Sie sind auf Seite 1von 58

one by one examine and

approve state

one by one
approve letter & date

General description and volume contents

T0101 1

1110233/EPC/4542/1132 2012.8.22

T0102

General utility drawings for architecture

T0102-01-17 5
T0102-14,18-22 5

1110233/EPC/2040/832 2012.6.11
1110233/EPC/5026/1138 2012.9.5

T0103

General utility drawings for civil

T0104

Collective drawings for embedded parts

T0105

Collective drawings for corbel

T0106

General utility drawings for composite slab

T0106-01-12 1

T0107

Collective of trench and its cover plate

T0108

Detail drawing of bored cast-in-situ piles

T0108-01 1

1110233/EPC/8452/408 2012.2.7

T0201

Architectural general arrangement drawing of main power


building

T0201-01-12 2

1110233/EPC/6780/1615 2012.10.30

10

T0202

Architectural detail drawing of main power building

T0202-01-07 1

1110233/EPC/6771/1606 2012.10.29

11

T0203

Architectural drawing of staircase for main power building

T0203-01-07 1

1110233/EPC/6772/1607 2012.10.29

12

T0204

Metal door and window order drawing of main power


building

T0204-01,02 1

1110233/EPC/6770/1605 2012.10.29

13

T0205

Architectural drawing of elevator for main power building

T0205-02,03 1
T0205-01 1

1110233/EPC/4732/1182 2012.8.28
1110233/EPC//5073/1219 2012.9.10

14

T0206

Architectural general arrangement drawing of central control


building

T0206-01-13 2

1110233/EPC/6781/1616 2012.10.30

15

T0207

Architectural detail drawing of central control building

T0207-02,03 1
T0207-01 1

1110233/EPC/4819/1104 2012.8.30
1110233/EPC//5074/1220 2012.9.10
1110233/EPC/6768/1603 2012.10.29

16

T0208

Metal door and window order drawing of central control


building

T0208-01,02 1

1110233/EPC/6769/1604 2012.10.29

17

T0209

Architectural drawing of Switchgear room for ESP and air


compressor house

T0209-01-13 1

1110233/EPC/8315/1940 2012.12.18

18

T0210

Architectural drawing of ash slurry pump house

It
em

Volume

T0101

drawing Title

1110233/EPC/1270/748 2012.5.15

19

T0211

Architectural drwaing of ash silo

T0211-01-10 1

1110233/EPC/9259/2101 2013.1.17

20

T0212

Architectural drawing of network control building

T0212-01-09 1

1110233/EPC/7268/1698 2012.11.19

21

T0213

Architectural drawing of 400kV GIS indoors 400kVGIS

T0213-01-05 1

1110233/EPC/7796/1808 2012.12.3

22

T0214

Architectural drawing of crusher house

T0214-02-13 1
T0214-01 1

1110233/EPC/4690/1173 2012.8.28
1110233/EPC/5148/1167 2012.9.10

23

T0215

Architectural drawing of No. 2 transfer tower 2

24

T0216

Architectural drawing of No. 3 transfer tower 3

T0216-02,04-11 1
T0216-01,03 1

1110233/EPC/4688/1171 2012.8.28

25

T0217

Architectural drawing of No. 4 transfer tower 4

T0217-02-11 1
T0217-01,03 1

1110233/EPC/4725/1175 2012.8.28
1110233/EPC/5071/1217 2012.9.10

26

T0218

Architectural drawing of No. 5 transfer tower 5

T0218-02-11 1
T0218-01,03 1

1110233/EPC/4724/1174 2012.8.28
1110233/EPC//5072/1218 2012.9.10

27

T0219

Architectural drawing of No. 6 transfer tower 6

T0219-01-07 1

1110233/EPC//5075/1221 2012.9.10

28

T0220

Architectural drawing of No. 7 transfer tower 7

T0220-01,06 1

1110233/EPC/5025/1137 2012.9.5

29

T0221

Architectural drawing of driving house for NO.3 conveyor


gallery3

30

T0222

Architectural drawing of overpass connected to main power


building

T0222-01,02 1

1110233/EPC/9244/2086 2013.1.17

31

T0223

Architectural drawing of CHP complex building

T0223-01-10 1

1110233/EPC/7800/1812 2012.12.3

32

T0224

Architectural drawing of fuel oil pump house

T0223-01-04 1

1110233_EPC_11675 2419 2013.3.8

33

T0225

Architectural drawing of Sea water desalination and DM


water treatment plant and DM water assay building

T0225-01-07 1

1110233/EPC/7795/1807 2012.12.03

34

T0226

Architectural drawing of hydrogen generation station

35

T0227

Architectural drawing of Condensate Polishing Regeneration


plant

T0227-02-07 1
T0227-01 1

1110233/EPC/7809/1821 2012.12.3
1110233/EPC/8142/1912 2012.12.13

36

T0228

Architectural drawing of sodium bichloride generation room

T0228-01-05 1

1110233/EPC/7798/1810 2012.12.03

37

T0229

Architectural drawing of Workshop

T0229-03-05 1
T0229-01-02 1

1110233/EPC/9253/2095 2013.1.17
1110233_EPC_11847 2455 2013.3.14

38

T0230

Architectural drawing of permanent store building

T0230-01-03 1
T0230-04 1

1110233/EPC/8316/1941 2012.12.18
1110233/EPC/8742/2002 2012.12.31

T0231-01-12 1
T0231-01-05 1
T0231-01,03-12 1
T0231-02 1

1110233/EPC/5693/1413 2012.9.27
1110233/EPC/6222/1507 2012.10.10
1110233_EPC_11359 2417 2013.3.8
1110233_EPC_11848 2456 2013.3.14

