438 0
0.45 0.061 0.304 0
0.50 0.099 0.195 0
0.55 0.147 0.110 0
0.60 0.204 0.049 0
0.65 0.271 0.012 0
0.70 0.347 0.000 0

38

Following similar procedures used for the analytical comparison, again, two
systems having the same reservoir properties and thickness are compared (oil-water and
gas-water). Both systems are totally penetrated and produced at the same water rate. The
cone shape around the wellbore is investigated. Figures 3.5 and 3.6 show the results.

Irreducible water
Saturation

Irreducible water
Saturation

Swept Zone

Swept Zone

Gas-Water

Oil-Water

Figure 3.5
Numerical comparison of water coning in oil-water and gas-water systems
after 395 days of production.

Figure 3.5 depicts water saturation in the reservoir after 392 days of production
for gas-water and oil-water systems. The initial water-hydrocarbon contact was at 5050
ft. In both systems the cone is developed almost in the same shape and height.
Figure 3.6 shows a zoom view at the top of the cone for both systems. For the oilwater system, the cone interface at the top is flat. For the gas-water system, however, the
39

cone interface is cone-down at the top. For this model the total length of the gas cone is
1.5 ft. One can see that the numerical model represents exactly the same behavior
predicted for the analytical model used previously.

Gas-Water System

Oil-Water System

Figure 3.6
Zoom view around the wellbore to watch cone shape for the numerical
model after 395 days of production.

From comparison of water coning after breakthrough in gas-water and oil-water


systems, it is possible to conclude that in gas wells, water cone is generated in the same
way as in the oil-water system. The shape at the top of the cone, however, is different in
oil-water than in gas-water systems. For the oil-water system the top of the cone is flat.
For the gas-water system a small inverse gas cone is generated locally around the

40

completion. This inverse cone restricts water inflow to the completions. Also, the inverse
gas cone inhibits upward progress of the water cone.
3.5

Discussion About Water Coning in Oil-Water and Gas-water Systems

The physical analysis of water coning in oil-water and gas-water systems is the
same. In both systems, water coning is generated when the drawdown in the vicinity of
the well is higher then the gravitational gradient due to the density contrast between the
hydrocarbon and the water.
The density difference between gas and water is grater than the density difference
between oil and water by a factor of at least four (Muskat, 1982). Because of that, the
drawdown needed to generate coning in the gas-water system is at least four-time grater
than the one in oil-water system. Pressure distribution, however, is more concentrated
around the wellbore for gas wells that for oil wells (gas flow equations have pressure
square in them, but oil flow equations have liner pressure; inertial effect is important in
gas well, and negligible in oil wells). This property makes water coning greater in gas
wells than in oil wells.
Gas mobility is higher that water mobility. Oil mobility, however, is lower than
water mobility. This situation makes water coning more critical in oil-water system than
in gas-water systems.
Gas compressibility is higher than oil compressibility. Then, gas could expand
larger in the well vicinity than oil. Because of this expansion, gas takes over some extra
portion of the well-completion (the local reverse cone explained in the previous section)
restricting water inflow.
In short, there are factor increasing and decreasing water coning tendency in both
system. The fact that oil-water systems appear more propitious for water coning
41

development should not create the appearance that the phenomena is not important is gaswater system.

42

CHAPTER 4
EFFECTS INCREASING BOTTOM WATER INFLOW TO GAS WELLS

In contrast to oil wells, relatively few studies have been reported on aspects of
mechanisms of water coning in gas wells. Kabir (1983) investigated water-coning
performance in gas wells in bottom-water drive reservoirs. He built a numerical simulator
model for a gas-water system and concluded that permeability and pay thickness are the
most important variables governing coning phenomenon. Other variables such as
penetration ratio, horizontal to vertical permeability, well spacing, producing rate, and the
impermeable shale barrier have very little influence on both the water-gas ratio response
and the ultimate recovery.
Beattle and Roberts (1996) studied water-coning behavior in naturally fractured
gas reservoirs using a simulator model. They concluded that coning is exacerbated by
large aquifer, high vertical to horizontal permeability, high production rate, and a small
vertical distance between perforations and the gas-water contact. Ultimate gas recovery,
however, was not significantly affected.
McMullan and Bassioni (2000), using a commercial numerical simulator, got
similar results to Kabir (1983) for the insensitivity of ultimate gas recovery with variation
of perforated interval and production rate. They demonstrated that a well in the bottom
water-drive gas reservoir would produce with a small water-gas ratio until nearly its
entire completion interval is surrounded by water.
The objective of this study is to identify and evaluate specific mechanisms
increasing water coning/production in gas wells. Analytical and numerical models are

43

used to identify the mechanisms. The mechanisms investigated are vertical permeability,
aquifer size, Non-Darcy flow effect, density of perforation, and flow behind casing.
4.1

Effect of Vertical Permeability


It is postulated here, in agreement with Beattle and Roberts (1996), that high

vertical permeability should generate early water production in gas reservoirs with
bottom water-drive. Vertical permeability accelerates water coning because high vertical
permeability would reduce the time needed for a water cone to stabilize.
A numerical reservoir model, shown in Figure 4.1, was adopted to evaluate the
effect of vertical permeability in gas wells. Reservoir and fluid properties used in the
model are shown on Figure 4.1 and Table 3.1, respectively. A sample data deck for the
Eclipse reservoir model is contained in Appendix C.

Well, rw = 3.3 in

= 25%
Sgr= 20%
Pinitial= 2300 psia

Swir= 30%
S.G.gas=0.6
kr= 10 md

2500 ft

100 layers
1 ft thick

30 ft

100 ft

Gas
9 layers 10 ft,
and one layer
110 ft thick

200 ft

Water
5000 ft

Figure 4.1
Numerical reservoir model used to investigate mechanisms improving
water coning/production (vertical permeability and aquifer size).

Horizontal permeability is set at 10 md, and four different values of vertical


permeability, 1, 3, 5, and 7 md, were considered (Permeability anisotropy, kv/kh, equal to
44

0.1, 0.3, 0.5, and 0.7 respectively). The wells are produced at constant tubing head
pressure of 500 psia (maximum gas rate). The completion penetrates 30% of the gas zone
at the top. The results are shown in Figures 4.2a,b,c, and d.

Figure 4.2-a kv/kh = 0.1

Figure 4.2-b kv/kh = 0.3

Figure 4.2-c kv/kh = 0.5

Figure 4.2-d kv/kh = 0.7

Figure 4.2

Distribution of water saturation after 395 days of gas production.

45

Figure 4.2 depicts water saturation in the reservoir after 395 days of gas
productions for the four values of vertical permeability. The initial water-gas contact was
at 5100 ft. The top of the cone for kv/kh equal to 0.1, 0.3, 0.5, and 0.7 is at 5080 ft, 5038
ft, 5025 ft, and 5021 ft respectively after 760 days of production. For kv/kh equal to 0.1,
and 0.3 the water cone is still below the completion and there is no water production. In
short, Figure 4.2 shows that water coning increases with vertical permeability.

160

Water Rate (stb/d)

140
120
100
80
60
40
20
0
0

1000

2000

3000

4000

5000

6000

7000

Time (Days)
Kv / Kh = 0.1

Figure 4.3

Kv / Kh = 0.3

Kv / Kh = 0.5

Kv / Kh = 0.7

Water rate versus time for different values of permeability anisotropy.

Figure 4.3 shows water rate versus time for the four different values of vertical
permeability. Figure 4.3 shows that water breakthrough time and water rate increase with
permeability anisotropy. The shortest water breakthrough time and highest water rate is
for kv/kh equal to 0.7. The longest water breakthrough and lowest water rate time is for
kv/kh equal to 0.1.

46

From this study, one can say that vertical permeability increases water
coning/production in gas wells. The higher the vertical permeability is, the higher the
water coning/production of the well.
4.2

Aquifer Size Effects


Textbook models of water inflow for material balance computations assume that

the amount of water encroachment into the reservoir is related to the aquifer size (Craft &
Hawkins, 1991). (For example, van Everdinger and Hurst used the term B to represent
the volume of aquifer. Fetkovichs model considers a factor called Wei defined as the
initial encroachable water in place at the initial pressure.)
Effect of aquifer size was investigated using the same numerical model used on
the previous section. Vertical and horizontal permeability are set at 10 and 1 md
respectively (kv/kh equal to 0.1). All parameters in the model were kept constant except
for the aquifer size. VAD is defined as the ratio of the aquifer pore volume to the gas pore
volume. VAD determines the amount of reservoir energy that can be provided by water
drive. The aquifer is represented by setting porosity to 10 (a highly fictitious value for
porosity), for the outermost gridblocks and the thickness of the lowermost gridblocks are
varied from 110 to 710 ft to adjust aquifer volume. VAD is varied from 346 to 1383. A
sample data deck for the Eclipse reservoir model is included in Appendix C. The results
are shown in Figures 4.4-a,b,c, and d.
Figure 4.4 depicts water saturation in the reservoir after 1124.8 days of gas
productions for the four values of VAD. The initial water-gas contact was at 5100 ft. The
top of the cone for VAD equal to 346, 519, 864, and 1383 is at 5046 ft, 5040 ft, 5034 ft,
and 5030 ft respectively; after 760 days of production. Figure 4.4, consequently, shows
that water coning increases with the aquifer size.
47

Figure 4.4-a VAD = 346

Figure 4.4-b VAD = 519

Figure 4.4-c VAD = 864

Figure 4.4-d VAD = 1383

Figure 4.4

Distribution of water saturation after 1124.8 days of gas production.

Figure 4.5 shows water rate versus time for the four different values of vertical
permeability. Figure 4.5 shows that water rate increase with aquifer size. Water
breakthrough time, however, is not affected by aquifer size.

48

160

Water Rate (stb/d)

140
120
100
80
60
40
20
0
0

1000

2000

3000

4000

5000

6000

Time (Days)
Vad = 346

Figure 4.5

Vad = 519

Vad = 864

Vad = 1383

Water rate versus time for different values of aquifer size.

Figures 4.3 and 4.5 show that vertical permeability is more important than aquifer
size in controlling the water breakthrough time. Both aquifer size and vertical
permeability, however, play an important role in increasing water rate.
From this study, one could conclude that aquifer size increases water
coning/production in gas wells without affecting water breakthrough time. The higher the
size of the aquifer is, the higher the water coning/production of the well.
4.3

Non-Darcy Flow Effects


Non-Darcy flow generates an extra pressure drop around the well bore that could

intensify water coning. Non-Darcy flow happens at high flow velocity, which is a
characteristic of gas converging near the well perforations.
The extra pressure drop is a kinetic energy component in the Forchheimers
formula (Lee & Wattenbarger, 1996),

dp
= v 2 .......(4.1)
dL

49

The effect of Non-Darcy flow in water production was studied analytically for two cases
of well completion: complete penetration of the gas and water zones, and penetration of
the gas zone. In the second case the well perforated in only the gas zone. Figure 4.6
illustrates the completion schematic and the production system properties.

rw= 0.5 ft

rw= 0.5

Ga

K= 100
md
P=2500

40

w=0.56 cp
w= 1.02 gr/cc
K= 100 md
Bw= 1.0 rb/STB

K= 100 md
P=2500 psi
o
T= 120 F

Kh / Kv =

40

w=0.56 cp
w= 1.02 gr/cc
K= 100 md
Bw= 1 0 rb/STB

Wate

re= 2500

Figure 4.6
production.

4.3.1

Gas
40 ft

Kh / Kv = 10

40 ft

Water

re= 2500 ft

Analytical model used to investigate the effect of Non-Darcy in water

Analytical Model

The analytical model of the well inflow comprises the following components:
Gas inflow model (Beggs, H.D., 1984):
Pe2 Pw2 =

1.422T g Zq g
k g hg

[ln(r / r ) + S + Dq ]
e

......(4.2)

where: S = S d + S dp + S pp ..(4.3)
and D = D r + D p (4.4)

50

Water inflow model (Beggs, H.D., 1984):


qw =

0.00708k w hw ( Pe Pw )
w Bw [ln(re / rw ) + S ]

...(4.5)

where: S = S d + S dp + S pp ..(4.6)
Skin factor representing mud filtrate invasion (Jones & Watts, 1971):
Sd =

hg

(rd rw ) k g
1 ln(rd / rw ) ...(4.7)
1 0.2

h per
h per k d

Skin factor representing perforation density (McLeod, 1983):


hg
S dp =
Lpnp

k
ln(rdp / r p ) g g ....(4.8)
k dp k d

Skin factor due to partial penetration (Saidikowski, 1979):


hg
hg
S pp =
1 ln
rw
h per

kH
kV


2 .(4.9)

Non-Darcy skin around the well (Beggs, H.D., 1984):


Dr =

r =

2.22 *10 15 g k g r

g h g rw

....(4.10)

2.33 *1010
.....(4.11)
k 1g.2

Non-Darcy skin in the crashed rock around the perforation tunnels (McLeod, 1983):
dp
D p = 2.22 *10 15 2 2
n p L p rp

dp =

k g h g g

....(4.12)

2.6 *10 10
..(4.13)
k dp

Figure 4.7 shows a sketch for the skin component at the well for a single perforation.

51

Cement
Mud cake

Crashed zone

kdp
rdp
rp

kr
Lp
rw
kd
rd
Filtrate invasion

Casing

Figure 4.7
Skin components at the well for a single perforation for the analytical
model used to investigate Non-Darcy flow effect in water production.
Computation procedure with the analytical model was as follows.
1.

Assume constant value for the pressure the drawdown at 100 psia, 300 psia,
500 psia, 1000 psia, and 1500 psia.

2.

Calculate gas and water production rates for the initial condition using
Equations 4.2 and 4.5, respectively.

3.

Compute the rates for water and gas for several intermediate steps of gas
recovery 10%, 20%, 30%, 40%, 50%, 60%, 70%, 80%, 90%, and 95%. (Note
that the fraction of initial gas zone invaded by water represents the gas
recovery factor.)

The above procedure was repeated for three different scenarios. The scenarios were:
without Non-Darcy and skin effects, including only skin effect, and including both skin
and Non-Darcy effects. The results of the study are shown in Figures 4.8 to 4.11.

52

Water-Gas Ratio (BLS/MMSCF)

1,600
1,400
1,200
1,000
800
600
400
200
0
0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

Recovery Factor (%)


Draw-Down = 100 psi

Draw-Down = 300 psi

Draw-Down = 1000 psi

Draw-Down= 1500 psi

Draw-Down = 500 psi

Figure 4.8
Water-Gas ratio versus gas recovery factor for total penetration of gas
column without skin and Non-Darcy effect.
Figure 4.8 demonstrates the delayed effect of water in a gas well completed in the
gas zone when Non-Darcy and skin are ignored. Not only does the problem occur after
80% of gas recovered but also Water-Gas ratio (WGR) is independent of pressure
drawdown and production rates.

Water-Gas Ratio (BLS/MMSCF)

1,600
1,400
1,200
1,000
800
600
400
200
0
0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

Recovery Factor (%)


Draw-Down = 100 psi

Draw-Down = 300 psi

Draw-Down = 1000 psi

Draw-Down = 1500 psi

Draw-Down = 500 psi

Figure 4.9
Water-Gas ratio versus gas recovery factor for total penetration of gas
column including mechanical skin only.

53

Figure 4.9 indicates that mechanical skin alone slightly increases WGR.

Water-Gas Ratio (BLS/MMSCF)

1,600
1,400
1,200
1,000
800
600
400
200
0
0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

Recovery Factor (%)


Draw-Down = 100 psi

Draw-Down = 300 psi

Draw-Down = 1000 psi

Draw-Down = 1500 psi

Draw-Down = 500 psi

Figure 4.10 Water-Gas ratio versus gas recovery factor for total penetration of gas and
water columns, skin and Non-Darcy effect included.
Figure 4.10 indicates that combined effects of skin and Non-Darcy flow would
strongly increase water production in gas wells. Also, WGR increases with increasing
pressure drawdown.
Figure 4.11 shows WGR histories for a gas well penetrating only the gas column.
Reducing well completion to the gas column does not change WGR development; the
WGR history is similar to that of complete penetration. Interestingly, although the
completion bottom is at gas-water contact, the production is practically water-free for
almost half of the recovery. This finding is in agreement with the analytical analysis of
gas-water interface and the inverse internal cone mechanism presented in previous
sections.

54

Water-Gas Ratio (BLS/MMSCF)

1,600
1,400
1,200
1,000
800
600
400
200
0
0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

Recovery Factor (%)


Draw-Down = 100 psi

Draw-Down = 300 psi

Draw-Down = 1000 psi

Draw-Down = 1500 psi

Draw-Down = 500 psi

Figure 4.11 Water-Gas ratio versus gas recovery factor for wells completed only
through total perforation of the gas column with combined effects of skin and NonDarcy.

From this study it is evident that:

Non-Darcy and distributed mechanical skin increase water gas ratio (WGR) by
reducing gas production rate and increasing water inflow, and the two effects
accelerate water breakthrough to gas well.

It does not make much difference how much of the well completion is covered by
water as long as the completion is in contact with water.

4.3.2

Numerical Model
The above observations regarding mechanical skin and Non-Darcy (N-D) effects

have been based on a simple analytical modeling. The analytical results are verified with
a commercial numerical simulator for the well-reservoir model shown in Figure 4.1. The
models characteristics are: The well totally perforates the gas zone. Mechanical skin is
set equal to five. Horizontal permeability is 10 md. Vertical permeability is 10% of the

55

horizontal (1 md). Frederick and Graves (1994) second correlation was used to calculate
N-D effect. The wells were run at constant gas rate of 10 MMscfd. Two scenarios were
considered: one without skin and N-D, and the other one including both (skin and N-D).
A sample data deck for IMEX reservoir model is included in Appendix C. Figures 4.12
and 4.13 show the results.

12

Gas Rate (MMscfd)

10
8
6
4
2
0
0

500

1000

1500

2000

2500

Time (Days)
Without Skin and N-D

Including Skin and N-D

Figure 4.12 Gas rate versus time for the numerical model used to evaluate the effect of
Non-Darcy flow in water production.

Figure 4.12 shows that after 1071 day of production, the well (including skin and
N-D) cannot produce at 10 MMscfd. At this point water production affects gas rate. The
well without skin and N-D is able to produce at 10 MMscfd for 1420 days.

56

250
225

Water Rate (stb/d)

200
175
150
125
100
75
50
25
0
0

100

200

300

400

500

600

700

800

900

1000

1100

Time (Days)
Without Skin and N-D

Including Skin and N-D

Figure 4.13 Water rate versus time for the numerical model used to evaluate the effect
of Non-Darcy flow in water production.

Figure 4.13 shows that water rate is always higher for the cases where skin and ND are included than when these two phenomenon are ignored. In short, skin and NonDarcy effect together increase water production in gas reservoirs with bottom waterdrive. These results are in general agreement with the outcomes from the analytical
model evaluated in the previous section.
4.4

Effect of Perforation Density


Perforations concentrate gas inflow around the well, increase flow velocity, and

further amplify the effect of Non-Darcy flow. The effect is examined here using the
modified analytical model utilized in section 4.3.1 (Figure 4.7). Similar calculation
procedure described on section 4.3.1 was used including skin and Non-Darcy effect. Two
different values of perforation density, four shoots per foot to 12 shoots per foot, were

57

employed. Behavior of the water-gas ratio was evaluated. The results are shown in Figure
4.14.

Water-Gas Ratio (BLS/MMSCF)

1,400
1,200
1,000
800
600
400
200
0
0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

Recovery Factor (%)


Drawdown = 100 psi (4 spf)

Drawdown = 500 psi (4 spf)

Drawdown = 1000 psi

Drawdown = 100 psi (12 spf)

Drawdown = 500 psi (12 spf)

Drawdown = 1000 psi (12 spf)

Figure 4.14 Effect of perforation density on water-gas ratio for a well perforating in
the gas column, skin and Non-Darcy effect are included.

There is a 40 % reduction in water-gas ratio resulting from a three-fold increase in


perforation density. Figure 4.14 shows the effect of decreased pressure drawdown that
significantly reduces WGR. Thus, well perforations increases water production due to
Non-Darcy flow effect; the smaller the perforation density, the higher the water-gas ratio.
4.5

Effect of Flow behind Casing


It is postulated here that a leak in the cemented annulus of the well could increase

water coning in gas wells. Water rate and water breakthrough time with and without
leaking cement (cement channel) were evaluated.
Typically, cement channeling in wells would result from gas invasion to the
annulus after cementing. Hydrostatic pressure of cement slurry is reduced due to the

58

cement changing from liquid to solid. Once developed, the channel would provide a
conduit for water from gas-water contact to the perforations. Figure 4.15 shows the
cement-channeling concept. It is assumed that the channel has a single entrance at its end.

Cement
channel
Skin damage
zone

Skin damage
zone

Gas

Gas

Cement
channel

Gas-Water
contact
Water

Figure 4.15-a A channel


develops in the annulus during
cementing and before
perforating. The initial gaswater contact is below the
channel bottom.

Gas

Water

Figure 4.15-b The well starts


producing only gas. A water
cone develops, and its top
reaches the channel.

Water

Figure 4.15-c Water is


sucked into the channel and
the well starts producing gas
and water.

Figure 4.15 Cement channeling as a mechanism enhancing water production in gas


wells.

4.5.1

Cement Leak Model


The channeling effect was simulated by assigning a high vertical permeability

value to the first radial outside the well in the numerical simulator model. It is assumed
that fluids could only enter the channel at the channel end. A relationship between the
size of a channel and permeability in the first grid was developed. Figure 4.16 shows the
modeling concept.
59

First grid with


high vertical

channel

casing

well

Figure 4.16-a Well with a channel in the


cemented annulus.

Figure 4.16

Figure 4.16-b Simulators first grid with high


vertical permeability.

Modeling cement leak in numerical simulator.

The relationship between flow in the channel and the simulators first grid was
based on the same value of pressure gradient in both systems. A circular channel with a
single entrance at its end and laminar single-phase flow of water were assumed. Flow
equation for linear flow in both systems was used in the model.
The linear flow equation describing laminar flow through pipe is (Bourgoyne et
al, 1991):
p f
L

where: v =

Thus,

(4.15)

1500d ch2

17.16q

q
p f

d ch2

(4.16)

= 87.41

d ch4

....(4.17)

60

Darcys law for linear flow in the simulators first grid is (Amyx et al, 1960):

q = 0.001127

A1 =

4 *144

k v1 A1 p
L

(d

2
1

d w2

(4.18)

) .(4.19)

Including Eq. 4.19 in Eq. 4.18, then:

k d 2 d w2
q
= 6.15 *10 6 v1 1
..(4.20)

kv1 = vertical permeability on the first grid around the wellbore, md

where:

A1 = first grids area, in2


d1 = first grids diameter, in
dch = channels diameter, in
dw = wells diameter, in
Equations 4.17 and 4.20 should be equal to represent the same behavior in both systems,
then:
87.41

d ch4

= 6.15 *10 16

Thus, k v1 = 1.42 *10 7

k v1 d 12 d w2

(d

d ch4
2
1

d w2

..(4.21)

From the numerical model: d w = 8 in

d 1 = 10 in

For the purpose of this study, the author will call flow capacity the ratio of flow
rate to the pressure gradient expressed in barrels per day divided by pound per square
inch per foot [(bbl/day)/ (psi/ft)].

61

Flow Capacity [bbl/day]/[psi/ft]


and First Grid Vertical Permeability
[md]

100,000,000.00
10,000,000.00
1,000,000.00
100,000.00
10,000.00
1,000.00
100.00
10.00
1.00
0.10
0.01

0.01

0.1

10

Channel Diameter [in]


First Grid Vertical Permeability [md]

Flow Capacity [bbl/day/psi]

Figure 4.17 Relationship between channel diameter and equivalent permeability in the
first grid for the leaking cement model.
Figure 4.17 shows the relationship between keq and dch, after the channel values
and well diameter are included in Eq. 4.21. Values of cement leaks flow capacity using
Eq. 4.17 are also included in Figure 4.17. However, this flow capacity is over calculated
with this equation because the hydrostatic head pressure is not included. The flow
capacity values are included to have an idea about the daily water rate for any channel
size.
A channel with diameter equal to 1.3 inches was assumed. The flow area for this
channel size equals to 4.7% of the total annulus area for 8-inch casing in a 10-inch hole.
From Figure 4.17, the channels 1.3-inch diameter has equivalent permeability of
1,000,000 md and flow capacity of 110 [bbl/day]/[psi/ft]. Thus, in the simulator, vertical
permeability of the first grid was set equal to 1,000,000 md.
Three different scenarios, shown in Figure 4.18, were analyzed with the numerical
simulator to investigate water breakthrough: without a channel, channel along the entire

62

gas zone (100 ft), and a channel over 80% (80 ft) of the gas zone. Wells are produced at a
constant gas rate of 25 MMscfd.

50 ft

50 ft

kr = 100 md
kv = 10 md

100 ft

100 ft

kv = 10E+6 md
from 0 to 100 ft
kr = 0 md
from 50 to 100 ft

kv = 10E+6 md
from 0 to 80 ft
50 ft

100 ft

Gas-Water contact

kv = 10E+6 md
from 101 to 105 ft
300 ft

4.18-a No channel.

kv = 10E+6 md
from 81 to 85 ft

Gas-Water contact

Gas-Water contact

300 ft

kr = 0 md
from 50 to 80 ft

300 ft

4.18-b Channel along the gas


zone (100 ft).

4.18-c Channel in 80% of gas


zone (80 ft).

Figure 4.18 Values of radial and vertical permeability in the simulators first grid to
represent a channel in the cemented annulus.

The modeling concept is shown in Figure 4.18. Vertical permeability was set
equal to 1,000,000 md in the first grid throughout the channels length (100 ft or 80 ft).
Radial permeability in the first grid was set equal to zero from the bottom of the
completion (50 ft) to the bottom of channel assuring no radial entrance to the channel.
Also, vertical permeability was set equal to 1,000,000 md 5 ft below the channel end,
without changing radial permeability value, for both cases. Sample data deck for Eclipse
reservoir model is included in Appendix C.
This model only partially represents the situation shown in Figure 4.15 because,
in the numerical model, the pressure difference between the first and second grids is
small, as the simulator models an open hole completion. (For perforated completion, one
63

would expect a large difference between the first and second grids representing the
pressure drop due to the flow in perforations.) Thus, for open-hole completions we would
expect smaller effect of water breakthrough and water production rate than that in the
perforated completions. However, the simulation could give an idea about the
phenomenon shown in Figure 4.15.
4.5.1.1 Effect of Leak Size and Length
Results for the effect of leak length, from the simulation study, are plotted in
Figure 4.19.

Water Production Rate (stb/day)

160
140
120
100
80
60
40
20
0
0

100

200

300

400

500

600

700

800

900

1000

Time (days)
Without Channel

Channel 80 ft long

Channel 100 ft long

Figure 4.19 Effect of leak length: Behavior of water production rate with and without a
channel in the cemented annulus.
The results can be summarized as follows:
When the channel taps the water zone, water production starts from the first day
of production and increases rapidly until 40 bbl/day after 25 days of production. Then,
water rate tends to stabilize at the value between 50 and 60 bbl/day. Finally, after 625
days of production, the water rate increases exponentially. At this time, the water cone
enters the well completion.
64

For the scenario with the channel ending above the initial gas-water contact (80 ft
long), water production starts after 90 days of production and increases to 30 bbl/day
after 550 days. Next, the water rate tends to stabilize at 30 bbl/day. Finally the water rate
increases following an exponential trend after 700 days of production. (At this time the
water cone reaches the completion.)
Without a channel, water production starts after 625 days of production and
increases in an exponential trend.
Effect of channel size in performance of water production was investigated, too.
Channel diameters of 0.5-inch, 0.9-in, and 1.3-in were selected. The no-channel scenario
was included in the analysis. From Figure 4.17, 25,000 md, 250,000 md, and 1,000,000
md were the equivalent vertical permeability values for the channel diameter selected.
The two channel length-scenarios evaluated previously were considered. Figures 4.20 and
4.21 show the results for the channel in 80% of the gas zone and along the total gas zone,
respectively.

Water Production Rate (stb/day)

100
90
80
70
60
50
40
30
20
10
0
0

100

200

300

400

500

600

700

800

900

1000

Time (days)
Without Channel

Channel 80 ft long, channel size: 0.5 in

Channel 80 ft long, channel size: 0.9 in

Channel 80 ft long, channel size: 1.3 in

Figure 4.20 Effect of channel size: Behavior of water production rate for a channel in
the cemented annulus above the initial gas-water contact.
65

Water Production Rate (stb/day)

100
90
80
70
60
50
40
30
20
10
0
0

100

200

300

400

500

600

700

800

900

1000

Time (days)
Without Channel

Channel 100 ft long, channel size: 0.5 in

Channel 100 ft long, channel size: 0.9 in

Channel 100 ft long, channel size: 1.3 in

Figure 4.21 Effect of channel size: Behavior of water production rate for a channel in
the cemented annulus throughout the gas zone ending in the water zone.
Figures 4.20 and 4.21 show similar behavior of water production rates for
different channel sizes. The water rate increases, showing the same pattern described
previously. First, water rate increases linearly; next it stabilizes; and finally it increases
exponentially. However, the size of the channel controls the water rate. The smaller the
channel, the lower the water production rate. The water breakthrough time is not affected
by the channel size.
From this first study, one could make the following comments:

A channel in the well cemented annulus reduces water breakthrough. This


reduction is a function of the length of the channel: the longer the channel,
the smaller the breakthrough time.

Channel size controls the amount of water produced without affecting the
water breakthrough time. The smaller the channel size, the lower the water
production rate.
66

Another interesting observation is that there is a particular pattern for


water production rate when a channel is considered. First, there is no water
production. Next, water production begins and water rate increases almost
linearly. This increment is more dramatic when the channel is originally
into the water zone. Then, there is stabilization of the water rate. Finally,
the water rate increases exponentially.

The water rate pattern in the presence of a channel is explained as follows:


First, there is no water production, so single-phase gas flows throughout
the channel. Second, water breaks through when the top of the water-cone
reaches the bottom of the channel. Two-phase flow begins (gas and water)
to occur in the channel. Third, the water rate increases because the cone
continues its upward movement. However, an inverted gas cone is
generated at the bottom of the channel (as it was explained in Chapter 2),
so two-phase flow continues in the channel with water rate increasing and
gas rate decreasing. Four, water rate stabilizes. At this point the water
cone eliminates the local gas cone at the bottom of the channel, so singlephase flow (water) occurs in the channel. Finally, the water rate increases
exponentially when the top of the water-cone reaches the completion.

The last (exponential) increase of water production is identical in all cases


thus indicating the effect of water coning unrelated to the leak.

4.5.1.2 Diagnosis of Gas Well with Leaking Cement


Based on the results shown in the previous section, one procedure to identify a gas
well with leaking cement was developed:

67

i. Make a Cartesian plot of water production rate versus time and identify early
(prior to exponential) inflow of water;
ii. Analyze early water rate behavior after the breakthrough and before the
exponential increase;
iii. If you see an initial increase of water production followed by rate stabilization,
chances are the well has leaking cement;
iv. Confirm the diagnosis with cement evaluation logs;
v. Verify with completion/production engineers a possibility of early water due to
hydraulic fracturing or water injection wells;
vi. Verify the leak by history matching with the numerical simulator model described
above: Water breakthrough time with the channel length, and water rate with the
channel size and length;
vii. A graph similar to Figure 4.17 could be made for the specific well geometry
evaluating channel size.

68

CHAPTER 5
EFFECT OF NON-DARCY FLOW ON WELL PRODUCTIVITY IN TIGHT GAS
RESERVOIRS

Eight areas account for 81.7 % of the United States dry natural gas proved
reserves: Texas, Gulf of Mexico Federal Offshore, Wyoming, New Mexico, Oklahoma,
Colorado, Alaska, and Louisiana (EIA, 2001). These areas had 144,326 producing gas
wells in 1996, but only 366 wells (0.25%) produced more than 12.8 MMscfd (EIA,
2000).
Non-Darcy effect was identified in the previous chapter as a mechanism for
increasing water coning/production in gas reservoirs. Traditionally, the Non-Darcy (N-D)
flow effect in a gas reservoir has been associated only with high gas flow rates.
Moreover, all petroleum engineerings publications claim that this phenomenon occurs
only near the wellbore and is negligible far away from the wellbore. As a result, the N-D
flow has not been considered in gas wells producing at rates below 10 MMscfd, or it has
been assigned only to the wellbore skin area.
Additional pressure drop generated by the N-D flow is associated with inertial
effects of the fluid flow in porous media (Kats et al., 1959). Forchheimer presented a
flow equation including the N-D flow effect as (Lee & Wattenbarger, 1996),

dp
= v + 3.238 *10 8 v 2 .(5.1)
dL k

where dp/dL= flowing pressure gradient; v= fluid velocity; = fluid viscosity; k=


formation permeability; v2= inertia flow term; and = inertia coefficient.

