Particular
1
1
2
2.2 PAGE 1
3
Clearing jungle including up rooting of rank
vegetation grass brush wood etc.
2.6.1 page 1
4.1.1.4 page 4
5.1.1 page 6
H/D
QTY
UNIT
4
1
5
15
6
9
7
-
8
135
9
Sqm.
21
1.8
1.8
1.8
122.47
Cum.
Total-
122.47
Cum
0.1
6.80
Cum.
Total-
6.80
Cum
NO.
21
1.8
1.8
21
1.6
1.6
0.8
43.01
Cum.
21
0.22
0.22
1.75
1.78
Cum.
18
0.22
0.22
3.5
3.05
Cum.
90
0.3
0.3
8.10
Cum.
Chhajjas
0.6
0.1
0.54
Cum.
Slab
11.7
0.1
10.53
Cum.
Total-
67.01
Cum
5.9.1 page 6
Sqm.
18
0.22
4.6
72.864
Sqm.
105
0.6
63
Sqm.
105
0.66
69.3
105
0.66
for chhajjas
0.75
for slab
11.7
69.3
Sqm.
6.75
Sqm.
105.3
Sqm.
386.51
Sqm.
Total-
6 S.O.R.5.16.3
45
0.785
35.33
Qtl.
15
0.5
67.50
Cum.
Total-
67.50
Cum.
S.O.R.2.27
in main building
Cum.
1
1
90
15.6
0.22
0.22
3.5
1.8
total
10
10
2
8
ceilling
S.O.R.13.1.2
15 mm cement plaster of mix. 1:6 (1 cement: 6
sand)
1.2
2
0.6
2.1
1
0.45
69.30
Cum.
6.18
69.30
Cum.
Cum.
5.54
Cum.
0.88
Cum.
0.48
0.22
0.22
0.22
total ded
net total
6.90
62.40
Cum.
Cum.
Cum.
Sqm.
105.3
Sqm.
105.30
Sqm.
Sqm.
735
50.4
12
16.2
9.6
Sqm.
Sqm.
Sqm.
Sqm.
Sqm.
Sqm.
13.1.3
13.2.3
in main building
Deduction for door and window
11.7
Total
20
2
8
4
3.5
2.1
2
1.35
1.2
total ded
88.20
net total
11
646.80
Sqm.
Sqm.
25.2
8.4
Sqm.
Sqm.
Sqm.
9.7.5.2 page 17
10
2
1.2 2-
2.1
2.1
total
33.60
AR PANNA
RATE
10
3.28
AMOUNT
11
443
123
123
15064
3335
3335
22691
4526
4526
303269
146
146
56431
4800
169560
388
26190
2519
2248
74
74
88
155786
7792
88
884
56918
884
29702
843847
42192
25315
42192
911355
9114
920469
SAY
R/O
920500.00
ESTIMATE FOR PROPOSED HOUSE OF SHRI HET RAM MISHRA AT BENISAGAR PANNA
FOR FIRST FLOOR OF OLD EXISTING HOUSE
SN.
CSR ITEM
NO.
Particular
NO.
H/D
QTY
1
1
12
15.24
0.3
0.3
16.46
15
0.3
0.3
9.45
2.44
0.15
1.46
0.15
1.20
staircase step
40
0.15
0.15
0.90
Slab
15.24
0.1
10.67
Total-
40.14
staircase slab
24
15.24
0.3
109.728
30
0.3
63
2.44
9.76
staircase step
80
0.15
12
Slab
15.24
106.68
staircase slab
Total-
3 S.O.R.5.16
.3
40.14
0.785
309.17
31.51
6.3.2
page 9
in main building
15.24 0.22
7 0.22
10
2
8
1.2
3.5
46.94
3.5
total
2.1
0.22
26.95
2
1
0.6 0.45
73.89
5.54
0.88
0.22
0.48
0.22
total de 6.90
net tota 66.99
13.1.3
ceilling
13.2.3
S.O.R.13.1.2
15 mm cement plaster of mix. 1:6 (1
cement: 6 sand)
in main building
15.24
106.68
2.44
19.52
10
134.20
Total
10
2
8
15.24 7
1.2
2
0.6
426.72
3.5
245
3.5
25.2
2.1
4.8
1.2
1.44
0.3
total de 703.16
9.7.5.2 page
17
10
2
1.2 2-
2.1
2.1
total
25.2
8.4
33.60
8
11.34 Providing and laying polished
vitrified floor tiles in
8
2.9
3.08
71.456
9
13.37 Finishing walls with Deluxe
Multi surface paint system for
interiors and exteriors using primer as
per manufacturers
specifications :
134.20
703.16
10
11
12
837.36
R/O
RS. EIGHT LAKH SEVEN THOUSAND ONLY .
