No. : DGM(PMC)/DPR/2016/0026
Date : 12.01.16
Index
/ Project Zone
A.
/ Coke Zone
B.
/ Mills Zone
C.
/ Steel Zone
D.
.. / OP Zone
E.
F.
G.
/ Power Zone
H.
I.
Installation of Cranes for BOF & CCP (Pkg.-029A) (7Nos 300T + 80 T Cap.)
J.
2 / Utility Zone
K.
L.
M.
4-( )-...
4 4 ( )
( )
4:
4 - ( )- ;<
. -( )-...
4 -( )-
4 - 4 ( )-
4 -( )- ... & .
4 - 4 ( )-
4 -( )-...3
4 -( )-2
4-( ) BD
4 -( )->?-..&...3
* F .
Depts Websites
Projects (http://cmmsftp.sail-bhilaisteel.com/projects/index.htm)
Total
BE (A)
BE ( I )
DE (A)
DE ( I )
TOTAL
124
14
125
244
507
Activity
Submtd.
121
26
97
242
486
Unit
Appd/KFR
90
24
87
230
431
Total vol.
AAN
Comntd
U/S
13
0
0
0
13
18
2
8
8
36
0
0
2
4
6
Cum. Prog.
Jan16
Plan
Drawings
Total
BE (A)
106
BE I
76
DE (A)
624
DE I
1067
1873
TOTAL
Activity
Submtd.
112
73
681
1224
2090*
Unit
Appd
110
72
667
1214
2063
Total vol.
AAN
2
0
3
0
5
Comntd
0
1
9
9
19
Jan16
Plan
Prog.
A4
Date : 11.01.16
PROGRESS ON DATE
A3
U/S
0
0
2
1
3
Cum. Prog.
Prog.
Earthwork
M3
84000
150
0
82100
Concreting
M3
30200
190
0
29463
Structure supply
T
2250
0
0
2240
Structure erection
T
2250
15
0
2138
Mech. Eqpt. supply
T
8200
0
0
8126
Elect. Eqpt. supply
T
1500
0
0
1480
*- Includes additional drgs. as per
Mech. Eqpt. erection
T
8200
133
32
7595
MECON.
Elect. Eqpt. erection
T
1500
17
8
1451
Part PAC issued on 14.04.15 w.e.f 12.01.15.
Part Commissioning certificate issued on 27.08.15 w.e.f. 20.07.15.
Processing of Gas from COB#11 in By-Product Plant - 3 started on
29.09.14. (Exhauster, ETP, PGC & Decanter running successfully). Ordering
(Mech.-8200 T & Elect.-1500 T) completed.
1/12/2016
Page : 2
SN
SCHEME / PACKAGE
PROGRESS ON DATE
Drawings
Total
Submtd.
Appd/KFR
AAN
Comntd
U/S
BE (A)
BE ( I )
DE (A)
DE ( I )
TOTAL
Activity
19
8
120
82
229
19
10
168
75
272*
16
7
144
60
227
0
1
11
10
22
2
2
6
1
11
1
0
7
4
12
15 M3 Concreting completed.
5 T Str. erected.
Unit
Total vol.
Plan
Jan16
Prog.
Cum. Prog.
Earthwork
M3
30000
1000
0
22800
Concreting
M3
10050
250
0
9800
*-Includes addition drgs.
Strl. supply
T
190
0
0
190
Strl. Erection
T
190
0
0
190
Mech. Eqpt. Ordering
T
509
50
0
459
Elect. Eqpt. Ordering
T
173
0
0
173
Mech. Eqpt. supply
T
509
50
0
459
Elect. Eqpt. supply
T
173
3
0
170
Mech. Eqpt. erection
T
509
0
0
459
Elect. Eqpt. erection
T
173
10
0
163
Nitrification tank I: Part commissioning activity completed on
29.11.14.Nitrification tank II: Major civil work completed.
Drawings
Total
Submtd
Appd/KFR
AAN
Comntd
U/S
Review meeting held on
145
142
0
2
1
BE (A)
145
07.01.16.
BE I
DE (A)
DE I
TOTAL
Activity
4
661
413
1223
4
661
413
1223
Unit
4
647
409
1202
0
0
0
0
Total vol.
0
6
4
12
Jan16
Plan
0
8
0
9
Cum. Prog.
Prog.
M3
Earthwork
250000
5000
0
242000
M3
Concreting
#52000
125
122
51307
T
Strl. supply
#8145
0
0
7764
T
#- Scope revised.
Strl. Erection
#8145
11
10
7731
T
Mech.Eqpt. ordering
7500
7
0
7493
T
Elect Eqpt. Ordering
2500
0
0
2500
T
Mech. Eqpt. Supply
7500
32
0
6593
T
Elec. Eqpt. Supply
2500
0
0
2478
T
Mech. Eqpt. Erection
7500
0
20
5932
T
Elec. Eqpt. Erection
2500
100
40
1540
Part PAC issued on 19.03.15 (for Dispatcher Building D2, 15 nos. APDs).
SCR- 5, 6, 7: Eqpt. erection in progress
New Silo (CDI - 2 nos. & Boiler - 2 nos.): Eqpt. erection in progress..Wagon
Tippler#4: Mech. Eqpt. erection completed.
SCR-3, 4: Trial run with load completed by 22.07.15.
1/12/2016
Page : 3
SN
A7
SCHEME / PACKAGE
Augmentation of Fuel & Flux Crushing &
Screening Facilities (Pkg. 064)
Contr. No. TK 2011/337
Consultant MECON
Agency M/s EPI
Contract price Rs. 272.65 Crs.
Contract signed on: 15.02.11,
Contr. Completion: 14.12.12,
Likely completion Mar16
(Proj. Mgr.- A P Barnwal, DGM, 20131)
PROGRESS ON DATE
10 M3 Concreting completed.
2 T Str. erected.
CHP Area:
Civil work for LTSS-1, Final crushing
station, Bldg. in progress.
Total
BE (A)
BE ( I )
DE (A)
DE ( I )
TOTAL
287
17
375
547
1226*
Activity
Submtd.
256
7
345
468
1076
Unit
Appd/KFR
207
5
278
412
902
AAN
Comntd
31
0
42
1
74
10
2
6
25
43
Plan
Jan16
Prog.
Total vol.
CSP Area :
Emergency coke yard: Eqpt. Erection in
progress.
Civil work for LTSS #2, 3 in progress.
U/S
8
0
19
30
57
Cum. Prog.
M3
Earthwork
95000
3000
1600
87300
M3
Concreting
#18000
500
235
15051
Structure supply
T
7250
250
45
4977
Structure Erection
T
7250
60
18
3570
Mech. Eqpt. ordering
T
2522
186
0
2336
Fuel & Flux area: Civil work for LTSS #4, 5 in Elect Eqpt. Ordering
T
526
0
0
300
progress.
Mech. Eqpt. supply
T
2522
100
0
1693
Elect Eqpt. supply
T
526
30
0
280
Mech. Eqpt. erection
T
2522
30
17
490
Elect Eqpt. erection
T
526
30
0
91
Important activities completed / Highlights
C-line conveyor: Integrated load trial run of new C-line conveyor taken on
07.11.13. CHP area: Civil work for Final crushing station ,LTSS-1 Bldg. in
progress. Coal feeding in Coal Tower started on 27.09.14. 1st Floor Slab of
LTSS#1 cast on 09.10.15.
CSP area: Trial run of Conveyor K11-9B & K11-10B completed.
Emergency coke yard: Eqpt. Erection in progress.
Civil work for LTSS #2, 3 in progress. 1st Floor Slab of LTSS#3 cast on
09.01.16.Fuel & Flux area: Civil work for LTSS #4, 5 in progress.
A 8 Cold repair of Coke Oven Battery no. -9 of CO & CCD (Stage-II approved on 04.08.12) completion: 25 months, Approved cost: Rs. 332.65 Crs. (Consultant CET)
Pkg.-1: Battery Proper
Review meeting scheduled on 19.01.16. Erection of Door frame completed on 02.07.15.
Contract No. TK 2012/ 365 Agency MECON
Temporary Heating in progress.
All 136 nos. WHB assembly erected by 21.07.15..
Contract price - Rs. 150.09 Crs.
TOPR dismantling in progress.
All 136 nos. Buckstay erected by 02.04.15.
Contract signed on : 29.08.12,
Quenching Tower: Civil & Structural work in Erection of temporary tie rods & charging hole completed.
Contr. Completion: 28.08.14,
progress.
Major Refractory erection for Battery proper completed on 13.03.15.
Likely completion Jan16
Cellar:
Eqpt.
Erection
in
progress.
Chimney Heating started on 22.06.15.
(Proj. Mgr. D K Dewangan, DGM,20134)
Wharf: Civil work in progress.
Temporary Heating started on 28.08.15.
TOPR dismantling started on 16.11.15.
Pkg.-4: Instrumentation & Automation
Equipment erection in progress.
All 13 nos. BE drgs. & all 50 nos. DE drgs. Submitted.
Contract No. TK 2012/ 374
Equipment erection in progress.
1/12/2016
Page : 4
SN
A8
Pkg.-8A:
Replacement
of
Ammonia Review meeting scheduled on 21.01.16.
Saturators # 5 & 6 in ASP #2 of CO&CCD
Erection of 1st saturator is in progress.
Contract No. TK 2012/364 Agency Beekay
Contract price - Rs. 5.40 Crs.
Contract signed on : 22.08.12 Cont Completion: 21.08.14,
Likely completion Jan16
(Proj. Mgr. D K Dewangan, DGM,20134)
PGC#1-4:
Illumination work in progress .
A9
1/12/2016
Page : 5
SN
SCHEME / PACKAGE
B. MILLS ZONE
B 1 Civil works for Bar & Rod Mill
(Pkg-051A-01) (Works Pkg.)
Consultant-MECON
Agency: M/s HSCL
Contract Price: Rs 123.93 Crs.
Contract signed on : 30.12.10
Completion period : 29.08.12
Likely Completion: Jan.16
(Proj. Mgr. A K Singh, AGM) 21014
B2
B3
PROGRESS ON DATE
Earthwork for flooring & drain in progress. Concreting for Main Bldg. Column fd/ns (190 nos.) completed on 25.07.14.
Civil work for Chiller Bldg. (Top portion) in Welfare Bldg. RCC work completed on 28.12.13.
Activity
Unit
Total Scope
Jan.16
Cum. Prog.
progress.
(*- Revised)
Plan
Prog.
Earthwork and Concreting for pump Earthwork
M3
325000 *
30
0
324970
foundation at 0-0 m level in Pump area of Concreting
M3
88125 $
1679
54
86500 #
Pumphouse in progress.
$ - Revised Scope as informed by Zone
Pressure grouting and cleaning of ECR-3 # - RCC Figures reported by Zone after reconciliation
basemen, Brickwork & plaster for Welfare Casting for Chimney, Flue duct & Furnace proper completed.
bldg. & final roof lift for O/h tank above ECRs-1, 2,3 & Furnace ECR RCC work completed.
Work Roll shop RCC work completed on 10.06.14.
23 m up to 25 m in progress.
Finishing & Flooring work in Mill area (AB, Slab at 5.0 m of BC Bay b/w Columns 3 to 23 (Furnace Exit area, Roughing,
BC and CD bay of all Blocks) in progress. Intermediate, Finishing mill & Finishing Block exit area) cast.
Cooling Bed and Bar lineRCC work completed.
3 M3 Concreting completed.
Unit
(*- Revised)
Strl. Fabrication
Strl. Erection
T
T
Jan.16
Total Scope
8500 *
8500 *
Plan
Cum. Prog.
Prog.
8500
8253
Status of Drgs.:
DE drgs Approved by MECON 15174 T 1A), further scope increased to 14200 T and further increased to 15500 T.
(combined for both the pkgs.)
Pkg. covers fabrication & erection of structures for Block-3 (partly) and
Block-4 (complete). ie. from Axis- 29 to 47.
Activity
Unit
Total Scope
Jan.16
Plan
Prog.
Cum.
Prog.
Awarded on : 24.11.12,
Contract signed on 15.02.13
Award value: Rs. 47.11 Crs.
Contr. Completion: 23.05.13
Strl. Fabrication
7000 *
200
6393
Strl. Erection
7000 *
500
23
5771.5
(*- Revised)
1/12/2016
Page : 6
SN
B4
PROGRESS ON DATE
SCHEME / PACKAGE
Reheating Furnaces for Bar & Rod Mill Design Engg., ordering, supply &
(Pkg.-049-1)
erection of eqpts. in progress.
Contract No.- TK/2011/335
Rod bending and shuttering for
Consultant - MECON
Concreting of basin of Cooling tower
Agency: M/s Fives Stein, Spain
at 7.4 M level in progress.
Fives Stein, India Beekay
Refractory erection of Furnace Proper
Contract price: Rs. 54.23 Crs.
started on 03.10.15 and erection of
Cont. signed on : 09.02.11
light alumina /alumina bricks in
Cont. Completion: 08.11.12
progress.
Likely compln: Mar.16
1 T Refractory erected.
(Proj. Mgr. J Gopi Krishnan, DGM)
21151
Total
Submtd
Appd/KFR
AAN
74
211
241
287
813
71
210
227
282
790
67
204
217
272
760
0
0
4
1
5
Unit
Total Scope
(*- Revised)
Plan
Prog.
Cum.
Prog.
324
62*
7*
1048*
195*
190*
1090*
1110*
202*
1280*
30
0.5
8
28
0
0
70
50
300
0
0
0
0
0
0
0
0
13
185
Comp.
6.5
1040
167
Comp.