Architectural drawing of bulldozer maintance shed

T0232-01 1
T0232-02 1

1110233/EPC/7269/1699 2012.11.19
1110233/EPC/8743/2003 2012.12.31

T0233

Architectural drawing of switchgear room for fuel oil plants

T0233-01-04 1

1110233/EPC/10509/2345 2013.2.15

42

T0234

Architechtural drawing of sample house

T0234-01-04 1

1110233/EPC/7164/1667 2012.11.12

43

T0235

ARCHITECTURL DRAWING OF ACID & CAUSTIC


STORAGE ROOM AND WASTEWATER NEUTRALIZE
ROOM

T0235-01-03

1110233_EPC_11843 2451 2013.3.13

44

T0236

Architectural drawing of pump room sodium hypochlorite


dosing

45

T0301

Pile arrangement drawing of turbine hall @ column line A


A

T0301,01 1,1
T0301-02 1

1110233/EPC/9357/519 2012.3.1
1110233/EPC/9510/560 2012.3.6

46

T0302

Pile arrangement drawing of main power building @


column line B,C,D B,C,D

T0302-01 1
T0302,02 1,1

1110233/EPC/8282/389 2012.1.30
1110233/EPC/9810/601 2012.3.19

47

T0303

Pile arrangement drawing of turbine hall column

T0303,01,02 1,1,1

1110233/EPC/10044/619 2012.3.23

48

T0304

Pile arrangement drawing of TG pedestal

T0304,T0304-01 1,1

1110233/EPC/0656/695 2012.4.26

49

T0305

Pile arrangement drawing of steel frame supported boiler

T0305,01 1,1
T0305,01 1,1

1110233/EPC/7306/287 2012.1.23
1110233/EPC/8344/398 2012.2.2

50

T0306

Pile arrangement drawing of coal mill

T0306,01,02,03 2,2,2,2
T0306,01,02,03 1,1,1,1

1110233/EPC/0689/700 2012.4.27

51

T0307

Pile arrangement drawing of flue gas duct racks

T0307,T0307-01

1110233/EPC/0635/693 2012.4.26

52

T0308

Pile arrangement drawing of steel frame supporting ESP

T0308,01,02 1,1,1

1110233/EPC/9511/561 2012.3.6

53

T0309

Pile arrangement drawing of flue & PAF/FDF

T0309,01,02 1,1,1

1110233/EPC/0836/712 2012.5.2

54

T0310

Pile arrangement drawing of IDF racks and foundation

T0310,01,02 1,1,1

1110233/EPC/0863/713 2012.5.2

39

T0231

Architectural drawing of Seivice building

40

T0232

41

55

T0311

Pile arrangement drawing of switchgear room for ESP and


air compressor house

T0311,01 1

1110233/EPC/6300/1521 2012.10.12

56

T0312

Pile arrangement drawing of of fly ash silo

T0312,01 1,1

1110233/EPC/0949/722 2012.5.7
1110233/EPC/5923/1459 2012.10.1

57

T0313

Pile arrangement drawing of structures outside column A of


turbine hall A

T0313,01-03 1,1T0313,02 1

1110233/EPC/1567/773 2012.5.24
1110233/EPC/6903/1627 2012.11.1
1110233/EPC/5923/1459 2012.10.1

58

T0314

Pile arrangement drawing drawing of network control


building

T0314,01 1,1

1110233/EPC/1565/771 2012.5.24
1110233/EPC/5923/1459 2012.10.1

59

T0315

Pile arrangement drawing of 400kV GIS indoors 400kV


GIS

T0315,01 1,1

1110233/EPC/1056/739 2012.5.11
1110233/EPC/5923/1459 2012.10.1

60

T0316

Pile arrangement drawing Of 400kV switchyard 400KV

T0316,01,02 1,1,1

1110233/EPC/1566/772 2012.5.24

61

T0317

Pile arrangement drawing of crusher house

T0317,01-02 1,1

1110233/EPC/0570/689 2012.5.3

62

T0318

Pile arrangement drawing of No 2transfer tower 2

T0318-01,02 1
T0318, 1

1110233/EPC/6902/1626 2012.11.1
1110233/EPC/7092/1646 2012.11.9

63

T0319

Pile arrangement drawing of No 3transfer tower 3

T0319,01,02 1,1,1

1110233/EPC/9664/578 2012.3.9

64

T0320

Pile arrangement drawing of No 4 transfer tower 4

T0320,01,02 1,1,1

1110233/EPC/10191/642 2012.3.28

65

T0321

Pile arrangement drawing of No 5 transfer tower 5

T0321,01,02 1,1,1

1110233/EPC/9961/614 2012.3.22

66

T0322

Pile arrangement drawing of No 6 transfer tower 6

T0322,01,02 1

1110233/EPC/4096/1053 2012.8.7

67

T0323

Pile arrangement drawing of No 7 transfer tower 7

T0323,01,02 1,1,1

1110233/EPC/1271/749 2012.5.15
1110233/EPC/5923/1459 2012.10.1

68

T0324

Pile arrangement drawing of No 2conveyor gallery 2

T0324,01,02 1

1110233/EPC/3967/1035 2012.8.2

69

T0325

Pile arrangement drawing of No 4 conveyor gallery 4

T0325,01,02 1,1,1

1110233/EPC/1035/730 2012.5.8
1110233/EPC/5923/1459 2012.10.1

70

T0326

Pile arrangement drawing of No 5 conveyor gallery 5

T0326,01,02 1,1,1

1110233/EPC/1038/733 2012.5.8

71

T0327

Pile arrangement drawing of No 6 conveyor gallery 6

T0327,01,02 1

1110233/EPC/3879/1031 2012.7.31

72

T0328

Pile arrangement drawing of No 7 conveyor gallery 7

T0328,01 1,1

1110233/EPC/1047/734 2012.5.8

73

T0329

Pile arrangement drawing of No 8 conveyor gallery 8

T0329,01,02 1,1,1

1110233/EPC/1057/740 2012.5.11

74

T0330

Pile arrangement drawing of No 9 conveyor gallery 9

T0330,01 1,1

1110233/EPC/1058/741 2012.5.11

75

T0331

Pile arrangement drawing of CHP complex building

T0331,01-02 1,1

1110233/EPC/08512/413 2012.5.3

76

T0332

Pile arrangement drawing of Sea water desalination and DM


water treatment plant and DM water assay building

T0332,01,02,03 1,1,1,1

77

T0333

Pile arrangement drawing of Workshop

78

T0334

Pile arrangement drawing of permanent store building

79

T0335

Pile arrangement drawing of Seivice building

T0335,01 1

1110233/EPC/7093/1647 2012.11.10

80

T0401

Foundations of turbine hall @ column line A A

T0401,01-07 1,1

1110233/EPC/1053/736 2012.5.9

81

T0402

Foundation of main power building @ column line B,C,D


B,C,D

T0402,01-09 1,1

1110233/EPC/1583/776 2012.5.25

82

T0403

Foundation of turbine hall column

T0403,01-09 1

1110233/EPC/4222/1076 2012.8.10

83

T0404

Detail drawing of column base of steel structure for main


power building

T0404,01-06 1,1

1110233/EPC/9640/568 2012.3.8

84

T0405

Base deck of TG pedestal

T0405,02,03,05 1
T0405-01,04 1,1

1110233/EPC/1505/768 2012.5.24
1110233/EPC/2038/830 2012.6.11

85

T0406

T0406,01-21 1

1110233/EPC/6493/1562 2012.10.18

86

T0407

T0407,01-06 1,1

1110233/EPC/0950/723 2012.5.7

87

T0408

Construction drawing of circulating water piping pit and


condensate pump pit

88

T0409

Underground facilities(El.0.00m) and auxiliary equipment


foundation of turbine hall

T0409-01-09 1

1110233/EPC/8752/2012 2013.1.2

89

T0410

Underground facilities(El.0.00m) and auxiliary equipment


foundation of boiler house

T0410,01-05 1

1110233/EPC/6642/1584 2012.10.25

Super structure drawing of TG pedestal

Foundations of steel frame supported boiler

T0408,01,05-08 1
T0408-02-04,09 1
T0418-07-08 1

1110233/EPC/7801/1813 2012.12.3
1110233/EPC/8586/1986 2012.12.27
1110233/EPC/10458 2331 2013.2.13

90

T0411

Foundation of coal mill

T0411-01-03 1

1110233/EPC/2037/829 2012.6.11

91

T0412

Foundation beams and strip footing for wall of main power


building

T0412, 1
T0412-01,02 1

1110233/EPC/5926/1462 2012.10.3
1110233/EPC/9482/2112 2013.1.22

92

T0413

General arrangement of steel structure for main power


building

T0413,01-76 1,1

1110233/EPC/9675/579 2012.3.10

93

T0414

Floors of turbine hall

A2

94

T0415

Floors under operating floor of deaerator and bunker bay

A2

95

T0416

Floors above operating floor of deaerator and bunker bay

A2

96

T0417(1)

