Sie sind auf Seite 1von 17

CHECKLIST FOR RENEWAL OF FIRMS WITH PEC AS

CONSTRUCTORS/OPERATORS
Sr
.No
1
2
3

Documents to be Submitted along with Application Form duly filled in CAPITAL Letters

4
5
6
7
8

Certificate from the firm regarding detail of works executed during last year.
List of works in progress

Application form duly filled


Previous Original Registration Certificate
Following documents are required in support of newly employed engineer
i) Appointment Letter of Engineer(s) employed duly signed by both Employer and Engineer
ii) Duly signed detailed CV of Engineer(s) employed
iii) Copy of valid PEC Renewal card of Engineer(s)
iv) Bank statement/Certificate as evidence regarding salary paid to Engineer(s)
Employed
v) NTN of Engineer(s),if applicable
In case of already employed engineer, following papers will be required
i.
Bank statement/Certificate as evidence regarding salary paid to Engineer(s)
Employed
ii.
NTN of Engineer(s),if applicable

List of running/ workable Machinery, Equipment and Technical Staff with their qualification
Annual audited report/ balance sheet of firm
Original paid Challan of requisite fee

I undertake that above mentioned information/documents provided by the undersigned are correct to the
best of knowledge and nothing has been concealed.

Dated: __________________

Signature______________________
(CEO/Chairman/Managing Partner or Director)

Note:
PEC license shall be issued on same day after 3.00 p.m and will be dispatched through courier.In case
of non-issuance of PEC registration certificate/renewal card within specified time mentioned above,
please contact;
i.Engr Khadim Hussain Bhatti, Registrar ( 0300-5557840)
ii.Engr M.Musaib Qureshi, Additional Registrar ( 0300-5557902

MISCELLINOUS CHECKLIST (FOR RENEWAL)


Following documents will be required as the case may be
01.

For change in ownership of firm


i) Sole Proprietor
i) Affidavit of sole proprietor
ii) Transfer deed with attestation of first class magistrate (in case of change of sole proprietor)
ii) Partnership Concern
i) Duly attested copy of partnership deed
ii) Form C/ H issued by respective Registrar of firms
iii) Form D And Dissolution deed (in case of cancellation/change in partnership)
iii) Private Limited
i) Certificate of incorporation
ii) Article of Association(AOA)
iii) Memorandum of Association(MOA)
iv) Form 29
v) Form A
iv) Public Limited Co. / Public Limited Co.
i) SECP Documents
ii) Stock Exchange Documents
v) Statutory Body
i) Copy of notification issued by competent authority
vi) In case of death of owner/shareholder/partner
i) Death certificate of owner/shareholder/partner
ii) Power of attorney attested by Ist class Magistrate
iii) Transfer deed with list of heirs attested by Ist class Magistrate
iv) No objection certificate from heirs
v) Succession certificate
vii) Readable copy of Identity Card of Owner/Shareholder(s)/partner in each above mentioned case

02.

Change in name of firm/address


i) Request from owner/ shareholder/partner
ii) Affidavit for change in name of firm/status
iii) Newspaper clipping for change in name of firm
iv) Documentary evidence in support issued by Registrar of firms/SECP(as the case may be)

04.

For addition of specialization codes


i) Request for addition of code on official letter head
ii) Detailed CV of engineer(s) showing experience relevant to the desired codes supported by experience
certificates
iii) Documentary evidence of Firms experience/work done relevant to desired codes
iv) Original PEC Licence

05.

For consideration of works in private Sector


i) Copy of Contract/agreement between Prime Constructor and Sub-constructor.
ii) Performance Certificate from Consultant engaged with Constructor duly verified by employer or client.
iii) Evidence of payments through cheques, bank statement and amount deducted as Income Tax thereof.
iv) Amount of work awarded to sub-constructor within its limit specified in license.

06.

For issuance of duplicate licence


i) Request from owner/ shareholder/partner
ii) Affidavit for lost of licence of firm
iii) Copy of FIR
iv) Newspaper clipping

07.

For down gradation of firm


i) Request on official letter head with desired category mentioned on it
ii) Original PEC licence

08.

