1. (a) Define Production and Operations Management. What are the major 2+2
+8
components of a Production System? Explain the areas of Production =12
and Operations Management.
(b) XYZ Cement Company is trying to decide between two location sites, 4+4
=8
A and B. The following data is available for both A and B sites:
Potential
Revenue
Variable Cost
Fixed cost
Location
Per unit
Per unit
per unit
(in?)
(in?)
(in?)
Site-A
50
32
60,000
Site-B
48
29
80,000
P.T.O.
.1
,.,.
......... KOP
Considering above data, suggest,:
(i)
'
Marks
2. (a) Define materials handling. Discuss the principles of materials handling. 2+8
=10
(b) Calculate the standard production per shift of 8 hours duration with the io
fo1lowig data :- .
Observed time per unit 05 minutes'
Rating factor = 120%
Total Allowances = 33 /% of normal time
3. (a).' wht'dd you mean by Siiiy circles 9. Suggest betS 4olity circles 3+7
proginmUor an organization.
(b) Ten samples each of size 100 of a component were inspected The 10
I
10
, 3
--
No. of Defections 2
2 ' 3
0
4,3
KOP'
II
(3)
KOP
Marks
16 per unit and the variable cost per unit is 12. If the annual fixed
costs of the firm are estimated as 1,20,000; find the break-even point
in units, in rupees, and as a percentage of capacity, if the firm has an
estimated capacity of 50,000 units of the product. What is the margin of
safety?
(b) The production planner of Omega industries, a maker of industrial 12
lenses, devised the following level output aggregate plan for the next 4
periods.
4.'
Period
Demand
48,000
70,000
48,000
30,000
48,000
55,000
48,000
9,000
.
P.T.O.
(4)'
Marks
KOP
Input
Process
:1!
5s
7.
10.
:7.
.6
6.
Diagram
,
(ii) Flow
(iii) Normal Time and The Crash Time
(iv) Measures to increase productivity .
(v) Work study