585
858
82.5
167
Activity
Concreting
Mech. Eqpt. (Imp.)Supply
Elect. Eqpt. (Imp.) Supply
Mech. Eqpt. (Ind.) Supply
Elect. Eqpt. (Ind.) Supply
Refractory (Imp.) Supply
Refractory (Ind.) Supply
Mech. Eqpt. Erection
Elect. Eqpt. Erection
Refractory Erection
M3
T
T
T
T
T
T
T
T
Comtd.
4
6
6
9
25
Jan.16
U/S
0
0
0
0
0
of
all
190
Erection of lifting frame assly., Chimney & lateral wall of Furnace completed & of Flue Refactory (Imp.) & all 1090 T
duct 96 % completed Erection of all burners & roof beam of Furnace Proper Refractory
(Indig.)
completed. Alignment of Skid & posts, Charge wall & DA fan completed. Alignment of completed.
all Roller tables & of Furnace actuator without damper completed. All Imported
Refractory received at site on 07.09.15. Pressure testing of indirect cooling water piping
for Furnace comp. on 14.09.15. Erection of Elect.eqpts. restarted on 21.04.15.
B5
Installation of Bar & Rod Mill (Pkg.- Erection and alignment of equipments in
Rolling Mill area, Rolling Mill exit area,
046)
Cooling bed area, Cutting to length
Contract No.- TK/2010/323
area, Product Forming area, Product
Consultant - MECON
Collecting area, Hyd. Cellars, Oil Cellars,
Agency: M/s Danieli & C SpA, Italyetc in progress.
Danieli India, Kolkata - Beekay
Elect. Erection work (on-field cable tray
Contract price: Rs. 406.09 Crs.
work in BC bay, cable laying from
Cont. Signed on : 25.08.10
Switchgear to ECR-1, control cable laying
Cont. Completion : 24.08.12
in Charging area and Mill area, erection
Likely Completion : Mar.16
of MPV panels,etc) in progress.
(Proj. Mgr. - K D Prasad, DGM) 22183
3 nos. Oil filled Transformers of ECR-1
Drawings
Total
Submtd
36
231
268
1280
1815
Appd/KFR
36
231
268
1280
1815
Activity
AAN
35
231
268
1279
1813
Unit
0
0
0
0
0
Comntd
1
0
0
1
2
Jan.16
Plan
Prog.
Total
Scope
U/S
0
0
0
0
0
Cum.
Prog.
B6
Diversion of Nallah passing through De-tilting of Nallah bed b/w Manhole 3 Laying/jointing of pipes for manholes nos. 6 to 9 & 12 to 24 completed.
Activity
Unit
Total
Jan.16
& 4 and preparation for PCC in progress.
Universal Rail Mill layout (Pkg-118 S)
Scope
Plan
Prog.
Agency-M/s Kulkarni & Sahu Buildcon
Laying of pipe between manhole-3 & 4 in
Contract price: Rs 9.68 Crs.
Cont. Signed on: 09.02.12
Completion period : 02.06.12
(Proj. Mgr. - A S P Sarma, DGM) 22187
M3
Cum.
Prog.
Earthwork
Concreting
Supply of RCC Pipes
M3
RM
42000
9500
2450
0
0
0
0
0
0
39200
5360
1900
Laying/jointing of Pipes
RM
2450
1900
1/12/2016
Page : 7
SN
B7
SCHEME / PACKAGE
Civil works for Universal Rail Mill
(Pkg-052A) (Works Pkg.)
Consultant-MECON
Agency: M/s HSCL
Contract price: Rs. 289.51 Crs.
Eff. dt. of Cont. : 07.09.10,
Cont. signed on : 15.09.10
Cont. Completion: 06.03.12
Likely compln: Jan.16
(Proj. Mgr. A S P Sarma, DGM)
22187
B8
B9
PROGRESS ON DATE
Concreting for Column fdns. in URM {Areas37, 38, 39, 41, 43}, Drain work parallel to E
row, in progress.
Apron work in Brushing Bldg. & S/s Bldg. of
RWL area in progress.
RCC work for Sceptic tank of Welding & S/s
Bldgs., work for Pre-cast slab for Sceptic tank
Finishing Bldg. & Brushing Bldg. i/p.
Garland Drain in S/s bldg. 90 % completed.
Concreting for railway track for Axis-1 to 20
comp. and in progress for Axis54 to 82.
Civil work for Chiller Bldg. 90 % completed.
Flooring work in various Areas in progress.
200 M3 Concreting completed.
Earthwork
M3
500000*
500000
Drgs. issued:Concreting (#)
M3
230000 $
6000
737
212638 #
Concreting 2,30,000 M3
$ - Revised Scope as informed by Zone # - RCC Figures reported by Zone after reconciliation
Strl. Fabrication for roof truss, supports & lighting Cum. 32270 T steel collected by M/s HSCL. Strl. fabrication for Cols. & CGs for Blks-1 to 7
walkway & erection for Blocks-1 to 7 (roof truss, completed. Assembly of all 342 columns & all 466 Crane Girders completed.
Cum. all 342 columns & 466 Crane girders erected.
girders, lighting walkway, staircase, etc) i/p.
342 Cols (Blk-152 nos,Blk-242 nos, Blk-355 nos, Blk-459 nos,Blk-545 nos,Blk-644 nos,Blk-7-45 nos)
3 T Strs. erected.
Status of Drgs. :-
26 th Review Meeting
held on 14.02.13.
466 CGs(Blk-1- 70 nos, Blk-2- 54 nos, Blk-3 76 nos, Blk-4- 86 nos,Blk-562 nos,Blk-660 nos &Blk-7-58 nos)
Cum. 492 out of 494 nos. Roof truss erected. 2 no. Long Crane girders at Blk-5 (A row) & 4 no. Long
BE drgs. (Scope) 30000 T (Blk-1-4497 T, Blk-2-3354 T, Blk- Crane girders Blk-7 (B, B row) of 36 m erected. Erection of 58 long trusses (45 m) completed by
3-4441 T,Blk-44415 T,Blk-54271 T, Blk-64500 T, Blk-73600 May.15. 1 no. long Roof girder at AB bay of Block-7 erected.
T, Misc922 T)
Activity
Unit
Total Scope
Structural fabrication
Structural erection
Drawings
Total
50
40
240
954
1284
Activity
Concreting (incl. precast slabs)
Elect. Eqpt. (Ind.) Ordering
Mech. Eqpt. (Imp.) Supply
Mech. Eqpt. (Ind.) Supply
Elect. Eqpt. (Imp.) Supply
Elect. Eqpt. (Ind.) Supply
Mech. Eqpt. Erection
Elect. Eqpt. Erection
Refractories Erection
Jan.16
Cum.
Prog.
(*- Revised)
Plan
Prog.
T
T
30513 $
30513 $
228
1500
1
67
30286
28607
Submtd.
Appd/KFR
AAN
Comtd.
U/S
50
40
240
934
1264
50
39
233
926
1248
0
1
3
1
5
0
0
3
6
9
0
0
1
1
2
Total Scope
(*-Revised)
475*
170*
171*
1800*
5
170*
1971*
175
1845
Plan
32
2
7
20
0.5
5
236
23
143
Unit
M3
T
T
T
T
T
T
T
T
Jan.16
Prog.
0
0
0
0
0
0
3
1
0
Cum.
Prog.
443
168
164
1780
4.5
165
1738
153
1702
ction of moving ducts, Flue tunnel & Chimney comp. Erection of refractory in Combustion air pipe
started on 19.11.14 & in Furnace Proper started on 19.03.15.Erection of Indigenous refractory in
Chimney area comp. & for flue tunnel 98% completed. Erection of Imported refractory completed
on 17.12.15. LCSS-1 & 3 of ECR along with 2 transformers charged by 18.12.15. No-load trial of
Emergency Pump at Pumphouse taken on 21.12.15. Pumphouse MCC of ECR charged on 19.12.15.
Convertor Transformer at ECR charged on 24.12.15. Mixed gas pipeline from TOP to main header
has been internally tested on 26.12.15. 690 V LT Switchboard at ECR charged on 31.12.15. 2 nos.
VFD panels for CA fan charged on 02.01.16.Cold trial of 2 nos. CA fan taken by 08.01.16. Furnace
MCC at ECR charged on 04.01.16. Cold trial of cum. 7 out of 19 pumps taken by 07.01.16.
1/12/2016
Page : 8
$ - Revised Scope
informed by Zone
as
SN
SCHEME / PACKAGE
B 10 Installation of Universal Rail Mill
(Pkg.-047)
Contract No. - TK/2010/322
Consultant - MECON
Agency - M/s SMS Meer GmbH,
Germany - SMS Meer India,
Kolkata -ABB, Bangalore
Contract price: Rs. 1177.40 Crs.
Contract Signed on: 23.08.10
Cont. Completion: 22.06.13
Likely Completion : Jan.16
(Proj. Mgr. -B K Dey, DGM) 20008
PROGRESS ON DATE
(Pkg.047-01)
Consultant-MECON Price: Rs 97.79 Lakhs
Agency M/s Pragya Eqpts.Pvt. Ltd., Indore
Contract Signed on: 13.09.13 Compln:
12.06.14
Contract no. TK/2013/389
Total
Submtd.
Appd/KFR
AAN
Comtd.
U/S
285
321
685
169
285
320
680
158
264
317
629
151
15
3
32
1
6
0
19
3
0
0
0
3
1460
1443
Unit
1361
Total
Scope
6750*
5800
1808
12550
1971
51
Activity
Mech. Eqpt. (Imp.) Supply
Mech. Eqpt. (Ind.) Supply
Elect. Eqpt. (Ind.) Supply
Mech. Eqpt. erection
Elect. Eqpt. erection
T
T
T
T
T
28
Jan.16
Plan
0
350
23
791
50
Prog.
0
0
0
111
20
Drawings
Basic Engg. (A)
Basic Engg. (I)
Detail Engg. (A)
Detail Engg. (I)
TOTAL
Total
Submtd.
Appd/KFR
AAN
37
12
88
253
390
37
12
88
253
390
34
12
86
251
383
1
0
2
0
3
Unit
Total Scope
*- Revised
Comtd
2
0
0
2
4
Jan.16
Plan
Prog.
6750
5450
1785
7471
1422
U/S
0
0
0
0
0
Cum. Prog.
3443
700
Drawings
Total
Submtd.
Appd/KFR
AAN
Comtd
U/S
203
48
270
761
1282
203
48
262
756
1269
203
48
262
752
1265
0
0
0
0
0
0
0
0
0
0
0
0
0
4
4
Unit
Total Scope
(*-Revised)
TOTAL
Activity
Mech. (Manufacturing)
Mech. (B/o items) Ordering
Elect. (B/o items) Ordering
Mech. Eqpt. Supply
Elect. Eqpt. Supply
Mech. Eqpt. Erection
Elect. Eqpt. Erection (incl DSL)
T
T
T
T
T
T
T
2636*
464*
1300*
3100*
1300*
3100*
1300*
Jan.16
Plan
Prog.
400
189
100
50
100
50
0
0
0
0
0
0
1/12/2016
Page : 9
to
be
commissioned for BRM
1500
17 Cranes, 3 Transfer
275
cars & 21 Electric Hoist.
Completed
Eqpt.
to
be
1652
commissioned for URM
1232.9
24 Cranes & 21 Elect.
1465.8
Hoist)
862.9
Cum. Prog.
Eqpt. erection with Crane-106 in BRM & Crane-413, 416, 418 & 421 in URM i/p. LT mechanism with trolley of Crane-101 & 116 in
BRM & Crane -406 of URM area erected. Crane-105 & 116 has been handed over for erection of eqpts. in BRM area.
Drawings
Total
Submtd.
Appd/KFR
AAN
Comtd
U/s
3
Cum. Prog.
Erection of eqpts. of Areas- 1 to 12, 14 to 19, 24 to 34, Hyd. Cellars and Oil cellars i/p. Ern. of Housing in all Mill Stands
comp. ECR-1 (LTSS-1, 2, 3 & 13 along with 8 Xmers & Converter Xmer & MCCs 1 to 5, RTDB-1 to 10, LV drive line up-1)
charged except MV drive lineup-1. ECR-2 (MCC-6 to 9, LTSS-4, 5 & 14 with 6 Xmers, RTDB-11 to 17 & LV drive line up-2)
charged except PDB and MV drive lineup-2. 2 out of 5 Crane PDBs charged.MCC -12 & 13 of ECR-3 charged. LTSS-6
to 9 & 8 nos. Xmers of ECR-3 charged. Converter Xmer-3 & LV drive line up-3 of ECR-3 charged on 19.12.15. Cold trial
of Tandem Mill Entry side extension roller table motors taken on 22.12.15. PDB-M3 at ECR-3 charged on 24.12.15.
MCC-10 & 11 at ECR#3 charged by 28.12.15.Converter transformer (CTR-2) at ECR#3 charged on 26.12.15. Converter
Transformer (CTR-5) & PDB P2 at ECR#3 charged on 30.12.15. RTDB-1 to 27 charged except 22 & 23. MCC-14 &15 at
ECR-3 charged by 01.01.16. LTSS#10 & 11 (including 4 nos. Transformers) charged. MCCs-16, 17&18 of ECR-3 charged
by 07.01.16. Crane PDB - 4 & PDB-P3 at ECR-3 charged on 08.01.16.
Activity
B 12 Hoisting and Handling Facilities Equipment erection with Cranein Bar & Rod Mill and Universal 413, 416, 418 & 421 in URM & with
Crane-106 in BRM in progress.
Rail Mill (Pkg. 030)
Supply & erection of equipments
Contract no. TK/ 2012 / 356
ConsultantMECON
(101, 103, 109, 114, 405, 406, etc) in
Agency-M/s HEC Ltd, Ranchi
progress.
8
6
6
8
4
0
7
3
0
1
0
0
0
1
0
0
0
0
10
30
12
10
(Eqpt.
