Sie sind auf Seite 1von 13

Curriculum Vitae

Khaled Elsayed Menshawy


Summary of Experience:
More than 14 years experience in oil & gas industries offshore / onshore
projects in the following fields:
Fabrication , Installation, Pre-commissioning & Commissioning and Start-up,
Engineering review (mechanical, equipment, piping & structure), Procurement
control, verification of piping materials ,Construction supervision, Project
planning, Project follow-up, Project cost control, Project close-out
Supervise platform jackets & decks Fabrication & Installation, pipeline laying,
commissioning and start up activities.
Developing, coordinating with contractors and vendors, reviewing and approving
projects documentation, time schedule,method of statement, installation
procedure ,material inspection, construction of Flow and Pipelines, welding
inspection and review contractors procedures and engineering packages, review
As-built / as laid drawings, supervise & witness of hydrostatic tests of piping and
pipelines, supervise construction activities of piping along with NDT inspections.
Supervise, witness and lead shutdown team projects during companys
Shutdown activities, of piping, pressure vessels, storage tanks, valves , static
equipment.
Attending construction & projects meetings, preparation of daily progress reports
highlighting productivity, carrying out and control projects in according to the
time schedule
In service inspection of pressure vessels, storage tanks and piping
Share project team in the preparation of bid documents, prequalification
documents, bid requests, bid evaluations, contract negotiations and contractor
selection.

Personal Data:
Family
Name :
Marital
Status :
Drive
license :
Language
(s) :
Computer
skill(s):

Menshawy

Given Name (s) :

Khaled

Nationality :

Egyptian

Passport :

Valid

Married
Valid

Arabic "Native", English Very Good "Reading, Writing, Speaking".


Microsoft Windows NT, MS-Office, Internet , autocad,and Primavera

Curriculum Vitae

Khaled Elsayed Menshawy


1)
2)
Profession:3)
4)
5)

Contact
Educatio

Code

QA/QC senior engineer, Lead Auditor ISO 9001:2008


Certified API 510 Inspector Cert.# 47190
Certified API 653 Inspector Cert.# 31427
Mob.#
+20100 667 3218
Email address: kmenshawy@petrogulfmisr.com and
khaledmanshawy@hotmail.com
Bachelor Degree in Power Mechanical Engineering, 1999. Grade
good with
Project excellent.
ASME Sections I, II, V, VIII, IX, B 31.1, B 31.3, B16.5
AWS D1.1
API 1104, API 510, API 570,..etc.
Various international standards, QP, ARMCO specifications.

Curriculum Vitae

Khaled Elsayed Menshawy


Qualificati
ons
&Training
Courses:

1) Certified Pressure Vessel API 510 Inspector


Cert.#31865
2) Certified A/G Storage Tank API 653 Inspector
Cert.# 43894
3) Lead Auditor ISO 9001:2008 Quality
Management System
4) Management Program/Courses

5)

6)

Project management professional PMP


Report writing
Project execution systems, format & procedures.
Professional Certificates/Courses
Primavera level I & II (projects planning)
U/T level II (ASNT-TC 1A)
R/T level II (ASNT-TC 1A)
MPI level II (ASNT-TC 1A)
Quality Management System Seminar (ISO 9001:2000).
Welding Technology
Pumps Technology
Pipes and Pipe Fitting Classification (according to ASTM)
Process Piping (design & fabrication) on ASME B31.3
Piping Code
Control of pipeline corrosion Hot tapping for installing
Corrosion Coupon
Mechanics & two phase horizontal fluid
Types of valves (Fabrication and Selection)
Subsea Pipeline repair methods
H.S.E

Occupational Safety and Health Administration


H2S & BA
Sea Survival
Basic Fire Fighting

Curriculum Vitae

Khaled Elsayed Menshawy


Work Experience:
Since July
2009 Till
present

Employer: PETROGULF MISR OIL CO. , Egypt


Position:
Senior Projects Engineer
Main Duties:
Lead projects team for maintanence, inspection and supervising of
new construction, in-service/out of service maintenance on:
process piping, pipelines, pressure vessels, Tanks and various
platforms structures
Monitored all piping installation and modification work carried in
facility.
Prepared progress reports for projects and mentioned all
modification work.
Determined test packs for process and ensured its compliance
with Piping Flow Diagrams.
Performed tests on hydraulic and pneumatic systems and in
accordance to international standards
Coordinated with contractors and interpreted drawings, monitored
piping and installation.

