Beruflich Dokumente
Kultur Dokumente
VALIDATE
Nature of Work: Improvement and upgradation of the road connecting Sub-Division Head Quarter with NH44 / Pecharthal to Kanchanpur road (26.50 km) / Phase -I.
Portion from Pecharthal to Machmara (8.50km) in Tripura
HELP
Bidder
Name :
SCHEDULE OF WORKS
(Improvement and upgradation of the road connecting Sub-Division Head Quarter with NH44 / Pecharthal to Kanchanpur road (26.50 km) / Phase -I. Portion from
Pecharthal to Machmara (8.50km) in Tripura )
Sl.
No.
Description of work
1.00
A) ROADS - 1) SUB HEAD:SITE CLEARENCE Clearing Grass and Removal of Rubbish - Clearing
grass and removal of rubbish up to a distance of 30
m outside the periphery of the area as per MoRD
Technical Specification Clause 201. By Manual
Means.
2.00
2.10
3.00
3.10
3.20
4.00
No.or
Qty.
Unit
Estimated Rate
(in. Rs.)
0.620 Hectare
7820.00
Figures
7820.00
1.443 Hectare
31924.00
AMOUNT
Rs.
P
Words
#VALUE!
4848.40
31924.00
#VALUE!
46066.33
185.00
Each
125.40
125.40
#VALUE!
23199.00
75.00
Each
238.10
238.10
#VALUE!
17857.50
4.10
A) By Manual Means.
i) Cement Concrete M-15 & M-20
20.85
Cum
226.00
226.10
#VALUE!
4714.19
5.00
30.00
Cum
163.40
163.40
#VALUE!
4902.00
6.00
6.10
7.00
131.50
500.00
Mt
Cum
109.80
93.00
109.80
93.00
#VALUE!
#VALUE!
14438.70
46500.00
VALIDATE
Nature of Work: Improvement and upgradation of the road connecting Sub-Division Head Quarter with NH44 / Pecharthal to Kanchanpur road (26.50 km) / Phase -I.
Portion from Pecharthal to Machmara (8.50km) in Tripura
HELP
Bidder
Name :
SCHEDULE OF WORKS
(Improvement and upgradation of the road connecting Sub-Division Head Quarter with NH44 / Pecharthal to Kanchanpur road (26.50 km) / Phase -I. Portion from
Pecharthal to Machmara (8.50km) in Tripura )
Sl.
No.
Description of work
No.or
Qty.
Unit
Estimated Rate
(in. Rs.)
8.00
Excavation in Soil with Dozer with lead upto 100m Excavation for roadway in soil by mechanical means
with Dozer including cutting and pushing the earth to
site of embankment upto a distance of 100m
(average lead of 50 metres), including trimming
bottom and side slopes in accordance with
requirements of lines, grades and cross-sections as
per MoRT&H Technical Specification clauses of
section 300.
1500.00
Cum
52.60
Figures
52.60
9.00
5982.62
Cum
36.30
10.00
5279.224
Cum
11.00
7184.359
12.00
Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with
approved material obtained from borrow pits with all
lifts and leads,transporting to site ,spreading,grading
to required slope and compacted to meet
requirement of Table 300.2 as per MoRT&H
Technical Specification clauses of section 300.
13.00
Compacting original ground supporting subgrade Loosening of the ground upto a level of 500 mm
below the subgrade level, watered, graded and
compacted in layers to meet requirement of Tables
300.2 for subgrade construction as per MoRT&H
Technical Specification clauses of section 300.
14.00
AMOUNT
Rs.
P
Words
#VALUE!
78900.00
36.30
#VALUE!
217169.11
146.40
146.40
#VALUE!
772878.39
Cum
92.70
92.70
#VALUE!
665990.08
27522.33
Cum
146.40
146.40
#VALUE!
4029269.11
10500.00
Cum
56.40
56.40
#VALUE!
592200.00
4500.00
Cum
29.40
29.40
#VALUE!
132300.00
VALIDATE
Nature of Work: Improvement and upgradation of the road connecting Sub-Division Head Quarter with NH44 / Pecharthal to Kanchanpur road (26.50 km) / Phase -I.
Portion from Pecharthal to Machmara (8.50km) in Tripura
HELP
Bidder
Name :
SCHEDULE OF WORKS
(Improvement and upgradation of the road connecting Sub-Division Head Quarter with NH44 / Pecharthal to Kanchanpur road (26.50 km) / Phase -I. Portion from
Pecharthal to Machmara (8.50km) in Tripura )
Sl.
