Sie sind auf Seite 1von 36

60

Set .#
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
Avg,
Site
Avg,
Site

7days 28 days
47.1
49
39.5
50.5
33.5
43
35.7
43
32.9
37.2
41.4
45.5
32.4
45
40
35.4
29.3
28.3
31.1
45.1
31.7
40.5
38.3
45.8
37.4
45.8
32.6
37.8
45.3
45.7
39.1
41.2
33.8
37.2
37.1
43.3
28.1
37.5
C60
for cube
37.1
42
52.5
29.4
41.2
51.5
C40
32
40
50
32
40.8
51

50

50.5

49

45.5
43

45

43

40
37.2
35.4
30

20

10
0

7d

45.5

45.8

45.1

45

45.8

45.7
43.3

43
41.2

40.5
37.8

37.2

37.2

37.5

35.4

28.3

10
7days

12
28 days

14

16

18

20

37.5

20

Concrete pouring cyliders reciving receipt from soil and foundation lab, in Taif
Municipality Building Project Taif - 11033
Month of : May 2015

Sr,
no.

Date of
pouring

Location
Screed conc,with micro cilica in between grid (1)y-06~y08,x-04~x-08(2)y-

11-May-15 09~y-11 &x-01~x02 (3) A-05~a-10 &y-12~b-06

13-May-15 Raft conc,c40 & c60 with M/S zone B2 x-06~x-11 &y-06~B04
3

li

No of
Mix
Quantity
Grade of Microin M specimen concrete in Silica
s
mpa
50

c40-98
c60 1973 12+102

20
c40+c60

yes
yes

ab, in Taif

Date of
Date of 7 days
28 days
testing
testing for Result
Result Remarks
for 28
7 days
(mpa)
(mpa)
days
16-Mar-15
21-May-15

5-Apr-15

Monthly Summary of Concret


Municipality Building Proje

Month of : Ap

Sr,no
.

Date of
pouring

21-4-15

25-04-15

Location
Protection Screed conc in between (1)A-21~A-23 & B06~B-09
(2)A-09~A-18&B-03~B-06
Raft concrete c40&c60 in between Zone B1&x-10~x-17 & y-06~b-05

Summary of Concrete Pouring at Site


cipality Building Project Taif - 11033
Month of : April 2015

No of

Mix
Quantity
Grade of
in M
specime concrete
ns
in mpa
70

12

c40-357 &

18

c60-2154

114

20
40
60

MicroSilica

Date of
testing for
7 days

yes

28-4-15

yes

2-May-15

7 days
Result
(mpa)

Date of
testing for
28 days

28 days
Result Remarks
(mpa)

Monthly Summary of Concrete Pouring at Site


Municipality Building Project Taif - 11033
Month of : MARCH 2015

No of
Sr,no.

Date of
pouring

8-Mar-15

Screed concrete in between ( A-07 &A-10 & Y -07 & Y -1 0)

9-Mar-15

Screed concrete in between ( A-08 &A-18 &b-02~b05)a-21~23&b04-7

15-Mar-15

Location

SCREED A-08 A-18 & B-02B-05, A-21A-23 & B-04B-08


Concrete for Tower carin footing

c40

22-Mar-15 BLINDING CONCRETE in between A05~ A09 & B02 ~B06

Quantity
in M

Mix
Grade of Microspecime concrete Silica
ns
in mpa
20

21

60

12

20

158

12

40

99

12

yes

28
Date of 7 days Date of
days Rem
testing for Result testing for
Result arks
7 days
(mpa) 28 days
(mpa)
16-Mar-15

22-Mar-15

5-Apr-15

12-Apr-15
0

Monthly Summary of Concrete Pouring at Site


Municipality Building Project Taif - 11033
Month of : FEBUARY 2015

Sr,no
.

Date of
pouring

3-Feb-15

Blinding concrete in between A 14-A17 & B-03-B06

9-Feb-15

Screed conc,in between (A-21~23&B02-05)2- A-07~A-12&Y-10~B-02

11-Feb-15

Blinding concrete in between X-01 ~X-02 &B-01 ~ Y 12

15-Feb-15

Blinding concrete in between A-11 ~A 15 & B-03 ~ B-06

22-Feb-15

Location

SCREED concrete in between A-18~22 &B02~05&A09~13

No of
Mix
Date of
Quantity
Grade of Microtesting for
in M specime concrete Silica
7 days
ns
in mpa

25-Feb-15

SCREED concrete in betweenTHK A-14~A-19 &B02-B 04

28-Feb-15

BLINDING CONCRETE in between X-01~X-02 & Y-09~ Y-10

10-Mar-15

YES

16-Mar-15

YES

18-Mar-15

YES

22-Mar-15

YES

68

YES

Screed concrete in between Y-06 &Y11 I X-02 &X-06

YES

75
0

29-Mar-15

YES

31-Mar-15

YES

7 days
Date of
28 days
Result testing for Result Remarks
(mpa)
28 days
(mpa)
31-Mar-15
6-Mar-15
8-Mar-15
12-Mar-15
19-Mar-15
22-Mar-15
0

Monthly Summary of Concrete Pouring at Site


Municipality Building Project Taif - 11033
Month of : January 2015

Mix
Grade
Date of
7 days
Quantity
Microof
testing for 7 Result
in M specime
Silica
concrete
days
(mpa)
ns
in mpa
No of

Sr,n
o.