SN
SCHEME / PACKAGE
B 14 Illumination System for URM, BRM & RWL
PROGRESS ON DATE
Total
20
0
350
71
441
TOTAL
Activity
Total
B 18 Air Drying Plant for Universal Rail Mill and Air Design Engg. & ordering of eqpts. in
Drying and Filtration Plant for BRM (Pkg. -114A)
progress.
Consultant-MECON
Cont. price: Rs 1.34 Crs.
Agency M/s Mellcon Engineers Pvt. Ltd, New
Delhi
Contract Signed:31.03.15
Contract Compln: 30.11.15
9
8
15
31
63
Submtd.
20
0
340
67
427
Unit
Appd/KFR
AAN
Comtd
18
0
194
65
277
Total
Scope
2
0
136
0
138
T
T
448
448
30
40
0
0
Submtd.
Appd/KFR
AAN
Comtd
0
0
0
0
0
0
2
0
3
5
9
8
15
31
63
Unit
9
6
15
28
58
Total
Scope
0
0
8
0
8
Jan.16
Plan
U/S
0
0
2
2
4
Cum. Prog.
Prog.
Jan.16
Plan
370
305
U/S
0
0
0
0
0
Cum. Prog.
Prog.
Total
31
4
302
47
384
Submtd.
31
4
297
47
379
Unit
Appd/KFR
31
4
203
33
271
Total Revised
Scope
AAN
Comtd
U/S
0
0
79
13
92
0
0
6
1
7
0
0
9
0
9
Cum. Prog.
Jan.16
Plan
Total
14
14
13
62
103
Total
5
0
31
44
80
Submtd.
14
13
12
60
99
Unit
Appd/KFR
13
12
11
58
94
Total
Scope
AAN
Comtd
0
0
0
0
0
1
1
0
1
3
Jan.16
Plan
U/S
0
0
1
1
2
Cum. Prog.
Page : 10
Prog.
T
T
420
20
29
10
0
0
391
10
Submtd.
Appd/KFR
AAN
Comtd
U/S
3
0
21
12
36
2
0
0
0
2
0
0
2
2
4
5
0
23
16
44
0
0
0
2
2
Drg. list & datasheets for air filter and air dryer KFR on 17.07.15. GA drgs, P & ID
diagrams, eqpt. list and foundation drawing for air filtration plant and air receiver for
BRM & URM KFR.
1/12/2016
Prog.
B 17 Roll & Repair Shop Equipment for Universal Design Engg., ordering & supply of eqpts. Drawings
Basic Engg. (A)
Rail Mill (Pkg-142-02)
in progress.
Basic Engg. (I)
Contract no. TK/2013/391
Welding rectifier & m/cs, Radial drilling Detail Engg. (A)
Consultant-MECON
m/cs, hack saw, band saw m/cs, lathes, Detail Engg. (I)
Cont. price: Rs 23.90 Crs.
universal milling m/c, Column drilling TOTAL
Agency M/s MACO Corporation, Kolkata
Activity
Contract Signed:26.09.13
m/c, grinding, brazing & welding m/cs,
Contract Compln: 25.09.14
profile redressal m/c, PDBs, etc supplied. Mech. Eqpt Supply
Likely Completion : Jan.16
(Proj. Mgr.- Rakesh Kumar, DGM) 21143
C. STEEL ZONE
SN
C1
PROGRESS ON DATE
SCHEME / PACKAGE
Instn. of Desulphurisation Unit at SMS-II (Consultant-CET) Sanction Cost: Rs 83.90 Crs.
Drawings
Pkg.-IV 180T+50T Ladle Crane
Critical Issue
BE (A)
Contract No TK- 2006/221
Supply of Main Trolley.
DE (A)
Consultant-CET
Start erection of eqpt. by M/s DE I
Agency -M/s Jessop
TOTAL
Jessop.
Cost : Rs. 13.18 Crs
Contr. date : 10.03.06
Contr. comp : 09.06.07
Project Mgr- S.K.Jain, DGM- 1058
C2
2.1
Total
Subm.
40
26
113
179
37
22
68
127
36
17
56
109
1
5
1
7
Unit
Total
vol.
Plan
Activity
Segment repair & mould repair shop for new slab caster at SMS-II, Consultant-CET
Drawing
Aug. of power supply facility for
BE (A)
segment repair & mould repair shop
Contract no. TK/2010/302
Agency-Hindustan Control & Eqpt., Kolkata
Cost : Rs. 2.63 Crs
Contract signed on : 23.02.10
Cont. Completion : 22.02.11
Likely Compl- Jan16
Proj. Mgr- MP Singh, DGM- 2678
2.2
T
T
T
T
Total
15
21
20
56
DE (A)
DE I
TOTAL
Activity
Earthwork
Concrete
Elect. Eqpt. Ord
Elect. Eqpt. Supply
Elect. Eqpt Erection
Submtd.
15
21
19
55
Appd/KFR
AAN
13
19
19
51
Unit
Total Vol.
M3
M3
MT
MT
MT
125
75
32
32
32
Comnt
4
4
Cum. Prog.
Prog.
AAN
U/S
7
7
Jan16
385
52
385
52
Appd/KFR
206
22
24
7
Comtd.
2
2
0
4
0
0
0
0
Jan16
Plan
Progress
U/S
0
0
0
0
Cum.
Prog
125
75
32
32
32
Contract no . TK/2010/320
Agency- M/s Texllence CNC, Pune
Cost : Rs 87.63 Lakhs
Contract signed : 06.08.10,
Cont. Compl. : 05.08.11
Likely Completion- Jan16
Proj. Mgr K. Rajshekhar, DGM- 0518
2.3
2.4
PAC issued with effect from 02.03.15. Load trials successful on 23.07.15.
Machine is down since Aug15 due to inverted screen problem and
electrical problem of post heat furnace.
All machines under M/s Saha had been erected and commissioned,
except universal tool & Cutter Grinder (1 no.) and Hydraulic press which is
erected but not commissioned. Charging of Oxygen line is balance.
1/12/2016
Page : 11
SN
C3
SCHEME / PACKAGE
BOF Shop Technological Package
(Pkg.-025)
Contract No. TK-2008/285
Consultant MECON
Agency-M/s Siemens VAI
Cost Rs. 1352.10 Crs (Revised)
Contract signed : 24.10.08,
Cont. Completion : Aug.11
Likely Compl: Jun16
(Conv.1-Mar16, Conv.2-May16)
PROGRESS ON DATE
Drawing
Total
Subtd.
Appd/KFR
AAN
Comntd
U/S
BE (A)
BE I
DE (A)
DE I
TOTAL
598
282
103
286
1269
597
277
108
279
1261
586
270
102
250
1208
3
1
1
8
13
5
5
5
16
31
3
1
0
5
9
7
0
1
30
38
4
11
9
140
164
0
0
1
8
9
Addl. Drawings
BE (A)
BE I
DE (A)
DE I
TOTAL
Activity
281
226
167
826
1500
Unit
270
215
156
648
1289
Total vol.
Jan16
Plan
C4
T
T
T
T
T
T
T
T
T
T
T
2426
22055
349
2121
4209
22055
2426
349
2121
2059
1095
Prog.
0
150
0
0
30.4
0
76
10
Cum.
Prog.
2426
21970
349
2107
0
21970
2412
349
2105
2058.5
533
Mechanical test for travel of piston of Gas Holder, to its operating limit
conducted on 18.01.14 along with EMD & SMS-II. Standard leak test of
Gas Holder conducted during 04-07.02.14 along with EMD & SMS-II and
joint inspection recorded for 24, 48 & 72 hrs. Electrical equipment
erection started on 04.11.14.
Erection of JBs, earthing strip and
earthing is in progress.
Cable shifting and dressing in
progress.
As on date total 76110 m cable
laying completed, out of which
8100 m laid this month.
0.5
T
elect.
eqpt
erection
completed.
Drawings
BE (A)
BE I
DE (A)
DE I
TOTAL
Addl. Drawings
BE (A)
BE I
DE (A)
DE I
TOTAL
Activity
Total
Submtd
Appd/KFR
723
108
266
937
2034
722
108
265
908
2003
706
108
258
902
1974
230
496
57
1802
2585
Unit
229
496
57
1795
2577
Total Vol.
T
T
T
T
T
T
T
T
T
T
3299
10791
239
1176
3299
10791
239
1176
2200
971
AAN
Comntd.
16
0
6
1
23
0
0
0
2
2
1
0
0
1
2
Jan16
Plan
Prog
0
0
0
0
50
0
0
0
78.5
3.846
0
0
0
0
0
U/S
0
0
1
3
4
0
0
0
6
6
Cum. Prog.
3294
10682
239
1120
3294
10198
239
1097
0
201.996
1/12/2016
Page : 12
SN
C5
PROGRESS ON DATE
SCHEME / PACKAGE
Instln. Of Secondary Refining Unit for Erection of Storage Bunker is in
SMS-III (Pkg.-025A)
progress.
Cont. No. 2010/303
Consultant MECON
Agency-M/s WISDRI, China
Cost : Rs. 205.56 Crs
Contract signed on 08.03.10,
Cont. Completion : : 22.09.12,
Likely Compl: Jun16
(LF1 & ARS1 - Feb'16,
LF 2 & 3, ARS 2 & 3 - Jun'16,
RH - Jun'16)
Proj. Mgr V.K. Rai, DGM - 0563
179
173
146
523
1021
Total
BE (A)
BE (I)
DE (A)
DE ( I )
TOTAL
Submtd.
179
173
146
510
1008
Submtd.
3
4
10
75
92
Activity
Unit
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
Appd/KFR
176
171
145
489
981
Appd/KFR
AAN
3
1
1
0
5
AAN
3
3
9
64
0
1
0
2
79
Total
Vol.
1698
1652
303
873
2150
353
480
1698
1652
2150
2150
303
873
3350
1176
Comntd
0
0
0
13
13
Comntd
0
0
1
7
8
Jan16
Progress
Plan
0
0
166
0
0
120
96
0
26
0
0.8
U/S
0
1
0
8
9
U/S
0
0
0
2
2
Cum.
Prog.
1698
1652
303
873
2150
353
0
617
304
691
248.901
208
468
83.99
137.3
1/12/2016
Page : 13
SN
C6
SCHEME / PACKAGE
Instln. of Hot Metal De-sulphurisation
Unit for SMS-III (Pkg.-027)
Contract No. TK-2008/283
Consultant MECON
Agency-M/s ESM USA-Beekay Engg.
Cost Rs. 37.73 Crs
Contract signed: 06.10.08 (Eff. date
06.03.09)
Contr. completion : 05.03.11,
Likely Compl: Mar16
Proj. Mgr -. N.V.Joshi, DGM-0799
PROGRESS ON DATE
Total
Submtd
Appd/KFR
AAN
Comtd
U/S
BE (A)
55
61
74
348
55
61
67
322
42
58
55
315
2
0
0
0
10
3
12
6
1
0
0
1
BE I
DE (A)
DE I
TOTAL
538
BE (A)
BE I
DE (A)
DE I
TOTAL
Activity
C7
Kiln 3 -
Drawings
Total
BE (A)
BE I
DE (A)
DE I
TOTAL
73
95
186
280
634
Activity
Earthwork
Pilling (Scope revised)
Concreting
Refractory ordering
Tech. Structures Supply
Bldg. Structures supply
Structures erection
Mech. Eqpt. Supply. (Imp.)
Mech. Eqpt. Supply. (Indg.)
Elect. Eqpt. supply. (Imp.)
Elect. Eqpt. Supply. (Indg.)
Refractory supply
Mech. Eqpt. Erection
Elect. Eqpt. Erection
505
470
Addl. Drawings
3
3
1
1
10
9
14
13
0
0
1
1
Jan16
Plan
Progress
Unit
Total Vol.
T
T
T
T
T
T
T
T
T
T
T
T
15
300
2
60
420
420
15
300
2
60
315
62
5
10
Appd/KFR
AAN
Submtd.
73
95
186
277
631
Unit
M3
Nos.
M3
T
T
T
T
T
T
T
T
T
T
T
72
95
184
277
628
Total vol.
108000
792
21195
4000
8364
2750
11114
21
2047
1.5
1000
4000
2068
1001.5
31
2
0
0
Cum.
Prog.
15
295
2
60
420
0
15
295
2
5.5
5
0
0
0
Comtd
1
0
0
0
0
1
0
1
1
2
Jan16
Plan
Prog.
200
50
25
106
10
9
0
45
24
270
76
18
9.5
7.6
5.5
U/S
0
0
0
0
0
Cum Prog
107302
792
21026
4000
8339
2750
10154
21
2032
1.5
994.5
0
1700.6
720.3
Chilled water line testing done at ECR Building on 03.07.15. No load trial
taken for 2 nos. blowers of Kiln 2 on 13.07.15. No load trial taken for 2 more
blowers of Kiln 2 on 17.07.15. 1 no. & PCC charged at Kiln-1 on 25.07.15. No
load trial taken for 3 nos. blowers of Kiln 1 on 27.07.15. 1 no. transformer (2
MVA) charged for Kiln no.1 on 25.08.15. Total 9 out 12 nos trans. charged.Trial
run taken for vibro feeder of Kiln no.2 on 25.08.15. MCC of Kiln1 & 2 Charged
on 28.08.15. 2 out of 3 nos 200 KVA lighting transformers & MLDB charged on
26.11.15.
1/12/2016
Page : 14
SN
C8
C9
Activity
Drawing
Plan
Appd/KFR
34
4
53
182
273
Unit
T
T
T
T
T
T
T
Jan16
Progress
Cum. Prog.
AAN
34
4
49
170
257
0
0
0
0
0
Total
vol.
507
494
760
3686
494
760
3686
Plan
9
300
300
100
10
Comntd.
