Beruflich Dokumente
Kultur Dokumente
(Multi-purpose)Laboratory Workshop
Building
Location of the Project: Caranan, Pasacao, Cam.
Sur
By
and
Between
owner/proprietor
of
CONTRACT AMOUNT
That both parties agree to be jointly and severally liable for the entire assignment.
That
both
parties
agree
that
_______________________________
and/or
______________________________ shall be the Official Representative of the Joint Venture, and is granted
full power and authority to do, execute and perform any and all acts necessary and/or to represent
the Joint Venture in the bidding as fully and effectively and the Joint Venture as may do and if
personally present with full power of substitution and revocation.
THAT this Joint Venture Agreement shall remain in effect only for the above stated Projects
until terminated by both parties.
That the parties of this joint Venture are covered by the following conditions as follows;
1.
2.
3.
4.
5.
Done this __________ day of ___________, in the year of our Lord ________________.
____________________________________________
___________________________________________
Witnesses;
_____________________________
___________________________________________________________
If the bidder is a joint venture, one of the requirements for Eligibility is the submission of a valid joint
venture agreement.
________________________
NOTARY PUBLIC
My
commission
expires
Dec.
31,
If the bidder is a joint venture, one of the requirements for Eligibility is the submission of a valid joint
venture agreement.
Juan F. Trivino Memorial High School
Caranan, Pasacao, Cam. Sur
purpose)Laboratory
Building
Workshop
WITNESS _____________________________
SEAL ________________________________________________
_____________________________________
(Signature, Name and Address)
________________________________
__________________________
The bidder should insert the amount of the guarantee in words and figures denominated in the
currency of the Employers country or an equivalent amount in a freely convertible currency. This
figure should be the same as shown of the instructions to Bidders.
3
Usually 28 days after the end of the validity period of the Bid date should be inserted by the
Employer before the bidding documents are issued.
Juan F. Trivino Memorial High School
Caranan, Pasacao, Cam. Sur
(Multipurpose)Laboratory
Workshop Building
Standard Form Number: SF-INFR
Revised on: August 2011
BOND NO. :
_____________________________
If the Principal does not accept the correction of arithmetical errors of his bid price in
accordance with the Instructions to Bidder; or
3) If the Principal having been notified of the acceptance of his Bid by the Employer
during the
period of bid validity:
a) fails or refuses to execute the Form of Agreement in accordance with the
Instructions to
Bidders, if required; or
b) fails or refuses to furnish the Performance Security in accordance with the
Instructions to
Bidders;
then this obligation shall remain in full force and effect, otherwise it shall be null and void.
PROVIDED HOWEVER, that the Surety shall not be:
the said
a)
liable for a greater sum than the specified penalty of this bond, nor
b)
liable for a greater sum that the sum that the difference between the amount of
Principals Bid and the amount of the Bid that is accepted by the Employer.
This Surety executing this instrument hereby agrees that its obligation shall be valid for 120 calendar
days after the deadline for submission of Bids as such deadline is stated in the Instructions to Bidders
or as it may be extended by the Employer, notice of which extension(s) to the Surety is hereby by
waived.
_____________________
1
The bidder should insert the amount of bond in words and figures, denominated in the currency of
the Employers country of an equivalent amount in a freely convertible currency and callable in
demand. This figure should be the same as shown in the Instructions to Bidders.
Department of Education, Division of Camarines Sur
Project Reference Number:
_________________
Name of the Project:
PRINCIPAL ___________________________________
SURETY _______________________________________
SIGNATURE(S) ________________________________
SIGNATURE(S) _________________________________
NAME(S) ______________________________________
SEAL ________________________________________
SEAL _________________________________________
Construction of
New (Multi-purpose)Laboratory
Workshop Building
Name of the Project:
Principal By:
______________________________________
By:
_______________________________________
_______________________________
________________________________
_______________________________
(Multi-purpose)Laboratory Workshop
Building
Location of the Project: Caranan,Pasacao,Cam. Sur
PRODUCTIVITY SCHEDULE
If granted the Award of Contract, I/we promise to deliver the said project
according to the following schedule:
Job Description
Origin
Destination
Date
Time
Personnel
In-Charge
______________________________________
(Name and signature of Authorized Representative)
__________________
Date
(Multi-purpose)Laboratory Workshop
Building
Location of the Project: Caranan, Pasacao, Cam Sur
MANPOWER REQUIREMENTS
The following are the vital personnel in the compay involved in the project unto whose
bidding I am participating into:
Name
Position
Job Description
Employee Number
______________________________________
(Name and signature of Authorized Representative)
__________________
Date
Construction of
New (Multi-purpose)Laboratory
Workshop Building
Name of the Project:
Location
of
the
Caranan,Pasacao,Cam.Sur
Project:
TECHNICAL SPECIFICATIONS
The following are the items involved in the project that are necessary in the integrity
and efficiency of the project and their specifications therein:
Item
Serial/License
Number
Description
Features
______________________________________
(Name and signature of Authorized Representative)
__________________
Date