T BENISAGAR PANNA
UNIT
RATE AMOUNT
10
11
4526
Cum.
Cum.
Cum.
Cum.
Cum.
Cum.
Cum
4526
Sqm.
146
181679
Sqm.
Sqm.
Sqm.
146
45139
Qtl.
4800
151248
Cum.
2519
Cum.
Cum.
Cum.
Cum.
Cum.
Cum.
Cum.
Cum.
Sqm.
2248
74
105519
Sqm.
Sqm.
Sqm.
74
88
9931
88
61878
Sqm.
Sqm.
Sqm.
Sqm.
Sqm.
Sqm.
Sqm.
884
Sqm.
Sqm.
Sqm.
Sqm.
884
868
29702
868
62024
71
59453
Sqm.
706572
35329
21197
35329
798426
7984
SAY
806411
ND ONLY .
807000
R/O
920500.0
0
CSR ITEM
NO.
Particular
NO.
4
1
5
15
6
12
21
1.8
1.8
21
1.8
1.8
21
1.6
1.6
21
0.22
0.22
18
0.22
0.22
90
0.3
Chhajjas
20
0.6
Slab
15
10.7
PORCH
18
0.22
105
0.6
105
0.66
105
0.66
for chhajjas
20
0.75
for slab
15
10.7
1
1
2
3
2.2 PAGE 1 Clearing jungle including up rooting of
rank vegetation grass brush wood etc.
Columns
6 S.O.R.5.16
.3
74.39
0.785
14.2
9.5
SOR
6.3.2
page 9
in main building
5
4
2
1
11
6
10
1
9.5
15
1.52
15
0.22
0.22
0.22
0.22
1.2
2
0.6
3
2.1
1
0.45
1.8
13.1.3
S.O.R.13.1.2
12mm cement plaster of mix. 1:6 (1
cement: 6 sand)
in main building
10
8
4
2
2
. S.O.R
11.34.1
13.34.1
PAGE 102
Finishing walls with textured exterior
paint of required shade :
New
work (Two or more coats applied @ 3.28
ltr/10sqm) over and including basecoat of
water proofing cement paint applied @
2.20kg/10 sqm
9.5 15 1.52 15 15 -
22
12
20
2
1.2 20.6 3-
15
WALLS
9.5
15
1.52
15
1.2
2.1
NET TOTAL
13.37.1
PAGE 102
Finishing walls with Deluxe Multi surface
paint system for
interiors and exteriors using primer as per
manufacturers
specifications :
Two or more
coats applied @ 1.25 ltr/10 sqm. over
and including one coat of Special primer
applied @
0.75 ltr / 10 sqm.
11
1042.8218.08=82
4.72
9.7.5.2 page
17
11
6
LUMPSUM
1.2 2.1 -
QTY
7
-
180
9
Sqm.
10
3.28
590
1.8
122.47
Cum.
123
15064
UNIT
RATE
AMOUNT
11
3335
0.1
6.80
Cum.
3335
22691
4526
0.8
43.01
Cum.
1.75
1.78
Cum.
3.5
3.05
Cum.
0.3
8.10
Cum.
0.1
1.20
Cum.
0.1
16.05
Cum.
0.1
1.20
Cum.