No.
Description of work
15.00
16.00
16.10
17.00
17.10
18.00
i) PCC M 15 Grade
Underground Drain at Edge of Pavement Construction of an underground drain 1 m x 1 m
(inside dimensions) lined with RCC M-20, 100 mm
thick and covered with RCC slab 100 mm in
thickness on urban roads as per MoRT&H Technical
Specification.
19.00
19.10
20.00
No.or
Qty.
Unit
Estimated Rate
(in. Rs.)
Sqm
31.70
Figures
31.70
780.00
Mt
46.20
430.54
140.00
Cum
Mt
7545.25
4466.12
Cum
Cum
42310.00
AMOUNT
Rs.
P
Words
#VALUE!
1341227.00
46.20
#VALUE!
36036.00
6567.29
4217.37
6567.29
4217.37
#VALUE!
#VALUE!
2827481.04
590431.80
2433.01
3775.89
2433.01
3775.89
#VALUE!
#VALUE!
18357668.70
16863577.85
VALIDATE
Nature of Work: Improvement and upgradation of the road connecting Sub-Division Head Quarter with NH44 / Pecharthal to Kanchanpur road (26.50 km) / Phase -I.
Portion from Pecharthal to Machmara (8.50km) in Tripura
HELP
Bidder
Name :
SCHEDULE OF WORKS
(Improvement and upgradation of the road connecting Sub-Division Head Quarter with NH44 / Pecharthal to Kanchanpur road (26.50 km) / Phase -I. Portion from
Pecharthal to Machmara (8.50km) in Tripura )
Sl.
No.
Description of work
No.or
Qty.
Unit
Estimated Rate
(in. Rs.)
21.00
8932.25
Cum
4649.54
22.00
59548.31
Sqm
26.04
23.00
59548.31
Sqm
9.31
24.00
24.10
2977.42
Cum
2381.93
Cum
25.00
25.10
26.00
AMOUNT
Rs.
P
Words
#VALUE!
41531246.68
26.40
#VALUE!
1572075.38
9.31
#VALUE!
554394.77
11774.46
11774.46
#VALUE!
35057512.69
13657.41
13657.41
#VALUE!
32530994.60
VALIDATE
Nature of Work: Improvement and upgradation of the road connecting Sub-Division Head Quarter with NH44 / Pecharthal to Kanchanpur road (26.50 km) / Phase -I.
Portion from Pecharthal to Machmara (8.50km) in Tripura
HELP
Bidder
Name :
SCHEDULE OF WORKS
(Improvement and upgradation of the road connecting Sub-Division Head Quarter with NH44 / Pecharthal to Kanchanpur road (26.50 km) / Phase -I. Portion from
Pecharthal to Machmara (8.50km) in Tripura )
Sl.
No.
Description of work
26.10
27.00
No.or
Qty.
Unit
Estimated Rate
(in. Rs.)
2955.21
Cum
125.10
Figures
125.10
591.03
Cum
580.60
AMOUNT
Rs.
P
Words
#VALUE!
369696.77
580.60
#VALUE!
343152.02
28.00
136.05
Cum
6567.29
6567.29
#VALUE!
893479.80
29.00
1144.46
Cum
7547.39
7547.39
#VALUE!
8637685.96
30.00
137.34
57564.50
57564.50
#VALUE!
7905908.43
31.00
602.00
Nos
219.50
219.50
#VALUE!
132139.00
32.00
542.00
Cum
3513.86
3513.86
#VALUE!
1904512.12
33.00
33.10
519.12
Cum
6404.29
6404.29
#VALUE!
3324595.02
33.20
519.12
Cum
3513.86
3513.86
#VALUE!
1824115.00
34.00
1730.40
Sqm
76.40
76.40
#VALUE!
132202.56
VALIDATE
Nature of Work: Improvement and upgradation of the road connecting Sub-Division Head Quarter with NH44 / Pecharthal to Kanchanpur road (26.50 km) / Phase -I.
Portion from Pecharthal to Machmara (8.50km) in Tripura
HELP
Bidder
Name :
SCHEDULE OF WORKS
(Improvement and upgradation of the road connecting Sub-Division Head Quarter with NH44 / Pecharthal to Kanchanpur road (26.50 km) / Phase -I. Portion from
Pecharthal to Machmara (8.50km) in Tripura )
Sl.
