CONSTRUCTION STANDARDS
3.1. Concessionary Rate for DCB, PCB and "Gama Neguma" LV lines
All the Low Voltage lines shall be of three phase construction. Even if a sing\e phase
line is requested under the DCB, PCB or Gama Neguma, CEB wil! provide a Three
Phase line (Fly, Wasp and ABC Conductor) at the concessionary rates given below.
This Concessionary Rate is only applicable to the DCB, PCB and Gama Neguma jobs
funded by the government.
Three Phase (Fly) 1km
Rs. 1,086,000.00/-
Rs. 1,154,000.00/-
Rs. 1,166,000.00/-
On this basis, CEB will incur an additional Cost of Rs. 75,000.00/- per km of LV (Fly,
Wasp and ABC Conductor) lines in order to provide 3 phase feeders under the PCB,
DCB and Gama Neguma jobs. This additional expenditure will be met from system
Augmentation Funds.
However in case of bulk supply consumers, property developers and all other
Commercial Establishments actual construction rates shall be applicable as follows.
Single Phase (FLY) 1km
Rs. 898,000.00/-
Rs. 1,161,000.00/-
Rs. 1.229,000.00/-
connections
within
network
Breakers
(MCCB).
No
s e r v i ce
cut-outs
shall
be used
in these
installations.
for miscellaneous
C o n s t r u r t i o n Costs - 2012.
Value Added Tax. (VAT) is not chargeable. There for all estimates issued for new line and
substation construction works should not be included with VAT component over and
above the Standard Cost Estimates.
(1) G M , CEB
f.i.pl.
(2) A G M {R2)
f.i.pl.
(3} A G M (R4)
f.Lpl.
(4) A G M ( R l )
f.i.pl.
(5) A G M (R3)
f.i.pl.
fj.pl.
& R4
f.i.pl.
f.i.pl.
f.i.pl.
COST Rs.
FLY-7/3.40mm
7/.134 inches
3 Ph.
1,086,000.00
WASP-7/4.39mm
7/.173 inches
3 Ph.
1.154,000.00
ABC
70x3+50mm2
1.166,000.00
Following rates are applicable for Bulk suppliers, Property developers, etc.. and all other third
parties.
COST Rs.
FLY-7/3.40mm
3 Ph.
1.161.000.00
WASP-7/4.39mm
3 Ph.
1,229,000.00
Note:The cost of construction of 1 ph. Fly (7/3.40mm) LV line for third parties shall be Rs. 898.000.00
b)
CONDUCTOR
COST Rs.
WASP7M.39mm
(7/.173 Inches)
FLY7/3.40mm
(7/.134 Inches)
1PH/3PH.
2 PH/3 PH.
344.000.00
245,000.00
528.000.00
41*
1
Ceylon Electricity Board
c).
CONDUCTOR
FLY-7/3.40mm
3 Ph.
WASP-7/4.39mm
3 Ph.
ABC
3Ph.4Wire
Combined Runon11kV/33
kV line cost in Rs.
636,000.00
713.000.00
684,000.00
d)
FLY-7/3.40mm
3 Ph.
WASP-7/4.39mm
3 Ph.
ABC
3Ph.4Wire
399.000.00
475,OCO.0O
579,000.00
Note.
Span of MV lines are reduced to the span required for LV. Therefore no LV poles introduced in
between MV Poles.
Following rates are applicable for Bulk suppliers, Property developers, and other third parties.
e)
FLY-7/3.40mm
3 Ph.
WASP-7/4.39mm
3 Ph.
ABC
3Ph,4Wire
Combined Run on
11kV/33kV line cost in Rs.
711,000.00
788,000.00
759.000.00
The above costs include the cost of additional intermediate LV poles (8.3m) required to support thf
LV feeder. However standard practice is to plant MV poles (10m or 11m) and construct the line oi
LV span. The difference in cost has to be borne by the CEB.
i
:J
f)
FLY-7/3.40mm
3 Ph.
WASP-7/4.39mm
3 Ph.
ABC
3Ph.4Wire
474,000.00
550,000.00
654,000.00
Note.
Span of MV lines are reduced to the span required for LV. Therefore no LV poles introduced in
between MV Poles.
2).