Total-
74.39
Cum
4526
Sqm.
146
4.6
72.864
Sqm.
63
Sqm.
69.3
Sqm.
69.3
Sqm.
15
Sqm.
160.5
Sqm.
336671
12
461.96
Sqm.
Sqm.
146
67447
58.40
Qtl.
4800
280302
0.5
67.45
Cum.
Total-
67.45
Cum.
388
26171
Cum.
2519
Total-
3.5
3.5
1.8
1.8
total
0.22
0.22
0.22
0.22
total ded
net total
36.58
46.20
1.20
5.94
89.92
Cum.
Cum.
Cum.
Cum.
Cum.
6.10
Cum.
2.64
Cum.
0.59
1.19
Cum.
10.52
79.40
Cum.
Cum.
2519
92132
Sqm.
3.5
3.5
1.8
10.7
1.8
total
332.50
Sqm.
420.00
Sqm.
10.94
Sqm.
321.00
Sqm.
54.00
Sqm.
Sqm.
1138.44
55.44
2.1
24.00
1
5.40
0.45
10.80
1.8
total ded
95.64
net total
1042.80
180.00
12
88
Sqm.
Sqm.
Sqm.
Sqm.
Sqm.
Sqm.
88
91767
Sqm.
868
156240
Sqm.
105
3.5
66.50
Sqm.
3.5
105.00
Sqm.
1.8
10.94
Sqm.
1.8
54.00
Sqm.
236.44
Sqm.
2.1
2.52
Sqm.
1.8
10.80
Sqm.
1.2
5.04
Sqm.
18.36
Sqm.
218.08
Sqm.
105
22899
824.72
Sqm.
71
58555
Sqm.
884
Sqm.
Sqm.
Sqm.
KG
884
58.4
TOTAL
TOTAL
NET TOTAL
2.1
1.2
total
27.72
15.12
42.84
2000.00
824.72
37871
116800
25000
1350199
67510
40506
67510
1458215
14582
SAY
R/O
1472797
1473000.00
Particular
NO.
H/D
QTY
4
1
5
16
6
11.4
7
-
8
182.4
9
Sqm.
21
1.8
1.8
1.8
122.47
Cum.
21
1.8
1.8
0.1
6.80
Cum.
21
1.6
1.6
0.8
43.01
Cum.
21
0.22
0.22
1.75
1.78
Cum.
18
0.22
0.22
3.5
3.05
Cum.
96
0.3
0.3
8.64
Cum.
Chhajjas
20
0.6
0.1
1.20
Cum.
Slab
15
10.7
0.1
16.05
Cum.
Total-
73.73
Cum
1
1
2
3
2.2 PAGE 1 Clearing jungle including up rooting of rank
vegetation grass brush wood etc.
Columns
UNIT
Sqm.
18
0.22
4.6
72.864
Sqm.
105
0.6
63
Sqm.
105
0.66
69.3
Sqm.
105
0.66
69.3
Sqm.
for chhajjas
20
0.75
15
Sqm.
for slab
STAIR
1
1
15
5.4
10.7
2.4
160.5
12.96
462.92
Sqm.
Sqm.
Sqm.
Total-
6 S.O.R.5.1
6.3
73.73
0.785
57.88
Qtl.
14.2
9.5
0.5
67.45
Cum.
Total-
67.45
Cum.
and
dressing
rooms
Cum.
SOR
6.3.2
page 9
Brick work with well brunt chimney , bricks,
crushing strength not less than 25kg /sq cm and
water abs or pt ion not more than 20% in
foundation and plinth Cement Mortar 1:6 (1
cement : 6 sand) Extra for brick work in
superstructure above floor II level for each Add
@ 1% of additional floor or part thereof.
in main building
13.1.3
S.O.R.13.1.2
12mm cement plaster of mix. 1:6 (1 cement: 6
sand)
5
4
2
1
17
11
11
1
10.6
16
1.52
16
1.2
2
0.6
2.4
0.22
0.22
0.22
0.22
3.5
3.5
1.8
1.8
total
2.1 0.22
1 0.22
0.45 0.22
1.8 0.22
total d
net tot
40.81
49.28
1.20
6.34
97.63
Cum.
