Coursework 2
Fault Tree Analysis (FTA) Application
Gkoumas Dimitrios
Reg. No. 201580394

Stais Giorgos
Reg. No. 201582379

This document is the coursework/project coversheet for all NAME classes conducted at University of
Strathclyde for academic year 2015-16. Please do the following when submitting your coursework:

Staple a completed printed copy of this form to every piece of coursework/project work
you submit for classes in the Department of Naval Architecture & Marine Engineering.
Avoid the use of document containers such as cardboard or plastic covers,
document wallets, ring binders or folders (unless otherwise instructed by the class
lecturer).

We do not wish to discourage students from discussing their work with fellow students and
collaborating in solving problems. However you must ensure that your submitted work distinguishes
your own intellectual contribution. The key point is that you must not present the results of another
persons work as though they were your own.
SUBMISSION
DETAILS
Please ensure that the details you give are accurate and completed to the best of your knowledge.
Registration Number : 201580394
Registration Number : 201582379
Class Code :NM916

Name : Gkoumas Dimitrios


Name: Stais Giorgos
Coursework Title: Fault Tree Analysis (FTA)

Lecturer: Dr . I. Lazakis

Declaration
I have read and understood the University of Strathclyde guidelines on plagiarism.
http://www.strath.ac.uk/media/ps/cs/gmap/academicaffairs/policesandprocedures/studentguide- to-academic-practice-and-plagiarism.pdf
I declare that:
1.

This is my coursework/project assignment. This is the version that I am submitting for


assessment. I understand the penalties of plagiarism.

2. Wherever published, unpublished, printed, electronic or other information sources have


been used as a contribution or component of this work, these are explicitly, clearly and
individually acknowledged by appropriate use of quotation marks, citations, references and
statements in the text.

Signature:

Stais Giorgos |Gkoumas Dimitrios

_ Date of Submission:

Table of Contents

1. Introduction

2. Analysis Procedure

3. FTA Symbols Description

4. Systems Fault Tree Analysis

5. Overall Results

11

6. Cut Sets

14

7. Importance Measurements

16

8. Systems Improvement

21

9. Conclusion

22

10. References

23

11. Appendix

24

Stais Giorgos |Gkoumas Dimitrios

1. Introduction
The fault tree analysis (FTA) is a well-known reliability tool used in various research
studies and industries since its original introduction in reliability analysis in the 60s
and 70s. It is a deductive procedure used to define the various combinations of
hardware and software failures and human errors that could cause undesired events at
the system level. Fault tree analysis maps the relationship between faults, subsystems,
and redundant safety design elements by creating a logic diagram of the overall system.
The analysis begins with a general conclusion, then attempts to determine the specific
causes of the conclusion by constructing a logic diagram called a fault tree. This is also
known as taking a top-down approach. The main purpose of the fault tree analysis is to
help identify potential causes of system failures before the failures actually occur. It
can also be used to evaluate the probability of the top event using analytical or statistical
methods. These calculations involve system quantitative reliability and maintainability
information, such as failure probability, failure rate and repair rate. After completing
an FTA, you can focus your efforts on improving system safety and reliability.

2. Analysis Procedure
Many different approaches can be used to model a FTA, but the most common way
can be summarized in a few steps. A single fault tree is used to analyze only one
undesired event or top event, which may be subsequently fed into another fault tree as
a basic event. FTA analysis can be defined in five steps:
1. The Definition of the undesired event. This can be very hard to find, although
some of the events are very easy and obvious to observe. Someone with an
engineering background and knowledge is the best person who can help define
and number the undesired events.
2. Understanding the problem. Once the undesired event is selected, all causes
with probabilities of affecting the undesired event of 0 or more are studied and
analyzed. Getting exact numbers for the probabilities leading to the event is
usually impossible for the reason that it may be very costly and time consuming
to do so.