Date of
pouring

1/1/2015

1/4/2015

Location

Blinding concrete Zone B2&B3 in between x03-x10 & B02

47

Blinding concrete Zone 'A' in between A17-A22 &B02-B04

Screed zone 'B'2 in between x08-x12 & y10-B02

1/8/2015

19.6

20

yes

20

yes

1/11/2015

109

20

yes

1/15/2015

17.5

25

1/8/2015

1/12/2015

screed zone 'B'3 y10-b02 &x05-x07 @ zone B2 x07-x12 &x07-y10

42

20

yes

1/19/2015

17.6

1/14/2015

Blinding conc,of sump pit Zone B1 & x16-x17 @B01- B02

15

20

yes

1/21/2015

12.1

1/17/2015

Screed Zone B1 in between x10-x16 @ b01-b02

28

20

yes

1/24/2015

11.9

1/19/2015

Screed Zone B1 in between x10-x17 @y06-y10

39

20

yes

1/26/2015

12.1

1/20/2015

Screed Zone B1 in between x10-x17 @y06-y11 ( for spacer)

20

yes

1/27/2015

1/21/2015

Screed Zone A1 in between A 19-A23 @ B03-B06.

66

20

yes

1/28/2015

17.8

10

1/26/2015

Blinding concrete in between A17 -A20 & B03 -B06

32

11

1/28/2015

Blinding concrete in between A08 -A12 & B02 -B04

109

12

1/31/2015

Blinding concrete in between X-05 ~ X-09 &B-02 ~ Y-07

Blinding concrete Zone A1 in between A19-A23 & B05-B08

2/2/2015
0

2/7/2015
48

Note: For more detail plz click on 7 days result.

prepared by:

Checked by :

Lab,supervisor

Construction manager,

Concrete Pouring at Site


ng Project Taif - 11033

th of : January 2015

28
Date of testing days
Remarks
for 28 days
Result
(mpa)
1/29/2015
02/04/15
2/5/2015
2/9/2015
2/11/2015
2/14/2015
2/16/2015
2/17/2015
2/18/2015
2/23/2015
0
2/28/2015

Verified by:

25.3

Project manager,

Monthly Summary of Concrete Pouring at Site


Municipality Building Project Taif - 11033
Month of : December 2014

No of

Mix
Date of
7 days
Quantity
Grade of Microtesting for 7 Result
in M
specim concrete Silica
days
(mpa)
ens
in mpa

Sr,n
o.

Date of
pouring

12/8/2014

Blinding concrete Zone B2 (x10-x12 @y10-B02)

80

20

yes

12/9/2014

Blinding concrete Zone B1(1.2m Raft)Towords park

70

20

yes

12/16/2014

17.1

12/13/2014

Blinding conc,zone B1 @y06- B02 x12-x17(1.2m Raft)

165

12

20

yes

12/20/2014

17.0

12/15/2014

Blinding conc,zone B2 near lift pit Y06-y10 @x09-x12(1.5m Raft)

99

20

yes

12/22/2014

17.3

12/17/2014

Blinding conc, zone B2 @X08-X10 @ y06-b02(1.5m Raft)

87

20

yes

12/24/2014

16.0

12/18/2014

Blinding conc,zone B3&x05-x08 @ y9-B02

17

20

yes

12/30/1899

12/21/2014

Blinding concrete Zone'B'2 @ B 3 & x05-x08 @y06-y10

87

20

yes

12/28/2014

17.8

12/23/2014

Blinding concrete Zone 'B'3 / B4 @x01-x06 & y06-y11

70

20

yes

12/30/2014

17.3

12/27/2014

Blinding conc,Zone B3&B4 @ x01-x05 @y10-B02

24

20

yes

1/3/2015

17.6

10

12/28/2014

Blinding conc,Zone B4 @ x01-x02@B01-B02

19

20

yes

1/4/2015

11

12/31/2014

Blinding conc,Slope Zone B1-B2/Zone A1-A2 @ x09-x17

40

20

yes

1/7/2015

16.9

Location

Total Concrete=758 M
Total samples=60 nos,
Note: For more detail plz click on 7 or 28 days result.