Review P'ID, Construction drawing and Iso's piping.

Preapre bill of material as per specification and standanard.

Review technical offers and reply clarification faxes.

Preapre time schedule & manpower for this projects.

Follow up prefabrication works for steel structure and


interconnect piping.
Preapre (ITP) inspection test plan with project team.

Review repir procedure for vessel , organiza with different


dept. topreapre vessel, witness hydrotest after repair.
Review welding map for welding joints to NDT test.

Review and adjust leveling reports for installation equipment


soft footing method and lift corner face,rim alignment report
with alignment vendor procedure.
Preapre TQR for any waives egineering drawing.

Review installation procedure and Method of statements.

Preapre as built construction drawing for steel strcuture and


Isometric for pipes.
Follow up project document organization chart, S-curve,
manpower histogram, time schedule.,etc.
Follow up pre-commissioning, commissioning and start-up
system.

Team leader for all structural, piping, vessel & coating works

Curriculum Vitae

Khaled Elsayed Menshawy

during any new platforms/Plant construction, extensions and


modifications
Ensure Contractors compliance with Company's Mandatory
Documents
Review, Validate and/or approve Project and Contractor Quality
Documents such as Piping & Instrumentation Diagram (P&ID),
Alignment Sheets, Isometric Drawings, Standard Operating
Procedures, Standard Inspection Procedures, Inspection Test
Plans, Checklists, Manufacturer / Mill / Material Test Certificate,
Review, approve and/or train Project and Contractor Quality
Personnel such as Quality Control Inspectors,
Full compliance of Permit-to-Work System especially during
shutdown
Share the project team in the preparation of bid documents,
prequalification documents, bid requests, bid evaluations, contract
negotiations and contractor selection.
Closely supervises and monitors the work of construction
contractors in liaison with the Project team to ensure that the
project proceeds according to the contract, deal with any queries,
problems, and claims that might arise.

Lead Specific complete shutdown, establishing the planning


shutdown activities, carefully preparations for the company needs
during the shutdown period on time, close site monitoring, take
immediate and appropriate actions/solutions which to be raised for
unforeseen/unplanned situations
EEmployer : Petrogulf Misr
Client
: Petrogulf Misr
Position : Senior Mechanical Projects Engineer
Installation new production mainfold extension deck & flowlines
by Jig-up barge Elzahra existing 32 m^2 cluster G-12

Review P'ID, Construction drawing and Iso's piping.

Preapre bill of material as per specification and ASME code B16.5

Preapre time schedule & manpower for this projects.

Follow up prefabrication works for steel structure as per AWS D1.1 and interconnect
piping.B31.3

Review painting procedure as required offshore painting specs

Preapre (ITP) inspection test plan with project team.

Preapre welding map for welding joints to NDT test.

Follow up project document organization chart, S-curve, manpower histogram, time


schedule.,etc.

Organizaned with contractor for final touch up painting.

Review as built drawing after installation.

Issue daily progress report for mangment.

Follow up pre-commissioning, commissioning and start-up system

Curriculum Vitae

Khaled Elsayed Menshawy


Employer : Petrogulf Misr

Client
: Petrogulf Misr
Position : Senior Mechanical Projects Engineer
Installation new deck extension 10x13 mt and power generation
offshore Platform by float barge Geebo

preapre tender for Engineering & procurement &construction deck extension

Platform offshore & installation gas fuel skid &3 gas generators 45 ton/ea. &
interconnecting piping according to spec's.