CONCRETE POLE
ABC Conductor
70x3+50mm2
70x3+50+16mm2
COST Rs.
COST Rs. (For the Second Circuit)
1.241.000.00
738.000.00
1,437,000.00
3
Tcylun Electricity Board
3).
MV LINE- COST PER km. (These rates are only applicable for Pole Line Constructions)
Since LV span (45m) used in MV constmction it may be economical to use 10.0 m (RC or PS) pole |
in MV construction. PS (11 .Om) poles may be used in special construction where clearance can not 1
be maintained by 10.0 m poles, (eg. Road crossings, urban areas)
f
CODE
11kV
7/ 4.09mm
37/2.79
RACOON
LYNX
Single Circuit
2,056,000.00
on 10m pole
Cost Rs.
Single Circuit
3.155,000.00
on 11m Pole 2,247,000.00
Cost Rs.
Single Circuit
3,604,000.00
on 13m Pole 2,34.5,000.00
Cost Rs.
Double
Circuit on
5.968.000.00
13m Pole
Cost Rs.
All values are in Rupees.
4)
19/ 3.76mm
ELM
33kV
37/2.79
LYNX
7M.09mm
RACOON
19/ 3.76mm
ELM
2,306.000.00
2.846.000.00
2,437,000.00
3.339,000.00
3.019,000.00
3.482,000.00
2.556,000.00
3.841,000.00
3,508,000.00
5,287.000.00
6.376,000.00
5.773,000.00
100
160
250
11kV/ LTRs.
1,299,000.00
1,492,000.00
1,788.000.00
33kV/ LT Rs.
1,392.000.00
1.573.000.00
1,839,000.00
i) .
Three Nos. Pin Insulators, Tension Insulator Sets (on line side) and all other material costs.
ii).
Two Sets of Fuse Switch Disconnectors (3ph. Unit with neutral Link) on LV side for two
feeders.
ill).
PVC Tail Wires (80 meters long) from the T/F LV Terminal to Fuse Switch Disconnectors for
the two LV Feeders.
iv) .
Connection Clamps (Crimp Type Sockets at the LV Terminal of the Transformer, Fuse
Switch Disconnectors and Bimetallic Clamps at the LV feeders).
v)
Substation metering set with metal enclosure.
vi)
Concrete Earthing Blocks (Four numbers) including earth rods, Exothennic Welding
materials, compression connectors. Earth mesh and 25m of 50 mm^ PVC Sheattied
conductors. ,
Therefore the costs for the above items need not be added to the Standard Costs when a quotation
for a Distribution Substation is prepared.
4
Ceylon Eicaricity Board
d),
250
400
630
716,000 1,187,000
1,418.000
1,802,000
2,222,000
707.000 1,282,000
1,502.000
1,821,000
2,428.000
100
Ri.
1000
800
T
hfl above schedule Includes the cost of the following items;
1}
Bulk Supply Meter Sets.
I)
Current Transformers
HI)
MCCBs.
W) " Crimp type Sockets {at the Transformer LV Temiinals and MCCBs)
: V) .
PVC insulated Cu Cables (10mdistance,fromTransformerLVTerminals to the MCCB)
Vl)
Bulk Supply Meter Box.
vll)
"4 Nos. of Concrete Earthing System with 50 mm^ Cables (30m) with compression lugs,
^
Earth rods and Exothermic materials
In IhQ event additional PVC Cables are required, the cost of such cables shall be added to the above
standard construction costs without adding extra labour and overhead costs.
The consumer shall provide the Transfomier Plinth and Meter Cubicle for Housing Bulk Supply Meter Box&
MCCB. (Transfonner plinth and the meter cubicle could either be a combined type or separate type as
roquired.)
6).
EXISTINGTRANSFORMER KVA
RATING OF AUGMENTED
SS TRANSFORMER KVA
IlkV
100
100
33kV
160
11kV
160
33kV
IlkV
250
250
33kV
NOTE:
63
100
160
279,000.00
208,000.00
573,000.00
511,000.00
394,000.00
354.000.00
187.000.00
439,000.00
716.000.00
The above Standard Costs are computed allowing for a rebate (100%) on the existing
Transformer based on 2011 prices.