Stais Giorgos |Gkoumas Dimitrios

3. Fault Tree Construction. After the selection of undesired event and having
analyzed the system so that we know all the causing effects we can now
construct the fault tree. Fault tree is based on AND and OR gates which define
the major characteristics of the fault tree.
4. Fault Tree Evaluation. After the fault tree has been assembled for a specific
undesired event, it is evaluated and analyzed for any possible improvement.
5. Control of systems hazards. This step is very specific and differs largely from
one system to another, but the main point will always be that after identifying
the hazards all possible methods are pursued to decrease the probability of
occurrence.

3. FTA Symbols Description


The FT structure consists of a number of gates and events. The most
commonly used are described below

AND gate
The output occurs if and only if all the input parts of the gate occur.
The input parts can be intermediate gates, basic ivents or a
combination of the two. The output can be the top event or any
intermediate event

OR gate
The output occurs if and only if any of the inputs parts of the gate
occur. The input parts can be intermediate gates, basic events or a
combination of the two. The output can be the top event or any
intermediate event. An OR gate should have at least two inputs

VOTING gate
By using this gate, the output occurs when m out of n input events occur.
When m is equal to n, the gate reacts like an OR gate. The input parts
can be intermediate gates, basic events or a combination of the two. The
number of inputs needs to be higher or equal to three. The output can
be the top event of the FT or any intermediate event.

Stais Giorgos |Gkoumas Dimitrios

Sequence Enforcing (SEQ) gate

Is used if all the input events occur in a specific order


(from left to right) as presented in the FT structure.
This means that the left most event occurs followed by
the one next to it and so on.

Transfer Gate

This gate is used as a connector between different parts


of the FT structure. In case of FT being too big in size
the transfer gate is used to represent part of the FT as
a single gate, thus minimizing the graphical size of the
whole FT structure

Basic event

Basic events describe the final stage of a FT structure


or branch of a FT and define the end of the analytical
structure.

Stais Giorgos |Gkoumas Dimitrios

4. Systems Fault Tree Analysis Diagram


In order to construct our system, the primary goal we have in mind is to
understand the working principles of the system and which are the elements
which fail first and how their reliability can be improved. Practically the latter
can be reached by applying condition monitoring to the most critical elements
so as to extend their operation life. Also the ships crew can achieve the increase
of the elements lifetime by performing regular inspection to the critical
equipment.
The system which we are going to examine is the Main Engine. Our Planned
Maintenance System includes the engines six cylinder items. The cylinders
cover, liner, piston and stuffing box are incorporated as well as all the crosshead
and crankpin bearings. The crankshaft component is consider as a separate unit
along with the thrust and main bearings. Apart from those units which need
either overhauling or dismantling and inspection, also some samples and
deflection measurements for some items are needed. Those items are composed
in a third separate category. Below, the overall layout of the system is
illustrated.

In order our diagram to be accurate, so as the results to be acceptable and


logical we have to select the appropriate gates. For the top gate a Voting gate
is used, so as to determine that in case two out of three units fail, the whole Main
Engine will stop working, as the first subsystem is measurements and samples
Stais Giorgos |Gkoumas Dimitrios

will always fail much earlier than the rest two subsystems. Therefore, if any of
the two other subsystems will fail in addition with the first, this will occur a
complete malfunction of the Main Engine.
At this point, transfer gates are used to handle each item as a subsystem for
convenience reasons. Each category are described in detail below.

The first subsystem is the Measurements & Samples. An OR gate is placed at the top
of the subsystem leading to a failure of the engine if only one of the following four
basic events fails. This is the less critical subsystem because in case engine crew forget
to take any of them, the Main Engine could still working without any problem. On the
other hand, the results of the above measurements and samples are very valuable as we
can evaluate the current condition of the Main Engine and prevent future major
components damages.

The second subsystem is the Cylinder Unit Failure. Our Main Engine consists of 6
Cylinders as a result we divide them separately. We chose a Voting gate for this
subsystem where in case two out of six cylinders will breakdown the top gate will
become out of order. We made this selection because as per classification requirements
Stais Giorgos |Gkoumas Dimitrios

all vessels should carry onboard a minimum quantity of major spare parts. As a result,
in case any item of cylinder unit breakdown then engine crew could easily replace it
from spare parts. But if an additional unit will fail then the top gate will stop working.