Review P'ID, Construction drawing and Iso's piping.

Prepare bill of material as per specification.

Review technical offers and reply clarification faxes.

Prepare time schedule & manpower for this project.

Follow up prefabrication works for steel structure as per AWS D1.1and interconnect
piping as per standard B31.3

Prepare (ITP) inspection test plan with project team.

Review welding map for welding joints to NDT test.

Follow installation procedure and method of statements.

Organize with different dept. for permit and tool box meeting with construction team.

Review and adjust leveling for installation equipment soft footing method and lift corner
face, rim alignment report with alignment vendor procedure.

Review as-built drawing, issue TQR if any.

Follow up project document organization chart, S-curve, manpower histogram, time


schedule.,etc.

Follow up pre-commissioning, commissioning and start-up system

E Employer : Petrogulf Misr

Client
: Petrogulf Misr
Position : Senior Mechanical Projects Engineer
Installation two new transfer pump 25000bbl/day (150 hp/each)
& connecting piping

Review P'ID, Construction drawing and Iso's piping.

Prepare bill of material as per specification.

Prepare time schedule & manpower for this project.

Follow up prefabrication work for pump skid.

Follow up fabrication for suction and discharge line as API 610.

Follow up installation work ,as per installation procedure.

E Employer : Petrogulf Misr

Client
: Petrogulf Misr
Position : Senior Mechanical Projects Engineer

Curriculum Vitae

Khaled Elsayed Menshawy


Internal/external repair for pressure vessel (1st &2nd separator)

Organize with different dept. for drain and gas vent vessel

Follow up internal cleaning and flushing

Prepare inlet/ outlet isolate vessel.

Organize for safety precaution

Review repair procedure, as per ASME VIII prepares equipment and tech. crew.

Organize with third party. "R" stamp

Review hydro test procedure as per ASME VIII.

Follow up pre-commissioning, commissioning and start-up system

Employer : Petrogulf Misr

Client
: Petrogulf Misr
Position : Senior Mechanical Projects Engineer
Installation safety boat (25 persons)with utilities steel strcuture
walkway for platform

Review Construction drawing and Iso's piping.

Review material as per specification.

Prepare time schedule & manpower for this project.

Follow up prefabrication works for steel structure as per AWS D1.1

Prepare (ITP) inspection test plan with project team.

Review installation procedure, mehod of statement.

Follow up testing and start-up system

EEmployer : Petrogulf Misr

Client
: Petrogulf Misr
Position : Senior Mechanical Projects Engineer
Repace existing boat landing & monkey ledder to new stairay by
Mardive 300 Barge

May,2008 to E
Mars,2009

Review Construction drawing.

Review material as per specification.

Follow up prefabrication works for steel structure as per AWS D1.1

review (ITP) inspection test plan with project team.

Review installation procedure, mehod of statement.

Employer : Velosi

Client

: ARMCO

Position : Senior Mechanical Projects Engineer

Fabrication & Installation new offshore Platforms (Y-1B&Y-2B)


Alex. MADDAIA Petojet contractor.

Curriculum Vitae

Khaled Elsayed Menshawy

May,2005 till
Mars,2008

Review (ITP) for installation static\rotating equipment according ARMCO Specs.

Review (MRR) for equipment.

Receive (RFI) for each equipment from contractor.

Review installation procedure check list according ARMCO Specs.

Review Fixation Drawing &Plot plan for location orientation equipment installed at each
deck.

Issued (TQR) for equipment which not matching tolerance according ARMCO Specs.

Review PIDS for each equipment after installation according approved dwg.

Review inspection Reports for each equipment (location ,leveling, orientation, checklist,
..etc)

Work as time work with different department inspection (painting, welding, NDT,..etc,).

Witness hydro test for static equipment.

