international energy markets and enhance its leading role as a world centre for
renewable energy research and development.
Today the UAE is number one in the Middle East in terms of infrastructure,
human development, technological development, knowledge economy, citizen
happiness and satisfaction, renewable energy, safety, security, trade, tourism,
and many other areas. We shall continue our pursuit of global excellence in all
elds, for we are a nation that accepts nothing less than rst place.
DEWAs projects are the life, essence and backbone of Dubais infrastructure.
DEWA provides world-class services at the highest levels of reliability, quality and
best international practices and technologies, to ensure uninterrupted supply
of electricity and water services and achieve the sustainable development
of the UAE.
activities
Way (ROW).
undertaken
by
DEWA
stakeholders/
infrastructure base.
This manual deemed the technical reference to
In line with HH Sheikh Mohammed Bin Rashid Al
cost-free.
the
Infrastructure
Information
and
Permits
Best regards,
department (II&P).
HE Saeed Mohammed Al Tayer
It clearly demonstrates the highest standards of
MD and CEO
xii
Introduction
DEWA Infrastructure NOC Technical Manual
Upon this inspiring note of declaration comes forth Dubais success story,
for the world to readily witness.
Infrastructure in Dubai is one among the key sectors
pledged in the Dubai Strategic Plan 2015 (DSP-15). It is
the dening component besides the healthy economy
that continuously scripts the Dubai success story.
The DSP framework was effectively developed to
augment the citys world-renowned excellence model,
evident in Dubais legacy of urban development and
prosperity. Right from the initial years of the Dubai
establishment, infrastructure efficiently played a
pivotal role in supporting the citys well-dened
journey of highvalue growth. In accordance and to help
support the momentum of progress, Dubai Electricity
and Water Authority (DEWA) has responsibly
played its part by ensuring a reliable electricity and
water supply and distribution system in Dubai. The
assurance proved conducive for economic activities of
the city to further ourish, enabling the construction
and infrastructural projects to correspondingly take
forward the Dubai vision.
xiv
duration
for
issuing
the
G Special sections for Abbreviations, Denitions and
References have also been included.
Infrastructure
Information
&
Permits [II&P] Department Activities
at a glance
xv
Dubai Electricity and Water Authority is a thoughtleadership and strategy-focussed organisation, aspiring
to be the best in the business and is professionally so
committed to that goal. The Authority has acknowledged
the notion that for corporate excellence to sustain,
improvement on excellence and innovation is a continuous
endeavour. In HH Sheikh Mohammeds wise words, in the
race for excellence, there is no nish line.
Contents
xvii
Chapter 1 - Utilities
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
20.
21.
22.
23.
24.
25.
26.
xviii
27.
28.
Proposed DEWA Electrical Ducts, Extension and protection of existing Ducts .........463
29.
Chapter 3 - Structures
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
42.
43.
Proposed Non-Disruptive Crossing Method (NDCM) (Road and service Crossing) ..... 687
46.
47.
48.
49.
50.
CHAPTER 1
UTILITIES
Table 2: Clearance & Protection details for proposed laying of LV cable and existing DEWA
Electricity HV services
Crossing Details
Electricity HV existing
Services
HV
(6.6/11/33 kV) Power/
Pilot Cable and Joints
Horizontal
Clearance
Vertical
Clearance
Crossing
Method
Standard
Protection
Remarks
G-0'8-,2*!*#0,!#
(Ref Fig: 1.2, Case1)
0.15 m
A/B
OC
1.0 m
HV
(6.6/11/33 kV) Manhole
HV
(6.6/11/33 kV) O.H.L
Crossing
Position
2.0 m
G#02'!*!*#0,!#
(Ref Fig: 1.3)
G0-2#!2'-,"#2'*1
(Ref Fig: 1.2, Case2)
NA
G-0'8-,2*!*#0,!#
(Ref Fig: 1.2, Case1)
NR
G-0'8-,2*!*#0,!#
(Ref Fig: 1.4)
Clearance & Protection details for access working under Existing HV OHL
HV
(6.6/11 kV) O.H.L.
G-0'8-,2*!*#0,!#
(Ref Fig: 1.5)
3.0 m
5.0 m
HV
(33 kV) O.H.L.
G#02'!*!*#0,!#
(Ref Fig: 1.5)
G0-2#!2'-,"#2'*1
(Ref Fig: 1.5)
3.5 m
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
19
51
53
Table 2: Clearance & Protection details for proposed laying of 132 kV Trough and existing DEWA
Electricity HV services
Crossing Details
Electricity HV Existing
Services
Horizontal
Clearance
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
Remarks
G-0'8-,2*!*#0,!#
(Ref Fig: 4.3)
HV
(6.6/11/33 kV) Power/
pilot Cable and Joints
0.3 m
0.5 m
OC
G#02'!*!*#0,!#
(Ref Fig: 4.4, Case 2)
G0-2#!2'-,"#2'*1
(Ref Fig: 4.4)
HV
(6.6/11/33 kV) Manhole
0.3 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig: 4.3)
HV
(6.6/11/33 kV) O.H.L
1.0 m
NR
G-0'8-,2*!*#0,!#
(Ref Fig: 4.5)
G-0'8-,2*!*#0,!#
(Ref Fig: 4.6)
3.0 m
5.0 m
HV
(33 kV) O.H.L
3.5 m
G#02'!*!*#0,!#
(Ref Fig: 4.6)
G0-2#!2'-,"#2'*1
(Ref g: 4.6)
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
59
75
Table 2: Clearance & Protection details for proposed laying of 132 kV Duct Bank and exisiting
DEWA Electricity HV services
Crossing Details
Electricity HV Existing
Services
HV
(6.6/11/33 kV) Power/
pilot Cables and Joints
Horizontal
Clearance
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
Remarks
G-0'8-,2*!*#0,!#
(Ref Fig: 5.2, Case 1)
0.15 m
0.15 m
OC
G#02'!*!*#0,!#
(Ref Fig: 5.3, Case 1)
G0-2#!2'-,"#2'*1
(Ref Fig: 5.3, Case 1 & 2)
HV
(6.6/11/33 kV) Manhole
0.15 m
NA
HV
(6.6/11/33 kV) O.H.L
G-0'8-,2*!*#0,!#
(Ref Fig: 5.2, Case 2)
HV
(33 kV) O.H.L
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
79
93
Table 2: Clearance & Protection details for proposed 132 kV cable Joint bay/Transition Joint and
existing DEWA Electricity HV services
Crossing Details
Electricity HV existing
Services
Horizontal
Clearance
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
Remarks
G-0'8-,2*!*#0,!#
(Ref Fig: 6.2, Case 1)
HV
(6.6/11/33 kV) Power/
Pilot Cable and Joints
0.3 m
NA
HV
(6.6/11/33 kV) Manhole
0.3 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig: 6.2, Case 2)
HV
(6.6/11/33 kV) O.H.L.
1.0 m
NR
G-0'8-,2*!*#0,!#
(Ref Fig: 6.3)
G0-2#!2'-,"#2'*1
(Ref Fig: 6.2)
G-0'8-,2*!*#0,!#
(Ref Fig: 6.4)
3.0 m
5.0 m
HV
(33 kV) O.H.L
G#02'!*!*#0,!#
(Ref Fig: 6.4)
G0-2#!2'-,"#2'*1
(Ref Fig: 6.4)
3.5 m
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
97
Table 3: Clearance & Protection details for proposed 132 kV cable Joint bay/Transition Joint and
existing DEWA Electricity EHV services
Crossing Details
Electricity EHV Existing
Services
Horizontal
Clearance
Vertical
Clearance
0.5 m
0.5 m
0.5 m
NA
NA
NA
Crossing
Position
Crossing
Method
Remarks
Standard
Protection
G-0'8-,2*!*#0,!#
(Ref Fig: 6.5)
G0-2#!2'-,"#2'*1
(Ref Fig: 6.5)
G-0'8-,2*!*#0,!#
(Ref Fig: 6.5)
G0-2#!2'-,"#2'*1
(Ref Fig: 6.5)
G-0'8-,2*!*#0,!#
(Ref Fig: 6.6)
G0-2#!2'-,"#2'*1
(Ref Fig: 6.6)
G-0'8-,2*!*#0,!#
(Ref Fig: 6.6)
0.5 m
NA
NA
NA
5.0 m
NR
G-0'8-,2*!*#0,!#
(Ref Fig: 6.7)
2.5 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig: 6.8)
G0-2#!2'-,"#2'*1
(Ref Fig: 6.6)
G-0'8-,2*!*#0,!#
(Ref Fig: 6.7)
4.5 m
5.0 m
G#02'!*!*#0,!#
(Ref Fig: 6.7)
G0-2#!2'-,"#2'*1
(Ref Fig: 6.7)
7.5 m
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
101
107
Table 3: Clearance & Protection details for proposed Installation of EHV-OHL and existing
DEWA Electricity EHV services
Crossing Details
Electricity EHV Existing
Services
Horizontal
Clearance
Vertical
Clearance
5.0 m
5.0 m
5.0 m
5.0 m
5.0 m
NR
NR
NR
NR
NR
Crossing
Method
Standard
Protection
6.0 m
20.0 m
Crossing
Position
A/B
8.0 m
20.0 m
NR
Remarks
G-0'8-,2*!*#0,!#
(Ref Fig: 7.4)
G0-2#!2'-,"#2'*1
(Ref Fig: 7.4)
G-0'8-,2*!*#0,!#
(Ref Fig: 7.4)
G0-2#!2'-,"#2'*1
(Ref Fig: 7.4)
G-0'8-,2*!*#0,!#
(Ref Fig: 7.4)
G0-2#!2'-,"#2'*1
(Ref Fig: 7.4)
G-0'8-,2*!*#0,!#
(Ref Fig: 7.4)
G0-2#!2'-,"#2'*1
(Ref Fig: 7.4)
G-0'8-,2*!*#0,!#
(Ref Fig: 7.4)
G0-2#!2'-,"#2'*1
(Ref Fig: 7.4)
G-0'8-,2*!*#0,!#
(Ref Fig: 7.4)
G#02'!*!*#0,!#
(Ref Fig: 7.5 & photo 7.1)
G-0'8-,2*!*#0,!#
(Ref Fig: 7.7)
G-0'8-,2*!*#0,!#
(Ref Fig: 7.6)
4.5 m
5.0 m
G#02'!*!*#0,!#
(Ref Fig: 7.6)
G0-2#!2'-,"#2'*1
(Ref Fig: 7.6)
7.5 m
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
113
8.1 Introduction
Distribution system is used to carry potable water from
transmission network/storage tanks to the end users;
it consists of distribution pipelines, valve chambers
etc. Distribution pipelines are always pressurised
to transmit potable water through various pipeline
diameters which vary from 100 mm to 450 mm, and
are laid with different types of pipelines materials
(i.e. FC, AC, GRP, GRE, HDPE, .etc).
