WBS
Tasks
Task
Lead
[Mr. Saurabh Sukla]
Start
End
23-Oct-15
2-Nov-15
1.1
Detail Engineering
23-Oct-15
2-Nov-15
23-Oct-15
2-Nov-15
24-Oct-15
2-Nov-15
P&ID
25-Oct-15
2-Nov-15
1.2
23-Oct-15
2-Nov-15
27-Oct-15
28-Nov-15
23-Oct-15
25-Oct-15
5-Dec-15
23-Oct-15
20-Dec-15
Erection Drawing
23-Oct-15
26-Dec-15
25-Oct-15
20-Dec-15
Commisioning Mannual
25-Oct-15
26-Dec-15
25-Oct-15
26-Dec-15
1.3
Duration (Days)
10
10
2
9
9
10
11
2
9
10
2
9
9
9
Design &
23-Oct-15
Engineering & Design
Detail Engineering
PFD(Scope Matrix,Utility Requirement)
Site layout (Top, Front ,Side, Elevention View)
P&ID
Fabrication Drawing for Workshop & Site
Document sumitted releted to Procurement Dept
Equipment Layout& BOQ for Workshop Site
Brought for Mechanical & Electrical with Inspection
Erection & Comissioning
Erection Drawing
BOQ & Erection with Weight wise /Project
Commisioning Mannual
Hand - Over Report,Trial& Documentation
25-Oct-15
27-Oct-15
15
29-Oct-15
31-Oct-15
2-Nov-15
4-Nov-15
4-Nov-15
6-Nov-15
8-Nov-15
WBS
2
Tasks
Procurement
Task
Lead
Mr. Jay Om Bhardwaj
End
Duration (Days)
[42]
27-Oct-15
20-Nov-15
24
Start
Perstudy Technical
Clarification
27-Oct-15
3-Nov-15
1.1
27-Oct-15
6-Nov-15
10
1.2
Comparative Statement
1.3
Negotation
1.4
Order Releasing
1.5
Follow Up
1.6
6-Nov-15
12-Nov-15
6-Nov-15
20-Nov-15
14
27-Oct-15
16-Nov-15
20
Finance Planing/Billing
planing/Taxes Planing
Inspection & Material
Receving
27-Oct-15
Procurement
Department
6-Nov-15
11-Nov-15
16-Nov-1
1-Nov-15
Procurement
Perstudy Technical Clarification
Project Estimation List as Material/Contaractor Part
Comparative Statement
Negotation
Order Releasing
Follow Up
Material Workshop to Start up Work
Complete metal Workshop
Finance Planing/Billing planing/Taxes Planing
Inspection & Material Receving
End Date: 20
End Date: 16-Nov-15
partment
11-Nov-15
16-Nov-15
21-Nov-15
26-Nov-15
Duration (Days)
Start
e: 11-Nov-15
End Date: 20-Nov-15
End Date: 16-Nov-15
WBS
Tasks
Task
Lead
Start
End
Duration (Days)
[42]
Fabrication
27-Oct-15
24-Dec-15
60
27-Oct-15
2-Nov-15
2-Nov-15
24-Dec-15
51
Workshop
Machining
Contractor Finilaziation
Inspection Plan
Dispatch Plan
Fabrication Department
27-Oct-15
6-Nov-15
16-Nov-15
26-Nov-15
End D
Fabrication
Planing For Machining & Contractor Work & Site starting & inspection
Workshop
Machining
Contractor Finilaziation
Inspection Plan
Dispatch Plan
End Da
epartment
16-Nov-15
26-Nov-15
6-Dec-15
16-Dec-15 26-Dec-15
5-Jan-16