69

In deriving an analytical model for , many authors considered permeability,


porosity, and tortuosity the most important factors controlling (Ergun & Orning, 1949;
Irmay, 1958; Bear, 1972; Scheidegger, 1974).
Empirical correlations (Janicek & Katz, 1955; Geertsman, 1974; Pascal et al,
1980; Jones, 1987; Liu et al, 1995; Thauvin & Mohanty, 1998) supported the analytical
models and included rock type as another important factor.
Also, liquid saturation was found to be another important factor affecting inertia
coefficient from lab experiments. increases with water (immobile) saturation (Evan et
al, 1987; Lombard et al, 1999).
Experimental studies provided data needed for inclusion of liquid saturation in the
equation for inertia coefficient (Geertsman, 1974; Tiss & Evans, 1989).
Frederic and Graves (1994) presented three empirical correlations for a wide
range of permeability. In the actual wells, can be calculated from the multi-flow rate
tests using Houpers procedure (Lee & Wattenbarger, 1996).
The object of this study is to identify the effect of N-D in gas wells flowing at low
rates (below 10 MMscfd) and to qualify the effect of N-D on the cumulative gas
recovery.
5.1

Non-Darcy Flow Effect in Low-Rate Gas Wells


Table 5.1 shows data used to evaluate the effect of N-D on the wells flowing

pressure using the analytical model of the N-D flow effect described in Appendix D.
Three different permeability values were used for the study, 1, 10, and 100 md. Six
porosity values were used, 1, 5, 10, 15, 20, and 25%. Eight values of gas rates were
included in the analysis, 0.1, 0.5, 1, 5, 10, 50, 100, and 1000 MMscfd.

70

Table 5.1

Data used for the analytical model

A = 17,424,000 ft2
CA = 31.62
rw = 0.3 ft
h = 50 ft
M = 17.38 lb/lb-mol
s=0

T = 580 oF
Psc = 14.7 psia
Tsc = 60 oF
Pwf = 2500 psia
= 0.018978 cp
hper = 15 ft

Using equations D-4 and D-5, included in Appendix D, a and b were calculated
for the analytical model. F was calculated with equation D-8 in Appendix D. Figures 5.1

F (Fraction of Pressure Drop Generated


by Non-Darcy Flow)

to 5.3 show graphs of F versus gas rates for the three permeability values.

1.0
0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1
0.0
0.1

10

100

1000

Gas Rate (MMscf/D)


Poro= 1%

Poro= 5%

Poro= 20%

Poro= 25%

Poro= 10%

Poro= 15%

Figure 5.1
Fraction of pressure drop generated by N-D flow for a gas well flowing
from a reservoir with permeability 100 md.

Figure 5.1 shows the results for permeability of 100 md. When porosity is 1%, the
contribution to the total pressure drop generated by the inertial component is 50% for the
71

gas rate 6.0 MMscfd. For gas rates higher than 33 MMscfd (when porosity is 25%), the

F (Fraction of Pressure Drop generated


by Non-Darcy flow)

N-D flow completely controls the total pressure drop.

1.0
0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1
0.0
0.1

10

100

1000

Gas Rate (MMscf/D)


Poro= 1%

Poro= 5%

Poro= 20%

Poro= 25%

Poro= 10%

Poro= 15%

Figure 5.2
Fraction of pressure drop generated by N-D flow for a gas well flowing
from a reservoir with permeability 10 md.

Figure 5.2 shows the results for permeability of 10 md. Reducing permeability
from 100 md to 10 md significantly increases the contribution of the N-D flow to the total
pressure drop. N-D flow controls pressure-drop in the system for gas rates greater than
2.2 MMscfd when porosity is 1% and 11 MMscfd when porosity is 25%.
Figure 5.3 shows the results for permeability of 1 md. The inertial component
controls the pressure drop for gas rates higher than 0.7 MMscfd when porosity is 1% and
3.6 MMscfd for porosity 25%.

72

F (Fraction of Pressure Drop Generated


by Non-Darcy Flow)

1.0
0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1
0.0
0.1

10

100

1000

Gas Rate (MMscf/D)


Poro= 1%

Poro= 5%

Poro= 20%

Poro= 25%

Poro= 10%

Poro= 15%

Figure 5.3
Fraction of pressure drop generated by N-D flow for a gas well flowing
from a reservoir with permeability 1 md.

The results show that the N-D flow effect increases with decreasing porosity and
permeability. This observation is physically correct because lower porosity and
permeability somewhat increase flow velocity and the resulting inertial effect.
From this analytical study, one could conclude that not only gas rate, but rock
properties, permeability, and porosity control the contribution of N-D flow effect to the
total pressure drop in gas reservoirs. Even for the low-gas rate, the N-D effect is still
important for wells in low-porosity, low-permeability gas reservoirs. It is possible to have
a gas well flowing less than 1 MMscfd, with the pressure drawdown resulting entirely
from the N-D flow.
5.2

Field Data Analysis


To support the previous observation, multi-rate test field data from three wells,

described by Brar & Aziz (1978), were selected to calculate F. The data is shown in
Table 5.2.
73

Table 5.2

Rock properties and flow rate data for well A-6, A-7, and A-8 from Brar
& Aziz (1978)

Well
Name

Porosity
(%)

Thickness
(ft)

kh
(mdft)

Permeability
(md)

a
(psia2/(MMscfd))

b
(psia2/(MMscfd)2)

q1
(MMscfd)

q2
(MMscfd)

q3
(MMscfd)

q4
(MMscfd)

A-6
A-7
A-8

8.3
8
67.5

56
35
454

169
455
2392

3
13
5.3

107,720
1,158,690
30,150

24,470
68790
400

4.194
8.584
31.612

6.444
9.879
44.313

8.324
12.867
56.287

9.812

Using the a and b published values for each well, F was calculated again using
equation D-8 from Appendix D, and the results are shown in Figure 5.4. No attempt has
been made to revise the published values of a and b. The porosity value reported for Well
A-8 seems too high. Although Brar & Aziz (1978) did not explain the high porosity value
for Well A-8, the author believes the reservoir may comprise fractured chalk, or

F (Fraction of Pressure Drop Generated by


Non-Darcy Flow)

diatomite.
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1
0.0
1

10

100

Gas Rate (MMscf/D)


Well-A6

Well-A7

Well-A8

Figure 5.4
Fraction of pressure drop generated by Non-Darcy flow for wells A-6, A7, and A-8; from Brar & Aziz (1978).
Figure 5.4 shows that N-D flow represents 48% of the total pressure drop when
well A-8 flows at 70.2 MMscfd from a reservoir with 67.5% porosity and permeability
5.3 md. N-D, however, represents 69% of the total pressure drop when well A-6 is
74

70.265

flowing at 9.8 MMscfd from a reservoir with 8.3% porosity and permeability 3 md. This
means that for one well flowing at a rate 7.1 times lower, the inertial effect contributes up
to an additional 44% to the total pressure drop. Moreover, Non-Darcy flow represents
37% of the total pressure drop when well A-7 flows at 9.8 MMscfd from a reservoir with
8% porosity and permeability 13 md, but N-D represents 69% of the total pressure drop
when well A-6 is flowing at 9.8 MMscfd from a reservoir with 8.3% porosity and
permeability 3 md. These two wells have similar porosity, and they flowed at almost the
same rate during the test, but N-D flow contributes less to the total pressure drop in well
A-7 that has higher permeability.
To evaluate actual field wells performance, additional multi-rate test data from
various publications (Brar & Aziz, 1978; Lee & Wattenbarger, 1996; Lee, 1982; Energy
Resources and Conservation Board, 1975) are included in Table 5.3 and Figure 5.5.
Figure 5.5 shows exactly the same trend as the analytical model.

Table 5.3

Flow rate and values of a and b for gas well with multi-flow tests.

Well Name
Well A-1 (Brar

&

a
56.69

b
20.68

q1 (MMscfd)
0.248

q2 (MMscfd)
0.603

q3 (MMscfd)
0.864

q4 (MMscfd)
1.135

Well A-3

(Brar

&

107.07

44.29

0.558

0.750

0.923

1.275

(Brar

&

39.15

10.23

1.520

2.041

2.688

3.122

(Brar

&

91.94

16.70

2.104

3.653

4.026

5.079

(Brar

&

107.72

24.47

4.194

6.444

8.324

9.812

1158.69

68.79

8.584

9.879

12.867

30.15

0.40

31.612

44.313

56.287

70.265

Aziz, 1978)
Aziz, 1978)

Well A-4
Aziz, 1978)

Well A-5
Aziz, 1978)

Well A-6
Aziz, 1978)

Well A-7

(Brar &

Aziz, 1978)

Well A-8

(Brar

&

Aziz, 1978)

Example 7.1

7.75x104

5.00x103

4.288

9.265

15.552

20.177

Example 7.2

2.074x104

2.109x106

0.983

2.631

3.654

4.782

10

Example 5.2

(Lee,

311700

17080

2.6

3.3

5.0

6.3

(Lee,

128300

19500

4.5

5.6

6.85

10.8

(ERCB,

0.0625

0.00084

2.73

3.97

4.44

5.50

(Lee &
Wattenbarger, 1996)
(Lee &
Wattenbarger, 1996)
1982)

11

Example 5.3
1982)

12

Example 3.1
1975)

75

F (Fraction of Pressure Drop


Generated by Non-Darcy Flow)

0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1
0.0
0.1

10

100

Gas Rate (MMscf/D)

Figure 5.5
field data.
5.3

Well-A6

Well-A7

Well-A8

Well-A5

Well-A4

Well-A3

Well-A1

Example 7.1

Example 7.2

Example 5.2

Example 5.3

Example 3.1

Fraction of pressure drop generated by Non-Darcy flow for gas wells

Numerical Simulator Model


A commercial numerical simulator with global and local N-D flow component

was used to investigate Non-Darcy flow effect on gas recovery. The reservoir model has
26 radial grids and 110 vertical layers (Armenta, White, & Wojtanowicz, 2003) to assure
adequate resolution for the near-well coning simulation. Reservoir parameters are
constant throughout the model (porosity = 10%, permeability = 10 md, initial reservoir
pressure = 2300 psia). The gas-water relative permeability curves are for a water-wet
system reported from laboratory data (Cohen, 1989); Gas deviation factor (Dranchuck,
1974) and gas viscosity (Lee et al, 1966) were calculated using published correlations.
Capillary pressure was neglected (set to zero), and relative permeability hysteresis was
not considered (Table 5.4). Well performance was modeled using the Petalas and Aziz
(1997) mechanistic model correlations (Schlumberger, 1998). Inertial coefficient, , was
calculated using Frederick and Graves (Computer Modelling Group Ltd, 2001) second
76

correlation (Equation 5.2). The well perforated 25% of the gas zone. The well is
produced at a constant tubing head pressure of 300 psia. Figure 5.6 shows a sketch of the
reservoir model. A sample data deck for IMEX reservoir model is contained in Appendix
E.
Well

= 10%
Sgr= 20%
Pinitial= 2300 psia

Swir= 30%
S.G.gas=0.6
kr= 10 md

2500 ft

100 of 1 ft
layers

25 ft

100 ft

Gas

9 of 10 ft, and
one 710 ft
layers

800 ft

Water
5000 ft

Figure 5.6

Sketch illustrating the simulator model used to investigate N-D flow.

Table 5.4

Gas and water properties used for the numerical simulator model

Gas Deviation Factor and Viscosity


Press Z
100 0.989
300 0.967
500 0.947
700 0.927
900 0.908
1100 0.891
1300 0.876
1500 0.863
1700 0.853
1900 0.845
2100 0.840
2300 0.837
2500 0.837
2700 0.839
3200 0.844

Gas and Water Relative Permeability

Visc
0.0122
0.0124
0.0126
0.0129
0.0133
0.0137
0.0141
0.0146
0.0151
0.0157
0.0163
0.0167
0.0177
0.0184
0.0202

77

Sg
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70

Krg
0.000
0.000
0.020
0.030
0.081
0.183
0.325
0.900

Pc
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Sw
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0

Krw
0.000
0.035
0.076
0.126
0.193
0.288
0.422
1.000

Pc
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Frederick and Graves second correlation: =

2.11*1010
(k g ) 1.55 (S g ) 1.0

..(5.2)

Where = inertia coefficient; kg= reservoir effective permeability to gas; = porosity, and
Sg= gas saturation.
5.3.1

Volumetric Gas Reservoir


Initially, the global N-D effect was simulated for a volumetric gas reservoir.

Figures 5.7 and 5.8 are the forecast of gas rate and cumulative gas recovery versus time,
respectively.
18
16

Gas Rate (MMscf/d)

14
12
10
8
6
4
2
0
0

1000

2000

3000

4000

5000

6000

7000

8000

9000

Time (Days)
Without Non-Darcy

Figure 5.7
reservoir.

Including Non-Darcy

Gas rate performance with and without N-D flow for a volumetric gas

Figure 5.7 shows that at early time the gas rate is higher when N-D is ignored.
After 1500 days, the situation reverses, and the gas rate becomes higher when N-D is
included. At later times, gas rate is almost the same for both cases. The well life is
slightly longer when N-D is included. This may result from N-D acting like a reservoirs

78

choke restricting gas rate and delaying gas expansion. In other words, gas expansion
happens faster when N-D is ignored.
Figure 5.8 shows that the final recovery is not affected by the N-D. However,
production time is longer, as was explained previously, when N-D is considered.
90
80

Gas Recovery (%)

70
60
50
40
30
20
10
0
0

1000

2000

3000

4000

5000

6000

7000

8000

9000

Time (Days)
Without Non-Darcy

Including Non-Darcy

F (Fraction of Pressure Drop Generated by Non


Darcy Flow)

Figure 5.8
Cumulative gas recovery performance with and without N-D flow for a
volumetric gas reservoir.
1
0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1
0
1

10

100

Gas Rate (MMscf/D)

Figure 5.9
Fraction of pressure drop generated by Non-Darcy flow for gas wells
simulator model.

79

The highest contribution of the Non-Darcy effect to the total pressure drop is
43%. It happens at the beginning of the gas production when the gas rate is 10.2 MMscfd
(Figure 5.9).
5.3.2

Water Drive Gas Reservoir


A gas reservoir with bottom water drive was considered in the analysis. Aquifer

pore volume is 155 times greater than the gas pore volume. The analysis considered the
N-D effect applied at the wellbore (typical for most reservoir simulators), distributed
throughout the reservoir, and entirely disregarded. A sample data deck for IMEX
reservoir model is included in Appendix E.
16

Gas Rate (MMscf/D)

14
12
10
8
6
4
2
0
0

500

1000

1500

2000

2500

3000

3500

4000

Time (days)
Without N-D

Setting N-D at the wellbore

Including N-D through the reservoir

Figure 5.10 Gas rate performances with N-D (distributed in the reservoir and assigned
to the wellbore) and without N-D flow for a gas water-drive reservoir.
Figure 5.10 shows the gas rate forecast for the three cases. At early times, all
results are similar to the volumetric scenario. The well without N-D would produce for
3,663 days. The well with N-D distributed throughout the reservoir would stop producing
after 1,882 days because it loads up with water. The well with N-D at the wellbore would

80

produce for 3,952 days. Note that for the cases when N-D is ignored or set at the
wellbore, the gas rate pattern is exactly the same as for the volumetric gas reservoir.
When N-D is at work throughout the reservoir, early liquid loading occurs. In short,
setting N-D only at the wellbore would seriously overestimate well performance.
70

Gas Recovery (%)

60
50
40
30
20
10
0
0

500

1000

1500

2000

2500

3000

3500

4000

Time (Days)
Without N-D

Setting N-D at the wellbore

Including N-D throughout the reservoir

Figure 5.11 Gas recovery performances with N-D (distributed in the reservoir and
assigned to the wellbore) and without N-D flow for a gas water-drive reservoir.
Figure 5.11 shows gas recovery versus time. The final gas recovery is almost the
same (61%) when N-D is ignored or set at the wellbore. However, when N-D is included
throughout the reservoir, the recovery is significantly lower (42.9%), caused by early
liquid loading of the well. The recovery reduction is 42.2%.
Figure 5.12 shows water rate versus time. Water production is always higher
when N-D is ignored or set at the wellbore than when it is considered globally in the
reservoir. All three wells stopped production due to water loading. However, the well
with N-D distributed in the reservoir is killed early with a lower water rate.

81

200
180

Water Rate (stb/d)

160
140
120
100
80
60
40
20
0
0

1000

2000

3000

4000

Time (Days)
Without N-D

Setting N-D at the wellbore

Including N-D throughout the reservoir

Figure 5.12 Water rate performances with ND (distributed in the reservoir and
assigned to the wellbore) and without N-D flow for a gas water-drive reservoir.
To explain the global N-D effect on well liquid loading, behavior of the flowing
bottom hole pressure (FBHP) and pressure in the first grid of the simulator model
(pressure before the completion) at the top of well completion were analyzed.

Bottom Hole Flowing Pressure (psia)

1400
1200
1000
800
600
400
200
0
0

1000

2000

3000

4000

Time (Days)
Without N-D

Setting N-D at the wellbore

Including N-D throughout the reservoir

Figure 5.13 Flowing bottom hole pressure performances with N-D (distributed in the
reservoir and assigned to the wellbore) and without N-D flow.

82

Figure 5.13 shows that FBHP is always higher when N-D is ignored, which
makes physical sense. Also, FBHP is the same for N-D at the wellbore or distributed
throughout the reservoir. After 1,882 days, however, the well with global N-D stops
producing while the other wells continue with increasing flowing pressure due water

Flowing Pressure at the Sandface at the Top


of Completion (psia)

inflow.
1800
1600
1400
1200
1000
800
600
400
200
0
0

1000

2000

3000

4000

Time (Days)
Without N-D

Setting N-D at the wellbore

Including N-D throughout the reservoir

Figure 5.14 Pressure performances in the first simulator grid (before completion) with
ND (distributed in the reservoir and assigned to the wellbore) and without N-D flow.
Analysis of pressure in the first grid of the simulator model (Figure 5.14) explains
the reason for early termination of production in the gas well with global N-D. Pressure
in the first simulator grid is the pressure before the well completion on the reservoir side.
For the same completion length and gas flow rate, pressure at the first grid of the
simulator should always be lower when N-D is considered. For this example, when N-D
is considered globally, pressure at the first grid of the simulator is always lower than the
non N-D scenario. This is in good agreement with the physical principle explained

83

previously. On the other hand, when N-D is set at the wellbore, pressure at the first grid
of the simulator is always higher than the non N-D scenario. This is contrary to the
physical principle explained previously. In short, setting N-D at the wellbore makes the
reservoir gain pressure instead of losing it at the sandface.
2400

Pressure (psi)

2200
2000
1800
1600
1400
1200
0.01

0.1

10

100

1000

10000

Distance From the Wellbore (ft)


Without N-D

Setting N-D at the wellbore

Including N-D trough the reservoir

Figure 5.15 Pressure distribution on the radial direction at the lower completion layer
after 126 days of production (Wells produced at constant gas rate of 8.0 MMSCFD) with
ND (distributed in the reservoir and assigned to the wellbore) and without N-D flow.
Figure 5.15 shows the pressure distribution on the radial direction at the lower
completion layer after 126 days of constant gas rate (8.00 MMSCFD) when N-D is
considered globally, assigned only at the wellbore, and without considering N-D. The
effect of N-D extends 6 feet from the wellbore. The main effect, however, happens two
feet around the wellbore. Again, pressure distribution around the wellbore is higher when
N-D is assigned to the wellbore than the case when N-D is ignored showing the
erroneous physical behavior for this condition (N-D set at the wellbore). Pressure at 0.01
ft from the wellbore is 500 psi lower when N-D is considered throughout the reservoir

84

than when N-D is ignored. This extra pressure drop in the reservoir makes gas wells
extremely vulnerable to water loading reducing final gas recovery.
From the previous analysis, it is evident that setting N-D at the wellbore to
simulate gas wells performance does not properly represent the N-D flow physical
principle. N-D should be distributed throughout the reservoir.
5.4

Results and Discussion


The results of this study emphasize the important physical principle of

considering N-D globallythroughout the reservoir.


Not only gas rate but also porosity and permeability control N-D contribution to
the total pressure drop in gas wells. Contribution of the pressure drop generated by N-D
to the total pressure drop increases when gas rate is increased. Increasing gas rate
increases interstitial gas velocity and the inertial component associated. Reducing
porosity increases contribution of N-D to the total pressure drop. Reduction on porosity
reduces rock-space for the gas to flow increasing, again, gas interstitial velocity.
Reducing permeability increases contribution of N-D to the total pressure drop, also.
Reduction on permeability reduces gas flow ability. At the same gas rate, gas interstitial
velocity increases when permeability is reduced.
The well-accepted assumption in petroleum engineering that assigning N-D at the
wellbore represents this phenomenon is not precise. N-D should be considered globally
throughout the gas reservoir to really evaluate its effect on gas rate and gas recovery.
N-D effect could reduce gas recovery in water-drive gas reservoirs because it
makes the well more sensitive to water loading. Liquid saturation may also increase the
N-D effect (Geertsman, 1974; Evan et al., 1987; Tiss & Evans, 1989; Frederick &

85

Graves, 1994; Lombard et al., 1999). Thus, around the wellbore, the combined effect of
high water saturation due to water coning and N-D could negatively affect gas rate and
gas recovery.
Completion length plays a role on the N-D flow effect. There is no analytical
equation describing this interaction. Some authors (Dake, 1978; Golan, 1991)
recommend changing h for hper in the second terms of the right side of Equation D-3
(Appendix D) to include the partial penetration effect in the N-D component of this
equation. For the field data used in this research, the author could not include the
completion length effect in the analysis.
N-D effect significantly influences gas production performance in fractured well
(Fligelman et al., 1989; Rangel-German, and Samaniego, 2000; Umnuayponwiwat et al.,
2000). Flower et al. (2003) proved that gas rate increased 20% when N-D in the fracture
is reduced. Alvarez et al (2002) explained that N-D should be considered in pressure
transient analysis of hydraulic fractured gas wells. Ignoring N-D for the pressure analysis
resulted on miscalculation of formation permeability, fracture conductivity and length.
From this study it is possible to conclude as follows:

The Non-Darcy flow effect is important in low-rate gas wells producing from
low-porosity, low-permeability gas reservoirs.

Setting the N-D flow component at the wellbore does not make reservoir
simulators represent correctly the N-D flow effect in gas wells. N-D flow
should be considered globally to predict correctly the gas rate and recovery.

Cumulative gas recovery could reduce up to 42.2% when N-D flow effect is
considered throughout the reservoir in gas reservoirs with bottom water drive.

86

CHAPTER 6
WELL COMPLETION LENGTH OPTIMIZATION IN GAS RESERVOIRS
WITH BOTTOM WATER

There is a dilemma in the petroleum industry about the completion length to solve
water production in gas wells. A normal practice is to make a short completion at the top
of the gas zone to delay water coning/production. This short completion, however,
reduces gas inflow and delays gas recovery. Recently, some researchers (McMullan &
Bassiouni, 2000; Armenta, White, and Wojtanowicz, 2003) have proposed that a long
completion should be used to increase gas rates and accelerate gas recovery. The previous
analysis, however, did not include the economic implications of completions length in
gas reservoir.
The objective of this study is to examine the factors that control the value of
water-drive gas wells and propose methods to analyze and optimize completion strategy.
Due to the size of the experimental matrix (20,736 results), one committee member (Dr.
Christopher D. White) helped the author building the statistical model and writing the
computer code to run the statistical model.
6.1

Problem Statement
The dependence of recovery on aquifer strength, reservoir properties and

completion properties is complex. Although water influx traps gas, it sustains reservoir
pressure; although limited completion lengths suppress coning, they lower well
productivity. These tradeoffs can be assessed using numerical simulation and discounting
to account for the desirability of higher gas rates.

87

6.2

Study Approach
A base model for a single well is specified. Many of the properties of this model

are varied over physically reasonable ranges to determine the ranges of relevant reservoir
responses including ultimate cumulative gas production, maximum gas rate, and
discounted net revenue. The responses are examined using analysis of variance, response
surface models, and optimization.
6.2.1

Reservoir Simulation Model


Numerical reservoir simulators can predict the behavior of complex reservoir-well

systems even if the governing partial differential equations are nonlinear. The same
model explained in section 5.3 was used for the study. The model chosen for this study
used 26 cylinders in the radial direction by 110 layers in the vertical direction (McMullan
& Bassiouni, 2000), providing adequate resolution of near-well coning behavior. The
radius of the gas zone is 2,500 ft, and its thickness is 100 ft. The gas zone has 100 grids
in the vertical direction (one foot per grid). The radius of the water zone is 5,000 ft, and
its thickness is varied from 110 to 1410 ft. The water zone has 10 grids in the vertical
direction. Nine of them have a thickness of 10 ft and the bottom grid is varied to
represent the aquifer. The aquifer is represented by setting porosity to one for the
outermost gridblocks and the thickness of the lowermost gridblocks are varied from 110
to 1410 ft to adjust aquifer volume. The gas-water relative permeability curves are for a
water-wet system (Table 5.4) reported from laboratory data (Cohen, 1989). The gas
deviation factor (Dranchuck et al., 1974) and gas viscosity (Lee et al., 1966) were
calculated using published correlations (Table 5.4). Capillary pressure is neglected (set to
zero), and relative permeability hysteresis is not considered. The well performance was
modeled using the Petalas and Aziz (1997) mechanistic model correlations
88

(Schlumberger, 1998). Appendix F includes a sample data deck for the Eclipse reservoir
model. Reservoir properties and economic parameter are the factors varied for the study.
6.2.1.1 Factors Considered
Factors are the parameters that are varied. Five reservoir parameters (initial
pressure, horizontal permeability, permeability anisotropy, aquifer size, and completion
length) and three economic factors (gas price, water disposal cost, and discount rate) are
selected for consideration; each factor is assigned a plausible range. Table 6.1 shows the
factors and the range values for each one.

Factor descriptions.

Factor Type Symbol


Reservoir
variables

Economic
variables
Controllable

# Levels

Table 6.1

Levels

Description

Units

pi

Initial Pressure

psia

kh

Horizontal Permeability

md

10

100

VAD

Aquifer Size

100

400

800 1500

kzD

Anisotropy Ration

0.1

0.3

0.5

Cg

Gas price

$/Mscf

3.5

$/bbl

0.5

1.25

Cw

Water cost

Discount rate

hpD

Completion Fraction

annual 4
~

1500 2300 3000

0
0.2

0.06 0.12 0.18


0.5

0.8

Factors can be classified by our knowledge and our ability to change them.
Controllable factors can be varied by process implementers. Observable factors can be
measured relatively accurately, but cannot be controlled. Uncertain factors can neither be
measured accurately nor controlled (White & Royer, 2003). For this study, there are four
uncontrollable, uncertain reservoir parameters. Initial pressure (pi) affects the original
gas in place and the absolute open flow potential of the well (Lee & Wattenbarger, 1996);
it has a less important effect on density contrast. Horizontal permeability (kh) affects flow
potential and influences coning behavior by altering the near-well pressure distribution
89

(Kabir, 1983). Permeability anisotropy (kzD = kz/kh) affects coning and crossflow
behavior Battle & Roberts, 1996), and aquifer size (VAD = W/G) determines the amount
of reservoir energy that can be provided by water drive.
There are three economic parameters. Gas price (Cg) and water disposal cost (Cw)
are used to compute the revenues and costs associated directly with production. No
capital costs or other operating costs are considered in this analysis. The discount rate (d)
is used to compute the present value of the gas production less the water disposal costs.
The economic parameters may be difficult to predict, especially gas price. Therefore, it is
reasonable to consider them uncertain and uncontrollable.
The only controllable factor is the completion length (hpD = hp/h). Completion
length should be chosen to minimize water production with acceptable reductions in flow
potential. The completion is assumed to occur over a continuous interval beginning at the
top of the reservoir. The completion length is optimized over the ranges of the uncertain
and/or uncontrollable factors.
6.2.1.2 Responses Considered
Decisions are based on responses obtained by measurement or modeling.
Reservoir studies examine responses that affect project values, e.g., time of water
breakthrough, cumulative recovery (White & Royer, 2003). Three responses were
examined in this study. The ultimate cumulative gas production (GpU) is the total
undiscounted value of a gas stream, whereas the peak rate (qg,max) is positively correlated
to the discounted value. Discounted cash flow (N) measures the net present value of the
production stream. The net present value ignores investments and all operating costs
except for water handling.

90

6.2.2

Statistical Methods

6.2.2.1 Experimental Design


Experimental design methods have found broad application in many disciplines.
In fact, we may view experimentation as part of the scientific process and as one of the
ways to learn about how systems or process work. Generally, we learn through a series of
activities in which we make conjecture about a process, perform experiments to generate
data from the process, and then use the information from the experiment to establish new
conjectures, which lead to new experiments, and so on (Montgomery, 1997).
The purpose of experimental design is to select experiments to provide
unambiguous, accurate estimates of factor effects with a reasonable number of
experiments. In the context of this study, an experiment is a numerical simulation. This
correspondence has been widely used, although there are relevant differences between
physical experiments (with nonrepeatable errors) and numerical simulations (Sacks et al.,
1989).
Because the simulations in this study are relatively inexpensive, a full multilevel
factorial is used (Table 6.1). For the five reservoir and completion parameters, this design
requires 576 simulations. The three economic factors increase the number of results for N
36-fold, to 20,736.
6.2.2.2 Statistical Analyses
Although the number of factors is moderately large (8) and the number of
economic responses to be considered is very large (20,736), this amount of data can be
manipulated using public-domain statistical program ( R ) and commercial spreadsheet
(Microsoft excel) software.

91

6.2.2.3 Linear Regression Models


Regression analysis is a statistical technique for investigating and modeling the
relationship between variables (Montgomery & Peck, 1982). The first step in the
statistical analysis of the responses was to formulate a linear model without interaction
among them. This linear model is described by the equation:
r

y = 0 + i xi (6.1)
i =1

Where there are r=8 factors xi with coefficients I; 0 is the intercept. This
equation is often called a response surface model (RSM), or simply a response
model, in the context of experimental design. This equation (Eqn. 6.1) was used as the
basis for analysis of variance.
Models with interactions are appropriate when the importance of a factor varies
with the values of other factors (Myers & Montgomery, 2002); for example, the
importance of aquifer size commonly depends on the permeability (White & Royer,
2003). A linear regression model with interaction was developed for the responses. The
interaction terms in a linear model have the form ijxixj (Eqn. 6.1) where ij is the
interaction coefficient between two factors, and xi, xj are factors. The coefficients of linear
models are commonly computed using linear least squares method. The last-squares
criterion is a minimization of the sum of the squared differences between the observed
responses, and the predicted responses for each fixed value of the factor (Jensen et al.,
2000).
Two additional complications were encountered when the linear model with
interactions was built. First, the response variance was not uniform. For example, a
subsample of large aquifer will have a larger volume variance than a subsample of
92

smaller aquifer. Such heteroscedacity was eliminated with a variance-stabilizing BoxCox transform (Box & Cox, 1964). Second, the responses were not linear with respect to
the factors (or independent variables). This tended to increase estimation error, and could
partly treated using a Box-Tidwell transform on each of the independent variables (Box
& Tidwell, 1962). The resulting form (for a first-order model in the transformed
parameters) is
r

y a = 0 '+ i ' x ib

..(6.2)

i =1

Where a is the Box-Cox power and the bi are the Box-Tidwell powers for each factor.
One must have a large number of experiments to estimate these parameters accurately.
The Box-Cox and Box-Tidwell transforms create a more accurate model that better
conforms to the assumptions of least-squares estimates. In general, untransformed
equations are more useful for discussion and transformed equations are better for
modeling.
6.2.2.4 Analysis of Variance
Analysis of variance (ANOVA) was used to discern which factors are
contributing to the variability of a response. The idea of an analysis of variance is to
express a measure of the total variation of a set of data as a sum of terms, which can be
attributed to specific source, or cause, of variation. ANOVA is an excellent procedure to
use to screen variables and is a standard method for analysis of factorial designs (Myers
& Montgomery, 2002).
6.2.2.5 Monte Carlo Simulation
Monte Carlo is a powerful numerical technique for using and characterizing
random variables in computer programs. If we know the cumulative distribution function
93

of the variables, the method enables us to examine the effects of randomness upon the
predicted outcome of numerical models (Jensen et al., 2000). Monte Carlo simulation
(MCS) is simply drawing randomly from the distribution functions for input functions to
estimate an output via a transfer function; it has been widely used in reservoir simulation
(Damsleth et. al., 1992). Although MCS is simple to implement, it is burdensomely
expensive when the transfer function is difficult to evaluate, which is the case for
reservoir simulations. (Typical MCS samples are much large than the 576-point
simulation model sample in this study). Therefore, engineers may use a response surface
model as a proxy for the reservoir simulation when performing MCS (Damsleth et. al.,
1992; White et. al., 2001).
6.2.3

Optimization
Optimization maximizes or minimizes an objective function subject to constraints.