For closure of firm


i) Request from owner/shareholder/partner
ii) Affidavit for closure of firm
iii) Original PEC Licence
iv) Payment of all outstanding dues

FOR OFFICE USE ONLY

PAKISTAN ENGINEERING COUNCIL


Ataturk Avenue (East), Sector G-5/2, Islamabad
UAN:111-111-732 , Fax: 051-2780346
e-mail: info@pec.org.pk, URL: http://www.pec.org.pk

Application
Tracking No.
Receiving Date

Renewal Form for Constructors/Operators for the Year______


1- Category: C

or O

Licence No. __________________

Valid upto _31/12/20______

(Attach Original Previous Licence)

2- Name of the Firm: __________________________________________NTN:


3- Name of CEO: ___________________________________________________________________
4- Mailing Address: _________________________________________________________________
Engr. Owner/Shareholder:

YES

Courier service availability:

NO

(Tick the appropriate box)

YES

NO

(Tick the appropriate box)

Mob: ____________________ Tele: _____________ Fax: ____________ e-mail: _________________


5- Type of Ownership
Individual
Sole-Proprietorship
Partnership
Private Ltd Co.
Public Ltd Co
Single Member Co (SMC). Statutory Body
Others ____________________ (Tick the appropriate box)
Any Change, be described (Supported by legal documents) ______________________________________
6- Detail of Engineers employed by the firm (Attach undertaking, duly signed CV, Valid copies of CNIC & Renewal Card of all Engineers):
Sr.

Name of Engineer

Date of Birth

PEC Reg. No.

Date of Reg

Renewed upto

Employed Since

1
2
3
4
Add separate sheet (if required)

7- Major works executed OR in Progress (Data for last 3 years):

Sr.

Year of
Award

Value of
Work (Rs)

Deptt / Org.

%age of
Completion

Completion
Date

Description of Work

1
2
3
4
Add separate sheet (if required)

8- Code of specialization required

(Supported with documents and


employment of relevant Engineer(s)) :

____________________________

9- UNDERTAKING
I undertake that;
a) The information given above and documents/papers attached herewith are correct and accurate
to the best of my knowledge and belief and nothing has been concealed.
b) I will abide by the provisions of PEC Act 1976 and Construction & Operation of Engineering
Works Bye-Laws 1987.
c) I shall be responsible if any information, document or paper submitted by me is found incorrect
or forged.
Company/Firms Seal

Signature

*Name: _________________________
Designation: ___________________
Mobile No: _____________________
Date: _______________

CNIC

No.

* The application should be signed by CEO or Shareholder or duly authorized employee of the
company. A non-employee is ineligible to sign the application.

PENALTIES VIZ--VIZ THE NATURE OF MISCONDUCT


Besides provisions stated in the PEC Construction & Operation of Engineering Works Bye-laws 1987,
following penalties will be imposed.
Nature of misconduct
In case, a firm has executed work
without having PEC license and
desires initial registration with PEC
in any higher category other than
C-6 category

1.

Penalty to be Imposed

Rs.250/- per day per PCP.


Suspension of licence for 03 months on 1 st

(i)
In case a firm submits an
incorrect/fake affidavit of engineer
to PEC.

2.

occurrence
Suspension of licence for 09 months on 2 nd

(ii)
occurrence

De-registration of firm on 3rd occurrence).


Suspension of licence for six months on 1 st

(iii)
(i)
In case a firm submits
fake/tempered PEC Licence to any
employee or PEC.

3.

In case a firm submits


fake/forged/incorrect work order(s)
or performance certificate / report
to PEC.

4.

5.

occurrence.
Suspension of licence for one year on 2 nd

(ii)
occurrence.

De-registration on 3rd occurrence.


Suspension of licence for six months on 1 st

(iii)
(i)
occurrence.

Suspension of licence for one year on 2 nd

(ii)
occurrence.
(iii)
(i)

Any other misconduct.

De-registration on 3rd occurrence


As decided by the Enrolment Committee, on
case to case basis under the provisions of PEC Act and
Byelaws

I fully understand the above mentioned penalties viz--viz the nature of misconduct. I shall be liable to
punitive action taken by PEC in event of misconduct committed by me or the firm.
Company/Firms Seal

Signature
Name: _________________________
Designation: _____________________
Mobile No: ______________________
Date: _______________

CNIC No.

[For official use only]


DECISION OF ENROLMENT COMMITTEE

________________

________________

________________

________________

CHAIRMAN
ENROLMENT COMMITTEE

Prescribed fee of Rs. . has been received and credited vide


Receipt

No.