This cost includes the cost for augmentation of transformer, labour, transport, contingency and overhead,
charges.
If the available fuse switch cut-outs are not in working condition they shall be replaced and the cost of such
items shall be met from the maintenance vote.
.5
Ceylon E l c d r i c i t y Board
Standard C o n s t r u c t i o n Ratcs-2012
7).
EXISTING
TRANSFORMERKVA
RATING OF
AUGMENTED
SUBSTATION
T
/F KVA
63
11kV 266,000
33kV 231.000
100
IlkV 497,000
160
160
33kV 449.000
11kV 854.000
250
250
33kV 773.000
41kV
1.301,000
400
33kV 1.379.000
400
630
IlkV i 2.111.000
630
33kV 2.210.000
11kV 2.701.000
800
33kV 2.749.000
800
11kV 3.252.000
1000
33kV 3.321.000
1000
All Values are in Rupees
100
160
250
400
302.000
272,000
660.000
596.000
1.107,000
1.202.000
1.917,000
2.033.000
2.507,000
2,572.000
3.057.000
3.145.000
453,000
413,000
900,000
1.018.000
1,709.000
1,849.000
2.300,000
2,388.000
2,850,000
2.961.000
568.000
738.000
1.378.000
1.569.000
1.968.000
2.108.000
2.519.000
2.681.000
993.000
979.000
1.583.000
1.518,000
2.134.000
2,091.000
630
800
100
896,000
799,000
1,446,000 916.000
1,371.000 930,000^
NOTE: The above Standard Costs are computed allowing for a rebate (100 %) on the existing Transformer.
MCCB and Cables, based on 2011 prices (except in the case of augmenting 63kVA Substation).
The cost of meter sets shall be charged only if there is no Bulk Supply meter set at present.
The costs of New MCCBs, Connecting sockets, PVC Tail Wires/ Cables, labour and overheads are
included in the above Standard Costs.
C e y l o n Electricity B o a r d
I
Standard C o n s t r u c t i o n Ratcs-2012i
8).
0).
I).
1lkV -
Rs. 222,500.00
II).
33kV
Rs. 235.000.00
SF6 MANUAL
i).
11 kV -
Rs. 580,500.00
682,000.00
Rs. 1.636,000.00
ii).
33kV -
Rs. 662.500.00
1.016,000.00
Rs. 1,989,500.00
10).
COSTOFINSTALUTIONOF AUTO-RECLOSERS
With Remote Operation.
11).
12).
I).
11kV -
Rs. 1.541.000.00
ii)
33kV -
Rs. 2,022,000.00
11kV -
Rs. 1.029.500.00
ii).
33kV -
Rs. 1,884,000.00
COSTOFINSTALLATION OF GUARD
Cradle Guard 20m. Spa" wltli width 3m
1. 11 kV-Rs. 85,000.00
.
2. 33 kV-Rs. 95.000.00
SERVICECONNECTIONS
a).
1 SinglePhase Up to 50m
Type
30A
'
Fixed Cofet
'
'
Rs. 15.000.00
2. Single Phase Beyond 50m and the maximum distance of service wire should not exceed
110m
Type
'
i
Fixed Cost
30A
. Rs. 15,000.00
Variable Cost
Remarks
Variable cost is
for the length in
excess of 50m
To Three Phase
Fixed Cost
Variable Cost
30A
30A
30A
60A
Rs. 16,500.00
Rs. 17,400.00
Rs. 560.00/meter
Rs. 690.00/meter
"
Note: Above rate it^ applicable only for the conversion of service wire. If Conversion of bare
conductors / ABC is required it should be carried as per the conversion rates.
S
Ceylon Electricity Board
(Applied for Colombo City and Kandy City Under ground networks only)
Loop Services -
15A
Rs. 4,250.00
THREEPHASE SERVICES
15A
30A
'
From-30A Service
Rs. 18,000.00
Rs. 18,000.00
Rs 350.00
Rs.375.00
.
,
2
1
The fixed costs include the cost of MCCB or MCB, Meter Box, 5 m length of service wire & D-brackets
required on Consumer' s side.
Variable Costs.
'
Variable costs include the cost of the service wire and line material such as poles, D-brackets, Stays. Struts
otc, as applicable.
.
