Sie sind auf Seite 1von 3

DESIGN & PLANNING DEPARTMENT

MANCOM REPORT
DATE: July 21, 2015
PROJECT

ITEMS

CURRENT STATUS

A. Site Development Plan

1. Dasmarias Cavite

B. Housing Components

ON -GOING WORKS

REMARKS & ISSUES

IN-CHARGE

Transfer Dwgs to CAD file

Follw up Survey Plan to Ar. Dupher

Paolo

Revisions as per corrections of


MBF

Finalization of Korean Land Lot Swapping

Land Data Computations

Follow up Topo

Single Detached

For Design Revisions

CURRENT TARGET

Mariz

Review MBF Comments


Duplex

For Design Revisions

MJ

Review MBF Comments


C. AMENITIES

Clubhouse

For site development scheme

Gate and Guardhouse

For site development scheme

D. ROAD SECTIONS

2. AUREVILLE

July 23 2015

For schematic

Model House Units

A. MIRABELLE

Interior Decoration- Final

Ff. up Operations regarding corrections on


site

Date of OB Aug 3-7, 2015

Ff. up Operations regarding corrections on


site

Date of OB Aug 3-7, 2015

Landscaping
B. CRISTELLE

Interior Decoration- Final


Landscaping

C. Entrance Statement and Signage


D. RFO Units

Landscaping Update
Cristelle- 8 units

FF. up Romar regarding Delivery of Plants


Drawings blueprint

done

Mirabelle- 1 unit

Drawings blueprint

done

For schematic site development


layout

A. Planting Strip

3. COSTA SMERALDA
For landscape quotation

B. RFO Units

A. FOR BUILDING PERMIT APPLICATION

Verify sales and docs department

Ff up Ms. Al (Sales Doc)

aa. Phase1 (4 units)

Barcelona- 1 un; Esperanza- 1 un;


Isabel- 1 un; Mercedez- 1 un.

For scheduling Jul 20-24

bb. Phase 3(7 units)

Esperanza- 1 un; Estelle- 2un;


Marinella- 2un; Patricia-1un;
regina-1un

For scheduling Jul 27-31

4. PGV Phase 1 to 4

5. PGT

A. FOR BUILDING PERMIT APPLICATION


(OLD VICTORIA)

aa. Block 2 Cluster- 5 units

For scheduling Aug 3-7

bb. Block 5 Cluster- 2 units


B. NICOLE MODEL UNIT

31-Jul

C. PGT Signage

6. PGV 5

A. Site Development Plan

B. House Model Units

For final payment

done

Concealment of power lines and


power supply

Ff. up Cebu Operations

Compilation of Engineering
Drawings as per Ar. Dupher's
update

Coordination with Ar. Dupher

Paolo

MJ

aa. PHOEBE

for updating of plans comments

Mariz & Paolo

bb. TIARA

for updating of plans comments

Mariz & Paolo

C. Linear Park

for architectural working


drawings

D. Signage Pylon

for finalization of working


drawings

E. Shophouse

7. SCHEMATIC SITE RESEARCH

A. Dasmarias Property

B. Marilao Property

C. Angeles Pampanga Property

8. MAIN OFFICE INTERIOR


RENOVATION

A. Updating of Floor Plan Layout

done

working drawings

aa. Aqcuire Dasma CLUP and zoning


ordinance

For OB to Dasma

bb. Bacoor CLUP and zoning ordinance

For OB to Bacoor

cc. NAMRIA maps

For OB to Taguig

aa. Acquire Marilao CLUP and zoning


ordinance

For OB Research to Marilao Bulacan

bb. Bocaue CLUP and zoning ordinance

OB Research Bocaue Bulacan

cc. Bulacan Provincial Framework Plan

OB Research Bulacan

dd. NAMRIA maps

OB NAMRIA Taguig

aa. Acquire Angeles CLUP and zoning


ordinance

OB Angeles Pampanga

bb. Pampanga Provincial Framework


Plan

OB San Fernando Pampanga

cc. NAMRIA maps

OB NAMRIA Taguig

Furnish copy to Logistics

B. Costing study of carpet

9. CPE/Training and Expos

C. interior layout study of Finance


Department

To get updates of organizational structure


of Finance Department

a. Philconstruct

research

b. Manila FAME
c. Real Estate Organizations
d. Product Presentation and Plant Visit

Arch./EnP. BRANDO R. BULOSAN


Design & Planning Manager

Mariz

Das könnte Ihnen auch gefallen