Dated

Bank

Draft

.. Dated Amount Rs ..
Signature of
Accounts Official: _______________

Signature of
Internal Auditor:________________________
Category: ______ Licence No:_________

Date of Approval :

Licence Serial No: ___________________


Date of Issue ______ Valid Upto:31/12/20__

Initial of Scrutiny
Official :

Initial of Section
Incharge:

No.

Registrar
PEC

INSTRUCTIONS FOR FILLING IN APPLICATION FORM


FOR RENEWAL OF CONSTRUCTOR/OPERATOR LICENCE
1. Before filling in the application form, please see clause 4 and 8 of the Construction and
Operation of Engineering Works Bye-laws, 1987
2. The annual application fee for all Constructor/Operator category licence, Financial
Limits and PCPs required for renewal of licence is mentioned below, the evidence of
payment should accompany the application form
3. For renewal, the applicant for the constructors or operators licence shall submit
application to the Council in the prescribed form. The application for renewal shall be
submitted to the Council by the 5 th day of November of the year based on the
constructors or operators status as on the 31 st day of October of the same year. The
licence shall stand expired on 31 st day of December each year. If the renewal is not
submitted by 31st day of March, a surcharge of 2% will be levied.
4. A licensee shall inform the Council of any events taking place after grant of a licence to
him or renewal thereof, which render him ineligible for continuation of licence in
accordance with the clauses of aforesaid bye-laws. On receipt of such information, the
Council may decide to reduce the category of licence or suspend or cancel the licence
as it may deem fit.
Constructors Categories, Fee, Financial Limits and other Associated Parameters

Sr. #

Category

Limit of
Construction Cost
of Project

C-A

No Limit

C-B

Up to Rs.3000 M

C-1

Up to Rs.1800 M

4
5
6
7
8

C-2
C-3
C-4
C-5
C-6

Up to Rs.800 M
Up to Rs.400 M
Up to Rs.150 M
Up to Rs.50 M
Up to Rs.20 M

Minimum Requirement of
Engineers
Two P.Es with 20 years of
Experience each + RE
Two P.Es with 15 years of
Experience each + RE
Two P.Es with 10 year of
Experience each + RE
One P.E + R.Es
One P.E + R.E
One P.E + R.E
One R.E
One R.E

PCPs

Fee (Rs)
(Local
Firms)

Fee (Rs)
(Foreign
Firms)

150

Rs.200,000/-

Rs.1,200,000/-

100

Rs.150,000/-

Rs.600,000/-

75

Rs.100,000/-

Rs.500,000/-

30
15
10
5
5

Rs.75,000/Rs.50,000/Rs.30,000/Rs.20,000/Rs.10,000/-

Rs.300,000/Rs.200,000/Rs.120,000/Rs.75,000/Rs.30,000/-

Operators categories, Fee, Financial Limits and other Associated Parameters

Sr.
#

Category

Limit of
Operational Cost of
Project

O-A

No Limit

O-B

Up to Rs.1500 M

O-1

Up to Rs.900 M

4
5
6

O-2
O-3
O-4

Up to Rs.400 M
Up to Rs.150 M
Up to Rs.75 M

Two P.Es with 20 years of


Experience each + REs
Two P.Es with 15 years of
Experience each + REs
Two P.Es with 10 years of
Experience each + REs
One P.E + R.Es
One P.E + R.Es
One P.E OR R.Es

7
8

O-5
O-6

Up to Rs.30 M
Up to Rs.15 M

One R.E
One R.E

Minimum Requirement of
Engineers

PCPs

Fee (Rs)
(Local Firms)

Fee (Rs)
(Foreign
Firms)

120

Rs.200,000/-

Rs.1,200,000/-

75

Rs.150,000/-

Rs.600,000/-

50

Rs.100,000/-

Rs.500,000/-

30
15
10

Rs.75,000/Rs.50,000/Rs.30,000/-

Rs.300,000/Rs.200,000/Rs.120,000/-

5
5

Rs.20,000/-

Rs.75,000/Rs.30,000/-

Rs.10,000/-

Note: A late fee @2% per month will be charged after 31 st march of the current year subject to
maximum of 18% of the annual fee.

REGISTRATION CATEGORIES, CODE AND SPECIALIZATION OF CONSTRUCTOR/ OPERATORS


CATEGORY

CODE

SPECIALIZATION

DESCRIPTION

CIVIL
ENGINEERING
CONSTRUCTION
(CE)

CE01

Road and Pavements


Drainage &
Retaining Structure

Construction of road and road


reinstatement, pavement, bus bays, open car
parks and related works such as kerbs,
footways.