Asuitable service bracket shall be provided and installed by the consumer.
9
( eylon lilcctricity Board
b).
In providing service connections to installations having equipment such as welding plant, Metal Crushers,
Saw Mills etc., which could have adverse effects on the other consumers connected to the existing feeder. A
separate feeder has to be constructed and a capital cost has to be charged as per the table given below, in
addition to the cost of the normal service connection provided from the separate feeder. This is not
applicable to the norma! 30A/60A suppliers where such equipment is not used.
05.
06.
07.
The above service connections should not be given from normal consumer distribution lines.
** The distance limits for 3 phase, 30A and 60A connections is applicable as per the construction
standards ie. 800m and 400m respectively from the T/F.
A capital cost of the new line has to be shared by the consumers in addition to the sen/ice
connection charges.
When providing the connection to the First Consumer, CEB has to bare the balance cost of the
feeder as the consumer will pay only his share as given in the table below. The balance
expenditure may be charged to the System Augmentation Fun^ls.
The capita! cost for different categories of the service connections is given in the table below.
If service connection can not be given due to distance limits or voltage drop, that has to be
referred to the Planning Engineer to study and make an appropriate System Augmentation
proposal.
The costs indicated below are valid only for the feeder section constructed on the existing pole^
parallel to an existing feeder. If it is required to install poles to get the connection off the existing
feeder or extend the existing feeder the length from the T-off or the point of extension to ih(
consumer point shall be charged under the relevant service connection rates.
.
Capital Costs.
Size of the service 60A 3 phase
connection
** Allowable distance 400m
from the Substation
No. of service connection 2
(allowable)
Rs.100,000.00
Capital cost per service
connection to be charged
from the consumer
Note:
30A3phase
30A1 phase
800m
1000m
4
Rs.100,000.00
Rs.75,000.00
This is only a puide line to prepare the cost estimates. These limits could be changed '
considering the voltage drops, consumer growth etc only on personal approval of t
Provincial DbMM on case by case basis.
10
Ceylon Electricity Board
On^ Flat Twin Core Service Main Wire (Black and Grayfor two Phases) and
One normal Single Phase Service Main Wire (Insulated Conductor for third phase
[Brown] and other Conductor [Sheathed, Blue] for neutral).
If there is a shortage of Flat Twin Core Service Main Wire, Single Core Insulated Wire may
be used.
(III).
Last Span
In all categories of service connections the last span shall generally not exceed 30m,
however in special circumstances it may be appropriate to change the last span slightly with
the approval of the Engineer concemed.
(Iv).
When the Service length exceeds 110m, up to 110m Standard Constaiction Cost for Service
Connection shall be used. For the balance length, Standard Construction Cost for LV Lines
(as indicated below) shall be used for estimation purposes, but it is to be noted that the total
bare aluminum conductor line length shall not exceed 1.8km from the distribution substation.
i).
ii).
: Rs.898.000.00
:Rs.1.161.000.00
(v).
Service Connectionsfor Consumers beyond 1.8km fromthe Distribution Substation
Distribution feeders shall not be_extended beyond I.Bkm from the distribution substation to provide
Service connection utilizing bare aluminum conductors. In the event service connections are to be
provided from the feeder terminal point (1.8kmfromthe dist. sub.) separate insulated service main
wires shall be used for each consumer up to a maximum distance of 110m. No bare conductors
shall be used to provide such service connections.
. ., .
li)n E l c d r i c i t y B o a r d
11
Standard C o n s l r u c t i o n
Raies-2012
14).
15 Amp.
1.
30 Amp.
60 Amp.
2.
Rs. 37,800.00
Rs.3,200.00
54,900.00
3,600.00
61,200.00
3,600.00
65,300.00
4,400.00
71.300.00
4,500.00
12
Ceylon Electricity Board
7.
8.
Rs. 4.250.00
Rs. 300/meter
THREEPHASELOOP SERVICE
a). Fixed Cost
b) Variable cost
Rs. 18,000.00
Rs. 350/meter
9.
Rs.18,000.00
Rs.375/meter
Remarks
Rs. 27,300.00
Rs. 34.100.00
13
Ceylon Electricity B o a r d
Standard C o n s U u c t i o n Ratcs-2012
14
on Electricity Board
16)
OTHERCHARGES.