Usually, the factors not being optimized are known (or specified) so that the optimization
can be carried out using standard gradient methods (Dejean & Blanc, 1999; Manceau et.
al, 2001). If uncontrollable factors are uncertain, other approaches can be used to
optimize, including seeking the maximum expected value of the objective function over
the distributions of uncertain factors (Aanonsen et. al., 1995; White & Royer, 2003).
Because the objective function is nonlinear, the optimum for the expected value of the
factors does not optimize the expected value of the objective function.
6.2.4

Workflow
The set of simulation models is specified using a factorial design. Simulation

models are constructed for all design points, making frequent use of INCLUDE
capabilities in simulator. A consistent naming convention ensures that all simulation runs
can be uniquely associated with a particular design point (or factor combination). All
94

simulation results can then be parsed to extract production profiles and other relevant
responses (Roman, 1999). The responses are scaled and formatted in the spreadsheet
before being exported to a statistics package (R Core Team, 2000). Response models can
be fit, significant terms identified, and appropriate transforms can be applied. The
resulting linear models are then exported back to the spreadsheet for Monte Carlo
simulation and optimization. Figure 6.1 shows a flow diagram for the workflow used for
this study.

576 RSM files


Result files

Reservoir Simulator
(Eclipse)

Calculations:
Fit response models
Identify significant terms
Apply transforms
Spreadsheet
(Excel)

Spreadsheet
(Excel)
Production profile
Calculations:
Net Present Value Statistics Package
(R)
Cumulative recovery

Simulator Models
20,736 results

Figure 6.1

Flow diagram for the workflow used for the study.

95

Calculations:
Monte Carlo Simulation
Optimization

6.3

Results and Discussion

6.3.1

Linear Models

Equations 6.3, 6.4, and 6.5 show the linear regression models for the ultimate cumulative
gas production (GpU), peak gas rate (qg,max), and discounted cash flow (N) without
interactions.
G pu = 8.98 E 6 + 2.03E 4 * pi + 1.15 E 3 * h pD + 1.04 E 5 * k h 6.28 E 3 * V AD 6.45 E 4 * k zD ...(6.3)
q g , max = 12750 + 8.425 * pi + 48.94 * h pD + 1670 * k h + 0.0269 * V AD + 0.6023 * k zD .(6.4)

N = 83.54 + 0.0449 * pi + 0.1049 * h pD + 0.5265 * k h 0.0112 * V AD 0.157 * k zD + 0.2305 * C g 0.867 * Cw 0.0322 * d

...(6.5)

GpU increases with initial reservoir pressure, length of completion and horizontal
permeability. GpU decreases with aquifer size and permeability anisotropy (Eqn. 6.3).
The maximum rate qg,max increases with the five reservoir factors included for the
study (Eqn. 6.4).
Finally, N increases with initial reservoir pressure, length of completion,
horizontal permeability, and gas price. N decreases with aquifer size, permeability
anisotropy, water disposal cost, and discount rate (Eqn. 6.5).
The precision of the liner models without interactions is poor; R2 values average
around 0.5 or 0.6. This is not accurate enough for optimization, and improved models
with interactions among the factors are needed.
A more accurate response model is needed to understand response variability and
to optimize. An accurate model for net present value is built by (1) applying a Box-Cox
transform to N, (2) computing maximum likelihood estimates of the Box-Tidwell
transforms (Box & Cox, 1964; Box & Tidwell, 1962), (3) scaling all factors to cover a
unit range, and (4) fitting a model with two-term interactions and quadratic terms.
96

Eqns. 6.6 to 6.12 (Table 6.2) show the relationship among the transformed to
untransformed factors where the superscript t denotes the transformed, scaled factor
values.
pit =

pi0.7013 168.90
105.7

(6.6)

k ht =

k h0.3362 0.2125
0.787

(6.7)

t
k zD
=

0.024
k zD
1.0585
0.062

t
VAD
=

0.519
VAD
0.0224
0.069

C gt =

Cg 1
5

(6.8)
.(6.9)

(6.10)

Cwt =

Cw 0.5
1.5

dt =

d 0.5135
0.415

(6.12)

Table 6.2

Factor descriptions including Box-Tidwell power coefficients

Factor Type Symbol


Reservoir
variables

Economic
variables
Controllable

# Levels

(6.11)

Levels

Description

Units

pi

Initial Pressure

psia

kh

Horizontal Permeability

md

10

100

VAD

Aquifer Size

100

400

800 1500

-0.52

kzD

Anisotropy Ration

0.1

0.3

0.5

0.02

Cg

Gas price

$/Mscf

3.5

$/bbl

0.5

1.25

Cw

Water cost

Discount rate

hpD

Completion Fraction

annual 4
~

97

BoxTidwell
Power

1500 2300 3000

0
0.2

0.70
-0.34
1

1.00

1.00

0.06 0.12 0.18

0.51

0.5

1.39

0.8

Equation 6.13 shows the transformed (with Box-Cox and Box-Tidwell


transforms) linear regression model with interactions.
t
t
+ 0.105 *V AD
+ 1.25 * C gt 0.018 * C wt 0.023 * d t ...
N t = 1.820 + 0.463 * p it 0.07 * k ht 0.072 * k zD
t
t
0.065 * h tpD 0.159( p it ) 2 0.184(k ht ) 2 0.03(k zD
) 2 0.006(V AD
) 2 0.471(C gt ) 2 + 0.0001(C wt ) 2 ...
t
t
0.095(d t ) 2 0.02(h tpD ) 2 + 0.142( p it * k ht ) + 0.02( p it * k zD
) + 0.016( p it *V AD
) + 0.14( p it * C gt ) ...
t
t
0.005( p it + C wt ) 0.132( p it * d t ) + 0.051( p it * h tpD ) 0.127(k ht * k zD
) 0.025(k ht *V AD
) ...
t
t
0.188(k ht * C gt ) + 0.012(k ht * C wt ) 0.351(k ht * d t ) + 0.101(k ht * h tpD ) + 0.087(k zD
*V AD
) ...
t
t
t
t
t
0.024(k zD
* C gt ) 0.007(k zD
* C wt ) + 0.054(k zD
* d t ) 0.015(k zD
* h tpD ) + 0.014(V AD
* C gt ) + ...
t
t
t
+ 0.01(V AD
* C wt ) 0.106(V AD
* d t ) 0.01(V AD
* h tpD ) + 0.013(C gt * C wt ) 0.12(C gt * d t ) + ...

+ 0.032(C gt * h tpD ) + 0.007(C wt * d t ) 0.006(C wt * h tpD ) + 0.138(d t * h tpD )............................................................(6.13)

Due to the complexity of the model shown on Eqn. 6.13 (44 terms), it is difficult
to discern the relationship between N and each one of the factors directly, as it was done
for the model without interactions.
The Box-Cox transform stabilizes the variance of the response and makes the
response more nearly normally distributed (Box & Cox, 1964). The Box-Tidwell
transforms maximize the linear correlations between each factor and the response
independently (table 6.2). Box-Tidwell exponents greater than one amplify the effect of
the factor, whereas values between zero and one damp the effect. A power near zero (e.g.,
for anisotropy ratio) should be set to zero and the logarithmic transform used (Box &
Tidwell, 1962). Values less than zero imply a reciprocal relation between the factor and
the response.
The linear model with interactions is quite accurate; R2 > 0.98.
6.3.2 Sensitivities (ANOVA)
Table 6.3 shows the results for the analysis of variance of the linear model with
out interactions (GpU, qg,max, and N ). The importance of a factor is related to the absolute

98

value of its effect. The effect is the change in the response across the range of the factor,
averaged across all levels of other factors.

Factor

Table 6.3

Linear sensitivity estimates for models without factors interactions.

Effects of factors across entire range.


GpU

qg,max

BCF

S.C.

MMCF/day

S.C.

MM$

S.C.

pi

30.49

***

12.64

***

0.399

***

***

kh

10.33

***

16.53

kzD

-5.81

***

0.05

VAD

-8.80

***

0.04

S.C. or Significance Codes


(ANOVA)

0.353

***

Pr(|t|)>

Pr(|t|)<=

Symbol

-0.101

***

0.001

***

-0.074

***

0.001

0.01

**

Cg

0.713

***

0.01

0.05

Cw

-0.009

**

0.05

0.1

-0.330

***

0.1

blank

0.070

***

hpD

-0.09

3.92

***

***

For cumulative gas production, all effects are highly significant except for
completion length, which has a relatively small effect. This weak effect implies that
varying the completion interval has little effect on cumulative production. For maximum
gas rate, all factors have significant effects except for permeability anisotropy. For net
present value, all factors are significant. The effects of gas price, initial pressure,
horizontal permeability, and discount rate dominate other factors; water disposal cost has
a relatively small effect. All effects were computed over the ranges given in table 6.1.
Table 6.4 shows the results for the analysis of variance of the response model
with interactions. The transformed linear model has a large number of terms. ANOVA
shows that 42 of the 44 terms are retained at the 90% level of significance (Eqn. 6.13).
This is a relatively complex response surface. Commercial spreadsheet (Microsoft excel)
was used to evaluate the model.

99

Table 6.4 Transformed, scaled model for the Box-Cox transform of net present value.

-0.026

0.000

Max
0.027

0.582

hpD
Term 2
pi

-0.065
Coeff.
-0.159

0.006
Std. Err.
0.004

-11.56 ***
T
S.C.
-43.32 ***

kh
kzD
VAD
Cg
Cw
d
hpD
Term 1
Term 2
pi
kh

-0.184
-0.030
-0.006
-0.471
0.000
-0.095
-0.020
Coeff.
0.142

0.004
0.004
0.005
0.004
0.004
0.004
0.004
Std. Err.
0.002

-43.14 ***
-8.16 ***
-1.32
-130.59 ***
-0.07
-23.10 ***
-4.93 ***
T
S.C.
56.88 ***

Term 1
S.C. or Significance Codes
(ANOVA)
Pr(|t|)>
0
0.001
0.01
0.05
0.1

Pr(|t|)<=
0.001
0.01
0.05
0.1
1

Symbol
***
**
*
O
Blank

Quadratic Terms

-0.474

Residuals
Median 3Q

1Q

Two-TermInteractions

Min

Linear Terms

Summary
Statistics

D.F.
2
R
2
R adj
F
Pr(>F)

Residual
44
20692
0.9805
0.9804
2.36E+04
0

Coefficients for Transformed, Scaled Factors


Factor
Coeff.
Std. Err.
T
S.C.
(Intercept)
1.820
0.004
442.85 ***
pi
0.463
0.005
90.21 ***
kh
-0.070
0.006
-12.07 ***
kzD
-0.072
0.005
-13.35 ***
VAD
0.105
0.007
16.05 ***
Cg
1.250
0.005
242.33 ***
Cw
-0.018
0.005
-3.46 ***
d
-0.023
0.005
-4.16 ***

Regress

100

pi

kzD

0.020

0.003

7.01

***

pi

VAD

0.016

0.003

5.92

***

pi

Cg

0.140

0.003

55.09

***

pi

Cw

-0.005

0.003

-2.15

pi

-0.132

0.003

-47.95

***

pi

hpD

0.051

0.003

18.81

***

kh

kzD

-0.127

0.003

-45.45

***

kh

VAD

-0.025

0.003

-9.40

***

kh

Cg

-0.188

0.002

-75.15

***

kh

Cw

***

kh

kh

hpD

kzD
kzD

0.012

0.002

4.91

-0.351

0.003

-129.65

***

0.101

0.003

37.81

***

VAD

0.087

0.003

28.77

***

Cg

-0.024

0.003

-8.48

***

kzD

Cw

-0.007

0.003

-2.53

kzD

0.054

0.003

17.47

***

kzD

hpD

-0.015

0.003

-4.82

***

VAD

Cg

0.014

0.003

5.03

***

VAD

Cw

0.010

0.003

3.69

***

VAD

-0.106

0.003

-36.32

***

VAD

hpD

-0.010

0.003

-3.49

***

Cg

Cw

***

Cg

Cg

hpD

Cw

0.007

0.003

2.46

Cw

hpD

-0.006

0.003

-2.18

hpD

0.138

0.003

46.50

***

0.013

0.003

4.98

-0.120

0.003

-43.27

***

0.032

0.003

11.65

***

First, the model was transformed back to the original factors, correcting it for bias
introduced by the back transform from the transformed response N0.19 to the original
response N (Jensen et. al., 1987); this correction ranges from about 5 percent at
N = 1 MM$ to less than percent at N = 350 MM$ . Next, graphs of the interaction of N

with respect to the factors were built. Finally, the graphs were analyzed to establish the
response model behavior.
Figures 6.2 to 6.5 show the response model graphs. The combination of
transformations, interactions and a second-order model yields surfaces that are far from
planar (factors not varied are set to their center point value). Visualization of these
surfaces contributes to understanding of the governing factors. Highly nonlinear
functions can be modeled because of the use of the Box-Cox and Box-Tidwell
transforms.

180
160
140
120
100
N
(MM$) 80
60
40
2550

20

2025

pi (psia)

1500
11

31

21

51

41

70

60

90

80

100

kh (md)

Figure 6.2

Effects of permeability and initial reservoir pressure on net present value.

101

Horizontal permeability is most influential when it is low, and its effect is


comparable to the initial pressure (Figure 6.2).

180
160
140
120
100
N
(MM$) 80
60
40
76

20
48

hpD
(percent)

20
11

31

21

51

41

70

60

90

80

100

kh (md)

Figure 6.3

Effects of permeability and completion length on net present value.

The effect of completion length appears small compared with horizontal


permeability (figure 6.3), and the permeability effect is largest at low permeability.
Completion length effect is statistically significant. Although small, the completion
length effect is not negligible (table 6.4).

180
160
140
120
100
N
(MM$) 80
60
40
76

20
48
1.5

2.5

20

hpD
(percent)

1.0

Cg ($/MCF)

2.0

3.5

3.0

4.0

6.0
5.5
5.0
4.5

Figure 6.4 Effects of gas price and completion length on net present value.

102

Gas price has a larger effect than the completion length (figure 6.4). The effect of
completion length is greater at high gas price; this is a two-term interaction supporting
the interacting, transformed linear model form.

225
200
175
150
125
N
(MM$) 100
75
50
25
5

Figure 6.5

0.162

0.108

d
(fraction)

0.135

0.054

3
0.081

0.027

Cg ($/MCF)

Effects of discount rate and gas price on net present value.

Finally, the economic factors have large effects (figure 6.5; note change in Naxis).
6.3.3 Monte Carlo Simulation
Monte Carlo simulation reveals the overall distribution of a response, helps
analyze sensitivities, and guides optimization (Damsleth et. al., 1992, White & Royer,
2003; White et. al., 2001). To perform Monte Carlo simulation, distributions on all
uncertain factors must be specified. In this study, beta distributions were used for all
factors (figure 6.6, table 6.5).
Beta distributions (Berry, 1996) are simple to manipulate and interpret: as a and b
increase, the distribution gets narrower, if a is larger than b the distribution peak shifts to
103

the left. The distributions are easily scaled to fit any range. In the illustrative figure
(figure 6.6), the uniform distributions (both parameters equal to 1) are appropriate for the
controllable variables, whereas distributions with a long positive tail (a>b) are well
suited to approximating factors like permeability. The distributions used in this study are
reasonable, but do not have any verifiable physical meaning. Selection of reasonable
factor distributions is discussed in texts on Bayesian statistics (Berry, 1996).

Table 6.5 Parameters for beta distributions of factors


Factor
pi
Design

Beta Dist

kzD

kzD

VAD

Cg

Cw

hpD

Minimum

1500

10

100

0.5

0.2

Maximum

3000

100

100

1500

0.18

10

20

20

10

20

20

6
(a,b)=(20,20

Probability Density

5
4
3
(a,b)=(5,2)

(a,b)=(4,4)
(a,b)=(1,1)

1
0
0

0.2

0.4

0.6

0.8

Scaled value of parameter

Figure 6.6

Beta distributions used for the Monte Carlo simulation.

Using these factor distributions, the distribution of net present value can be
visualized (figure 6.7). Compared to the base case where hpD is allowed to vary randomly
over its entire range, the case with low hpD has a peak at lower N and fewer high N
104

values. Similarly, high hpD is associated with higher N. This shows that, on average,
higher hpD yields higher N.
0.018
0.016

full range hpD


minimum hpD

0.014

Proportion

0.012
0.01
0.008
0.006

maximum hpD

0.004
0.002
0
0

50

100

150

200

250

Net present value (MM$)

Figure 6.7

Monte Carlo simulation of the net present value.

The effects of all factors can be examined by setting each of the factors in to their
P10, P50, and P90 values while allowing the other factors to vary according to their
distributions (table 6.6). Unlike the linear sensitivity analysis (earlier), the Monte Carlo
sensitivity (MCS) method incorporates factor value uncertainty in to the analysis. Table
6.6 shows the results.

Table 6.6

Monte Carlo sensitivity estimates.


Variations and Effects on Net Present Value
(MM$)
Effects
Factor

P10

P50

P90

Linear

Quad.

pi

69.1

99.3

122.9

53.79

-6.69

kh

95.0

98.5

100.1

5.16

-1.89

VAD

104.1

97.2

93.2

-10.93

2.83

kzD

100.4

97.5

95.9

-4.51

1.39
0.56

Cg

74.4

97.6

121.4

47.00

Cw

98.3

98.0

97.6

-0.66

0.00

101.4

97.8

94.5

-6.86

0.26

hpD

93.8

98.1

102.0

8.27

-0.32

105

These results (table 6.6) bear out the importance of initial pressure and gas price.
Compared with the linear sensitivity analysis, MCS estimates lower sensitivity of net
present value to horizontal permeability. The difference is computed from the P90 to the
P10 values, which excludes the extremely low permeability values for which the
permeability sensitivity is greatest (figure 6.2). In general, MCS results differ from linear
sensitivity analyses because unlikely values are down-weighted in MCS. The completion
effect from the MCS appears relatively small (but it is the fourth most important factor).
However, increasing the completion length from 28 (P10) to 92 (P90) percent of the total
interval length increases the average net present value from 93.8 to 102 MM$, a
substantial change (figure 6.8, table 6.6).

140

Net present value (MM$)

135

low d, high pi, kh, and VAD

130
125
120
115
optima

110
105
100
base case

95
90
20

40

60

80

100

Completion length (percent)

Figure 6.8

Optimization of net present considering uncertainty in reservoir and


economic factors (two cases).

106

6.3.4

Optimization
Development teams seek to choose the optimum well configuration for the

prevailing reservoir properties and operating conditions. Response models can be used
for this optimization.
One approach is to differentiate the response model for the objective function
with respect to the controllable parameter, set it equal to zero, and solve for the
controllable parameter (White & Royer, 2003). Here, the model for net present value (Eq.
6.13) is differentiated with respect to the completion length hpD, the differenciate
equation set equal to zero, and then solved for hpD. Eqn. 6.14 shows the resulting
correlation to maximize net present value for any combination of the other parameters.
This correlation is not a function of completion length. This is a mathematical equation
resulting from the statistical function derived for Net Present Value.

t
t
h tpD ,opt = 1,294 p it + 2.550k ht 0.372k zD
0.254V AD
+ 0.803C gt 0.150C wt + 3.481d t 1.635 .(6.14)

Where the superscript t denotes the transformed, scaled factor values. The effects
of these factors are difficult to interpret because of the Box-Tidwell powers (table 6.2),
but the function can be to evaluate to aid understanding (Roman, 1999). The equations
relating transformed to untransformed factors are given in item 6.3.1 (Eqns. 6.6 to 6.12).
Several observations can be made from Eqn. 6.14: as the initial pressure,
permeability anisotropy and water cost increase, the optimal interval is decreased (These
factors have positive Box-Tidwell power coefficient and negative coefficient in Eq. 6.14).
As the gas price and discount rate increase, motivating higher rates, the optimal interval

107

increases (both factors have positive Box-Tidwell power coefficient and positive
coefficient in Eq. 6.14).
Comparison among optimum completion length calculated using Eqn. 6.14 and
fitting responses directly from the data was done, getting good agreement among them
(figure 6.9).

Optimal completion length (percent)

120
100
80
60
40
Using Eqn. (3)

20

Directly fit response surface

0
0

20

40

60

80

100

Horizonal permeability (md)

Figure 6.9

6.4

Optimal completion length calculated from the transformed model and a


response model computed from local optimization.

Implications for Water-Drive Gas Wells


The statistical and optimization analyses shed light on the general problem of gas

completions in the presence of water drives. Aquifer size is the third most important
factor after initial pressure and gas price (table 6.6). Furthermore, the optimal completion
length was often the full interval, even in the presence of large aquifers and higher-thanaverage water costs (figure 6.9).
The optimization from the response model (Eqn. 6.14) is evaluated by comparison
with directly simulated results (Figure 6.9), confirming that the optimum completion

108

length is often the full interval (for 55 percent of the cases examined), and the average
optimum length is 80% of the gas zone.
The relative loss of net present value caused by sub-optimal completion length
can be calculated as:
L =1

N (h pd )
N ( h pD ,opt )

..(6.15)
0.25

Loss relative to optimized case,


fraction of NPV

kh
0.2

hpD
0.15

pi

Cg

VAD

0.1

kzD
0.05

0
1

Factor Level

Figure 6.10

Relative loss of net present values if completion length is not optimized.

The loss ranges from about 2 to over 20 percent, and the average loss is 10
percent (figure 6.10). The greatest losses due to sub-optimal completion length are for
low pressure, low completion length, and low permeability; losses also increase as the
discount rate increases.
The response models and conclusions from this study can be applied to other
water-drive gas reservoirs in a general sense. However, the statistical models are valid
only over the ranges considered and if the other well and reservoir parameters are similar.

109

CHAPTER 7
DOWNHOLE WATER SINK WELL COMPLETIONS IN GAS RESERVOIR
WITH BOTTOM WATER

Water production reduces gas recovery by shortening the wells life. Water loads
up the gas well, killing it when a lot of gas remains in the reservoir. Various concepts and
techniques have been used to solve water-loading problems in gas wells (Chapter 2).
Some of them are: pumping units, liquid diverters, gas lifts, concentric dual-tubing
strings, plunger lifts, soap injection, Downhole Gas Water Separation (DGWS), and flow
controllers. All the above-mentioned solutions for water production in gas wells work
inside the wellbore.
Downhole Water Sink (DWS) technology has been successfully proved to control
water coning in oil wells with bottom water drive increasing oil production rate and oil
recovery (Swisher & Wojtanowicz, 1995; Shirman & Wojtanowicz, 1997, and 1998;
Wojtanowicz et al., 1999). DWS works outside the wellbore to solve water production.
The objective of this study is to evaluate DWS performance for different gas
reservoir conditions and to compare DWS wells to the conventional gas wells with no
water control and with water control (using DGWS technology).
7.1

Alternative Design of DWS for Gas Wells


The most-promising configuration of dual (DWS) completion to improve

performances of gas wells was identified qualitatively using several technical


considerations as follows.
DWS has proved successful in oil wells for a few particular designs of dualcompletion. However, Armenta and Wojtanowicz (2002) proved that the mechanism of
110

water coning in gas wells was different than that in oil wells. Therefore, a specific design
of DWS for gas wells was to be different than for oil wells. Three different possible
configurations were evaluated:

7.1.1

Dual completion without a packer;

Dual completion with a packer;

Dual completion with a packer and gravity gas-water separation.

Dual Completion without Packer


Figure 7.1 depicts the DWS configuration including two completions without a

packer.

Gas

Water

Water

Figure 7.1

Dual completion without packer.

For this configuration, one completion is located at the top of the gas zone.
Another is located in the water zone. Gas is produced from the top completion and water
111

from the bottom completion. A pump is located below the lower completion to drain the
water zone and inject the water into a lower disposal zone. This pump generates an
inverse gas cone. Also, the bottom hole pressure at the gas and water completion is the
same.
This configuration gives partial control over the water coning, although some
water is still produced with the gas. The control efficiency, however, would be reduced
with time because (as the gas-water contact moved upward) the amount of water
produced from the top completion would increase and eventually kill the gas production.
The solution here would be a bigger water pump. However, higher pump rate
means the bottom-hole pressure is reduced with time while the amount of water produced
from the top completion increases at the same time. This combination makes the well
very sensitive to liquid loading. In short, this configuration could kill the well early. So, it
would be better to have the two completions isolated to control the vertical movement of
gas-water contact outside the well.
7.1.2

Dual Completion with Packer


Figure 7.2 depicts the DWS configuration with two completions separated with a

packer. The objective is to isolate the bottomhole pressure for the two completions.
Isolating the bottomhole pressure would allow the pump rate to increase when the gaswater contact moves up without making the well too sensitive to water loading.
Eventually, some water would be produced to the surface from the top completion at later
times.
This configuration allows for better control of water coning in gas wells with time
because it allows two different values of the bottom hole flowing pressures. The top
completion could keep producing gas longer with a small amount of water or even water112

free. However, the big disadvantage of this configuration is that some gas could be coned
down to the lower completion. As the gas could not escape, it would create a high
backpressure below the packer reducing the effectiveness of the system. Therefore, a
venting system for the gas inflowing the bottom completion is needed to maintain
control of water coning.

Gas
Water

Water

Figure 7.2 Dual completion with packer.


7.1.3

Dual Completion with a Packer and Gravity Gas-Water Separation


Figure 7.3 shows the DWS configuration of two completions with a packer and

gas-water separation at the bottom of the well.


For this configuration, the two completions are separated only with the packer.
This means that the bottom completion section begins close to the end of the top
completion section. The top completion is produced through the annulus between the
113

tubing and the production casing. Also, water with some gas inflows the bottom
completion due to the inverse gas coning. The production strategy ensures using a very
long top completion ,producing water-free gas for most of the time. As water and gas
separate in the well below the packer, gas is produced at the surface, and the water is
injected into a disposal zone.

Gas

Water

Water

Figure 7.3 Dual completion with a packer and gravity gas-water separation.
This configuration would control the water cone ascent outside the well and
maximize the gas production rate at the top completion with no water loading. The gas
production would be maximized due to the longer top completion and the extra gas
production from the bottom completion thus accelerating gas recovery. The
disadvantage of this configuration is its complexity. However, the design could always be

114

made simple if the water from the bottom completion was lifted to the surface with the
small amount of gas.
From this qualitative analysis the author selected this design (dual completion
with a packer and gravity gas-water separation) as the best configuration of DWS for gas
wells.
7.2

Comparison of Conventional Wells and DWS Wells

7.2.1

Reservoir Simulator Model


Numerical reservoir simulators can predict the behavior of complex reservoir-well

systems even if the governing partial differential equations are nonlinear. This method
was chosen for this study for several reasons.

Water production in gas reservoirs is a complex problem.

Water-drive gas reservoirs have two flowing phases, and it is difficult to


analyze this behavior analytically. Actually, there is no analytical model for
water coning in gas wells.

The gas-water contact location is dynamic, further complicating analysis.

Modern reservoir simulators (Schlumberger, 1997) integrate reservoir


inflow and tubing outflow models, which is a vital component of gas well
performance prediction (Lee & Wattenbarger, 1996).

A comparison of gas recovery for conventional and DWS wells was performed
using a gas reservoir model shown in Figure 7.4. The layer cake-type model consists of
a gas reservoir on the top of an aquifer (McMullan & Bassiouni, 2000). The radius of the
gas zone is 2,500 ft, and its thickness is 100 ft. The gas zone has 100 grids in the vertical
direction (one foot per grid). The radius of the water zone is 5,000 ft, and its thickness is
800 ft. The water zone has 10 grids in the vertical direction. Nine of them have a
115

thickness of 10 ft and the bottom grid is 710 ft thick. The gas-water relative permeability
curves are for a water-wet system (Table 5.4) reported from laboratory data (Cohen,
1989). The gas deviation factor (Dranchuck et al., 1974) and gas viscosity (Lee et al.,
1966) were calculated using published correlations (Table 5.4). Capillary pressure is
neglected (set to zero), and relative permeability hysteresis is not considered. The well
performance was modeled using the Petalas and Aziz (1997) mechanistic model
correlations (Schlumberger, 1998). Appendix F includes a sample data deck for the
Eclipse reservoir model.

Well, rw= 3.3 in


Top: 5000 ft
100 layers
1 ft thick

hp

100 ft

Gas (G)

9 layers 1 ft
thick, and one
layer 710 ft
thick.

800 ft

Water (W)
5000 ft

Figure 7.4 Simulation model of gas reservoir for DWS evaluation.

116

7.2.2

Reservoir Parameters Selection


Vertical permeability and aquifer size were selected to create a well-reservoir

system with severe water problems. Vertical permeability increases water coning in gas
wells; the higher the vertical permeability is, the more severe the coning becomes
(Beattle & Roberts,1996; Armenta & Wojtanowicz, 2002). A reasonable assumption in
petroleum engineering is that vertical permeability is ten-fold smaller than horizontal
permeability. To create a scenario of severe water coning, vertical permeability was
assumed to be fifty percent of horizontal.
Textbook models of water inflow for material balance computations assume that
the amount of water encroachment into the reservoir is related to the aquifer size (Craft &
Hawkins, 1991). (For example, van Everdinger and Hurst used the term B representing
the volume of aquifer. The Fetkovich model considers a factor called Wei defined as the
initial encroachable water in place at the initial pressure.) For this study, we assumed that
the pore volume of the aquifer is 968fold greater than the gas pore volume a condition
of strong bottom water drive.
The inflow gas rate depends on reservoir permeability, so the rate of recovery is
controlled by the gas rate. Three values of permeability, 1, 10, and 100 md, were selected
for this study.
Water loading kills gas wells causing reduced gas recovery; initial reservoir
pressure plays an important role in this process. To investigate this effect, three different
initial reservoir pressures were considered: low (subnormal), normal, and high
(abnormal). Typically, reservoirs with an initial pressure gradient between 0.43 and 0.5
psi/ft are considered normally pressured (Lee & Wattenbarger, 1996). For this study, the
initial reservoir pressure was calculated assuming 0.3 psi/ft, 0.46 psi/ft, and 0.6 psi/ft
117

values of pore pressure gradients for the subnormal, normal, and abnormal reservoir,
respectively.
Gas recovery from certain water-drive gas reservoirs may be very sensitive to gas
production rate. If practical, the field should be produced at as high a rate as possible.
This may result in a significant increase in gas reserves by lowering the abandonment
pressure (Agarwal et al., 1965).
Simulations for conventional wells were run at constant tubing head pressure
(THP) of 300 psi at a maximum gas rate for the THP.
The DWS well was modeled assuming two wells at the same location; the topcompletion well was produced the same way as the conventional well. The bottom-well
completion was also run at constant THP (300 psi) until there was no more gas inflow to
the bottom completion. Then, the bottom-completion well was produced at a constant
maximum water rate. The length of the bottom completion for the DWS well was set at
30% the length of the top completion.
7.2.3

Conventional Wells Completion Length


The potential benefit of long completion length to increase net present value in

gas wells was identified in Chapter 6. This result agrees with detailed studies of
completion length in gas reservoirs (McMullan & Bassiouni, 2000). For this study, the
well completion length of conventional wells was selected to maximize gas recovery. The
selection was needed to provide an unbiased comparison of the single and dual
completed wells and to investigate if DWS gives some extra recovery beyond the
maximum recovery of conventional wells.
The effect of completion length on recovery was simulated for different initial
reservoir pressure and permeability.
118

80
70
Gas Recovery (%)

60
50
40
30
20
10
k = 100 md

0
5

k = 10 md

10

30

50

k = 1 md

70

100

Fraction of Gas Zone Perforated (%)

Figure 7.5 Gas recovery for different completion length in gas reservoirs with subnormal
initial pressure.

Figure 7.5 shows the results for a gas reservoir with subnormal initial reservoir.
Gas recovery increases with permeability. Also, for each permeability value, the
maximum recovery occurs when the gas zone is totally perforated.

70

Gas Recovery (%)

60
50
40
30
20
10
k =100 md

0
5

k =10 md

10

30

50

k =1 md

70

100

Fraction of Gas Zone Perforated (%)

Figure 7.6 Gas recovery for different completion length in gas reservoirs with normal
initial pressure.

119

70

Gas Recovery (%)

60
50
40
30
20
10
k =100 md

0
5

k =10 md

10

30

k =1 md

50

70

100

Fraction of Gas Zone Perforated (%)

Figure 7.7
Gas recovery for different completion length in gas reservoirs with
abnormal initial pressure.
Figures 7.6 and 7.7 confirm the results for normal and abnormal reservoir
pressure; maximum recovery is reached for a totally perforated gas well. For permeability
100 md, however, completion length effect is very small.

Flowing Bottom Hole Pressure (psia)

2,200
2,000
1,800
1,600
1,400
1,200
1,000
800
600
400
200
0
0

1000

2000

3000

4000

5000

6000

Time (days)
k= 1 md

k= 10 md

k= 100 md

Figure 7.8 Flowing bottom hole pressure versus time (Normal initial pressure; 50%
penetration).

120

The finding can be explained as follows. Gas recovery increases with


permeability because of the larger gas rate and higher flowing bottom hole pressure. The
well can tolerate higher water rates before loading up with liquid. Moreover, gas recovery
is faster at high gas rates.

30,000

Gas Rate (Mscf/D)

25,000
20,000
15,000
10,000
5,000
0
0

1000

2000

3000

4000

5000

6000

Time (days)
k= 1 md

Figure 7.9

k= 10 md

k= 100 md

Gas rate versus time (Normal initial pressure; 50% penetration).

