Beruflich Dokumente
Kultur Dokumente
Solutions
Services
Slide 1
10/01/2013
Slide 2
10/01/2013
Slide 3
10/01/2013
Control center
Category 1
Display
ATG
Category 2
Alarm
ATG
Category 3
Slide 4
10/01/2013
Receipt
LAHH
Receipt
Alarm
Control center
Category 1
Display
Fully attended
ATG
Receipt
(min.
Category
2 1h at the start + min. 1h after the
Alarm
end + periodically visual check on site)
Be aware: no manual hand dipping during
ATG LAHH
Receipt
product receipt and until at least 30
min
Category 3
Alarm
after a product receipt!
Slide 5
10/01/2013
Control center
Semi-attended
(min. 30 min at the start +Display
min. 30 min after the end)
Category 1
ATG
Category 2
Alarm
ATG
Category 3
Slide 6
Receipt
LAHH
Receipt
Alarm
10/01/2013
ATG
Category 2
Alarm
ATG
Category 3
Slide 7
10/01/2013
Receipt
LAHH
Receipt
Alarm
Slide 8
10/01/2013
Category 2
Category 3
Multiple tanks
can be filled
simultaneously
Multiple tanks
can be filled
simultaneously
Control center
Category 1
Display
ATG
Category 2
Alarm
ATG
Category 3
Slide 9
10/01/2013
Receipt
LAHH
Receipt
Alarm
Slide 10
10/01/2013
ATG
Category 1
Display
AOPS
Logic Solver
ATG
Receipt
Alarm
Category 2
AOPS
Logic Solver
ATG
Category 3
LAHH
AOPS
Receipt
Alarm
Logic Solver
Slide 11
10/01/2013
Slide 12
10/01/2013
Slide 13
10/01/2013
10/01/2013
Competition: 2 in 1 feature?
Competitor claims to have two redundant electronic boards in one
radar/device, but they are still using the same/one antenna.
This is not allowed by API2350 for an AOPS
What happens, if moisture/water is in the electronic compartment
or having water built-up in the antenna?
What happens, if the radar beam is not reflected (e.g. liquid is
boiling, obstacles in the radar beam)?
What happens, if cables breaks?
Slide 15
10/01/2013
Slide 16
10/01/2013
Time in Minutes
45
30
15
Slide 17
10/01/2013
Category 1
CH
Category 3
CH
HH
MW
Slide 18
10/01/2013
CH
Category 2
Category 3
CH
MW
Slide 19
10/01/2013
CH
2. Application standard
Implementation for Process industries
Safety
Regulations
IEC 61508
Supplier and
manufacturers
IEC 61511
ISA 84
System
integrator/
Operator/User
10/01/2013
Prevention
Mitigation
Layers of protection
Plant emergency response
Emergency response
layer
Embankment
Emergency
Shutdown
Wild
process
Normal
process
Slide 21
10/01/2013
Ngo
Slide 22
A) management system
B) risk assessment system
C) defining operational parameters
D) requirements for procedures
E) equipment systems
10/01/2013
Slide 23
10/01/2013
External Swivel
plate for functional
proof testing
Slide 24
10/01/2013
Floating Roof
oil
Slide 25
10/01/2013
Alain ENGELS
FMR51
700 mm version
20 m
13 m
1000 mm version
Slide 26
10/01/2013
Alain ENGELS
Slide 27
10/01/2013
12 years
Ngo
3 years
2 years
Slide 32
10/01/2013
Slide 33
10/01/2013
Slide 34
10/01/2013
Tuning
Fork
Radar
Slide 35
Proof testing
Push button
activated test
generator
High proof test
coverage
Proven in use
10/01/2013
By proof test
simulation
Proof test
coverage
depends on
inspection depth
Mounting
Top
adjustable
Side
Top
Top
Free
space
Radar
Damaged deck
No Failure
No Failure
No failure
Tuning
Fork
Slide 36
Lost deck
10/01/2013
Buncefield report
Buncefield Report:
http://www.buncefieldinvestigation.gov.uk
Slide 37
10/01/2013
Ngo
Failed !!!
Slide 38
10/01/2013
Ngo
Slide 39
10/01/2013
Ngo
Slide 40
10/01/2013
Ngo
Slide 41
10/01/2013
Ngo
Liquiphant in practice
Liquiphipant in safety
Click the blue box
Oil detection in pipes/sump pits
Slide 42
10/01/2013
Ngo
built-up
suspension
air bubbles
viscosity change
pressure and
temperature change
electrical properties
foam
plant
vibration
Slide 43
10/01/2013
turbulences
Ngo
4..20mA +
LIVE-Signal
Liquiphant FailSafe FTL80/81/85
Nivotester
FTL825
PLC
Liquiphant FailSafe
FTL80/81/85
Slide 44
Safety function
420 mA output with life signalRisk
(every 3
reduction:
seconds self checking procedure)
~48.000
SIL 3 capable in single device
min/max safety function
proof test simulation with push-button
proof test interval can be extended up to
12 years !
4..20mA +
LIVE-Signal
Optional
10/01/2013
Slide 45
10/01/2013