121
125
Table 2: Clearance & Protection details for proposed Distribution Water Pipeline
(100 mm to 450 mm Dia) and existing DEWA Electricity HV services
Crossing Details
Electricity HV existing
Services
HV
(6.6/11/33 kV) Power/
Pilot Cable and Joints
Horizontal
Clearance
Vertical
Clearance
Crossing
Position
Crossing
Method
Remarks
Standard
Protection
G-0'8-,2*!*#0,!#
(Ref Fig: 8.2, Case 1)
1.0 m
0.5 m
OC
G#02'!*!*#0,!#
(Ref Fig: 8.3, Case 2)
G0-2#!2'-,"#2'*1
(Ref Fig: 8.3)
HV
(6.6/11/33 kV) Manhole
1.0 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig: 8.2, Case 2)
HV
(6.6/11/33 kV) O.H.L
5.0 m
NR
G-0'8-,2*!*#0,!#
(Ref Fig: 8.4)
Clearance & Protection details for access and working under Existing HV-OHL
HV
(6.6/11 kV) O.H.L
G-0'8-,2*!*#0,!#
(Ref Fig: 8.4)
3.0 m
5.0 m
HV
(33 kV) O.H.L
G#02'!*!*#0,!#
(Ref Fig: 8.4)
G0-2#!2'-,"#2'*1
(Ref Fig: 8.4)
3.5 m
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
Table 3: Clearance & Protection details for proposed Distribution Water Pipeline
(100 mm to 450 mm Dia) and existing DEWA Electricity EHV services
Crossing Details
Electricity EHV
existing Services
Horizontal
Clearance
Vertical
Clearance
Crossing
Position
Crossing
Method
Remarks
Standard
Protection
G-0'8-,2*!*#0,!#I#$
'%B|@yK
1.0 m
0.5 m
OC
G#02'!*!*#0,!#I#$
'%B|@}K
G0-2#!2'-,"#2'*1
(Ref Fig: 8.9 & 8.10)
G-0'8-,2*!*#0,!#I#$
'%B|@yK
1.0 m
0.5 m
OC
G#02'!*!*#0,!#I#$
'%B|@}K
G0-2#!2'-,"#2'*1
(Ref Fig: 8.9 & 8.10)
G-0'8-,2*!*#0,!#I#$
'%B|@zK
1.0 m
0.5 m
OC
G#02'!*!*#0,!#I#$
'%B|@|K
G0-2#!2'-,"#2'*1
(Ref Fig: 8.8 & 8.10)
G-0'8-,2*!*#0,!#I#$
'%B|@zK
1.0 m
1.0 m
NA
5.0 m
NR
1.0 m
OC
0.5 m
OC
G#02'!*!*#0,!#I#$
'%B|@|K
G0-2#!2'-,"#2'*1
(Ref Fig: 8.8 & 8.10)
G-0'8-,2*!*#0,!#I#$
'%B|@{K
G0-2#!2'-,#2'*1I#$
'%B|@{K
G-0'8-,2*!*#0,!#I#$
'%B|@uxK
G0-2#!2'-,"#2'*1I#$
'%B|@uxK
G-0'8-,2*!*#0,!#I#$
'%B|@uuK
G#02'!*!*#0,!#I#$
'%B|@uvK
G0-2#!2'-,"#2'*1I#$
'%B|@uvK
2.5 m
R
2.0 m
G#02'!*!*#0,!#I#$
'%B|@uwK
NDCM
G0-2#!2'-,"#2'*1I#$
'%B|@uwK
Clearance & Protection details for access and working under Existing EHV-OHL
EHV (132 kV) O.H.L
G-0'8-,2*!*#0,!#I#$
'%B|@uxK
4.5 m
5.0 m
G#02'!*!*#0,!#I#$
'%B|@uxK
7.5 m
G0-2#!2'-,"#2'*1I#$
'%B|@uxK
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
129
139
159
175
Table 2: Clearance & Protection details for Proposed Drainage Gravity Pipeline and existing
DEWA Electricity HV services
Crossing Details
Electricity HV existing
Services
HV
(6.6/11/33 kV) Power/
Pilot Cable and Joints
Horizontal
Clearance
Vertical
Clearance
Crossing
Position
Crossing
Method
Remarks
Standard
Protection
G-0'8-,2*!*#0,!#
(Ref Fig: 12.2, Case 1)
1.0 m
0.5 m
OC
G#02'!*!*#0,!#
(Ref Fig: 12.3, Case 2)
G0-2#!2'-,"#2'*1
(Ref Fig: 12.3)
HV
(6.6/11/33 kV) Manhole
1.0 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig: 12.2, Case 2)
HV
(6.6/11/33 kV) O.H.L
5.0 m
NR
G-0'8-,2*!*#0,!#
(Ref Fig: 12.4)
Clearance & Protection details for access and working under Existing HV-OHL
HV
(6.6/11 kV) O.H.L
G-0'8-,2*!*#0,!#
(Ref Fig: 12.4)
3.0 m
5.0 m
HV
(33 kV) O.H.L
G#02'!*!*#0,!#
(Ref Fig: 12.4)
G0-2#!2'-,"#2'*1
(Ref Fig: 12.4)
3.5 m
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
197
Table 3: Clearance & Protection details for proposed Drainage gravity pipeline and existing DEWA
Electricity EHV services
Crossing Details
Electricity EHV
existing Services
Horizontal
Clearance
1.0 m
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
0.5 m
OC
Remarks
G-0'8-,2*!*#0,!#I#$
'%Buv@yK
G#02'!*!*#0,!#I#$
'%Buv@|K
G0-2#!2'-,"#2'*1I#$
'%Buv@|K
1.0 m
1.0 m
G-0'8-,2*!*#0,!#I#$
'%Buv@yK
0.5 m
OC
G#02'!*!*#0,!#I#$
'%Buv@|K
G0-2#!2'-,"#2'*1I#$
'%Buv@|K
G-0'8-,2*!*#0,!#I#$
'%Buv@zK
0.5 m
OC
G#02'!*!*#0,!#I#$
'%Buv@}K
G0-2#!2'-,"#2'*1I#$
'%Buv@}K
G-0'8-,2*!*#0,!#I#$
'%Buv@zK
1.0 m
0.5 m
OC
G#02'!*!*#0,!#I#$
'%Buv@}K
G0-2#!2'-,"#2'*1I#$
'%Buv@}K
1.0 m
NA
5.0 m
NR
G-0'8-,2*!*#0,!#I#$
'%Buv@{K
G-0'8-,2*!*#0,!#I#$
'%Buv@uwK
G0-2#!2'-,"#2'*1I#$
'%Buv@uwK
G-0'8-,2*!*#0,!#I#$
'%Buv@utK
1.0 m
EHV (400 kV) Tunnel
OC
2.5 m
G#02'!*!*#0,!#I#$
'%Buv@uuK
R
2.0 m
G0-2#!2'-,"#2'*1I#$
'%Buv@uuK
G#02'!*!*#0,!#I#$
'%Buv@uvK
NDCM
G0-2#!2'-,"#2'*1I#$
'%Buv@uvK
Clearance & Protection details for access and working under Existing EHV-OHL
EHV (132 kV) O.H.L
G-0'8-,2*!*#0,!#I#$
'%Buv@uwK
4.5 m
5.0 m
7.5 m
G#02'!*!*#0,!#I#$
'%Buv@uwK
G0-2#!2'-,"#2'*1I#$
'%Buv@uwK
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
201
Table 2: Clearance & Protection details for proposed Drainage pressure pipeline and existing
DEWA Electricity HV services
Crossing Details
Electricity HV existing
Services
HV
(6.6/11/33 kV) Power/
Pilot Cable and Joints
Horizontal
Clearance
Vertical
Clearance
Crossing
Position
Crossing
Method
Remarks
Standard
Protection
G-0'8-,2*!*#0,!#
(Ref Fig: 13.2, Case 1)
2.0 m
1.0 m
OC
G#02'!*!*#0,!#
(Ref Fig: 13.3, Case 2)
G0-2#!2'-,"#2'*1
(Ref Fig: 13.3)
HV
(6.6/11/33 kV) Manhole
HV
(6.6/11/33 kV) O.H.L
2.0 m
5.0 m
NA
NR
G-0'8-,2*!*#0,!#
(Ref Fig: 13.2, Case 2)
G-0'8-,2*!*#0,!#
(Ref Fig: 13.4)
G0-2#!2'-,"#2'*1
(Ref Fig: 13.4)
Clearance & Protection details for access and working under Existing HV-OHL
HV
(6.6/11 kV) O.H.L
G-0'8-,2*!*#0,!#
(Ref Fig: 13.4)
3.0 m
5.0 m
HV
(33 kV) O.H.L
G#02'!*!*#0,!#
(Ref Fig: 13.4)
G0-2#!2'-,"#2'*1
(Ref Fig: 13.4)
3.5 m
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
213
Table 3: Clearance & Protection details for Proposed Drainage Pressure pipeline and existing
DEWA Electricity EHV services
Crossing Details
Electricity EHV
existing Services
Horizontal
Clearance
Vertical
Clearance
Crossing
Position
Crossing
Method
Remarks
Standard
Protection
G-0'8-,2*!*#0,!#I#$
'%Buw@yK
3.0 m
3.0 m
1.0 m
OC
G#02'!*!*#0,!#I#$
'%Buw@utK
G0-2#!2'-,"#2'*1I#$
'%Buw@utK
G-0'8-,2*!*#0,!#I#$
'%Buw@yK
0.5 m
OC
G#02'!*!*#0,!#I#$
'%Buw@}K
G0-2#!2'-,"#2'*1I#$
'%Buw@}K
G-0'8-,2*!*#0,!#I#$
'%Buw@zK
3.0 m
1.0 m
OC
G#02'!*!*#0,!#I#$
'%Buw@uuK
G0-2#!2'-,"#2'*1
(Ref Fig: 13.11, 13.12 & 13.13)
G-0'8-,2*!*#0,!#I#$
'%Buw@zK
3.0 m
0.5 m
OC
G#02'!*!*#0,!#I#$
'%Buw@|K
G0-2#!2'-,"#2'*1I#$
'%Buw@|K
3.0 m
NA
5.0 m
NR
1.0 m
OC
G-0'8-,2*!*#0,!#I#$
'%Buw@{K
G-0'8-,2*!*#0,!#I#$
'%Buw@u{K
G0-2#!2'-,"#2'*1I#$
'%Buw@u{K
G-0'8-,2*!*#0,!#I#$
'%Buw@uxK
G#02'!*!*#0,!#I#$
'%Buw@uyK
2.5 m
R
2.0 m
G0-2#!2'-,"#2'*1I#$
'%Buw@uyK
G#02'!*!*#0,!#I#$
'%Buw@uzK
NDCM
G0-2#!2'-,"#2'*1I#$
'%Buw@uzK
Clearance & Protection details for access and working under Existing EHV-OHL
EHV (132 kV)
O.H.L
EHV (400 kV)
O.H.L
G-0'8-,2*!*#0,!#I#$
'%Buw@u{K
4.5 m
5.0 m
7.5 m
G#02'!*!*#0,!#I#$
'%Buw@u{K
G0-2#!2'-,"#2'*1I#$
'%Buw@u{K
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
217
229
247
Table 2: Clearance & Protection details for proposed District Cooling Pipeline and existing
DEWA Electricity HV services
Crossing Details
Electricity HV existing
Services
HV
(6.6/11/33 kV) Power/
Pilot Cable and Joints
Horizontal
Clearance
Vertical
Clearance
Crossing
Position
Crossing
Method
Remarks
Standard
Protection
G-0'8-,2*!*#0,!#
(Ref Fig: 16.2)
1.0 m
0.5 m
OC
G#02'!*!*#0,!#
(Ref Fig: 16.3)
G0-2#!2'-,"#2'*1
(Ref Fig: 16.4)
HV
(6.6/11/33 kV) Manhole
0.5 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig: 16.2)
HV
(6.6/11/33 kV) O.H.L
5.0 m
NR
G-0'8-,2*!*#0,!#
(Ref Fig: 16.5)
Clearance & Protection details for access and working under Existing HV-OHL
HV
(6.6/11 kV) O.H.L
G-0'8-,2*!*#0,!#
(Ref Fig: 16.5)
3.0 m
5.0 m
HV
(33 kV) O.H.L
G#02'!*!*#0,!#
(Ref Fig: 16.5)
G0-2#!2'-,"#2'*1
(Ref Fig: 16.5)
3.5 m
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
269
Table 3: Clearance & Protection details for proposed District Cooling Pipeline and existing
DEWA Electricity EHV services
Crossing Details
Electricity EHV
existing Services
Horizontal
Clearance
Vertical
Clearance
Crossing
Position
Crossing
Method
Remarks
Standard
Protection
G-0'8-,2*!*#0,!#I#$
'%Buz@{K
3.0 m
1.0 m
OC
G#02'!*!*#0,!#I#$
'%Buz@uuK
G0-2#!2'-,"#2'*1I#$
'%Buz@uuK
3.0 m
3.0 m
G-0'8-,2*!*#0,!#I#$
'%Buz@{K
0.5 m
OC
G#02'!*!*#0,!#I#$
'%Buz@}K
G0-2#!2'-,"#2'*1I#$
'%Buz@}K
G-0'8-,2*!*#0,!#I#$
'%Buz@{K
1.0 m
OC
G#02'!*!*#0,!#I#$
'%Buz@utK
G0-2#!2'-,"#2'*1I#$
'%Buz@utK
G-0'8-,2*!*#0,!#I#$
'%Buz@{K
3.0 m
0.5 m
OC
G#02'!*!*#0,!#I#$
'%Buz@|K
G0-2#!2'-,"#2'*1I#$
'%Buz@|K
3.0 m
NA
5.0 m
NR
2.5 m
2.0 m
NDCM
G-0'8-,2*!*#0,!#I#$
'%Buz@zK
G0-2#!2'-,#2'*1I#$
'%Buz@zK
G-0'8-,2*!*#0,!#
(Ref Fig: 16.14)
G-0'8-,2*!*#0,!#
(Ref Fig: 16.12)
G#02'!*!*#0,!#I#$
'%Buz@uwK
G0-2#!2'-,"#2'*1I#$
'%Buz@uwK
Clearance & Protection details for access and working under Existing EHV-OHL
EHV (132 kV) O.H.L
G-0'8-,2*!*#0,!#
(Ref Fig: 16.14)
4.5 m
5.0 m
G#02'!*!*#0,!#I#$
'%Buz@uxK
7.5 m
G0-2#!2'-,"#2'*1I#$
'%Buz@uxK
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
273
283
Table 2: Clearance & Protection details for proposed Gas/Fuel Pipeline and existing
DEWA Electricity HV services
Crossing Details
Electricity HV existing
Services
HV
(6.6/11/33 kV) Power/
Pilot Cable and Joints
Horizontal
Clearance
Vertical
Clearance
Crossing
Position
Crossing
Method
Remarks
Standard
Protection
G-0'8-,2*!*#0,!#
(Ref Fig: 17.3, Case 1)
10.0 m
1.0 m
OC
G#02'!*!*#0,!#
(Ref Fig: 17.3, Case 2)
G0-2#!2'-,"#2'*1
(Ref Fig: 17.3, Case 2)
HV
(6.6/11/33 kV) Manhole
10.0 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig: 17.3, Case 3)
HV
(6.6/11/33 kV) O.H.L
10.0 m
NR
G-0'8-,2*!*#0,!#
(Ref Fig: 17.4)
Clearance & Protection details for access and working under Existing HV-OHL
HV
(6.6/11 kV) O.H.L
G-0'8-,2*!*#0,!#
(Ref Fig: 17.4)
3.0 m
10.0 m
HV
(33 kV) O.H.L
G#02'!*!*#0,!#
(Ref Fig: 17.4)
G0-2#!2'-,"#2'*1
(Ref Fig: 17.4)
3.5 m
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
287
299
Table 3: Clearance & Protection details for proposed Telecommunication duct and existing
DEWA Electricity EHV services
Crossing Details
Electricity EHV
existing Services
Horizontal
Clearance
0.5 m
Vertical
Clearance
0.5 m
Crossing
Position
Crossing
Method
OC
Remarks
Standard
Protection
G-0'8-,2*!*#0,!#
(Ref Fig: 18.4, Case 1)
G#02'!*!*#0,!#I#$
'%Bu|@|K
G0-2#!2'-,"#2'*1I#$
'%Bu|@|K
0.5 m
0.5 m
OC
G-0'8-,2*!*#0,!#
(Ref Fig: 18.4, Case 1)
G#02'!*!*#0,!#I#$
'%Bu|@|K
G0-2#!2'-,"#2'*1I#$
'%Bu|@|K
G-0'8-,2*!*#0,!#I#$
'%Bu|@yK
0.5 m
0.5 m
OC
G#02'!*!*#0,!#I#$
'%Bu|@zK
G0-2#!2'-,"#2'*1I#$
'%Bu|@zK
G-0'8-,2*!*#0,!#I#$
'%Bu|@yK
0.5 m
0.5 m
OC
G#02'!*!*#0,!#I#$
'%Bu|@{K
G0-2#!2'-,"#2'*1I#$
'%Bu|@{K
1.0 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig: 18.4, Case 2)
EHV
(132/400 kV)
O.H.L
5.0 m
NR
G-0'8-,2*!*#0,!#I#$
'%Bu|@}K
G-0'8-,2*!*#0,!#
(Ref Fig: 18.10, Case 1)
1.0 m
EHV (400 kV)
Tunnel
OC
2.5 m
G#02'!*!*#0,!#
(Ref Fig: 18.10, Case 2)
G0-2#!2'-,"#2'*1I#$
'%Bu|@utK
2.0 m
G#02'!*!*#0,!#I#$
'%Bu|@uuK
NDCM
G0-2#!2'-,"#2'*1I#$
'%Bu|@uuK
Clearance & Protection details for access and working under Existing EHV-OHL
EHV (132 kV)
O.H.L
4.5 m
5.0 m
G-0'8-,2*!*#0,!#I#$
'%Bu|@}K
B
7.5 m
G#02'!*!*#0,!#I#$
'%Bu|@}K
G0-2#!2'-,"#2'*1I#$
'%Bu|@}K
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
305
CHAPTER 2
ROAD WORKS
315
19.1 Introduction
The purpose of the asphalt carriageways are to
facilitate the movement of the motorists/travellers/
road users and to accommodate large volumes of
traffic with the road design speed in accordance with
the geometric design. Roads have different classes
(Freeway, expressway, primary arterial, secondary
arterial, collector and local roads). Each road has a
distinct function, character and level of access control.