Close up static equipment after final inspection.

Prepare projects documentation.

Employer: Bureau Veritas Doha, Qatar


Position: Senior Surveyor
Main Duties:
Third Party Inspection and Certification

Involved in all activities as codes/ standards


application, parent & consumables material identity, preweld inspection, preheating, post-weld inspection, inprocess welding surveillance, welding procedure review,
witnessing of welder and procedure approval tests, welder
approvals, post weld heat treatment, NDT reports
assessment inspection reports, interpretation of weld
drawings and symbols, ensuring that quality assurance
standards and procedures are maintained.
Third Party Inspection during piping / structure steel
fabrication and erection.
Review and approval of welding procedures / welders
qualification certificates / drawings / NDT procedures / NDT
operators qualifications / material certificates / NDT
including reporting / pressure testing procedure / Quality
Control documentation.
Review material inspection certificate: Type 3.1B, 3.1C
and 3.2
According to EN 10204
Monitoring and approved of fabrication methods
Visual inspection and accept welding
Witness and accept pressure testing
Dimensional survey and acceptance
Inspection and accept of packages

Curriculum Vitae

Khaled Elsayed Menshawy

Attending QA/QC meetings


Issue of inspection release certifica

Client: Maersk Oil Qatar As


Duty: Third party certification Senior Surveyor
Project: Fabrication of 4 offshore platform jackets named GC, BF,
EF&CF Jackets and 3 bridges.
Scope of work including:
Inspection for the materials, products assemblies as per
drawings, and weld sizes as per-welding symbols in drawings
consumables and welding activities.
Reviewing WPS and PQR witnessing for DT destructive
testing, fracture analysis testing and WQT welder tests.
Witness and interpretation for radiograph and NDT, endorse
NDT & QC reports.
Witness hydrostatic test and check punch lists for test
packages
Review QA/QC documents including final dossiers.
Codes & standards application, parent &consumables
material identity, pre-weld inspection, preheating, post-weld
visual inspection, in-process welding surveillance, welding
procedure review, witnessing of welder and procedure
approval tests, welder approvals, post weld heat treatment,
NDT reports assessment inspection reports, interpretation of
weld drawings and symbols, ensuring that quality assurance
standards and procedures are maintained.
Follow strictly with the approved Inspection and test plan
(ITP)

Since Nov Employer: GEISUM OIL COMPANY, Egypt (Offshore /


Onshore)
Till
Jan
Position: Projects Engineer (Piping / Mechanical, )
2005
Main Duties:

Monitoring the day-to-day activities of the Contractors to


ensure that the assigned projects meet their objectives,
including monitoring of Contractors Quality Control
activities.
Ensure the pre-project planning activities including

Curriculum Vitae

Khaled Elsayed Menshawy

feasibility study and project strategy definition are


performed correctly.
Develop project objectives, execution strategy, work
breakdown structure and contracting strategy identifying
types of contracts required for the project such as EPC,
EPCM, and Third Party Verification etc.
Supervises the implementation of projects including,
verification of construction bidders lists, participation in
the preparation of Call for Tender documents consisting of
terms of reference, scope of works, special terms and
conditions and project master schedule (PMS).
Closely supervises and monitors the work of construction
contractors in liaison with the Project team to ensure that
the project proceeds according to the contract, deal with
any queries, problems, and claims that might arise. Chairs
the periodic progress review meetings with contractors.
Review and approval of proposed Welding Procedure
Specifications
(WPSs)
and
Witnessing
Procedure
Qualifications (PQRs).
Witnessing of Welder/Welding operator qualification.
Review of NDT procedures (UT, RT, MT & DPI)
Review of NDT operators qualifications
Review of register of NDT equipment and calibration
certificates
Review of Radiographs and NDT Reports
Preparation of punch list and giving line clearance for
Hydro test
Witnessing Hydro test
Surveying on reinstated items after Hydro test
Intervention during the fabrication as per ITP and
subsequent certification.
Monitoring the classification and completion of Punch
items
Issue release certificate
Prepare project close out report.
Identify critical issues and areas of concern that may
affect the project progression work performance and
company target.
Work in line with Company HSE policy, ensure during
bidding that contractors have understood HSE
procedures, Rules & Regulations and guarantee
Contractors compliance during execution.

