They are small in size, mass, and initial cost per unit output.
Their delivery time is relatively short and they can be installed
quickly.
They are quick starting (as low as 10 s), often by remote control.
Professor
Department of Mechanical Engineering
Bangladesh University of Engineering & Technology (BUET)
Dhaka-1000, Bangladesh
zahurul@me.buet.ac.bd
http://teacher.buet.ac.bd/zahurul/
(BUET)
Gas Turbine
ME 403 (2015)
1 / 25
(BUET)
Gas Turbine
ME 403 (2015)
2 / 25
T401
T371
(BUET)
Gas Turbine
ME 403 (2015)
3 / 25
T402
(BUET)
Gas Turbine
ME 403 (2015)
4 / 25
T403
T404
Representation of a simple
cycle gas turbine.
T405
(BUET)
Gas Turbine
ME 403 (2015)
5 / 25
(BUET)
Gas Turbine
T407
Gas Turbine
ME 403 (2015)
T408
Schematic representation of a
regenerative cycle.
(BUET)
6 / 25
T406
ME 403 (2015)
7 / 25
(BUET)
Gas Turbine
ME 403 (2015)
8 / 25
T409
(BUET)
Gas Turbine
ME 403 (2015)
9 / 25
T410
(BUET)
Gas Turbine
ME 403 (2015)
10 / 25
T412
T411
(BUET)
Gas Turbine
ME 403 (2015)
11 / 25
(BUET)
Gas Turbine
ME 403 (2015)
12 / 25
T414
T413
(BUET)
Gas Turbine
ME 403 (2015)
13 / 25
(BUET)
Gas Turbine
ME 403 (2015)
14 / 25
T418
T417
T419
(BUET)
Gas Turbine
ME 403 (2015)
(BUET)
Gas Turbine
ME 403 (2015)
16 / 25
T420
(BUET)
Gas Turbine
ME 403 (2015)
17 / 25
T421
(BUET)
Gas Turbine
ME 403 (2015)
18 / 25
T423
T422
(BUET)
Gas Turbine
ME 403 (2015)
19 / 25
(BUET)
Gas Turbine
ME 403 (2015)
20 / 25
T427
T424
(BUET)
Gas Turbine
ME 403 (2015)
21 / 25
(BUET)
Gas Turbine
ME 403 (2015)
22 / 25
T429
T430
(BUET)
Gas Turbine
ME 403 (2015)
23 / 25
(BUET)
Gas Turbine
ME 403 (2015)
24 / 25
T433
(BUET)
Gas Turbine
ME 403 (2015)
25 / 25