Each cylinder unit is sub-divided in two systems which are the Cover-Piston-Liner
Failure and ConRod - PistonRod Failure. In the first system is included the Piston, the
Cylinder Cover and the Cylinder Liner. In the second system is included the Stuffing
Box, the CrossHead Bearing and the CrankPin Bearing. All basic events are connected
with an OR gate with the top event due to the fact that all of them are extremely
critical, thus failure of any of them will occur complete failure of the unit.

The third subsystem is the Crankshaft Failure which is divided in two parts. The first
is Main Bearings and the second is the Thrust Bearing. We used an OR gate to
connect them because crankshaft is very sensitive to any possible damage of the
bearings, thats why all engines are equipped with an Oil Mist Detector which
automatically slow-down the engine in case of bearings failure.
Stais Giorgos |Gkoumas Dimitrios

Finally the Main Bearings subsystem consists of eight basic events which represents
each individual Main Bearing. As we mentioned before, every vessel is obliged to carry
onboard some spare parts and one of them is one set of Main Bearings. Consequently,
we chose a Voting Gate to connect the basic events with the top one which will fail
only in case two out of eight main bearings run out of order.

Stais Giorgos |Gkoumas Dimitrios

10

5. Overall Results
Availability & Reliability Calculations
In this stage of our coursework we have to calculate the overall results. We start
calculating the FTA results from the M/E for 43800 hours correspond to 5years of
operation. The time steps for this simulation time are 21.

We select the exact

calculations method. This method calculates the reliability and availability, the cut sets
with their probability and normalized probability as well as their roots and the
Importance measures.
The reliability represents a components ability to work at a certain capacity. The
reliability can be again to its initial condition after the proper maintenance is applied.
The availability shows the ability of a component to be accessible and ready to work
the amount of hours set by the manufacturer. This value also decreases after several
working hours and can be brought back up to approximately 100 percent after the
adequate maintenance.

Main Engines Reliability & Availability


Months
0
3
6
9
12
15
18
21
24
27
30
33
37
40
43
46
49
52
55
58
61

Hours Unreliability Unavailability Reliability Availability


0
0
0 100,000%
100,000%
2190
0,865934
0,865934
13,407%
13,407%
4380
0,984126
0,984126
1,587%
1,587%
6570
0,998242
0,998242
0,176%
0,176%
8760
0,999813
0,999813
0,019%
0,019%
10950
0,999981
0,999981
0,002%
0,002%
13140
0,999998
0,999998
0,000%
0,000%
15330
1,000000
1,000000
0,000%
0,000%
17520
1,000000
1,000000
0,000%
0,000%
19710
1,000000
1,000000
0,000%
0,000%
21900
1,000000
1,000000
0,000%
0,000%
24090
1,000000
1,000000
0,000%
0,000%
26280
1,000000
1,000000
0,000%
0,000%
28470
1,000000
1,000000
0,000%
0,000%
30660
1,000000
1,000000
0,000%
0,000%
32850
1,000000
1,000000
0,000%
0,000%
35040
1,000000
1,000000
0,000%
0,000%
37230
1,000000
1,000000
0,000%
0,000%
39420
1,000000
1,000000
0,000%
0,000%
41610
1,000000
1,000000
0,000%
0,000%
43800
1,000000
1,000000
0,000%
0,000%

Stais Giorgos |Gkoumas Dimitrios

11

Stais Giorgos |Gkoumas Dimitrios

12

Crankshafts Reliability & Availability


Months
0
3
6
9
12
15
18
21
24
27
30
33
37
40
43
46
49
52
55
58
61

Time Unreliability Unavailability Reliability Availability


0
0
0
100%
100%
2190
0,159943
0,159943
84%
84%
4380
0,37676
0,37676
62%
62%
6570
0,567512
0,567512
43%
43%
8760
0,712154
0,712154
29%
29%
10950
0,813808
0,813808
19%
19%
13140
0,882027
0,882027
12%
12%
15330
0,926412
0,926412
7%
7%
17520
0,954656
0,954656
5%
5%
19710
0,972331
0,972331
3%
3%
21900
0,983252
0,983252
2%
2%
24090
0,989929
0,989929
1%
1%
26280
0,993978
0,993978
1%
1%
28470
0,996416
0,996416
0%
0%
30660
0,997876
0,997876
0%
0%
32850
0,998746
0,998746
0%
0%
35040
0,999261
0,999261
0%
0%
37230
0,999566
0,999566
0%
0%
39420
0,999746
0,999746
0%
0%
41610
0,999852
0,999852
0%
0%
43800
0,999913
0,999913
0%
0%