Curriculum Vitae

Khaled Elsayed Menshawy


GEISUM OIL COMPANY is an offshore oil company in the gulf
of Suez ; it consists of four offshore platforms , six remote wells
and jack up rig converted to complex production platform named
SETTY includes the following :(a)- Oil processing facilities to handle 25,000 BPD and includes :
Separators, Test separator, Heaters, Heat exchangers, Crude
transfer pumps, Gas fuel skid , Chemical injection skids and
flaring system.
(b)- Oily water treatment plant : To handle 22,000 BWPD and
consists of hydro cyclone, induced gas flotation unit, booster
pumps and oil skim tank.
(c) - Water injection plant : To handle 25,000 BWPD controlled by
distributed control system (D.C.S.), fisher Rosemount RS3 and
consists of three lift pumps, two coarse filters , three fine filters,
deaerator tower , two vacuum pumps, three booster pumps, two
injection pumps and chemical injection skid..
(d) - Diesel and gas Power generation system and utility system.
Projects/Subject handled:

Extension of Two existing platforms (4 legs


12 slots each).

Participate in all planned or emergency


Shutdowns for inspection works of the
company's assets during the work period
approximately 7 years with minimum 20
partial and complete shutdowns

Laying of sub-sea flow lines (4.5" coil tubing)

Modification of existing piping net work


including fire fighting net work , Auxiliary
piping net work and fir alarm and detection
system , etc) ,

Deal with several contractors such as: Enppi,


PMS (PETROLEUM MARINE SERVICES),
CCIC, PETROJET, TECNOMARE, MARIDIVE,
Brown & Root, Corporation, PPC (PIPELINES
PETROLEUM COMPANY), etc.

Liaison with Classification society as: ABS,


LR , GL & BV

Fabrication/Installation of piping and


structures for Jet pumping system platform.

Complete refurbishment of Boat landing 5


platforms

Curriculum Vitae

Khaled Elsayed Menshawy

Over all modification of Central platform


including Several Hot tapping points (2 up to
16).
Complete in-service inspection, refurbishment
& repair of Storage oil tanks (3 x 100 MBBL).
In-service & out of service inspection and
witnessing repair works of pressure vessels.

Working as Instructor for Following Courses :S/N


1
2

Course Title
Tanks Design & Maintenance according
API_653
LEEA lifting fundamental Lifting Equip.
Eng. Association

Duration

Center

Location

Companies
Attendances

Petrogulf

Cairo

Petrogulf

Petrogulf

Cairo

Petrogulf

API 653 inspection of storage tanks

INTEGRATED
Consul.

Saudi

SABIC Affiliate

Inspection for forklift & cranes

75

GESCO

Libyan

ADWOC

API 653 inspection of storage tanks

INTEGRATED
Consul.

Saudi

ARAMCO

Inspection of cranes according


ASME/ANSI Code

EK KHALAJ

Qatar

QP

API 653 inspection of storage tanks

INTEGRATED
Consul.

Saudi

SABIC Affiliate

Inspection for forklift & cranes

75

GESCO

Libyan

ADWOC

API 653 inspection of storage tanks

INTEGRATED
Consul.

Saudi

ARAMCO

10

API 650 Design of storage tanks

OGI

Egypt

PSP

TV - Nord

Doha

Qatar Petrolum

11

API107- API 650 Coded Design of Welded


Steel Tanks for Bulk Storage

Curriculum Vitae

Khaled Elsayed Menshawy

Das könnte Ihnen auch gefallen