LUMP SUM ITEM WORK RCC ESR :-

Sr.
No.

Particulars

Qty.

Unit

Rate

Amount

Design & Construction of I nos.R.C.C


Elevated Service reservoir of minimum 20
m staging,20t/sqm SBC, 300 kl capacity at
choti sadri as per specifications including
fixing of inlet, outlet, washout & overflow
pipes. Installation of valves on inlet; outlet;
washout & overflow pipes, puddle collars,
duck foot bends, pipe interconnecting with
the incoming & out going mains with all
specials; float valve with auxiliary valve,
water indicator, plinth protection works ,
fixing of lightening arrestor etc. as per
general arrangement drawing, finishing
testing and commissioning complete
including
detailed
engineering
&
responsibility as per the specifications and
scope of work.It will also include all cost of
any other accessory, earthwork,filling,
concreting,
equipment,
material,field
survey,data collection including those
mention in scope of work and payment will
be as per given payment terms.It is a
composite,all inclusive,lumpsum item and
nothing extra shall be payable.

300

KL

Lump
Sum

2991381.46

Scope of Work and Specifications of ESR


Scope of Work:It is Proposed to Construct RCC ESR at Choti Sadri under IHSDP Scheme.. The Live
Storage capacity of the tank is 300 Kl at 20 mtr staging complete with providing &
fixing necessary CI / DI Inlet, Outlet, overflow & washout pipes with puddle collars,
Duck Foot bends, valves etc. complete job.
Carrying out necessary topographical survey for the ESR within the limit of the contract
in consultation with Engineer In Charge.
Conducting required soil / strata investigations for the foundation of ESR.
The Contractor will be solely responsible for preparing and submitting required designs /
drawings after carrying out appropriate field surveys, data collection, designs etc. for
approval of Engineer in Charge.
Preparation and submission of all detailed working drawings and Designs approved by
MBM Engineering College Jodhpur / MNIT Jaipur .

Construction of RCC ESR:The work consists of construction of RCC ESR:


The contractor shall be fully responsible for the soundness of the construction, structural
safety & water tightness of the structure based on the specifications, sound engineering
practices, and latest I.S. provisions.
The reservoir is to be constructed of minimum 300 KL live storage capacity over 20
mtr staging with providing & fixing necessary CI / DI Inlet, Outlet, overflow & washout
pipes with puddle collars, Duck Foot bends, valves etc. complete job.
detailed as below.
S.N. Capacity & Stg Size of Inlet Size of Outlet Size
of Size
of
of tank
pipe
pipe
Overflow pipe
Washout
pipe
1
300 kl & 20 m 150 mm 1 200 mm 1 200 mm 1 100 mm
staging
no.
no.
nos.
1 no.
The scope of work includes Construction of reservoir as per the provisions given
in the Specifications for civil works.
(i)

Supply and installation of puddle collars and duck foot bends for installation of Inlet,
outlet, washout and overflow pipes up to 200 mm dia.

(ii)

Supply and installation of double flanged CI / DI pipes for inlet, outlet, washout
(scour) and overflow with specials up to 200 mm dia.
(iii)
Providing & installation of Soft Seated Sluice valves at least two nos. on out let, one
soft seated valve on inlet & washout pipe for reservoir. The sizes of the valves shall be
equal to that of the main on which they are to be installed.
(iv)
Interconnection of the overflow pipe to the distribution or the outgoing feeders as per the
approval of Engineer-in-Charge using CI / DI / MS double flanged pipes and required
specials.
(v)
Providing scour / washout pipes up to suitable length to drain the water away from the
structure in an environmental friendly manner, using a sluice valve equal to the size of
washout pipe as listed above, CI double flanged pipes and required specials.
(vi)
To provide Masonry Valve chambers for all valves installed on the inlet, outlet, scour &
overflow pipes.
(vii) Providing water level indicator as per specifications given in the chapter of
specifications for civil works for reservoir.
(viii) Excavation for all structures including working spaces, trench excavation for pipes &
other ancillary works in all sorts of soils, refilling & disposal of surplus earth at suitable
site & dressing as per direction of Engineer-in-Charge.
(ix)
Providing plinth protection works as per specifications and approved drawings for ESR.
xviii Providing lightning arrester on the top of ESR etc as required
(x)
Providing access to the top and inside the reservoir as per the specifications given in the
chapter of specifications for civil works.
(xi)
Providing ventilation for the reservoir as per the specifications given in the chapter of
specifications for civil works.
(xii) Providing manhole / headroom for access inside the reservoir.
(xiii) Providing 25 mm diameter GI pipe in two rows in 50 x 50 x 6 mm angle iron railing of
reservoir, on the sides of the staircase and balcony, and the other suitable points for
the requirement of safety of maintenance and execution staff.
(xiv) Testing of tank for water tightness and structural stability by filling it with water and in
accordance to the procedure laid down in tender document/ IS code.
(xv) Colour washing using cement paint of approved quality as per specifications.
(xvi) Painting the metallic surface & putting slogan on tank as per specifications.
(xvii) Final clearance of site before handing over the work, including leveling of earth and
disposal of surplus earth as per directions of the Engineer-in-Charge.

Submission of lay-out plans with site contour plan and site grading levels and plinth
protection works for approval of EIC.

Submission of structural designs and working drawings for approval of Engineer-inCharge. The structural design and reinforcement drawings shall be prepared assuming
SBC of soil or the base rock as 20 T/Sqm, if the SBC on testing is found to be 20 T/Sqm
or more at foundation depth ( which should not be less than 2.0 m ). If the SBC testing
is found to be less than 20 T/Sqm at foundation depth the structure shall be designed on
the basis of actual SBC found on testing for which no extra payment will be made to
contractor. SBC tests shall be got done through an approved agency wherever the strata
on which foundation is to be laid is not rocky. The foundation shall only be laid on firm
rock or hard soil bed after removing decomposed rock and all loose material.

The contractor shall be fully responsible for Technical suitability of design, soundness of
the construction, structural safety & water tightness of the structure based on the
specifications, sound engineering practices, and latest IS provisions.
The Contractor will submit structural design & drawing of proposed RCC ESR duly checked and
approved by competent authority of MNIT Jaipur / Engineering Collage Jodhpur

PAYMENT TERMS:The Payment shall be made to the contractor as per breakup of payment mentioned below
in which stages of progress have been clearly defined:
1. On completion of foundation raft and beam.
2. On completion of half of the staging with braces and stairs up to
half staging
3. On completion of full staging braces and stairs up to full staging.
4. On completion of Bottom Ring Beam, Conical Wall, Balcony
Beam & Bottom Dome
5. On completion of half the Height of vertical wall
6. On completion of full height of tank wall, top ring beam and top
dome R.C.C. stairs from last landing to balcony beam and top of tank
7. Fixing of all pipes, Valves, Duck Foot Bends, Specials and Valves
and accessories like ladder inside tank, railing, lightening arrestor etc.
8. On completion of Plinth Protection, Valve chambers, finishing,
painting etc. and site clearance.
9. On completion of testing of tank
TOTAL

10%
10%
10%
15%
10%
10%
15%
10%
10%
100%