Staircase structural drawing for main power building

A2

2012.10.1

97

T0417(2)

Staircase structural drawing for main power building

A2

2012.10.1

98

T0418

Construction drawing of steel coal bunker

99
100

T0419
T0420

101

T0421

Roof structure of turbine hall


crane girder of turbine hall
Roof structures of rooms within main power building

102

T0422

103

T0418,01-09 1
T0418-07-08 1
T0419,01-05 1,1
T0420,01-06 1,1

1110233/EPC/8420/1947 2012.12.19
1110233/EPC/10458/2331 2013.2.13
1110233/EPC/10186/637 2012.3.28
1110233/EPC/10187/638 2012.3.28

T0421,01,02 1

1110233/EPC/4484/1124 2012.8.22

structural drawing of elevator for main power building

T0422,01-05 1

1110233/EPC/4588/1145 2012.8.23

T0423

Construction drawing of boiler front floors

T0423,01-06 1

1110233/EPC/7491/1750 2012.11.27

104

T0424

Elevator shaft of boiler

T0424,01-07 1

1110233/EPC/4587/1144 2012.8.23

105

T0425

Detail drawing of emergency oil pit for turbine

T0425,01-03 1
T0425, 1

1110233/EPC/5747/1404 2012.9.26
1110233/EPC/9479/2109 2013.1.22

106

T0427

Floors of central control building

107

T0428

Structural drawing of staircase for central control building

T0428,04-06 1

1110233/EPC/9136/2051 2013.1.10

108

T0429

Underground facilities of central control building

T0429,01-05 1

1110233/EPC/8996/2041 2013.1.9

109

T0430

Construction drawing of conveyor gallery in bunker bay

T0430,01-08 1

1110233/EPC/6218/1503 2012.10.10

110

T0501

Construction drawing of flue gas duct racks

T0501,04-07 1
T0501-01-03 1

1110233/EPC/1052/1215 2012.9.11
1110233/EPC/8907/2023 2013.1.4

111

T0502

Foundation of steel frame supporting ESP

T0502,01-03 1,1

1110233/EPC/1052/735 2012.5.9

A2

112

T0503

Auxiliary equipment foundation of ESP

113

T0504

114

T0503,01,02 1

1110233/EPC/4597/1154 2012.8.24

Racks of flue & PAF/FDF and foundation of PAF/FDF

T0504,01-25 1

1110233/EPC/4550/1140 2012.8.23

T0505

Racks and foundation of IDF

T0505-01-19 1

1110233/EPC/5930/1466 2012.10.4

115

T0506

Structural drawing of switchgear room for ESP and air


compressor house

T0506,04,07,09-26 1
T0506-01-03,05-11,13-15,17 1

1110233/EPC/7904/1860 2012.12.6
1110233/EPC/8438/1965 2012.12.21

116

T0507

Construction drawing of fly ash silo

T0507,01-20 1

1110233/EPC/9152/2067 2013.1.11

117

T0508

Structural drawing of ash slurry pump house

T0508,01,03 1
02 2

1110233_EPC_11676 2420 2013.3.8

118

T0509

Foundation drawing of high efficiency concentrator

T0509,01-04 1

1110233/EPC/8304/1933 2012.12.18

119

T0510

Foundation drawing of dry-type Slag Extractor and bottom


ash silo

T0510,02-03 1

1110233/EPC/8762/2022 2013.1.4

120

T0511

Foundation drawing of mill rejects silo

T0511,01 1

1110233/EPC/5167/1186 2012.9.10

121

T0601

T0601-01,04,05,15-19,22-25 1
Structures outside column A of turbine hall A
T0601-02,03,06-14,20-21,26-30 1

