Sie sind auf Seite 1von 22

w =

9.81

1 =

15.90

'1 =

Solution for Cantilever Sheet Pile Wall in Sand


Example Problem 9.1 from Das book on Foundation Engineering
z
p
V
M
z' =
2.04
Mmax =
0.00
0
0
0
209.58

32.00

L1

2.00

10

Ka =
L1 =

0.307
2.00

L1+L2

5.00
5.66

19
0.0

'1 =

9.77

V = 0.
L - L5

2 =
' =
'2 =

19.33
9.52
32.00

Ka =
L2 =

0.307
3.00

'2 =

18.55

FS Kp =

1.00

Kp =

3.25

Kp-Ka =
L3 =

p = 0.

7.70

10

all =

52
93
Sreq'd =
Err:523 Err:523 Das Solution

Err:523 Err:523 Err:523 Err:523 and taking a moment at the


Err:523 Err:523 Err:523 Err:523 pile tip.
Pressure

Moment

Shear

0 20 40 60 80 100120140

0 10 20 30 40 50 60 70

0 2 4 6 8 10 12 14 16 18 20

0.00

0.00

2.95

1.00

1.00

1.00

0.66
9.77
29.31
13.16
6.13
58.38
2.23

2.00

2.00

2.00

3.00

3.00

3.00

4.00

4.00

4.00

5.00

5.00

5.00

6.00

6.00

6.00

A2 =

16.64

A3 =

151.3

A4 =

230.6
Old L4 = Err:523
Err:523
Zero =
Increment Err:523
New L4 = Err:523
D = Err:523
'3 = Err:523
'4 =

Err:523

L5 =

Err:523

0.00122

Err:523 Err:523 Err:523 Obtained by summing forces

0.00

Area 1 =
Area 2 =
Area 3 =
Area 4 =
P=
Zbar =
'5 = 214.99
A1 =
7.66

172000.00

Use F9 to
iterate until
zero 0

'6 =

Err:523

1.00

1.00

1.00

2.00

2.00

2.00

3.00

3.00

3.00

4.00

4.00

4.00

5.00

5.00

5.00

6.00

6.00

6.00

Solution for Cantilever Sheet Pile Wall in Sand with no Wate

Section 9.5 from Das book on Foundation Engineering, 5th ed. - Reference Fig. 9.9 (Ex
z
p
V
15.9

24.43

61

0.307

5.52

0.00

67

7.22

Err:523

Err:523

Err:523

Err:523

Err:523

Err:523

Err:523

Err:523

900

-500 -400 -300 -200 -100 0

24.43

FS Kp =

1.00

L+D

Kp =

3.25

Kp-Ka =

2.95

L3 =

0.52
61.07
6.37
67.43
2.19

283.16

A1 =

6.04

A2 =

11.51

A3 =

90.0

A4 =

122.4
Err:523
Err:523
Err:523
Err:523
Err:523

-500 -300 -100 100


0.00

Depth Z

Area 1 =
Area 2 =
P=
Zbar =
'5 =

D=
'3 =

L=
'2 =

Zero =
ncrement =
New L4 =

32

p = 0.
V = 0.
L - L5

Old L4 =

300

500

700

1.00

1.00

2.00

2.00

3.00

100 200 3

0.00

Depth Z

=
' =
Ka =

3.00

Err:523

'4 =

Err:523

L5 =

Err:523

'6 =

Err:523

4.00

4.00

5.00

5.00

6.00

Pressure

6.00
Shear

Source Data for Graphs

z
0.00
1.00
2.00
3.00
4.00
5.00
5.17
5.35
5.521
5.80
6.09
6.37
6.65
6.93
7.22
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523

p
0
5
10
15
20
24
16
8
0
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
0

V
0
2
10
22
39
61
65
67
67
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523

M
0
1
7
23
54
104
115
126
138
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523

all in Sand with no Water

- Reference Fig. 9.9 (Example 8.2 Das 4th Edition)


M
z' =
Mmax =
0
all =
104

300 -200 -100 0

223.80
172000.00

138
Err:523

Sreq'd =
0.00130
Das Solution obtained by summing

Err:523

forces and taking a moment at the

Err:523

pile tip.

100 200 300 400 500

0
0.00

1.00

1.00

50

100

Depth Z

0.00

2.00

1.70

2.00

999

3.00

3.00

4.00

4.00

5.00

5.00

6.00
Shear

6.00

Moment

150

w =

9.81

1 =

15.90

'1 =

Solution for Cantilever Sheet Pile Wall in Sand


Example Problem 9.2 from Das 5th ed. on Foundation Engineering
z
p
V
M
z' =
0.41
Mmax =
0.00
0.0
0.0
0.0
103.6
all =

32.00

L1

2.00

9.8

9.8

6.6

Ka =
L1 =

0.307
2.00

L1+L2

5.00
5.41

18.5
127.6

52.2
0.0

93.2
103.8

'1 =
2 =

9.77
19.33

' =
'2 =

9.52
32.00

Ka =
L2 =

0.307
3.00

'2 =

18.55

FS Kp =

1.00

Kp =

3.25

Kp-Ka =

2.95
9.77
29.31
13.16
52.25

Area 1 =
Area 2 =
Area 3 =
P=
z1bar =

V = 0.
L1+L2+L3

Sreq'd = 6.0087E-04
Das Solution

Err:523 127.6 Err:523 Err:523 Obtained by summing forces


Err:523 Err:523 Err:523 Err:523 and taking a moment at the

p=0
L1+L2+D

Err:523

248.4

pile tip.