0
0
0
9
9
Jan16
Progress
U/S
0
0
4
3
7
Cum.
Prog.
498
173
760
1540
106
749.3
0
Mech. eqpt. Supply started on 11.01.14. Elect. Eqpt. Supply started on 27.05.14.
Drawing
Total
Submtd.
96
79
316
449
70
70
175
220
940
535
BE (A)
BE I
DE (A)
DE I
Total
Activity
Appd/KFR
60
60
115
202
Unit
Submtd.
34
4
64
182
284
Total
Activity
Total
vol.
Consultant-MECON
Unit
BE (A)
BE I
DE (A)
DE I
TOTAL
SCHEME / PACKAGE
Installation of Cranes for BOF & CCP
(Pkg.-029A) (7Nos 300T + 80 T Cap.)
T
T
T
T
T
T
437
Total vol.
3484
233
3484
233
3484
233
AAN
2
0
0
0
2
Plan
300
100
200
50
0
0
Comntd.
0
5
30
0
35
Jan16
Progress
U/S
8
5
30
18
61
Cum.
Prog.
1511
10
0
0
0
0
Drawing
Total
Submtd.
201
52
210
508
971
201
52
210
505
968
BE (A)
BE I
DE (A)
DE I
Total
Activity
Appd/KFR
Unit
T
T
T
T
T
T
200
51
205
501
957
Total vol.
704
329
704
329
704
329
AAN
1
0
0
1
2
Plan
10
200
40
Comntd.
0
0
0
0
0
Jan16
Progress
-
U/S
0
1
5
3
9
Cum.
Prog.
704
329
694
329
385
50
1/12/2016
Page : 15
SN
SCHEME / PACKAGE
C 12 Cast in situ bored piling work in SMS-III
complex (Pkg.-033-A 1)
PROGRESS ON DATE
Nos.
Nos.
Nos.
Earth Work
Concreting(PCC)
M3
M3
Concreting(RCC)
M3
Activity
Jan16
Cum. Prog.
Plan
Prog
8287
7163
15450
239490
3000
2000
Unit
Earth work
Concreting For BOF
-For CCP
Total Concreting
Consultant MECON
Agency-M/s Simplex Infrastructures
Cost : Rs. 330.06 Crs (Revised)
Award Dt. 11.02.13
Contract signed: 28.02.13
Cont. Compl. : 30.04.14.
Likely Completion: Jan16
Proj. Mgr N.V.Joshi, DGM-0799
Total Vol.
8287
7163
15450
239490
3000
733
Consultant-MECON
Agency -M/s HSCL
Cost Rs 191.37 Crs (Revised)
Award Dt. 10.02.11. Cont. Signed: 21.02.11
Cont. compl. 20.10.12.
Unit
Total Vol.
M3
M3
M3
M3
460566
104411
103512
207923*
Jan16
Cum. Prog.
Plan
Prog
3000
873
1451
2824
1466
294
260
554
250037
84381
92794
177175
Activity
Unit
MT
MT
MT
MT
MT
MT
MT
Total Vol.
106947
57349
42601
99950
57349
42601
99950
Jan16
Plan
Prog
Cum. Prog.
1000
1100
400
1500
1425
1024
2449
0
390
100
490
520
264
784
100500
52452
38419
90871
46447.11
36125.89
82573
89952 T (51231 & 38721) design drawing issued by MECON. 53884 T (BOF) & 42687 T
(CCP) drgs approved by MECON.
Drawing
Total
BE (A)
DE (A)
DE ( I)
TOTAL
Submtd
Appd/KFR
AAN
Comntd
U/S
21
27
38
86
Unit
21
27
38
86
Total vol.
0
0
0
0
0
0
0
0
0
0
0
0
Cum.
Prog.
21
27
41
89
Activity
Jan16
Plan
T
T
T
T
T
T
187.3
44.5
187.3
44.5
187.3
44.5
7.3
2.5
17.3
9
50
20
Prog.
180
42
180
42
125
15
All parts of 75/15 T crane erected and load test completed on 04.07.15.
1/12/2016
Page : 16
SN
C 17
SCHEME / PACKAGE
Inter Plant Pipe Conveyor from RMP-3
to RMP-2 (Pkg.-140)
PROGRESS ON DATE
Pipe conveyor started and trial run is
under progress.
Contract no . TK/2011/334
Consultant- MECON
Agency : M/s FL Smidth Pvt. Ltd
Cost- Rs 58.11 Crs
Contract Signed : 04.02.11,
Cont. Completion : 03.05.12
Likely Completion : Jan16
BE (A)
BE I
DE (A)
DE I
TOTAL
Total
Submtd
50
27
145
60
282
50
21
142
53
266
48
19
141
53
261
Unit
Total vol.
Activity
Appd/KFR
AAN
Comntd.
0
0
0
0
0
1
2
0
0
3
Jan16
Plan
U/S
1
0
1
0
2
Cum Prog.
Prog.
Earthwork
M3
9700
9700
5000
Concreting
M3
5100
20
Mech. equipment Ord
T
558
558
Elect. equipment Ord
T
200
200
Bldg Strl Fab
T
1600
1600
Bldg Strl Supply
T
1600
1600
Tech. Strl Supply
T
55
55
Strl Erection
T
1655
1654.5
0.5
Mech. Eqpt supply
T
558
556
2
200
Elect. equipment Supply
T
200
Mech. Eqpt erection
T
558
549
9
Electrical Eqpt erection
T
200
198
2
All 133 nos. gallery erection completed on 05.02.15.Electrical eqpt supply completed on
11.03.15. Conveyor belt laying in RMP-2 started on 28.04.15. 2 nos. transformer (2 MVA)
charged at S/S of RMP-2 end on 03.07.15 & 04.07.15. No load trial taken for 2 nos. motors at
tail end on 11.07.15 & another 1 no. on 14.07.15.MCC Panel of RMP-III end charged on
13.07.15. No load coupled trial (motor with gear) of 2 nos motors at head end (RMP-II)
taken on 15.07.15. & no motor at tail end (RMP-III) taken on 16.07.15. Pipe conveyor started
on 21.10.15.
C 18
Activity
Unit
Total vol.
Jan16
Plan
Cum Prog
Prog.
T
T
T
T
T
T
T
T
T
898
53
34535.6
16019
28
10189.5
707
21293.03
25
5829.5
191
13242.57
30
18
2460.74
1376
5
0
1605.93
674
25
18
854.81
702
15
100
15
10495.21
5700
0
0
0
100
15
15
4795.21
Converter-2- Top cone erected on 30.01.15. Converter-3- Erection of Trunnion
ring assembly completed on 16.02.15. Converter-3 bottom Shell erection
completed on 28.02.15. Finfan Cooler erected at Pump house on 17.03.15.
Converter-2 tilting device installation done on 14.09.15. Converter-1- Cooling
Stack Part1 & 2 positioned at location on 23.11.15. Converter-3- Tilting drive
assembly completed on 08.12.15. Refractory work started in caster area from
21.12.15.
1/12/2016
Page : 17
SCHEME / PACKAGE
SN
C 20 Illumination,Earthing & lighting protection system
PROGRESS ON DATE
Total
Submtd
Appd/KFR
AAN
BE (A)
Comntd.
2
U/S
BE (I)
DE (A)
13
10
DE I
TOTAL
47
72
35
57
Unit
0
0
12
18
Activity
26
38
Total vol.
299.15
T
T
T
Jan16
Plan
0
299.15
299.15
1
1
Cum Prog
Prog.
160
0
C 21
92
Unit
47
Total vol.
Earthwork
M3
Concreting
M3
Mech. equipment Ord
T
Elect. equipment Ord
T
Mech. equipt supply
T
Bldg Strl Fabrication
T
Mech. Eqpt supply started on 06.01.16
Drawing
Total
BE (A)
DE I
TOTAL
Compl.Dt. 28.02.14
Submtd
9
116
96
DE (A)
221
Activity
129
Activity
Consultant MECON
9
5
21
12
DE I
C 23
Appd/KFR
14
7
46
25
DE (A)
Total
Submtd
19
17
50
43
BE I
Total
BE (A)
Contract no . TK/2011/343
Consultant- MECON
Agency M/s OGPE
Cost : Rs. 9.18 crs
Cont. signed: 19.04.11
Effective Dt. of contract: 16.03.11
Contl. completion: 15.03.12
Likely Completion : Mar16
Drawing
Appd/KFR
6
94
78
178
Unit
Total vol.
Comtd.
1
0
4
3
8
Jan16
Plan
3400
1070
300
50
300
50
7
103
85
195
T
T
T
T
AAN
150
250
AAN
2
0
8
2
25
12
Cum Prog
120
Comntd.
1
4
6
11
Jan16
2700
230
290
40
120
0
U/S
BE (A)
BE I
DE (A)
DE I
Total
13
39
48
3
103
Activity
13
36
45
3
97
Unit
Cum Prog
885
Plan
-
175
50
31.67
885
30
480
885
10
30
38
2
80
Total vol.
Prog.
-
696.7
Mech. Eqpt. Ordering
T
5.1
Elect. Eqpt. Ordering
T
696.7
Mech. Eqpt. Supply
T
5.1
Elect. Eqpt. Supply
T
Mech. Eqpt supply started on 05.01.16
1/12/2016
Page : 18
1
0
0
0
1
Jan16
Plan
0
0
0
0
0
2
1
3
885
Mech. Eqpt. Supplied started from 16.10.14. Electrical ordering startred from 04.03.15. Mech. Eqpt
erection started on 09.11.15. Piping work started on 29.12.15.
Drawing
Total
Submtd Appd/KFR
AAN
Comtd.
U/S
Prog.
30
0
3
0
3
U/S
2
2
13
8
2
5
7
1
15
0
1
0
0
1
Cum Prog
Prog.
340
661.5
4.86
340
SN
SCHEME / PACKAGE
D 1 Installation of Buffer Vessels and
Pressure Reducing & Metering Stn. for
Oxygen, Nitrogen & Argon (Pkg. 075B)
Consultant-MECON,
AgencyM/s Blue Star Ltd, Kolkata & BHPV,
Visakhapatnam
Contract price Rs. 51.39 Crs.
Contract signed: 07.07.12 (Eff. date 06.07.12)
Contr. Completion : 05.07.13
Likely Completion : Jan.16
Proj. Mgr. R.K. Baghel, DGM, 3571
PROGRESS ON DATE
Total
12
91
58
161
Total
Additional drawings
DE (A)
71
DE I
14
Total
85
Activity
Submtd.
Appd/KFR
AAN
12
91
55
158
10
80
45
135
0
8
1
9
2
3
9
14
0
0
0
0
70
9
79
Unit
65
8
73
Total
vol.
14050*
1673*
292*
3
0
3
2
1
3
0
0
0
Cum.
Prog.
13950
1580
260
Earth work
Concreting
Tech. Strl. Fabrication
M3
M3
T
T
T
T
T
T
T
T
292*
1860*
2.2*
1860*
2.2*
1860*
2.2
Comntd.
Jan.16
Plan
100
70
10
Prog.
U/S
30
230
0
0
0
0.2
30
0.3
1860
2.2
1847
1.8
1768
1.7
Total
10
138
133
281
Submtd.
10
138
133
281
Unit
Appd/KFR
10
138
133
281
Total
vol.
9500
950
410
AAN
Comntd.
0
0
0
0
0
0
0
0
Jan.16
Plan
-
Prog.
U/S
0
0
0
0
Cum.
Prog.
9500
950
410
Earth work
Concreting
Tech. Strl. Fabrication
M3
M3
T
410
410
T
T
T
T
561.3
2
561.3
2
561.3
2
561.3
2
Total
4
9
13
1/12/2016
Submtd.
4
9
13
Unit
T
T
T
Page : 19
Appd/KFR
4
9
13
Total
vol.
6
6
6
AAN
Comntd.
0
0
0
0
0
0
Jan.16
Plan
-
Prog.
6
6
2
U/S
0
0
0
Cum.
Prog.
6
6
2
SN
E
E1
2.1
SCHEME / PACKAGE
PROGRESS ON DATE
Total
Submtd.
122
6
65
142
335
BE (Appl.)*
BE (Info.)
DE (Appl.) *
DE (Info.) *
TOTAL
Appd/KFR
120
6
64
135
325
Activity
Concreting
Bldg. strs. Erection
Techno. Strs. Erection
Mech. Eqpt. Supply
Elect. Eqpt. Supply
Mech. Eqpt. Erection
Elect. Eqpt. Erection
119
5
58
130
312
M3
T
T
T
T
T
T
Comntd.
0
0
3
1
4
1
1
3
3
8
Jan.15
Total
vol.
*1400
*383
* 461
*267
*20
*267
*20
Unit
AAN
Plan
25
3
82
1
3
68
12
Prog
11
13
U/S
0
0
0
1
1
Cum.
Prog.
1375
380
390
266
17
212
8
to
M/s
Scintillant
on
Consultant-MECON
Cost: Rs. 7.99 Crs.
Contract signed on: 19.06.10,
Drawings
Total
BE (Appl.)*
BE (Info.)
DE (Appl.) *
DE (Info.) *
TOTAL
Activity
21
2
56
70
149
Unit
Concreting
Techno. Strl erection
Elect. Eqpt. Supply
Mech. Eqpt. Erection
Elect. Eqpt. Erection
Submtd
21
2
57
72
152
M3
T
T
T
T
Total
vol.
400
60
19.25
582
19.25
Appd/KFR
AAN
21
2
56
66
145
0
0
0
0
0
Jan.15
Plan
0
0
0
0
0
Comntd
0
0
0
4
4
Prog
U/S
0
0
0
0
0
Cum.
Prog.
350
57
18.75
543
13
Drawings
Total
6
6
3
26
41
BE (Appl.)
BE (Info.)
DE (Appl.)
