MALAYSIA
2014
DOMESTIC
OFFICE /
COMMERCIAL
14
INDUSTRIAL HOTELS
OUTLINE SPECIFICATION
Owner operated factories, low rise, light weight industry RC structure, including small office with simple fit-out and M&E, but excluding
air-conditioning and heating.
RC structure with steel roof and M&E to main distribution, but excluding
air-conditioning, heating and lighting.
1) Interior decoration
2) Furniture (fixed and movable)
3) Special light fittings (chandeliers, etc.)
4) Operating Supplies and Equipmet (OS&E) excluded.
Including public area fit-out and M&E, but excluding shop fit-out.
RC structure, curtain wall, including public area fit-out, tenant area with raised floor/
carpet, painted wall and false ceiling.
(Malaysia only) Average standard offices exclude tenant fitout.
Houses with good quality fit-out, including air-conditioning, kitchen cabinets and home
appliances, but excluding decorative light fittings, loose furniture, garden and parking.
Apartment units with fit-out, including air-conditioning, kitchen cabinets and home
appliances, but excluding decorative light fittings and loose furniture.
(Malaysia only) 6-12 units per floor, 46m2 - 83m2 per unit
Apartment units with good quality fit-out, including air-conditioning, kitchen cabinets
and home appliances, but excluding decorative light fittings and loose furniture.
Houses with fit-out, including air-conditioning, kitchen cabinets and home appliances,
but excluding decorative light fittings, loose furniture, garden and parking.
BUILDING TYPE
1
CONSTRUCTION COST DATA
1. CONSTRUCTION COST DATA
15
General hospital
Students residences
RC structure with steel roof and M&E to main distribution, but excluding airconditioning, heating and lighting.
(Malaysia only) Schools with standard government provisions.
Including fit-out, loose furniture and air-conditioning.
(Malaysia only) Student hostels to university standard.
Dry sports (no swimming pool) and are for leisure centre type schemes including
main sports hall, ancillary sports facilities, changing and showers, restaurant/cafe,
bar, etc. Costs include Furniture, Fittings and Equipment (FF&E).
Excluding medical and operating equipment.
Notes:
1. The costs for the respective categories given above are averages based on fixed price competitive tenders. It must be understood that the actual cost
of a building will depend upon the design and many other factors and may vary from the figures shown.
2. The costs per square metre are based on Construction Floor Areas (CFA) measured to the outside face of the external walls/ external perimeter
including lift shafts, stairwells, balconies, plant rooms, water tanks and the like.
3. All buildings are assumed to have no basements (except otherwise stated) and are built on flat ground, with normal soil and site condition.
The cost excludes site formation works, external works, land cost, professional fees, finance costs, legal expenses and construction cost fluctuations.
4. The standard for each category of building varies from region to region and do not necessary follow that of each other.
5. All costs are in US$/m2 unless otherwise stated. Fluctuation in exchange rates may lead to changes in construction costs expressed in U.S. dollars.
OTHERS
Domestic
RM/m2
4,000
3,500
3,000
2,500
2,000
1,500
1,000
500
0
2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013
Office / Commercial
RM/m2
4,500
4,000
3,500
3,000
2,500
2,000
1,500
1,000
500
0
2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013
RM/m2
2,400
1,800
1,200
600
0
2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013
RM/m2
9,000
8,000
7,000
6,000
5,000
4,000
3,000
2,000
1,000
0
2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013
17
18
HOTELS
OFFICE / COMMERCIAL
DOMESTIC
3,192
3,325
6,017
1,519
2,142
1,870
1,472
2,231
748
1,009
2,332
415
550
600
3,376
4,216
7,108
1,673
3,171
2,345
2,000
2,734
1,021
1,507
2,843
451
600
700
BUILDING
1,250
770
1,875
940
1,402
830
903
809
168
289
793
99
150
200
1,565
1,444
2,000
1,155
1,600
1,155
1,000
1,000
278
441
900
131
200
250
SERVICES
RM/m2
4,442
4,095
7,892
2,459
3,544
2,700
2,375
3,039
916
1,298
3,125
515
700
800
TOTAL
4,941
5,660
9,108
2,829
4,771
3,500
3,000
3,734
1,299
1,948
3,743
582
800
950
1
CONSTRUCTION COST DATA
19
949
1,270
1,098
647
712
914
1,834
884
1,145
1,400
825
813
984
1,946
1,127
1,377
902
1,198
368
210
189
242
540
362
483
530
593
600
289
210
289
641
520
583
693
751
1,465
856
901
1,155
2,374
1,312
1,753
1,415
1,739
The above costs are at 4th Quarter 2013 levels, inclusive of preliminaries (10%) but exclusive of contingencies.
OTHERS
INDUSTRIAL
2,000
1,114
1,023
1,273
2,587
1,647
1,960
1,595
1,949