Pressure
-200.0 -100.0

0.0

0.0

100.0 200.0 300.0

Shear
20.0

40.0

0.0

60.0

0.00

0.00

0.00

1.00

1.00

1.00

2.00

2.00

2.00

3.00

3.00

3.00

4.00

4.00

5.00

5.00

5.00

6.00

6.00

6.00

1.78
47.00

c=
'6 =

127.64

A2 =

104.49

A3 =

357.3
Old D = Err:523
Err:523
Zero =
Increment Err:523
New D = Err:523
Dactual = Err:523
'7 =
248.4
L4 =

Err:523

L3 =

Err:523
0.41

z' =

172500.00

Use F9 to

4.00 iterate until


zero 0

Moment
50.0

100.0

150.0

5.00

5.00

5.00

6.00

6.00

6.00

z
0.00
0.40
0.80
1.20
1.60
2.00
2.30
2.60
2.90
3.20
3.50
3.80
4.10
4.40
4.70
5.00
5.00
5.14
5.27
5.41
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523

p
0.0
2.0
3.9
5.9
7.8
9.8
10.6
11.5
12.4
13.3
14.2
15.0
15.9
16.8
17.7
18.5
-127.6
-127.6
-127.6
-127.6
-127.6
-127.6
-127.6
-127.6
-127.6
-127.6
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
248.4
0

V
0.0
0.4
1.6
3.5
6.3
9.8
12.8
16.2
19.7
23.6
27.7
32.1
36.7
41.6
46.8
52.2
52.2
34.8
17.4
0.0
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523

M
0.0
0.1
0.5
1.5
3.4
6.6
10.0
14.4
19.8
26.3
34.0
42.9
53.3
65.0
78.3
93.2
93.2
99.1
102.7
103.8
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523

umming forces
moment at the

Moment
50.0

100.0

150.0

w =

9.81

=
' =
Ka =

15.90
32.00

L=
'2 =
sat cl =
' =
' =
Ka =
c=

0.307
5.00
24.43
18.00
8.19
0.00
1.000
47.00

FS Kp =

1.00

Kp =

1.00

Kp-Ka =

0.00

P1 = 61.07
= 108.50
= 267.50
L4 = Err:523
z' =
Zbar =

p = 6

5.00
5.56

V = 0.
L+D-L4 Err:523
L+D
Err:523

108.5
-109
-109
268

18
0

-100

100

Sreq'd =
0.00069
Das Solution

Err:523 Err:523 Obtained by summing forces


Err:523 Err:523 and taking a moment at the
pile tip.

Pressure
-200

118
119.2

Moment

Shear

200

0 20 40 60 80 100120140

0 10 20 30 40 50 60 70

300

0.00

0.00

0.00

1.00

1.00

1.00

2.00

2.00

2.00

3.00

3.00

3.00

4.00

4.00

4.00

5.00

5.00

5.00

6.00

6.00

6.00

0.56
1.67

A1 =

108.50

A2 =

-122.13

A3 =

-352.3

Old L4 =

Solution for Cantilever Sheet Pile Wall Penetrating Clay


Section 9.7 from Das book on Foundation Engineering 5E
z
p
V
M
z' =
0.56
Mmax =
0.00
0
0
0
118.96

=
L
5.00
24
7
4
172000.00
all

Err:523
Err:523
Zero =
Increment Err:523
New L4 = Err:523
D = Err:523
L3 = Err:523

Use F9 to
iterate until
zero 0

5.00

5.00

5.00

6.00

6.00

6.00

z
0.00
0.33
0.67
1.00
1.33
1.67
2.00
2.33
2.67
3.00
3.33
3.67
4.00
4.33
4.67
5.00
5.00
5.06
5.11
5.17
5.23
5.28
5.34
5.39
5.45
5.51
5.56
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523

p
0
2
3
5
7
8
10
11
13
15
16
18
20
21
23
24
-109
-109
-109
-109
-109
-109
-109
-109
-109
-109
-109
-109
-109
-109
-109
-109
-109
-46
17
80
142
205

V
0
0
1
2
4
7
10
13
17
22
27
33
39
46
53
61
61
55
49
43
37
31
24
18
12
6
0
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523

M
0
0
0
1
2
4
7
10
16
22
30
40
52
66
83
102
102
105
108
111
113
115
116
118
119
119
119
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523
Err:523

Err:523
Err:523

268
0

Err:523 Err:523

umming forces
moment at the

Moment

20 40 60 80 100120140

Solution for Anchored Sheet Pile Wall in Sand


Example Problem 9.3 from Das book on Foundation Engineering
w =
9.81
z
p
V
M
1 =
16.00
0.00
0.00
0.00
0.00
1 =
L1
30.0
3.05
8.16
6.24
3.36
Ka =

0.333

L1 =
l1 =

Err:523

Err:523

0.00

Err:523

3.05

V=0
L1+L2

9.15

-48.5

Err:523

Err:523

1.53

p = 0.