Table 2: Clearance & Protection details for Proposed Asphalt Carriageway and existing
DEWA Electricity HV services
Crossing Details
Electricity HV existing
Services
HV
(6.6/11/33 kV) Power/
Pilot Cable and Joints
HV
(6.6/11/33 kV)
Manhole.
HV
(6.6/11/33 kV) O.H.L.
Horizontal
Clearance
Remarks
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
0.9 m
NA
G-0'8-,2*!*#0,!#I#$
'%Bu}@xK
NA
G-0'8-,2*!*#0,!#I#$
'%Bu}@zK
G-0'8-,2*!*#0,!#I#$
'%Bu}@wK
G#02'!*!*#0,!#I#$
'%Bu}@yK
1.0 m
5.0 m
Clearance & Protection details for access and working under Existing HV-OHL
HV
(6.6/11 kV) O.H.L.
3.0 m
5.0 m
HV
(33 kV) O.H.L.
G-0'8-,2*!*#0,!#I#$
'%Bu}@zK
B
G#02'!*!*#0,!#I#$
'%Bu}@zK
G0-2#!2'-,"#2'*1I#$
'%Bu}@zK
3.5 m
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
319
wvv
Table 3: Clearance & Protection details for Proposed Asphalt Carriageway and existing
DEWA Electricity EHV services
Crossing details
Electricity EHV
Existing Services
Horizontal
Clearance
Iuwv)K
Oil Filled Cable(O.F)
Remarks
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
v@t+
u@v+
G-0'8-,2*!*#0,!#I#$
'%Bu}@{K
G#02'!*!*#0,!#I#$
'%Bu}@uuK
G0-2#!2'-,#2'*1I#$
'%Bu}@uuK
Iuwv)K
Power/Pilot/
F.O Cable
(Directly Buried)
v@t+
1.0 m
G-0'8-,2*!*#0,!#I#$
'%Bu}@{K
G#02'!*!*#0,!#I#$
'%Bu}@utK
Iuwv)K0-3%&
v@t+
1.0 m
G-0'8-,2*!*#0,!#I#$
'%Bu}@|K
G#02'!*!*#0,!#I#$
'%Bu}@uvK
G0-2#!2'-,"#2'*1I#$
'%Bu}@uvK
Iuwv)K
Duct Bank
v@t+
1.0 m
G-0'8-,2*!*#0,!#I#$
'%Bu}@|K
G#02'!*!*#0,!#I#$
'%Bu}@uwK
G0-2#!2'-,"#2'*1I#$
'%Bu}@uwK
Iuwv)K
Joint Bay/
Transition Joint
v@t+
NA
G-0'8-,2*!*#0,!#I#$
'%Bu}@}K
Iuwv)K@@
vy@t+
15.0 m
Ixtt)K@@
xt@t+
16.5 m
Ixtt)K
Tunnel
v@y+
1.0 m
G-0'8-,2*!*#0,!#I#$
'%Bu}@uyK
G#02'!*!*#0,!#I#$
'%Bu}@uyK
B
R
G-0'8-,2*!*#0,!#I#$
'%Bu}@uzK
G#02'!*!*#0,!#I#$
'%Bu}@uzK
G-0'8-,2*!*#0,!#I#$
'%Bu}@uxK
G#02'!*!*#0,!#I#$
'%Bu}@uxK
Clearance & Protection details for access and working under Existing EHV-OHL
Iuwv)K@@
G-0'8-,2*!*#0,!#
I#$
'%Bu}@uy9u}@uzK
x@y+
5.0 m
Ixtt)K@@
7.5 m
G#02'!*!*#0,!#
I#$
'%Bu}@uy9u}@uzK
G0-2#!2'-,"#2'*1
I#$
'%Bu}@uy9u}@uzK
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
338
Table 2: Clearance & Protection details for Proposed Asphalt Access/Service Road and existing
DEWA Electricity HV Services
Crossing Details
Electricity HV existing
Services
HV
(6.6/11/33 kV) Power/
Pilot Cable and Joints.
Horizontal
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
0.9 m
G#02'!*!*#0,!#
I#$
'%Bvt@wK
GI#$
'%Bvt@wA1#wK
NA
NA
G-0'8-,2*!*#0,!#
I#$
'%Bvt@xK
NR
HV
(6.6/11/33 kV) Manhole.
HV
(6.6/11/33 kV) O.H.L.
Remarks
Vertical
Clearance
5.0 m
Clearance & Protection details for access and working under Existing HV-OHL
HV
(6.6/11 kV) O.H.L.
G-0'8-,2*!*#0,!#
I#$
'%Bvt@xK
3.0 m
5.0 m
HV
(33 kV) O.H.L.
G#02'!*!*#0,!#
I#$
'%Bvt@xK
G0-2#!2'-,"#2'*1
I#$
'%Bvt@xK
3.5 m
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
Table 3: Clearance & Protection details for Proposed Asphalt Access /Service Road and existing
DEWA Electricity EHV services
Crossing Details
Electricity EHV
existing Services
Horizontal
Clearance
Iuwv)K
Oil Filled
Cable (O.F)
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
v@t+
u@v+
Iuwv)K
Power/Pilot/
F.O Cable
(Directly Buried)
NR
1.0 m
Iuwv)K
Trough
NR
1.0 m
Remarks
G-0'8-,2*!*#0,!#I#$
'%Bvt@yK
G#02'!*!*#0,!#I#$
'%Bvt@|K
G#02'!*!*#0,!#I#$
'%Bvt@}K
GI#$
'%Bvt@zK
G#02'!*!*#0,!#I#$
'%Bvt@utK
G0-2#!2'-,"#2'*1I#$
'%Bvt@utK
Iuwv)K
Duct Bank
NR
1.0 m
Iuwv)K
Joint Bay/
Transition Joint
v@t+
NA
Iuwv)K
O.H.L
vy@t+
15.0 m
xt@t+
16.5 m
Ixtt)K
Tunnel
v@y+
1.0 m
G#02'!*!*#0,!#I#$
'%Bvt@uuK
G-0'8-,2*!*#0,!#I#$
'%Bvt@{K
G-0'8-,2*!*#0,!#I#$
'%Bvt@uwK
G#02'!*!*#0,!#I#$
'%Bvt@uwK
B
Ixtt)K
O.H.L
GI#$
'%Bvt@zK
R
G-0'8-,2*!*#0,!#I#$
'%Bvt@uxK
G#02'!*!*#0,!#I#$
'%Bvt@uxK
G-0'8-,2*!*#0,!#I#$
'%Bvt@uvK
G#02'!*!*#0,!#I#$
'%Bvt@uvK
Clearance & Protection details for access and working under Existing EHV-OHL
Iuwv)K
O.H.L
G-0'8-,2*!*#0,!#
I#$
'%Bvt@uwAvt@uxK
x@y+
5.0 m
Ixtt)K
O.H.L
7.5 m
G#02'!*!*#0,!#
I#$
'%Bvt@uwAvt@uxK
G0-2#!2'-,"#2'*1
I#$
'%Bvt@uwAvt@uxK
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
wxu
Table 4: Clearance & Protection details for Proposed Asphalt Access/Service Road and existing
DEWA Gas/Fuel services
Crossing Details
Gas/Fuel Existing
Services
Horizontal
Clearance
Existing Fence
8.0 m
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
NA
Remarks
G-0'8-,2*!*#0,!#
I#$
'%Bvt@uyK
G-0'8-,2*!*#0,!#
I#$
'%Bvt@uyK
Gas/Fuel pipeline
(All diameter)
10.0 m
3.0 m
G#02'!*!*#0,!#
I#$
'%Bvt@uzK
G0-2#!2'-,#2'*1
I#$
'%Bvt@uzK
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
wx}
wyv
vu@0-.-1#"-"-0)R
Asphalt Parking
21.1 Introduction
Asphalted parking lot is the area, remote from the
road designated for the parking of vehicles. The road
may contain Parking lanes which are the areas on the
pavement, perpendicular, inclined or parallel to but
outside the travelling way. Each parking lane contains
several parking bays in which the area are marked out
for different sizes of vehicle parking.
356
Table 2: Clearance & Protection details for Proposed Asphalt Parking and existing
DEWA Electricity HV services
Crossing Details
Electricity HV
Existing Services
Horizontal
Clearance
HV
(6.6/11/33 kV)
Power/Pilot
Cable and Joints
Crossing
Position
Crossing
Method
Standard
Protection
0.9 m
G#02'!*!*#0,!#
I#$
'%Bvu@wA1#u9vK
GI#$
'%Bvu@wA1#wK
NA
NA
G-0'8-,2*!*#0,!#I#$
'%Bvu@xK
NR
HV
(6.6/11/33 kV)
Manhole
HV
(6.6/11/33 kV)
O.H.L.
Remarks
Vertical
Clearance
5.0 m
Clearance & Protection details for access and working under Existing HV-OHL
HV
(6.6/11 kV) O.H.L.
3.0 m
5.0 m
HV
(33 kV) O.H.L.
G-0'8-,2*!*#0,!#I#$
'%Bvu@xK
B
3.5 m
G#02'!*!*#0,!#I#$
'%Bvu@xK
G0-2#!2'-,"#2'*1I#$
'%Bvu@xK
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
Table 3: Clearance & Protection details for Proposed Asphalt Parking and existing
DEWA Electricity EHV services
Crossing Details
Electricity EHV
Existing Services
Horizontal
Clearance
Iuwv)K
Oil Filled Cable (O.F)
Remarks
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
v@t+
u@v+
G-0'8-,2*!*#0,!#I#$
'%Bvu@yK
G#02'!*!*#0,!#I#$
'%Bvu@{K
Iuwv)K
Power/Pilot/
F.O Cable
(Directly Buried)
NR
1.0 m
G#02'!*!*#0,!#I#$
'%Bvu@|K
Iuwv)K0-3%&
NR
1.0 m
G#02'!*!*#0,!#I#$
'%Bvu@}K
G0-2#!2'-,"#2'*1I#$
'%Bvu@}K
Iuwv)K
Duct Bank
NR
1.0 m
G#02'!*!*#0,!#I#$
'%Bvu@utK
Iuwv)K
Joint Bay/
Transition Joint
v@t+
NA
G-0'8-,2*!*#0,!#I#$
'%Bvu@zK
Iuwv)K@@
vy@t+
15.0 m
Ixtt)K@@
xt@t+
16.5 m
Ixtt)K
Tunnel
v@y+
1.0 m
G-0'8-,2*!*#0,!#I#$
'%Bvu@uvK
G#02'!*!*#0,!#I#$
'%Bvu@uvK
B
G-0'8-,2*!*#0,!#
I#$
'%Bvu@uwK
G#02'!*!*#0,!#I#$
'%Bvu@uwK
G-0'8-,2*!*#0,!#
I#$
'%Bvu@uuK
G#02'!*!*#0,!#I#$
'%Bvu@uuK
Clearance & Protection details for access and working under Existing EHV-OHL
Iuwv)K@@
x@y+
5.0 m
Ixtt)K@@
7.5 m
G-0'8-,2*!*#0,!#
I#$
'%Bvu@uv9vu@uwK
G#02'!*!*#0,!#
I#$
'%Bvu@uv9vu@uwK
G0-2#!2'-,"#2'*1
I#$
'%Bvu@uv9vu@uwK
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
359
Table 4: Clearance & Protection details for Proposed Asphalt Parking and existing
DEWA Gas/Fuel services
Crossing Details
Gas/Fuel Existing
Services
Horizontal
Clearance
Existing Fence
8.0 m
Gas/Fuel pipeline
(All diameter)
10.0 m
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
NA
3.0 m
Remarks
G-0'8-,2*!*#0,!#
I#$
'%Bvu@uxK
G-0'8-,2*!*#0,!#
I#$
'%Bvu@uxK
G#02'!*!*#0,!#I#$
'%Bvu@uyK
G0-2#!2'-,"#2'*1I#$
'%Bvu@uyK
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
367
w{x
Table 2: Clearance & Protection details for Proposed Interlock Carriageway and existing
DEWA Electricity HV services
Crossing Details
Electricity HV
Existing Services
HV
(6.6/11/33 kV)
Power/Pilot
Cable and Joints
Horizontal
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
0.9 m
NA
G-0'8-,2*!*#0,!#
I#$
'%Bvv@xK
NA
G-0'8-,2*!*#0,!#I#$
'%Bvv@zK
G-0'8-,2*!*#0,!#I#$
'%Bvv@wK
G#02'!*!*#0,!#I#$
'%Bvv@yK
1.0 m
HV
(6.6/11/33 kV)
Manhole
HV
(6.6/11/33 kV)
O.H.L.