DE (Info.)
TOTAL
Submtd
4
2
0
2
8
Appd/KFR
4
0
0
0
4
AAN
0
2
0
2
4
Comntd
0
0
0
0
0
U/S
0
0
0
0
0
Revised Drawing & equipment list has been submitted by M/s Primetals
on 16.11.15. Site activities inaugurated by GM I/c (Projects) on 19.11.15.
1/12/2016
Page : 20
SN
SCHEME / PACKAGE
E3
PROGRESS ON DATE
Commissioning activity in progress.
Defect rectification job in progress.
Total
BE (Appl.)*
BE (Info.)
DE (Appl.) *
DE (Info.) *
TOTAL
126
22
295
215
658
Activity
Earth work
Concreting
Bldg. Strl. fabrication
Bldg. Strl. Erection
Tech. Strl. Erection
Mech. Eqpt supply
Mech. Eqpt Erection
Elect. Eqpt Erection
*- Scope revised
Submtd. Appd/KFR
AAN
Comntd
U/S
122
0
4
0
126
22
0
0
0
22
293
0
2
0
295
214
0
1
0
215
658
651
0
7
0
Jan.15
Cum. Prog.
Total
Unit
Plan
Prog.
vol.
M3
*68050
37
68013
M3
*19700
1
19699
T
*3451
1
3450
T
*3451
30
3340
T
*503
3
500
T
* 2600
10
2590
T
* 2600
40
2458
T
*1960
40
1717
1960
Drawings
BE (Appl.) *
BE (Info.)
DE (Appl.) *
DE (Info.) *
TOTAL
Total
Submtd
334
25
457
642
1458
297
18
530
496
1341
1/12/2016
Page : 21
Appd/KFR
AAN
Comntd
U/S
15
10
38
1
0
0
96
46
58
8
14
1
97
120
70
Jan.15
Cum.
Activity
Unit
Total vol.
Prog.
Plan
Prog.
Earth work
M3
*375000
1140
372780
Concreting
M3
*100888
1264
157
99664
Bldg. strs. Fabrication
T
*14597
983
11906
Bldg. strs. Erection
T
*14597
1164
139
8618
Techno. Strs. Fabrication
T
*4487
356
3808
Techno. Strs. Erection
T
*4487
687
593
Mech. Eqpt Ordering
T
*3946
296
3650
Elect. Eqpt Ordering
T
*1589
209
1380
Mech. Eqpt Supply
T
*3946
350
3559
Elect. Eqpt Supply
T
*1589
200
1170
Mech. Eqpt Erection
T
*3946
440
5
2917
Elect. Eqpt erection
T
*1589
250
4
161
WT Complex: Rotational drive system flushing jobs of WT completed on 18.06.15. No
load rotational trial of Wagon Tippler (only upto 45 degree) taken on 24.06.15. Long
travel trial run, movement of Boom Conveyor & Luffing of Boom of Stacker No. 4B
conducted on 26.08.15. Trial & Testing of Twin Boom Stacker No. - 5B conducted
successfully on 30.09.15. Trial run of Wagon Tippler with Side Arm Charger (without
wagon) taken on 01.01.16. Erection of 1 span conveyor gallery of conveyor Z12C1/C2 across the Tandula Canal completed on 07.01.16. Excavation for Junction
House L-10 started on 09.01.15.
234
17
330
473
1054
SN
SCHEME / PACKAGE
PROGRESS ON DATE
F. BF ZONE
F1
F2
2.1
Drawings
BE (Appl.)*
BE (Info.) *
DE (Appl.) *
DE (Info.) *
Total
517
1204
3026
3507
8254
TOTAL
Activity
Unit
Earth work
M3
Concreting
M3
Bldg. Strs. Fabrication
T
Bldg. Strs. Erection
T
Techno. Strs. Fabrication
T
Techno. Strs. Erection
T
Mech. Eqpt Ordering (Imp.)
T
Mech. Eqpt Ordering (Indig.)
T
Elect. Eqpt Ordering (Imp.)
T
Elect. Eqpt Ordering (Indig.)
T
Refractory Ordering (Imp.)
T
Refractory Ordering (Indig.)
T
Mech. Eqpt Supply (Imp.)
T
Mech. Eqpt Supply (Indig.)
T
Elect. Eqpt Supply (Imp.)
T
Elect. Eqpt Supply (Indig.)
T
Refractory Supply (Imp.)
T
Refractory Supply (Indig.)
T
Mech. Eqpt. Erection
T
Elect. Eqpt. Erection
T
Refractory Erection
T
Submtd
Appd/KFR
501
1159
3024
3449
8133
473
1092
2804
3322
7691
Total vol.
*260000
* 81000
*24785
*24785
*20404
*20404
*4223
*8757
54
*510
*2144
21022
*4223
*8757
54
*510
*2144
21022
*12980
*564
23166
AAN
7
2
85
24
118
Comntd.
Jan.15
Plan
Prog
355
100
186
400
13
30
0
7
50
145
5
500
U/S
21
65
122
91
299
21
4
9
150
21
74
0
0
13
12
25
Cum. Prog.
260000
80666
24785
24002
20404
19711
4223
8757
54
510
2144
20622
4210
8706
51
502
2144
20500
12272
552
22178
Leakage testing of cooling water circuit No. 3 of BF-8 completed on 03.10.15. 1 No. 2 MVA Transformer
(57A-1T) 6.6KV/0.433 KV, at Central Contrl Room along with PCC 57-A charged from HTSS - 57, feeder No. 617 on 06.10.15. 2 Nos. 2 MVA Transformer (56J - 1T & 2T) 11 KV / 0.433 KV at GSTS-1 along with PCC 56J
charged from HTSS No. - 56 feeder No. - 12 & 55 on 10.11.15.
Up-gradation of Stoves No. 10, 11 & 12 of Blast Furnace #4 (Proj. Mgr. S.K. Ghosh, DGM) 20274 (Consultant CET), Stage-II approval received on 12.03.13 at a sanction cost of Rs. 70.65 Crs.
Jan.15
HTS design for Achieving Higher Hot Blast
Total issued drgs by CET -152/162 Nos.
Activity
Unit
Total vol.
Cum. Prog.
Plan
Prog
Temperature (Pkg. WP-01)
(52/54 Strl, all 7 Utility, 50/55 Refractory,
Award letter No.: 5(2934)/349,
Date of Award :16.03.13
Agency : Evo Tech, Bhilai Award value Rs. 18.44 Crs,
Contr. Completion: 15.11.14
2.2
Review
Meeting
15.07.15.
held
on
Earth work
M3
1900
0
200
Concreting
M3
377
75
136
Techno. Strl Fabrication
T
995
60
165
Techno. Strl Erection
T
995
75
165
Pkg. No. SP-02 Stove Refractory Material (18 items) 2210.7T/7274.47T Supplied.
Pkg. No. SP-03: -16.2/48.6T Columns, 17.1/51.3T Girders & 27.9/83.7T Grids supplied.
Pkg. No.SP-04: All 15 Stove Valves, Lubrication & Hydraulic system (1 No. each) supplied.
Pkg. No. SP-05 Expansion joints: - All 5 Nos. Expansion joint supplied. Casting of both CA fan
Apprd /KFR
23
20
43
Unit
Total vol.
T
T
43.5
22.7
1/12/2016
Page : 22
AAN
1
1
2
Commented
0
3
3
Jan.15
Plan
-
Prog
U/S
1
0
1
Cum. Prog.
43.5
22.7
SN
2.3
SCHEME / PACKAGE
PROGRESS ON DATE
Design
engineering,
equipment
ordering & supply is in progress.
Total
BE
DE (Apl. Cat.)
DE (Info. Cat.)
TOTA
14
58
31
103
Submitted
Approved /KFR
AAN
Commented
U/S
14
52
15
81
13
39
5
57
1
5
2
8
0
6
7
13
0
2
1
3
Activity
Unit
Total vol.
T
T
* 64
* 64
Jan.15
held
on
Review meeting
04.12.15.
held
on
Review Meeting
05.01.15.
held
on
Cum. Prog.
Prog
Plan
0
0
Review meeting
30.10.14.
61.5
57.4
Drawings
Total
BE (Appl. Cat.)*
78
110
94
371
653
BE (Info. Cat.)*
DE (Appl. Cat.)*
DE (Info. Cat.)*
TOTAL
Consultant - MECON
(Agency M/s Qinhuangdao Qinye Heavy Ind.
with Associated Industrial Furnace,
Cost: Rs. 108.20 Crs.
Contract signed: 10.09.10,
Contr. completion: 09.05.12
Likely completion: Jan.16
(Proj. Mgr. Mr. B.K. Prasad DGM) 20271
*- Scope revised.
Submitted
Approved /KFR
AAN
Commented
U/S
77
110
88
371
646
62
110
78
368
618
15
0
1
0
16
0
0
9
3
12
0
0
0
0
0
Activity
Unit
Total vol.
Earth work
Concreting
Bldg. Strs. Fabrication
Bldg. Strs. Erection
Techno. Strs. Fabrication
Techno. Strs. Erection
Mech. Eqpt Ordering (Indig.)
Elect. Eqpt Ordering (Indig.)
Mech. Eqpt Supply (Imp.)
Mech. Eqpt Supply (Indig.)
Elect. Eqpt Supply (Imp.)
Elect. Eqpt Supply (Indig.)
Refractory Supply (Imp.)
Refractory supply (Indig.)
Mech. Eqpt. Erection
Elect. Eqpt. Erection
M3
M3
T
T
T
T
T
T
T
T
T
T
T
T
T
T
*12000
*4700
*875
*875
*265
*265
*370
100
2200
*370
25
100
*1474
717
*2570
125
Jan.15
Plan
Cum. Prog.
Prog.
0
55
3
25
6
0
-
10990
4622
875
872
265
190
364
100
2200
295
25
75
1374
168
2308
54
0
2
All imported items 2200 T Mech. Eqpt. & 25 T Elect. Eqpt. Ordered. Refractory ordering
(Imported & Indig.) completed. Erection of all 12 Nos. TLC (Torpedo Ladle Car)
completed by 31.05.15. Rail Laying at TLRS (566 RM completed). Sheeting job (6410
Sq. M out of 7000 Sq. M. completed).
F4
*- Scope revised.
Drawings
BE (Appl. Cat.)
BE (Info. Cat.)
DE (Info. Cat.)
Total
Total
Submtd
Appd/KFR
6
20
20
46
6
20
20
46
6
20
20
46
Activity
Unit
T
T
T
T
T
Total vol.
*40
*107.8
61
273
0.17
AAN
Comntd.
U/S
0
0
0
0
0
0
0
0
0
0
0
0
Jan.15
Plan
Prog
0
-
Cum. Prog
0
107.8
61
273
0.17
All 6 Nos. BE (Appl. Cat.), 20 Nos. BE (Info. Cat.) & 20 Nos. DE (Info. Cat.)
Drawings have been approved. All Elect. Eqpt. & Mech. Eqpt. (Indig. &
Imported) ordered & Supplied.
1/12/2016
Page : 23
SN
SCHEME / PACKAGE
F5
PROGRESS ON DATE
Drawings
BE (Appl. Cat.)
DE (Appl. Cat.)
DE (Info. Cat.)
Total
F6
6.1
10
46
62
118
10
9
11
30
5
2
0
7
U/S
5
5
5
15
0
2
6
8
0
0
0
0
Jan.15
Activity
Unit
Total vol.
Plan
Review meeting
08.01.16.
held
on
Cum. Prog.
Plan
21
21
Stage-II Approved on 16.02.11 at a cost of Rs. 21.27 Crs. (Rev. on 10.09.13) with completion period 14 months(Apr.12)
Rebuilding of Stove No. 18 of BF-6 (Consultant CET)
Total
Submtd
Appd/KFR
AAN
Comntd.
U/S
Electrical,
Instrumentation
&
Supply of balance Electrical equipment Drawings
BE
(Appl.)
20
20
16
1
3
0
Automation (Pkg-5)
(HT, LT Cable and Vacuum Contactor
DE (Appl.)
37
36
31
3
2
0
Agency: Hindustan Controls & Eqpt. P. Ltd.
Panel) is to be done.
DE (Info) *
TOTAL
F7
Total
22
79
Activity
20
76
Unit
19
66
Total vol.
0
4
1
6
Jan.15
Plan
0
0
Cum. Prog.
Prog.
Contract signed with M/s Enviropol Engineers Pvt. Ltd., Noida on Kickoff meeting held on 29.12.15.
08.12.15 at a total price of Rs 1,56,67,039/- with completion period 9
months.
G. POWER ZONE
G 1 Augmentation of MSDSs & Installation MSDS-5:
Lighting jobs in progress.
of MSDS-VII (Pkg.-070)
Charging of outgoing feeders upto reactors
Contract No. TK-2008/282
are in progress (For sections 4 to 9 - 30 feeders
(Consultant-MECON)
are charged including 3 reactors for
(Agency M/s Alstom)
buscouplers).
Cont. signed on : 25.09.08
Control cable laying and termination at MSDS-1
Contr. Completion : 24.09.10
(for 132 KV outgoing feeder to MSDS-4) is in
progress.
Cost: Rs. 216.25 Crs.
PAC issued on 19.03.15 w.e.f. 03.02.15.
Likely completion: Jan.16
(Proj. Mgr. Mr. P. Subba Rao, DGM) 21090
Retrofit job:
At MSDS-II, dismantling of old panels is being
carried out for erection of 132 KV panels of 80
MVA Transformer -1T.
At SS 31 (MSDS-3), door preparation jobs for
retrofit of 6.3 MVA-3 T in progress.
Change
order
for
capacity MSDS-5:
enhancement of MSDS-4 & MSDS-5
Lighting jobs in progress.
under Augmentation of MSDSs -7 (Pkg.