Charge (Rs.)
Types of Charge
800.00
Disconnection at the customer's request
800.00
Reconnection at the customer's request
800.00
Reconnection after a statutorydisconnection
800.00
Testing of an energy or energy/ demand meter (230/400 V)
8,500.00
Testing of an energy or energy/ demand meter and associated
equipment {230/400 V)
8,500.00
Testing of an energy or energy/ demand meter associated equipment
(used at voltages higher than 230/400 V)
CCE
Installation testing 250.00
Changing an account'name and/or the tariff category
Free of charge for changing
Changing an energy or energy/ demand meter
defective meters. For other
cases CCEshall apply.
CCE
CCE
' CCE
CCE
based
on
compensation
charges
decided by Divisional
Secretaies and cost of
removing way leaves.
Free of charge
Free of charge
CCE
CCE
10.
11.
12.
13.
14.
15.
16.
17.
18.
15
Standard ConsmiaionRaIes-2012
16
Ceylon l:tricity Board
(i)
-
' -^
:
. :
;
(ii)
I
; -1
- If the .power reqoireinent is 3 0 100 Amp. or less, in the case of areas where the
distribution system is underground and 3 0,60 Amp. or less in the case of areas where
the .distribution system is overhead and if it is technically possible to provide the
power connection from the existing L T distribution system, the Area Engineer shaU
give tiie quotation to the prospective applicant based on tiie standard rates subject to
other conditions. If the capadiy of the substation is required to be increased tiie cost of
augmentation should also be recovered along with the cost of service-cormectioiu
If the power' requirement (contract demand) of fee building cannot be provided from
' ti^e existing L V network then substation capacity and the location of the new
substation has to be decided by Commercial Engineer (Heavy Supply) of the Province.
The total electddty power requirement of the building should be assessed- by the
Provincial Planning Committee based on the information gathered by the Commercial
Engineer from the buHding owner., Planning Committee should comprise of D G M of
the Province, Planning" Erigiheer'of'the ProviiKC Chief Eriginee: (Cbmmerdal) and
Commercial Engineer (Heavy Supply) : :
(iii)
Commercial Engineer (Heavy Supply) should advice with the owner of th>3 building
and provide a design for a suitable LT switchgear and distribution panel to
accommodate various power connections (service connection) to various floors/
apartments i n the high-rise building. The LT panel has to be provided by thfi owner, of
, the bmldihg at a suitable location with adequate security.. It is advisable to locate these
""\ panels i n the substation cubical itself or in a separate room in the ground floor of the
1 ,
building and install all meters'in the L T distribution paneL A l l consumers shaU bring
ftieir load wires up to the paneL Cost of cabling to the LT switchgear and distribution
panel and meter panel has to be calculated and added to the cost of substation. . .
;^(iv)
The quotation for providing electricity supply to the high rise building has to be
prepared.considering the length of required H I spur line (or HT Cable).and cost of
substation (Indoor"substation where applicable) as in the case of buBc supply .-
(v).
Thepxesent Comrnerdal Policy and method of cost sharing for giving connections i n
Colombo Q t y shall be adopted i n Kandy Dehiwala and M t Lavinia Munf-cipal Areas
as weE, wherq there area underground distribution systems. *
i
"(vi)
' j,
F. P R O V I S I O N O F
EOECnaCrry STJPPLY T O L A N D D E V E L O P E R S
(AUCnON L A N D S ) . . ,
The 'Commercial Engiiaeer (Heavy Supply) shall assess the power requirement
.of the developed I-iid assuming thataLL blocks of developed land will have
houses except roads and xeservatioDS for common purposes such as play
grounds etc Commercial Engineer may compute electriciiy demand per house
hold orr the following basis.
Peak Load of the
Installation (kW) ,LDpk
" .035 . .-- "
.0.75 ^>
- Category
....
r-:^";
,:
-I
U . -
t~X.^.
p
'
1.
^ .
Houses to* bmld ih'De^oped Lands in the areas o&er.than MnnicipsI Lbiiite and Urban
Coimdl .areas shall be-considered ^as small or medium ^isize/-considering the geography,
-Simomdingand'roadcdnditianof thelocali^ . ' - .