No.
Description of work
No.or
Qty.
Unit
Estimated Rate
(in. Rs.)
AMOUNT
Rs.
P
Words
35.00
35.10
35.20
35.30
35.40
36.00
10.00
52.00
24.00
1.00
Each
Each
Each
Each
2313.46
2108.54
2242.62
2450.73
2313.46
2108.54
2242.62
2450.73
2068.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
23134.60
109644.08
53822.88
2450.73
36.10
36.20
37.00
9.00
43.00
52.00
Each
Each
Each
2068.46
523.99
853.11
2068.46
523.99
853.11
#VALUE!
#VALUE!
#VALUE!
18616.14
22531.57
44361.72
38.00
284.00
Each
919.49
919.49
#VALUE!
261135.16
39.00
8.00
Sqm
3053.30
3053.30
#VALUE!
24426.40
40.00
8) SUB HEAD:SLAB AND BOX CELL CULVERT Excavation for Structures - Earthwork in excavation
for structures as per drawing and MoRT&H technical
specifications Clause 304 including setting out,
construction of shoring & bracing, removal of stumps
& other deleterious material and disposal upto a lead
of 50 m, dressing of sides & bottom and backfilling in
trenches with excavated suitable material.
40.10
965.21
Cum
125.10
125.10
#VALUE!
120747.77
2125.00
Cum
580.60
580.60
#VALUE!
1233775.00
41.00
VALIDATE
Nature of Work: Improvement and upgradation of the road connecting Sub-Division Head Quarter with NH44 / Pecharthal to Kanchanpur road (26.50 km) / Phase -I.
Portion from Pecharthal to Machmara (8.50km) in Tripura
HELP
Bidder
Name :
SCHEDULE OF WORKS
(Improvement and upgradation of the road connecting Sub-Division Head Quarter with NH44 / Pecharthal to Kanchanpur road (26.50 km) / Phase -I. Portion from
Pecharthal to Machmara (8.50km) in Tripura )
Sl.
No.
Description of work
No.or
Qty.
Unit
Estimated Rate
(in. Rs.)
42.00
102.91
Cum
6567.29
Figures
6567.29
43.00
482.77
Cum
7547.39
44.00
140.48
Cum
45.00
64.50
46.00
47.00
48.00
49.00
AMOUNT
Rs.
P
Words
#VALUE!
675839.81
7547.39
#VALUE!
3643653.47
8168.09
8168.09
#VALUE!
1147453.28
58160.20
58160.20
#VALUE!
3751332.90
228.00
Nos
219.50
219.50
#VALUE!
50046.00
243.43
Cum
3513.86
3513.86
#VALUE!
855378.94
87.00
Cum
6227.89
6227.89
#VALUE!
541826.43
64.00
Mt
1671.90
1671.90
#VALUE!
107001.60
VALIDATE
Nature of Work: Improvement and upgradation of the road connecting Sub-Division Head Quarter with NH44 / Pecharthal to Kanchanpur road (26.50 km) / Phase -I.
Portion from Pecharthal to Machmara (8.50km) in Tripura
HELP
Bidder
Name :
SCHEDULE OF WORKS
(Improvement and upgradation of the road connecting Sub-Division Head Quarter with NH44 / Pecharthal to Kanchanpur road (26.50 km) / Phase -I. Portion from
Pecharthal to Machmara (8.50km) in Tripura )
Sl.
No.
Description of work
No.or
Qty.
Unit
Estimated Rate
(in. Rs.)
50.00
60.00
Nos
6696.40
Figures
6696.40
51.00
Cement concrete blocks (size 0.5 x 0.5 x 0.5m) Providing and laying of apron with cement concrete
blocks of size 0.5 x 0.5 x 0.5 m cast in-situ and made
with nominal mix of M 15 grade cement concrete with
a minimum cement content of 250 kg/cum as per
IRC: 21-2000 as per drawings & MoRT&H technical
specifications Clauses 2503.