70) Dt. Of issue of change order: 11.10.11,
Contract Price: 4.57 Crs.
Contractual Completion: 10.09.12.
*- Scope revised.
Jan.15
Cum.
Plan
Plan
Progress
Elect. Eqpt. supply
T
2425
1.5
2423.5
Mech. Eqpt. Erection
T
580
3
577
Elect. Eqpt. Erection
T
2425
23.5
2401.5
All 955 Nos. Drawings have been approved. Preliminary Acceptance Certificate
(PAC) for subject contract issued on 19.03.15 w.e.f. 03.02.15.
Retrofit jobs: Door Retrofit job of 11 KV Cubicle-2 (Spare feeder) at MSDS-2
completed on 24.10.15.
MSDS-4: Inauguration of MSDS-4 done by CEO, BSP on 29.10.13.
MSDS-5: 3 Nos. 11 KV feeders charged upto outgoing of reactors (Cubicle No. 103,
110 & 133) at MSDS-5 on 24.11.15. 6.6KV Section-2 connected Neutral Earthing
Transformer at MSDS-5 charged on 26.11.15. Charging of 16 MVA Transformer-2T
done on 08.01.16.
MSDS-7: 132 KV charged cable from MSDS-5to7 Normalised on 06.09.14. SAS Testing
completed.
MSDS-2: 6.6KV Bus Coupler (Cubicle 640) charged on 22.12.15.
Activity
Activity
Concreting
Mech. Eqpt. Supply
Elect. Eqpt. Supply
Mech. Eqpt. Erection
Elect. Eqpt. Erection
Unit
Unit
M3
T
T
T
T
Total vol.
Total vol.
640
7.5
40.7
7.5
40.7
Jan.15
Plan
Prog
Cum.
Progress
1.5
1
1.7
1
2
GF, 1st & 2nd floor brick work, Ground floor flooring completed.
1/12/2016
Page : 24
638.5
6.5
39
6.5
38.7
Review
26.06.15.
Meeting
held
on
SN
SCHEME / PACKAGE
G2
*- Scope revised.
PROGRESS ON DATE
Auxiliary Eqpt. Erection at SSs - 43, 45, 47,
48, 56, 57, 60, 64, 65, 68, 71, 71A & 73 are
in progress.
Bldg. Structural Fabrication & erection job
is in progress.
6.6 KV Panel testing at SS-63 is in progress.
Incoming cable laying in progress for SS73.
6 M3 Concreting completed.
8 T Bldg. Strs. Fabricated.
5 T Bldg. Strs. Erected.
Drawings
BE (Appl. Cat.)*
BE (Info. Cat.)*
DE (Appl. Cat.)*
DE (Info. Cat.)*
TOTAL
Activity
Earth work
Submtd. Appd/KFR
127
120
2
1
1069
1014
260
220
1458
1355
Total
Unit
vol.
M3 *133492
M3
*32091
T
*10400
AAN
3
1
26
38
68
Comntd
4
0
29
2
35
Jan.15
Plan
Prog
U/S
0
0
0
0
0
Cum.
Progress
Review
07.09.15.
Meeting
held
on
Review
20.11.15.
meeting
held
on
3000
123894
Concreting
700
82
30647
Building strs. Fabrication
600
69
9010
Building strs. Erection
T
*10400
900
52
7067
Mech. Equipment ordering
T
128
24
104
Electrical eqpt. ordering
T
*6116
41
6075
Mech. Equipment Supply
T
128
10
104
Electrical equipment supply
T
*6116
2
6050
Mech. Equipment Erection
T
128
20
1
46
Electrical Eqpt. Erection
T
*6116
800
42
3110
Total 7638 T Fabricated Strs. Supplied. 3 Nos. 11 KV outgoing feeders
(cubicle No. 25, 31 & 79) at HTSS No. - 64 charged on 03.12.15.
Charging of cubicle 62 (LTSS-7) at SS-70 completed on 10.12.15.
Charging of 11 KV cubicle 32 (1 MVA Transformer in ECR-0) done in SS70 on 15.12.15. Charging of Feeder-14 and Transformer 70I-1T at SS-70
done on 16.12.15. Charging of Incomer-1 of LTSS-7 in ECR-3 through SS70 done on 16.12.15. First time charging of 6.6 KV cubicles No. 612, 616,
629 & 630 (Feeding to 250 KW cooling water pump house) in SS-56
done on 21.12.15.
Drawings
Total
Submtd.
Appd/KFR
AAN
BE (A)
BE I
DE (A)
DE I
Total
241
94
575
442
1352
241
94
575
442
1352
181
69
416
375
1041
7
1
6
5
19
Comntd.
U/S
45
8
18
6
144
9
51
10
258
33
Jan.16
Cum.
Activity
Unit
Total vol.
Prog.
Plan
Prog
18
32098
32500
500
Earth work
M3
29
12267.9
12500
400
Concreting
M3
3879
3916
109.6
Building strs. Fabrication
T
20.3
3787.3
3916
150
Building strs. Erection
T
5200
5402
193
Mech. Eqpt ordering
T
250
515
23
Elect. equipment ordering
T
4406
5402
650
Mech. equipment supply
T
242
515
20
Elect. equipment supply
T
700
1.5
4045
5402
Mech. equipment Erection
T
80
117.5
515
Elect. equipment Erection
T
MV/LV Switchgear building 8 m floor RCC slab cast on 20.05.15. MCC building 12
M slab casting and 3 Nos. column casting done on 12.06.15. STB building 0-0 M
level floor casting done on 27.06.15. MCC control room building 16 M slab casting
done on 17.07.15. CEA Inspection of electrical facilities carried out on 20.9.2015.
1/12/2016
Page : 25
SN
G4
SCHEME / PACKAGE
PROGRESS ON DATE
Instln. of Steam turbine generator, STG area
back pressure turbine generator,
Hydro test for steam pipe lines completed.
Cooling water system & Power
Instrumentation jobs in progress.
Evacuation Sys. (Pkg.- 011-1B)
CWPH: Erection of all 5 pumps completed.
Consultant-MECON
Main header jobs are in progress.
Agency-M/s Triveni Engineering.
Maintenance platform completed.
Contract Price Rs. 170.50 Crs.
Cooling Tower: Crane Load Testing
Contract signed: 19.01.12
completed. Makeup water line work in
Contractual Completion : 18.07.13
progress. Backwash line work is in progress
Likely Completion : Jan.16
in STB building.
(Proj. Mgr. : P. Subba Rao, DGM), 21090
ECR: Erection of cable tray & cable laying
is in progress. Instrumentation jobs in
progress. FDA system is in progress.
Total
Submtd.
BE (A)
BE I
DE (A)
DE I
Total
74
37
147
720
978
74
37
147
720
978
Activity
Appd/KFR
74
37
147
710
968
Unit
Earth work
Concreting
Piling
Building strs. Fabrication
Building strs. Erection
Mech. Eqpt ordering
Elect. equipment ordering
Mech. equipment supply
Elect. equipment supply
Mech. equipment Erection
Elect. equipment Erection
AAN
Total vol.
M3
M3
Nos.
T
T
T
T
T
T
T
T
41000
14061
340
1770
1770
1410
500
1410
500
1410
500
Comntd.
0
0
0
2
2
0
0
0
8
8
Jan.16
Plan
Prog
1570
563
0
21
0
0
6
1
1
91
38
23.5
U/S
0
0
0
0
0
Cum.
Prog.
39430
13504
340
1770
1749
1410
500
1406
499
1357
489
Drawings
Total
Submtd.
BE (A)
BE I
DE (A)
DE I
60
8
220
112
400
60
8
219
112
399
Total
Activity
Appd/KFR
60
8
219
112
399
Unit
Total vol.
AAN
51
7
205
98
361
Comntd.
4
0
4
3
11
Jan.16
Plan
Prog
U/S
4
1
9
10
24
Cum.
Prog.
Earth work
M3
7300
95
7205
Concreting
M3
3000
78
2922
Building strs. Fabrication
T
30
0
30
Building strs. Erection
T
30
0
30
Mech. Equipment ordering
T
650
0
650
Elect. equipment ordering
T
30
0
30
Mech. equipment supply
T
650
8
642
Elect. equipment supply
T
30
0
30
Mech. equipment Erection
T
650
12
638
Elect. equipment Erection
T
30
5
25
Plant is in operation for DM water supply to Coke Oven battery # 11
from stream B & C. Generation of DM water from stream B done for a
continous period of 32.5 Hrs.
1/12/2016
Page : 26
SN
SCHEME / PACKAGE
G6
PROGRESS ON DATE
Unit#1- cold blast pipe line jobs & oil line
jobs in completion stage. Common cold
blast collector supply to BF#8 - pipe line
erection job is in completion stage.
Unit#3- Condenser surge pipe drain pipe
line modification work completed.
Condenser-Impulse
tubing
jobs
in
progress. Oil flushing in progress. Cold
Blast Line Bellow erection job completed.
Transmitters Governor- Oil tubing at 4.5
mtr under progress. TR.9 all transmitter
gland & termination work under progress
Instrument job & caliberation in progress.
Total
BE (A)
BE I
DE (A)
DE I
Total
33
19
37
148
237
Submtd.
33
19
37
148
237
Activity
Earth work
Concreting
Piling
Mech. Eqpt. Ordering
Elect. Eqpt. Ordering
Mech. Eqpt. Supply
Elect. Eqpt. Supply
Mech. Eqpt. Erection
Elect. Eqpt. Erection
Appd/KFR
29
18
26
130
203
Unit
Total vol.
M3
M3
Nos.
T
T
T
T
T
T
4800
1700
88
1590*
347*
1590*
347*
1590*
347*
AAN
Comntd.
1
3
0
1
7
4
0
16
8
24
Jan.16
Plan
Prog
157
40.5
25
29.3
59
U/S
0
0
0
2
2
Cum. Prog.
4643
1659.5
88
1590
347
1565
347
1560.7
288
Drawings
Total
Submtd.
BE (A)
BE I
DE (A)
DE I
Total
4
11
54
24
93
4
11
54
24
93
Activity
Appd/KFR
4
11
50
18
83
Unit
Total vol.
T
T
T
T
53
53
28
25
Eqpt. Ordering
Eqpt. Supply
Eqpt. Erection Phase-I
Eqpt. Erection Phase-II
AAN
Comntd.
0
0
0
0
0
4
0
4
0
8
Jan.16
Plan
Prog
0.5
8
7
U/S
0
0
0
2
2
Cum. Prog.
53
52.5
25
0
Drawings
Total
Submtd.
Appd/KFR
Consultant-MECON,
BE (A)
BE I
DE (A)
DE I
Total
4
1
22
9
36
4
1
22
9
36
4
1
20
3
28
Activity
Eqpt. Supply
Eqpt. Erection
Unit
Total vol.
T
T
4.9
4.9
AAN
Comntd.
0
0
0
0
2
0
0
6
2
6
Jan.16
Plan
Prog
0.9
U/S
0
0
0
0
0
Cum. Prog.
4.9
4
All 18 nos. RTU connected with Central Energy Monitoring system. UPS
charged on 22.05.14. OPC server installed at OP-II for BOO plant
parameters.
1/12/2016
Page : 27
SN
H-3
SCHEME / PACKAGE
Installation of Hot metal Rail Weigh Bridges
(Pkg-099B) Consultant-MECON,
PROGRESS ON DATE
Drawings
Total
BE (A)
BE I
DE (A)
DE I
Total
2
21
13
12
48
Activity
Eqpt. Supply
Eqpt. Erection
Submtd.
Appd/KFR
2
21
13
12
48
AAN
2
19
13
12
46
Unit
Total vol.
T
T
54
54
0
0
0
0
0
Comntd.
U/S
0
2
0
0
2
Jan.16
Plan
Prog
4
-
0
0
0
0
0
Cum. Prog.
50
0
Drawings
Total
BE (A)
BE I
DE (A)
DE I
Total
9
20
7
10
46
Activity
Earth work
Concreting
Eqpt. Supply
Eqpt. Erection
Submtd.
Appd/KFR
9
20
7
10
46
AAN
9
19
3
10
41
Unit
Total vol.
M3
M3
T
T
178
523
60
60
0
0
0
0
0
Comntd.
U/S
0
0
0
0
0
Jan.16
Plan
Prog
0
1
4
0
5
Review
15.06.15.
meeting
Cum. Prog.
170
300
60
30
100
-
M/S Alumax
responding.
new
Delhi
is
not Party has already submitted soft & hard copy of all drgs to BEDB.
I-2
Appointment
of
consultant
for
development of Aquatic Centre near
Jayanti stadium ConsultantBEDB,
AgencyM/s ARCH-EN DESIGN Lucknow
Draft soft copy of specification & Award letter issued on 20.12.12. Draft soft copy of specification & tendor
tendor schedule sent by zone to Arch in schedule sent by zone to Arch in design for finalisation from their side on
design for finalisation from their side on 08.04.15.
08.04.15. Final report is awaited.
I-3
Activity
Earth work
Unit
M3
Total vol.
800
Jan.16
Plan
Prog.
Cum. Prog.
500
Concreting
M3
800
50
400
Pipe laying
RM
223
0
Earth work completed on 01.12.14. Concreting work started on 15.01.15. Water
Tank: Plinth beam casting completed. Tie beam at 4 mtr. Level casting completed.
Office bldg: Plinth beam casting completed on 11.04.15. Casting of Lintel beam for
Office bldg. completed on 11.05.15. Casting of slab for Office bldg. completed on
13.06.15. Office bldg. of civil work completed on 07.08.15.
1/12/2016
Page : 28
held
on
SN
SCHEME / PACKAGE
J-1
J. UTILITY ZONE
Aug. of Power Supply facilities for BF
Slag dumps (Electrical Pkg.) (Pkg.-2).