T0601-31 1

1110233/EPC/7688/1792 2012.11.30
1110233/EPC/9156/2071 2013.1.11
1110233/EPC/9258/2100 2013.1.17

122

T0602

Structural drawing of network control building

T0602,01-19 1

1110233/EPC//5076/1222 2012.9.10

123

T0603

structural drawing of 400kV GIS indoors 400kVGIS

T0603-01-13 1
T0603,14-15 1

1110233/EPC/4591/1148 2012.10.4
1110233/EPC/6226/1511 2012.10.11

124

T0604

Structures Of 400kV switchyard 400KV

T0604,01-13,15-18,22,23 1
T0604-14,19,20,21 1

1110233/EPC/6904/1628 2012.11.2
1110233/EPC/7685/1789 2012.11.30

125

T0605

Construction drawing of lightning rod

126

T0606

Foundation of road lighting

T0606,01 1

1110233/EPC/4007/1039 2012.8.3

127

T0701

Structural drawing of crusher house

T0701,01-27 1

1110233/EPC/6435/1552 2012.10.17

128

T0702

structural drawing of No 2 transfer tower 2

129

T0703

structural drawing of No 3 transfer tower 3

T0703,01-20 1

1110233/EPC/4266/1085 2012.8.13

130

T0704

structural drawing of No 4 transfer tower 4

T0704,01-20 1

1110233/EPC/4267/1086 2012.8.13

131

T0705

structural drawing of No 5 transfer tower 5

T0705,01-20 1

1110233/EPC/4544/1134 2012.8.22

132

T0706

structural drawing of No 6 transfer tower 6

T0706,01-13 1
T0706-01,02,06-10,12,13 1

1110233/EPC//5077/1223 2012.9.10
1110233/EPC/6579/1580 2012.10.22

133

T0707

structural drawing of No 7 transfer tower 7

T0707,01-17 1

1110233/EPC/4543/1133 2012.8.22

134

T0708

Construction drawing of No 2 conveyor gallery 2

T0708,01-10 1

1110233/EPC/4392/1099 2012.8.16

135

T0709

Construction drawing of coal stock piles and NO.3conveyor


gallery 3

136

T0710

Construction drawing of No4 conveyor gallery 4

T0710,01-12 1

1110233/EPC/7340/1704 2012.11.20

137

T0711

Construction drawing of No 5 conveyor gallery 5

T0711,01-12 1

1110233/EPC/7348/1712 2012.11.20

138

T0712

Construction drawing of No 6 conveyor gallery 6

T0712,01-10 1

1110233/EPC/7161/1664 2012.11.14

139

T0713

Construction drawing of No 7 conveyor gallery 7

T0713-04-18 1
T0713,01-03,06-08,09,16,17 1

1110233/EPC/3213/961,965 2012.7.19
1110233/EPC/4053/1047 2012.8.6

140

T0714

Construction drawing of No 8conveyor gallery 8

T0714-04-05,08-17 1
T0714,01-03,06,07 1

1110233/EPC/3322/989 2012.7.24
1110233/EPC/4262/1081 2012.8.13

141

T0715

Construction drawing of No 9 conveyor gallery 9

T0715,01-24 1

1110233/EPC/4393/1100 2012.8.16

142

T0716

Structural drawing of CHP complex building

T0716,01-21 1

1110233/EPC/7104/1658 2012.11.12

143

T0717

Construction drawing of bulldozer maintance shed

144

T0718

Construction drawing of control room of weight bridge

145

T0719

Construction drawing of fuel oil storage area

T0719-01-07 1

1110233/EPC/9495/2125 2013.1.24

146

T0720

Structural drawing of fuel oil pump house

T0720-01-12 1

1110233/EPC/9903/2222 2013.1.31

147

T0721

Construction drawing of Switchgear room for fuel oil plant

148

T0801

Foundation of Sea water desalination and DM water


treatment plant and DM water assay building

T0801,01-04 1

1110233/EPC/4106/1057 2012.8.8

149

T0802

Underground facilities(El.0.00m) of Sea water desalination


and DM water treatment plant and DM water assay building

T0802,01-10 1

1110233/EPC/9148/2063 2013.1.10

150

T0803

Super structure of Sea water desalination and DM water


treatment plant and DM water assay building

T0803,01-19 1

1110233/EPC/8574/1974 2012.12.26

Outdoor structure of Sea water desalination and DM water


treatment plant house

151

T0804(1)

152

T0805

153

T0806

154

T0807

155

T0808

156

T0901

Structural drawing of Workshop

157

T0902

Structural drawing of permanent store building

158

T0903

159
160

T0804(1),01-06 1

1110233/EPC/8037/1879 2012.12.10

T0806,01-25 1

1110233/EPC/9758/2183 2013.1.29

T0807-01 1

1110233/EPC/7209/1674 2012.11.16

T0808,01-10 1

1110233/EPC/9157/2072 2013.1.11

T0901-01-13 1

1110233/EPC/9903/2222 2013.1.31

Structural drawing of Seivice building

T0903,01-04 1

1110233/EPC/9158/2073 2013.1.11

T0904

Structural drawing of Seivice building

T0904-01-19 1

1110233/EPC/9903/2222 2013.1.31

T1001

Construction drawing of common piping Racks

Ydgdle-C-01 1

1110233_EPC_11842 2450 2013.3.16

161 Ydgdle-C-01

Structural drawing of hydrogen generation station

Structural drawing of Condensate Polishing Regeneration


plant
Outdoor structure of condensate polishing Regeneration
plant
Structural drawing ofsodium bichloride generation room

UPPER STRUCTURAL DESIGN DESCRIPTION

It
em

Volume

S0101

2
3

S0102
S0103

S0104

drawing Title
General layout drawing and design instruction of water supply

Equipment list
Material list
Water supply kks code detailed instruction
KKS

S0201

Layout of seawater make-up pump house

S0202

Layout of pump lubricating and screen washing facility in seawater


make-up pump house

S0203

Layout drawing of comprehensive water pump house and reservoir

S0301

S0302

10

S0303

11

S0304

12

S0305

13

one by one examine and


approve state

one by one
approve letter & date

S0101-01-03 2

1110233/EPC/5898/1434 2012.9.28

S0102-01 5

1110233/EPC/5898/1434 2012.9.28

S0104-01 5

1110233/EPC/5306/1266 2012.9.12

S0201-20,21 5
S0201-18,19 5
S0201-02,07-15,17,18,21,22 5
S0201-06-18,21,22 5
S0201-04,05,16 1
S0201-01 1

1110233/EPC/2346/892 2012.6.20
1110233/EPC/5911/1447 2012.9.29
1110233/EPC/8302/1931 2012.12.18
1110233/EPC/8423/1950 2012.12.19
1110233/EPC/8748/2008 2013.1.2
1110233/EPC/10039/2256 2013.2.1

S0202-01-07 1
S0202-01-02 1
S0202-03-07 5

1110233/EPC/4269/1088 2012.8.14
1110233/EPC/7266/1696 2012.11.19
1110233/EPC/9606/2140 2013.1.24

S0203-04-15 5
S0203-0001
s0203-11(2)1617 5
S0203-02 1

1110233/EPC/5961/1481 2012.10.5
1110233/EPC/10053/2270 2013.2.4
1110233/EPC/10504 /2340 2013.2.14
1110233/EPC/10710/2356 2013.2.19