58.7623
Cum
6345.40
52.00
52.10
52.20
53.00
i) Upto 3m depth
ii) 3m to 6m depth
Bored Cast-in-Situ M-30 grade RCC pile excluding
reinforcement complete as per Detailed Drawing &
MoRT&H technical specifications Clauses 1100,
1700 and removal of excavated earth with all lifts and
lead upto 1000 m (Pile diameter-1200 mm)
774.06
833.54
432.00
Cum
Cum
Mt
54.00
34.02
55.00
56.00
57.00
57.10
57.20
58.00
58.10
58.20
58.30
59.00
i) Height upto 5m
ii) Height above 5m upto 10m
iii) RCC Grade M-30 for Pedestal & Seismic Arrestor
Blocks
Supplying, fitting & placing Thermo-Mechanically
treated bar/ Cold twisted deformed steel bar
reinforcement in substructure complete as per
drawings & MoRT&H technical specification Clauses
1600, 2200.
AMOUNT
Rs.
P
Words
#VALUE!
401784.00
6345.40
#VALUE!
372870.30
125.10
148.60
11196.00
125.10
148.60
11196.00
#VALUE!
#VALUE!
#VALUE!
96834.91
123864.04
4836672.00
Cum
6006.10
6006.10
#VALUE!
204327.52
385.24
Cum
7144.20
7144.20
#VALUE!
2752231.61
97.60
57516.10
57516.10
#VALUE!
5613571.36
428.10
42.60
T
T
500.00
8300.00
500.00
8300.00
#VALUE!
#VALUE!
214050.00
353580.00
142.52
15.49
4.89
Cum
Cum
Cum
7553.60
7757.20
7578.20
7553.60
7757.20
7578.20
#VALUE!
#VALUE!
#VALUE!
1076539.07
120159.03
37057.40
20.15
57580.50
57580.50
#VALUE!
1160247.08
VALIDATE
Nature of Work: Improvement and upgradation of the road connecting Sub-Division Head Quarter with NH44 / Pecharthal to Kanchanpur road (26.50 km) / Phase -I.
Portion from Pecharthal to Machmara (8.50km) in Tripura
HELP
Bidder
Name :
SCHEDULE OF WORKS
(Improvement and upgradation of the road connecting Sub-Division Head Quarter with NH44 / Pecharthal to Kanchanpur road (26.50 km) / Phase -I. Portion from
Pecharthal to Machmara (8.50km) in Tripura )
Sl.
No.
Description of work
No.or
Qty.
Unit
Estimated Rate
(in. Rs.)
60.00
140.00
Nos
219.50
Figures
219.50
61.00
305.10
Cum
557.60
62.00
108.34
Cum
2461.70
63.00
190200.00
Cucm
1.20
64.00
64.10
65.00
137.58
23.59
Cum
T
66.00
54.28
67.00
68.00
69.00
AMOUNT
Rs.
P
Words
#VALUE!
30730.00
557.60
#VALUE!
170123.76
2461.70
#VALUE!
266700.58
1.20
#VALUE!
228240.00
8824.50
58176.20
8824.54
58176.20
#VALUE!
#VALUE!
1214080.21
1372376.56
Mt
1706.50
1706.50
#VALUE!
92628.82
8.00
Nos
6696.40
6696.40
#VALUE!
53571.20
7.38
Cum
6006.30
6006.30
#VALUE!
44326.49
28.54
Cum
9962.80
9962.80
#VALUE!
284338.31
VALIDATE
Nature of Work: Improvement and upgradation of the road connecting Sub-Division Head Quarter with NH44 / Pecharthal to Kanchanpur road (26.50 km) / Phase -I.
Portion from Pecharthal to Machmara (8.50km) in Tripura
HELP
Bidder
Name :
SCHEDULE OF WORKS
(Improvement and upgradation of the road connecting Sub-Division Head Quarter with NH44 / Pecharthal to Kanchanpur road (26.50 km) / Phase -I. Portion from
Pecharthal to Machmara (8.50km) in Tripura )
Sl.
No.
Description of work
No.or
Qty.
Unit
Estimated Rate
(in. Rs.)
70.00
203.25
Sqm
26.20
71.00
10.16
Cum
13718.60
72.00
203.25
Sqm
73.00
250.00
74.00
75.00
76.00
AMOUNT
Rs.
P
Words
#VALUE!
5325.15
13718.60
#VALUE!
139380.98
365.20
356.20
#VALUE!
72397.65
Sqm
41.30
41.30
#VALUE!
10325.00
24.00
Mt
10197.50
10197.50
#VALUE!
244740.00
21.99
Mt
221.00
221.00
#VALUE!
4859.79
21.99
Mt
321.00
321.00
#VALUE!
7058.79
VALIDATE
Nature of Work: Improvement and upgradation of the road connecting Sub-Division Head Quarter with NH44 / Pecharthal to Kanchanpur road (26.50 km) / Phase -I.