Figures 7.8, and 7.9 support these observations. (They show the results for the
normal initial reservoir pressure with 50% gas zone penetration.) They show the highest
flowing pressure and gas rate for permeability 100 md.
Overall, shorter completion length gives longer production time for conventional
wells.
From this study, it is possible to conclude that the highest gas recovery is when
the gas zone is totally perforated, particularly for permeability 1 and 10 md. For
permeability 100 md, gas recovery is almost insensitive to length of perforation.
121

7.2.4

Gas Recovery and Production Time Comparison


Gas recovery and production time were calculated for the DWS wells and

compared with the maximum gas recovery for the conventional wells calculated in the
previous section.

Total Production Time (Days)

60

Gas Recovery (%)

50
40

30

20
10

16000
14000
12000
10000
8000
6000
4000
2000
0

k = 1md, Low
Pressure

k= 1 md, Normal
Pressure

Conventional Well

k = 1md, Low
Pressure

k= 1 md, High
Pressure

k=1md, Normal
Pressure

Conventional Well

DWS Well

k= 1 md, High
Pressure

DWS Well

Figure 7.10 Gas recovery and total production time for conventional and DWS wells for
different initial reservoir pressure and permeability 1 md.

Figure 7.10 shows the results for a reservoir with permeability 1 md. Gas
recovery is always higher for DWS compared with the conventional well. (At low initial
reservoir pressure, gas recovery increases from 11% to 28%; at normal initial reservoir
pressure, the increase is from 30% to 48%; at high reservoir pressure the increase is from
37% to 54%.) Furthermore, production time is always longer for DWS compared with the
conventional well. In short, for tight reservoirs, DWS increases gas recovery by
extending the well life.
122

80

8000

Total Production Time (Days)

Gas Recovery (%)

70
60
50
40
30
20
10
0
k= 10 md; Low
Pressure

k= 10 md; Normal
Pressure

Conventional Well

7000
6000
5000
4000
3000
2000
1000
0

k= 10 md; High
Pressure

k= 10 md; Low
Pressure

DWS Well

k=10md; Normal
Pressure

Conventional Well

k= 10 md; High
Pressure

DWS Well

Figure 7.11 Gas recovery and total production time for conventional and DWS wells for
different initial reservoir pressure and permeability 10 md.

Figure 7.11 shows similar results when the reservoir permeability is 10 md. Gas
recovery with DWS is higher for all initial reservoir pressures. (At low initial reservoir
pressure, gas recovery increases from 42% to 54%; at normal initial reservoir pressure,
the increase is from 62% to 68%; at high reservoir pressure the increase is from 65% to
69%.) Production time is longer for DWS only for low initial reservoir pressure. It
becomes shorter for the normal and high initial reservoir pressure. Thus, DWS increases
gas recovery by extending the well life only for low-pressure reservoirs. In the normal
and high-pressure reservoir, the DWS advantage is two-fold: it stimulates and accelerates
the recovery.
Figure 7.12 confirms these results for a reservoir with permeability 100 md. Gas
recovery is always higher with DWS, but the improvement is very small. (At low initial
reservoir pressure, gas recovery increases from 65% to 68%; at normal initial reservoir
pressure, the increase is from 68% to 70%; at high reservoir pressure, the increase is from
123

69% to 70%.) Figure 7.12 also shows that production time is always slightly shorter with
DWS, but the difference becomes almost insignificant.

4000

Total Production Time (Days)

80

Gas Recovery (%)

70
60
50
40
30
20
10
0

3500
3000
2500
2000
1500
1000
500
0

k = 100 md, Low


k=100 md,
Pressure
Normal Pressure
Conventional Well

k= 100 md, High


Pressure

k = 100 md, Low


k=100 md,
k= 100 md, High
Pressure
Normal Pressure
Pressure

DWS Well

Conventional Well

DWS Well

Figure 7.12 Gas recovery and total production time for conventional and DWS wells for
different initial reservoir pressure and permeability 100 md.

7.2.5

Reservoir Candidates for DWS Application


It is evident from the previous study that gas recovery is higher for DWS wells

than conventional wells. DWS increases gas recovery up to 160% for low-pressure
(subnormal), low-permeability (1 md) gas reservoirs. The advantage, however, reduces to
10% for reservoirs with normal pressure and permeability 10 md, and it almost
disappears when permeability is 100 md for any initial reservoir pressure. There is also
some reduction of production time for permeabilities 10 and 100 md.
Analysis of the production mechanism shows that DWS extends the well life by
preventing early water loading of the well. Figures 7.13 and 7.14 support this conclusion.
(These two figures are for subnormal initial reservoir pressure and permeability 1 md.)

124

3,000

Gas Rate (Mscf/D)

2,500
2,000
1,500
1,000
500
0
0

1000

2000

3000

4000

5000

6000

7000

Time (Days)
DWS-Top Completion

Conventional

Figure 7.13 Gas rate history for conventional and DWS wells (Subnormal reservoir
pressure and permeability 1 md).

Bottom Flowing Pressure (psia)

800
700
600
500
400
300
200
100
0
0

1000

2000

3000

4000

5000

6000

7000

Time (Days)
DWS-Top Completion

Conventional

Figure 7.14 Flowing bottom hole pressure history for conventional and DWS wells
(Subnormal reservoir pressure and permeability 1 md).

125

Figure 7.13 shows gas rate versus time for the conventional and DWS well. The
gas rate is always higher for DWS because the top completion produces almost water free
most of the time.
Figure 7.14 shows flowing bottom hole pressure of the wells. It shows that the
bottom hole flowing pressure increase is slower for DWS than for conventional wells. In
short, removing the water inflow to the top completion delays liquid loading of the well
and elevates production rate.
From this study, one could conclude that the best reservoir conditions for DWS
would be low-permeability low-pressure gas reservoirs. With conventional technology,
such reservoirs necessitate the use of a lifting technology (i.e. DGWS) to produce gas and
water.
7.3

Comparison of DWS and DGWS


The comparison is made for a gas reservoir with low permeability (1 md) and

subnormal initial pressure. This is the worst-case scenario for conventional gas recovery,
identified in the previous section, where there is a need for DWS or other (DGWS)
technology.
7.3.1 DWS and DGWS Simulation Model
The reservoir simulator model described in section 7.2.1 was also used in this
study.
DWS was simulated using two different wells located at the same place, but with
different completion length and depth. The wells represented the top and bottom
completions of DWS wells. Also, two cases of completion length were considered. In the
first case, the top DWS completion totally penetrates the gas zone (100 ft), and the
bottom completion is 30 feet long with the top located one foot below the bottom of the
126

top completion (DWS-1). (The same configuration was used to compare DWS with
conventional wells.) In the second case, the top and bottom completion length are 70 and
60 feet, respectively (DWS-2). The two wells representing DWS completions produce
simultaneously at constant THP (300 psia). It is assumed that the tubing of the bottom
completion would only produce gas liberated from water (The Tubing Performance
Relationship curves were built for zero water cut condition, only. Bottomhole flowing
pressure for the bottom conditions is controlled by the THP and the gas friction losses,
only. Both, gas and water, are produced from the reservoir and separated at the wellbore).
When the bottom completion stops producing gas, the well is switched to produce at a
constant and maximum water rate.
DGWS was simulated using two different wells at the same place, too. The two
wells had the same completion length and location. One well represents the situation until
the well loads up with water. At this time the first well is shut down and the second well
takes over. The second well models removal of water by downhole separator (DGWS),
i.e. water free production of gas. Both wells are produced at constant THP (300 psia). It is
assumed that the DGWS well produces gas free of water all the time. This is the best
operational performance of DGWS. Two cases with different completion length were
also considered; totally penetrated gas zone (DGWS-1) and 70% penetration (DGWS-2).
Finally, the economic limit of 400Mscfd was set for the DGWS and DWS wells.
Appendix F includes a sample data deck for the Eclipse reservoir model.
7.3.2

DWS vs. DGWSComparison Results


Figures 7.15, 7.16, 7.17, and 7.18 summarize the results of the comparison

between DWS and DGWS.

127

PTR [(Production Time Conventional, DWS, or DGWS) /


(Production Time Conventional)]

45
40

Gas Recovery (%)

35
30
25
20
15
10
5
0

Gas Zone Totally


Perforated
Conventional

Gas Zone 70%


Perforated
DWS

7.0
6.0
5.0
4.0
3.0
2.0
1.0
0.0

DGWS

Gas Zone Totally


Perforated
Conventional

Gas Zone 70%


Perforated
DWS

DGWS

Figure 7.15 Gas recovery and Production Time Ratio (PTR) for conventional, DWS, and
DGWS wells.

Figure 7.15 shows gas recovery and Production Time Ratio (PTR) for the two
cases of well completion.
PTR =

(Tp ) DWS / DGWS


(Tp ) conventional

..(7-1)

Where:
PTR = Production time ratio,
(Tp)DWS = Production time for DWS wells,
(Tp)DGWS = Production time for DGWS wells,
(Tp)conventional = Production time for conventional wells.

Figure 7.15 shows that DGWS gives the highest gas recovery (41.5%) when the
gas zone is totally penetrated, and DWS gives the highest recovery (40.7%) when 70% of
the gas zone is penetrated. Thus, maximum recovery for DWS and DGWS is almost the
128

same. Moreover, the PTR are 7.4 and 3.5 for DGWS and DWS, respectively. This means
that the same recovery with DGWS takes (6.4/3.5 = 1.83) 1.83 times longer than that
with DWS.

45
DWS-2

DGWS-1

40

Gas Recovery (%)

35
DGWS-2

30
DWS-1

25
20
15
10
5

Conventional

0
0

3000

6000

9000

12000

15000

18000

21000

Time (Days)
DWS-2

Figure 7.16

DWS-1

DGWS-2

DGWS-1

Conventional Well-1

Gas recovery versus time for DWS, DGWS, and conventional wells.

Figure 7.16 gives gas recovery versus time for the wells in all the cases. The
DGWS-1 and DWS-2 designs give maximum final recoveries that are almost equal.
However, DGWS-1 produces 50% longer than DWS-2. Thus, DWS-2 accelerates gas
recovery. One additional observation for DWS is that reducing the length of the top
completion and increasing the length for the bottom completion would increase gas
recovery by 49% (from 27.3% to 40.7%). This is an important observation because it
shows that completion lengths for DWS should be optimized (Armenta & Wojtanowicz,
2003).

129

3,000

Gas Rate (Mscf/d)

2,500
2,000
Conventional

1,500
DWS-2 Top

1,000
500

DWS-2 Bottom

DGWS-1

0
0

3000

6000

9000

12000

15000

18000

21000

Time (Days)
Conventional Well-1

Figure 7.17

DGWS-1

DWS-2 Top

DWS-2 Bottom

Gas rate history for DWS-2, DGWS-1, and conventional wells.

90
80
DWS-2 Bottom

Water Rate (stb/d)

70
60
50

DGWS-1

40
30
20
Conventional

DWS-2 Top

10
0
0

3000

6000

9000

12000

15000

18000

Time (Days)
Conventional Well-1

DGWS-1

DWS-2 Top

DWS-2 Bottom

Figure 7.18 Water rate history for DWS-2, DGWS-1, and conventional wells.

130

21000

The rate decline plots in Figure 7.17 show that the gas rate for DWS-2 is always
higher than that for DGWS-1. Also, the bottom completion of DWS-2 only produces gas
during the initial 28% of the total production time (first 3405 days).
Figure 7.18 is the water production history for the two highest gas recovery cases
(DWS-2 and DGWS-1) and the conventional well. It shows that the bottom completion of
DWS-2 has the highest water rate, and the top completion has the lowest. It means the
DWS-2 produces the lowest amount of water to the surface because most of the water is
injected using the bottom completion.
7.3.3

Discussion about the Packer for DWS Wells

Bottom Hole Flowing Pressure (psia)

500
DWS-2 Top

Conventional

400
DGWS-1

300

200

100
DWS-2 Bottom

0
0

2000

4000

6000

8000

10000

12000

14000

16000

18000

20000

Time (Days)

Conventional Well-1

DGWS-1

DWS-2 Top

DWS-2 Bottom

Figure 7.19 Bottom hole flowing pressure history for DWS-2, DGWS-1, and
conventional wells.

Figure 7.19 shows bottomhole pressure history for the two highest gas recovery
cases (DWS-2 and DGWS-1) and the conventional well. It shows that bottom hole
pressure for the conventional well increases rapidly due to the water production. Bottom
131

hole pressure for the DWS well is always deferent for the two completions. This
difference is dramatically bigger when the top completion is set to produce at the
maximum water rate releasing the THP restriction for the bottom completion (after 4000
days). This situation would not be possible without a packer. Therefore, as it was
mentioned in section 7.1.3, the packer is needed to guarantee isolation between the two
completions. This isolation is still possible when the two completions are one after the
other (this is the case) giving a better control on the water coning.
From this study, one can say that for the reservoir model used here, DGWS and
DWS could give almost the same final gas recovery, but DWS production time is 35 %
shorter than that for the DGWS well. DWS well, however, would produce little water at
the surface from the top completion, but DGWS well would not lift any water. A packer
between the two completions for the DWS wells is very important giving insulations
between the completions and improving control on the water coning.

132

CHAPTER 8
DESIGN AND PRODUCTION OF DWS GAS WELL

The potential benefit of Downhole Water Sink (DWS) technology in gas wells
was previously identified in Chapter 7. The analysis, however, did not address operating
conditions of DWS in gas reservoir.
The objective of this study is to find out how to produce DWS wells in low
productivity gas reservoirs with bottom water. The operational principle is maximum
final gas recovery. Six factors control DWS operation: water rate from the bottom
completion; top completion length; bottom completion length; distance between the
bottom and the top completion; bottomhole flowing pressure at the bottom completion,
and time to install DWS in gas wells (Note that the variable are not independent as
flowing pressure relates to the completion length, and fluids rates for a given
well/reservoir system). Figure 8.1 depicts four factors considered for the analysis.

Separation between the


completions

Top completion length

Water rate at the


bottom completion

Gas
Water

Bottom completion
length

Water

Figure 8.1

Factors used to evaluate DWS performance.


133

The evaluation is done for a low productivity gas reservoir with reservoir
pressure: 1500 psia (Subnormal); depth: 5000 ft; and for two different permeabilities: 1
and 10 md. The well (top completion) is produced at a constant tubing head pressure, 300
psia. The bottom completion is produced even at constant water rate or constant Bottom
Hole Pressure (BHP). The gas-water contact is located at 5100 ft. An identical model to
the one described in section 7.2.1 was used for the study. Table 5.4 shows the fluid
properties, and Appendix F includes a sample data deck for the Eclipse reservoir model.
8.1

Effect of Top Completion Length

Gas Recovery Factor (%)

55
50
45
40
35
30
25
20
15
10
5
0

k= 10 md
Perf.= 20%

Figure 8.2

Perf.= 40%

Perf.= 60%

k= 1 md
Perf.= 80%

Perf.= 100%

Gas recovery factor for different length of the top completion.

Figures 8.2 and 8.3 show the results for the top completion length evaluation.
Four different top completion lengths were evaluated (40%, 60%, 80%, and 100%
penetration of the gas zone) for permeability 1 md. Five different top completion lengths
were evaluated (20%, 40%, 60%, 80%, and 100% penetration of the gas zone) for
134

permeability 10 md. Bottom completion is located at the top of the aquifer (at 5100 ft)
penetrating 20 ft of the water zone. The bottom completion length (20 ft) was constant
for each case. Constant water-drainage rate from the bottom completion was used (30 bpd
for permeability 1 md, and 200 bpd for permeability 10 md) for each case (Table 8.1).

Permeability= 1 md

Permeability: 10 md

5,000

Total Production Time (Days)

Total Production Time (Days)

15,000

12,000

9,000

6,000

3,000

3,000

2,000

1,000

0
Perf.=
40%

Figure 8.3

4,000

Perf.=
60%

Perf.=
80%

Perf.=
20%

Perf.=
100%

Perf.=
40%

Perf.=
60%

Perf.=
80%

Total production time for different length of the top completion.

135

Perf.=
100%

Table 8.1
% of gas zone
penetrated

Operation conditions for top completion length evaluation


Permeability 1 md
Length /
Length /
Location Location Top Complet.
Bottom
(ft)
Comp.(ft)

Permeability 10 md
Water % of gas zone
Length /
Length /
Rate
penetrated
Location Location (STB/D)
Top Complet.
Bottom
(ft)
Comp.(ft)

Water
Rate
(STB/D)

Perf = 40%

40 / (50005040)

20 / (51005120

30

Perf = 20%

20 / (50005020)

20 / (51005120

300

Perf = 60%

60 / (50005060)

20 / (51005120

30

Perf = 40%

40 / (50005040)

20 / (51005120

300

Perf = 80%

80 / (50005080)

20 / (51005120

30

Perf = 60%

60 / (50005060)

20 / (51005120

300

Perf = 100%

100 / (50005100)

20 / (51005120

30

Perf = 80%

80 / (50005080)

20 / (51005120

300

Perf = 100%

100 / (50005100)

20 / (51005120

300

The highest gas recovery for both permeability values happens for the shortest top
completion length (Figures 8.2). Also, the longest production time is for the shortest top
completion (Figures 8.3). This means that the benefit of DWS is reduced for longer top
completion. This effect was also noticed when a comparison of DWS and DGWS was
done (Section 7.3.2.). The longer the top completion is, the closer to the gas-water
contact is the completion. Then for long completions, water inflows the top completion
early. Water rate at the top completion is higher for longer completion, also. Therefore,
higher water-drained rates from the bottom completion are needed to maintain the top
completion water free. In this case, however, to evaluate the effect of the top completion
length alone, the water-drainage rate is constant. In short, DWS delays water loading
longer when short top completion are used.
The benefit of the highest gas recovery for the shortest top completion length is
more evident for permeability 1 md than 10 md (Figure 8.2). This is because of the higher

136

gas mobility related to water. Low permeability delay vertical water movement to the top
completion allowing longer water free production of the top completion.
8.2

Effect of Water-drainage Rate from the Bottom Completion


Four different water-drainage rates were used to evaluate its effects on gas

recovery and production time. Three of them were constant all the time, and the other one
was varied to always produce at maximum water rate from the bottom completion (Table
8.2). Location (at the top of the water zone: 5100 ft), and length (20 ft) for the bottom
completion is constant for all the cases (1 and 10 md). For permeability 1 md, top
completion length was constant penetrating 40% of the gas zone, and the water rates
were: 10 bpd, 20 bpd, 30 bpd, and the maximum water rate (from 32 to 39 bpd). For
permeability 10 md, top completion length was constant penetrating 20% of the gas zone,
and the water rates were: 100 bpd, 200 bpd, 300 bpd, and the maximum water rate (from
300 to 400 bpd).

Table 8.2

Operation conditions for water-drained rate evaluation


Permeability 1 md

% of gas
Length /
zone
Location penetrated Top Complet.
(ft)
40%
40%
40%
40%

40 / (50005040)
40 / (50005040)
40 / (50005040)
40 / (50005040)

Permeability 10 md

Length /
Location Bottom
Comp.(ft)

Water
Rate
(STB/D)

% of gas
Length /
zone
Location penetrated Top Complet.
(ft)

20 / (51005120)
20 / (51005120)
20 / (51005120)
20 / (51005120)

10

20%

20

20%

30

20%

Qw= Max
(32-39)

20%

137

20 / (50005020)
20 / (50005020)
20 / (50005020)
20 / (50005020)

Length /
Location Bottom
Comp.(ft)

Water
Rate
(STB/D)

20 / (51005120)
20 / (51005120)
20 / (51005120)
20 / (51005120)

100
200
300
Qw= Max
(300-400)

Table 8.2 shows the operational conditions for the water-drained evaluation, and

Gas Recovery Factor (%)

Figures 8.4 and 8.5 show the results for this analysis.

60
55
50
45
40
35
30
25
20
15
10
5
0
Qw= 10 Qw= 20
Qw= 30
bpd
bpd
bpd

Figure 8.4

Qw=
Qw=
Qw=
Max
Qw=
100 bpd
200 bpd
(32-39
300 bpd
bpd)

Qw=
Max
(300400 bpd)

Gas recovery factor for different water-drained rate.


Permeability: 1 md

Permeability: 10 md

5,000

Total Production Time (Days)

16,000

Total Production Time (Days)

k= 10 md
k= 1 md

12,000

8,000

4,000

3,000

2,000

1,000

0
Qw= 10
bpd

Figure 8.5

4,000

Qw= 20
bpd

Qw= 30
bpd

Qw= 100
Qw= 200
bpd
Qw= 300
bpd
bpd

Qw= Max
(32-39
bpd)

Total production time for different water-drained rate.

138

Qw= Max
(300-400
bpd)

Gas recovery increases with water-drained rate. The maximum recovery occurs at
the maximum water-drainage rate (Figure 8.4). The effect of water drained in gas
recovery follows the same pattern on both permeabilities. Production time increases with
water-drained rate, also. The longest production time happens at the maximum waterdrainage rate (Figure 8.5). Increasing water-drained rate for permeability 10 md extends
the well life, however, the effect of water drained on total production time is small; It
means that increasing water-drained rate has a dual effect on gas recovery: increases, and
accelerates it at the same time.
Removing water from the top completion delays liquid loading of the well. In
short, the more water is removed from the top completion, the higher and faster/longer
the gas recovery.
8.3

Effect of Separation between the Two Completions

Table 8.3

Operation conditions for evaluation


completions.

of

separation

between

the

Permeability 1 md
Permeability 10 md
Separation % of gas Length / Length / Water Separation % of gas Length / Length / Water
between the
zone
Location - Location - Rate between the
zone
Location - Location - Rate
completions penetrated
Top
Bottom (STB/D) completions penetrated
Top
Bottom (STB/D)
Comp. (ft) Comp.(ft)
Comp. (ft) Comp.(ft)
0 ft

60%

20 ft

60%

40 ft

60%

60 ft

40%

40 /
(50005040)
40 /
(50005040)
40 /
(50005040)
40 /
(50005040)

20 / (50415060)

15

0 ft

40%

20 / (50605080)

15

20 ft

40%

20 / (50805100)

15

40 ft

40%

20 / (51005120)

15

60 ft

40%

80 ft

20%

139

20 /
(50005020)
20 /
(50005020)
20 /
(50005020)
20 /
(50005020)
20 /
(50005020)

20 / (50215040)

150

20 / (50405060)

150

20 / (50605080)

150

20 / (50805100)

150

20 / (51005120)

150

Four (for permeability 1md) and five (for permeability 10 md) different
separation distances between the two completions were evaluated. The top completion
length was constant, perforating 40% (permeability 1 md) and 20% (permeability 10 md)
of the gas zone. Top and bottom completion produced gas from day one. The waterdrainage rate was constant (15 bpd for permeability 1 md and 150 bpd for permeability
10 md) once the bottom completion started producing water (Table 8.3). Figures 8.6 and
8.7 show the results for the evaluation of separation distance between the two
completions.

55

Gas Recovery Factor (%)

50
45
40
35
30
25
20
15
10
5
0

k= 10 md
Separ.= 0 ft

Figure 8.6

Separ.= 20 ft

Separ.= 40 ft

k= 1 md
Separ.= 60 ft

Separ.= 80 ft

Gas recovery factor for different separation distance between the


completions.

Gas recovery reduces with the separation between the two completions (Figure
8.6). The highest recovery occurs when the two completions are one after the other. Both
permeabilities values (1 md and 10 md) show the same pattern. Reducing separation
between the completions increases gas recovery because the inverse gas-cone to the

140

bottom completion is more efficient. The reverse gas-cone is needed on the DWS
completion to guarantee water-free production of the top completion.
Permeability 1 md

Permeability 10 md

6,000

14,000

Total Production Time (Days)

Total Production Time (Days)

16,000

12,000
10,000
8,000
6,000
4,000
2,000
0

4,000
3,000
2,000
1,000
0

Separ.= 0
Separ.=
ft
20 ft

Figure 8.7

5,000

Separ.=
40 ft

Separ.=
Separ.=
Separ.=
0 ft
Separ.=
20 ft
Separ.=
40 ft
60 ft
80 ft

Separ.=
60 ft

Total production time for different separation distance between the


completions.

DWS extends the well life longer when the two completions are together, also
(Figure 8.7). Delaying water inflows to the top completion retards well liquid loading.
At DWS wells, bottomhole flowing pressure is always different for the two
completions (Section 7.3.3) particularly when the water-drained rate is maximized. The
fact that the two completion are one the other does not change this situation (Figure
7.19).
8.4

Effect of Bottom Completion Length


Four (for permeability 1md) and five (for permeability 10 md) different lengths

for the bottom completion were evaluated. The top completion length was constant,
perforating 40% (permeability 1 md) and 20% (permeability 10 md) of the gas zone. The
141

bottom completion starts at the end of the top completion. Top and bottom completion
begins producing gas from day one. The water-drainage rate was constant (15 bpd for
permeability 1 md and 150 bpd for permeability 10 md) once the bottom completion
started producing water (Table 8.4). Figures 8.8 and 8.9 show the results for the bottom
completion length evaluation.
Table 8.4

Operation conditions for different bottom completion length.

% of gas zone
Perforat.
Length / Water Rate % of gas zone
penetrated
Length - Top Location - (STB/D)
penetrated
Comp. (ft)
Bottom
Comp. (ft)

Perforat.
Length - Top
Comp. (ft)

Length / Water Rate


Location - (STB/D)
Bottom
Comp. (ft)

Perf = 60%

40

20 / (50415060)

15

Perf = 40%

20

20 / (50215040)

150

Perf = 80%

40

40 / (50415080)

15

Perf = 60%

20

40 / (50215060)

150

Perf = 100%

40

60 / (50415100)

15

Perf = 80%

20

60 / (50215080)

150

Perf = 100%
plus 10 ft of
aquifer

40

80 / (50415120)

15

Perf = 100%

20

80 / (50215100)

150

Perf = 100%
plus 10 ft of
aquifer

20

100 /
(50215120)

150

Gas Recovery Factor (%)

55
50
45
40
35
30
25
20
15
10
5
0

k= 10 md
Perf.= 20 ft

Figure 8.8

Perf.= 40 ft

Perf.= 60 ft

k= 1 md
Perf.= 80 ft

Perf.= 100 ft

Gas recovery factor for evaluation of different length at the bottom


completion.

142

Permeability 1 md

Permeability 10 md

6,000

14,000.0

Total Production Time (Days)

Total Production Time (Days)

16,000.0

12,000.0
10,000.0
8,000.0
6,000.0
4,000.0
2,000.0
0.0

4,000
3,000
2,000
1,000
0

Perf.= 20
Perf.= 40
Perf.= 60
ft
ft
Perf.= 80
ft
ft

Figure 8.9

5,000

Perf.=
20 ft

Perf.=
40 ft

Perf.=
60 ft

Perf.=
80 ft

Perf.=
100 ft

Total production time for evaluation of different length at the bottom


completion.

The highest recovery happens at the shortest bottom completion length. The
longest production time occurs at the shortest completion, also. Long bottom completion
moves the perforation closer to the gas-water contact, increasing water rate and
accelerating the well water load-up. Water inflows the well early.
There is a bias on this bottom completion length analysis because longer bottom
completions allow higher water-drainage rates, also. For this analysis, however, the
water-drainage rate was constant and equal for all the cases. This situation is corrected in
the next item.
8.5

DWS Operational Conditions for Gas Wells


Some generic guidelines to operate DWS in low productivity gas reservoir could

be obtained from the previous study. More modeling, reservoir properties, and production
143

conditions should be done getting a more general idea about how to operate DWS
completion in gas reservoir. Statistical procedure similar than the one used in Chapter 6
could be done getting DWS operational-understanding in gas reservoir.
According to the previous study, DWS for low productivity gas wells with
bottom-water should be operated as follows:

Water should be drained as much as possible with the bottom completion;

The top completion should be short, penetrating between 20% to 40% of the
gas zone;

The two completions should be as close as possible;

The bottom completion should be short, penetrating between 20 to 40% of


the gas zone, too.

The same numerical reservoir model was used to investigate the maximum gas
recovery for the optimum DWS operation described above. Separation between the two
completions was constant. The two completions are together (The bottom completion
begins when the top completion ends). The top completion is operated at constant tubing
head pressure (300 psia). The bottom completion is operated at constant tubing head
pressure (300 psia) until water production begins; Ones water inflows the bottom
completion this completion is switched to produce at maximum water-drainage (Bottom
hole flowing pressure is assumed constant and equal to 14.7 psia.). This last assumption
could overestimate DWS performance, but in the next item this assumption is removed,
and a more realistic bottom hole flowing pressure is assumed. Perforation length is varied
for the two completions looking for the maximum gas recovery. Table 8.5 shows the
operational conditions for each one of the cases evaluated, and Figures 8.10 to 8.13
shows the results for this evaluations.
144

Table 8.5

Operation conditions for different top completion length, bottom


completion length, and water-drained rate.

Permeability 1 md
% of gas
Length /
Length /
Water
zone
Location - Location drained
penetrated Top Comp.
Bottom
Rate (ft)
Comp.
Maximum
(ft)
(STB/D)

Permeability 10 md
Separation % of gas
Length /
Length /
Water Separation
between
zone
Location - Location - drained
between
the two
penetrated Top Comp.
Bottom
Rate the two
complet.
(ft)
Comp.
Maximu complet. (ft)
(ft)
(ft)
m
(STB/D)

Perf = 60% 40 / (5000- 20 / (50415040)


5060)

1 - 19.2

Perf = 60% 30 / (5000- 30 / (5031- 7 - 267.3


5030)
5060)

Perf = 70% 40 / (5000- 30 / (50415040)


5070)

1 - 26.9

Perf = 70% 30 / (5000- 40 / (5031- 1 - 331.7


5030)
5070)

Perf = 80% 50 / (5000- 30 / (50515050)


5080)

1 - 26.2

Perf = 40% 20 / (5000- 20 / (5021- 1 - 177.3


5020)
5040)

Perf = 60% 30 / (5000- 30 / (50315030)


5060)

1 - 28.2

Perf = 50% 20 / (5000- 30 / (5021- 1 - 248.4


5020)
5050)

Perf = 70% 30 / (5000- 40 / (50315030)


5070)

1 - 36.3

Perf = 60% 20 / (5000- 40 / (5021- 1 - 322.7


5020)
5060)

Perf = 80% 30 / (5000- 50 / (50315030)


5080)

1 - 44.0

Perf = 70% 20 / (5000- 50 / (5021- 1 - 407.3


5020)
5070)

Perf = 90% 30 / (5000- 60 / (50315030)


5090)

1 - 51.6

Perf = 80% 20 / (5000- 60 / (50215020)


5080)

43.2 465.2

Perf =
100%

30 / (5000- 70 / (50315030)
5100)

8.1 - 61.3

Perf = 90% 20 / (5000- 70 / (50215020)


5090)

93.1 549.2

Perf =
100% plus
10 ft of
aquifer

30 / (5000- 80 / (5031- 31.6 - 84.5


5030)
5110)

Perf =
100%

20 / (5000- 80 / (50215020)
5100)

167.9 658.4

Perf =
100% plus
10 ft of
aquifer

20 / (5000- 90 / (50215020)
5110)

376.9 898.3

Figures 8.10 and 8.11 show the results for permeability 1 md. Top completion
length was varied from 20 to 50 feet (20 to 50% gas zone penetration). Bottom
completion length was varied from 20 to 80 feet. Together the two completions penetrate
from 60% to 100% of the gas zone including a case where 10 feet of the aquifer was
perforated, also.

145

65
60
55

Gas Recovery (%)

50
45
40
35
30
25
20
15
10
5
0
Top= 40 ft,
Bott.=20 ft

Top=40 ft,
Bott.=30ft

Top=50ft,
Bott.=30ft

Top=30ft,
Bott.=30ft

Top=30ft,
Bott.=40ft

Top=30ft,
Bott.=50ft

Top=30ft,
Bott.=60ft

Top=30ft,
Bott.=70ft

Top=30ft,
Bott.=80ft

Figure 8.10 Gas recovery for different lengths of top, and bottom completions and
maximum water drained. The two completions are together. Reservoir
permeability is 1 md.

60,000

Total Production Time (Days)

50,000

40,000

30,000

20,000

10,000

0
Top= 40 ft,
Bott.=20 ft

Top=40 ft,
Bott.=30ft

Top=50ft,
Bott.=30ft

Top=30ft,
Bott.=30ft

Top=30ft,
Bott.=40ft

Top=30ft,
Bott.=50ft

Top=30ft,
Bott.=60ft

Top=30ft,
Bott.=70ft

Top=30ft,
Bott.=80ft

Figure 8.11 Total production time for different lengths of top and bottom completions
and maximum water drained. The two completions are together. Reservoir
permeability is 1 md.