Consultant BEDB
PROGRESS ON DATE
J-2
7 nos. HT Isolator, all cables, 5 nos. high mast light & GI pipe supplied
M/s Infra-in consulting Pvt. Ltd has not Presentation of detail project report held on 15.10.12.
applied for further date extension to
complete the work.
Consultant CET
Agency - M/s Sanjay Engr. & Fabricators
II
Activity
Consultant CET,
Agency - M/s BSBK
Award value Rs. 11.10 Crs.
Date of Award: 18.05.10,
Contr. Completion: 17.04.11
(Proj. Mgr. : G. Ravibabu, AGM), 22695
Unit
Total vol.
Earth work
Concreting
Brick work
Plastering
WBM
RCC Pipe Laying
M3
M3
M3
M2
M3
RM
39000
7000
2200
26000
22000
330
RM
3000
Jan.16
Plan
Prog.
0
0
0
0
0
-
Cum. Prog.
37035
6595
2055
25680
22000
330
3000
J-4
Drawings
BE A
BE I
DE A
DE I
TOTAL
Total
Submtd
15
30
67
56
168
14
30
66
51
161
Appd/KFR
14
29
64
51
158
AAN
0
0
2
0
2
Comntd
0
1
0
0
1
U/S
0
0
0
0
0
All Earth work 3300M3, All Concreting 950M3, All 75T Bldg. strs. fabrication &
erection , All 5T Tech. strs. fabrication & erection, all 270T Mech. eqpt. & 20T
Elect. eqpt. ordering, supply & erection completed, Equipment Erection
completed on 01.10.14. HT & MCC panel charged on 31.03.15. Engg. closer
meeting organized by MECON Ranchi on 10.09.14 to complete the engg.
issue. TOP connection completed on 14.04.15. Blower fan testing completed.
1/12/2016
Page : 29
Review
28.05.14.
meeting
held
on
SN
SCHEME / PACKAGE
J-5
PROGRESS ON DATE
Drawings
Total
BE (A)
BE I
DE (A)*
DE I*
Total
25
5
440
1878
2348
Activity
Submtd.
Appd/KFR
25
5
440
1878
2348
Unit
22
3
428
1753
2206
Total vol.
AAN
1
0
0
0
1
Comntd
U/S
1
1
0
108
110
1
1
12
17
31
Jan.16
Plan
Prog.
Cum.
Prog.
*100000
2000
750
96470
*16348
350
106
15944
*7305
300
54
5301
*7305
68
4164
200
10000
9098
0
10000
89
4133
250
37
0
36
3
0
2
37
36
0
3
2
0
37
10
0
3
0.5
0
Mech. & Elect. Eqpt. erection started on 26.09.15. BF gas DN 2200 for COB-11
deblanking & charging has been completed on 03.11.2015.
Zone-A: All 262 nos. trestle & girder erection completed, erection of pipe line
completed. Zone-B: 179 nos. out of 201 nos. foundation bolt lift, 117 nos. Trestle &
72/174 nos. girder erection completed, Erection of Pipe line 26% completed. ZoneC: 114 nos. out of 116 nos. foundation bolt lift & 89 trestle & 67/90 nos. girder
erection completed, Erection of Pipe line 56% completed. Zone-E: All 83 nos.
foundation bolt lift, 82 Trestle & 72 nos. girder erections completed Pipeline erection
95% completed. Zone-D: 155 no. out of 186 nos. bolt lift & 26/186 nos. trestle
erection completed.
Earth work
Concreting
Bldg. Strl. fabrication
Bldg. Strl. erection
Tech. Strl. fabrication
Tech. Strl. erection
Mech. Eqpt. Ordering
Elect. Eqpt. ordering
Mech. Eqpt. supply
Elect. Eqpt. supply
Mech. Eqpt. erection
Elect. Eqpt. erection
Drawings
Total
BE A*
BE I
DE A
DE I
TOTAL
66
23
234
184
507
Activity
M3
M3
T
T
T
T
T
T
T
T
T
T
Submtd
Appd/KFR
66
23
151
75
315
Unit
47
2
36
32
117
Total vol.
AAN
Comntd
U/S
4
0
34
0
38
12
19
58
40
129
3
2
23
3
31
Jan.16
Plan
Prog.
3000
1000
50
Cum. Prog.
*104000
78362
*30000
9435
*2800
*2800
*3000
1970
200
*530
450
10
*3000
54
115
80
*530
20
5
Eqpt. ordering & supply started on 17.02.15. WTP-1: All 22 nos. piles casting
completed. Casting of top slab of PH completed on 28.08.15. WTP-3: Earth work for
thickener started on 09.08.14. WTP-4: Excavation for Secondary settling tank started
on 12.03.15. Plinth beam of SST pump house completed. ECR:21/22 nos. footing &
plinth beam completed. WTP-5: All 25 nos. footing completed for MWPH. 80/88 nos.
footing completed for common pump house with emergency overhead tank.
Earth work
Concreting
Bldg. Strs. Fabrication
Bldg. Strs. Erection
Mech. Eqpt. Ordering
Elect. Eqpt. Ordering
Mech. Eqpt. Supply
Elect. Eqpt. Supply
1/12/2016
Page : 30
M3
M3
T
T
T
T
T
T
Review
27.12.14.
meeting
held
on
SN
SCHEME / PACKAGE
PROGRESS ON DATE
Drawings
Total
BE A
BE I
DE A
DE I
TOTAL
104
24
494
158
780
Activity
82
17
296
92
487
63
9
186
60
318
Unit
Total vol.
0
0
14
0
14
18
8
60
23
109
Jan.16
Plan
Prog
U/S
1
0
36
9
46
Cum. Prog.
87420
400
74259
URM
9916
27
8651
M3
350
BRM
9869
6412
Total Concreting
19785
350
27
15063
URM
260
236
Bldg. Strs. Fabtn
MT
20
BRM
260
0
Total Bldg. Strs. Fabtn.
520
236
URM
260
216
Bldg. Strs. Erection
MT
20
BRM
260
0
Total Bldg. Strs. Erection
520
216
URM
450
320
Tech. Strs. Fabtn.
MT
0
BRM
380
200
Total Tech. Strs. Fabtn.
830
0
520
URM
450
263
MT
20
Tech. Strs. Erection
BRM
380
0
Total Tech. Strs. Erection
830
0
263
Mech. Eqpt. Ord. (URM+BRM)
670
340
MT
Elect. Eqpt. Ord. (URM+BRM)
905
500
Total Eqpt. Ordering
1575
840
URM
320
200
Mech. Eqpt. Supply
MT
0
BRM
350
140
Total Mech. Eqpt. Supply
670
0
340
URM
400
260
Elect. Eqpt. Supply
MT
0
BRM
505
225
Total Elect. Eqpt supply
905
485
URM
320
20
180
MT
Mech. Eqpt. Erection
BRM
350
0
Total Mech. Eqpt. Erection
670
180
URM
400
15
250
Elect. Eqpt Erection
MT
BRM
505
0
Total Elect. Eqpt Erection
905
250
Mech. eqpt. erection started on 25.01.15. WTP-1: Civil work of WTP-1 in all respect
up to tie beam at RL 318.40 completed by 30.01.15. WTP-2: Casting of slab at
314m level completed on 10-11.01.15. WTP-3: - Casting of fan deck slab of WTP-3
cooling tower completed on 03.04.15.WTP-4: Casting of slab of pump house at
WTP-4 completed on 10.06.14. WTP-5: Raft concreting started on 13.08.15. PCC
work started on 29.05.15. Scale pit raft concreting completed on 16.07.15. WTP-6:
Concreting of secondary settling tank wall completed on 11.03.15. Hot sump
wall completed. Concreting of cold sump slab 80% completed on 19.09.15.ECR
(WTP-6 BRM area): Casting of slab for ECR completed on 11.06.15. Casting of air
washer slab for ECR completed on 15.09.15. WTP-7: SST completed. Concreting
of ICW Cooling Tower up to fan deck level completed. Casting of pump house
slab completed on 04.09.15. Concreting of slab for ECR bldg. at WTP-7 BRM area
completed.
1/12/2016
M3
Page : 31
Review meeting
05.09.15.
held
on
04-
SN
SCHEME / PACKAGE
J-8
Consultant MECON,
Agency- M/s Vishwa Infrastructure,
Contract Price Rs. 90.04 Crs. + Revised cost
7.89 Lakhs., (Total cost 90.11crs.)
Contract signed: 01.10.11
Contr. Completion : 31.12.12
Likely Completion : Feb.16
(Proj. Mgr. VS Sai, DGM), 21216
PROGRESS ON DATE
Design Engg. in progress.
30 M3 Earth work completed.
4 M3 Concreting completed.
4 T Bldg. strs. fabricated.
2 T Tech. strs. erected.
Intake pump house: (Maroda-2)
ECR: Fixing of door & windows, rolling shutter
are balance.
Makeup water (IW) Pipe Route: Civil work for
pedestal & erection of Tech. pipe line (Dia.
900 mm) in progress.
Bend fabrication for Railway track crossing in
progress (at sheet 2 of 23 near MWPH),
Pipe erection at sheet 2 of 23 Railway track
crossing in progress (near MWPH).
MWPH: R/S for wall in progress.
Drinking water treatment plant:
Earth work for ECR (DWTP) 10/34 foundation
completed.
Trestle erection at Cable gallery from SS-71 to
DWPH in progress.
Concreting for cable gallery foundations
23/25 nos. completed.
Raw water pipe route: (Maroda -2 to DWPH).
1100/1200 Mtr. Pipe laying completed. Pipe
pushing (near intake PH under rail track)
completed & pipe laying in progress. Bend
erection at Raw water pipe route from intake
to DWTP in progress.
J-9
Total
BE A
BE I*
DE A
DE I
TOTAL
34
14
226
61
335
Activity
Earth work
Concreting
Bldg. Strs. fabrication
Bldg. Strs. Erection
Tech. Strs. supply
Tech. Strs. erection
Mech. Eqpt ordering
Elect. Eqpt ordering
Mech. Eqpt Supply
Elect. Eqpt Supply
Mech. eqpt. erection
Elect. Eqpt erection
Submtd
Appd/KFR
34
12
162
43
251
32
11
77
25
145
Unit
Total vol.
M3
M3
MT
MT
MT
MT
MT
MT
MT
MT
MT
MT
*50000
*15000
*1250
*1250
6000
6000
*550
*250
*550
*250
*550
*250
AAN
Comntd
U/S
0
0
57
0
57
2
1
17
18
38
0
0
8
0
8
Jan.16
Plan
890
240
70
65
25
70
20
10
40
20
30
10
Prog
330
17
42
27
Cum. Prog.
43998
9585
766
637
4622
3117
400
170
400
168
15
5
#Cum. Prog. Reconcioled by zone on 07.10.15. Hydraulic testing of Industrial water pipe 2X DN
200 MS PIPE at URM successfully completed on 09.12.15. Trail run of DN200 Make up water pipe
line up to URM -C1 done on 24.11.15. DWTP: Casting of Dirty Back wash water compartment
completed. Casting of Drinking water treatment plant Pump House slab completed on 10.09.14.
MWPH: Laying of DN 900mm pipe near Boria gate completed on 07.12.13. Intake PH: Erection of
gangway completed. Casting of top slab of IWPH completed on 12.01.15. ECR: casting of slab
completed on 15.09.14. Mech. & Elect. eqpt. supply started on 08.04.14. MCC panel for IWPH
supplied on 09.09.14. Mech. eqpt. erection started on 13.08.15. Elect. eqpt. erection started on
02.12.15.
Activity
Earth work
Concreting
Supply of Ballast
Dismtlg. of existing track
Laying of railway track
Unit
Total vol.
M3
M3
M3
RM
TM
1080000
6130
103500
8000
41500
Jan.16
Plan
Prog
0
0
0
0
0
Cum. Prog.
912600
3661
75230
1400
24925
WT-5 - Main line (Western side) track connectivity completed & loco testing
completed on 29.04.13. 5 nos. out of 7 nos. Bridge deck slab completed.
Activity
(Pkg.-95B).
ConsultantMECON
Agency -M/s ISC projects Pvt. Ltd. Bhusawal
Contract Price Rs. 76.08 Crs. (4th revision)
Contract signed 18.08.10
Contr. completion; 17.02.13
(Proj. Mgr.; D.K, Pouriya DGM), 21954
Earth work
Concreting
Supply of Ballast
Dismtlg. of existing track
Laying of railway track
Unit
M3
M3
M3
RM
RM
Total vol.
Jan.16
Plan
Prog
Cum. Prog.
150000
0
147835
5800
0
5458
79000
0
61000*
13500
0
11761
*37300
0
15500*
Track no. 18 near high line linking completed on 22.10.13. Line no. 41: track laying of
dump car line, Boiler coal line & escape engine line completed by 23.05.14.
1/12/2016
Page : 32
SN
SCHEME / PACKAGE
ConsultantMECON
Agency -M/s Jhajharia Nirman Ltd.
Award value Rs. 16.91 Crs.
Date of award: 17.10.2015
Contract signed: 02.11.15.
Contr. completion; 17.07.2016
(Proj. Mgr.; D.K, Pouriya DGM), 21954
PROGRESS ON DATE
Unit
M3
137464
15000
5300
20900
M3
26000
4200
4200
Track Dismantling
TM
2336
Rail track Laying
TM
20500
1000
91
1791
Bhoomi poojan held on 19.10.2015. Earth work started on 07.11.15.Track
laying started on 28.11.15. Rail track Connectivity line from RSM to URM
1400 TM laying completed.
Jan.16
Activity
Unit
Total vol.
Cum. Prog.