Remarks
Vertical
Clearance
5.0 m
Clearance & Protection details for access and working under Existing HV-OHL
HV
(6.6/11 kV) O.H.L.
3.0 m
5.0 m
HV
(33 kV) O.H.L.
G-0'8-,2*!*#0,!#I#$
'%Bvv@zK
B
3.5 m
G#02'!*!*#0,!#I#$
'%Bvv@zK
G0-2#!2'-,"#2'*1I#$
'%Bvv@zK
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
Table 3: Clearance & Protection details for Proposed Interlock Carriageway and existing
DEWA Electricity EHV services
Crossing Details
Electricity EHV
Existing Services
Horizontal
Clearance
Iuwv)K
Oil Filled
Cable(O.F)
Remarks
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
v@t+
u@v+
G-0'8-,2*!*#0,!#I#$
'%Bvv@{K
G#02'!*!*#0,!#I#$
'%Bvv@utK
G0-2#!2'-,"#2'*1I#$
'%Bvv@utK
Iuwv)K
Power/Pilot/
F.O Cable
(Directly Buried)
v@t+
1.0 m
G-0'8-,2*!*#0,!#I#$
'%Bvv@{K
G#02'!*!*#0,!#I#$
'%Bvv@uuK
Iuwv)K
Trough
v@t+
1.0 m
G-0'8-,2*!*#0,!#I#$
'%Bvv@|K
G#02'!*!*#0,!#I#$
'%Bvv@uvK
G0-2#!2'-,"#2'*1I#$
'%Bvv@uvK
Iuwv)K
Duct Bank
v@t+
1.0 m
G-0'8-,2*!*#0,!#I#$
'%Bvv@|K
G#02'!*!*#0,!#I#$
'%Bvv@uwK
G0-2#!2'-,"#2'*1I#$
'%Bvv@uwK
Iuwv)K
Joint Bay/
Transition Joint
v@t+
NA
G-0'8-,2*!*#0,!#I#$
'%Bvv@}K
Iuwv)K
O.H.L
vy@t+
15.0 m
G-0'8-,2*!*#0,!#I#$
'%Bvv@uyK
G#02'!*!*#0,!#I#$
'%Bvv@uyK
B
Ixtt)K
O.H.L
xt@t+
16.5 m
Ixtt)K
Tunnel
v@y+
1.0 m
R
G-0'8-,2*!*#0,!#I#$
'%Bvv@uzK
G#02'!*!*#0,!#I#$
'%Bvv@uzK
G-0'8-,2*!*#0,!#I#$
'%Bvv@uxK
G#02'!*!*#0,!#I#$
'%Bvv@uxK
Clearance & Protection details for access and working under Existing EHV-OHL
Iuwv)K
O.H.L
x@y+
5.0 m
Ixtt)K
O.H.L
7.5 m
G-0'8-,2*!*#0,!#
I#$
'%Bvv@uy9uzK
G#02'!*!*#0,!#
I#$
'%Bvv@uy9uzK
G0-2#!2'-,"#2'*1
I#$
'%Bvv@uy9uzK
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
377
Table 2: Clearance & Protection details for Proposed Interlock Access /Service Road and existing
DEWA Electricity HV services
Crossing Details
Electricity HV
Existing Services
Horizontal
Clearance
HV
(6.6/11/33 kV)
Power/Pilot
Cable and Joints.
Remarks
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
0.9 m
G#02'!*!*#0,!#
I#$
'%Bvw@wA1#u9vK
GI#$
'%Bvw@wA1#wK
NA
G-0'8-,2*!*#0,!#I#$
'%Bvw@xK
NR
HV
(6.6/11/33 kV)
Manhole.
HV
(6.6/11/33 kV)
O.H.L.
5.0 m
Clearance & Protection details for access and working under Existing HV-OHL
HV
(6.6/11 kV) O.H.L.
3.0 m
5.0 m
HV
(33 kV) O.H.L.
G-0'8-,2*!*#0,!#I#$
'%Bvw@xK
B
3.5 m
G#02'!*!*#0,!#I#$
'%Bvw@xK
G0-2#!2'-,"#2'*1I#$
'%Bvw@xK
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
393
396
Table 3: Clearance & Protection details for Proposed Interlock Access /Service Road and existing
DEWA Electricity EHV services
Crossing Details
Electricity
EHV Existing
Services
Horizontal
Clearance
Iuwv)K
Oil Filled Cable
(O.F)
Remarks
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
v@t+
u@v+
G-0'8-,2*!*#0,!#I#$
'%Bvw@yK
G#02'!*!*#0,!#I#$
'%Bvw@|K
G0-2#!2'-,"#2'*1I#$
'%Bvw@|K
Iuwv)K
Power/Pilot/
F.O Cable
(Directly Buried)
NR
1.0 m
G#02'!*!*#0,!#I#$
'%Bvw@}K
G0-2#!2'-,"#2'*1I#$
'%Bvw@}K
Iuwv)K
Trough
NR
1.0 m
GI#$
'%Bvw@zK
G#02'!*!*#0,!#I#$
'%Bvw@utK
G0-2#!2'-,"#2'*1I#$
'%Bvw@utK
Iuwv)K
Duct Bank
NR
1.0 m
GI#$
'%Bvw@zK
G#02'!*!*#0,!#I#$
'%Bvw@uuK
Iuwv)K
Joint Bay/
Transition Joint
v@t+
NA
G-0'8-,2*!*#0,!#I#$
'%Bvw@{K
Iuwv)K
O.H.L
vy@t+
15.0 m
G-0'8-,2*!*#0,!#I#$
'%Bvw@uwK
G#02'!*!*#0,!#I#$
'%Bvw@uwK
B
Ixtt)K
O.H.L
xt@t+
16.5 m
Ixtt)K
Tunnel
v@y+
1.0 m
R
G-0'8-,2*!*#0,!#I#$
'%Bvw@uxK
G#02'!*!*#0,!#I#$
'%Bvw@uxK
G-0'8-,2*!*#0,!#I#$
'%Bvw@uvK
G#02'!*!*#0,!#I#$
'%Bvw@uvK
Clearance & Protection details for access and working under Existing EHV-OHL
Iuwv)K
O.H.L
x@y+
5.0 m
Ixtt)K
O.H.L
7.5 m
G-0'8-,2*!*#0,!#
I#$
'%Bvw@uwAuxK
G#02'!*!*#0,!#I#$
'%Bvw@uwAuxK
G0-2#!2'-,"#2'*1I#$
'%Bvw@uwAuxK
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
Table 2: Clearance & Protection details for Proposed Interlock Parking and existing DEWA
Electricity HV services
Crossing Details
Electricity HV
Existing Services
Horizontal
Clearance
HV
(6.6/11/33 kV)
Power/Pilot
Cable and Joints
Crossing
Position
Crossing
Method
Standard
Protection
0.9 m
G#02'!*!*#0,!#
I#$
'%Bvx@wA1#u9vK
GI#$
'%Bvx@wA1#wK
NA
G-0'8-,2*!*#0,!#I#$
'%Bvx@xK
NR
HV
(6.6/11/33 kV)
Manhole
HV
(6.6/11/33 kV)
O.H.L.
Remarks
Vertical
Clearance
5.0 m
Clearance & Protection details for access and working under Existing HV-OHL
HV
(6.6/11 kV) O.H.L.
3.0 m
5.0 m
HV
(33 kV) O.H.L.
G-0'8-,2*!*#0,!#I#$
'%Bvx@xK
B
3.5 m
G#02'!*!*#0,!#I#$
'%Bvx@xK
G0-2#!2'-,"#2'*1I#$
'%Bvx@xK
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
xuu
xux
Table 3: Clearance & Protection details for Proposed Interlock Parking and existing DEWA
Electricity EHV services
Crossing Details
Electricity EHV
Existing Services
Iuwv)K
Oil Filled
Cable (O.F)
Horizontal
Clearance
v@t+
Vertical
Clearance
u@v+
Crossing
Position
Crossing
Method
Remarks
Standard
Protection
G-0'8-,2*!*#0,!#
I#$
'%Bvx@yK
G#02'!*!*#0,!#
I#$
'%Bvx@{A1#wK
Iuwv)K
Power/Pilot/
F.O Cable
(Directly Buried)
NR
1.0 m
G#02'!*!*#0,!#
I#$
'%Bvx@{A1#u9vK
G0-2#!2'-,"#2'*1
I#$
'%Bvx@{A1#u9vK
Iuwv)K
Trough
NR
1.0 m
G#02'!*!*#0,!#I#$
'%Bvx@|K
G0-2#!2'-,"#2'*1I#$
'%Bvx@|K
Iuwv)K
Duct Bank
NR
1.0 m
G#02'!*!*#0,!#I#$
'%Bvx@}K
Iuwv)K
Joint Bay/
Transition Joint
v@t+
NA
G-0'8-,2*!*#0,!#I#$
'%Bvx@zK
Iuwv)K
O.H.L
vy@t+
15.0 m
G-0'8-,2*!*#0,!#I#$
'%Bvx@uuK
G#02'!*!*#0,!#I#$
'%Bvx@uuK
B
Ixtt)K
O.H.L
xt@t+
16.5 m
Ixtt)K
Tunnel
v@y+
1.0 m
R
G-0'8-,2*!*#0,!#I#$
'%Bvx@uvK
G#02'!*!*#0,!#I#$
'%Bvx@uvK
G-0'8-,2*!*#0,!#I#$
'%Bvx@utK
G#02'!*!*#0,!#I#$
'%Bvx@utK
Clearance & Protection details for access and working under Existing EHV-OHL
Iuwv)K
O.H.L
x@y+
5.0 m
Ixtt)K
O.H.L
G-0'8-,2*!*#0,!#I#$
'%Bvx@uuAuvK
G#02'!*!*#0,!#I#$
'%Bvx@uuAuvK
G0-2#!2'-,"#2'*1I#$
'%Bvx@uuAuvK
7.5 m
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
xvv
Table 4: Clearance & Protection details for Proposed Interlock Parking and existing
DEWA Gas/Fuel services
Crossing Details
Gas/Fuel Existing
Services
Horizontal
Clearance
Existing Fence
8.0 m
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
NA
Remarks
G-0'8-,2*!*#0,!#
I#$
'%Bvx@uwK
G-0'8-,2*!*#0,!#
I#$
'%Bvx@uwK
Gas/Fuel pipeline
(All diameter)
10.0 m
3.0 m
G#02'!*!*#0,!#
I#$
'%Bvx@uxK
G0-2#!2'-,"#2'*1
I#$
'%Bvx@uxK
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
vy@0-.-1#"-"-0)R
(Bridges/Interchanges/Railway/Ramps/Flyover/
Roundabout)
xvy
25.1 Introduction
The purpose of bridge/interchange/yover/railway
overpass is to cross over existing water ways, roads,
railway tracks etc., to enable free traffic to ow through
the junctions without direct crossing or congestion.