Cum.
Cum.
Cum.
Cum.
9.42
Cum.
4.84
Cum.
0.65
0.95
Cum.
15.87
81.76
Cum.
Cum.
Sqm.
in main building
10
8
4
2
2
10
. S.O.R
11.34.1
9.5 15 1.52 15 15 -
34
22
22
2
17
332.50
3.5
420.00
3.5
10.94
1.8
321.00
10.7
54.00
1.8
total 1138.44
85.68
2.1
44.00
1
5.94
0.45
8.64
1.8
total d 144.26
net tot 994.18
204.00
12
Sqm.
Sqm.
Sqm.
Sqm.
Sqm.
Sqm.
Sqm.
Sqm.
Sqm.
Sqm.
Sqm.
Sqm.
Sqm.
13.34.1
PAGE 102
Sqm.
2
2
4
2
10.6
16
1.52
15
1.2
2
2
3
2.1
74.20
3.5
112.00
3.5
10.94
1.8
54.00
1.8
TOTAL 251.14
2.52
2.1
Sqm.
Sqm.
Sqm.
Sqm.
Sqm.
Sqm.
10.80
Sqm.
5.04
18.36
Sqm.
Sqm.
232.78
Sqm.
12
13.37.1
PAGE 102
Finishing walls with Deluxe Multi surface
paint system for
interiors and exteriors using primer as per
manufacturers
specifications :
Two or more coats
applied @ 1.25 ltr/10 sqm. over
and including one coat of Special primer
applied @
0.75 ltr / 10 sqm.
13
1138
.44232.
78=9
05.6
6
905.66
9.7.5.2 page
17
Sqm.
Sqm.
17
11
1.2 2.1 -
2.1
1.2
total
42.84
27.72
70.56
Sqm.
Sqm.
Sqm.
LUMP
SUM
CONSTRUCTION OF WATER
HARVESTING TANK
TotalAdd 5% for electrification
Add 3% for white washing
Add 5% for sanitary fittings including 500
lit tank for each quarter
Total
Add 1% for labour welfare tax
R/
HALLA PANNA
RATE AMOUNT
10
3.28
11
598
123
15064
3335
3335
22691
4526
4526
333683
146
146
67587
4800
277815
388
26171
2519
2519
88
102800
88
87488
868
177072
105
105
24442
71
64302
884
884
62375
25000
1287089
64354
38613
64354
SAY
R/O
1390056
13901
1403957
1404000.00
CSR
ITEM
NO.
Particular
NO.
H/D
QTY
4
1
5
16
6
11.4
7
-
182.4
21
1.8
1.8
1.8
122.47
21
1.8
1.8
0.1
6.80
21
1.6
1.6
0.8
43.01
21
0.22
0.22
1.75
1.78
18
0.22
0.22
3.5
3.05
96
0.3
0.3
8.64
Chhajjas
20
0.6
0.1
1.20
Slab
15
10.7
1
1
2
3
2.2 PAGE Clearing jungle including up rooting of rank
1
vegetation grass brush wood etc.
4.1.1.4
page 4
0.1
16.05
Total-
73.73
18
0.22
4.6
72.864
105
0.6
63
105
0.66
69.3
105
0.66
for chhajjas
20
0.75
15
for slab
STAIR
1
1
15
5.4
10.7
2.4
160.5
12.96
462.92
69.3
Total-
6 S.O.R.5.
16.3
73.73
0.785
57.88
14.2
9.5
0.5
67.45
Total-
67.45
SOR
6.3.2
page 9 Brick work with well brunt chimney , bricks, crushing
strength not less than 25kg /sq cm and water abs or pt
ion not more than 20% in foundation and plinth
Cement Mortar 1:6 (1 cement : 6 sand) Extra for brick
work in superstructure above floor II level for each
Add @ 1% of additional floor or part thereof.
in main building
10
11
12
5
4
2
1
17
11
11
1
LUMPS
UM
10.6
16
1.52
16
1.2
2
0.6
2.4
3.5 40.81
3.5 49.28
1.20
1.8
6.34
1.8
total 97.63
9.42
2.1 0.22
4.84
1 0.22
0.65
0.45 0.22
0.95
1.8 0.22
total 15.87
net to 81.76
0.22
0.22
0.22
0.22
Total
Add 1% for labour welfare tax
AR MOHALLA PANNA
UNIT
RATE
AMOUNT
9
Sqm.