146

The maximum recovery happens when the top completion penetrates 30 ft and the
bottom completion penetrates 80 ft (Figure 8.10). This is the scenario where 10 ft of the
aquifer were penetrated. Increasing top completion length more than 30 ft gives no extra
recovery. Actually, the lowest recovery happens when the top completion penetrates 50%
of the gas zone. In short, increasing bottom completion length increases gas recovery
when the water-drainage rate is increased at the same time.
For top completion penetration of 30% of the gas zone, the total production time
(TPT) increases when bottom completion is increased from 30 to 50 ft. TPT, however,
decreases when bottom completion length increases from 60 to 80 ft. In short, increasing
bottom completion length and water-drainage rate at the same time increases and
accelerates gas recovery.

70
65
60
55

Gas Recovery (%)

50
45
40
35
30
25
20
15
10
5
0
Top=30ft,
Bott.=30ft

Figure 8.12

Top=30ft,
Bott.=40ft

Top=20ft,
Bott.=20ft

Top=20ft,
Bott.=30ft

Top=20ft,
Bott.40ft

Top=20ft,
Bott.=50ft

Top=20ft,
Bott.=60ft

Top=20ft,
Bott.70ft

Top=20ft,
Bott.80ft

Top=20ft,
Bott.=90

Gas recovery for different lengths of top, and bottom completions and
maximum water drained. The two completions are together. Reservoir
permeability is 10 md.

147

Figures 8.12 and 8.13 confirm the previous finding. Figures 8.12 and 8.13 show
the results for permeability 10 md. Top completion length was varied from 20 to 30 feet
(20% to 30% gas zone penetration). Bottom completion length varied from 20 to 90 feet.
Together the two completions penetrate from 40% to 100% of the gas zone including a
case where 10 feet of the aquifer was perforated, too.
Figure 8.12 shows gas recovery for the ten cases evaluated. The maximum
recovery occurs when the top completion penetrates 20 ft and the bottom completion
penetrates 90 ft. This is the scenario where 10 feet of the aquifer was penetrated.
Increasing top completion length more than 20 ft gives no extra recovery. Actually, gas
recovery is always lower when the top completion penetrates 30 feet instead of 20 feet of
the gas zone. Again, increasing bottom completion length increases gas recovery when
water-drainage rate is increased at the same time.

7,000

Total Production Time (days)

6,000

5,000

4,000

3,000

2,000

1,000

0
Top=30ft,
Bott.=30ft

Top=30ft,
Bott.=40ft

Top=20ft,
Bott.=20ft

Top=20ft,
Bott.=30ft

Top=20ft,
Bott.40ft

Top=20ft,
Bott.=50ft

Top=20ft,
Bott.=60ft

Top=20ft,
Bott.70ft

Top=20ft,
Bott.80ft

Top=20ft,
Bott.=90

Figure 8.13 Total production time for different lengths of both completions and
maximum water drained. The two completions are together. Reservoir
permeability is 10 md.
148

Figure 8.13 shows Total Production Time (TPT) for the ten cases evaluated. For
top completion penetration of 20% of the gas zone, TPT always decreases when bottom
completion is increased from 20 to 90 ft. Therefore; Increasing bottom completion length,
once more, accelerates gas recovery when water-drainage rate is increased at the same
time.
8.5.1

Effect of Bottom Hole Flowing Pressure at the Bottom Completion


The previous analysis was done assuming bottom hole flowing pressure (BHP)

equal to atmospheric pressure (14.7 psia). This situation would overestimate DWS
performance. Three different values for constant BHP were used to evaluate its effect on
gas recovery and TPT. Table 8.5 shows the operational conditions used for this analysis,
and Figures 8.14 and 8.15 show the results.

Table 8.6

Operation conditions for evaluation of different constant bottomhole


flowing pressure at the bottom completion.
Permeability 1 md

Bottomhole
Flowing
Pressure
(psia)

Permeability 10 md

Length /
Length /
Water drained Bottomhole
Length /
Length /
Water drained
Location Location Rate Flowing
Location Location Rate Top Comp.
Bottom
Maximum
Pressure Top Comp.
Bottom
Maximum
(ft)
Comp. (ft)
(STB/D)
(psia)
(ft)
Comp. (ft)
(STB/D)

BHP= 14.7

30 / (50005030)

80 / (50315110)

31.6 - 84.5

BHP= 14.7

20 / (50005020)

90 / (50215110)

376.9 - 898.3

BHP= 100

30 / (50005030)

80 / (50315110)

30.2 - 80.3

BHP= 100

20 / (50005020)

90 / (50215110)

359.2 - 832.6

BHP= 200

30 / (50005030)

80 / (50315110)

28.2 - 74.8

BHP= 200

20 / (50005020)

90 / (50215110)

335.5 - 777.6

BHP= 300

30 / (50005030)

80 / (50315110)

26.2 - 68.46 BHP= 300

20 / (50005020)

90 / (50215110)

310.3 - 714.3

149

70

Gas Recovery (%)

60
50
40
30
20
10
k= 10 md

0
BHP= 14.7
psia

BHP=100
psia

k= 1 md
BHP=200
psia

BHP=300
psia

Figure 8.14 Gas recovery for different constant BHP at the bottom completion.
Figure 8.14 shows that increasing BHP at the bottom completion from 14.7 psia
to 300 psia slightly reduces gas recovery (gas recovery reduces from 64.37% to 62.1%
for permeability 1 md, and from 64.37% to 62.1% for permeability 10 md).
Permeability 1 md

Permeability 10 md

6,000

Total Production Time (Days)

Total Production Time (Days)

60,000
50,000
40,000
30,000
20,000
10,000
0

5,000
4,000
3,000
2,000
1,000
0

BHP= 14.7
psia

BHP=100
psia

BHP=200
psia

BHP= 14.7
psia

BHP=300
psia

BHP=100
psia

BHP=200
psia

BHP=300
psia

Figure 8.15 Total Production Time for evaluation of different constant BHP at the
bottom completion.

150

Increasing BHP at the bottom completion from 14.7 psia to 300 psia increases
total production time, particularly for permeability 10 md (Figure 8.15). This is because
less amount of water is drained from the bottom completion when the bottomhole
pressure (BHP) is increased delaying well life. For permeability 1 md, however, the
situation reverses when BHP is increased beyond 100 psia. Increasing BHP at the bottom
completion from 100 psia to 200 psia reduces the amount of water drained increasing the
aquifer effect on the reservoir. Bottom hole pressure at the top completion is higher for
BHP=200 psia than for BHP=100 psia (Figure 8.16). Also, average reservoir pressure is
higher for BHP=200 psia than for BHP=100psia (Figure 8.17). In short, for permeability
1 md, increasing BHP at the bottom completion beyond 100 psia increases aquifer effect
on the reservoir pressure, reducing well life.

Bottomhole Flowing Pressure (psia)

900

TopCompletion (BHP= 200 psia)

800
700
600

TopCompletion (BHP= 100 psia)

500
400
300
Bottom Completion (BHP= 200 psia)

200
Bottom Completion (BHP= 100 psia)

100
0
0

10000

20000

30000

40000

50000

Time (Days)
Top Completion (BHP= 200 psia)

Bottom Completion (BHP= 200 psia)

Top Completion (BHP= 100 psia)

Bottom Completion (BHP= 100 psia)

Figure 8.16 Flowing Bottomhole Pressure history at the top, and bottom completion for
two different constant BHP at the bottom completion (100 psia, and 200
psia). Permeability is 1 md.

151

60000

Average Reservoir Pressure (psia)

1200

1000

800

600

400

200

0
0

10000

20000

30000

40000

50000

60000

Time (Days)
Reservoir Pressure (BHP= 200 psia)

Reservoir Pressure (BHP= 100 psia)

Figure 8.17 Average reservoir for two different constant BHP at the bottom completion
(100 psia, and 200 psia). Permeability is 1 md.

Another important observation is that the BHP at the top and bottom completion
is always different (Figure 8.16). There is a drawdown of at least 150 psia (for BHP at the
bottom completion equal to 200 psia), and 250 psia (for BHP at the bottom completion
equal to 100 psia). It is not possible to have this drawdown for two close-completion
without isolation. Therefore, the packer insulation between the two completions is needed
for the DWS completion in low productivity gas wells to guarantee the drawdown
between the completions. This observation is in general agreement with the discussion
included on section 7.3.3 when DWS was compared with DGWS.

152

8.6

When to Install DWS in Gas Wells


Four different scenarios for when DWS should be installed were evaluated:

when water production begins in a top short completion (30% for permeability 1 md and
20% for permeability 10 md), at late time in a totally perforated well, from day one of
production, and after the well die. Water-drainage is maximum all the time for the
scenarios when DWS is installed. The top completion length is 30 feet for permeability 1
md and 20 feet for permeability 10 md. The bottom completion length is 70 feet for
permeability 1 md and 80 feet for permeability 10 md. Table 8.7 includes the operation
conditions for the cases used for this study, and Figures 8.18 and 8.19 show the results.

Table 8.7

Water Drained
Rate

Operation conditions for when to install DWS in low productivity gas


well.
Permeability 1 md
Length /
Length /
When Installing
Location Location DWS
Top Comp.
Bottom
(ft)
Comp. (ft)

Water Drained
Rate

Permeability 10 md
Length /
Length /
Location Location Top Comp.
Bottom
(ft)
Comp. (ft)

When
Installing
DWS

Qw = Max

30 (50005030)

70 (50315100)

After well died

Qw = Max

20 / (50005020)

80 / (50215100)

After well
died

Qw = Max

30 (50005030)

70 (50315100)

Late time in a Qw = Max


totally
perforated well

20 / (50005020)

80 / (50215100)

Late time in
a totally
perforated
well

Qw = Max

30 (50005030)

70 (5031Water
Qw = Max
5100)
production starts
in the top short
completion

20 / (50005020)

80 / (50215100)

Water
production
starts in the
top short
completion

Qw = Max

30 (50005030)

70 (50315100)

20 / (50005020)

80 / (50215100)

From day
one

From day one

Qw = Max

153

Gas Recovery (%)

60
50
40
30
20
10
0
After the
Late in a
well die
totally
Perforated

When
From Day
Water
One
Prod.
begins in a
30% Perf.

k = 10 md
After the
well die

Late in a
totally
Perforated

k = 1 md
When
From Day
Water
One
Prod.
begins in a
20% Perf.

Figure 8.18 Gas recovery for different times of installing DWS.

Permeability 10 md

60,000

6,000

50,000

5,000

Total Production Time (Days)

Total Production Time (Days)

Permeability 1 md

40,000

30,000

20,000

10,000

4,000

3,000

2,000

1,000

0
After the well
die

Late in a When Water From Day


totally
Prod. begins
One
Perforated
in a 30%
Perf.

After the well


die

Late in a When Water


totally
Prod. begins
Perforated
in a 30%
Perf.

From Day
One

Figure 8.19 Total production time for different times of installing DWS.

154

Figure 8.18 shows that: The lowest recovery occurs when DWS is installed after
the well die (Actually, there is no extra recovery when DWS is installed after the well
die); the highest recovery happens when DWS is installed from day one, and when water
production begins (The final recovery is almost the same when DWS is installed from
day one of production or at the beginning of water production in a short top perforated
well); Installing DWS late in a totally perforated well reduces final gas recovery.
Total production time slightly decreases when DWS is installed from day one
than when water production begins; Total production time is shorter when DWS is
installed late in a totally perforated well than when is installed from day one or when
water production begins (Figure 8.19).
Some comments can be made for DWS completion in a low productivity reservoir
from the previous analysis:

DWS should not be installed after the well die. It is better to use another
technology available solving water production problems such as: gas lift,
pumping units, plunger, soap injection, etc.

There is no extra benefit installing DWS from day one of well production.

DWS should be installed early in the well life after water production begins.
Figure 8.20 shows the gas recovery history for the scenarios considered when

permeability is 10 md (the scenario after the well died is represented by the


conventional 100% perforated well because there is no extra gas recovery when DWS is
installed after the well has died). It is shown that the final gas recovery is the same when
DWS is installed from day one and when it is installed after water production begins.

155

70
65
60

Gas Recovery Factor (%)

55
50
45
40
35
30
25
20
15
10
5
0
0

1000

2000

3000

4000

5000

6000

Time (Days)
Late in a Totally Perf.

Conv. 100% Perf.

When Water Prod. Begins in a 20% Perf.

From Day One

Figure 8.20 Cumulative gas recovery for different times of installing DWS. Reservoir
permeability is 10 md.

8.7

Recommended DWS Operational Conditions in Gas Wells


According to this study, the best operational conditions for DWS in gas wells are:

Water should be drained with the bottom completion at the highest rate
possible;

The top completion should be short, penetrating between 20% to 40% of the
gas zone;

The two completions should be as close as possible;

A packer is needed to insolate the completions;

The bottom completion should be long, penetrating the rest of the gas zone
and even the top of the aquifer;

DWS should be installed early in the well life after water production begins.

156

Producing the drained-water at the surface together with the gas from the
bottom completion, instead of injecting the water downhole, has little effect
on the final gas recovery. Therefore, drained water can be lifted to the
surface when there is no deeper injection-zone.

157

CHAPTER 9
CONCLUSIONS AND RECOMMENDATIONS

9.1

Conclusions

In gas wells, a water cone is generated in the same way as in the oil-water system.
The shape at the top of the cone, however, is different in oil-water than in gaswater systems. For the oil-water, the top of the cone is flat. For the gas-water
system, a small inverse gas cone is generated locally around the completion. This
inverse cone restricts water inflow to the completions. Also, the inverse gas cone
inhibits upward progress of the water cone.

Vertical permeability, aquifer size, Non-Darcy flow effect, density of perforation,


and

flow

behind

casing

are

unique

mechanisms

improving

water

coning/production in gas reservoirs with bottom water drive.

There is a particular pattern for water production rate at a gas well located in a
water drive reservoir with a channel in the cemented annulshaving a single
entrance at its end-. First, there is no water production. Next, water production
starts and water rate increases almost linearly. This increment is more dramatic
when the channel is originally in the water zone. Then, water rate stabilizes.
Finally, water rate increases exponentially. This pattern is explained because of
the flowing phases (single of two phase flow) in the channel at different
production steps of the well.

Non-Darcy flow effect is important in low-rate gas wells producing from lowporosity, low-permeability gas reservoirs. It is possible to have a gas well flowing

158

at 1 MMscfd with 60% of the pressure drop generated by the Non-Darcy flow
effect (porosity 1%, permeability 1 md).

Setting the Non-Darcy flow component at the wellbore does not make reservoir
simulators represent correctly the Non-Darcy flow effect in gas wells. Non-Darcy
flow should be considered globally (distributed throughout the reservoir) to
correctly predict the gas rate and recovery.

Cumulative gas recovery could be reduced up to 42.2% when Non-Darcy flow


effect is considered throughout the reservoir in gas reservoirs with bottom water
drive. This is because the well loads up early and is killed for water production.

The most promising design of Downhole Water Sink (DWS) installation in gas
wells includes dual completion with isolated packer between them and gravity
gas-water separation at the bottom completion. The design allows good control of
water coning outside the well and increases coning of gas and maximum rate at
the top completion with no water loading.

The highest recovery for a conventional gas well in the low-permeability reservoir
(1-10 md) occurs when the gas zone is totally penetrated. For permeability 100
md, gas recovery becomes almost insensitive to the completion length for
penetration greater than 30%.

Gas recovery increases with permeability for a gas reservoir with bottom water
drive. In general, high permeability allows higher gas rates with smaller reservoir
drawdown; therefore the well has more energy to produce gas with higher water
cut.

159

The optimum completion length can be calculated from the model developed
here, for maximum net present value. A rule of thumb is to perforate 80% of the
gas zone in a gas reservoir with bottom-water drive.

Gas recovery with DWS is always higher than recovery with conventional wells.
The best reservoir conditions to apply DWS are when permeability is smaller than
10 md, and reservoir pressure is subnormal (or depleted). For reservoirs with lowpermeability (1 md) and subnormal pressure, gas recovery increases 160% for
DWS completion. This advantage, however, reduces what to 10% for
permeability 10 md and normal reservoir pressure.

For the reservoir model used here, Downhole Gas-Water Separation (DGWS) and
DWS could give almost the same final gas recovery, but DWS production time is
35 % shorter than that of DGWS wells. Also, the DWS well would produce less
water at the surface because most of the water would inflow the bottom
completion and be injected downhole.

Packer insulation between the two completions is needed for the DWS
configuration in low productivity gas wells. There should a drawdown between
the completions to guarantee reverse gas cone inflows to the bottom completion
improving control on the water coning.

The recommended operational conditions for DWS in gas wells located in bottom
water drive reservoirs are: Water would be drained with the bottom completion at
the highest rate possible. The top completion would be short, penetrating between
20% to 40% of the gas zone. The two completions should be as close as possible.
A packer should insolate the two completions. The bottom completion would be
long, penetrating the rest of the gas zone and even the top of the aquifer. DWS
160

would be installed early at the well life after water production begins. Producing
the drained-water at the surface together with the gas from the bottom completion,
instead of injecting the water downhole, has little effect on the final gas recovery.
9.2

Recommendations

The water rate pattern found in a gas well with leaking cement could be
confirmed using field data. Production data for gas wells with leaking cement
would be analyzed looking for the described pattern.

Effects of Non-Darcy flow in low-productivity gas wells should be studied


considering a fracture in the well. A normal practice in the industry is to fracture
gas wells with low productivity. Non-Darcy flow distributed in the reservoir and
into the fracture should be considered.

Effects of a fracture and permeability heterogeneity in water production, and final


gas recovery should be evaluated in water drive gas reservoirs using numerical
simulators.

More possible configurations for DWS in gas wells should be evaluated. A single
very long completion (totally perforating the gas zone and the top of the aquifer)
without a packer could be one of the many new possibilities.

Economic evaluation of DWS in gas wells should be done. This evaluation should
consider not only injecting drained-water into a lower zone but lifting water to the
surface, also.

A combined mechanism of DWS and two fractures (one in the top completion and
the other in the bottom completion) in a low productivity gas well should be
evaluated.

161

More in-depth study involving different modeling, reservoir properties, and


production conditions should be done getting a better understanding of DWS
operations in gas reservoir.

More in-depth study involving different modeling, reservoir properties, and


production conditions should be done for comparison of DWS and DGWS
identifying best opportunity for each technology.

A field pilot project installing DWS in low productivity gas reservoirs should be
conducted. This project should refine the operational optimization performed in
this research, giving new information about the possibilities of DWS in low
productivity gas reservoirs.

162

REFERENCES
Abercrombie, B., 1980, Plunger Lift, The Technology of Artificial Lift Methods, Vol.
2b, K.E. Brown (ed), PennWell Publ. Co., Tulsa, OK (1980), p483-518.
Adams, L.S., and Marsili, D.L., 1992, Design and Installation of a 20,500-ft Coiled
Tubing Velocity String in the Gomez Field, Pecos County, Texas, paper SPE
24792, 67th Annual Technical Conference and Exhibition, Washington, D.C.,
October 4-7.
Agarwal, R.G., Al-Hussainy, R., and Ramey, Jr. H.J., 1965, The Importance of Water
Influx in Gas Reservoir, Journal of Petroleum Technology, November, 1965,
p1336-42.
Aguilera, R., Conti, J.J., Lagrenade E., 2002, Reducing Gas Production Decline
Through Dewatering: A Case History From the Naturally Fractured Aguarague
Field, Salta, Argentina, paper SPE 75512, SPE Gas Technology Symposium,
Calgary, Canada, 30 April-2 May.
Alvarez, C.H., Holditch, S.A, McVay, D.A., 2002, Effects of Non-Darcy Flow on
Pressure Transient Analysis of Hydraulically Fractured Gas Wells, paper SPE
77468, Annual Technical Conference and Exhibition, San Antonio, TX, 29
September-2 October.
Amyx, J.W., Bass, D.M., Whitinig, R.L. 1960, Petroleum Reservoir Engineering,
McGraw-Hill, New York, p 64-68.
Arcaro, D. P. and Bassiouni, Z. A., 1987, The Technical And Economic Feasibility of
Enhanced Gas Recovery in The Eugene Island Field by Use a Coproduction
Technique, Journal of Petroleum Technology (May 1987), p585-90.
Armenta, M., and Wojtanowicz, A.K., 2003, Incremental Recovery Using DualCompleted Wells in Gas Reservoir with Bottom Water Drive: A Feasibility
Study, paper 2003-194 Canadian International Petroleum Conference-2003,
Calgary, Alberta, Canada, June 10-12.
Armenta, M., White, C., Wojtanowicz, A.K., 2003, Completion Length Optimization in
Gas Wells, paper 2003-192 Canadian International Petroleum Conference-2003,
Calgary, Alberta, Canada, June 10-12.
Armenta, M., and Wojtanowicz, A., 2002, Severity of Water Coning in Gas Wells,
paper SPE 75720 SPE Gas Technology Symposium, Calgary, Alberta, Canada, 30
April-2 May.
Arthur, M.G., 1944, Fingering and Coning of Water and Gas in Homogeneous Oil
Sand, AIME Transactions, Vol. 155, 184-199.
163

Avery, D.J. and Evans, R.D., 1988, Design Optimization of Plunger Lift Systems,
paper SPE 17585, International Meeting on Petroleum Engineering of the SPE,
Tianjin, China, Nov. 1-4.
Awadzi, J., Babbitt, J., Holland, S., Snyder, K., Soucer, T., Latter, K., 1999, Downhole
Capillary Soap Injection Improves Production, paper SPE 52153, Mid-Continent
Operations Symposium, Oklahoma City, OK, March 28-31.
Baruzzi, J.O.A., Alhanati, F.J.S., 1995, Optimum Plunger Lift Operation, paper SPE
29455, Production Operations Symposium, Oklahoma City, OK, April 2-4.
Bear, J., 1972, Dynamic of Fluids in Porous Media, Dover Publications, INC., New
York.
Beauregard, E., and Ferguson, P.L., 1982, Introduction to Plunger Lift: Applications,
Advantages and Limitations, paper SPE 10882, Rocky Mountain Regional
Meeting of the SPE, Billings, MT, May 19-21.
Beattle, D.R. and Roberts, B.E., 1996, Water Coning in Naturally Fractured Gas
Reservoirs, Paper SPE 35643, Gas Technology Conference, Calgary, Alberta,
Canada, 28 April 1 May.
Beeson, C.M., Knox, D.G., and Stoddard, J.H., 1958, Short-Cut Design Calculations and
Field Applications of the Plunger Lift Method of Oil Production, The Petroleum
Engineer, (June-Oct. 1958).
Beggs H.D. 1984, Gas Production Operation, Oil and Gas Consultants International,
Inc, Tulsa, Oklahoma, p53-59.
Berry, D. A., 196, Statistics: A Bayesian Perspective, Wadsworth Publishing Co.,
Belmont, CA, 518 p.
Bizanti, M.S., and Moonesan, A., 1989, How to Determine Minimum Flow Rate for
Liquid Removal, World Oil, (September, 1989), p 71-73.
Bourgoyne, A.T., Chenevert, M.E., Millheim, K.K., Young, F.S. 1991, Applied Drilling
Engineering, Society of Petroleum Engineering Textbook Series Volume 2,
Richardson, TX, p137-155.
Box, G. E. P. and Cox D.R., 1964 An Analysis of Transformations, J. of the Royal
Statistical Society, 26 No. 2, 211-252
Box, G. E. P. and Tidwell, P.W., 1962 Transformation of the Independent Variables,
Technometrics, 4 No. x, 531-550.
Brady, C.L., and Morrow, S.J., 1994, An Economic Assessment of Artificial Lift in
Low-Pressure Tight Gas Sands in Ochiltree County, Texas, paper SPE 27932,
SPE Mid-Continent Gas Symposium, Amarillo, TX, May 22-24.
164

Brar, S.G., Aziz, K., 1978, Analysis of Modified Isochronal Test To Predict The
Stabilized Deliverability Potential of Gas Well Without Using Stabilized Flow
Data, JPT (Feb.) 297-304; Trans. AIME, p297-304.
Campbell, S., Ramachandran, S., and Bartrip, K., 2001, Corrosion Inhibition/Foamer
Combination Treatment to Enhance Gas Production, paper SPE 67325,
Production and Operations Symposium, Oklahoma City, OK, March 24-27.
Chaperon, I., 1986, Theoretical Study of Coning Toward Horizontal and Vertical Wells
in Anisotropic Formations: Subcritical and Critical Rates, paper SPE 15377, SPE
Annual Technical Conference and Exhibition, New Orleans, Oct. 5-8.
Cohen, M.F. 1989, Recovery Optimization in a Bottom/Edge Water-Drive Gas
Reservoir, Soehlingen Schneverdinge, paper SPE 19068 SPE Gas Technology
Symposium, Dallas, June 7-9.
Coleman, S.B., Hartley, B.C., McCurdy, D.G., and Norris III, H.L., 1991, A New Look
at Predicting Gas-Well Load-up, J. Pet. Tech. (Mar. 1991) p329-38.
Computer Modelling Group Ltda, 2001, Users Guide, IMEX, Advanced Oil/Gas
Reservoir Simulator, CMG, p425-26.
Craft B.C. and Hawkins M.F. 1959, Applied Petroleum Reservoir Engineering,
Prentice Hall PTR, Englewood Cliffs, NJ, p300-01.
Craft B.C. and Hawkins M.F. 1991, Applied Petroleum Reservoir Engineering,
Prentice Hall PTR, Englewood Cliffs, NJ, p226-227; 280-299.
Dake L.P., 1978, Fundamentals of Reservoir Engineering, Elsevier Scientific
Publishing Company, New York, p255-258.
Damsleth, E., Hage, A. and Volden, R., 1992: Maximum Information at Minimum Cost:
A North Sea Field Development Study with Experimental Design, J. Pet. Tech
(December 1992) 1350-1360.
Dejean, J.-P., and Blanc, G., 1999, Managing Uncertainties on Production Predictions
Using Integrated Statistical Methods, Paper SPE 56696, SPE Annual Technical
Conference and Exhibition, Houston, Texas, 3-6 October.
Dranchuck, P.M., Purvis, R.A., and Robinson, D.B., 1974, Computer Calculations of
Natural Compressibility Factors Using the Standing and Katz Correlations,
Institute of Petroleum Technical Series.
Economides, M.J., Oligney, R.E., Demarchos, A.S., and Lewis, P.E., 2001, Natural Gas:
Beyond All Expectations, Paper SPE 71512, Annual Technical Conference and
Exhibition, New Orleans, 30 September- 3 October.
165

E&P Environment, 2001, GTI Studies Gas Well Water Management, J&E
Communication, Inc, Vol. 12 No. 23, p1-4.
Elmer, W.G., 1995, Tubing Flow Rate Controller: Maximize Gas Well Production From
Start To Finish, paper SPE 30680, SPE Annual Technical Conference and
Exhibition, Dallas, September 22-25.
Energy Information Administration, 2000, Distribution of Gas Wells and Production,
http://www.eia.doe.gov/pub/poi_gas/petrosystem/natural_gas/petrosysgas.html
Energy Information Administration, 2001, U.S. Crude Oil, Natural Gas, and Natural Gas
Liquids Reserves 2001 Annual Report,
http://www.eia.doe.gov/pub/oil_gas/natural_gas/data_publications/crude_oil_natu
ral_gas_reserves/current/pdf/ch4.pdf
Energy Information Administration, 2001, U.S. Natural Gas Markets: Recent Trends
and Prospects For the Future,
http://tonto.eia.doe.gov/FTPROOT/service/oiaf0102.pdf
Energy Information Administration, 2003, Annual Energy Outlook 2003 With
Projection to 2025, www.eia.doe.gov/oiaf/aeo, January.
Energy Resources and Conservation Board, 1975, Theory and Practice of The Testing of
Gas Wells, third edition, Pub. ERCB-75-34, ERCB, Calgary, Alberta, p3-18 to p321.
Ergun, S. and Orning, A.A., 1949, Fluid Flow Through Ramdomly Packed Collumns
and Fluidized Beds. Industrial and Engineering Chemistry 41, No 6, p11791184.
Evan, R.D., Hudson, C.S., Greenlee, J.E., 1987, The Effect of an Immobile Liquid
Saturation on the Non-Darcy Flow Coefficient in Porous Media, SPE Production
Engineering (November ), p331-38.
Ferguson, P.L., and Beauregard, E., 1985, How to Tell if Plunger Lift Will Work in
Your Well, World Oil, August 1, p33-36.
Fligelman, H., Cinco-Ley, H., Ramley Jr., Braester, C., Couri, F., 1989, PressureDrawdown Test Analysis of a Gas Well Application of New Correlation, paper
SPE 17551 Facilities Engineering, September (1989) p409.
Flowers, J.R., Hupp, M.T., and Ryan, J.D., 2003, The Results of Increased Fracture
Conductivity on Well Performance in a Mature East Texas Gas Field, paper SPE
84307 Annual Technical Conference and Exhibition, Denver, Colorado, October
5-8.

166

Foss, D.L., and Gaul, R.B., 1965, Plunger-Lift Performance Criteria with Operating
Experience-Ventura Avenue Field, Drilling and Production Practice, API
(1965), p124-40.
Frederick, D.C., Graves, R.M., 1994, New Correlations To Predict Non-Darcy Flow
Coefficients at Immobile and Mobile Water Saturation, paper SPE 28451 Annual
Technical Conference and Exhibition, New Orleans, Sept. 25-28
Gasbarri, S. and Wiggins, M.L., 2002, A Dynamic Plunger Lift Model for Gas Wells,
SPE Production and Facilities, May 2001, p89-96.
Geertsma, J., 1974, Estimating the Coefficient of Inertial Resistance in Fluid Flow
through Porous Media, SPEJ (Oct. 1974) p445-450.
Girardi, F., Lagrenade, E., Mendoza, E., Marin, H. and Conti, J.J., 2001, Improvement
of Gas Recovery Factor Through the Application of Dewatering Methodology in
the Huamampampa Sands of the Agurague Field, paper SPE 69565, SPE Latin
American and Caribbean Petroleum Engineering Conference, Buenos Aires,
Argentina, March 25-28.
Golan M. and Whitson C., 1991, Well Performance, Prentice-Hall Inc., New Jersey,
p268-284.
Grubb, A.D., and Duvall, D.K., 1992, Disposal Tool Technology Extends Gas Well Life
and Enhances Profits, paper SPE 24796, 67th Annual Technical Conference and
Exhibition of the SPE, Washington, D.C., October 4-7.
Hacksma, J.D., 1972, Users Guide to Predict Plunger Lift Performance, Proceeding,
Texas Tech. U. Southwestern Petroleum Short Course, Lubbock, TX.
Hasan, A.R., and Kabir, C.S., 1985, Determining Bottomhole Pressures in Pumping
Wells, SPEJ (Dec., 1985) 823-38.
Hebert, D.W., 1989, A Systematic Approach To Design of Rod Pumps in Coal
Degasification Wells: San Juan Basin, New Mexico, paper SPE 19011, SPE
Joint Rocky Mountain Regional/Low Permeability Reservoirs Symposium and
Exhibition, Denver, Colorado, March 6-8.
Henderson L.J., 1984, Deep Sucker Rod Pumping for Gas Well Unloading, paper SPE
13199, 59th Annual Technical Conference and Exhibition, Houston, TX,
September 16-19.
Hernandez, A., Marcano, L., Caicedo, S., and Carbunaru, R., 1993, Liquid Fall-back
Measurements in Intermittent Gas Lift with Plunger, paper SPE 26556, SPE
Annual Technical Conference and Exhibition, Houston, TX, October 3-6.