xwx
Table 3: Clearance & Protection details for proposed work and existing DEWA Electricity
EHV services
Crossing Details
Electricity EHV
Existing Services
Horizontal
Clearance
Iuwv)K
Oil Filled
Cable(O.F)
Vertical
Clearance
5.5 m
v@t+
Iuwv)K
Power/Pilot/
F.O Cable
(Directly Buried)
5.5 m
v@t+
Crossing
Position
Crossing
Method
Remarks
Standard
Protection
G-0'8-,2*!*#0,!#
I#$
'%Bvy@zK
G#02'!*!*#0,!#
I#$
'%Bvy@|K
G-0'8-,2*!*#0,!#
I#$
'%Bvy@zK
G#02'!*!*#0,!#
I#$
'%Bvy@|K
Iuwv)K
Trough
v@t+
5.5 m
G-0'8-,2*!*#0,!#
I#$
'%Bvy@{K
G#02'!*!*#0,!#
I#$
'%Bvy@|K
Iuwv)K
Duct Bank
v@t+
NR
G-0'8-,2*!*#0,!#
I#$
'%Bvy@{K
G-0'8-,2*!*#0,!#
I#$
'%Bvy@|K
G#02'!*!*#0,!#
I#$
'%Bvy@|K
Iuwv)K
Joint Bay/
Transition Joint
5.5 m
v@t+
Ixtt)K
Tunnel
G#$-2# #*-5
Iuwv)K@@
vy@t+
10.0 m
15.0 m
G-0'8-,2*!*#0,!#
I#$
'%Bvy@ut9vy@uuK
G#02'!*!*#0,!#
I#$
'%Bvy@uvK
Ixtt)K@@
xt@t+
16.0 m
16.5 m
G-0'8-,2*!*#0,!#
I#$
'%Bvy@ut9vy@uuK
G#02'!*!*#0,!#
I#$
'%Bvy@uvK
Clearance & Protection details for access and working under Existing EHV-OHL
Iuwv)K@@
x@y+
5.0 m
Ixtt)K@@
7.5 m
?-2#B&#+6'+3+4' 02'-,*#4#*$-0!'4'*5-0)1,-22-#6!##"uy++H1
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
G-0'8-,2*!*#0,!#
I#$
'%Bvy@}K
G#02'!*!*#0,!#
I#$
'%Bvy@}K
G0-2#!2'-,"#2'*1
I#$
'%Bvy@}K
xxu
Table 4: Clearance & Protection details for proposed work and existing DEWA Gas/Fuel services
Crossing Details
Gas/Fuel Existing
Services
Horizontal
Clearance
Existing Fence
Gas/Fuel pipeline
(All diameter)
Remarks
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
13.0 m
NA
G-0'8-,2*!*#0,!#
I#$
'%Bvy@uwK
15.0 m
NA
G-0'8-,2*!*#0,!#
I#$
'%Bvy@uwK
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
vz@0-.-1#"0"',%
xxw
26.1 Introduction
The purpose of grading work is to prepare the
existing ground to be suitable to receive construction
activities, such as building foundations, roads works,
landscape works etc., by shaping/reshaping either by
cutting and/or lling which allows a maximum depth
of 300 mm. In general the grading works include
Grading work
Proposed Grading
xx{
Table 3: Clearance & Protection details for Proposed Grading works and existing
DEWA Electricity EHV services
Crossing Details
Electricity EHV
Existing Services
Horizontal
Clearance
Iuwv)K
Oil Filled Cable (O.F)
Remarks
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
NR
0.9 m
G#02'!*!*#0,!#
I#$
'%Bvz@xK
Iuwv)K
Power/Pilot/
F.O Cable
(Directly Buried)
NR
0.9 m
G#02'!*!*#0,!#
I#$
'%Bvz@xK
Iuwv)K0-3%&
NR
0.9 m
G#02'!*!*#0,!#
I#$
'%Bvz@xK
Iuwv)K
Duct Bank
NR
0.9 m
G#02'!*!*#0,!#
I#$
'%Bvz@xK
Iuwv)K
Joint Bay/Transition
Joint
NA
G#02'!*!*#0,!#
I#$
'%Bvz@yK
G#02'!*!*#0,!#
I#$
'%Bvz@zK
15.0 m
Iuwv)K@@
NR
16.5 m
Ixtt)K@@
Ixtt)K3,,#*
NR
1.0 m
Clearance & Protection details for access and working under Existing EHV-OHL
Iuwv)K@@
G-0'8-,2*!*#0,!#
I#$
'%Bvz@yK
x@y+
5.0 m
Ixtt)K@@
7.5 m
G#02'!*!*#0,!#
I#$
'%Bvz@yK
G0-2#!2'-,"#2'*1
I#$
'%Bvz@yK
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
Proposed Grading
xyu
Table 4: Clearance & Protection details for Proposed Grading works and existing
DEWA Gas/Fuel services
Crossing Details
Gas/Fuel Existing
Services
Horizontal
Clearance
Existing Fence
Gas/Fuel pipeline
(All diameter)
Remarks
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
8.0 m
NA
G-0'8-,2*!*#0,!#
I#$
'%Bvz@{K
10.0 m
NA
G-0'8-,2*!*#0,!#
I#$
'%Bvz@{K
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
Proposed Grading
v{@0-.-1#"-"',2#,,!#-0)1
27.1 Introduction
The purpose of road maintenance work is to maintain
the road elements such as wearing course, base course,
curbstone, guardrail, road marking, etc., to keep it as
its original condition as constructed or as subsequently
improved to provide satisfactory and safe condition
to motorists/road users. The road maintenance is a
xyw
Table 3: Clearance & Protection details for Proposed Road Maintenance -Resurfacing and
existing DEWA Electricity EHV services
Crossing Details
Electricity EHV Existing
Services
Horizontal
Clearance
Iuwv)K
Oil Filled Cable(O.F)
Remarks
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
NR
As
Existing
G#02'!*!*#0,!#
I#$
'%Bv{@xK
Iuwv)K
Power/Pilot/F.O Cable
(Directly Buried)
NR
As
Existing
G#02'!*!*#0,!#
I#$
'%Bv{@xK
Iuwv)K0-3%&
NR
As
Existing
G#02'!*!*#0,!#
I#$
'%Bv{@xK
Iuwv)K
Duct Bank
NR
As
Existing
G#02'!*!*#0,!#
I#$
'%Bv{@xK
Iuwv)K
Joint Bay/
Transition Joint
NA
IuwvHxtt)K@@
NA
Ixtt)K3,,#*
NR
As
Existing
G#02'!*!*#0,!#
I#$
'%Bv{@zK
Clearance & Protection details for access and working under Existing EHV-OHL
Iuwv)K@@
G-0'8-,2*!*#0,!#
I#$
'%Bv{@yK
x@y+
5.0 m
Ixtt)K@@
7.5 m
G#02'!*!*#0,!#
I#$
'%Bv{@yK
G0-2#!2'-,"#2'*1
I#$
'%Bv{@yK
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
xy{
Table 4: Clearance & Protection details for Proposed Road Maintenance -Resurfacing and
existing DEWA Gas/Fuel services
Crossing Details
Gas/Fuel Existing
Services
Horizontal
Clearance
Existing Fence
Gas/Fuel pipeline
(All diameter)
Remarks
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
As Existing
NA
G-0'8-,2*!*#0,!#
I#$
'%Bv{@{K
As Existing
NA
G-0'8-,2*!*#0,!#
I#$
'%Bv{@{K
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
xzu
xzw
x|t
Table 2: Clearance & Protection details for proposed duct work and existing DEWA Electricity
HV services
Crossing Details
Electricity HV
Existing Services
Horizontal
Clearance
HV
(6.6/11/33 kV)
Power/Pilot Cable
and Joints
Remarks
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
v@t+
NR
G-0'8-,2*!*#0,!#
I#$
'%Bv|@vK
HV
(6.6/11/33 kV)
Manhole
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bv|@wK
HV
(6.6/11/33 kV)
O.H.L.
NR
NR
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
Table 3: Clearance & Protection details for proposed duct work and existing DEWA Electricity
EHV services
Crossing Details
Electricity EHV Existing
Services
Horizontal
Clearance
Iuwv)K
Oil Filled Cable (O.F)
Remarks
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
v@t+
NR
G-0'8-,2*!*#0,!#
I#$
'%Bv|@xK
Iuwv)K
Power/Pilot/F.O Cable
(Directly Buried)
v@t+
NR
G-0'8-,2*!*#0,!#
I#$
'%Bv|@xK
Iuwv)K0-3%&
v@t+
NR
G-0'8-,2*!*#0,!#
I#$
'%Bv|@yK
Iuwv)K
Duct Bank
v@t+
NR
G-0'8-,2*!*#0,!#
I#$
'%Bv|@yK
Iuwv)K
Joint Bay/ Transition
Joint
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bv|@zK
Ixtt)K3,,#*
v@y+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bv|@{K
IuwvHxtt)K@@
5.0 m
NR
G-0'8-,2*!*#0,!#
I#$
'%Bv|@|K
Clearance & Protection details for access and working under Existing EHV-OHL
Iuwv)K@@
G-0'8-,2*!*#0,!#
I#$
'%Bv|@|K
x@y+
5.0 m
Ixtt)K@@
7.5 m
G#02'!*!*#0,!#
I#$
'%Bv|@|K
G0-2#!2'-,"#2'*1
I#$
'%Bv|@|K
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
x|w
Table 4: Clearance & Protection details for proposed duct work and existing DEWA
Gas/Fuel services
Crossing Details
Gas/Fuel Existing
Services
Horizontal
Clearance
Existing Fence
Gas/Fuel pipeline
(All diameter)
Remarks
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
8.0 m
NA
G-0'8-,2*!*#0,!#
I#$
'%Bv|@}K
10.0 m
NA
G-0'8-,2*!*#0,!#
I#$
'%Bv|@}K
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
x|}
v}@0-.-1#"#"#120',0'"%#
x}u
29.1 Introduction
The purpose of pedestrian/foot bridges is to provide
a safe crossing for the pedestrians to cross areas
where walking could be perilous/impossible such
as carriageways, water ways, etc., from one side to
the other.
Table 3: Clearance & Protection details for proposed Pedestrian Bridge and existing
DEWA Electricity EHV services
Crossing Details
Electricity EHV Existing
Services
Horizontal
Clearance
Iuwv)K
Oil Filled Cable (O.F)
Remarks
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bv}@xK
Iuwv)K
Power/Pilot/F.O Cable
(Directly Buried)
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bv}@xK
Iuwv)K0-3%&
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bv}@yK
Iuwv)K
Duct Bank
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bv}@yK
Iuwv)K
Joint Bay/Transition
Joint
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bv}@zK
Ixtt)K3,,#*
v@y+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bv}@}K
Iuwv)K@@
15.0 m
NA
G-0'8-,2*!*#0,!#
I#$
'%Bv}@{K
Ixtt)K@@
vt@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bv}@|K
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
x}y
Table 4: Clearance & Protection details for proposed Pedestrian Bridge and existing DEWA
Gas/Fuel services
Crossing Details
Gas/Fuel Existing
Services
Horizontal
Clearance
Existing Fence
Gas/Fuel pipeline
(All diameter)
Remarks
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
8.0 m
NA
G-0'8-,2*!*#0,!#
I#$
'%Bv}@utK
10.0 m
NA
G-0'8-,2*!*#0,!#
I#$
'%Bv}@utK
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
501
CHAPTER 3
STRUCTURES
503
Table 3: Clearance & Protection details for proposed Bus shelter/Kiosks and existing DEWA
Electricity EHV services
Crossing Details
Electricity EHV Existing
Services
Horizontal
Clearance
Iuwv)K
'*
'**#" *#I@
K
Remarks
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwt@xK
Iuwv)K
-5#0H'*-2H
@ *#
I'0#!2*730'#"K
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwt@xK
Iuwv)K0-3%&
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwt@yK
Iuwv)K
Duct Bank
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwt@yK
Iuwv)K
Joint Bay/ Transition
Joint
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwt@zK
Ixtt)K3,,#*
v@y+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwt@}K
Iuwv)K@@
15.0 m
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwt@{K
Ixtt)K@@
vt@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwt@|K
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
507
Table 4: Clearance & Protection details for proposed Bus shelter/Kiosks and existing DEWA
Gas/Fuel services
Crossing Details
1H
3#* 6'12',%
Services
Horizontal
Clearance
6'12',%
#,!#
1H
3#*.'.#*',#
I**"'+#2#0K
Remarks
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
|@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwt@utK
10.0 m
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwt@utK
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
513
yu|
Table 2: Clearance & Protection details for proposed Installation of Street light and existing
DEWA Electricity HV services
Electricity HV
Existing
Services
HV
Iz@zHuuHww)K
Power/Pilot
Cable and
Joints.
HV
Iz@zHuuHww)K
Manhole.
HV
Iz@zHuuHww)K
O.H.L.
Crossing Details
Proposed
Street light
Horizontal
Clearance
Vertical
Clearance
Crossing
Position
Crossing
Method
0.3 m
NA
-3,"2'-,
G-0'8-,2*!*#0,!#
I#$
'%Bwu@vA1#RuK
R
Cable
0.3 m
t@v+
OC
Cable
0.3 m
NA
3.0 m
NA
v@t+
NA
5.0 m
NR
Street Light
Pole
Cable
Remarks
Standard
Protection
G-0'8-,2*!*#0,!#
I#$
'%Bwu@vA1#RvK
G#02'!*!*#0,!#
I#$
'%Bwu@vA1#RwK
G-0'8-,2*!*#0,!#
I#$
'%Bwu@wK
G
**',%!*#0,!#$0-+
conductor
I#$
'%Bwu@xA#$&-2-Bwu@uK
G
**',%!*#0,!#$0-+127
0-.#I#$
'%Bwu@xK
G-0'8-,2*!*#0,!#$0-+
1270-.#I#$
'%Bwu@yA1#RvK
Clearance & Protection details for access and working under Existing HV-OHL
HV
Iz@zHuu)K
O.H.L.