Layout drawing of C.W. pump house


Lubricating and cooling facility for C.W. pump and motor

Layout drawing of C.W. pipe outside A list and C.W. pipe of


auxiliary engine A
Layout drawing of C.W. pipe in front of cooling tower

Installation of valve well of circulating water pipe

S0301-06-19 5
S0302-01-04 5
S0302-01,03,04 1

1110233/EPC/2252/883 2012.6.19
1110233/EPC/5357/1288 2012.9.12
1110233/EPC/8131/1901 2012.12.12

S0303-04-12 5
5S0303-01-13 5

1110233/EPC/1563/769 2012.5.24
1110233/EPC/5361/1292 2012.9.12

S0304-01-16 5

1110233/EPC/5361/1292 2012.9.12

S0305-01-02 5
S0305-01 5

1110233/EPC/5895/1431 2012.9.28
1110233/EPC/8128/1898 2012.12.12

S0306

Layout drawing of circulating water trench

S0306-01-06 1

1110233/EPC/8132/1902 2012.12.12

14

S0307

Layout drawing of induced draft cooling tower

S0307-01-07 1

1110233/EPC/5912/1448 2012.9.29

15

S0308

S0308-01-04 1,5

1110233/EPC/2005/824 2012.6.15

16

S0401

S0401-02 5
S0401-01 1

1110233/EPC/5906/1442 2012.9.29
1110233/EPC/9771/2196 2013.1.29

17

S0402

S0402-06 5
S0402-02 1
S0402-03-06,08-14 1

1110233/EPC/6151/1492 2012.10.9
1110233/EPC/7266/1696 2012.11.19
1110233/EPC/7689/1793 2012.11.30

layout drawing of cathodic protection for C.W. pipes


General Layout drawing of sewage treatment station

Layout drawing of domestic sewage treatment

18

S0403

Layout drawing of coal and oil waste water treatment house


oily waste water regulating pond and pond of coal sludge

19

S0404

Layout drawing of recycling water pump house and central effluent


monitoring basin

20

S0405

Layout drawing of seawater drainage pump house

21

S0406

Layout drawing of rain water pump house

22

S0407

23

S0408

24

S0501

Layout drawing of ash slurry water pipe

25

S0502

Layout drawing of ash water recovery transfer pump house

26

S0503

Layout drawing of ash recovery water pipe

27

S0601

28

S0602

29

S0603

30

S0604

31

S0605

32

S0606

33

S0607

34

S0608

35

S0701

Layout drawing of coal water and rain water settling pond

Layout drawing of transformer emergency oil pit

Layout drawing of service waste water pipe of plant area

Main power building indoor sanitary system

1110233/EPC/8053/1895 2012.12.12
1110233/EPC/8299/1928 2012.12.17
1110233/EPC/9607/2141 2013.1.25

S0404-07 5
S0404-05-08 5
S0404-03,04,09 1
S0404-01 1

1110233/EPC/2297/889 2012.6.20
1110233/EPC/7255/1685 2012.11.16
1110233/EPC/7689/1793 2012.11.30
1110233/EPC/8296/1925 2012.12.17
1110233/EPC/9752/2177 2013.1.29

S0405-01 1
S0405-04-06,10,11 5
S0405-02,03 1
S0405-05 5

1110233/EPC/8053/1895 2012.12.12
1110233/EPC/8310/1939 2012.12.18
1110233/EPC/8424/1951 2012.12.19
1110233/EPC/8987/2032 2013.1.9

S0406-02 5
S0406-02-16 1
S0406-01 1

1110233/EPC/5357/1288 2012.9.12
1110233/EPC/8749/2009 2013.1.2
1110233/EPC/9762/2187 2013.1.29

S0407-01-06 2
S0407-01-06 5

1110233/EPC/1826/791 2012.6.1
1110233/EPC/9907/2226 2013.1.31

S0408-01-08 5
S0408-01-08 1

1110233/EPC/5359/1290 2012.9.12
1110233/EPC/10045/2262 2013.2.4

S0502-01-08 1

1110233/EPC/9897/2216 2013.1.31

S0601-01-10 1

1110233/EPC/7497/1756 2012.11.26
1110233/EPC/10090/2286 2013.2.7

S0602-01-13 5

1110233/EPC/5701/1421 2012.9.28

S0603-01-15 5

1110233/EPC/5701/1421 2012.9.28

S0604-01-10 5

1110233/EPC/5702/1422 2012.9.28

S0605-01-07 5

1110233/EPC/5701/1421 2012.9.28

S0606-01-06 5

1110233/EPC/5891/1427 2012.9.28

S0607-01-07 1

1110233/EPC/8132/1902 2012.12.12

S0608-01-05 5

1110233/EPC/5702/1422 2012.9.28

S0701-01-05 1

1110233/EPC/5162/1181 2012.9.10

Layout drawing of make-up water pipe and sea water drainage


A2
pipe
Layout drawing of service water pipe of plant area

Layout drawing of potable water pipe of plant area

Layout drawing of coal and oil waste water of plant area

Layout drawing of recycling water of plant area

Layout drawing of domestic sewage drainpipe of plant area

Layout drawing of seawater drainage pipe of plant area

S0403-02 1
S0403-03-07,09-17 1
S0403-01,08 5

36

S0702

37

S0703

38

S0704

39

S0705

40

S0706

41

S0707

42

S0708

43

S0709

44

S0710

45

S0711

46
47
48

S0712
S0713
S0714

49

S0715

50

S0716

51

S0717

Central control building , feeding chemical room and


sampling room indoor sanitary system

Sea water make-up pump house indoor sanitary system

CPU Regenertion building indoor sanitary system

Coal and oil waste water treatment house indoor sanitary


system
Coal handing system indoor sanitary system
Hydrogen generation house indoor sanitary system

Coal plant control building indoor sanitary system

Network control building indoor sanitary system

Bulldozer shed indoor sanitary system


Switchgear room for electrostatic precipitator and air
compressor house indoor sanitary system

Shed for parking indoor sanitary system


Assay building indoor sanitary system
Work shop indoor sanitary system
Permanent store building indoor sanitary system

Guard house indoor sanitary system


Chemical dosing house of industrial waste water
indoor sanitary system

S0702-01-05 1

1110233/EPC/5160/1179 2012.9.10

S0703-01-05 1

1110233/EPC/5161/1180 2012.9.10

S0704-01,02 1

1110233/EPC/5163/1182 2012.9.10

S0705-01-04 5

1110233/EPC/5197/1224 2012.9.10

S0706-01-05 1

1110233/EPC/5201/1228 2012.9.10

S0707-01-03 1

1110233/EPC/5157/1176 2012.9.10

S0708-01-06 1

1110233/EPC/5159/1178 2012.9.10

S0709-01,02 5

1110233/EPC/5198/1225 2012.9.10

S0710-01-02 1

1110233/EPC/5158/1177 2012.9.10

S0711-01,02 5

1110233/EPC/5356/1287 2012.9.12

S0712-01-04 5
S0713-01-06 1
S0714-01-04 1

1110233/EPC/5199/1226 2012.9.10
1110233/EPC/5156/1175 2012.9.10
1110233/EPC/5200/1227 2012.9.10

S0715-01-04 1

1110233/EPC/5154/1173 2012.9.10

S0716-01-03 1

1110233/EPC/5155/1174 2012.9.10


one by one examine and approve
state

one by one
approve letter & date

PILES ARRANGEMENT DRAWING OF THE SEA


WATER MAKE UP PUMP HOUSE

S5201,01-02 1,1

1110233/EPC/3809/1009 2012.7.27
1110233/EPC/5923/1459 2012.10.1

S5202

SUPER STRUCTURE CONSTRUCTION DRAWING


OF SEA WATER MAKE UP PUMP HOUSE

S5202-01-27 1

1110233/EPC/9147/2062 2013.1.10

S5203

SUBSTRUCTURE CONSTRUCTION DRAWING OF


SEA WATER MAKE UP PUMP HOUSE

S5203,01-26 1

1110233/EPC/7215/1679 2012.11.15

S5204

ARCHITECTURE DRAWING OF SEA WATER MAKE


UP PUMP HOUSE

S5204-01-07 1

1110233/EPC/9153/2068 2013.1.11

S5205

CONSTRUCTION DRAWING OF FOREBAYS FOR SEA


WATER MAKE UP PUMP HOUSE

S5205,01-08 1

1110233/EPC/9119/2050 2013.1.10

S5206

CONSTRUCTION DRAWING OF SWITCHGEAR


ROOM FOR SEA WATER MAKEUP PLANT

S5206-01,03-05 1

1110233_EPC_11846 2454 2013.3.14

S5209

CONSTRUCTION DRAWING OF R.C.C ENCASEMENT


FOR C.W. PIPE1(1)

S5209-01-07 1

1110233/EPC/5956/1476 2012.10.5

S5210

CONSTRUCTION DRAWING OF R.C.C ENCASEMENT


FOR C.W. PIPE 2(2)

S5210-01-04 1

1110233/EPC/5957/1477 2012.10.5

10

S5211

CONSTRUCTION DRAWING OF R.C.C ENCASEMENT


FOR C.W. PIPE 3(3)

S5211,01-06 1

1110233/EPC/6640/1582 2012.10.24

11

S5301

S5301,01-03 1

1110233/EPC/1868/797 2012.6.5
1110233/EPC/5923/1459 2012.10.1

12

S5302

S5302 1

1110233/EPC/9749/2174 2013.1.28

13

S5303

SUB STRUCTURE CONSTRUCTION DRAWING OF


I.D.C.T.