167

Hoyland, L.A., Papatzacos, P., and Skjaeveland, S.M., 1989, Critical Rate for Water
Coning: Correlation and Analytical Solution, SPE Reservoir Engineering, p459502, November 1989.
Houpeurt, A., 1959, On the Flow of Gases in Porous Media, Revue de LInstitut
Franais du Ptrole (1959) XIV (11), p1468-1684.
Hutlas, E.J. and Granberry, W.R., 1972, A Practical Approach to Removing Gas Well
Liquids, J. Pet. Tech., (August 1972) 916-22.
Ikoku, C.I., 1984, Natural Gas Production Engineering, John Wiley & Sons, New York,
p369.
Inikori, S.O., 2002, Numerical Study of Water Coning Control With Downhole Water
Sink (DWS) Well Completions in Vertical and Horizontal Well, PhD
dissertation, Louisiana State University and A&M College, Baton Rouge, LA,
August.
Irmay, S, 1958, On the Theoretical Derivation of Darcy and Forchheimer Formulas,
Trans., American Geophysical Union 39, No 4, p702-707.
Janicek, J.D., and Katz, D.L., 1995, Applications of Unsteady State Gas Flow
Calculations, Proc., U. of Michigan Research Conference, June 20.
Jensen, J.L., Lake, L.W., Corbett, P.W.M., and Goggin, D.J., 2000, Statistics for
Petroleum Engineers and Geoscientists, Elsevier, New York.
Jones, S.C., 1987, Using the Inertial Coefficient, , To Characterize Heterogeneity in
Reservoir Rock, paper SPE 16949 SPE Annual Technical Conference and
Exhibition, Dallas, Sept. 27-30.
Jones, L.G. and Watts, J.W., Feb. 1971, Estimating Skin Effects in a Partially
Completed Damaged Well, JPT 249-52; AIME Transactions, 251.
Joshi, S.D., 1991, Horizontal Well Technology, PennWell Books, Tulsa, Oklahoma,
p251-267.
Katz, D.L., Cornell, D., Kobayashi, R., Poettman, F.H., Vary, J.A., Elenbans, J.R., and
Weinaug, C.F., 1959, Handbook of Natural Gas Engineering, McGraw-Hill
Book Co., Inc., New York, p46-51.
Kabir, C.S., 1983, Predicting Gas Well Performance Coning Water in Bottom-Water
Drive Reservoirs, Paper SPE 12068, 58th Annual Technical Conference and
Exhibition, San Francisco, Oct 5-8.
Klein, S.T., 1991, The Progressing Cavity Pump in Coaled Methane Extraction, paper
SPE 23454, SPE Eastern Regional Meeting, Lexington, Kentucky, October 22-25.
168

Klein, S.T., Thompson, S., 1992, Field Study: Utilizing a Progressing Cavity Pump for a
Closed-Loop Downhole Injection System, paper SPE 24795, 67th Annual
Technical Conference and Exhibition of the SPE, Washington, D.C. October 4-7.
Lea, J.F., 1982, Dynamic Analysis of Plunger Lift Operations, Journal of Petroleum
Technology, (Nov. 1982), p2617-2629.
Lea, J.F., Winkler, H.W., and Snyder, R.E., 2003, Whats new in artificial lift, World
Oil, (April, 2003), p 59-75.
Lea Jr., J.F., and Tighe, R.E., 1983, Gas Well Operation With Liquid Production, Paper
SPE 11583, Production Operation Symposium, Oklahoma City, OK, February 27March 1.
Lee J., 1982, Well Testing, Society of Petroleum Engineering of AIME Textbook Series
Volume 1, New York, p82-84.
Lee, A.L., Gonzales, M.H., and Eakin, B.E., 1966, The Viscosity of Natural Gases,
Journal of Petroleum Technology, (August 1966).
Lee J. and Wattenbarger R. 1996, Gas Reservoir Engineering, Society of Petroleum
Engineering Textbook Series Volume 5, Richardson, Texas, p32; p170-174;
p245.
Libson, T.N., Henry, J.R., 1980, Case Histories: Identification of and Remedial Action
for Liquid Loading in Gas Wells Intermediate Shelf Gas Play, Journal of
Petroleum Technology, (April, 1980), p685-93.
Liu, X., Civan, F., and Evans, R.D., 1995, Correlation of the Non-Darcy Flow
Coefficient, J. Cdn. Pet. Tech. (Dec. 1995) 34, No 10, p50-54.
Lombard, J-M., Longeron, D., Kalaydjan, F., 1999, Influence of Connate Water and
Condensate Saturation on Inertia Effect in Gas Condensate Fields, paper SPE
56485 SPE Annual Technical Conference and Exhibition, Houston, October 3-6.
Manceau, E., Mezghani M., Zabalza-Mezghani, I., and Roggero, F., 2001, Combination
of Experimental Design and Joint Modeling Methods for Quantifying the Risk
Associated with Deterministic and Stochastic UncertaintiesAn Integrated Test
Study, paper SPE 71620, SPE Annual Technical Conference and Exhibition,
New Orleans, Louisiana, 30 September-3 October.
Maggard, J.B., Wattenbarger, R.A., and Scott, S.L., 2000, Modeling Plunger Lift for
Water Removal From Tight Gas Wells, paper SPE 59747, SPE/CERI Gas
Technology Symposium, Calgary, Alberta Canada, April 3-5.

169

Marcano, L. and Chacin, J., 1992, Mechanistic Design of Conventional Plunger Lift
Installations, paper SPE 23682, Second Latin American Petroleum Engineering
Conference of the SPE, Caracas, Venezuela, March 8-11.
McLeod, H.D. Jr. Jan. 1983, The Effect of Perforating Conditions on Well
Performance, JPT, p31-39.
McMullan, J.H., Bassiouni, Z., 2000, Optimization of Gas-Well Completion and
Production Practices, Paper SPE 58983, International Petroleum Conference and
Exhibition, Mexico, Feb 1-3.
Melton, C.G., and Cook, R.L., 1964, Water-Lift and Disposal Operations in LowPressure Shallow Gas Wells, Journal of Petroleum Technology (June 1964),
p619-22.
Meyer, H.I. and Garder, A.O., 1954, Mechanics of Two Immiscible Fluids in Porous
Media, Journal of Applied Physics, (November 1954) 25, No. 11, 1400.
Mills, R.A.R., Gaymard, R., 1996, New Application for Wellbore Progressing Cavity
Pumps, paper SPE 35541, Intl. Petroleum Conference & Exhibition of Mexico,
Villahermosa, Mexico, March 5-7.
Montgomery, D.C., 1997, Design and Analysis of Experiments, 4th ed., John Wiley and
Sons, Inc., New York City.
Mower, L.N., Lea, J.F., Beauregard, E., and Ferguson, P. L., 1985, Defining the
Characteristics and Performance of Gas Lift Plungers, paper SPE 14344, SPE
Annual Technical Conference and Exhibition, Las Vegas, NV, Sept. 22-25.
Muskat, M.,1982, Flow of Homogeneous Fluids, International Human Resources
Development, Boston, p687-692.
Muskat, M. and Wyckoff, R.D., 1935, An approximate Theory of Water Coning in Oil
Production, AIME Transactions, Vol. 114, 144-163.
Myers, R. H. and Montgomery, D. C., 2002, Response Surface Methodology: Process
and Product optimization Using Designed Experiments, 2nd ed., John Wiley &
Sons, New York.
National Energy Board of Canada, 1995, Unconnected Gas Supply Study: Phase I
Evaluation of Unconnected Reserves in Alberta, NEB Energy Resources Branch,
January.
Neves, T.R., and Brimhall, R.M., 1989, Elimination of Liquid Loading in LowProductivity Gas Wells, paper SPE 18833, SPE Production Operation
Symposium, Oklahoma City, OK, March 13-14.

170

Nichol, J.R., and Marsh, J., 1997, Downhole Gas/Water Separation: Engineering
Assessment and Field Experience, paper SPE 38828, SPE Annual Technical
Conference and Exhibition, San Antonio, TX, October 5-8.
Nosseir, M.A., Darwich, T.A., Sayyouh, M.H., and El Sallaly, M., 2000, a New
Approach for Accurate Prediction of Loading in Gas Wells Under Different
Flowing Conditions, SPE Prod. & Facilities 15 (4), November, p241-46.
Pascal H., Quillian, R.G., Kingston, J., 1980, Analysis of Vertical Fracture Length and
Non-Darcy Flow Coefficient Using Variable Rate Tests, paper SPE 9438 Annual
Technical Conference and Exhibition, Dallas, Sept. 21-24.
Petalas, N & Aziz, K, 1997, A Mechanistic Model for Stabilized Multiphase Flow in
Pipe, Petroleum Engineering Department, Stanford University, August 1997.
Pigott, M.J., Parker, M.H., Mazzanti, D.V., Dalrymple, L.V., Cox, D.C., and Coyle, R.A.,
2002, Wellbore Heating To Prevent Liquid Loading, paper SPE 77649, SPE
Annual Technical Conference and Exhibition, San Antonio, TX, 29 September-2
October.
Putra, S.A., and Christiansen R.L., 2001, Design of Tubing Collar Inserts for Producing
Gas Wells Bellow Their Critical Rate, paper SPE 71554, SPE Annual Technical
Conference and Exhibition, New Orleans, Louisiana, September 30- October 3.
R Core Team, 2000, The R Reference Index: Version 1.1.1.
Rangel-German, E., and Samaniego V., F, 2000, On the determination of the skin factor
and the turbulence term coefficient through a single constant gas pressure test, J.
of Pet. Sci. & Eng., (2000) 26, p121.
Randolph, P.L., Hayden, C.G., and Anhaiser, J.L., 1991, Maximizing Gas Recovery
From Strong Water Drive Reservoir, paper SPE 21486, SPE Gas Technology
Symposium, Houston, TX, January 23-25.
Rogers, L.A., 1984, Test of Secondary Gas Recovery by Coproduction of Gas and
Water From Mt. Selman Field, TX, paper SPE 12865, SPE/DOE/GRI
Unconventional Gas Recovery Symposium, Pittsburgh, PA, May 13-15.
Roman, S., 1999, Writing Excel Macros, O'Reilly and Associates, Sebastopol,
California, p529.
Rosina, L, 1983, A Study of Plunger Lift Dynamics, MS Thesis, The University of
Tulsa, Tulsa, OK.
Rudolph J., and Miller J., 2001 Downhole Produced Water Disposal Improves Gas
Rate, GasTIPS, pp 21-24, Fall 2001.

171

Sacks, J., S. B. Schiller, and W. J. Welch, 1989, Designs for Computer Experiments,
Technometrics (1989) 31 No. 1, 41-47.
Saidikowski, R.M., 1979, Numerical Simulations of the Combined Effects of Wellbore
Damage and Partial Penetration, Paper SPE 8204 Annual Fall Technical
Conference and Exhibition, Nevada, Sep 23-26.
Saleh, S., and Al-Jamaey, M., 1997, Foam-Assisted Liquid Lifting in Low Pressure Gas
Wells, paper SPE 37425, Production Operations Symposium, Oklahoma City,
Marc 9-11.
Scheidegger, A.E., 1974, The Physics of Flow through Porous Media, University of
Toronto Press, Toronto.
Schlumberger: VFPi User Guide 98A, 1998, Sclumberger GeoQuest, App. N, pN-1 to N8.
Schlumberger Technology Co., 1997, Eclipse 100 Reference Manual, Sclumberger
GeoQuest, unpaginated.
Schneider, T.S., and Mackey, Jr. V., 2000, Plunger Lift Beneficts Bottom Line for a
Southeast New Mexico Operator, paper SPE 59705, SPE Permian Basin Oil and
Gas Recovery Conference, Midland, TX, March 21-23.
Schols, R.S., 1972, An Empirical Formula for the Critical Oil Production Rate, Erdoel
Erdgas, Z, Vol 88, No 1, p6-11, January 1972.
Schwall, G.H., 1989, Case Histories: Plunger Lift Boosts Production in Deep
Appalachian Gas Wells, paper SPE 18870, SPE Production Operations
Symposium, Oklahoma City, OK, March 13-14.
Scott, W.S., and Hoffman, C.E., 1999, An Update On Use of Coiled Tubing for
Completion and Recompletion Strings, paper SPE 57447, SPE Eastern Regional
Meeting, Charleston, West Virginia, October 21-22.
Shirman, E.I., Wojtanowicz, A.K., 1997, Water Coning Reversal Using Downhole
Water Sink Theory and Experimental Study, paper SPE 38792, SPE Annual
Technical Conference & Exhibition, San Antonio, TX, Oct.
Shirman, E.I., Wojtanowicz, A.K., 1998 More Oil With Less Water Using Downhole
Water Sink Technology: A Feasibility Study, paper SPE 49052 73rd SPE Annual
Technical Conference & Exhibition, New Orleans, LA, Oct. 27-30.
Silverman, S.A., Butler, W., Ashby, T., and Snider, K., 1997, Concentric Capillary
Tubing Boosts Production of Low-Pressure Gas Wells, Harts Petroleum
Engineer International, Vol. 70, No 10, October 1997, p71-73.

172

Smith, R.V., 1990, Practical Natural Gas Engineering, 2nd Edition, PennWell Books,
Tulsa, 1990.
Stephenson G.B., Rouen R.P., Rosenzweig M.H., 2000, Gas-Well Dewatering: A
Coordinated Approach, paper SPE 58984, 2000 SEP International Petroleum
Conference and Exibition, Villahermosa, Mexico, February 1-3.
Sutton, R.P., Cox, S. A., Williams Jr., E. G., Stoltz, R.P., and Gilbert, J.V., 2003, Gas
Well Performance at Subcritical Rates, paper SPE 80887, SPE Production and
Operations Symposium, Oklahoma City, OK, March 22-25.
Swisher, M.D. and Wojtanowicz, A.K., 1995, In Situ-Segregated Production of Oil and
Water A Production Method with Environmental Merit: Field Application,
paper SPE 29693 SPE/EPA Exploration & Production Environmental
Conference, Houston, TX, March 27-29.
Swisher, M.D. and Wojtanowicz, A.K., 1995, New Dual Completion Method Eliminates
Bottom Water Coning, paper SPE 30697, SPE Annual Technical Conference &
Exhibition, Dallas, TX, Oct. 22-25.
Thauvin, F., and Mohanty, K.K., 1998, Network Modeling of Non-Darcy Flow through
Porous Media, Transport in Porous Media, 31, p19-37.
Timble, A.E., DeRose, W.E., 1976, Field Application of Water-Conning Theory to
Todhunters Lake Gas Field, Paper SPE 5873, SPE-AIME 46th Annual California
Regional Meeting, Long Beach, April 8-9.
Tiss, M. and Evans, R.D., 1989, Measurement and Correlation of Non-Darcy Flow
Coefficient in Consolidated Porous Media, J. Petroleum Science and
Engineering, Vol. 3, Nos. 1-2, p19-33.
Turner, R.G, Hubbard, M.G., and Dukler, A.E., 1969, Analysis and Prediction of
Minimum Flow Rates for the Continuous Removal of Liquid from Gas Wells, J.
Pet. Tech. (Nov., 1969) 1475-82.
Umnuayponwiwat, S., Ozkan, E., Pearson, C.M., and Vincent, M., 2000, Effect of nonDarcy flow on the interpretation of transient pressure responses of hydraulically
fractured wells, paper SPE 63176 presented at the SPE Annual Technical
Conference and Exhibition, Dallas, October 1-4.
Upchurch, E.R., 1987, Expanding the Range for Predicting Critical Flowrates of Gas
Well Producing From Normally Pressured Water Drive Reservoir, paper SPE
16906, SPE Annual Technical Conference and Exhibition, Dallas, September 2730.
Vosika, J.L., 1983, Use of Foaming Agents to Alleviate Loading in Great Green River
TFG Wells, paper SPE/DOE 11644, SPE/DOE Symposium on Low Permeability,
Denver, Colorado, March 14-16.
173

Weeks, S., 1982, Small-Diameter Concentric Tubing Extends Economic Life of High
Water/Sour Gas Edwards Producers, Journal of Petroleum Technology,
(September, 1982), p1947-50.
White, C., 2002, PETE-4052 Well Testing, Syllabus, Louisiana State University, Craft
& Hawkins Petroleum Engineering Department.
White, G.W., 1982, Combine Gas Lift, Plunger to Increase Production Rate, World Oil
(Nov. 1982), p69-74.
White, C.D., and Royer, S.A., 2003, Experimental Design as a Framework for Reservoir
Studies, paper SPE 79676, SPE Reservoir Simulation Symposium, Houston,
February 3-5.
White, C.D., Willis, B.J., Narayanan, K., and Dutton, S.P., 2001, Identifying and
Estimating Significant Geologic Parameters with Experimental Design, SPEJ
(September 2001) 311-324.
Wiggins, M. L., Nguyen, S.H., and Gasbarri, S., 1999, Optimizing Plunger Lift
Operations in Oil and Gas Wells, paper SPE 52119, SPE Mid-Continent
Operations Symposium, Oklahoma City, Oklahoma, March 28-31.
Wojtanowicz, A.K., Shirman, E.I., Kurban, H., 1999, Downhole Water Sink (DWS)
Completion Enhance Oil Recovery in Reservoir With Water Coning Problems,
paper SPE 56721, SPE Annual Technical Conference & Exhibition, Houston, TX,
Oct. 3-6.
Xu, R., Yang, L., 1995, A New Binary Surfactant Mixture Improved Foam Performance
in Gas Well Production, paper SPE 29004, International Symposium on Oilfield
Chemistry, San Antonio, TX, February 14-17.

174

APPENDIX A
ANALYTICAL COMPARISON OF WATER CONING IN OIL AND GAS WELLS
1.

Analytical comparison of water coning in oil and gas wells before water
breakthrough
The pressure drop to generate a stable cone height of 20 feet in the oil-water

system is:
P = 0.052( w o )h
P = 0.052(8.5 6.6) * 20
P = 2 psi
The oil production rate for this pressure drop assuming pseudo-steady-state
conditions is:

qo =

0.00708 * hko ( pe p1 )
Bo * [ln(0.472re / rw ) + S ]
Assuming that the skin effect (S) is generated only by the partial penetration (skin

effects generated by drilling mud and perforation geometry are zero). After Saidikowski
(1979), S can be estimated from the equation:
h
h
S = t 1 ln t
h

p
rw

kH
kV

Where: ht is the reservoir thickness, hp is the completed interval, rw is the wellbore


radius, kH is the horizontal permeability, and kV is the vertical permeability.
50 50
For this example: S = 1 ln
2 = 3.9
20 0.5
The oil flow rate is:

175

0.00708 * 50 * 100(2000 1998)


0.9 *1.1 * [ln (0.472 *1000 / 0.5) + 3.9]
q o = 6.7 STB / D
qo =

Next, it was assumed that the reservoir has gas instead of oil. Then, the value of
the pressure drop and the gas production rate, necessary to generate the same stable cone
height generated for oil-water systems (20 ft), was calculated. The pressure drop to
generate a 20 ft high stable cone is:
P = 0.052( w g )h
P = 0.052(8.5 0.8) * 20
P = 8 psi

The gas production rate for this pressure drop at pseudo-steady-state conditions,
neglecting Non-Darcy flow term, is:
qg =

6.88 * 10 7 * hk g ( p e2 p12 )
TZ * [ln(0.472 * re / rw ) + S ]

Assuming that the skin effect (S) is generated only by the partial penetration (skin
effects generated by drilling mud and perforation geometry are zero). From the previous
calculation, S = 3.9
The gas flow rate is:
6.88 * 10 7 * 50 * 100 * (2000 2 1992 2 )
572 * 0.84 * 0.017 * [ln(0.472 * 1000 / 0.5) + 3.9]
q g = 1.25 MMSCF / D
qg =

176

2.

Analytical comparison of water coning in oil and gas wells after water
breakthrough

well

oil / gas

Pw

Pe
ye

y=?

water

Figure A-1

r
Theoretical model used to compare water coning
in oil and gas wells after

breakthrough.

Assumptions: radial flow, isothermal conditions, porosity, and permeability are


the same in the gas and water zone, and steady state conditions.
For gas-water system:
Qg =

2r (h y )kp p
..(A-1)
g
r

Qw =

2ryk p
w r

R=

Qg
Qw

..(A-2)

w (h y ) p
g y

At re R =

Qg
Qw

.(A-3)
w Pe (1 ( y e / h))

g ( y e / h)

....(A-4)

Rearranging equation (A-1):

177

Qg g

= rhp

2k

p
p
ryp
r
r

...(A-6)

Rearranging equation (A-2):


Qw w
p
= ry
2k
r

....(A-7)

Substituting (A-7) in (A-6):


Qg g

= rhp

2k

p Q w w
p ...(A-8)

r 2k

Defining some constants:

a=

b=

Qg g
2kh
Qw w
2kh

..(A-9)

....(A-10)

Substituting (A-9) and (A-10) in (A-8):


a = rp

p
bp ..(A-11)
r

Rearranging equation (A-11) gives:


1
p
r
b
p =
r
a

+ p
b

.....(A-12)

Integrating (A-12):
pe

e
p
r
(1 / b)
p =
[(a / b) + p ] r r
p

.....(A-13)

The solution for (A-13) is:


ln

re 1
a p + a / b
.... (A-14)
= p e p ln e
b p + a / b
r b

The ratio (a/b) may be found dividing equation (A-9) by equation (A-10):
a Qg g
=
b Qw w

..(A-15)
178

From equation (A-4):


Qg g
Qw w

1 ( y e / h)
a
pe =
b
( y e / h)

..(A-16)

The ratio (1/b) can be found from equation (A-14) at the wellbore (r = rw p = pw):

=
b
a p e + (a / b)
( p e p w ) ln

b p w + (a / b)
r
ln e
rw

(A-17)

Finally, y may be solved from equation (A-3) and (A-15):


Qg g
Qw w

(h y ) p a
=
y
b

y=

hp

[(a / b) + p]

..(A-18)

Repeating the same analysis for the oil-water system:


Qo =

2r (h y )k p
o
r

Qw =

2ryk p
w r

R=

....(A-20)

Qo w (h y )
=
Qw
o y
Qo o
2kh

If: a =

.....(A-19)

...(A-21)

, and b =

Rearranging Eq. A-19:

Qw w
2kh

, then

(h y e )
a Qo o
=
=
...(A-22)
b Qw w
ye

Qo o
p
p
= rh
ry
r
2k
r

.....(A-23)

Integrating (A-23):
a
+ 1
b

r
ln e
r

re

r 1
=
r
b

pe

p .(A-24)

1
( p e p )
b
...(A-25)
=
a

+ 1
b

179

Solving for y: y =

h
a
+ 1
b

...(A-26)

180

APPENDIX B
EXAMPLE ECLIPSE DATA DECK FOR COMPARISON OF WATER CONING
IN OIL AND GAS WELLS AFTER WATER BREAKTHROUGH
GAS-WATER MODEL
Runspec
Title
Comparison of Water Coning in Oil and Gas Wells After Water
Breakthrough
Gas-Water Model
MESSAGES
6* 3*5000 /
Radial
Dimens
-NR
Theta
NZ
26
1
128
/
Gas
Water
Field
Regdims
2
/
Welldims
-- Wells
Con Group Well in group
2
100
1
2
/
VFPPDIMS
10 10 10 10 0 2 /
Start
1 'Jan' 2002 /
Nstack
300
/
Unifout
------------------------------------------------------------Grid
Tops
26*5000 /
Inrad
0.333
/
DRV
0.4170 0.3016 0.4229 0.5929 0.8313
1.166
1.634
2.292
3.213
4.505
6.317
8.857
12.42
17.41
24.41
34.23
48.00
67.30
94.36
132.3
185.5
260.1
364.7
511.4
717.0
2500 /
DZ
3120*0.5
182*5
26*550
/
Equals
'DTHETA'
360
/
'PERMR'
10
/
'PERMTHT'
100
/
'PERMZ'
5
/
'PORO'
0.25
/
'PORO'
0
26 26 1 1 1
100 /
'PORO'
10
26 26 1 1 101 128 /

181

/
INIT
--RPTGRID
--1
/
------------------------------------------------------------PROPS
DENSITY
45
64
0.046
/
ROCK
2500
10E-6
/
PVTW
2500
1
2.6E-6
0.68
0
/
PVZG
-- Temperature
120
/
-- Press
Z
Visc
100
0.989
0.0122
300
0.967
0.0124
500
0.947
0.0126
700
0.927
0.0129
900
0.908
0.0133
1100
0.891
0.0137
1300
0.876
0.0141
1500
0.863
0.0146
1700
0.853
0.0151
1900
0.845
0.0157
2100
0.840
0.0163
2300
0.837
0.0167
2500
0.837
0.0177
2700
0.839
0.0184
3200
0.844
0.0202
/
--Saturation Functions
--Sgc =
0.20
--Krg @ Swir =
0.9
--Swir =
0.3
--Sorg =
0.0
SGFN
--Using Honarpour Equation 71
-Sg
Krg
Pc
0.00
0.000
0.0
0.10
0.000
0.0
0.20
0.020
0.0
0.30
0.030
0.0
0.40
0.081
0.0
0.50
0.183
0.0
0.60
0.325
0.0
0.70
0.900
0.0
/
SWFN
--Using Honarpour Equation 67
-Sw
Krw
Pc
0.3
0.000
0.0
0.4
0.035
0.0
0.5
0.076
0.0
0.6
0.126
0.0
0.7
0.193
0.0
0.8
0.288
0.0
0.9
0.422
0.0
1.0
1.000
0.0
/

182

------------------------------------------------------------REGIONS
Fipnum
2600*1
728*2
/
------------------------------------------------------------SOLUTION
EQUIL
5000
1500
5050
0
5050
0
/
RPTSOL
6* 2 2 /
------------------------------------------------------------SUMMARY
SEPARATE
RPTONLY
WGPR
/
WWPR
/
WBHP
/
WTHP
/
WGPT
/
WWPT
/
WBP
/
RGIP
/
RPR
1 2 /
TCPU
------------------------------------------------------------SCHEDULE
NOECHO
INCLUDE
'WELL-5000-VI.VFP' /
ECHO
RPTSCHED
6*
2
/
RPTRST
4
/
restarts once a year
TUNING
0.0007
30.4
0.0007 0.0007
1.2
/
3* 0.00001 3* 0.0001 /
2*
500 1*
100
/
WELSPECS
'P' 'G' 1 1 5000 'GAS'
2* 'STOP' 'YES' /
/
COMPDAT
'P' 1 1 1
100
'OPEN' 2* 0.666 /
/
WCONPROD
'P' 'OPEN' 'THP'
6* 300
1 /
/
WECON
'P' 1* 1000 3* 'WELL' 'YES' /
/

183

TSTEP
6*30.4
TSTEP
48*30.4
TSTEP
35*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
End

/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/

184

ECLIPSE VFP INCLUDED FILE: WELL-5000-VI


VFPPROD
1 5.00000E+003 'GAS' 'WGR' 'OGR' 'THP' '' 'FIELD' 'BHP'/
5.00000E+002
1.00000E+004
3.00000E+002
0.00000E+000
4.00000E-001
0.00000E+000
0.00000E+000
1

1.00000E+003
1.50000E+004
5.00000E+002
5.00000E-002
6.00000E-001
/
/

3.37024E+002
9.16800E+002
5.59849E+002
1.01422E+003
7.84870E+002
1.14823E+003
1.00767E+003
1.17821E+003
1.33083E+003
1.26153E+003
1.63681E+003
1.38041E+003
1.02840E+003
1.40325E+003
1.35532E+003
1.48036E+003
1.66413E+003
1.59380E+003
1.06877E+003
1.79136E+003
1.40292E+003
1.87547E+003
1.71647E+003
2.00566E+003
1.14745E+003
2.63140E+003
1.49259E+003
2.70978E+003
1.81241E+003
2.82769E+003
1.22282E+003
3.33657E+003
1.57486E+003
3.40719E+003
1.89758E+003
3.51185E+003
1.29426E+003
3.93384E+003
1.65009E+003
4.00224E+003
1.97324E+003
4.09229E+003
1.36153E+003
4.54574E+003
1.71853E+003
4.60380E+003
2.04060E+003
4.68526E+003

3.00000E+003
1.80000E+004
7.00000E+002
1.00000E-001
8.00000E-001

3.45916E+002
1.30649E+003
5.65127E+002
1.37324E+003
7.88564E+002
1.47144E+003
6.85715E+002
1.69683E+003
1.14235E+003
1.75038E+003
1.43549E+003
1.83132E+003
7.98358E+002
2.01561E+003
1.17999E+003
2.06380E+003
1.46993E+003
2.13846E+003
9.06174E+002
2.60038E+003
1.23965E+003
2.65034E+003
1.53687E+003
2.72983E+003
1.03248E+003
3.81908E+003
1.35495E+003
3.86469E+003
1.66240E+003
3.93860E+003
1.13624E+003
4.76408E+003
1.46356E+003
4.80311E+003
1.77592E+003
4.86696E+003
1.23434E+003
5.78065E+003
1.56415E+003
5.81806E+003
1.87771E+003
5.87715E+003
1.32752E+003
6.91460E+003
1.65684E+003
6.95034E+003
1.96914E+003
7.00651E+003

185

5.00000E+003
/
/
2.00000E-001
1.00000E+000

4.25316E+002
1.53942E+003
6.15848E+002
1.59511E+003
8.24884E+002
1.67903E+003
5.26979E+002
2.00157E+003
7.95789E+002
2.04461E+003
1.08259E+003
2.11135E+003
6.46858E+002
2.37484E+003
9.33680E+002
2.41335E+003
1.24089E+003
2.47443E+003
8.40372E+002
3.08950E+003
1.14544E+003
3.12890E+003
1.43807E+003
3.19348E+003
1.14282E+003
4.60402E+003
1.42442E+003
4.64024E+003
1.68147E+003
4.70113E+003
1.39809E+003
5.69293E+003
1.65458E+003
5.72329E+003
1.89757E+003
5.77621E+003
1.62877E+003
7.03960E+003
1.86048E+003
7.06883E+003
2.09286E+003
7.11864E+003
1.83827E+003
8.57619E+003
2.04934E+003
8.60433E+003
2.27214E+003
8.65222E+003

5.47796E+002
/
7.04360E+002
/
8.91574E+002
/
6.66317E+002
/
8.23119E+002
/
1.05816E+003
/
7.92196E+002
/
9.70272E+002
/
1.22716E+003
/
1.03062E+003
/
1.22814E+003
/
1.50399E+003
/
1.50309E+003
/
1.68890E+003
/
1.92590E+003
/
1.90174E+003
/
2.07013E+003
/
2.26855E+003
/
2.24629E+003
/
2.39607E+003
/
2.57229E+003
/
2.56051E+003
/
2.69480E+003
/
2.85658E+003
/

EXAMPLE ECLIPSE DATA DECK FOR COMPARISON OF WATER CONING


IN OIL AND GAS WELLS AFTER WATER BREAKTHROUGH
OIL-WATER MODEL
Runspec
Title
Comparison of Water Coning in Oil and Gas Well After Water
Breakthrough
Oil-Water Model
MESSAGES
6* 3*5000 /
Radial
Dimens
-NR
Theta
NZ
26
1
128
/
NONNC
Oil
--Gas
--Disgas
Water
Field
Regdims
2
/
Welldims
-- Wells
Con Group Well in group
2
100
1
2
/
VFPPDIMS
10 10 10 10 0 2 /
Start
1 'Jan' 2002 /
Nstack
300
/
Unifout
------------------------------------------------------------Grid
Tops
26*5000 /
Inrad
0.333
/
DRV
0.4170 0.3016 0.4229 0.5929 0.8313
1.166
1.634
2.292
3.213
4.505
6.317
8.857
12.42
17.41
24.41
34.23
48.00
67.30
94.36
132.3
185.5
260.1
364.7
511.4
717.0
2500 /
DZ
3120*0.5
182*5
26*550
/
Equals
'DTHETA'
360
/
'PERMR'
10
/
'PERMTHT'
100
/
'PERMZ'
5
/
'PORO'
0.25
/
'PORO'
0
26 26 1 1 1
100 /

186

'PORO'
10
26 26 1 1 101 128 /
/
INIT
--RPTGRID
--1
/
------------------------------------------------------------PROPS
DENSITY
45
64
0.046
/
ROCK
2500
10E-6
/
PVTW
2500
1
2.6E-6
0.68
0
/
SWOF
-- Sw
0.27
0.35
0.40
0.45
0.50
0.55
0.60
0.65
0.70

Krw
0.000
0.012
0.032
0.061
0.099
0.147
0.204
0.271
0.347

Krow
0.900
0.596
0.438
0.304
0.195
0.110
0.049
0.012
0.000

Pcow
0
0
0
0
0
0
0
0
0
/

PVCDO
2500
1.15
1.5E-5
0.5
0
/
RSCONST
0.379
1000
/
------------------------------------------------------------REGIONS
Fipnum
2600*1
728*2
/
------------------------------------------------------------SOLUTION
EQUIL
5000
3000
5050
0
100
0 1 1 2*
/
RPTSOL
6* 2 2 /
------------------------------------------------------------SUMMARY
SEPARATE
RPTONLY
WOPR
/
WWPR
/
WBHP
/
WTHP
/
WOPT
/
WWPT
/
WBP
/

187

RGIP
/
RPR
1 2 /
TCPU
------------------------------------------------------------SCHEDULE
NOECHO
--INCLUDE
--'WELL-5000-VI.VFP' /
ECHO
RPTSCHED
6*
2
/
RPTRST
4
/
restarts once a year
TUNING
0.0007
30.4
0.0007 0.0007
1.2
/
3* 0.00001 3* 0.0001 /
2*
500 1*
100
/
WELSPECS
'P' 'G' 1 1 5000 'GAS'
2* 'STOP' 'YES' /
/
COMPDAT
'P' 1 1 1
100
'OPEN' 2* 0.666 /
/
WCONPROD
'P' 'OPEN' 'ORAT'
630 /
/
WECON
'P' 2* 1.0 2* 'WELL' 'YES' /
/
TSTEP
6*30.4
/
TSTEP
48*30.4
/
TSTEP
35*30.4
/
TSTEP
48*30.4
/
TSTEP
48*30.4
/
TSTEP
48*30.4
/
TSTEP
48*30.4
/
TSTEP
48*30.4
/
TSTEP
48*30.4
/
TSTEP
48*30.4
/
TSTEP
48*30.4
/
TSTEP
48*30.4
/
TSTEP
48*30.4
/
TSTEP
48*30.4
/
TSTEP
48*30.4
/