3.0 m
5.0 m
HV
Iww)K@@@
G-0'8-,2*!*#0,!#
I#$
'%Bwu@yK
G#02'!*!*#0,!#
I#$
'%Bwu@yK
B
R
G-0'8-,2*!*#0,!#
I#$
'%Bwu@yK
3.5 m
G#02'!*!*#0,!#
I#$
'%Bwu@yK
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
yvx
Table 3: Clearance & Protection details for proposed Installation of Street light and existing
DEWA Electricity EHV services
Electricity
EHV Existing
Services
Iuwv)K
'*
'**#"
*#I@
K
Iuwv)K
Power/
Pilot/
@ *#
I'0#!2*7
30'#"K
Crossing details
Proposed
Street light
Horizontal
Clearance
-3,"2'-,
1.0 m
Crossing
Position
Crossing
Method
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwu@zA1#RuK
Cable
1.0 m
0.5 m
OC
G-0'8-,2*!*#0,!#
I#$
'%Bwu@zA1#RvK
G#02'!*!*#0,!#
I#$
'%Bwu@}K
G0-2#!2'-,"#2'*1
I#$
'%Bwu@}K
-3,"2'-,
1.0 m
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwu@zA1#RuK
Cable
1.0 m
0.5 m
OC
G-0'8-,2*!*#0,!#
I#$
'%Bwu@zA1#RvK
G#02'!*!*#0,!#
I#$
'%Bwu@}K
G0-2#!2'-,"#2'*1
I#$
'%Bwu@}K
-3,"2'-,
1.0 m
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwu@{A1#RuK
Cable
0.5 m
0.5 m
OC
G-0'8-,2*!*#0,!#
I#$
'%Bwu@{A1#RvK
G#02'!*!*#0,!#
I#$
'%Bwu@utK
G0-2#!2'-,"#2'*1
I#$
'%Bwu@utK
-3,"2'-,
1.0 m
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwu@{A1#RuK
Iuwv)K
Trough
Cable
0.5 m
0.5 m
OC
G-0'8-,2*!*#0,!#
I#$
'%Bwu@{A1#RvK
G#02'!*!*#0,!#
I#$
'%Bwu@utK
G0-2#!2'-,"#2'*1
I#$
'%Bwu@utK
-3,"2'-,
1.0 m
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwu@|A1#RuK
Cable
0.5 m
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwu@|A1#RvK
Street light
Pole
5.0 m
NA
G
**',%!*#0,!#
I#$
'%Bwu@uuA1#Ru,"
#$&-2-Bwu@vK
Iuwv)K
Duct Bank
Iuwv)K
Joint Bay/
Transition
Joint
Iuwv)K
O.H.L
EHV
Ixtt)K
O.H.L
Standard
Protection
Remarks
Vertical
Clearance
R
Cable
5.0 m
NR
OC
Street light
Pole
z@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwu@uuA1#RvK
R
Cable
5.0 m
NR
OC
G
**',%!*#0,!#
I#$
'%Bwu@uvA1#Ru,"
#$&-2-Bwu@vK
G-0'8-,2*!*#0,!#
I#$
'%Bwu@uvA1#RvK
Table 3: Clearance & Protection details for proposed Installation of Street light and existing
DEWA Electricity EHV services
Electricity
EHV Existing
Services
EHV
Ixtt)K
Tunnel
Crossing details
Proposed
Street light
Horizontal
Clearance
-3,"2'-,
Cable
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
v@y+
NA
v@y+
1.0 m
OC
Remarks
G-0'8-,2*!*#0,!#
I#$
'%Bwu@uwK
G#02'!*!*#0,!#
I#$
'%Bwu@uwK
Clearance & Protection details for access and working under Existing EHV-OHL
Iuwv)K
O.H.L
4.5 m
5.0 m
EHV
Ixtt)K
O.H.L
G-0'8-,2*!*#0,!#
I#$
'%Bwu@uxA1#RuK
G#02'!*!*#0,!#
I#$
'%Bwu@uxA1#RuK
B
R
G-0'8-,2*!*#0,!#
I#$
'%Bwu@uxA1#RvK
7.5 m
G#02'!*!*#0,!#
I#$
'%Bwu@uxA1#RvK
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
yvy
534
Table 4: Clearance & Protection details for proposed Installation of Street light and existing
DEWA Gas/Fuel services
1H
3#*
Existing
Services
Crossing Details
Proposed
Street light
Horizontal
Clearance
-3,"2'-,
|@t+
Vertical
Clearance
Crossing
Position
Crossing
Method
NA
6'12',%
#,!#
1H
3#*
pipeline
I**"'+#2#0K
Cable
|@t+
v@t+
NDCM
-3,"2'-,
10.0 m
NA
Cable
10.0 m
v@t+
NDCM
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
Standard
Protection
Remarks
G-0'8-,2*
clearance
I#$
'%Bwu@uyK
G-0'8-,2*
clearance
I#$
'%Bwu@uyK
ywz
wv@
,12**2'-,-$0-.-1#"
Advertisement Signage
32.1 Introduction
The purpose of advertisement signage is to
attract peoples attention and create awareness
for products, services or ideas of fered by an
organisation/company.
A typical outdoor signage is a structure supported
by a vertical post to display the advertisements in
yxv
Table 3: Clearance & Protection details for proposed Installation of Advertisement Signages
and existing DEWA Electricity EHV services
Crossing Details
Electricity EHV Existing
Services
Horizontal
Clearance
Iuwv)K
'*
'**#" *#I@
K
Remarks
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwv@yK
Iuwv)K
-5#0H'*-2H
@ *#
I'0#!2*730'#"K
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwv@yK
Iuwv)K0-3%&
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwv@zK
Iuwv)K
Duct Bank
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwv@zK
Iuwv)K
Joint Bay/ Transition
Joint
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwv@{K
Ixtt)K3,,#*
v@y+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwv@utK
Iuwv)K@@
15.0 m
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwv@|K
Ixtt)K@@
vt@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwv@}K
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
yx|
Table 4: Clearance & Protection details for proposed Installation of Advertisement Signages
and existing DEWA Gas/Fuel services
Crossing Details
1H
3#* 6'12',%
Services
Horizontal
Clearance
6'12',%
#,!#
1H
3#*.'.#*',#
I**"'+#2#0K
Remarks
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
|@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwv@uuK
10.0 m
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwv@uuK
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
Table 3: Clearance & Protection details for proposed Installation of Traffic Signal and existing
DEWA Electricity EHV services
Electricity
EHV Existing
Services
Iuwv)K
'*
'**#" *#
I@
K
Iuwv)K
Power/Pilot/
@ *#
I'0#!2*730'#"K
Iuwv)K
Trough
Iuwv)K
Duct Bank
Crossing Details
Proposed
Traffic Signal
Horizontal
Clearance
-3,"2'-,
Vertical
Clearance
Crossing
Position
Crossing
Method
v@t+
NA
Cable
1.0 m
0.5 m
OC
-3,"2'-,
v@t+
NA
Cable
1.0 m
0.5 m
OC
-3,"2'-,
v@t+
NA
Standard
Protection
Remarks
G-0'8-,2*!*#0,!#
I#$
'%Bww@yA1#RuK
G-0'8-,2*!*#0,!#
I#$
'%Bww@yA1#RvK
G#02'!*!*#0,!#
I#$
'%Bww@|K
G0-2#!2'-,"#2'*1
I#$
'%Bww@|K
G-0'8-,2*!*#0,!#
I#$
'%Bww@yA1#RuK
G-0'8-,2*!*#0,!#
I#$
'%Bww@yA1#RvK
G#02'!*!*#0,!#
I#$
'%Bww@|K
G0-2#!2'-,"#2'*1
I#$
'%Bww@|K
G-0'8-,2*!*#0,!#
I#$
'%Bww@zA1#RuK
Cable
1.0 m
0.5 m
OC
G-0'8-,2*!*#0,!#
I#$
'%Bww@zA1#RvK
G#02'!*!*#0,!#
I#$
'%Bww@}K
G0-2#!2'-,"#2'*1
I#$
'%Bww@}K
-3,"2'-,
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bww@zA1#RuK
G-0'8-,2*!*#0,!#
I#$
'%Bww@zA1#RvK
G#02'!*!*#0,!#
I#$
'%Bww@}K
G0-2#!2'-,"#2'*1
I#$
'%Bww@}K
G-0'8-,2*!*#0,!#
I#$
'%Bww@{A1#RuK
G-0'8-,2*!*#0,!#
I#$
'%Bww@{A1#RvK
Cable
1.0 m
0.5 m
OC
-3,"2'-,
v@t+
NA
Cable
1.0 m
NA
-3,"2'-,
v@y+
NA
OC
Cable
v@y+
1.0 m
OC
Iuwv)K
O.H.L
Traffic Signal
Pole
15.0 m
NA
G-0'8-,2*!*#0,!#
I#$
'%Bww@uuK
Ixtt)K
O.H.L
Traffic Signal
Pole
vt@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bww@uvK
Iuwv)K
Joint Bay/
Transition Joint
Ixtt)K
Tunnel
G-0'8-,2*!*#0,!#
I#$
'%Bww@utK
G#02'!*!*#0,!#
I#$
'%Bww@utK
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
Installation of Proposed Traffic Signal
557
570
Table 3: Clearance & Protection details for proposed Installation of Address/Traffic Sign and
existing DEWA Electricity EHV services
Crossing Details
Electricity EHV Existing
Services
Horizontal
Clearance
Iuwv)K
'*
'**#" *#I@
K
Remarks
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwx@xK
Iuwv)K
-5#0H'*-2H
@ *#
I'0#!2*730'#"K
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwx@xK
Iuwv)K0-3%&
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwx@yK
Iuwv)K
Duct Bank
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwx@yK
Iuwv)K
Joint Bay/ Transition
Joint
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwx@zK
Ixtt)K3,,#*
v@y+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwx@}K
Iuwv)K@@
15.0 m
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwx@{K
Ixtt)K@@
vt@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwx@|K
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
y{z
Table 4: Clearance & Protection details for proposed Installation of Address/Traffic Sign and
existing DEWA Gas/Fuel services
Crossing Details
1H
3#* 6'12',%
Services
Horizontal
Clearance
6'12',%
#,!#
1H
3#*.'.#*',#
I**"'+#2#0K
Remarks
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
|@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwx@utK
10.0 m
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwx@utK
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
y|v
Table 3: Clearance & Protection details for proposed Installation of Traffic Gantry/Cantilever
and existing DEWA Electricity EHV services
Crossing Details
Electricity EHV Existing
Services
Horizontal
Clearance
Iuwv)K
'*
'**#" *#I@
K
Remarks
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwy@xK
Iuwv)K
-5#0H'*-2H
@ *#
I'0#!2*730'#"K
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwy@xK
Iuwv)K0-3%&
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwy@yK
Iuwv)K
Duct Bank
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwy@yK
Iuwv)K
Joint Bay/ Transition
Joint
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwy@zK
Ixtt)K3,,#*
v@y+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwy@}K
Iuwv)K@@
15.0 m
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwy@{K
Ixtt)K@@
vt@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwy@|K
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
y}t
wz@
,12**2'-,-$0-.-1#"#0+,#,2
OHL Warning/Head Room Gantry
36.1 Introduction
&# .30.-1# -$ -4#0&#" *',# IK 50,',% %,207H
head room gantry is to restrict the height of vehicles
or equipment that intends to cross under the OHL/
existing structure, and to ensure that the minimum
safe vertical clearance is maintained. OHL warning/
head room gantries are installed on roads well in
advance in the direction of traffic ow.