Stais Giorgos |Gkoumas Dimitrios

13

Measurements & Samples


Reliability & Availability
Months Time
Unreliability Unavailability Reliabilty Availability
0
0
0
0 100,00%
100,00%
3
2190
0,840409
0,840409
15,96%
15,96%
6
4380
0,974531
0,974531
2,55%
2,55%
9
6570
0,995935
0,995935
0,41%
0,41%
12
8760
0,999351
0,999351
0,06%
0,06%
15
10950
0,999896
0,999896
0,01%
0,01%
18
13140
0,999983
0,999983
0,00%
0,00%
21
15330
0,999997
0,999997
0,00%
0,00%
24
17520
1,000000
1,000000
0,00%
0,00%
27
19710
1,000000
1,000000
0,00%
0,00%
30
21900
1,000000
1,000000
0,00%
0,00%
33
24090
1,000000
1,000000
0,00%
0,00%
37
26280
1,000000
1,000000
0,00%
0,00%
40
28470
1,000000
1,000000
0,00%
0,00%
43
30660
1,000000
1,000000
0,00%
0,00%
46
32850
1,000000
1,000000
0,00%
0,00%
49
35040
1,000000
1,000000
0,00%
0,00%
52
37230
1,000000
1,000000
0,00%
0,00%
55
39420
1,000000
1,000000
0,00%
0,00%
58
41610
1,000000
1,000000
0,00%
0,00%
61
43800
1,000000
1,000000
0,00%
0,00%

Stais Giorgos |Gkoumas Dimitrios

14

Stais Giorgos |Gkoumas Dimitrios

15

6. Cut Sets
A cut set identifies which unique combination of component failures and/or
events can cause an undesired event to occur. A minimal cut set is the smallest
set of events, which, if they all occur, cause the top event to occur. The Cut
Sets show the weak parts of a system and the ways of having a break down
with the less amount of non-operational elements.

Stais Giorgos |Gkoumas Dimitrios

16

Stais Giorgos |Gkoumas Dimitrios

17

7. Importance Measures
Importance measures are the systems most critical components, which will define
the failure of the system. They are important in order to identify which components
should be maintained first and help us to prioritize the overall maintenance work. The
importance measures are expressed in percentage of importance. The highest the
percentage, the highest the importance of an element.
We can use several methods to identify the importance measures. The software
calculates those values by using the Criticality and the Fussell-Vesely method. Both of
them obtaining the same results. Below, the top 10 most important measures of each
subsystem are presented.