188

TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
End

/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/

189

APPENDIX C
EXAMPLE ECLIPSE DATA DECK FOR EFFECT OF VERTICAL
PERMEABILITY ON WATER CONING
Runspec
Title
Effect of Vertical Permeability on Water Coning
Vertical Permeability equal to 30% Horizontal Permeability
MESSAGES
6* 3*5000 /
Radial
Dimens
-NR
Theta
NZ
26
1
110
/
Gas
Water
Field
Regdims
2
/
Welldims
-- Wells
Con
1
100
/
VFPPDIMS
10 10 10 10 0 1 /
Start
1 'Jan' 1998 /
Nstack
100
/
Unifout
------------------------------------------------------------Grid
Tops
26*5000 /
Inrad
0.333
/
DRV
0.4170 0.3016 0.4229 0.5929 0.8313
1.166
1.634
2.292
3.213
4.505
6.317
8.857
12.42
17.41
24.41
34.23
48.00
67.30
94.36
132.3
185.5
260.1
364.7
511.4
717.0
2500 /
DZ
2600*1
234*10
26*110
/
Equals
'DTHETA'
360
/
'PERMR'
10
/
'PERMTHT'
10
/
'PERMZ'
3
/
'PORO'
0.25
/
'PORO'
0
26 26 1 1 1 100 /
'PORO'
10
26 26 1 1 101 110 /
/

190

INIT
--RPTGRID
--1
/
------------------------------------------------------------PROPS
DENSITY
45
64
0.046
/
ROCK
2500
10E-6
/
PVTW
2500
1
2.6E-6
0.68
0
/
PVZG
-- Temperature
120
/
-- Press
Z
Visc
100
0.989
0.0122
300
0.967
0.0124
500
0.947
0.0126
700
0.927
0.0129
900
0.908
0.0133
1100
0.891
0.0137
1300
0.876
0.0141
1500
0.863
0.0146
1700
0.853
0.0151
1900
0.845
0.0157
2100
0.840
0.0163
2300
0.837
0.0167
2500
0.837
0.0177
2700
0.839
0.0184
/
--Saturation Functions
--Sgc =
0.20
--Krg @ Swir =
0.9
--Swir =
0.3
--Sorg =
0.0
SGFN
--Using Honarpour Equation 71
-Sg
Krg
Pc
0.00
0.000
0.0
0.20
0.000
0.0
0.30
0.020
0.0
0.40
0.081
0.0
0.50
0.183
0.0
0.60
0.325
0.0
0.70
0.900
0.0
/
SWFN
--Using Honarpour Equation 67
-Sw
Krw
Pc
0.3
0.000
0.0
0.4
0.035
0.0
0.5
0.076
0.0
0.6
0.126
0.0
0.7
0.193
0.0
0.8
0.288
0.0
0.9
0.422
0.0
1.0
1.000
0.0
/

191

------------------------------------------------------------REGIONS
Fipnum
2600*1
260*2
/
------------------------------------------------------------SOLUTION
EQUIL
5000
2300
5100
0
5100
0
/
RPTSOL
6* 2 2 /
------------------------------------------------------------SUMMARY
SEPARATE
RPTONLY
WGPR
/
WWPR
/
WBHP
/
WTHP
/
WGPT
/
WWPT
/
WBP
/
RGIP
/
RPR
1 2 /
TCPU
------------------------------------------------------------SCHEDULE
NOECHO
INCLUDE
'WELL-5000-VI.VFP' /
ECHO
RPTSCHED
6*
2
/
RPTRST
4
/
restarts once a year
TUNING
0.0007
30.4
0.0007 0.0007
1.2
/
3* 0.00001 3* 0.0001 /
2*
100
/
WELSPECS
'P' 'G' 1 1 5000 'GAS' 2* 'STOP' 'YES' /
/
COMPDAT
'P' 1 1 1 30 'OPEN' 2* 0.666 /
/
WCONPROD
'P' 'OPEN' 'THP' 5* 550 500
1 /
/

192

WECON
'P' 1*
/
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
End

1220

4*

'YES'

/
/
/
/
/
/
/
/
/
/
/
/

193

EXAMPLE ECLIPSE DATA DECK FOR EFFECT OF AQUIFER SIZE ON


WATER CONING
Runspec
Title
Effect of Aquifer Size on Water Coning
VAD equal to 519
MESSAGES
6* 3*5000 /
Radial
Dimens
-NR
Theta
NZ
26
1
110
/
Gas
Water
Field
Regdims
2
/
Welldims
-- Wells
Con
1
100
/
VFPPDIMS
10 10 10 10 0 1 /
Start
1 'Jan' 1998 /
Nstack
100
/
Unifout
------------------------------------------------------------Grid
Tops
26*5000 /
Inrad
0.333
/
DRV
0.4170 0.3016 0.4229 0.5929 0.8313
1.166
1.634
2.292
3.213
4.505
6.317
8.857
12.42
17.41
24.41
34.23
48.00
67.30
94.36
132.3
185.5
260.1
364.7
511.4
717.0
2500 /
DZ
2600*1
234*10
26*410
/
Equals
'DTHETA'
360
/
'PERMR'
10
/
'PERMTHT'
10
/
'PERMZ'
1
/
'PORO'
0.25
/
'PORO'
0
26 26 1 1 1 100 /
'PORO'
10
26 26 1 1 101 110 /
/
INIT
--RPTGRID
--1
/

194

------------------------------------------------------------PROPS
DENSITY
45
64
0.046
/
ROCK
2500
10E-6
/
PVTW
2500
1
2.6E-6
0.68
0
/
PVZG
-- Temperature
120
/
-- Press
Z
Visc
100
0.989
0.0122
300
0.967
0.0124
500
0.947
0.0126
700
0.927
0.0129
900
0.908
0.0133
1100
0.891
0.0137
1300
0.876
0.0141
1500
0.863
0.0146
1700
0.853
0.0151
1900
0.845
0.0157
2100
0.840
0.0163
2300
0.837
0.0167
2500
0.837
0.0177
2700
0.839
0.0184
/
--Saturation Functions
--Sgc =
0.20
--Krg @ Swir =
0.9
--Swir =
0.3
--Sorg =
0.0
SGFN
--Using Honarpour Equation 71
-Sg
Krg
Pc
0.00
0.000
0.0
0.20
0.000
0.0
0.30
0.020
0.0
0.40
0.081
0.0
0.50
0.183
0.0
0.60
0.325
0.0
0.70
0.900
0.0
/
SWFN
--Using Honarpour Equation 67
-Sw
Krw
Pc
0.3
0.000
0.0
0.4
0.035
0.0
0.5
0.076
0.0
0.6
0.126
0.0
0.7
0.193
0.0
0.8
0.288
0.0
0.9
0.422
0.0
1.0
1.000
0.0
/
------------------------------------------------------------REGIONS
Fipnum

195

2600*1
260*2

/
------------------------------------------------------------SOLUTION
EQUIL
5000
2300
5100
0
5100
0
/
RPTSOL
6* 2 2 /
------------------------------------------------------------SUMMARY
SEPARATE
RPTONLY
WGPR
/
WWPR
/
WBHP
/
WTHP
/
WGPT
/
WWPT
/
WBP
/
RGIP
/
RPR
1 2 /
TCPU
------------------------------------------------------------SCHEDULE
NOECHO
INCLUDE
'WELL-5000-VI.VFP' /
ECHO
RPTSCHED
6*
2
/
RPTRST
4
/
restarts once a year
TUNING
0.0007
30.4
0.0007 0.0007
1.2
/
3* 0.00001 3* 0.0001 /
2*
100
/
WELSPECS
'P' 'G' 1 1 5000 'GAS' 2* 'STOP' 'YES' /
/
COMPDAT
'P' 1 1 1 30 'OPEN' 2* 0.666 /
/
WCONPROD
'P' 'OPEN' 'THP' 5* 550 500
1 /
/
WECON
'P' 1* 1220 4* 'YES' /
/

196

TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
End

/
/
/
/
/
/
/
/
/
/
/
/

197

EXAMPLE ECLIPSE DATA DECK FOR EFFECT OF FLOW BEHIND CASING


ON WATER CONING
Runspec
Title
Effect of Flow Behind Casing
Channel Size 1.3 inches (Permeability in the first grid 1,000,000 md)
Channel Initially in the Water Zone
6* 3*5000 /
Radial
Dimens
-NR
Theta
NZ
26
1
110
/
Gas
Water
Field
Regdims
2
/
Welldims
-- Wells
Con
1
100
/
VFPPDIMS
10 10 10 10 0 1 /
Start
1 'Jan' 1998 /
Nstack
100
/
Unifout
------------------------------------------------------------Grid
Tops
26*5000 /
Inrad
0.333
/
DRV
0.4170 0.3016 0.4229 0.5929 0.8313
1.166
1.634
2.292
3.213
4.505
6.317
8.857
12.42
17.41
24.41
34.23
48.00
67.30
94.36
132.3
185.5
260.1
364.7
511.4
717.0
2500 /
DZ
2600*1
234*10
26*110
/
Equals
'DTHETA'
360
/
'PERMR'
100
/
'PERMTHT'
100
/
'PERMZ'
10
/
'PORO'
0.25
/
'PORO'
0
26 26 1 1 1 100 /
'PORO'
10
26 26 1 1 101 110 /
'PERMZ'
1000000
1
1
1 1 1
101 /
'PERMR'
0
1
1
1 1 51 100 /

198

/
INIT
--RPTGRID
--1
/
------------------------------------------------------------PROPS
DENSITY
45
64
0.046
/
ROCK
2500
10E-6
/
PVTW
2500
1
2.6E-6
0.68
0
/
PVZG
-- Temperature
120
/
-- Press
Z
Visc
100
0.989
0.0122
300
0.967
0.0124
500
0.947
0.0126
700
0.927
0.0129
900
0.908
0.0133
1100
0.891
0.0137
1300
0.876
0.0141
1500
0.863
0.0146
1700
0.853
0.0151
1900
0.845
0.0157
2100
0.840
0.0163
2300
0.837
0.0167
2500
0.837
0.0177
2700
0.839
0.0184
/
--Saturation Functions
--Sgc =
0.20
--Krg @ Swir =
0.9
--Swir =
0.3
--Sorg =
0.0
SGFN
--Using Honarpour Equation 71
-Sg
Krg
Pc
0.00
0.000
0.0
0.20
0.000
0.0
0.30
0.020
0.0
0.40
0.081
0.0
0.50
0.183
0.0
0.60
0.325
0.0
0.70
0.900
0.0
/
SWFN
--Using Honarpour Equation 67
-Sw
Krw
Pc
0.3
0.000
0.0
0.4
0.035
0.0
0.5
0.076
0.0
0.6
0.126
0.0
0.7
0.193
0.0
0.8
0.288
0.0
0.9
0.422
0.0

199

1.0
1.000
0.0
/
------------------------------------------------------------REGIONS
Fipnum
2600*1
260*2
/
------------------------------------------------------------SOLUTION
EQUIL
5000
2500
5100
0
5100
0
/
RPTSOL
6* 2 2 /
------------------------------------------------------------SUMMARY
SEPARATE
RPTONLY
WGPR
/
WWPR
/
WBHP
/
WTHP
/
WGPT
/
WWPT
/
WBP
/
RGIP
/
RPR
1 2 /
TCPU
------------------------------------------------------------SCHEDULE
NOECHO
INCLUDE
'GWVFP.VFP' /
ECHO
RPTSCHED
6*
2
/
RPTRST
4
/
restarts once a year
TUNING
0.0007
30.4
0.0007 0.0007
1.2
/
3* 0.00001 3* 0.0001 /
2*
100
/
WELSPECS
'P' 'G' 1 1 5000 'GAS' 2* 'STOP' 'YES' /
/
COMPDAT
'P' 1 1 1 50 'OPEN' 2* 0.666 /
/
WCONPROD

200

'P' 'OPEN' 'BHP' 2* 25000


/
WECON
'P' 1* 1220 4* 'YES' /
/
TSTEP
12*30.4
/
TSTEP
12*30.4
/
TSTEP
6*30.4
/
TSTEP
48*30.4
/
TSTEP
48*30.4
/
TSTEP
48*30.4
/
TSTEP
48*30.4
/
TSTEP
48*30.4
/
TSTEP
48*30.4
/
TSTEP
48*30.4
/
TSTEP
48*30.4
/
End

2*

2000

201

1*

EXAMPLE IMEX DATA DECK FOR EFFECT OF NON-DARCY FLOW ON


WATER CONING
Effect of Non-Darcy Effect on Water Coning
Non-Darcy Flow Effect Distributed in the Reservoir
RESULTS SIMULATOR IMEX
RESULTS SECTION INOUT
**SS-UNKNOWN
** REGDIMS
** 2
/
**SS-ENDUNKNOWN
**SS-UNKNOWN
** INIT
** --RPTGRID
** --1
/
** ------------------------------------------------------------**SS-ENDUNKNOWN
*DIM *MAX_WELLS 1
*DIM *MAX_LAYERS 100
***********************************************************************
*****
**
**
*IO
**
***********************************************************************
*****
*TITLE1
**Effect of Non-Darcy Effect on Water Coning
**Non-Darcy Flow Effect Distributed in the Reservoir
**-----------------------------------------------------------**SS-NOEFFECT
** MESSAGES
** 6* 3*5000 /
**SS-ENDNOEFFECT
**-----------------------------------------------------------*INUNIT *FIELD
*OUTUNIT *FIELD
GRID RADIAL 26 1 110 RW 3.33000000E-1
KDIR DOWN
DI IVAR
0.417 0.3016 0.4229 0.5929 0.8313 1.166 1.634 2.292 3.213 4.505
6.317 8.857
12.42 17.41 24.41 34.23 48. 67.3 94.36 132.3 185.5 260.1 364.7
511.4 717.
2500.
DJ CON 360.
DK KVAR
100*1. 9*10. 210.

202

DTOP

26*5000.

RESULTS
RESULTS
RESULTS
RESULTS

SECTION
SECTION
SECTION
SECTION

GRID
NETPAY
NETGROSS
POR

**$ RESULTS PROP POR Units: Dimensionless


**$ RESULTS PROP Minimum Value: 0 Maximum Value: 1
POR ALL
2860*1.
MOD 1:26 1:1 1:110 = 0.1
26:26 1:1 1:100 = 0
26:26 1:1 101:110 = 1
RESULTS SECTION PERMS
**$ RESULTS PROP PERMI Units: md
**$ RESULTS PROP Minimum Value: 10
PERMI ALL
2860*1.
MOD 1:26 1:1 1:110 = 10
**$ RESULTS PROP PERMJ Units: md
**$ RESULTS PROP Minimum Value: 10
PERMJ ALL
2860*1.
MOD 1:26 1:1 1:110 = 10
**$ RESULTS PROP PERMK Units: md
**$ RESULTS PROP Minimum Value: 1
PERMK ALL
2860*1.
MOD 1:26 1:1 1:110 = 1
RESULTS SECTION TRANS
RESULTS SECTION FRACS
RESULTS SECTION GRIDNONARRAYS
CPOR MATRIX
1.E-05
PRPOR MATRIX
2500.

Maximum Value: 10

Maximum Value: 10

Maximum Value: 1

RESULTS SECTION VOLMOD


RESULTS SECTION SECTORLEASE
**$ SECTORARRAY 'SECTOR1' Definition.
SECTORARRAY 'SECTOR1' ALL
2600*1 260*0
**$ SECTORARRAY 'SECTOR2'
SECTORARRAY 'SECTOR2' ALL
2600*0 260*1

Definition.

RESULTS SECTION ROCKCOMPACTION


RESULTS SECTION GRIDOTHER
RESULTS SECTION MODEL
MODEL *BLACKOIL
**$ OilGas Table 'Table A'

203

*TRES
120.
*PVT *EG 1
** P
Rs
Bo
EG
VisO
VisG
14.7
5.51
1.0268
5.05973
1.2801
213.72
47.23
1.0414
75.1695
1.0556
412.74
97.95
1.0599
148.3052 0.8894
611.76
153.78
1.0811
224.457
0.7705
810.78
213.36
1.1045
303.5186 0.6824
1009.8
275.94
1.1299
385.257
0.6146
1208.82
341.06
1.1571
469.289
0.5609
1407.84
408.36
1.1859
555.068
0.5173
1606.86
477.62
1.2163
641.895
0.481
1805.88
548.62
1.2481
728.959
0.4504
2004.9
621.23
1.2813
815.4
0.4241
2203.92
695.32
1.3158
900.389
0.4013
2402.94
770.77
1.3515
983.192
0.3813
2601.96
847.5
1.3885
1063.222 0.3636
2800.98
925.44
1.4265
1140.054 0.3479
3000.
1004.5
1.4657
1213.424 0.3337
*DENSITY *OIL 50.0004
*DENSITY *GAS 0.046
*DENSITY *WATER 63.9098
*CO
1.777275E-05
*BWI
1.003357
*CW
2.934065E-06
*REFPW
2500.
*VWI
0.658209
*CVW
0

0.011983
0.01216
0.0124
0.01268
0.012993
0.013335
0.013705
0.014103
0.014528
0.01498
0.01546
0.015969
0.016508
0.017077
0.017678
0.018313

RESULTS SECTION MODELARRAYS


RESULTS SECTION ROCKFLUID
***********************************************************************
*****
**
**
*ROCKFLUID
**
***********************************************************************
*****
*ROCKFLUID
*RPT 1
*SWT
0.300000
0.400000
0.500000
0.600000
0.700000
0.800000
0.900000
1.000000

0.000000
0.035000
0.076000
0.126000
0.193000
0.288000
0.422000
1.000000

*SGT *NOSWC
0.000000 0.000000
0.200000 0.000000
0.300000 0.020000
0.400000 0.081000

1.000000 0.000000
0.857142857142857
0.714285714285714
0.571428571428572
0.428571428571429
0.285714285714286
0.142857142857143
0.000000 0.000000

0.000000
0.000000
0.000000
0.000000
0.000000
0.000000

1.000000 0.000000
0.714285714285714 0.000000
0.571428571428572 0.000000
0.428571428571429 0.000000

204

0.500000
0.600000
0.700000

0.183000
0.325000
0.900000

0.285714285714286 0.000000
0.142857142857143 0.000000
0.000000 0.000000

*NONDARCY *FG2
*KROIL *SEGREGATED
RESULTS SECTION ROCKARRAYS
RESULTS SECTION INIT
***********************************************************************
*****
**
**
*INITIAL
**
***********************************************************************
*****
*INITIAL
**-----------------------------------------------------------**SS-NOEFFECT
** RPTSOL
** 6* 2 2 /
** ------------------------------------------------------------**SS-ENDNOEFFECT
**-----------------------------------------------------------*VERTICAL *DEPTH_AVE *WATER_GAS *TRANZONE *EQUIL
**$ Data for PVT Region 1
**$ ------------------------------------*REFDEPTH 5000.
*REFPRES 2300.
*DWGC 5100.

RESULTS SECTION INITARRAYS


**$ RESULTS PROP PB Units: psi
**$ RESULTS PROP Minimum Value: 0
PB CON 0
RESULTS SECTION NUMERICAL
*NUMERICAL

Maximum Value: 0

RESULTS SECTION NUMARRAYS


RESULTS SECTION GBKEYWORDS
RUN
**SS-UNKNOWN
** RPTRST
** 4
/
**SS-ENDUNKNOWN

RESTARTS ONCE A YEAR

DATE 2002 01 01.


**-----------------------------------------------------------**SS-NOEFFECT

205

** NOECHO
**SS-ENDNOEFFECT
**-----------------------------------------------------------PTUBE WATER_GAS 1
DEPTH 5000.
QG
5.E+05 1.E+06 3.E+06 5.E+06 1.E+07 1.5E+07 1.8E+07
WGR
0 5.E-05 1.E-04 0.0002 0.0004 0.0006 0.0008 0.001
WHP
300. 500. 700.
BHPTG
1
1
3.37024000E+02 5.59849000E+02 7.84870000E+02
2
1
1.00767000E+03 1.33083000E+03 1.63681000E+03
3
1
1.02840000E+03 1.35532000E+03 1.66413000E+03
4
1
1.06877000E+03 1.40292000E+03 1.71647000E+03
5
1
1.14745000E+03 1.49259000E+03 1.81241000E+03
6
1
1.22282000E+03 1.57486000E+03 1.89758000E+03
7
1
1.29426000E+03 1.65009000E+03 1.97324000E+03
8
1
1.36153000E+03 1.71853000E+03 2.04060000E+03
1
2
3.45916000E+02 5.65127000E+02 7.88564000E+02
2
2
6.85715000E+02 1.14235000E+03 1.43549000E+03
3
2
7.98357000E+02 1.17999000E+03 1.46993000E+03
4
2
9.06174000E+02 1.23965000E+03 1.53687000E+03
5
2
1.03248000E+03 1.35495000E+03 1.66240000E+03
6
2
1.13624000E+03 1.46356000E+03 1.77592000E+03
7
2
1.23434000E+03 1.56415000E+03 1.87771000E+03
8
2
1.32752000E+03 1.65684000E+03 1.96914000E+03
1
3
4.25316000E+02 6.15848000E+02 8.24883000E+02
2
3
5.26979000E+02 7.95789000E+02 1.08259000E+03
3
3
6.46858000E+02 9.33680000E+02 1.24089000E+03
4
3
8.40372000E+02 1.14544000E+03 1.43807000E+03
5
3
1.14282000E+03 1.42442000E+03 1.68147000E+03
6
3
1.39809000E+03 1.65458000E+03 1.89757000E+03
7
3
1.62877000E+03 1.86048000E+03 2.09286000E+03
8
3
1.83827000E+03 2.04934000E+03 2.27214000E+03
1
4
5.47796000E+02 7.04360000E+02 8.91575000E+02
2
4
6.66316000E+02 8.23118000E+02 1.05816000E+03
3
4
7.92196000E+02 9.70272000E+02 1.22716000E+03
4
4
1.03062000E+03 1.22814000E+03 1.50399000E+03
5
4
1.50309000E+03 1.68890000E+03 1.92590000E+03
6
4
1.90174000E+03 2.07013000E+03 2.26855000E+03
7
4
2.24629000E+03 2.39607000E+03 2.57229000E+03
8
4
2.56051000E+03 2.69480000E+03 2.85658000E+03
1
5
9.16800000E+02 1.01422000E+03 1.14823000E+03
2
5
1.17821000E+03 1.26153000E+03 1.38041000E+03
3
5
1.40325000E+03 1.48036000E+03 1.59380000E+03
4
5
1.79136000E+03 1.87547000E+03 2.00566000E+03
5
5
2.63140000E+03 2.70978000E+03 2.82769000E+03
6
5
3.33657000E+03 3.40719000E+03 3.51185000E+03
7
5
3.93384000E+03 4.00224000E+03 4.09229000E+03
8
5
4.54574000E+03 4.60380000E+03 4.68526000E+03
1
6
1.30649000E+03 1.37324000E+03 1.47144000E+03
2
6
1.69683000E+03 1.75038000E+03 1.83132000E+03
3
6
2.01561000E+03 2.06380000E+03 2.13846000E+03
4
6
2.60038000E+03 2.65034000E+03 2.72983000E+03
5
6
3.81908000E+03 3.86469000E+03 3.93860000E+03
6
6
4.76408000E+03 4.80311000E+03 4.86696000E+03

206

7
8
1
2
3
4
5
6
7
8

6
6
7
7
7
7
7
7
7
7

GROUP 'G' ATTACHTO

5.78065000E+03
6.91460000E+03
1.53942000E+03
2.00157000E+03
2.37484000E+03
3.08950000E+03
4.60402000E+03
5.69293000E+03
7.03960000E+03
8.57618000E+03

5.81806000E+03
6.95034000E+03
1.59511000E+03
2.04461000E+03
2.41335000E+03
3.12890000E+03
4.64024000E+03
5.72329000E+03
7.06884000E+03
8.60434000E+03

'FIELD'

WELL 1 'P' ATTACHTO 'G'


PRODUCER 'P'
PWELLBORE TABLE 5000. 1
OPERATE MAX STG 1.E+07 CONT
OPERATE MIN BHP 14.7 CONT
MONITOR MIN STG 1.2E+06 STOP
GEOMETRY K 0.333 0.37 1. 5.
PERF GEO
'P'
1 1 1 1. OPEN
1 1 2 1. OPEN
1 1 3 1. OPEN
1 1 4 1. OPEN
1 1 5 1. OPEN
1 1 6 1. OPEN
1 1 7 1. OPEN
1 1 8 1. OPEN
1 1 9 1. OPEN
1 1 10 1. OPEN
1 1 11 1. OPEN
1 1 12 1. OPEN
1 1 13 1. OPEN
1 1 14 1. OPEN
1 1 15 1. OPEN
1 1 16 1. OPEN
1 1 17 1. OPEN
1 1 18 1. OPEN
1 1 19 1. OPEN
1 1 20 1. OPEN
1 1 21 1. OPEN
1 1 22 1. OPEN
1 1 23 1. OPEN
1 1 24 1. OPEN
1 1 25 1. OPEN
1 1 26 1. OPEN
1 1 27 1. OPEN
1 1 28 1. OPEN
1 1 29 1. OPEN
1 1 30 1. OPEN
1 1 31 1. OPEN
1 1 32 1. OPEN
1 1 33 1. OPEN
1 1 34 1. OPEN
1 1 35 1. OPEN

207

5.87715000E+03
7.00651000E+03
1.67903000E+03
2.11135000E+03
2.47443000E+03
3.19348000E+03
4.70113000E+03
5.77622000E+03
7.11864000E+03
8.65223000E+03

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93

1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.
1.

OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN

208

1
1
1
1
1
1
1

1
1
1
1
1
1
1

94 1. OPEN
95 1. OPEN
96 1. OPEN
97 1. OPEN
98 1. OPEN
99 1. OPEN
100 1. OPEN

XFLOW-MODEL 'P' FULLY-MIXED


OPEN 'P'
TIME 30.4
TIME 60.8
TIME 91.2
TIME 121.6
TIME 152
TIME 182.4
TIME 212.8
TIME 243.2
TIME 273.6
TIME 304
TIME 334.4
TIME 364.8
TIME 395.2
TIME 425.6
TIME 456
TIME 486.4
TIME 516.8
TIME 547.2
TIME 577.6
TIME 608
TIME 638.4
TIME 668.8
TIME 699.2

209

TIME 729.6
TIME 760
TIME 790.4
TIME 820.8
TIME 851.2
TIME 881.6
TIME 912
TIME 942.4
TIME 972.8
TIME 1003.2
TIME 1033.6
TIME 1064
TIME 1094.4
TIME 1124.8
TIME 1155.2
TIME 1185.6
TIME 1216
TIME 1246.4
TIME 1276.8
TIME 1307.2
TIME 1337.6
TIME 1368
TIME 1398.4
TIME 1428.8
TIME 1459.2
TIME 1489.6
TIME 1520
TIME 1550.4
TIME 1580.8

210

TIME 1611.2
TIME 1641.6
TIME 1672
TIME 1702.4
TIME 1732.8
TIME 1763.2
TIME 1793.6
TIME 1824
TIME 1854.4
TIME 1884.8
TIME 1915.2
TIME 1945.6
TIME 1976
TIME 2006.4
TIME 2036.8
TIME 2067.2
TIME 2097.6
TIME 2128
TIME 2158.4
TIME 2188.8
TIME 2219.2
TIME 2249.6
TIME 2280
TIME 2310.4
TIME 2340.8
TIME 2371.2
TIME 2401.6
TIME 2432
TIME 2462.4

211

TIME 2492.8
TIME 2523.2
TIME 2553.6
TIME 2584
TIME 2614.4
TIME 2644.8
TIME 2675.2
TIME 2705.6
TIME 2736
TIME 2766.4
TIME 2796.8
TIME 2827.2
TIME 2857.6
TIME 2888
TIME 2918.4
TIME 2948.8
TIME 2979.2
STOP
***************************** TERMINATE SIMULATION
*****************************
RESULTS SECTION WELLDATA
RESULTS SECTION PERFS

212

APPENDIX D
ANALYTICAL MODEL FOR NON-DARCY EFFECT IN LOW PRODUCTIVITY
GAS RESERVOIRS

Analytical Model of Pressure Drawdown with N-D Flow Effect


For constant-rate production from a well in a gas reservoir with closed outer
boundaries, the late-time (stabilized) solution to the diffusivity equation is (Lee &
Wattenbarger, 1996):
p p = p p ( p ) p p ( p wf ) (D-1)

p p =

1.422 *10 6 qT
kg h

10.06 A 3
+ s + Dq (D-2)
1.151 log
2

C A rw 4

Houpeurt (1959) wrote equation 2 in a simple form:


p p = p p ( p ) p p ( p wf ) = aq + bq 2 ..(D-3)

Where,
a=

10.06 A 3
1.422 *10 6 T
+ s .(D-4)
1.151 log
2
kgh
C A rw 4

And,
b=

1.422 *10 6 TD
kgh

....(D-5)

Equation D-3 is the basis for Houpeurts procedure to analyze well deliverability
tests in gas wells. The coefficient a represents the pressure drop generated by viscous
forces, and b represents the inertial resistance. The N-D flow coefficient, D, is defined in
terms of the inertia coefficient, ,
D=

2.715 *10 12 k g Mp sc
h g ( p wf )rw Tsc

.(D-6)
213

This expression is based on an integration of Forchheimers equation assuming


steady state flow (Dake, 1978).
Lee and Wattenbarger (1996) recommend using the following correlation for
calculations (Jones, 1987):
= 1.88 *10 10 k 1.47 0.53 .(D-7)

One analytical model was built, using the equations shown above, to evaluate the
effect of rock properties, porosity and permeability, and the gas flow rate on the N-D
flow. For this model, following Dake (1978) and Golan (1991), h was replaced by hper in
Eq. 5. A new variable, F, was defined (White, 2002). F is the fraction of the total
pressure drop generated by the N-D flow when gas flows through porous media.
Mathematically, F was defined using Eq. 3 as:
F=

bq
a + bq

(D-8)

214

APPENDIX E
EXAMPLE IMEX DATA DECK FOR NON-DARCY FLOW IN LOW
PRODUCTIVITY GAS RESERVOIRS

RESULTS SIMULATOR IMEX


RESULTS SECTION INOUT
**SS-UNKNOWN
** REGDIMS
** 2
/
**SS-ENDUNKNOWN
**SS-UNKNOWN
** INIT
** --RPTGRID
** --1
/
** ------------------------------------------------------------**SS-ENDUNKNOWN
*DIM *MAX_WELLS 1
*DIM *MAX_LAYERS 100
***********************************************************************
*****
**
**
*IO
**
***********************************************************************
*****
*TITLE1 'Non-Darcy Flow Effect in Low-Productivity Gas Reservoir'
**Non-Darcy Effect Distribute in the Reservoir
**Water Drive Gas Reservoir
**-----------------------------------------------------------**SS-NOEFFECT
** MESSAGES
** 6* 3*5000 /
**SS-ENDNOEFFECT
**-----------------------------------------------------------*INUNIT *FIELD
*OUTUNIT *FIELD
GRID RADIAL 26 1 110 RW 3.33000000E-1
KDIR DOWN
DI IVAR
0.417 0.3016 0.4229 0.5929 0.8313 1.166 1.634 2.292 3.213 4.505
6.317 8.857
12.42 17.41 24.41 34.23 48. 67.3 94.36 132.3 185.5 260.1 364.7
511.4 717.
2500.
DJ CON 360.
DK KVAR
100*1. 9*10. 710.

215

DTOP

26*5000.

RESULTS
RESULTS
RESULTS
RESULTS

SECTION
SECTION
SECTION
SECTION

GRID
NETPAY
NETGROSS
POR

**$ RESULTS PROP POR Units: Dimensionless


**$ RESULTS PROP Minimum Value: 0 Maximum Value: 1
POR ALL
2860*1.
MOD 1:26 1:1 1:110 = 0.1
26:26 1:1 1:100 = 0
RESULTS SECTION PERMS
**$ RESULTS PROP PERMI Units: md
**$ RESULTS PROP Minimum Value: 10
PERMI ALL
2860*1.
MOD 1:26 1:1 1:110 = 10
**$ RESULTS PROP PERMJ Units: md
**$ RESULTS PROP Minimum Value: 10
PERMJ ALL
2860*1.
MOD 1:26 1:1 1:110 = 10
**$ RESULTS PROP PERMK Units: md
**$ RESULTS PROP Minimum Value: 5
PERMK ALL
2860*1.
MOD 1:26 1:1 1:110 = 5
RESULTS SECTION TRANS
RESULTS SECTION FRACS
RESULTS SECTION GRIDNONARRAYS
CPOR MATRIX
1.E-05
PRPOR MATRIX
2500.

Maximum Value: 10

Maximum Value: 10

Maximum Value: 5

RESULTS SECTION VOLMOD


RESULTS SECTION SECTORLEASE
**$ SECTORARRAY 'SECTOR1' Definition.
SECTORARRAY 'SECTOR1' ALL
2600*1 260*0
**$ SECTORARRAY 'SECTOR2'
SECTORARRAY 'SECTOR2' ALL
2600*0 260*1

Definition.