Portion from Pecharthal to Machmara (8.50km) in Tripura
HELP
Bidder
Name :
SCHEDULE OF WORKS
(Improvement and upgradation of the road connecting Sub-Division Head Quarter with NH44 / Pecharthal to Kanchanpur road (26.50 km) / Phase -I. Portion from
Pecharthal to Machmara (8.50km) in Tripura )
Sl.
No.
Description of work
No.or
Qty.
Unit
77.00
12) SUB HEAD:DIVERSION (5.0m WIDE) Clearing and grubbing road land including uprooting
wild vegetation , grass, bushes, shrubs, saplings and
trees of girth upto 300 mm , removal of stumps of
such trees cut earlier and disposal of unserviceable
materials and stacking of serviceable material to be
used or auctioned, upto a lead of 1000 m including
removal and disposal of top organic soil not
exceeding 150 mm in thickness as per MoRT&H
Technical Specification clause 201. i) In area of light
jungle
78.00
781.405
Cum
146.40
79.00
93.768
Cum
29.40
80.00
30.00
Mt
13279.40
81.00
200.00
Sqm
241.40
82.00
C) BRIDGE- B 13) SUB HEAD:FOUNDATION Earthwork in excavation for structures as per drawing
and MoRT&H technical specifications Clause 304
including setting out, construction of shoring and
bracing, removal of stumps and other deleterious
material and disposal upto a lead of 50 m, dressing
of sides and bottom and backfilling in trenches with
excavated suitable material.Ordinary Soil (By
Manual means)
82.10
82.20
83.00
i) Upto 3m depth
ii) 3m to 6m depth
Bored Cast-in-Situ M-30 grade RCC pile excluding
reinforcement complete as per Detailed Drawing &
MoRT&H technical specifications Clauses 1100,
1700 and removal of excavated earth with all lifts and
lead upto 1000 m (Pile diameter-1200 mm)
650.59
492.56
576.00
Cum
Cum
Mt
125.10
148.60
11208.00
0.048 Hectare
Estimated Rate
(in. Rs.)
23782.00
AMOUNT
Rs.
P
Words
#VALUE!
1141.54
146.40
#VALUE!
114397.69
29.40
#VALUE!
2756.78
13729.40
#VALUE!
411882.00
241.40
#VALUE!
48280.00
125.10
148.60
11208.00
#VALUE!
#VALUE!
#VALUE!
81388.81
73194.42
6455808.00
VALIDATE
Nature of Work: Improvement and upgradation of the road connecting Sub-Division Head Quarter with NH44 / Pecharthal to Kanchanpur road (26.50 km) / Phase -I.
Portion from Pecharthal to Machmara (8.50km) in Tripura
HELP
Bidder
Name :
SCHEDULE OF WORKS
(Improvement and upgradation of the road connecting Sub-Division Head Quarter with NH44 / Pecharthal to Kanchanpur road (26.50 km) / Phase -I. Portion from
Pecharthal to Machmara (8.50km) in Tripura )
Sl.
No.
Description of work
No.or
Qty.
Unit
Estimated Rate
(in. Rs.)
44.23
Cum
6016.00
Figures
6016.00
498.15
Cum
7154.80
86.00
138.00
87.00
732.90
39.40
i) Height upto 5m
ii) Height above 5m upto 10m
iii) RCC Grade M-30 for Pedestal & Seismic Arrestor
Blocks
Supplying, fitting & placing Thermo-Mechanically
treated bar/ Cold twisted deformed steel bar
reinforcement in substructure complete as per
drawings & MoRT&H technical specification Clauses
1600, 2200.
90.00
84.00
85.00
AMOUNT
Rs.
P
Words
#VALUE!
266087.68
7154.80
#VALUE!
3564163.62
57521.30
57521.30
#VALUE!
7937939.40
T
T
500.00
8300.00
500.00
8300.00
#VALUE!
#VALUE!
366450.00
327020.00
170.19
30.61
10.04
Cum
Cum
Cum
7564.20
7767.80
7588.80
7564.20
7767.80
7588.80
#VALUE!
#VALUE!
#VALUE!
1287351.20
237772.36
76191.55
27.85
57585.70
57585.70
#VALUE!
1603761.75
128.00
Nos
219.50
219.50
#VALUE!
28096.00
91.00
280.10
Cum
557.60
557.60
#VALUE!