S5303,01-07 1

1110233/EPC/5064/1158 2012.9.6

14

S5304

PILES ARRANGEMENT DRAWING FOR C.W. PUMP


HOUSE

S5304,01,02 1
S5304-12 1

1110233/EPC/4455/1111 2012.8.17
1110233/EPC/10509/2345 2013.2.15

It
em

Volume

S5101

GENERAL DESCRIPTION AND CONTENT OF


HYDRAULIC STRUCURES

S5201

drawing Title

PILES ARRANGEMENT DRAWING OF T I.D.C.T.

SUPER STRUCTURE CONSTRUCTION DRAWING OF


I.D.C.T.

15

S5305

ARCHITECTURAL DRAWING OF C.W. PUMP HOUSE

S5305-01-08 1

1110233/EPC/8998/2043 2013.1.9

16

S5306

CONSTRUCTION DRAWING OF C.W. PUMP HOUSE


SUBSTRUCTURE

S5306,01-29 1

1110233/EPC/6766/1601 2012.10.29

17

S5307

CONSTRUCTION DRAWING OF C.W. PUMP HOUSE


SUPER SRUCTURE

S5307,01-03,05-32 1
S5307-04 1
S5307,01,04,06,07,09,31,32 1

1110233/EPC/5919/1455 2012.10.1
1110233/EPC/6740/1596 2012.10.26
1110233/EPC/9138/2053 2013.1.10

18

S5308

CONSTRUCTION DRAWING OF FOREBAYS FOR C.W.

S5308-01-17 1

1110233/EPC/8143/1913 2012.12.14

19

S5309

S5309,01-03,05-13 1
S5309-02,04 1

1110233/EPC/8134/1904 2012.12.13
1110233/EPC/8150/1920 2012.12.17

20

S5310

S5310,01-10 1

1110233/EPC/7146/1656 2012.11.12

21

S5311

CONSTRUCTION DRAWING OF LOCK GATE WELL


FOR C.W. CHANNEL

S5311,01-05 1

1110233/EPC/7157/1660 2012.11.12

22

S5312

CONSTRUCTION DRAWING OF VALVE WELL FOR


C.W. DUCT

S5312,02-05 1

1110233/EPC/5522/1351 2012.9.17

23

S5313

CONSTRUCTION DRAWING OF 6.6KV PUBLIC


SWITCH ROOM
6.6KV

S5313-01-04 1
S5313,01-20 1

1110233/EPC/7208/1673 2012.11.15
1110233/EPC/7859/1835 2012.12.4

24

S5314

CONSTRUCTION DRAWING OF OIL TANK FOR


COMMON STEP-DOWN TRANSFORMER

S5314,01-11 1
S5314-13-14 1

1110233/EPC/8997/2042 2013.1.9
1110233_EPC_11691 2435 2013.3.12

25

S5401

CONSTRUCTION DRAWING OF COMPREHENSIVE


WATER HOUSE

S5401,(05,07,08,10,12131820)1
S5401 06 2

1110233_EPC/11674/2418 2013.3.8

26

S5402

CONSTRUCTION DRAWING OF SERVICE WATER


FIRE FIGHTING WATER AND PORTABEL WATER
BASINS

S5402-01,12-15 1
S5402-02-11 1

1110233/EPC/3862/1014 2012.7.31
1110233/EPC/5032/1144 2012.9.6

27

S5403

SUPER STRUCTURE CONSTRUCTION DRAWING OF


RAIN WATER DRAINAGE PUMP HOUSE

S5403,01-19 1

1110233/EPC/7100/1654 2012.11.9

PILE ARRAGEMENT DRAWING FOR RAIN WATER


DRAINAGE PUMP HOUSE

S5404,01-02 1

1110233/EPC/6649/1591 2012.10.26

S5404(2)-01-23 1
S5406(2)

1110233/EPC/8050/1892 2012.12.11
1110233/EPC/9240/2082 2013.1.16

SUPER STRUCTURE CONSTRUCTION DRAWING OF


SEA WATER DRAINAGE PUMP HOUSE

S5405,01-14 1

1110233/EPC/6784/1619 2012.10.30

PILE ARRANGEMENT DRAWING OF SEA WATER


DRAINAGE PUMP HOUSE

S5406,01,02 1

1110233/EPC/5892/1428 2012.9.28

28 S54041

Plan layout of pipe pits


CONSTRUCTION DRAWING OF C.W. CHANNEL

SUB STRUCTURE CONSTRUCTION DRAWING OF


29 S54042 RAIN WATER DRAINAGE PUMP HOUSE

30

S5405

31

S5406(1)

