Sie sind auf Seite 1von 4

Kanwar Pawan Singh

E-mail: pawan.rana87@gmail.com
Mobile: +91 90 9995 7693

CAREER OBJECTIVE
Seeking a job with an organization, which will help me enhance my management skills
and improve my technical knowledge in order to shape my future as a leader in the
energy sector and can add value to the organization.

WORK EXPERIENCE
GUJARAT GAS LTD. ( Erstwhile GSPC Gas Company Limited)

(July 2010 to Present) (years 5+)


Location: Gandhinagar (Corporate-Office)
Current Profile: currently, deputed in technical services and is responsible for
post merger gap analysis of technical documents of GSPC GAS company ltd. and
Gujarat gas company ltd. my current responsibility includes modification of
following documents in line with the gaps observed and agreed by the erstwhile
GSPC GAS and GGCL teams:

Steel pipeline laying tender Modification


API 5L Steel pipe and 3 LPE coating specification modification
Valves specification and PMS modification
Modification in Data sheets of ball valves, globe valves, plug valves
Modification in technical specification of fittings, flange, gaskets and stud, nut &
bolts
Modification in technical specification, data sheet and ITP of monolithic insulation
joint
Modification in ITPs( inspection test plans)
Additional roles as a SAP core team member for merger of SAP processes of GSPC
GAS and GGCL and unification of processes in newly formed Gujarat Gas Ltd.
Tender Document preparation:

Prepared Technical Tender document of PE pipeline laying activities.


Prepared Technical Tender document for steel pipeline laying activities.
Prepared Technical Specification for PE pipes, PE Ball Valves, Brass fittings, Service
Regulator.
Prepared technical scope for Powder coated GI Pipes & GI Fittings.
Prepared technical specification for steel Pipe and 3 LPE coatings.
Prepared technical specification for valves, fittings, flanges, IJ

Vendor premise inspection:


approval of various data sheets and inspection
test plans in line with the company documents and in compliance with various
Codes and standards for the procurement of a better quality product from various
vendors .And also witnessing of test performed on raw material and finished
product to ensure quality of material supplied by the various vendors is as per the
standards and quality assurance for followings:

Ball valves
Steel pipe

Page
1

PE pipe
Skids
3 LPE coating
Service regulator
Rubber hose
Fittings and flanges
Steel pipeline Projects:

Successfully executed and commissioned 6dia steel pipeline project, 3.5 km spur
line in Gandhinagar (Gujarat) for connecting of CNG station including Tap-off for
DRS sector 21 to sector 24 (2013-14).
Successfully executed and commissioned 6dia steel pipeline project, 2.5 km Spur
line in Gandhinagar city (Gujarat) for connecting sector 5 CNG station(2013-14).
Successfully executed and commissioned high pressure 6 steel pipeline 3 km
(Operating pressure 76 Bar-g) project for setting up of online CNG station in
Palanpur City (Gujarat) (2015).

Engineering and Planning:

To Plan CGD network in newly identified areas in synchronization with ROU team
aiming for lesser conflicts with various statuary authorities.
Study of the impacts of new Steel pipelines (series, parallel, looping) on flow and
pressure conditions of existing network on SynerGEE Software in planning phase
focusing on the optimization of existing infrastructure.
To carry out the detailed engineering of Coordination with C&M department after
the signing of contract by new industrial customers and carrying out the design
calculations for the skid to be installed in customer premises.
Helped in organizing PE welder training and initiated the record keeping of various
PE welders and their working history for better quality of fusion jointing.

SAP PS Module core team member:

Recommended by mentor to take the responsibility of PS module


implementation as a Core Member of SAP in house team. With joint efforts
our Team implemented SAP in 8 months.
Developed and Tested reports of PS module. Prepared end user training document
PS module and imparted training to the end users at the time of go live.
Post go live support to all PS users in company. Helped finance department in
Capitalization and answering the queries in audit after SAP implementation.

Business development:

Asset take over from GGCL in Vapi city and technical planning for connecting
these assets to our network for network looping and effective utilization of
network.
Assessment of technical feasibility and Process development for the use of
sourced rich gas in our CNG stations .

Audit:

Carried out the audit of PE bills to find the mismatch b/w current actual
commissioned PE quantity, actual bills paid, and actual bills pending for payment,
Capitalization by finance, current work in progress and material present in various
contractor locations.

Page
2

Carried out the audit of laid and commissioned quantity of Steel pipelines to find
the mismatch and to resolve the various bills related issues across all locations
and helped the capitalization team in finding the bills but pending for
capitalization quantity.

MIS:

Preparation of daily registered, installed and commissioned domestic customer


report in coordination with all the zone offices and city managers.
Preparation of weekly laying and commissioning report of steel and PE pipeline
network in coordination with the city offices and site engineers and circulation of
report to CEO and other concerned departments. Preparation of weekly report of
installation and commissioning of CGS,DRS/CPRS/IPRS/MRS, valve chambers and
service regulators across all the sites.
Coordination with all the zones and GAs for the preparation of report to track the
commercial/non commercial and industrial customer registration and
commissioning report.
Monitoring of target v/s actual goals monthly and quarterly and submission for
quarterly target monitoring meetings presided by CEO and project head for
analysis of Target V/S actual goals achieved of all the cities and zones.
Preparation of data submitted to PNGRB in coordination with C&M department
which involves inch dia. commissioned, customer status, CNG stations and Gas
sales
Coordinating with CNG team and prepare the progress report of all the CNG
stations and various permits status required

ACADEMIC BACKGROUND
Year(s
)

Qualification
Degree

Board / University

College / School

200810

MBA
(Oil & Gas Management)

University of
Petroleum & Energy
Studies

200408

B. E.
(Chemical Engineering)

Kurukshetra University

2004

12th

2002

10th

College of
Management &
Economics Studies
Jmit, Radaur
(yamunanagar)
Adarsh high School
Gharaunda, Karnal
Adarsh high School
Gharaunda, Karnal

Board of school
education Haryana
Board of school
education Haryana

PERSONAL DETAILS
Date of Birth
Gender
Nationality
Permanent Address

Telephone
Languages Known
Passport
Mobility

:
:
:

:
:

March 20, 1987


:
Male
Indian
VPO Jamalpur
Karnal, Haryana
+91 9991355114
English, Hindi,
H4391302
:
Willing to relocate anywhere in India and overseas

REFERENCES

Mr. KSR Prasad


Sr. Vice president (Technical Services)

Page
3

%/
CGPA
3.18/4
63.00
%
71.20
%
80.00
%

Gujarat Gas Ltd.


+91 9099953919

Mr. Shashwat Agarwal


Sr. Vice President Projects
MGL (Mahanagar Gas).
+91 8879983053

Mr. Dipen Chauhan


Sr. vice President- Commercial & Marketing
Gujarat Gas Ltd.
+91 9825308253

Page
4

Das könnte Ihnen auch gefallen