y}x
Table 3: Clearance & Protection details for proposed OHL Warning/Head Room gantry and
existing DEWA Electricity EHV services
Crossing Details
Electricity EHV Existing
Services
Horizontal
Clearance
Iuwv)K
'*
'**#" *#I@
K
Remarks
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwz@xK
Iuwv)K
-5#0H'*-2H
@ *#
I'0#!2*730'#"K
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwz@xK
Iuwv)K0-3%&
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwz@yK
Iuwv)K
Duct Bank
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwz@yK
Iuwv)K
Joint Bay/ Transition
Joint
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwz@zK
Ixtt)K3,,#*
v@y+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bwz@|K
4.5 m
Iuwv)K@@
100.0 m
Ixtt)K@@
7.5 m
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
G-0'8-,2*!*#0,!#
I#$
'%Bwz@{K
G#02'!*!*#0,!#
I#$
'%Bwz@{K
Table 3: Clearance & Protection details for proposed RTU (Remote Terminal Unit) and existing
DEWA Electricity EHV services
Crossing Details
Electricity EHV Existing
Services
Horizontal
Clearance
Iuwv)K
'*
'**#" *#I@
K
Remarks
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bw{@xK
Iuwv)K
-5#0H'*-2H
@ *#
I'0#!2*730'#"K
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bw{@xK
Iuwv)K0-3%&
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bw{@yK
Iuwv)K
Duct Bank
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bw{@yK
Iuwv)K
Joint Bay/ Transition
Joint
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bw{@zK
Ixtt)K3,,#*
v@y+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bw{@|K
4.5 m
Iuwv)K@@
5.0 m
Ixtt)K@@
7.5 m
G-0'8-,2*!*#0,!#
I#$
'%Bw{@{K
G#02'!*!*#0,!#
I#$
'%Bw{@{K
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
zty
zut
Table 4: Clearance & Protection details for proposed RTU (Remote Terminal Unit) and existing
DEWA Gas/Fuel services
Crossing Details
1H
3#* 6'12',%
Services
Horizontal
Clearance
6'12',%
#,!#
1H
3#*.'.#*',#
I**"'+#2#0K
Remarks
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
|@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bw{@}K
10.0 m
NA
G-0'8-,2*!*#0,!#
I#$
'%Bw{@}K
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
zuz
Table 3: Clearance & Protection details for proposed Fencing and existing DEWA Electricity
EHV services
Crossing Details
Electricity EHV Existing
Services
Horizontal
Clearance
Iuwv)K
'*
'**#" *#I@
K
Remarks
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
1.0 m
NA
G-0'8-,2*!*#0,!#
I#$
'%Bw|@xK
Iuwv)K
-5#0H'*-2H
@ *#
I'0#!2*730'#"K
1.0 m
NA
G-0'8-,2*!*#0,!#
I#$
'%Bw|@xK
Iuwv)K0-3%&
1.0 m
NA
G-0'8-,2*!*#0,!#
I#$
'%Bw|@yK
Iuwv)K
Duct Bank
1.0 m
NA
G-0'8-,2*!*#0,!#
I#$
'%Bw|@yK
Iuwv)K
Joint Bay/
Transition Joint
1.0 m
NA
G-0'8-,2*!*#0,!#
I#$
'%Bw|@zK
Ixtt)K3,,#*
v@y+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bw|@}K
Iuwv)K@@
15.0 m
NA
G-0'8-,2*!*#0,!#
I#$
'%Bw|@{K
Ixtt)K@@
vt@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bw|@|K
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
zv|
Table 3: Clearance & Protection details for proposed Site office and existing DEWA Electricity
EHV services
Crossing Details
Electricity EHV Existing
Services
Horizontal
Clearance
Iuwv)K
'*
'**#" *#I@
K
Remarks
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bw}@xK
Iuwv)K
-5#0H'*-2H
@ *#
I'0#!2*730'#"K
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bw}@xK
Iuwv)K0-3%&
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bw}@yK
Iuwv)K
Duct Bank
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bw}@yK
Iuwv)K
Joint Bay/ Transition
Joint
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bw}@zK
Ixtt)K3,,#*
v@y+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bw}@}K
Iuwv)K@@
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bw}@{K
Ixtt)K@@
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bw}@|K
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
zxt
Table 3: Clearance & Protection details for proposed Sound barrier and existing DEWA Electricity
EHV services
Crossing Details
Electricity EHV Existing
Services
Horizontal
Clearance
Iuwv)K
'*
'**#" *#I@
K
Remarks
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bxt@xK
Iuwv)K
-5#0H'*-2H
@ *#
I'0#!2*730'#"K
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bxt@xK
Iuwv)K0-3%&
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bxt@yK
Iuwv)K
Duct Bank
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bxt@yK
Iuwv)K
Joint Bay/ Transition
Joint
v@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bxt@zK
Ixtt)K3,,#*
v@y+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bxt@}K
Iuwv)K@@
15.0 m
NA
G-0'8-,2*!*#0,!#
I#$
'%Bxt@{K
Ixtt)K@@
vt@t+
NA
G-0'8-,2*!*#0,!#
I#$
'%Bxt@|K
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
zx|
CHAPTER 4
GENERAL PROJECTS
Table 3: Clearance & Protection details for proposed Dewatering and existing DEWA Electricity
EHV services
Crossing Details
Electricity EHV existing
Services
Horizontal
Clearance
Vertical
Clearance
Crossing
Position
Crossing
Method
Remarks
Standard
Protection
G-0'8-,2*!*#0,!#
(Ref Fig: 41.7)
2.0 m
NA
2.0 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig: 41.7)
1.0 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig: 41.9)
1.0 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig: 41.10)
2.0 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig: 41.8)
5.0 m
NR
G0-2#!2'-,"#2'*1
(Ref Fig: 41.5)
G#$#0,-2# #*-5
G-0'8-,2*!*#0,!#
(Ref Fig: 41.11)
G0-2#!2'-,"#2'*1
(Ref Fig: 41.6 & 41.11)
Clearance & Protection details for access and working under Existing EHV-OHL
EHV (132 kV) O.H.L
5.0 m
EHV (400 kV) O.H.L
Note:
G-0'8-,2*!*#0,!#
(Ref Fig: 41.11)
4.5 m
B
7.5 m
G#02'!*!*#0,!#
(Ref Fig: 41.11)
G0-2#!2'-,"#2'*1
(Ref Fig: 41.11)
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
Proposed Dewatering
659
666
670
Table 2: Clearance & Protection details for Proposed Soil investigation/Bore hole and existing
DEWA Electricity HV services
Crossing Details
Electricity HV existing
Services
Horizontal
Clearance
Vertical
Clearance
Crossing
Position
Crossing
Method
Remarks
Standard
Protection
G-0'8-,2*!*#0,!#
(Ref Fig: 42.2)
HV
(6.6/11/33 kV)
Power/Pilot Cable and
Joints.
1.5 m
NA
HV
(6.6/11/33 kV) Manhole.
1.0 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig: 42.3)
HV
(6.6/11/33 kV) O.H.L.
5.0 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig: 42.4)
G0-2#!2'-,"#2'*1
(Ref Fig: 42.2)
Clearance & Protection details for access and crossing under Existing HV-OHL
HV
(6.6/11 kV) O.H.L.
G-0'8-,2*!*#0,!#
(Ref Fig: 42.5)
3.0 m
5.0 m
HV
(33 kV) O.H.L.
3.5 m
G#02'!*!*#0,!#
(Ref Fig: 42.5)
G0-2#!2'-,"#2'*1
(Ref Fig: 42.5)
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
Table 3: Clearance & Protection details for proposed Soil investigation/Bore hole and existing
DEWA Electricity EHV services
Crossing Details
Electricity EHV existing
Services
Horizontal
Clearance
2.0 m
Vertical
Clearance
NA
2.0 m
NA
2.0 m
NA
2.0 m
NA
2.0 m
NA
5.0 m
NR
2.5 m
NA
Crossing
Position
Crossing
Method
Remarks
Standard
Protection
G-0'8-,2*!*#0,!#
(Ref Fig: 42.6)
G0-2#!2'-,"#2'*1
(Ref Photo: 42.3)
G-0'8-,2*!*#0,!#
(Ref Fig: 42.6)
G0-2#!2'-,"#2'*1
(Ref Photo: 42.3)
G-0'8-,2*!*#0,!#
(Ref Fig: 42.7)
G0-2#!2'-,"#2'*1
(Ref Photo:42.3)
G-0'8-,2*!*#0,!#
(Ref Fig: 42.8)
G0-2#!2'-,"#2'*1
(Ref Photo:42.3)
G-0'8-,2*!*#0,!#
(Ref Fig: 42.9)
G0-2#!2'-,"#2'*1
(Ref Photo:42.3)
G-0'8-,2*!*#0,!#
(Ref Fig: 42.10)
G0-2#!2'-,"#2'*1
(Ref Fig: 42.10)
G-0'8-,2*!*#0,!#
(Ref Fig: 42.11)
G0-2#!2'-,"#2'*1
(Ref Photo:42.3)
Clearance & Protection details for access and working under Existing EHV-OHL
EHV (132 kV) O.H.L
G-0'8-,2*!*#0,!#
(Ref Fig: 42.10)
4.5 m
5.0 m
7.5 m
G#02'!*!*#0,!#
(Ref Fig: 42.10)
G0-2#!2'-,"#2'*1
(Ref Fig: 42.10)
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
677
Table 3: Clearance & Protection details for proposed NDCM and existing DEWA Electricity
EHV services
Crossing Details
Electricity
EHV existing
Services
Horizontal
Clearance
Remarks
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
2.0 m
2.0 m
NDCM
G-0'8-,2*!*#0,!#I#$
'%Bxw@xK
G#02'!*!*#0,!#I#$
'%Bxw@xK
G0-2#!2'-,"#2'*1I#$
'%Bxw@xK
2.0 m
2.0 m
NDCM
G-0'8-,2*!*#0,!#I#$
'%Bxw@xK
G#02'!*!*#0,!#I#$
'%Bxw@xK
G0-2#!2'-,"#2'*1I#$
'%Bxw@xK
2.0 m
2.0 m
NDCM
G-0'8-,2*!*#0,!#I#$
'%Bxw@yK
G#02'!*!*#0,!#I#$
'%Bxw@yK
G0-2#!2'-,"#2'*1I#$
'%Bxw@yK
2.0 m
2.0 m
NDCM
G-0'8-,2*!*#0,!#I#$
'%Bxw@yK
G#02'!*!*#0,!#I#$
'%Bxw@yK
G0-2#!2'-,"#2'*1I#$
'%Bxw@yK
5.0 m
NA
G-0'8-,2*!*#0,!#I#$
'%Bxw@zK
EHV
(132/400 kV)
O.H.L
5.0 m
NR
NDCM
G-0'8-,2*!*#0,!#I#$
'%Bxw@}K
G0-2#!2'-,"#2'*1I#$
'%Bxw@}K
G-0'8-,2*!*#0,!#I#$
'%Bxw@{K
G#02'!*!*#0,!#I#$
'%Bxw@|K
G0-2#!2'-,"#2'*1
(Ref Fig:43.7 & 43.8)
2.5 m
2.0 m
NDCM
Clearance & Protection details for access and working under Existing EHV-OHL
EHV (132 kV)
O.H.L
4.5 m
5.0 m
7.5 m
G-0'8-,2*!*#0,!#I#$
'%Bxw@}K
G#02'!*!*#0,!#I#$
'%Bxw@}K
G0-2#!2'-,"#2'*1I#$
'%Bxw@}K
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
695
Table 3: Clearance & Protection details for proposed Shoring and existing DEWA Electricity
EHV services
Crossing Details
Electricity EHV
existing Services
Proposed
Shoring
Horizontal
Clearance
Shoring
2.0 m
Vertical
Clearance
Crossing
Position
Crossing
Method
NA
Anchoring
NR
2.0 m
Shoring
2.0 m
NA
Anchoring
NR
2.0 m
Shoring
2.0 m
NA
NR
2.0 m
Shoring
2.0 m
NA
Anchoring
NR
2.0 m
Shoring
2.0 m
NA
Standard
Protection
Remarks
G-0'8-,2*!*#0,!#
(Ref Fig:44.4)
G-0'8-,2*!*#0,!#
(Ref Fig:44.4)
G-0'8-,2*!*#0,!#
(Ref Fig:44.5)
G-0'8-,2*!*#0,!#
(Ref Fig:44.5)
G-0'8-,2*!*#0,!#
(Ref Fig:44.6)
Anchoring
NR
2.0 m
Shoring
15.0 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig:44.7)
Shoring
20.0 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig:44.8)
G#$#0-2# #*-5
Note: The maximum vibration level for civil works not to exceed 15 mm/s PPV
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
707
Table 2: Clearance & Protection details for proposed Scaffolding and existing DEWA Electricity
HV services
Crossing Details
Electricity HV existing
Services
Horizontal
Clearance
Vertical
Clearance
Crossing
Position
Crossing
Method
Remarks
Standard
Protection
G-0'8-,2*!*#0,!#
(Ref Fig: 45.2)
HV
(6.6/11/33 kV)
Power/Pilot Cable
and Joints
1.0 m
NR
HV
(6.6/11/33 kV) Manhole
1.0 m
NR
G-0'8-,2*!*#0,!#
(Ref Fig: 45.3)
HV
(6.6/11/33 kV) O.H.L.
5.0 m
NR
G-0'8-,2*!*#0,!#
(Ref Fig: 45.4)
G0-2#!2'-,"#2'*1
(Ref Fig: 45.2 )
Clearance & Protection details for access and working under Existing HV-OHL
HV
(6.6/11 kV) O.H.L.
G-0'8-,2*!*#0,!#
(Ref Fig: 45.4)
3.0 m
5.0 m
HV
(33 kV) O.H.L.
G#02'!*!*#0,!#
(Ref Fig: 45.4 )
G0-2#!2'-,"#2'*1
(Ref Fig: 45.4 )
3.5 m
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
Proposed Scaffolding
717
720
Table 3: Clearance & Protection details for proposed Scaffolding and existing DEWA Electricity
EHV services
Crossing Details
Electricity EHV
existing Services
Horizontal
Clearance
1.0 m
1.0 m
1.0 m
Remarks
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
NR
G-0'8-,2*!*#0,!#
(Ref Fig: 45.5)
G0-2#!2'-,"#2'*1
(Ref Fig: 45.5 )
G-0'8-,2*!*#0,!#
(Ref Fig: 45.5 )
G0-2#!2'-,"#2'*1
(Ref Fig: 45.5 )
G-0'8-,2*!*#0,!#
(Ref Fig: 45.6 )
G0-2#!2'-,"#2'*1
(Ref Fig: 45.6)
NR
NR
1.0 m
NR
G-0'8-,2*!*#0,!#
(Ref Fig:45.6 )
G0-2#!2'-,"#2'*1
(Ref Fig: 45.6)
2.0 m
NR
G-0'8-,2*!*#0,!#
(Ref Fig: 45.7 )
NR
15.0 m
NR
16.5 m
G#02'!*!*#0,!#
(Ref Fig: 45.9)
G0-2#!2'-,"#2'*1
(Ref Fig: 45.9)
2.5 m
NR
G-0'8-,2*!*#0,!#
(Ref Fig: 45.8)
G0-2#!2'-,"#2'*1
(Ref Fig: 45.8)
Clearance & Protection details for access and working under Existing EHV-OHL
EHV (132 kV) O.H.L
G-0'8-,2*!*#0,!#
(Ref Fig: 45.9 )
4.5 m
5.0 m
G#02'!*!*#0,!#
(Ref Fig: 45.9)
G0-2#!2'-,"#2'*1
(Ref Fig: 45.9)
7.5 m
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
Table 2: Clearance & Protection details for proposed construction of Utility Manhole/Chamber/
Gully and existing DEWA Electricity HV services
Crossing Details
Electricity HV existing
Services
HV
(6.6/11/33 kV)
Power/Pilot Cable
and Joints
Horizontal
Clearance
Vertical
Clearance
0.5 m
5.0 m
Crossing
Method
Standard
Protection
G-0'8-,2*!*#0,!#
(Ref Fig: 46.2 - Case 1)
G-0'8-,2*!*#0,!#
(Ref Fig: 46.2 - Case 2)
G-0'8-,2*!*#0,!#
(Ref Fig: 46.3)
NA
HV
(6.6/11/33 kV) Manhole
HV
(6.6/11/33 kV) O.H.L.
