GSM BSC Hardware & Software Acceptance Testing

BSC & PCU INTEGRATION and ACCEPTANCE TESTS

BSC/PCU Name

BSC/MSC Connectivity

Circle

BSC/PCU ID

CITY

BSC/PCU TYPE

BSC/PCU Address
BSC/PCU Configuration
BSC/PCU Installation
Date

IP ADDRESS
(BSC/PCU)
Software Release
(BSC/PCU)
BSC/PCU
Commissioning Date

Contents:
1. INSTALLATION & COMMISSIONING ACCEPTANCE CHECKLIST.................2
2. SYSTEM VERIFICATIONS.........................................................................3
3. BASIC FUNCTIONALITY VERIFICATIONS..................................................4
4. SITE ACCEPTANCE CERTIFICATE.............................................................6

Aircel Ltd.

Page 1 of 8

GSM BSC Hardware & Software Acceptance Testing

1.

INSTALLATION & COMMISSIONING ACCEPTANCE CHECKLIST

S.N
o.

BSC/RBSC & PCU AT schedule

1
2
3
4

Physical Installation of BSC/RBSC & PCU


Physical Grouting of the cabinet is secure
Cabling secure and has proper labelling
Cabinet/Frame not damaged / scratched
Power supply measurement (nominal
voltage to be -48V to -60V)
Proper earthing of BSC/RBSC cabinet
cable
Colors of the grounding cable Yellow &
Green
Hardware and Software configuration
delivered as per specification
Verify All Board Level Self Tests Pass
Pull out the fan
from the BSC Rack
The FAN Alarm is
reported to the
alarm maintenance
Testing of Fan &
system
Fault Alarm
Re-install the fan
into BSC Rack
The corresponding
fan alarm recovers
Factory test report present at the site
Commissioning Document present at the
site
BSC & PCU Product Document present at
the site
Check the hardware configuration of BSC
from LMT
Check the hardware configuration of PCU
from LMT
No active alarms present at BSC and PCU

5
6
7
8
9

10
11
12
13
14
15
16

Ye
s

N
o

Comments

Punch List:Sr. No.

Item

Date Closed

Name / Signature
of closing
authority

All test completed without any items on punch list

Aircel Ltd.

Page 2 of 8

GSM BSC Hardware & Software Acceptance Testing

2.

SYSTEM VERIFICATIONS
S.No.
BS
C
Tes
t
Des
crip
tio
n
1
2
3
4
5
6
7
8
9
10
11
12
13
14

S.N
o.
1
2
3
4
6
7
8
9
10
11

Aircel Ltd.

Pass/Fail
BSC Software / Firmware downloading and system
Initialization.
BSC Software Version check
BSC Diagnostics and Alarms check
BSC-TC Link status check
BSC-BTS Link status check
Loop Break check for all Exchange terminals in the
BSC
BSC PCU Link status check
BSC- MGW/MSS Link status check
BSC Clock stability Checking
Lock , Unlock and Reset Display of Logical Elements
Redundancy Tests for all the applicable
cards/modules
System recovery after software reset
Alarm handling (Alarm triggered and cleared for
hardware and software faults)
Fan fault handling

PCU Test Description


PCU Version Verification
PCU Software Version Check
PCU Diagnostics and Alarms Check
PCU-SGSN Link status check
Verify the GPRS information on the broadcast
channels
Verify functionality of standby timer
Redundancy Tests for all the applicable
cards/modules
System recovery after software reset
Alarm Handling (Alarm triggered and cleared for
hardware and software faults)
Fan fault handling

Comm
ents

Pass/F
ail

Comme
nts

Page 3 of 8

GSM BSC Hardware & Software Acceptance Testing

Aircel Ltd.

Page 4 of 8

GSM BSC Hardware & Software Acceptance Testing

3.

BASIC FUNCTIONALITY VERIFICATIONS

Location update

Test Case

Complete
d

IMSI attach (to be verified together with engineer at MSC/VLR


site)
IMSI detach (to be verified together with engineer at MSC/VLR
site)
Location update
MOC/MTC Calls
Test Case

Complete
d

Mobile Originated Call


Mobile Terminated Call
MS to MS call, A-party IMSI detached
Long duration ( More than 5 Min) call
Uplink DTX during MS to MS call
FR, EFR, HR, AMR HR voice version test
Blocking & unblocking of single trunk in A interface
Blocking & unblocking of trunk group of A interface
SMS Services
Test Case Name
Mobile
Mobile
Mobile
Mobile

Complete
d

Originated SMS
Terminated SMS
Originated SMS during a call
Terminated SMS during a call

GPRS/ EDGE Testing


Test Case Name

Complete
d

GPRS Attach
Multiple GPRS Attach and Multiple Applications
Voice Call made during Data Standby
Voice Call In during Data session
PDP Session on EDGE and GPRS
Online monitoring of GPRS and Edge traffic on TRX

Aircel Ltd.

Page 5 of 8

GSM BSC Hardware & Software Acceptance Testing

Aircel Ltd.

Page 6 of 8

GSM BSC Hardware & Software Acceptance Testing


Data calls
Test Case Name

Complete
d

Mobile Originated Circuit Switched data call


Mobile Terminated Circuit Switched data call
Handover test
Test Case Name

Complete
d

Inter cell handover


Cell Load Sharing
Inter BSC handover
BSC incoming & outgoing handover
BTS forced handover
System Backup and Restoration
Test Case Name
Taking fallback of the BSC Package/software
Restoring software package from fallback
Backup copying of BSC software to MOD
Restoring BSC software package from MOD

Completed

PAD connection to OSS router


Test Case Name

Complete
d

Check the semi permanent PAD connection to OSS router. Login


to any other BSC
System Recovery Test
Test Case Name

Complete
d

BSC system restart with radio network restart

Aircel Ltd.

Page 7 of 8

GSM BSC Hardware & Software Acceptance Testing

4.

SITE ACCEPTANCE CERTIFICATE

This is to certify that the said equipment has been accepted


CUSTOMER
NAME
BSC NAME
BSC serial
Number
LOCATION
SITE ADDRESS

(Place)

(Date)

(Aircel Representative)

(signature)

(OEM Representative)

(signature)

Aircel Ltd.