10
3.28
598
11
Cum.
123
15064
3335
Cum.
3335
22691
4526
Cum.
Cum.
Cum.
Cum.
Cum.
Cum.
Cum
4526
Sqm.
146
333683
Sqm.
Sqm.
Sqm.
Sqm.
Sqm.
Sqm.
Sqm.
Sqm.
146
67587
Qtl.
4800
277815
Cum.
388
26171
Cum.
2519
Cum.
Cum.
Cum.
Cum.
Cum.
Cum.
Cum.
Cum.
Cum.
Cum.
Cum.
2519
102800
25000
871410
43570
26142
43570
941122
9411
950534
SAY
R/O
951000.00
CSR ITEM
NO.
Particular
NO.
H/D
QTY
4
1
5
3
6
7.6
7
-
22.8
9
Sqm.
1.8
1.8
1.8
34.99
Cum.
1.8
1.8
0.1
1.94
Cum.
1.6
1.6
0.8
12.29
Cum.
0.22
0.22
1.75
0.51
Cum.
0.22
0.22
3.5
1.02
Cum.
21.5
0.3
0.3
1.94
Cum.
Chhajjas
3.3
0.6
0.1
0.20
Cum.
Slab
3.3
8.5
0.1
2.81
Cum.
Total-
18.75
Cum
1
1
2
3
2.2 PAGE 1 Clearing jungle including up rooting of rank vegetation
grass brush wood etc.
UNIT
Sqm.
0.22
4.6
24.288
Sqm.
21.5
0.6
12.9
Sqm.
21.5
0.66
14.19
Sqm.
for chhajjas
3.3
0.75
2.475
Sqm.
for slab
STAIR
1
1
3.3
5.4
8.5
2.4
28.05
12.96
94.86
Sqm.
Sqm.
Sqm.
Total-
6 S.O.R.5.16
.3
18.75
0.785
14.72
Qtl.
0.5
10.50
Cum.
Total-
10.50
Cum.
SOR
6.3.2
page 9
in main building
Cum.
21.5
0.22
3.5
16.56
Cum.
total
Deductions for doors
ventilator
. S.O.R
11.34.1
1
2
2.1
0.6
2.1
0.45
0.22
0.22
total ded
net total
7
16.56
Cum.
0.97
Cum.
0.12
1.09
15.47
Cum.
Cum.
Cum.
21.00
Sqm.
Sqm.
13.34.1
PAGE 102
Finishing walls with textured exterior paint of
required shade :
New work (Two or more
coats applied @ 3.28 ltr/10sqm) over and including
basecoat of water proofing cement paint applied @
2.20kg/10 sqm
WALLS
2
2
7.6
3
3.5
3.5
TOTAL
DEDUCTION FOR
DOOR
2.1
2.1
TOTAL
NET TOTAL
53.20
Sqm.
21.00
74.20
Sqm.
Sqm.
4.41
Sqm.
4.41
Sqm.
69.79
Sqm.
11
13.37.1
PAGE 102
69.79
69.79
Sqm.
10.6.3 PAGE
71
2.1
2.1
4.41
Sqm.
4.41
Sqm.
Total
NA
RATE
AMOUNT
10
3.28
11
123
4304
75
3335
3335
6483
4526
4526
84865
146
146
13850
4800
70650
388
4074
2519
2519
41702
868
18228
105
105
7328
71
4955
999
999
4406
260920
SAY
260920
261000