RESULTS SECTION ROCKCOMPACTION


RESULTS SECTION GRIDOTHER
RESULTS SECTION MODEL
MODEL *BLACKOIL

216

**$ OilGas Table 'Table A'


*TRES
120.
*PVT *EG 1
** P
Rs
Bo
EG
VisO
VisG
14.7
10.87
1.0289
5.05973
0.3034
213.72
93.23
1.06
75.1695
0.2644
412.74
193.36
1.1007
148.3052 0.2378
611.76
303.58
1.1482
224.457
0.2184
810.78
421.2
1.2014
303.5186 0.2034
1009.8
544.75
1.2597
385.257
0.1911
1208.82
673.28
1.3225
469.289
0.1809
1407.84
806.15
1.3896
555.068
0.1722
1606.86
942.87
1.4604
641.895
0.1647
1805.88
1083.05
1.535
728.959
0.158
2004.9
1226.39
1.6129
815.4
0.1521
2203.92
1372.64
1.6942
900.389
0.1469
2402.94
1521.59
1.7785
983.192
0.1421
2601.96
1673.07
1.8658
1063.222 0.1377
2800.98
1826.92
1.956
1140.054 0.1338
3000.
1983.
2.0489
1213.424 0.1301
*DENSITY *OIL 45.
*DENSITY *GAS 0.046
*DENSITY *WATER 62.6263
*CO
3.E-05
*BWI
1.003357
*CW
2.934065E-06
*REFPW
2500.
*VWI
0.62582
*CVW
0

0.011983
0.01216
0.0124
0.01268
0.012993
0.013335
0.013705
0.014103
0.014528
0.01498
0.01546
0.015969
0.016508
0.017077
0.017678
0.018313

RESULTS SECTION MODELARRAYS


RESULTS SECTION ROCKFLUID
***********************************************************************
*****
**
**
*ROCKFLUID
**
***********************************************************************
*****
*ROCKFLUID
*RPT 1
*SWT
0.300000
0.400000
0.500000
0.600000
0.700000
0.800000
0.900000
1.000000

0.000000
0.035000
0.076000
0.126000
0.193000
0.288000
0.422000
1.000000

*SGT *NOSWC
0.000000 0.000000
0.200000 0.000000
0.300000 0.020000

1.000000 0.000000
0.857142857142857
0.714285714285714
0.571428571428572
0.428571428571429
0.285714285714286
0.142857142857143
0.000000 0.000000

0.000000
0.000000
0.000000
0.000000
0.000000
0.000000

1.000000 0.000000
0.714285714285714 0.000000
0.571428571428572 0.000000

217

0.400000
0.500000
0.600000
0.700000

0.081000
0.183000
0.325000
0.900000

0.428571428571429 0.000000
0.285714285714286 0.000000
0.142857142857143 0.000000
0.000000 0.000000

*NONDARCY *FG1
*KROIL *SEGREGATED
RESULTS SECTION ROCKARRAYS
RESULTS SECTION INIT
***********************************************************************
*****
**
**
*INITIAL
**
***********************************************************************
*****
*INITIAL
**-----------------------------------------------------------**SS-NOEFFECT
** RPTSOL
** 6* 2 2 /
** ------------------------------------------------------------**SS-ENDNOEFFECT
**-----------------------------------------------------------*VERTICAL *DEPTH_AVE *WATER_GAS *TRANZONE *EQUIL
**$ Data for PVT Region 1
**$ ------------------------------------*REFDEPTH 5000.
*REFPRES 2300.
*DWGC 5100.

RESULTS SECTION INITARRAYS


**$ RESULTS PROP PB Units: psi
**$ RESULTS PROP Minimum Value: 0
PB CON 0
RESULTS SECTION NUMERICAL
*NUMERICAL

Maximum Value: 0

RESULTS SECTION NUMARRAYS


RESULTS SECTION GBKEYWORDS
RUN
**SS-UNKNOWN
** RPTRST
** 4
/
**SS-ENDUNKNOWN

RESTARTS ONCE A YEAR

DATE 2002 01 01.


**------------------------------------------------------------

218

**SS-NOEFFECT
** NOECHO
**SS-ENDNOEFFECT
**-----------------------------------------------------------PTUBE WATER_GAS 1
DEPTH 5000.
QG
5.E+05 1.E+06 3.E+06 5.E+06 1.E+07 1.5E+07 1.8E+07
WGR
0 5.E-05 1.E-04 0.0002 0.0004 0.0006 0.0008 0.001
WHP
300. 500. 700.
BHPTG
1
1
3.37024000E+02 5.59849000E+02 7.84870000E+02
2
1
1.00767000E+03 1.33083000E+03 1.63681000E+03
3
1
1.02840000E+03 1.35532000E+03 1.66413000E+03
4
1
1.06877000E+03 1.40292000E+03 1.71647000E+03
5
1
1.14745000E+03 1.49259000E+03 1.81241000E+03
6
1
1.22282000E+03 1.57486000E+03 1.89758000E+03
7
1
1.29426000E+03 1.65009000E+03 1.97324000E+03
8
1
1.36153000E+03 1.71853000E+03 2.04060000E+03
1
2
3.45916000E+02 5.65127000E+02 7.88564000E+02
2
2
6.85715000E+02 1.14235000E+03 1.43549000E+03
3
2
7.98357000E+02 1.17999000E+03 1.46993000E+03
4
2
9.06174000E+02 1.23965000E+03 1.53687000E+03
5
2
1.03248000E+03 1.35495000E+03 1.66240000E+03
6
2
1.13624000E+03 1.46356000E+03 1.77592000E+03
7
2
1.23434000E+03 1.56415000E+03 1.87771000E+03
8
2
1.32752000E+03 1.65684000E+03 1.96914000E+03
1
3
4.25316000E+02 6.15848000E+02 8.24883000E+02
2
3
5.26979000E+02 7.95789000E+02 1.08259000E+03
3
3
6.46858000E+02 9.33680000E+02 1.24089000E+03
4
3
8.40372000E+02 1.14544000E+03 1.43807000E+03
5
3
1.14282000E+03 1.42442000E+03 1.68147000E+03
6
3
1.39809000E+03 1.65458000E+03 1.89757000E+03
7
3
1.62877000E+03 1.86048000E+03 2.09286000E+03
8
3
1.83827000E+03 2.04934000E+03 2.27214000E+03
1
4
5.47796000E+02 7.04360000E+02 8.91575000E+02
2
4
6.66316000E+02 8.23118000E+02 1.05816000E+03
3
4
7.92196000E+02 9.70272000E+02 1.22716000E+03
4
4
1.03062000E+03 1.22814000E+03 1.50399000E+03
5
4
1.50309000E+03 1.68890000E+03 1.92590000E+03
6
4
1.90174000E+03 2.07013000E+03 2.26855000E+03
7
8
1
2
3
4
5
6
7
8
1
2
3
4

4
4
5
5
5
5
5
5
5
5
6
6
6
6

2.24629000E+03
2.56051000E+03
9.16800000E+02
1.17821000E+03
1.40325000E+03
1.79136000E+03
2.63140000E+03
3.33657000E+03
3.93384000E+03
4.54574000E+03
1.30649000E+03
1.69683000E+03
2.01561000E+03
2.60038000E+03

2.39607000E+03
2.69480000E+03
1.01422000E+03
1.26153000E+03
1.48036000E+03
1.87547000E+03
2.70978000E+03
3.40719000E+03
4.00224000E+03
4.60380000E+03
1.37324000E+03
1.75038000E+03
2.06380000E+03
2.65034000E+03

219

2.57229000E+03
2.85658000E+03
1.14823000E+03
1.38041000E+03
1.59380000E+03
2.00566000E+03
2.82769000E+03
3.51185000E+03
4.09229000E+03
4.68526000E+03
1.47144000E+03
1.83132000E+03
2.13846000E+03
2.72983000E+03

5
6
7
8
1
2
3
4
5
6
7
8

6
6
6
6
7
7
7
7
7
7
7
7

GROUP 'G' ATTACHTO

3.81908000E+03
4.76408000E+03
5.78065000E+03
6.91460000E+03
1.53942000E+03
2.00157000E+03
2.37484000E+03
3.08950000E+03
4.60402000E+03
5.69293000E+03
7.03960000E+03
8.57618000E+03

3.86469000E+03
4.80311000E+03
5.81806000E+03
6.95034000E+03
1.59511000E+03
2.04461000E+03
2.41335000E+03
3.12890000E+03
4.64024000E+03
5.72329000E+03
7.06884000E+03
8.60434000E+03

'FIELD'

WELL 1 'P' ATTACHTO 'G'


PRODUCER 'P'
PWELLBORE TABLE 5000. 1
OPERATE MAX STW 3000. CONT
OPERATE MIN WHP IMPLICIT 300. CONT
OPERATE MIN BHP 14.7 CONT
MONITOR MAX WGR 1. STOP
MONITOR MIN STG 0 STOP
GEOMETRY K 0.333 0.37 1. 0.
PERF GEO
'P'
1 1 1 1. OPEN
1 1 2 1. OPEN
1 1 3 1. OPEN
1 1 4 1. OPEN
1 1 5 1. OPEN
1 1 6 1. OPEN
1 1 7 1. OPEN
1 1 8 1. OPEN
1 1 9 1. OPEN
1 1 10 1. OPEN
1 1 11 1. OPEN
1 1 12 1. OPEN
1 1 13 1. OPEN
1 1 14 1. OPEN
1 1 15 1. OPEN
1 1 16 1. OPEN
1 1 17 1. OPEN
1 1 18 1. OPEN
1 1 19 1. OPEN
1 1 20 1. OPEN
1 1 21 1. OPEN
1 1 22 1. OPEN
1 1 23 1. OPEN
1 1 24 1. OPEN
1 1 25 1. OPEN
XFLOW-MODEL 'P' FULLY-MIXED
OPEN 'P'
TIME 30.4

220

3.93860000E+03
4.86696000E+03
5.87715000E+03
7.00651000E+03
1.67903000E+03
2.11135000E+03
2.47443000E+03
3.19348000E+03
4.70113000E+03
5.77622000E+03
7.11864000E+03
8.65223000E+03

TIME 60.8
TIME 91.2
TIME 121.6
TIME 152
TIME 182.4
TIME 212.8
TIME 243.2
TIME 273.6
TIME 304
TIME 334.4
TIME 364.8
TIME 395.2
TIME 425.6
TIME 456
TIME 486.4
TIME 516.8
TIME 547.2
TIME 577.6
TIME 608
TIME 638.4
TIME 668.8
TIME 699.2
TIME 729.6
TIME 760
TIME 790.4
TIME 820.8
TIME 851.2
TIME 881.6
TIME 912

221

TIME 942.4
TIME 972.8
TIME 1003.2
TIME 1033.6
TIME 1064
TIME 1094.4
TIME 1124.8
TIME 1155.2
TIME 1185.6
TIME 1216
TIME 1246.4
TIME 1276.8
TIME 1307.2
TIME 1337.6
TIME 1368
TIME 1398.4
TIME 1428.8
TIME 1459.2
TIME 1489.6
TIME 1520
TIME 1550.4
TIME 1580.8
TIME 1611.2
TIME 1641.6
TIME 1672
TIME 1702.4
TIME 1732.8
TIME 1763.2
TIME 1793.6

222

TIME 1824
TIME 1854.4
TIME 1884.8
TIME 1915.2
TIME 1945.6
TIME 1976
TIME 2006.4
TIME 2036.8
TIME 2067.2
TIME 2097.6
TIME 2128
TIME 2158.4
TIME 2188.8
TIME 2219.2
TIME 2249.6
TIME 2280
TIME 2310.4
TIME 2340.8
TIME 2371.2
TIME 2401.6
TIME 2432
TIME 2462.4
TIME 2492.8
TIME 2523.2
TIME 2553.6
TIME 2584
TIME 2614.4
TIME 2644.8
TIME 2675.2

223

TIME 2705.6
TIME 2736
TIME 2766.4
TIME 2796.8
TIME 2827.2
TIME 2857.6
TIME 2888
TIME 2918.4
TIME 2948.8
TIME 2979.2
TIME 3009.6
TIME 3040
TIME 3070.4
TIME 3100.8
TIME 3131.2
TIME 3161.6
TIME 3192
TIME 3222.4
TIME 3252.8
TIME 3283.2
TIME 3313.6
TIME 3344
TIME 3374.4
TIME 3404.8
TIME 3435.2
TIME 3465.6
TIME 3496
TIME 3526.4
TIME 3556.8

224

TIME 3587.2
TIME 3617.6
TIME 3648
TIME 3678.4
TIME 3708.8
TIME 3739.2
TIME 3769.6
TIME 3800
TIME 3830.4
TIME 3860.8
TIME 3891.2
TIME 3921.6
TIME 3952
TIME 3982.4
TIME 4012.8
TIME 4043.2
TIME 4073.6
TIME 4104
TIME 4134.4
TIME 4164.8
TIME 4195.2
TIME 4225.6
TIME 4256
TIME 4286.4
TIME 4316.8
TIME 4347.2
TIME 4377.6
TIME 4408
TIME 4438.4

225

TIME 4468.8
TIME 4499.2
TIME 4529.6
TIME 4560
TIME 4590.4
TIME 4620.8
TIME 4651.2
TIME 4681.6
TIME 4712
TIME 4742.4
TIME 4772.8
TIME 4803.2

STOP
***************************** TERMINATE SIMULATION
*****************************
RESULTS SECTION WELLDATA
RESULTS SECTION PERFS

226

APPENDIX F
EXAMPLE ECLIPSE DATA DECK FOR COMPARISON OF CONVENTIONAL
WELLS AND DWS WELLS
Runspec
Title
Effect of Completion Length on Conventional Wells
--Normal Reservoir Pressure (2300 psia), Horizontal Permeability 10 md,
--Length of Perforations: 20 ft.
MESSAGES
6* 3*5000 /
Radial
Dimens
-NR
Theta
NZ
26
1
110
/
Gas
Water
Field
Regdims
2
/
Welldims
-- Wells
Con
1
100
/
VFPPDIMS
10 10 10 10 0 1 /
Start
1 'Jan' 2002 /
Nstack
100
/
Unifout
------------------------------------------------------------Grid
Tops
26*5000 /
Inrad
0.333
/
DRV
0.4170 0.3016 0.4229 0.5929 0.8313
1.166
1.634
2.292
3.213
4.505
6.317
8.857
12.42
17.41
24.41
34.23
48.00
67.30
94.36
132.3
185.5
260.1
364.7
511.4
717.0
2500 /
DZ
2600*1
234*10
26*1410
/
Equals
'DTHETA'
360
/
'PERMR'
10
/
'PERMTHT'
10
/
'PERMZ'
5
/
'PORO'
0.25
/
'PORO'
0
26 26 1 1 1 100 /
'PORO'
10
26 26 1 1 101 110 /
/

227

INIT
--RPTGRID
--1
/
------------------------------------------------------------PROPS
DENSITY
45
64
0.046
/
ROCK
2500
10E-6
/
PVTW
2500
1
2.6E-6
0.68
0
/
PVZG
-- Temperature
120
/
-- Press
Z
Visc
100
0.989
0.0122
300
0.967
0.0124
500
0.947
0.0126
700
0.927
0.0129
900
0.908
0.0133
1100
0.891
0.0137
1300
0.876
0.0141
1500
0.863
0.0146
1700
0.853
0.0151
1900
0.845
0.0157
2100
0.840
0.0163
2300
0.837
0.0167
2500
0.837
0.0177
2700
0.839
0.0184
3200
0.844
0.0202
/
--Saturation Functions
--Sgc =
0.20
--Krg @ Swir =
0.9
--Swir =
0.3
--Sorg =
0.0
SGFN
--Using Honarpour Equation 71
-Sg
Krg
Pc
0.00
0.000
0.0
0.20
0.000
0.0
0.30
0.020
0.0
0.40
0.081
0.0
0.50
0.183
0.0
0.60
0.325
0.0
0.70
0.900
0.0
/
SWFN
--Using Honarpour Equation 67
-Sw
Krw
Pc
0.3
0.000
0.0
0.4
0.035
0.0
0.5
0.076
0.0
0.6
0.126
0.0
0.7
0.193
0.0
0.8
0.288
0.0
0.9
0.422
0.0
1.0
1.000
0.0

228

/
------------------------------------------------------------REGIONS
Fipnum
2600*1
260*2
/
------------------------------------------------------------SOLUTION
EQUIL
5000
2300
5100
0
5100
0
/
RPTSOL
6* 2 2 /
------------------------------------------------------------SUMMARY
SEPARATE
RPTONLY
WGPR
/
WWPR
/
WBHP
/
WTHP
/
WGPT
/
WWPT
/
WBP
/
RGIP
/
RPR
1 2 /
TCPU
------------------------------------------------------------SCHEDULE
NOECHO
INCLUDE
'WELL-5000-VI.VFP' /
ECHO
RPTSCHED
6*
2
/
RPTRST
4
/
restarts once a year
TUNING
0.0007
30.4
0.0007 0.0007
1.2
/
3* 0.00001 3* 0.0001 /
2*
500 1*
50
/
WELSPECS
'P' 'G' 1 1 5000 'GAS' 2* 'STOP' 'YES' /
/
COMPDAT
'P' 1 1 1 20 'OPEN' 2* 0.666 /
/
WCONPROD
'P' 'OPEN' 'THP' 1* 3000 40000 3*
300
1 /

229

/
WECON
'P' 4*
/
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
End

1.0

'WELL'

'YES'

/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/

230

EXAMPLE ECLIPSE DATA DECK FOR COMPARISON OF DWS AND DGWS


DWS MODEL
Runspec
Title
Comparison of DWS and DGWS
--DWS-2 Model: Top completion 70 ft; Bottom Completion 60 ft
MESSAGES
6* 3*5000 /
Radial
Dimens
-NR
Theta
NZ
26
1
110
/
Gas
Water
Field
Regdims
2
/
Welldims
-- Wells
Con Group Well in group
2
100
1
2
/
VFPPDIMS
10 10 10 10 0 2 /
Start
1 'Jan' 2002 /
Nstack
300
/
Unifout
------------------------------------------------------------Grid
Tops
26*5000 /
Inrad
0.333
/
DRV
0.4170 0.3016 0.4229 0.5929 0.8313
1.166
1.634
2.292
3.213
4.505
6.317
8.857
12.42
17.41
24.41
34.23
48.00
67.30
94.36
132.3
185.5
260.1
364.7
511.4
717.0
2500 /
DZ
2600*1
234*10
26*1410
/
Equals
'DTHETA'
360
/
'PERMR'
1
/
'PERMTHT'
1
/
'PERMZ'
.5
/
'PORO'
0.25
/
'PORO'
0
26 26 1 1 1 100 /
'PORO'
10
26 26 1 1 101 110 /
/
INIT

231

--RPTGRID
--1
/
------------------------------------------------------------PROPS
DENSITY
45
64
0.046
/
ROCK
2500
10E-6
/
PVTW
2500
1
2.6E-6
0.68
0
/
PVZG
-- Temperature
120
/
-- Press
Z
Visc
100
0.989
0.0122
300
0.967
0.0124
500
0.947
0.0126
700
0.927
0.0129
900
0.908
0.0133
1100
0.891
0.0137
1300
0.876
0.0141
1500
0.863
0.0146
1700
0.853
0.0151
1900
0.845
0.0157
2100
0.840
0.0163
2300
0.837
0.0167
2500
0.837
0.0177
2700
0.839
0.0184
3200
0.844
0.0202
/
SGFN
--Using Honarpour Equation 71
-Sg
Krg
Pc
0.00
0.000
0.0
0.20
0.000
0.0
0.30
0.020
0.0
0.40
0.081
0.0
0.50
0.183
0.0
0.60
0.325
0.0
0.70
0.900
0.0
/
SWFN
--Using Honarpour Equation 67
-Sw
Krw
Pc
0.3
0.000
0.0
0.4
0.035
0.0
0.5
0.076
0.0
0.6
0.126
0.0
0.7
0.193
0.0
0.8
0.288
0.0
0.9
0.422
0.0
1.0
1.000
0.0
/
------------------------------------------------------------REGIONS
Fipnum
2600*1

232

260*2
/
------------------------------------------------------------SOLUTION
EQUIL
5000
1500
5100
0
5100
0
/
RPTSOL
6* 2 2 /
------------------------------------------------------------SUMMARY
SEPARATE
RPTONLY
WGPR
/
WWPR
/
WBHP
/
WTHP
/
WGPT
/
WWPT
/
WBP
/
RGIP
/
RPR
1 2 /
TCPU
------------------------------------------------------------SCHEDULE
NOECHO
INCLUDE
'WELL-5000-DGWS.VFP' /
ECHO
RPTSCHED
6*
2
/
RPTRST
4
/
restarts once a year
TUNING
0.0007
30.4
0.0007 0.0007
1.2
/
3* 0.00001 3* 0.0001 /
2*
500 1*
100
/
WELSPECS
'P' 'G' 1 1 5000 'GAS'
2* 'STOP' 'YES' /
'W' 'G' 1 1 5100 'WATER' 2* 'STOP' 'YES' /
/
COMPDAT
'P' 1 1 1
70
'OPEN' 2* 0.666 /
'W' 1 1 71 103
'OPEN' 2* 0.666 /
/
WCONPROD
'P' 'OPEN' 'THP'
6* 300
1 /
'W' 'OPEN' 'THP'
6* 300 2 /
/
WECON

233

'P' 1* 400 3* 'WELL' 'YES' /


/
TSTEP
35*30.4
/
TSTEP
48*30.4
/
TSTEP
48*30.4
/
/
WCONPROD
'W' 'OPEN' 'THP'
6* 14.7 2 /
/
TSTEP
48*30.4
/
TSTEP
48*30.4
/
TSTEP
48*30.4
/
TSTEP
48*30.4
/
TSTEP
48*30.4
/
TSTEP
48*30.4
/
TSTEP
48*30.4
/
TSTEP
48*30.4
/
TSTEP
48*30.4
/
TSTEP
48*30.4
/
TSTEP
48*30.4
/
TSTEP
48*30.4
/
TSTEP
48*30.4
/
TSTEP
48*30.4
/
TSTEP
48*30.4
/
TSTEP
48*30.4
/
TSTEP
48*30.4
/
TSTEP
48*30.4
/
TSTEP
48*30.4
/
TSTEP
48*30.4
/
TSTEP
48*30.4
/
TSTEP
48*30.4
/
TSTEP
48*30.4
/

234

TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4

/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/

235

TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
End

/
/
/
/
/
/

236

EXAMPLE ECLIPSE DATA DECK FOR COMPARISON OF DWS AND DGWS


DGWS MODEL
Runspec
Title
Comparison of DWS and DGWS
--DGWS-1 Model: Top completion 100 ft
MESSAGES
6* 3*5000 /
Radial
Dimens
-NR
Theta
NZ
26
1
110
/
Gas
Water
Field
Regdims
2
/
Welldims
-- Wells
Con Group Well in group
2
100
1
2
/
VFPPDIMS
10 10 10 10 0 2 /
Start
1 'Jan' 2002 /
Nstack
800
/
Unifout
------------------------------------------------------------Grid
Tops
26*5000 /
Inrad
0.333
/
DRV
0.4170 0.3016 0.4229 0.5929 0.8313
1.166
1.634
2.292
3.213
4.505
6.317
8.857
12.42
17.41
24.41
34.23
48.00
67.30
94.36
132.3
185.5
260.1
364.7
511.4
717.0
2500 /
DZ
2600*1
234*10
26*1410
/
Equals
'DTHETA'
360
/
'PERMR'
1
/
'PERMTHT'
1
/
'PERMZ'
.5
/
'PORO'
0.25
/
'PORO'
0
26 26 1 1 1 100 /
'PORO'
10
26 26 1 1 101 110 /
/
INIT
--RPTGRID
--1
/

237

------------------------------------------------------------PROPS
DENSITY
45
64
0.046
/
ROCK
2500
10E-6
/
PVTW
2500
1
2.6E-6
0.68
0
/
PVZG
-- Temperature
120
/
-- Press
Z
Visc
100
0.989
0.0122
300
0.967
0.0124
500
0.947
0.0126
700
0.927
0.0129
900
0.908
0.0133
1100
0.891
0.0137
1300
0.876
0.0141
1500
0.863
0.0146
1700
0.853
0.0151
1900
0.845
0.0157
2100
0.840
0.0163
2300
0.837
0.0167
2500
0.837
0.0177
2700
0.839
0.0184
3200
0.844
0.0202
/
SGFN
--Using Honarpour Equation 71
-Sg
Krg
Pc
0.00
0.000
0.0
0.20
0.000
0.0
0.30
0.020
0.0
0.40
0.081
0.0
0.50
0.183
0.0
0.60
0.325
0.0
0.70
0.900
0.0
/
SWFN
--Using Honarpour Equation 67
-Sw
Krw
Pc
0.3
0.000
0.0
0.4
0.035
0.0
0.5
0.076
0.0
0.6
0.126
0.0
0.7
0.193
0.0
0.8
0.288
0.0
0.9
0.422
0.0
1.0
1.000
0.0
/
------------------------------------------------------------REGIONS
Fipnum
2600*1
260*2
/
-------------------------------------------------------------

238

SOLUTION
EQUIL
5000
1500
5100
0
5100
0
/
RPTSOL
6* 2 2 /
------------------------------------------------------------SUMMARY
SEPARATE
RPTONLY
WGPR
/
WWPR
/
WBHP
/
WTHP
/
WGPT
/
WWPT
/
WBP
/
RGIP
/
RPR
1 2 /
TCPU
------------------------------------------------------------SCHEDULE
NOECHO
INCLUDE
'WELL-5000-DGWS.VFP' /
ECHO
RPTSCHED
6*
2
/
RPTRST
4
/
restarts once a year
TUNING
0.0007
30.4
0.0007 0.0007
1.2
/
3* 0.00001 3* 0.0001 /
2*
1000 1*
500
/
WELSPECS
'P' 'G' 1 1 5000 'GAS'
2* 'STOP' 'YES' /
'W' 'G' 1 1 5000 'WATER' 2* 'STOP' 'YES' /
/
COMPDAT
'P' 1 1 1
100
'OPEN' 2* 0.666 /
'W' 1 1 1
100
'SHUT' 2* 0.666 /
/
WCONPROD
'P' 'OPEN' 'THP'
1* 3000 40000 2* 50 300
1 /
'W' 'SHUT' 'THP'
6* 300 2 /
/
WECON
'P' 1* 400 3* 'WELL' 'YES' /
/
TSTEP

239

48*30.4
/
TSTEP
31*30.4
/
/
COMPDAT
'W' 1 1 1
100
/
WCONPROD
'W' 'OPEN' 'THP'
'P' 'SHUT' 'THP'
/
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4

'OPEN'
6*
6*

300
300

2*

0.666

2 /
1 /

/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/

240

TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4

/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/

241

TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
TSTEP
48*30.4
End

/
/
/
/
/
/

242

ECLIPSE VFP INCLUDED FILE: WELL-5000-DGWS


VFPPROD
1 5.00000E+003 'GAS' 'WGR' 'OGR' 'THP' '' 'FIELD' 'BHP'/
5.00000E+002
1.00000E+004
3.00000E+002
0.00000E+000
4.00000E-001
0.00000E+000
0.00000E+000
1

1.00000E+003
1.50000E+004
5.00000E+002
5.00000E-002
6.00000E-001
/
/

3.37024E+002
9.16800E+002
5.59849E+002
1.01422E+003
7.84870E+002
1.14823E+003
1.00767E+003
1.17821E+003
1.33083E+003
1.26153E+003
1.63681E+003
1.38041E+003
1.02840E+003
1.40325E+003
1.35532E+003
1.48036E+003
1.66413E+003
1.59380E+003
1.06877E+003
1.79136E+003
1.40292E+003
1.87547E+003
1.71647E+003
2.00566E+003
1.14745E+003
2.63140E+003
1.49259E+003
2.70978E+003
1.81241E+003
2.82769E+003
1.22282E+003
3.33657E+003
1.57486E+003
3.40719E+003
1.89758E+003
3.51185E+003
1.29426E+003
3.93384E+003
1.65009E+003
4.00224E+003
1.97324E+003
4.09229E+003
1.36153E+003
4.54574E+003

3.00000E+003
1.80000E+004
7.00000E+002
1.00000E-001
8.00000E-001

3.45916E+002
1.30649E+003
5.65127E+002
1.37324E+003
7.88564E+002
1.47144E+003
6.85715E+002
1.69683E+003
1.14235E+003
1.75038E+003
1.43549E+003
1.83132E+003
7.98358E+002
2.01561E+003
1.17999E+003
2.06380E+003
1.46993E+003
2.13846E+003
9.06174E+002
2.60038E+003
1.23965E+003
2.65034E+003
1.53687E+003
2.72983E+003
1.03248E+003
3.81908E+003
1.35495E+003
3.86469E+003
1.66240E+003
3.93860E+003
1.13624E+003
4.76408E+003
1.46356E+003
4.80311E+003
1.77592E+003
4.86696E+003
1.23434E+003
5.78065E+003
1.56415E+003
5.81806E+003
1.87771E+003
5.87715E+003
1.32752E+003
6.91460E+003

243

5.00000E+003
/
/
2.00000E-001
1.00000E+000

4.25316E+002
1.53942E+003
6.15848E+002
1.59511E+003
8.24884E+002
1.67903E+003
5.26979E+002
2.00157E+003
7.95789E+002
2.04461E+003
1.08259E+003
2.11135E+003
6.46858E+002
2.37484E+003
9.33680E+002
2.41335E+003
1.24089E+003
2.47443E+003
8.40372E+002
3.08950E+003
1.14544E+003
3.12890E+003
1.43807E+003
3.19348E+003
1.14282E+003
4.60402E+003
1.42442E+003
4.64024E+003
1.68147E+003
4.70113E+003
1.39809E+003
5.69293E+003
1.65458E+003
5.72329E+003
1.89757E+003
5.77621E+003
1.62877E+003
7.03960E+003
1.86048E+003
7.06883E+003
2.09286E+003
7.11864E+003
1.83827E+003
8.57619E+003

5.47796E+002
/
7.04360E+002
/
8.91574E+002
/
6.66317E+002
/
8.23119E+002
/
1.05816E+003
/
7.92196E+002
/
9.70272E+002
/
1.22716E+003
/
1.03062E+003
/
1.22814E+003
/
1.50399E+003
/
1.50309E+003
/
1.68890E+003
/
1.92590E+003
/
1.90174E+003
/
2.07013E+003
/
2.26855E+003
/
2.24629E+003
/
2.39607E+003
/
2.57229E+003
/
2.56051E+003
/

1.71853E+003
4.60380E+003
2.04060E+003
4.68526E+003

1.65684E+003
6.95034E+003
1.96914E+003
7.00651E+003

2.04934E+003
8.60433E+003
2.27214E+003
8.65222E+003

2.69480E+003
/
2.85658E+003
/

VFPPROD
2

5.00000E+003 'GAS' 'WGR' 'OGR' 'THP' '' 'FIELD' 'BHP'/

5.00000E+002
1.00000E+004
1.00000E+002
0.00000E+000
0.00000E+000
0.00000E+000
1

1.00000E+003
1.50000E+004
3.00000E+002
1.20000E+000
/
/

1.20764E+002
8.67338E+002
3.37024E+002
9.16800E+002
5.59849E+002
1.01422E+003
7.84870E+002
1.14823E+003
1.20764E+002
8.67338E+002
3.37024E+002
9.16800E+002
5.59849E+002
1.01422E+003
7.84870E+002
1.14823E+003

3.00000E+003
/
5.00000E+002
/

1.44218E+002
1.27581E+003
3.45916E+002
1.30649E+003
5.65127E+002
1.37324E+003
7.88564E+002
1.47144E+003
1.44218E+002
1.27581E+003
3.45916E+002
1.30649E+003
5.65127E+002
1.37324E+003
7.88564E+002
1.47144E+003

244

5.00000E+003
7.00000E+002

2.88734E+002
/
4.25316E+002
/
6.15848E+002
/
8.24884E+002
/
2.88734E+002
/
4.25316E+002
/
6.15848E+002
/
8.24884E+002
/

4.52423E+002
5.47796E+002
7.04360E+002
8.91574E+002
4.52423E+002
5.47796E+002
7.04360E+002
8.91574E+002

VITA
Miguel A. Armenta Sanchez, son of Miguel A. Armenta Van-Strahalen and
Salvadora Sanchez de Armenta, was born on April 3, 1964, in Santa Marta, Magdalena,
Colombia.
He received the degree of Bachelor Engineering in Petroleum Engineering from
the Universidad Industrial de Santander, Bucaramanga, Colombia, in June 1986. In June
1996, he received his masters degree in environmental development from the Pontificia
Universidad Javeriana, Bogot, Colombia.
He has over fourteen years of industry experience in petroleum engineering
practice working for ECOPETROL (The State Oil Company of Colombia) on drilling
projects. His job experience ranges from designing, supervising on site, and evaluating
drilling operations to solving environmental problems of drilling projects in sensitive
areas like the Amazon rain forest.
He enrolled in the doctoral degree program in petroleum engineering at the Craft
and Hawkins Department of Petroleum Engineering in August 2000. The doctoral degree
is conferred on him at the December 2003 commencement.

245

Das könnte Ihnen auch gefallen