Calcolatiou'of gpTOup demandj"
= . * -
:,
TotiLLoad . ;
XDEk X ji X C ^ -
^ ',
'-~
." -
..
y\
.. ' '.
nok^
Total'load='.^0.75kV^pb:haii^eXl5
4 -~.5.0.93
No - -of ;17
.19
Houses: \
to
18Coihddet
052 051
. Factor
.1
i.) i - I.-
1-1
0.86
.6.-_. -7
0.79
^--T
S;.._ -
"10
^r-
20- 21
22-"-
05- 0.49
23
a43
24
0.47
25
to
"28
0.46
ll--0.61
29 . "-30- to
33 "
0:45
0.44
14"^-
rl2:
34
0-55 054
053
35 ..
to
50 &
Above
'39 0.43
0.42
40
"to .
4?
\'
0.40)
(ii)
Once group demand is computed thfen capacity of the substatLcn and its location
should be decided, taking the nearest standard substation, capadly
(in)
Design the jntemal overhead electricity distributioh system of the land to cater" the
Icjng- term pQwer xeqmxement (assume each block of land contains a hoi.'se). and
enabling all tiie houses, to get a service coimection'"without using a pole.
Quotation tb the Developed Land should include.
^i^i rJ.'
(a)
(b)
'(c)-
BaU'costof the'mtemalLT
Full cost of the H X spur line reqoirem^^ .
Apportioned cost of'the substation according, to the ratio of contract demand
and capacity of the:substationi..Balance costhas to be borne by_CEB. The cost of
substation is the substation for K E schemes hked i n this, document
;':(y) If the-pawef.fe^iiremCTt"(gr^
demaiid) of the Dev^'oped'-Iahd could be met from
!.' /
the exisfegXV distribution^^
cost, internal of L V distributibn ^stem
shall H P rhartredfrom-the annHrant'.
the prospective"retai.corisTnn^
and 60 Arnp?)" .are tnated'witSiit"tfre^^
.'.--existing LT network (that; is \!w!thin 1.8 kmlirnit) Supply "should be given as usuaL Anjrthing
^ outside witt require a separatee^
/
,.-T>.If
P O L I C Y ON N E W S E R V I C E C O N N E C T I O N S
Colombo City
Generally supplied and. metered at. 11- kV..
Costof alt IT kV works associated-witti the
supply up to the metering point
normaliy be paid by the
customer.
However,
if
augmentation
of
Grid Substation or Primary Substation, is
necessary. to provide' requested-; supply.;
theri a proportionate cost as given below to
bepaid by the customer. .
.-
Proportionate c o s t . .
T y p e of S u p p l y
SUPLIES O V E R ; 1 M V A
tiiifii.-.:.
i-.sU
Outstatloris'
Supplied & metered
at 33 kv.or .11 kv.
Costing is similar to
Colombo'City.
2.A
100KVASUPPUE5 "
:.BUU<(tSQ^np-:^30).^.^
.;
;CbsLof4Qq:^^
;WkWContractDemand.
.
''.-'
If
t h e . ' customer
reguii"eme'nt- .more
than, or- equal to
;capacity-"'- .'
. of
-standard: .S/S on
CEB'
does
not.
Tntent;- - --..utlisirig
;si3are'capadty theh
:custorTier.:'' .'should
.beatr.the fijil cost of
SIS:}. and"----HT/LT
;;iihes '~ !c V; ;
tOOKVASUPfeY-FOR' _ '
. RETAlLDlSTRIBLmON
f
:BUIK
; C11-
f100:AMP^3gii:-"'-::-
1
i
7dKVA-SUPp'fes-'FOR -
.RETAILDtSTRIBUnON T'...
' - ' S U P P L I E S AS6>^5^ KVA
AND0PTO7a-KVA-'-
T Y P E O F L T S t J P P L I E S SERVICE C O N N E C n O N S -
- '
'30 A 30 Loop
' soA-ierLoop
, .ISA 30^
.15 A 30 Loop
i.5A.10. '
::l5A'i0Loop
60X30
It)
3Q'A'30.-.
". -
"111)3CFA'30LOOP
1V)
3O:Ai:0tlbop
3aA.i0
V1)): 1 5 A 3 0 .