Signcraft Installation
Installation of an integrated sign posting
system for complexes, airports, shopping
centres, etc. Also includes setting up of
exhibition stands and road signs.
Airports Taxiways, runways, aprons,
aircraft parking bays, baggage handling
system, track transit system, etc.
CE02

CE03

Bridge Structures

Construction of concrete, masonry, timber


or steel bridges.

Piling

Installation of all types of piling sheet piles,


driven precast reinforced and prestressed
concrete piles, bored cast in situ piles and
timber piles etc.

Marine Structures
Dredging

Construction of marine structure such as


jetties, ports, wharves, harbours, sea and
river walls offshore construction works etc.

Underwater Works
CE04

Dams/Water
Retaining Structures

Underwater construction works and


maintenance of underwater construction
works.
Construction of water retaining structure
such as dams, reservoirs, aqueducts,
treatment plants, pipe laying works etc.

Irrigation & Flood


Control Systems

Earth work/dredging in canal, river and


offshore.

CE05

Offshore Works

Offshore construction works including


related works.

CE06

Tunneling and
underpinning

Tunneling and underpinning works.

CE07

Railways Tracks

Installation of railway tracks, distressing of


rails and tracks.

CE08

Oil and Gas Pipe


Lines

Installation, maintenance and repair of oil


and gas pipelines.

CE09

Sewerage Works

Sewerage pipelines, disposal works,


sewerage treatment works and allied works.
Installation, maintenance and repair of
water supply pipelines, pumping stations,
tube wells, water treatment works etc.
General civil engineering works, including
earthworks, sub-soil drainage, etc.

Water Supply
CE10

General Civil
Engineering Works

Slope Protection
System

Slope protection works.

Concrete Repairs

Reinforcement of structures by way of


pressure grouting, guniting, etc.
Soil Investigation and Services include sampling, investigation
Stabilization
and testing services to determine soil
classifications, strength and composition.
Also includes soil stabilization works such
as micro piling, ground anchoring, sand
drains and ground grouting.

BC01

Landscaping &
Horticulture

Provision of Landscaping services


including tree planting, turfing, horticulture
etc.

Reclamation Works

Reclamation works.

General Buildings
and Maintenance

General building works, including fixing


partitions, roofing and general maintenance
of buildings.

Waterproofing

Water proofing of basement, roofs and


walls.

Prefabricated
Buildings and Steel
Framed Buildings
and Industrial Plants

Construction of buildings and industrial


plants using prefabricated components and
systems. Construction of steel framed
buildings and industrial plants.
Airports Terminal buildings, Satellite
buildings, cargo terminals, air traffic
control towers, contact piers, passenger
loading bridges.

MECHANICAL
ENGINEERING
(ME)

BC02

Restoration and
Conservation

BC03

High Rise Buildings

ME01 HVAC

Building restoration and conservation.

Installation, Commissioning maintenance


and repairs of air conditioning,
refrigeration, cold rooms and ventilation

system.
ME02 Fire Prevention and
Protection System

Installation and maintenance of fire alarms,


prevention and protection systems.

ME03 Lifts and Escalators


Compressor
Generators

Installation, commissioning and


maintenance of lifts, escalators, travel lators
and conveyor systems.

ME04

Building Automation
System

Building automation, industrial and process


control systems, include installation and
maintenance of microprocessors or
computer based building control systems
and industrial process control systems.

ME05 Workshop, Mill,


Quarry System

Installation, commissioning and


maintenance of workshop, mill and quarry
systems such as cranes, hoist, crushing and
screening plant, asphalt mixing plant, etc.

ME06 Specialized
Fabrication and
Treatment

Erection, maintenance and repair of exhaust


stocks, tanks, reactors, separators, filters,
scrubbers, dehydrators, evaporators,
pipings, furnaces, grit blasting and painting,
hot and cold insulation, flare system,
bearing and welding.
Installation, commissioning and
maintenance of medical equipment such as:
- Compressed air systems
- Hot water installation
- Sterilizer and autoclave
- Medical gas installation
- Hydrotherapy system
- Dental chair
- Mortuary refrigerator etc.

Medical Equipment

Kitchen and Laundry


Equipment

Installation, commissioning and


maintenance of cooking and kitchen
equipment, laundry equipment, etc.

Heat Recovery
System

Installation, commissioning maintenance


and repair of boiler plant, heat exchangers,
absorption chillers, unfired pressure vessels
and hot water systems, etc.

