Beruflich Dokumente
Kultur Dokumente
I. PRESSURE MONITORING
Fire Hydrant
Description
F.H.1
F.H.2
F.H.3
F.H.4
F.H.5
F.H.6
F.H.7
F.H.8
Location
Entrance of Green Valley Subdivision
Inside Green Valley Subdivision
Beside Danny De Fiesta's Residence
Near Masiay PW
Bridge (Dumalon Supply Line)
Entrance of Sabina Loon Drive
After Skyview Valve (Dumalon Line)
Near Going to Corote-San Roque Intersection (Dumalon Line)
Before Adjustment
Pressure Reading
Time
(psi)
9:02
10
9:17
9:10
9:47
9:58
10:06
12
12
7
5
24
After Adjustm
Time
1:20 PM
2:30 PM
2:24 PM
11:33 AM
11:02 AM
1:41 PM
1:51 PM
1:52 PM
Location
Near Petron Gas Station
Alfaro J. Estrada Drive (Mainline-C.I. Pipeline)
Before Adjustment
No. of Turns
Time
(Open)
17 turns F.O.
15 turns P.O.
After Adjustm
Time
10:38 AM
10:27 AM
V3
V4
V5
V6
12 turns P.O.
6.5 turns P.O.
18 turns F.O.
23 turns F.O.
10:27 AM
10:23 AM
10:38 AM
After Adjustment
Pressure Reading
(psi)
0
0
0
0
0
0
20
26
Resume Operation
Pressure Reading
Time
(psi)
7:22 PM
14
7:25 PM
19
7:39 PM
21
7:30 PM
18
7:35 PM
18
7:33 PM
16
3:49 PM
1
3:54 PM
16
After Adjustment
No. of Turns
(Open)
0 FC
0 FC
Final Status
No. of Turns
Time
(Open)
3:04 PM 17 TURNS F.O.
0 FC
3:15 PM 12.5 TURNS F.O.
0 FC
0 FC
I. PRESSURE MONITORING
Fire Hydrant
Description
F.H.1
F.H.2
F.H.3
F.H.4
F.H.5
F.H.6
F.H.7
F.H.8
SURE MONITORING
Before Adjustment
Location
Time
AY PW OPERATION
Operation (TIME):
peration (TIME):
VE ADJUSTMENT
Before Adjustment
Location
Near Petron Gas Station
Alfaro J. Estrada Drive (Mainline-C.I. Pipeline)
Alfaro J. Estrada Drive (Feederline-PVC Pipeline)
Pasay Drive
Near Pasay Drive Entrance (Tricycle Parking Area)
Skyview Valve (Dumalon Line)
Time
the Philippines
Y WATER DISTRICT
Zamboanga City
Before Adjustment
Pressure Reading
(psi)
After Adjustment
Pressure Reading
Time
(psi)
Resume Operation
Pressure Reading
Time
(psi)
Before Adjustment
No. of Turns
(Open)
After Adjustment
No. of Turns
Time
(Open)
Final Status
No. of Turns
Time
(Open)