156183.76
92.00
99.47
Cum
2461.70
2461.70
#VALUE!
244865.30
93.00
380400.00
Cucm
1.20
1.20
#VALUE!
456480.00
87.10
87.20
88.00
88.10
88.20
88.30
89.00
VALIDATE
Nature of Work: Improvement and upgradation of the road connecting Sub-Division Head Quarter with NH44 / Pecharthal to Kanchanpur road (26.50 km) / Phase -I.
Portion from Pecharthal to Machmara (8.50km) in Tripura
HELP
Bidder
Name :
SCHEDULE OF WORKS
(Improvement and upgradation of the road connecting Sub-Division Head Quarter with NH44 / Pecharthal to Kanchanpur road (26.50 km) / Phase -I. Portion from
Pecharthal to Machmara (8.50km) in Tripura )
Sl.
No.
Description of work
No.or
Qty.
Unit
Estimated Rate
(in. Rs.)
AMOUNT
Rs.
P
Words
94.00
94.10
95.00
268.94
47.18
Cum
T
8835.10
58181.40
8835.10
58181.47
#VALUE!
#VALUE!
2376111.79
2745001.75
96.00
93.28
Mt
1707.50
1707.50
#VALUE!
159275.60
97.00
16.00
Nos
6696.40
6696.40
#VALUE!
107142.40
98.00
7.39
Cum
6016.20
6016.20
#VALUE!
44459.72
99.00
28.58
Cum
9973.70
9973.70
#VALUE!
285048.35
349.500
Sqm
26.20
26.20
#VALUE!
9156.90
17.48
Cum
13733.40
13733.40
#VALUE!
240059.83
VALIDATE
Nature of Work: Improvement and upgradation of the road connecting Sub-Division Head Quarter with NH44 / Pecharthal to Kanchanpur road (26.50 km) / Phase -I.
Portion from Pecharthal to Machmara (8.50km) in Tripura
HELP
Bidder
Name :
SCHEDULE OF WORKS
(Improvement and upgradation of the road connecting Sub-Division Head Quarter with NH44 / Pecharthal to Kanchanpur road (26.50 km) / Phase -I. Portion from
Pecharthal to Machmara (8.50km) in Tripura )
Sl.
No.
Description of work
No.or
Qty.
Unit
Estimated Rate
(in. Rs.)
349.50
Sqm
365.30
Figures
365.30
300.00
Sqm
41.30
48.00
Mt
10197.50
22.07
Mt
22.07
Mt
107.00 16) SUB HEAD:DIVERSION Clearing and grubbing road land including uprooting
wild vegetation , grass, bushes, shrubs, saplings and
trees of girth upto 300 mm , removal of stumps of
such trees cut earlier and disposal of unserviceable
materials and stacking of serviceable material to be
used or auctioned, upto a lead of 1000 m including
removal and disposal of top organic soil not
exceeding 150 mm in thickness as per MoRT&H
Technical Specification clause 201. i) In area of light
jungle
0.09 Hectare
1315.22
Cum
AMOUNT
Rs.
P
Words
#VALUE!
127672.35
41.30
#VALUE!
12390.00
10197.50
#VALUE!
489480.00
221.00
221.00
#VALUE!
4877.47
321.00
321.00
#VALUE!
7084.47
23782.00
#VALUE!
2140.38
146.40
#VALUE!
192548.21
23782.00
146.40
VALIDATE
Nature of Work: Improvement and upgradation of the road connecting Sub-Division Head Quarter with NH44 / Pecharthal to Kanchanpur road (26.50 km) / Phase -I.
Portion from Pecharthal to Machmara (8.50km) in Tripura
HELP
Bidder
Name :
SCHEDULE OF WORKS
(Improvement and upgradation of the road connecting Sub-Division Head Quarter with NH44 / Pecharthal to Kanchanpur road (26.50 km) / Phase -I. Portion from
Pecharthal to Machmara (8.50km) in Tripura )
Sl.
No.
Description of work
No.or
Qty.
Unit
Estimated Rate
(in. Rs.)
78.918
Cum
29.40
110.00
45.00
Mt
13279.40
111.00
300.00
Sqm
241.40
Words
#VALUE!
2320.19
13279.40
#VALUE!
597573.00
241.40
#VALUE!
72420.00
248889510.36
Total in Figures
Total in Words
AMOUNT
Rs.
P
#VALUE!