Pollution Control
System

Landfill technology, incinerator, oil


separators.

Miscellaneous
Mechanical
Equipment

Installation, testing commission,


maintenance and repair of mechanical
based systems such as pumping installation,
sewerage treatment plant installation, water
treatment plant installation, rotary pumps,
reciprocating pumps, centrifugal pumps and
special purpose pumps, etc.

Chiller for Power


Generation

Installation, maintenance and repair of gas


turbine driven chiller, steam turbine driven
chiller and centrifugal chiller.

Specialized Plant

Erection, maintenance and repair of


compressor station, metering station,
onshore terminal station, co-generation
plant, gas processing plant, petrochemical
plant, oil refinery, aviation re-fuelling and
de-fuelling system, petrol station, heating
ventilation and air-conditioning.

ELECTRICAL
ENGINEERING
(EE)

ELECTRONICS
ENGINEERING

EE01

Sound System

Public address system, audiovisual system,


conference system, intercom system and
MAT.

EE02

Security, Safety
Surveillance System

EE03

Building Automation
System and Energy
Generation System

Installation and maintenance of security,


safety and surveillance systems (security,
alarm, car park security control and card
access control systems. CCTV,
sensor/detection system, vibration
monitoring system, gas protection system,
platform alarm system, aircraft warning
system, fire protection system and earthing
and lighting protection.
Building Automation, industrial and
process control system, included
installation and maintenance of
microprocessors or computer based
building control systems and industrial
process control systems, includes
installation and maintenance of energy
generation systems.

EE04

Low Voltage
Installation

General wiring and control system wiring


works not exceeding 1 KV. Installation and
maintenance of low tension overhead lines
and underground cabling not exceeding
1KV. Also includes installation and
maintenance of generating plant and
equipment not exceeding 1 KV.

EE05

High Voltage
Installation

Installation and maintenance of high


voltage equipment and underground
cabling, high-tension overhead line
including transmission tower exceeding
1kV. Also includes installation and
maintenance of generator plant and
equipment exceeding 1KV.

EE06

Specialized Lighting
System

Installation and maintenance of street


lighting, stadium floodlighting, traffic
lighting, airfield lighting, high mast lighting
installation, laser system, stage lighting,
special effect lighting, navigational aid,
underwater lighting, platform lighting,
petrochemical plant lighting, oil refinery
plant lighting, etc

EE07

Telecommunication
Installation

Telephone cabling and internal ducting,


radio based communication system, PABX,
microwave system, multiplex and
signalling troposcatter system, satellite
system, radar surveillance system, data
communication equipment, remote
subscriber system, vessels and navigational
specialized system, etc.

EE08

External
Telecommunication
Works

Telecommunication cabling (underground/


overhead), manholes, underground
ducting/pipes.

EE09

IT & Software Engg

EE10

Miscellaneous
Specialized

Installation, commissioning and


maintenance of surgical/operating theater
table and lights, radiography equipment,
radiotherapy equipment, nurse call system,
electronic scoreboard, uninterruptible
power supply (UPS) system, etc.

Any other works*

Any work not covered in above


categorization and description relevant to
any engineering discipline.

*Provide herein code(s) (CE11, BC04, ME07, EE11) as applicable and define work.

APPENDIX B
[see bye-law 5(1)]

UNDERTAKING BY ENGINEER
I EngrS/o, adult, resident of
.. do hereby solemnly declare as
under:1.

That I am registered with PEC as a Registered/Professional Engineer and a certificate


of registration bearing No. .. dated . has
been issued by the Pakistan Engineering Council which has been renewed up
to . (Invalid renewal not acceptable)

2.

That I am presently employed on regular/fulltime basis with


..

since

and presently hold the position of


.. I further state that I am not employed on any other
assignment with any other private firm, government agency, office or bureau of any
other consulting engineer.
3.

That I undertake to intimate the Pakistan Engineering Council about my disassociation


with the above-mentioned employer within thirty days of the same.

4.

5.

That I have enclosed with this undertaking my following document:a.

Copy of Computerized National Identity Card

b.

Copy of PEC Registration Card (Renewed)

c.

Detailed duly signed Curriculum vitae

d.

Copy of appointment letter of the Firm/Company

e.

Proof of monthly salary received from the firm

That I have not ever incurred any disqualification in any manner under the Pakistan
Engineering Council Act and Bye-laws. (if in the past any disqualification was incurred
please mention material detail).