SUB STRUCTURE CONSTRUCTION DRAWING OF


SEA WATER DRAINAGE PUMP HOUSE

Sea water drainage switchgear room


GENERAL LAYOUT DRAWING OF SEWAGE
TREATMENT STATION

S5406-01-14 1
S5406-14 1

1110233/EPC/9149/2064 2013.1.11
1110233/EPC/9257/2099 2013.1.17

S5407,01-09 1

1110233/EPC/9155/2070 2013.1.11

S5501-01 1

1110233/EPC/8048/1890 2012.12.11

CONSTRUCTION DRAWING OF COAL WASTE


WATER TREATMENT HOUSE

S5502-01-17 1

1110233/EPC/8305/1934 2012.12.18

S5503

CONSTRUCTION DRAWING OF CENTRAL EFFLUENT


MONITORING BASIN

S5503,01-11 1

1110233/EPC/6652/1594 2012.10.26

37

S5504

CONSTRUCTION DRAWING OF RECYCLING WATER


PUMP HOUSE

S5504,01-12 1

1110233/EPC/7257/1687 2012.11.12

38

S5505

CONSTRUCTION DRAWING OF EQUIPMENT


FOUNDATION FOR DOMESTIC SEWAGE
TREATMENT

S5505,01-04 1

1110233/EPC/6156/1497 2012.10.9

39

S5506

CONSTRUCTION DRAWING OF DOMESTIC SEWAGE


REGULATING POND AND SIEVE WELL

S5506,01,04-12 1
S5506-02,03 1

1110233/EPC/7605/1763 2012.11.27
1110233/EPC/7794/1806 2012.12.03

40

S5507

CONSTRUCTION DRAWING OF COAL WASTE


WATER REGULATING POND

S5507,01-10 1

1110233/EPC/7103/1657 2012.11.12

41

S5508

CONSTRUCTION DRAWING OF OILY WASTE WATER


REGULATING POND

S5508,03-07,09 1

1110233/EPC/8421/1948 2012.12.19

42

S5509

CONSTRUCTION DRAWING OF COAL SLUDGE


POND

S5509,01-04 1

1110233/EPC/6641/1583 2012.10.25

43

S5510

valve pits and equipment foundations

S5510,01,03-06 1
S5510-02 1

1110233/EPC/8422/1949 2012.12.19
1110233/EPC/8439/1966 2012.12.21

44

S5601

GENERAL LAYOUT DRAWING OF INDUSTRIAL


WASTE WATER COLLECTION AND TREATMENT
STATION

S5601-01 1

1110233/EPC/8139/1909 2012.12.13

45

S5602

CONSTRUCTION DRAWING OF INCLINED PLATE


SETTLER ROOM

S5602,01-13 1

1110233/EPC/8761/2021 2013.1.4

46

S5603

CONSTRUCTION DRAWING OF ROOT BLOWER AND


CONTROL ROOM

S5603,01-11 1

1110233/EPC/9154/2069 2013.1.11

47

S5604

CONSTRUCTION DRAWING OF FLOCCULATION


REACTION TANK AND PH REGULATING TANK
PH

S5604,01-05 1

1110233/EPC/4684/1167 2012.8.27

32

S5406(2)

33

S5407

34

S5501

35

S5502

36

48

S5605

CONSTRUCTION DRAWING OF REGULAR WASTE


WATER TANKFINAL NEUTRALIZATION AND
CLEAR WATER TANK

49

S5606

CONSTRUCTION DRAWING OF INFREQUENT


WASTE WATER POND

S5606,01-09 1

1110233/EPC/5746/1403 2012.9.26

50

S5607

CONSTRUCTION DRAWING OF ACID AND Alkali


STROAGE BASIN

S5607,02-08 1

1110233/EPC/8130/1900 2012.12.12

51

S5701

CONSTRUCTION DRAWING OF TRANSFORMER


EMERGENCY OIL PIT

S5701,01-09 1

1110233/EPC/10704/2350 2013.2.18

52

S5702

CONSTRUCTION DRAWING OF COAL AND RAIN


WATER SETTLING POND

S5702-02,17 1
S5702-01-17 1

1110233/EPC/2858/939 2012.7.6
1110233/EPC/4996/1129 2012.9.5

S5703

SUPER STRUCTURE CONSTRUCTION DRAWING OF


ASH WATER RECYCLING PUMP HOUSE FOR ASH
POND

54

S5704

SUBSTRUCTURE CONSTRUCTION DRAWING OF


ASH WATER RECYCLING PUMP HOUSE FOR ASH
POND

55

S5705

CONSTRUCTION DRAWING ASH WATER


RECYCLING TANK

56

S5706

CONSTRUCTION DRAWING FOR FOAM STORAGE


TANK HOUSE

57

S5707

CONSTRUCTION DRAWING FOR SERVICE WASTE


WATER REGULATING TANK

S5707,01-09 1

1110233/EPC/6739/1595 2012.10.26

58

S5708

Water drainage regulating tank for cooling tower

S5708,01,04-09 1
S5708-02,03 1

1110233/EPC/8415/1942 2012.12.
1110233/EPC/8756/2016 2013.1.2

###

S5709

construciton drawing of valve wells for makeup water and


drainage water

s5709-0106-07 1
S5709-02-05
1

1110233/EPC/10458/2331 2013.2.14
1110233_EPC/11677/2421 2013.3.8

###

S5710

53

S5605-01,02,04-11 1
S5605,-03 5

1110233/EPC/5149/1168 2012.9.10
1110233/EPC//5316/1276 2012.9.12

It
em

Volume

drawing Title

basic Layout drawings

one by one examine and approve


state

Z-01,Z-03-16,Z-18-19,22 1
Z-02,17,19 2

Z0101

General layout construction specification and content of volumes

A2

Z0102

General layout drawing of plant area

A2

Z0103

Vertical layout drawing of plant area

Z0104

Detail design of open drain around main building area

Z0105

Z0106

Z0107(2)

Road and square detail drawing of plant area

Z0107(1)

Detail Drawing Of Road And Square Around Coal Stock Piles Of Plant
Area

Z0108

Pipe and trenches arrangement of plant area

10

Z0109

Overhead pipes and cable tray arrangement of plant area

11

Z0110

Trenches detail drawing of plant area

12

Z0111

13

Z0112

one by one
approve letter & date
1110233/EPC/10054/2271
2013.1.14

Z0104-05 1
Z0104,
Z0104,01-02,04-05 1

1110233/EPC/4067/156 2011.10.14
1110233/EPC/7961/1868 2012.12.7
1110233/EPC/8582/1982 2012.12.26

Detail design of drain around coal yard area

Z0105-02 1
Z0105-01 1

1110233/EPC/1034/729 2012.5.8
1110233/EPC/6778/1613 2012.10.30

Detail design of road around main building

Z0106-01,03,04,05 1,1,1,1Z0106-04 1

Detail drawing of fenceing, wall and gate within plant area

The plan of the main entrance road

1110233/EPC/3005/114 2011.3.8
1110233/EPC/6743/1599 2012.10.26

Z0107(2)-01,02,04,05,08-13 1
Z0107(2)-01,03,04,06,07 1

1110233/EPC/6767/1602 2012.10.29
1110233/EPC/8581/1981 2012.12.26

Z0107(1)01,03 1
Z0107(1)02,03 1

1110233/EPC/1033/728 2012.5.8
1110233/EPC/5151/1170 2012.9.10

Z0112-01-04 1
Z0112-02,03 1

1110233/EPC/7619/1777 29.11.2012
1110233/EPC/9163/2078 2013.1.15

It
em

Volume

1
2
3
4
5
6

J0101
J0102
J0103
J0104
J0105
J0107

J0108

J0201

BOILER WALL TEMPERATURE SYSTEM

J0202

Plan arrangement-boiler side underground

10

J0203

System drawing of turbine part

11

J0204

12

J0301

13

J0302

14

J0303

15

J0304

16

J0305

17
18

drawing Title

General description and content


Equipment list
Material list
Damper list
Valve list
Mechanical legend & code
Power plant identification system(KKS)--mechanical part KKS