10.54

Err:523

Err:523

Err:523

l2 =

1.52

Err:523

Err:523

Err:523

Err:523

'1 =
2 =

16.27
19.50

' =
2 =

9.69
30.0

Ka =
L2 =

0.33
6.10

'2 =

35.97

FS Kp =

1.00

Kp =

3.00

Kp-Ka =

2.67

L3 =
Area 1 =
Area 2 =
Area 3 =
Area 4 =
P=
Zbar =
A2 =

1.39
24.81
99.23
60.09
25.04
209.16
4.21
13.52

A3 =

116.57
Use F9 to Solve
Old L4 = Err:523
Zero = Err:523
Increment Err:523
New L4 = Err:523
L4 = Err:523
Dtheory = Err:523

Use F9 to Solve
Old z-L1 = Err:523
Zero = Err:523
Increment =

Err:523

New z-L1 =

Err:523

z = Err:523
Mmax = Err:523
all = 172000.0
Sreq'd =

Shear

Pressure
0.00
0.00

25.00

0.00
0.00

5.00

Moment
10.00

0.00
0.00

0.20

0.20

0.40

0.40

0.60

0.60

0.80

0.80

1.00

1.00

1.20

1.20

1.40

1.40

1.60

1.60

1.80

1.80

0.50

1.00

1.50

2.00

2.50

3.00

Dfactor =

1.30
Dcomp = Err:523
3.50

Err:523

1.00

2.00

3.00

4.00

3.00

F = Err:523

3.50

1.60

1.60

1.80

1.80

Solution for Anchored Sheet Pile Wall in Clay (Free Support Method)
Example Problem 9.5 from Das book on Foundation Engineering
w =
9.81
z
p
V
M
1 =
17.00
0.00
0.00
0.00
0.00
1 =
L1
35.0
3.00
6.91
5.18
2.74
Ka =

0.271

L1 =
l1 =

3.00
1.50

l2 =

1.50

'1 =
2 =

13.82
20.00

' =
2 =

10.19
35.0

Ka =
L2 =

0.27
6.00

'2 =
c=

30.39
41.0

FS Kp =

1.00

Kp =

3.69

Kp-Ka =

3.42
20.73
82.92
49.70

Area 1 =
Area 2 =
Area 3 =
P1 = 153.36
Zbar = 3.22
6 =
51.86
a 51.86
b 777.90
c -1313.78
1.53
D=
0.00
Zero =

Dtheory =

1.60

Dfactor =

1.30

Dcomp =

2.50
70.4

F =

Use F9 to Solve
Old z-L1 =
Zero =
Increment =

5.81

21.6

0.00

-159.26

New z-L1 =

p = 0.

9.00
9.00

-50.7
-51.86

-4.97
82.98

-34.13
-34.13

z=
Mmax =

10.53

-51.86

3.51

32.13

all =

V=0
L1+L2

Sreq'd =
Shear

Pressure
0

0.0

25

5.0

10.0

Moment
0

15.0

10

10

10

12

12

12

Pressure

Shear

Moment

10

12

0.00
0.50
1.00
1.50
1.50
2.00
2.50
3.00
3.23
3.47
3.70
3.94
4.17
4.40
4.64
4.87
5.10
5.34
5.57
5.81
6.21
6.60
7.00
7.40
7.80
8.20
8.60
9.00
9.00
9.31
9.61
9.92
10.23
10.53
10.53

0.00
2.30
4.61
6.91
6.91
9.21
11.52
13.82
14.47
15.11
15.76
16.40
17.05
17.69
18.34
18.99
19.63
20.28
20.92
21.57
22.67
23.77
24.88
25.98
27.08
28.18
29.29
30.39
-51.86
-51.86
-51.86
-51.86
-51.86
-51.86
0.00

0.00
0.58
2.30
5.18
-65.20
-61.17
-55.99
-49.65
-46.34
-42.89
-39.28
-35.52
-31.61
-27.54
-23.33
-18.97
-14.45
-9.78
-4.97
0.00
8.83
18.10
27.81
37.97
48.56
59.59
71.06
82.98
82.98
67.08
51.19
35.30
19.40
3.51

0.00
0.14
0.86
2.74
2.74
-28.86
-58.14
-84.55
-95.78
-106.21
-115.82
-124.56
-132.41
-139.32
-145.27
-150.22
-154.12
-156.96
-158.68
-159.26
-157.50
-152.12
-142.96
-129.82
-112.55
-90.96
-64.88
-34.13
-34.13
-11.14
6.99
20.24
28.62
32.13

Use F9 to Solve
2.81
0.00
-0.001
2.81
5.81
-159.8
172500.0
0.0009263

Moment
4

10

12

Das könnte Ihnen auch gefallen