6.

That the contents of the above mentioned undertaking are true to the best of my
knowledge, belief and information received and nothing has been concealed therefrom.
__________________________
Signature of Engineer
CNIC NO._______________________
CONTACT No: _______________________
DATE: _______________________
PLACE: _______________________

SPECIMEN OF UNDERTAKING OF CHANGE OF NAME/STATUS


(The affidavit would be on Rs.10/- stamp paper and attested by a First Class Magistrate/Oath Commissioner)

It is requested that I/we----------------------------------------------------------------------Owner/Partner(S) of M/s----------------------------------------------------------------------------------------Address--------------------------------------------------------------------------------------------------------Want to change the name/status of my/our firm to state that:
My/our previous firm M/s------------------------------------------------------------------------Address-----------------------------------------------------------------------------------------------------------------Has not been backlisted by any department and has no liability from any department/financial
institution. If any, such liability is detected by any department/financial institution at any stage. I
shall be responsible for the same.
Reason(s)

for

change

of

name/status

is------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Name of Contractor:____________________
Name of Partner(s):____________________
CNIC NO.____________________________
Contact No: __________________________
Permanent Address: ___________________
____________________________________
____________________________________
Dated: ___________

Signature: ___________________________

SPECIMEN OF AFFIDAVIT OF UNDERTAKING BY CONTRACTOR


(Note:-The affidavit would be on Rs.10/- Stamp Paper and attested by a First Class
Magistrate/Oath Commissioner /Notary Public)

I, ___________________________________an applicant for registration with Pakistan


Engineering Council as Constructor in Category C-______ (applied for), certify that at present I
am not undertaking any engineering work. I further certify that names, registration numbers
and affidavits of engineers employed by me will be supplied to the Council in accordance with
the Construction and Operation of Engineering Works Bye-laws 1987, when any work is
awarded to the firm.

Signature: ____________________________________
Name of Constructor: __________________________
Name of Firm: _______________________________
Address: ____________________________________
___________________________________________
Contact No

_________________________________

Date: ______________________________________

UNDERTAKING
(On Stamp Paper of Rs.10/-)
(to be submitted upon physical appearance of Guarantor at any PEC office)

1.

I, Engr. _______________________________ am owner / shareholder / partner of firm

namely M/s. ____________________________________ registered as Constructor / Operator


with PEC as C-___ / O-___, and valid upto 31st December, ___________.
2.

I solemnly declare that following engineers are employed with my firm. Evidence of the

employment can be provided, when required by PEC:Sr.

Name of Engineer

Date of Birth

PEC Reg. No.

Date of Reg

Renewed upto

Employed Since

1
2
3
4
5
6
7
8

3.

Above information is given to the best of my knowledge and nothing has been concealed.

I shall be responsible if any information given above is found incorrect and liable to punitive
action under PEC Rules and Bye-laws.

Signature: ________________________________
Name of Engr______________________________
CNIC No: _________________________________
PEC Reg. # _______________________________
Contact No________________________________
Date: ____________________________________

PERFORMANCE CERTIFICATE
(For each major work during last three years)

NAME OF EMPLOYER: _______________________________________________________


NAME OF PROJECT: _________________________________________________________
NAME OF CONSULSTANT (IF EMPLOYED): ______________________________________
STARTING DATE: _________________
ORIGINAL COMPLETION DATE: _________________
ACTUAL COMPLETION DATE: ___________________
DELAY PERIOD: ______________________________
LIQUIDATED DAMAGES: ________________________
ORIGINAL CONTRACT VALUE: ___________________
VALUE OF WORK DONE UPTO FINAL BILL: _________
PERCENTAGE OF WORK DONE WITH DATE _____________________________________
ENGINEERS EMPLOYED DURING THE EXECUTION OF THE WORK
Sr.

Name of Engineer

Date of
Birth

PEC Reg.
No.

Date of
Reg

Renewed
upto

Employed
From

Employed
To

1
2
3
4

QUALITY OF WORK EXECUTED AND REMARKS BY EMPLOYER

To be filled by contractor
Name of Owner/
Share holder:__________________________
Mobile No: ___________________________
Signature: ____________________________
Date: __________________________________

Company seal/stamp

To be filled by employer
Name & designation
of employer :_______________________
Fax No: ___________________________
Mobile No: _________________________
Date: _____________________________

Official seal/stamp

Das könnte Ihnen auch gefallen