Stais Giorgos |Gkoumas Dimitrios

18

Main Engines Important Measures

Event

Criticality

Fussell-Vesely

Fussell-Vesely
Alternative
12,1%

Bearings Clearance

12,1%

12,1%

CorssheadBearing3

5,5%

5,5%

5,5%

Cover1

5,5%

5,5%

5,5%

Cover2

5,5%

5,5%

5,5%

Cover3

5,5%

5,5%

5,5%

Cover4

5,5%

5,5%

5,5%

Cover5

5,5%

5,5%

5,5%

Cover6

5,5%

5,5%

5,5%

CrankPinBearing1

5,5%

5,5%

5,5%

CrankPinBearing2

5,5%

5,5%

5,5%

Crankshafts Important Measures


Event

Criticality

Fussell-Vesely

Fussell-Vesely
Alternative
23,73%

MainBearing1

23,73%

23,73%

MainBearing2

20,77%

20,77%

20,77%

MainBearing3

24,41%

24,41%

24,41%

MainBearing4

23,13%

23,13%

23,13%

MainBearing5

20,77%

20,77%

20,77%

MainBearing6

21,86%

21,86%

21,86%

MainBearing7

20,77%

20,77%

20,77%

MainBearing8

23,50%

23,50%

23,50%

Thrust Bearing

10,52%

10,52%

10,52%

Stais Giorgos |Gkoumas Dimitrios

19

Cylinders Important Measures

Event

Criticality

Fussell-Vesely

Fussell-Vesely Alternative

CorssheadBearing3

5,56%

5,56%

5,56%

Cover1

5,56%

5,56%

5,56%

Cover2

5,56%

5,56%

5,56%

Cover3

5,56%

5,56%

5,56%

Cover4

5,56%

5,56%

5,56%

Cover5

5,56%

5,56%

5,56%

Cover6

5,56%

5,56%

5,56%

CrankPinBearing1

5,56%

5,56%

5,56%

CrankPinBearing2

5,56%

5,56%

5,56%

CrankPinBearing3

5,56%

5,56%

5,56%

Measurements and Samples


Important Measures

Event

Criticality

Fussell-Vesely

Fussell-Vesely Alternative

Bearings Clearance

23,4%

23,4%

23,4%

CrankShaft Deflection

23,4%

23,4%

23,4%

Clearance

23,4%

23,4%

23,4%

Lub Oil Analysis

29,9%

29,9%

29,9%

CrossHead Guide & Shoes

Stais Giorgos |Gkoumas Dimitrios

20

8. Systems Improvement
There are various measures could be taken in order to improve the overall system/subsystem reliability such as:
i.

All Maintenance jobs should be carried out prior reaching the maximum
limit as per manufacturer data in order to achieve highest performance of
our equipment.

ii.

All similar components of our system like all Liners or all Pistons should
have the same maintenance intervals in order to avoid continuous stoppages
for repairs and better engine performance as all the similar items will have
the same running hours

iii.

As it is known, classification inspections take place on annually, 2.5 and 5


years interims therefore major repairs works should take place based on
above periodicity in order to eliminate off-hire periods.

iv.

Additionally, in order to minimize the repair costs some items that effect
one each other, it is preferably to have the same maintenance intervals. For
example, in order to dismantle the piston, it is compulsory to dismantle the
cylinder cover as a result it is an opportunity to perform all
inspections/repairs on it.

v.

As this vessel has only one Main Engine, additional spare parts for critical
items should be kept onboard in order crew to have the ability to replace
them in case of malfunction.

Stais Giorgos |Gkoumas Dimitrios

21

9. Conclusion
The Main Engine of the vessel is one of the most complicated machinery item
onboard consisting of a lot of parts. On this coursework, we checked only few major
items of the main engine. This is the reason our results not represent exactly the real
situation but very close of it. To conclude, through the PTC WINDCHILL QUALITY
SOLUTIONS Software we can obtain valuable results which will assist us to prepare
an effective and cost-competitive maintenance plan.

Stais Giorgos |Gkoumas Dimitrios

22

10. References

1. NM523 / NM916 Systems availability and maintenance Lecture


Notes, Dr. Iraklis Lazakis, University of Strathclyde, 2014.
2. Fault Tree Analysis as a tool for modeling the marine main
engine reliability structure, Rafal Laskowski, Scientific Journals
of the maritime university of Szczecin, 2015
3. Operational Information of The Two Stroke Crosshead EngineThe Piston,
http://www.marinediesels.info/2_stroke_engine_parts/piston.htm
4. Operational Information of The Two Stroke Crosshead EngineThe Cylinder Liner,
http://www.marinediesels.info/2_stroke_engine_parts/liner.htm
5. PTC Windchill FTA Data sheet, 2014

Stais Giorgos |Gkoumas Dimitrios

23

11.

Appendix

Planned Maintenance System-Vessels Master List

Stais Giorgos |Gkoumas Dimitrios

24

Stais Giorgos |Gkoumas Dimitrios

25

Das könnte Ihnen auch gefallen