prepared by:
Lab,supervisor

Checked by :
Construction manager,

f Concrete Pouring at Site


ding Project Taif - 11033

of : December 2014

28
Date of
days
testing for
Result
28 days
(mpa)

Remarks

06-Jan-2015

24.7

10-Jan-2015

23.5

''

12-Jan-2015

23.7

''

14-Jan-2015

24.0

18-Jan-2015

25.1

20-Jan-2015

24.1

''

24-Jan-2015

24.7

''

25-Jan-2015

''

28-Jan-2015

23.2

''

Supplier,Al-Henaki.Co

''

''
''
''

Verified by:
Project manager,

Monthly Summary of Field Density Test

Soil type

Wet Density gm/cc

Field Moisture %

Dry Density g/cc

Month of December 2014

Depth in Cm

Municipality Building Project Taif - 11033

15

S/C

2.147

5.16

2.042

''

15

''

2.150

4.07

2.056

''

15

''

2.177

6.08

2.052

''

''

15

''

2.191

5.32

2.08

''

''

15

''

2.186

6.98

2.043

''

''

15

''

2.213

7.13

2.066

8-Dec-2015

15

''

2.171

5.0

2.068

''

''

15

''

2.069

5.45

1.962

''

''

15

''

2.149

5.36

2.04

''

''

15

''

2.027

3.42

1.96

''

''

15

''

2.082

4.37

1.995

''

''

15

''

1.891

4.42

1.811

''

''

15

''

1.996

4.11

1.917

''

''

15

''

1.909

4.66

1.824

''

''

15

''

1.943

6.53

1.824

''

''

15

''

2.075

3.36

2.008

''

''

15

''

2.049

3.98

1.971

''

''

15

''

2.035

4.36

1.95

Date of testing

Test .No

7-Dec-2015

''

''

Location

Zone B1 (x10-x17@ y06-B02)

Zone B2 (x06-x10 @ y06-B02)

Note: For more detail plz click on date of testing.

prepared by:

Checked by :

Lab,supervisor

Construction manager,

''
''
13-Dec-2015

''
''
15-Dec-2015

''
''
''
''
''
16-Dec-2015

''
''
''
''
''

Zone B2 towards park (1.2m)raft


(Retest dated on 08-12-2014 )
''
Zone B1 @ x12-x17 & y6- B 02

''
''
Zone B2 & in between Y06-y10 @x09-x12

'''
''
''
''
''
Zone B2 in between @X08-X10 @ y06-b02
''
''
''
''
''

Dry Density g/cc

1
2
3
1
2
3
1
2
3
4
5
6
1
2
3
4
5
6

Field Moisture %

12-Dec-2014

Location

Wet Density gm/cc

Test .No

Soil type

Date of testing

Depth in Cm

Monthly Summary of Field Density Test


Municipality Building Project Taif - 11033 Month of December 2014

15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15

S/C
''
''
''
''
''
''
''
''
''
''
''
''
''
''
''
''
''

2.121
2.133
2.076
2.036
2.084
2.101
2.103
2.256
2.16
2.089
2.170
2.333
1.987
2.166
2.210
2.037
2.182
2.343

3.57
2.77
2.4
3.61
3.79
4.44
6.88
6.16
5.4
7.83
7.22
8.82
8.48
6.69
6.86
3.37
6.3
6.42

2.048
2.075
2.027
1.965
2.008
2.012
1.968
2.215
2.049
1.937
2.024
2.052
1.832
2.03
2.068
1.971
2.053
2.02

Note: For more detail plz click on date of testing.

prepared by:

Checked by :

Lab,supervisor

Construction manager,

''
''
''
''
''
''
''
''
''
23-Dec-2015

''
''
''
''
''

Zone'B'2 @ B 3 & x05-x08 @ y06-y10


''
''
''
''
''
''
''
''
''
Zone 'B'3 / B4 @x01-x06 & y06-y11
''

''
''
''
''

Dry Density g/cc

1
2
3
4
5
6
7
8
9
10
1
2
3
4
5
6

Field Moisture %

21-Dec-14

Location

Wet Density gm/cc

Test .No

Soil type

Date of testing

Depth in Cm

Monthly Summary of Field Density Test


Municipality Building Project Taif - 11033 Month of December 2014

15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15

S/C
''
''
''
''
''
''
''
''
''
''
''
''
''
''
''

2.184
2.191
2.264
2.171
2.120
1.980
2.156
2.120
2.281
2.243
2.258
2.265
2.277
2.156
2.170
2.180

5.28
6.12
11.0
6.26
4.74
5.43
10.1
8.70
10.6
9.46
3.56
5.46
5.7
3.67
4.17
4.81

2.074
2.065
2.04
2.043
2.024
1.878
1.958
1.950
2.062
2.049
1.987
2.148
2.154
2.08
2.083
2.08

Note: For more detail plz click on date of testing.

prepared by:
Lab,supervisor

Checked by :
Construction manager,

''
''
''
''
''