Plan
Prog
Earth work
M3
210277*
10000
162575
Concreting
M3
4100
0
3979
Sub grade
M3
60200
1090
59110
Road carpeting
M2
72450*
0
49259
Road carpeting behind PRO completed on 01.07.14. Survey for 8A, 8B & 8C
completed.
Total
Submtd
28
2
95
125
17
2
52
Appd/KFR
AAN
13
2
47
71
62
2
0
3
Jan.16
Total
vol.
Unit
Comntd
2
0
2
U/S
0
0
0
0
Cum. Prog.
Plan
Prog.
Piles
Nos.
344
0
127
Earth work
M3
260000
0
58600
Concreting
M3
26000
100
6
16392
Elect. Eqpt. ordering
T
33.8
0
9
Elect. Eqpt. supply
T
33.8
0
9
Elect. Eqpt. Erection
T
33.8
0
6
Bldg. Structural fabn.
T
28
0
10
Bldg. Strl. erection
T
28
0
8
Road WMM
M2
65000
0
15550
Road Carpeting (BM)
RM
4450
0
2350
F.O. No.-2: CEZ to Boria road T junction both side WMM completed. Road
widening work from junction to Boria gate in progress. F.O. No.-3: GAD submitted on
29.07.14. 11 nos. pier caps & 2 nos. abutment cap completed. Casting of 10th deck
slab completed by 30.05.15. F.O. No.-1: GAD approved from railway. Approval of
GAD awaited from NHAI.
Drawings
Total
Submtd.
Appd/KFR
AAN
Comntd
U/S
14
3
66
93
14
3
71
101
189
DE (A)
DE I
TOTAL
9
3
48
85
1/12/2016
Page : 33
Unit
145
0
0
2
7
0
0
0
0
22
9
0
Jan.16
Cum. Prog.
Plan
Prog
Earth work
M3
1284
1284
Concreting
M3
877
877
Elect. Eqpt. Supply
T
1185
1185
Elect. Eqpt. Erection
T
1185
1185
HM Tower: 18/19 nos. high mast tower charged by 29.03.13. 29/32 nos. CSS erection
completed by 08.02.14. Erection completed on 01.07.14
Activity
176
5
0
16
1
Total vol.
SN
SCHEME / PACKAGE
PROGRESS ON DATE
Communication protocol issued on 04.11.14. List of drawing & Billing Kick off meeting held on 14.11.14.
schedule approved, Power od attorney submitted. Land allotted for
stores at TDS-1. QAP approved on 15.12.15.
Activity
Consultant- MECON,
Agency M/s Kulkarni & Sahu,
Award value of Rs. 9.39 Crs.
Date of award: 03.11.10,
Contr. Completion: 02.11.11
Likely Completion: Feb.16
(Proj. Mgr. : S.S. Prasad, Mgr), 22708
J-19
J-20
J-21
Total vol.
Jan.16
Plan
Prog
-
Cum. Prog.
1000
Earth work
M3
15.8
Elect. Eqpt. ordering
T
15.8
Elect. Eqpt. supply
T
15.8
Elect. Eqpt. Erection
T
Cable laying job completed. All work completed on 30.09.2014.
All work completed on 31.12.15.
Consultant- MECON
Agency- M/s HCL Info systems
Contract price Rs. 0.8137 Crs
Contract signed on : 30.04.11
Contr. Completion by : 29.08.11
(Proj. Mgr. : N.C.Ray, DGM), 21359
J-18
Unit
Activity
Unit
Total vol.
Earth work
Concreting
RCC Pipe laying
M3
M3
RM
129500
12110
1150
Jan.16
Plan
Prog
8000
400
0
11
1000
15.8
15.8
15.8
Cum. Prog.
63480
4900
1029
Unit
Total vol.
M3
M3
T
T
3700
1313
230
230
Jan.16
Plan
Prog
200
200
0
Cum. Prog.
3125
450
230
230
Activity
Unit
Total vol.
Concreting
M3
2800
Brick work
M3
650
Road carpeting
M2
1800
Railway track laying
RM
150
Road carpeting completed on 21.12.11.
1/12/2016
Page : 34
Jan.16
Plan
Prog
0
0
0
Cum. Prog.
1740
606
1800
0
SN
SCHEME / PACKAGE
J-22
PROGRESS ON DATE
Electrical
progress.
Equipment
erection
in
Consultant MECON,
Agency: M/s GAME
Contract price Rs. 1.75 Crs.,
Contract signed on :13.10.09,
Contr. Completion : 12.04.10,
(Proj. Mgr. : D.K, Pouria, DGM), 21954
J-24
J-25
48
Elect. Eqpt. Supply
72.1
0
31
Elect. Eqpt. Erection
T
All 200 M3 Earth work, 150 M3 Concreting & 72.1 T Elect. Eqpt. Ordered.
2 nos. PDB supplied. PDB erected at MRS.
Consultant-MECON,
Agency- M/s Hindustan Controls & Eqpt,
Contract price Rs. 2.519 Crs).
Contract signed on: 09.01.10,
Contr. Completion: 08.10.10
Likely Completion : ---------(Proj. Mgr. : N.C.Ray, DGM), 21359
J-23
Activity
Total
Submtd.
7
19
3
29
7
14
1
22
Appd/KFR
7
14
0
21
AAN
Comntd.
0
0
0
0
U/S
0
0
1
1
0
0
0
0
Jan.16
Cum. Prog.
Plan
Prog
Dismantling of Eqpt.
No.
62
62
Relocation of Eqpt.
No.
40
0
22
Jan.16
Total
Activity
Unit
Cum. Prog.
vol.
Plan
Prog
Dismantling of sheet
M2
30000
0
26250
Dismantling of Railway track
MT
200
0
200
Dismantling of Boundary wall
RM
490
0
Dismantling of Railway track completed on 09.07.11. Case handles in arbitration.
Activity
Unit
Total vol.
M/s Sadani Enterprises has not applied 10 nos. Machine commissioned successfully by 26.03.13.
for further date extension to complete
the work.
J-26
J-27
Activity
Earth work
Concreting
Fabrication of Strs.
Erection of Strs.
Fabrication of Tech. Pipes
Erection of Tech. Pipes
Unit
Total vol.
M3
M3
T
T
RM
RM
705
215
135
135
1660
1660
Jan.16
Plan
Cum. Prog.
Prog
0
0
0
0
0
0
245
108
72
63
839
839
Total vol.
M3
M3
T
T
2300
282
165
165
Jan.16
Cum. Prog.
Plan
Prog
165
165
93
58
2300
282
93
58
1/12/2016
Page : 35
K1
K2
K3
L.
SN
L1
L2
L3
L4
L5
L6
L7
L8
SAIL Board has decided that the SPUs will be established with Joint Venture.
NIT
01.08.14
TOD
20.10.14
PBOD
10.03.15
BIDDERS
Consortium of MECON Ltd.,
Bangalore
14.03.15
15.04.15
03.08.15
22.06.15
22.07.15
01.10.15
Consortium
of
Maco {L-1 Cost : Rs 4,39,57,641 (NOC)}, CETs estimate : Rs. 8.76 Crs. (NOC)}
Documents forwarded to Shop on 03.10.15 for obtaining Stage-II
Corporation India Limited,
approval. L-1 bidder has been requested to extend the offer validity up to
Kolkata and Green Project S.r.I,
31.01.16, reply awaited. Reminder sent to party for the same.
Italy
Amkay Construction Co. , Bhilai
Letter sent on 20.10.15 for obtaining Stage II approval.
04.08.15
15.09.15
30.10.15
26.06.15
13.08.15
24.11.15
HSCL, Bhilai
01.07.15
30.07.15
16.11.15
HSCL
18.11.15
09.12.15
09.12.15
14.10.14
05.12.14
15.09.15
30.11.15
L9
09.03.15
06.05.15
L 10
28.03.14
16.05.14
L 11
19.12.14
05.02.15
1/12/2016
Page : 36
STATUS AS ON DATE
(L-1 Cost - 556.02 Cr., Estimate - 732.08 Cr.)
Proposal sent to Corporate Office on 26.03.15 for Stage-II approval.
MECON has extended the validity of their offer up to 31.01.16 and has
also confirmed extension of validity of Bank Guarantee towards EMD.
A meeting held on 31.12.15 between SAIL/BSP and M/s MECON led
Consortium regarding restructuring of their consortim for the package
(M/s Moorgate Projects Pvt.Ltd. being referred as consortium partner in
place of M/s Stemcor India & M/s Stemcor DMCC), party to revert back.
M/s GEA has extended validity of price and offer till 15.02.16.
M/s GEA vide email dt 04.01.16, regretted to give further discount and
requested to consider their quaoted price as final and the same has been
forwarded to CET for submission of price evaluation report.
(L-1 Cost Rs. 5.57 Crs, Estimate Rs. 7.78 Crs.)
RA report along with price break-up received from M/s Mjunction on
03.12.15 and sent to CET on 04.12.15 for price evaluation.
TC held on 23.11 / 27.11.15 for opening of offer of single eliglible
bidder, recommendation under approval.
All the 5 eligible bidders (M/s Bhilai Techneeds was ineligible bidder) have submitted
their confirmation of original price bid on 01.12.15.
TC held on 04.12.15 and recommended for conducting RA, recommendation is under
approval.
All the techno-commercial eligible and acceptable parties have been asked to extend
their offer validity up to 29.02.16 and EMD BG up to 30.06.16, confirmation for the
same received from all the bidders.
SN
L 12
SCHEME / PACKAGE
Replacement of Wet Type LD Gas Holder (Cap. 40,000 M3) by Dry
Type LD Gas Holder (Cap. 60,000 M3) Package-I
(Consultant MECON) (PCC-TK- R K Panigrahi, DGM) 20168
NIT
19.12.14
24.02.15
26.03.15
15.07.15
18.08.15
06.05.15
31.08.15
L 16 Installation of ESP in Sinter Dispatch Route of Sinter Plant II (Pkg.II) (Consultant-CET) (PCC TK V Anil Kumar, AGM) 20206
04.08.15
22.09.15
01.10.15
17.11.15
22.10.15
21.12.15
22.06.15
13.08.15
L 13
b.
TOD
05.03.15
PBOD
BIDDERS
1. Beijing Shougang Construction Group Co China Stewarts & Lloyds of India, Kolkata.
2 Motherwell Bridge Ltd., UK Gillanders Arbuthnot & Co Ltd, Kolkata
3. Bengal Tools Limited
4.Lazarus and Associates Ltd, UK and Maco
Corporation (India) Pvt. Ltd. Kolkata
1. Otto Projects Pvt. Ltd., Kolkata
2. Graduate Agro & Mech.Engineers, Bhilai
3. Technovations, Bhilai
4. Consortium of Mechast Engineers, Durg and Forbes
Marshall Pvt. Ltd., Pune
5. Instrumentation Ltd., Kota
6. Consortium of Oriental Nicco Projects
Private Ltd., Ahmedabad and Oriental
Enterprise Pvt. Ltd., Vadodara
1.
2.
3.
4.
5.
1/12/2016
STATUS AS ON DATE
Documents of one of the eligible bidder. i.e. of M/s Bengal Tools
received from MECON on 30.12.15.
Documents of M/s MICCO received from MECON on 04.01.16.
Clarification received from all bidders and the same has been
forwarded to Mines & Consulant by 02.11.15.
Page : 37
SN
c.
SCHEME / PACKAGE
Replacement of By-Product Plant Equipment (Pkg-3)
NIT
22.07.15
TOD
05.10.15
PBOD
22.07.15
01.08.15
22.12.15
22.06.15
01.08.15
16.11.15
26.11.15
02.01.16
30.01.16
d.
e.
BIDDERS
STATUS AS ON DATE
Technical discussions held with bidders at CET, Ranchi during
02.11-07.11.15 and on 16.11.15.
Commercial discussion held with bidders during 14.11-20.11.15
and on 26.11.15.
Reminders have been given to bidders on 28.11.15, 03.12.15,
11.12.15, 14.12.15, 17.12.15, 22.12.15, 24.12.15 & 25.12.15 for
submitting pending commercial documents/ clarifications.
Issuance of TER awaited
CUI, Ukraine
{L-1 Price Rs. 52.97 Crs (NOC), Estimate Rs 40.62 Crs (NOC)}
Price negotiation scheduled on 12.01.16.
08.01.16
Hydraulico, Denmark
1/12/2016
Page : 38
SN
SCHEME / PACKAGE
L 30
L 31
NIT
TOD
PBOD
BIDDERS
M1
15.05.14
22.10.14
03.03.15
M2
14.08.14
22.09.14
13.08.15
M3
10.03.15
10.04.15
08.09.15
HSCL,Bhilai
24.02.15
02.05.15
27.11.15
31.08.13
08.11.13
M4
M5
M6
i.
ii.
iii.
M7
STATUS AS ON DATE
Stage-I approved by SAIL Board on 03.04.07 at an indicative cost of Rs. 11262 Crs. and sanctioned Rs. 200 Crs. Towards Enabling / Preliminary works.
1/12/2016
Page : 39
SN
SCHEME / PACKAGE
2. High Alumina Low Cement Gunning Castable (01 item)
Open Tender
NIT
07.05.15
TOD
05.06.15
3. SS Anchors 03 items
Open Tender
18.05.15
10.06.15
M8
09.05.15
13.07.15
M 9
05.06.15
28.08.15
M 10
20.02.15
09.09.15
M 11
M 12
M 13
M 14
M 15
PBOD
Bidders
1. Continental Refractories.
2. Sharadaa Ceramics.
3. Shreekant Ind..
4. Industrial Associates.
5. Refcom.
6. Dalmia Refractories.
7. TRL Krosaki.
8. National Refractories.
9. Champion Ceramics
10. IGL Refractories
11. Arvind
STATUS AS ON DATE
TAR issued by MECON on 02.01.16.
for
1/12/2016