DESIGN & PLANNING DEPARTMENT

MANCOM REPORT
DATE: Aug 14, 2015
PROJECT

ITEMS

CURRENT STATUS

ON -GOING WORKS

REMARKS & ISSUES

IN-CHARGE

Transfer Dwgs to CAD file

Folow up Survey Plan to Ar. Dupher

Paolo

Revisions as per corrections of


MBF

Finalization of Korean Land Lot Swapping

Land Data Computations

Follow up Topo

Single Detached

For Design Revisions, with inputs from


BRB & MBF

Mariz

Preparation of plans for presentation


(dimensions and colouring)

Paolo

For Design Revisions, with inputs from


BRB & MBF

MJ

Preparation of plans for presentation


(dimensions and colouring)

Pao

Clubhouse

For site development scheme with inputs


from BRB

MJ

Schemes Week 34 (Aug 17-21)

Gate and Guardhouse

For site development scheme with inputs


from BRB

Mariz

Schemes Week 34 (Aug 17-21)

initial cadd drawings

For schematic proposals

MJ

A. MIRABELLE

Interior Decoration- Final

For inventory

Mariz

Landscaping

Updates and coordination

Mariz

B. CRISTELLE

Interior Decoration- Final

For inventory

Mariz

Landscaping

Updates and coordination

Mariz

Forward files from MJ to Pao

Schematic design for checking

Paolo

A. SDP

B. HOUSING COMPONENTS

1. DASMARIAS
Duplex

C. AMENITIES

D. ROAD SECTIONS

2. AUREVILLE
C. MODEL 62 SQ M
D. Entrance Statement and Signage
A. Planting Strip

3. COSTA SMERALDA

B. RFO Units

As of July 29, 2015 (no movement of


sales)

A. FOR BUILDING PERMIT APPLICATION

aa. Phase 3 (7 units)

Date of OB Aug 3-7, 2015

Landscaping Update

Updates and coordination

Mariz

Date of OB Aug 3-7, 2015

For costing

Mariz

Date of OB Aug 3-7, 2016

For landscape quotation

Updates and coordination

Mariz

Verify sales and docs department

Ff up Ms. Al (Sales Doc)

Natalia-

Marinela- Blk 6 Lot 6;


Patricia- Blk 3 Lot 44;
Regina- Blk 3 Lot 45

For scheduling

For pouching Aug 21, 2015

Paolo

For scheduling

Paolo

4. PGV PHASE 1 to 4
bb. Phase 4A (2 units)

Date of OB Aug 3-7, 2015

For schematic site development


layout

Janella- Blk 15 Lot 18;


Blk 15 Lot 24

C. FOR BUILDING PERMIT APPLICATION

CURRENT TARGET

Olivia- Blk 4 Lot 17;


Olivia- Blk 3 Lot 18

A. FOR BUILDING PERMIT APPLICATION


(OLD VICTORIA)

5. PACIFIC GRAND
TOWNHOMES

aa. Block 2 Cluster- 5 units

For scheduling

Week 34 (Aug 17-21)

bb. Block 5 Cluster- 2 units

For scheduling

Week 34 (Aug 17-21)

B. NICOLE MODEL UNIT

Paolo

C. PGT Signage

A. Site Development Plan

B. House Model Units

For final payment

DONE

Concealment of power lines and


power supply (on-going repairs)

Ff. up Cebu Operations (Janine marcial)

Paolo

Compilation of Engineering
Drawings as per Ar. Dupher's
update

Coordination with Ar. Dupher

MJ

aa. PHOEBE

For updating of plans comments

Mariz & Paolo

bb. TIARA

For updating of plans comments

Mariz & Paolo

For Pouching Aug 21, 2015

6. PACIFIC GRAND VILLAS 5

C. Linear Park

For architectural working


drawings

D. Signage Pylon

For finalization of working


drawings

E. Shophouse
A. Dasmarias Property

B. Marilao Property

7. SCHEMATIC SITE
RESEARCH

C. Angeles Pampanga Property

8. MAIN OFFICE INTERIOR


RENOVATION

DONE

Working drawings
aa. Aqcuire Dasma CLUP and zoning
ordinance

For OB to Dasma

bb. Bacoor CLUP and zoning ordinance

For OB to Bacoor

cc. NAMRIA maps

For OB to Taguig

aa. Acquire Marilao CLUP and zoning


ordinance

BRB & Mariz

DONE

For OB Research to Marilao Bulacan

BRB & MJ

DONE

bb. Bocaue CLUP and zoning ordinance

OB Research Bocaue Bulacan

BRB & MJ

DONE

cc. Bulacan Provincial Framework Plan

OB Research Bulacan

BRB & MJ

DONE

dd. NAMRIA maps

OB NAMRIA Taguig

BRB & Mariz

DONE

aa. Acquire Angeles CLUP and zoning


ordinance

OB Angeles Pampanga

Tentative Week 35 (Aug24-28)

bb. Pampanga Provincial Framework


Plan

OB San Fernando Pampanga

Tentative Week 35 (Aug24-28)

cc. NAMRIA maps

OB NAMRIA Taguig

BRB & Mariz

DONE

Paolo

A. Updating of Floor Plan Layout

Furnish copy to Logistics

B. Costing study of carpet

Review of supplier / contractors


quotation

DONE

8. MAIN OFFICE INTERIOR


RENOVATION

9. CPE/Training and Expos

C. Interior layout study of Finance


Department

For schematic study

Already got a copy of organizational


structure of Finance Department

Paolo

a. PHILCONSTRUCT

Pre-registered
Oct 8-11, 2015; 10:00am6:00pm SMX, MOA Complex, Pasay

Copy of pre-registration confirmation


code on file

Mariz

b. Manila FAME

Pre-registered
Oct 8-11, 2015; 10:00am6:00pm SMX, MOA Complex, Pasay

c. Green Construct PH

Pre-registered
Sept 24-26,2015;
SMX, MOA Complex, Pasay

d. Real Estate Organizations

Research

Mariz

e. PHILGBC

For inquiries: Application / Membership


forms

Mariz

Arch./EnP. BRANDO R. BULOSAN


Design & Planning Manager

Mariz

Copy of pre-registration confirmation


code on file

Mariz

MJ