Near the Last sump pit of zone B3-B4 @x01-x05


y10-B02 and Near slope .
''
''

''
''

Dry Density g/cc

1
2
3
4
5
6

Field Moisture %

27-Dec-2015

Location

Wet Density gm/cc

Test .No

Soil type

Date of testing

Depth in Cm

Monthly Summary of Field Density Test


Municipality Building Project Taif - 11033 Month of December 2014

15
15
15
15
15
15

S/C
''
''
''
''
''

2.076
2.108
2.067
2.105
2.133
2.112

3.14
3.29
2.3
2.81
1.45
1.13

2.013
2.041
2.02
2.047
2.103
2.088

Note: For more detail plz click on date of testing.

prepared by:
Lab,supervisor

Checked by :
Construction manager,

Remarks

Specified Compaction %

Month of December 2014

Compaction %

Taif - 11033

Max,lab , density gm/cc %

of Field Density Test

2.04

100.1

95

Pass

2.04

101.3

''

Pass

2.04

100.6

''

Pass

2.04

102.0

''

Pass

2.04

100.2

''

Pass

2.04

101.3

''

Pass

2.04

101.4

''

Pass

2.04

96.2

''

Pass

2.04

100

''

Pass

2.04

96.1

''

Pass

2.04

97.8

''

Pass

2.04

88.8

''

Fail

2.04

94.0

''

Fail

2.04

89.4

''

Fail

2.04

89.4

''

Fail

2.04

98.4

''

Pass

2.04

96.6

''

Pass

2.04

96.6

''

Pass

Verified by:

project manager,

100.4
101.7
99.4
96.3
98.4
98.6
96.5
104.2
100.4
95
99.2
100.6
89.8
99.5
101.4
96.6
100.6
107.9

Verified by:

95
''
''
''
''
''
''
''
''
''
''
''
''
''
''
''
''

Remarks

Specified Compaction %

2.04
2.04
2.04
2.04
2.04
2.04
2.04
2.04
2.04
2.04
2.04
2.04
2.04
2.04
2.04
2.04
2.04
2.04

Compaction %

Max,lab , density gm/cc %

of Field Density Test


Taif - 11033 Month of December 2014

Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Fail
Pass
Pass
Pass
Pass
Pass

project manager,

Specified Compaction %

Remarks

2.04
2.04
2.04
2.04
2.04
2.04
2.04
2.04
2.04
2.04
2.04
2.04
2.04
2.04
2.04
2.04

Compaction %

Max,lab , density gm/cc %

of Field Density Test


Taif - 11033 Month of December 2014

101.7
101.2
100.0
100.2
99.2
92.1
96.0
95.6
101.1
100.4
97.4
105.3
105.6
101.9
102.1
102.0

95
''
''
''
''
''
''
''
''
''
''
''
''
''
''
''

Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass

Verified by:
project manager,

Specified Compaction %

Remarks

2.04
2.04
2.04
2.04
2.04
2.04

Compaction %

Max,lab , density gm/cc %

of Field Density Test


Taif - 11033 Month of December 2014

98.7
100
99
100.4
103.1
102.4

95
''
''
''
''
''

Pass
Pass
Pass
Pass
Pass
Pass

Verified by:
project manager,

Concrete pouring cyliders reciving receipt from soil and foundation lab, in Taif
Municipality Building Project Taif - 11033
Month of : MARCH 2015

No of
Sr,no.

Date of
pouring

21-4-15

Location
Screed concwith micro cilica in between (1)A-21~A-23 & B06~B-09

Sign,
Qa/Qc Engr,
Al-khodari.Co

(2)A-09~A-18&B-03~B-06

Mix
Date of
Grade of
testing for 7
specime concrete
days
ns
in mpa
3

20

28-4-15

7 days
Result
(mpa)

b, in Taif

Date of
testing
for 28
days

28 days
Result Remarks
(mpa)

Sign,
Representative
Soil and foundation (lab,)

Compression Test report with curve 7&28 days age Raft concrete c60 with M/silica Z
Pouring Date on 14-06-2015
70

Set .# 7days 28 days


34.5
36.4
37.5
32.9
34.2
36.3
35.5

44.4
47.4
41.7
42.9
42.3
40.5
43

60

Compressive strength in (Mpa)

1
2
3
4
5
6
7

50

47.4
44.4
41.7

42.9

42.3

43
40.5

40

34.5

36.4

37.5
32.9

30

34.2

36.3

35.5

20

C40
Avg,

10

Site

35.3

43.2

8
7days

10

11

28 days

12
Set.#

13

14

15

28 days age Raft concrete c60 with M/silica Zone A1


Pouring Date on 14-06-2015

43
40.5

36.3

35.5

8
7days

10
28 days

11

12
Set.#

13

14

15

16

17

18

19

20

Das könnte Ihnen auch gefallen