Remarks
Crossing
Position
NR
G-0'8-,2*!*#0,!#
(Ref Fig: 46.3)
3.0 m
5.0 m
HV
(33 kV) O.H.L.
G#02'!*!*#0,!#
(Ref Fig: 46.3)
G0-2#!2'-,"#2'*1
(Ref Fig: 46.3)
3.5 m
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
731
734
Table 3: Clearance & Protection details for proposed construction of Utility Manhole/Chamber/
Gully and existing DEWA Electricity EHV services
Crossing Details
Electricity EHV
existing Services
Horizontal
Clearance
Remarks
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
1.0 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig: 46.4)
1.0 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig: 46.4)
1.0 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig: 46.5)
1.0 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig: 46.5)
2.0 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig: 46.6)
5.0 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig: 46.7)
2.5 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig: 46.8)
Clearance & Protection details for access and working under Existing EHV OHL
EHV (132 kV) O.H.L
G-0'8-,2*!*#0,!#
(Ref Fig: 46.7)
4.5 m
5.0 m
G#02'!*!*#0,!#
(Ref Fig: 46.7)
G0-2#!2'-,"#2'*1
(Ref Fig: 46.7)
7.5 m
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
Table 2: Clearance & Protection details for proposed Loading, Unloading Material Machinery and
existing DEWA Electricity HV services
Crossing Details
Electricity HV existing
Services
HV
(6.6/11/33 kV)
Power/Pilot Cable
and Joints
Horizontal
Clearance
Vertical
Clearance
1.0 m
5.0 m
Crossing
Method
Standard
Protection
G-0'8-,2*!*#0,!#
(Ref Fig: 47.2, Case 1)
G-0'8-,2*!*#0,!#
(Ref Fig: 47.2, Case 2)
G-0'8-,2*!*#0,!#
(Ref Fig: 47.3)
NA
HV
(6.6/11/33 kV) Manhole
HV
(6.6/11/33 kV) O.H.L.
Remarks
Crossing
Position
NA
G-0'8-,2*!*#0,!#
(Ref Fig: 47.3)
3.0 m
5.0 m
HV
(33 kV) O.H.L.
G#02'!*!*#0,!#
(Ref Fig: 47.3)
G0-2#!2'-,"#2'*1
(Ref Fig: 47.3)
3.5 m
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
743
746
Table 3: Clearance & Protection details for proposed Loading, Unloading Material Machinery and
existing DEWA Electricity EHV services
Crossing Details
Electricity EHV
existing Services
Horizontal
Clearance
Remarks
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
2.0 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig: 47.4)
2.0 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig: 47.4)
2.0 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig: 47.5)
2.0 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig: 47.5)
3.0 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig: 47.6)
5.0 m
G-0'8-,2*!*#0,!#
(Ref Fig: 47.8)
2.5 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig: 47.7)
Clearance & Protection details for access under Existing EHV OHL
EHV (132 kV) O.H.L
G-0'8-,2*!*#0,!#
(Ref Fig: 47 .8)
4.5 m
5.0 m
G#02'!*!*#0,!#
(Ref Fig: 47.8)
G0-2#!2'-,"#2'*1
(Ref Fig: 47.8)
7.5 m
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
752
Table 2: Clearance & Protection details for proposed removal of Plants/Trees and existing DEWA
electricity HV services
Crossing Details
Electricity HV existing
Services
Horizontal
Clearance
Vertical
Clearance
Crossing
Position
Crossing
Method
HV
(6.6/11/33 kV)
Power/Pilot Cable
and Joints
1.0 m
NR
HV
(6.6/11/33 kV)
Manhole
1.0 m
NR
HV
(6.6/11/33 kV)
O.H.L.
5.0 m
NR
Remarks
Standard
Protection
G-0'8-,2*!*#0,!#
(Ref Fig: 48.2)
G0-2#!2'-,"#2'*1
(Ref Fig: 48.2 )
G-0'8-,2*!*#0,!#
(Ref Fig: 48.3)
G-0'8-,2*!*#0,!#
(Ref Fig:48.4)
G0-2#!2'-,"#2'*1
(Ref Fig: 48.4 )
Clearance & Protection details for access and working under Existing HV-OHL
HV
(6.6/11 kV) O.H.L.
G-0'8-,2*!*#0,!#
(Ref Fig: 48.4)
3.0 m
5.0 m
HV
(33 kV) O.H.L.
G#02'!*!*#0,!#
(Ref Fig: 48.4 )
G0-2#!2'-,"#2'*1
(Ref Fig: 48.4 )
3.5 m
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
755
758
Table 3: Clearance & Protection details for proposed removal of Plants/Trees and existing DEWA
electricity EHV services
Crossing Details
Electricity EHV
existing Services
Horizontal
Clearance
1.0 m
1.0 m
1.0 m
Remarks
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
NR
G-0'8-,2*!*#0,!#
(Ref Fig:48.5)
G0-2#!2'-,"#2'*1
(Ref Fig: 48.5 )
G-0'8-,2*!*#0,!#
(Ref Fig: 48.5 )
G0-2#!2'-,"#2'*1
(Ref Fig: 48.5 )
G-0'8-,2*!*#0,!#
(Ref Fig: 48.6 )
G0-2#!2'-,"#2'*1
(Ref Fig: 48.6)
NR
NR
1.0 m
NR
G-0'8-,2*!*#0,!#
(Ref Fig: 48.6 )
G0-2#!2'-,"#2'*1
(Ref Fig: 48.6)
2.0 m
NR
G-0'8-,2*!*#0,!#
(Ref Fig: 48.7 )
NR
2.5 m
NR
G-0'8-,2*!*#0,!#
(Ref Fig: 48.8)
G0-2#!2'-,"#2'*1
(Ref Fig: 48.8)
Clearance & Protection details for access and working under Existing EHV-OHL
EHV (132 kV) O.H.L
G-0'8-,2*!*#0,!#
(Ref Fig: 48.9 )
4.5 m
5.0 m
G#02'!*!*#0,!#
(Ref Fig: 48.9 )
G0-2#!2'-,"#2'*1
(Ref Fig: 48.9 )
7.5 m
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
762
Table 4: Clearance & Protection details for proposed removal of Plants/Trees and existing DEWA
Gas/Fuel services
Crossing Details
Gas/Fuel existing
Services
Existing Fence
Gas/Fuel Pipeline
(All diameter)
Horizontal
Clearance
Vertical
Clearance
8.0 m
10.0 m
NR
NR
Crossing
Position
Crossing
Method
Standard
Protection
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
Remarks
G-0'8-,2*!*#0,!#
(Ref Fig: 48.10)
G0-2#!2'-,"#2'*1
(Ref Fig: 48.10 )
G-0'8-,2*!*#0,!#
(Ref Fig: 48.10)
G0-2#!2'-,"#2'*1
(Ref Fig: 48.10 )
768
Table 3: Clearance & Protection details for proposed Soft Landscaping/Tree and existing DEWA
Electricity EHV services
Electricity
EHV existing
Services
Proposed
Soft
Landscaping/
Tree
Horizontal
Clearance
Soft
Landscaping
Crossing Details
Remarks
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
NR
1.0 m
G#02'!*!*#0,!#
(Ref Fig:49.4)
Tree
5.0 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig:49.4)
Soft
Landscaping
NR
1.0 m
G#02'!*!*#0,!#
(Ref Fig:49.4)
Tree
5.0 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig:49.4)
Soft
Landscaping
NR
1.0 m
G#02'!*!*#0,!#
(Ref Fig:49.5)
Tree
5.0 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig:49.5)
Soft
Landscaping
NR
1.0 m
G#02'!*!*#0,!#
(Ref Fig:49.5)
Tree
5.0 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig:49.5)
Soft
Landscaping
NA
Tree
5.0 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig:49.6)
Soft
Landscaping
NA
Tree
15.0 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig:49.7)
Soft
Landscaping
NA
Tree
20.0 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig:49.8)
Soft
Landscaping
NR
1.0 m
G#02'!*!*#0,!#
(Ref Fig:49.9)
Tree
5.0 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig:49.9)
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
780
Table 3: Clearance & Protection details for proposed Hard Landscaping and existing DEWA
Electricity EHV services
Crossing Details
Electricity EHV
existing Services
Proposed Hard
Landscaping
Horizontal
Clearance
Interlock Tiles
Remarks
Vertical
Clearance
Crossing
Position
Crossing
Method
Standard
Protection
NR
1.0 m
G#02'!*!*#0,!#
(Ref Fig:50.4)
Stones, Granite,
Concrete, etc
1.0 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig:50.4)
Interlock Tiles
NR
1.0 m
G#02'!*!*#0,!#
(Ref Fig:50.4)
Stones, Granite,
Concrete, etc
1.0 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig:50.4)
Interlock Tiles
NR
1.0 m
G#02'!*!*#0,!#
(Ref Fig:50.5)
Stones, Granite,
Concrete, etc
1.0 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig:50.5)
Interlock Tiles
NR
1.0 m
G#02'!*!*#0,!#
(Ref Fig:50.5)
Stones, Granite,
Concrete, etc
1.0 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig:50.5)
Interlock Tiles
NA
Stones, Granite,
Concrete, etc
1.0 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig:50.6)
Interlock Tiles
NA
Stones, Granite,
Concrete, etc
1.0 m
NA
Interlock Tiles
NA
Stones, Granite,
Concrete, etc
1.0 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig:50.8)
Interlock Tiles
NR
1.0 m
G#02'!*!*#0,!#
(Ref Fig:50.9)
Stones, Granite,
Concrete, etc
2.5 m
NA
G-0'8-,2*!*#0,!#
(Ref Fig:50.9)
G-0'8-,2*!*#0,!#
(Ref Fig:50.7)
Table Abbreviation
A - Above existing DEWA services.
R - Required Protection.
NR - Not required.
NA - Not allowed.
788
ACRONYMS
S No
Abbreviations
Expansion
AC Pipe
CPT
DEWA
Dia
Diameter
EHV
FGL
Fig
Figure
F.O
Fiber optic
FRL
10
GI
Galvanized Iron
11
GL
Ground level
12
GRE
13
GRP
14
HDD
15
HDPE
16
HV
High Voltage
17
HL
Horizontal
18
I/H Beam
I or H shape beam
19
ID
Internal Diameter
20
kV
Kilovolt
21
LV
Low Voltage
22
Meter
23
Max
Maximum
24
Min
Minimum
25
mm
Millimeter
26
NDCM
27
NDRC
28
NOC
No Objection Certicate
29
Diameter
30
OHL
31
O.F
Oil Filled
32
OPGW
33
PPV
34
Ref
Refer to
35
RCC
36
ROW
Right Of Way
37
RTA
38
SCADA
39
Temp.
Temporary
40
uPVC
41
VL
Vertical
789
791
22. Hump: Small mounted projection rising above the existing ground/road level.
23. HV Manhole: Access chamber for making connections and maintenance for buried HV cables under the road.
24. I/H Beam: I-Beam shape or H-beam shaped is a steel element, used as a supporting element.
25. Joint Bay for Transmission Cable Joints: A concrete structure with cover to accommodate and protect 132 kV
cable joints
26. Link Box: It is a box like enclosure equipped with disconnecting/ isolating links, used in the transmission
cable system, for bonding and grounding the metallic screen/ sheath of power transmission cables.
27. Manual excavation: It is the excavation activity carried out by hand tools only and without the use of any
mechanical machines/equipment.
28. Oil Field cable: It is a cable insulated with Oil and paper.
29. OPGW: Optical Ground Wire is a combination of Fiber optic cables (inside) for communication purpose, and
ground wire (outside) for lightening protection, used in HV and EHV overhead power transmission lines.
30. Overhead Line: One or more power transmission lines (conductors) stringed/ suspended above the ground by
insulators on towers/ Pylons or utility poles.
31. Pile Cap: It is a structure element consists of mass concrete mat connecting group of piles/single pile
top portion
32. Pilot cable: It is a copper cable laid for cable route identication, which helps to indicate the presence of
Transmission cable(s) underneath the subject area.
33. Pipeline joint: It is the assembly of two pipes or ttings or pipe and tting by electrical or mechanical means
to form a exible or rigid joint
34. Pole: It is a Steel or wooden post used to support an Overhead HV power line
35. Power Cable: An assembly of one or more electrical conductors covered with sheath used for transmission of
electrical power.
36. Protection Slab: A at reinforced concrete structure element, used to protect the existing services.
37. Pylon: It is a Steel lattice structure /tower used to support an Overhead power transmission lines.
38. Route marker: Standard visible markers installed on the services route to indicate the existing services.
39. Settlement Calculation: An accurate estimate of soil settlement.
40. Sheet Pile: It is always steel sheet structure to support the soil during the excavation
41.
Shoulder line: It is the yellow line that denes the portion of pavement continuous with the travelled way for
accommodation of stopped vehicles for emergency use.
42. Soft material: Any compressive material that can separate two different elements without showing impact
on the contacted materials
43. Spare Duct: An additional pipe/duct placed for future use.
44. Split Duct: A longitudinally split/cut pipe used to protect existing cable/pipe always surrounded with concrete.
REFERENCES
Infrastructure NOC Technical Manual references
G
0'2'1&2,"0"1IK
G
G
1.#!'o!2'-,1
G
G
+#0'!,2#0-0)111-!'2'-,IK
G
Ruxz}v
G
#-+#20'!"#1'%,+,3*$-03 '0-"1IvttuK
793