one by one examine and


approve state

one by one
approve letter & date

J0104 5

1110233/EPC/5902/1438 2012.9.29

J0107-01 5

1110233/EPC/9635/2152 2013.1.25

J0108-01 5

1110233/EPC/9635/2152 2013.1.25

J0201-17 1
J0201-04-1518-20 1
A2

1110233/EPC/9747/2172 2013.1.28
1110233/EPC/10054/2271 2013.2.4

J0203-27 2
J0203-34-39 2
J0203-01-27 1

1110233/EPC/2157/872 2012.6.15
1110233/EPC/7485/1744 2012.11.23
1110233/EPC/10055/2272
04/01/2013

General arrangement drawing of turbine part


Erection drawing of boiler auxiliary equipment

Erection drawing of turbine auxiliary equipment

Erection drawing of turbine proper auxiliary equipment

A2
J0301-01,04-14 5
J0301-02-03 1

1110233/EPC/5617/1372 2012.9.20

J0304-01,08-11 1
J0304-1 5

J0306
J0307

Pplatforms and stairs in boiler house


Drawing of platforms and stairs in turbine hall

Lifting equipment in boiler house


Lifting equipment in turbine hall

19

J0401

20

J0302-01-23 5
J0302-01-25 5

1110233/EPC/5902/1438 2012.9.29
1110233/EPC/7863/1839 2012.12.5

J0303-01-23 5
J0303-01-23 5

1110233/EPC/5887/1423 2012.9.28
1110233/EPC/7863/1839 2012.12.5

1110233/EPC/7863/1839 2012.12.5
1110233/EPC/9922/2241 2013.2.1

J0305-01-13 1

1110233/EPC/7863/1839 2012.12.5

J0307-01-07 1

1110233/EPC/7863/1839 2012.12.5

Erection drawing of pulverized coal piping

J0401 5

1110233/EPC/7267/1697 2012.11.19

J0501

Erection drawing of cold primary air duct

J0501-01-39 5

1110233/EPC/4973/1123 2012.9.4

21

J0502

Erection drawing of cold secondary air duct

J0502-01-22 5

1110233/EPC/4974/1124 2012.9.4

22

J0503

Erection drawing of hot primary air duct

J0503-01-30 5

1110233/EPC/4975/1125 2012.9.4

23
24

J0504
J0505

Erection drawing of sealing air duct


Erection drawing of flue before IDF

25

J0506

Erection drawing of flue after IDF

J0505-01-50 5
J0506-01-02 5
J0506-01,03-15 5

1110233/EPC/5021/1133 2012.9.5
1110233/EPC/5520/1349 2012.9.17
1110233/EPC/9766/2191 2013.1.29

26

J0507

27

J0601

28

J2605

29

J2607

30

J0701

31

J0702

32

J0703

33

Erection drawing of flame detection cooling air fan and relevant


piping
Arrangement drawing of coal bunker empty pipe

PUMP HOUSE FUEL OIL PIPE SYSTEM DRAWING

DIRTY OIL TREATMENT SYSTEM DIAGRAM


Erection drawing of boiler drain and vent piping

Erection drawing of boiler blowdown flash tank exhaust piping

J0507-01-05 5
J0507-01-05 1

1110233/EPC/5477/1335 2012.9.17
1110233/EPC/9783/2208 2013.1.30

J0601-01-03 5

1110233/EPC/8416/1943 2012.12.19

J2605-01-02 5

1110233/EPC/9905/2224 2013.1.31

J2607-01 5

1110233/EPC/9898/2217 2013.1.31

J0701 5

1110233/EPC/7267/1697 2012.11.19

J0702-01-04 5

1110233/EPC/9921/2240 2013.2.1

Erection drawing of intermittent blowdown flash tank drain


piping

J0703-01-04 5

1110233/EPC/9633/2150 2013.1.25

J0704

Erection drawing of continuous blowdown flash tank secondary


steam piping

J0704-01-04 5

1110233/EPC/9632/2149 2013.1.25

34

J0705

Erection drawing of cooling water piping for boiler recirculating


pump

J0705-01-02 5

1110233/EPC/10718/2364 2013.2.21

35

J0801

36
37

J0802
J0901

38

J0902

39

J0903

40

J0904

41

J0905

42

J0906

43

J0907

44

J1001

45

J1002

46

J1003

47

J1004

48

J1005

49

J1006

Erection drawing of pulverizing system fire extinguishing piping

Outdoor protection measures


Erection drawing of main steam piping
Erection drawing of hot reheat steam piping

Erection drawing of cold reheat steam piping

Erection drawing of turbine HP bypass system piping

Erection drawing of turbine LP bypass system piping

Erection drawing of feedwater pump turbine intermediate pressure


steam piping
Erection drawing of main steam to shaft sealing steam piping

Erection drawing of turbine 1st extraction steam piping

Erection drawing of turbine 2nd extraction steam piping

Erection drawing of turbine 3rd extraction steam piping

Erection drawing of turbine 4th extraction steam piping

Erection drawing of turbine 5th extraction steam piping

Erection drawing of turbine 6th extraction steam piping

J0801-01 021 5
J0801-02-04 5
J0802-01-05 5
J0901-01-06 5

1110233/EPC/9918/2237 2013.2.1
1110233/EPC/10055/2272 04/01/2013
1110233/EPC/5913/1449 2012.9.29
1110233/EPC/1934/812 2012.6.6

J0902-01-05 5

1110233/EPC/1934/812 2012.6.6

J0903-00-04 5
J0903-02-04 5

1110233/EPC/1935/813 2012.6.6
1110233_EPC_11910 2459 2013.3.16

J0904-00-03 5

1110233/EPC/1935/811 2012.6.6

J0905-00-03 5
J0905-01-03 5

1110233/EPC/1935/810 2012.6.6
1110233_EPC_11829 2437 2013.3.13

J0906-01-04 5

1110233/EPC/5275/1244 2012.9.12

J0907-01-04 5

1110233/EPC/5305/1265 2012.9.12

J1001-01-04 5

1110233/EPC/5299/1259 2012.9.12

J1002-01-04 5
J1002-02-04 5

1110233/EPC/4734/1184 2012.8.29
1110233_EPC_11912 2461 2013.3.15

J1003-01-04 5

1110233/EPC/5300/1260 2012.9.12

J1004-01-04 5

1110233/EPC/4735/1185 2012.8.29

J1005-01-04 5

1110233/EPC/5266/1235 2012.9.12

J1006-01-04 5

1110233/EPC/5265/1234 2012.9.12

50

J1007

Erection drawing of feedwater pump turbine low pressure steam and


commissioning steam piping

J1007-01-04 5

1110233/EPC/5176/1195 2012.9.11

51

J1008

Erection drawing of turbine HP cylinder ventilation piping

J1008-01-03 5

1110233/EPC/5264/1233 12/09/2012

52

J1101

Erection drawing of start-up steam piping

53

J1102

J1102-01-08 5

1110233/EPC/5391/1310 2012.9.17

54

J1103

J1103-01-04 5
J1103-02-04 5

1110233/EPC/5281/1250 2012.9.17
1110233_EPC_11913 2462 2013.3.16

55

J1104

J1104-01-04 5

1110233/EPC/4687/1170 2012.8.28

56

J1105

J1105-01-04 5
J1105-01 2 J1105-02-05 5

1110233/EPC/4828/1113 2012.9.3
1110233_EPC_11914 2463 2013.3.16

57

J1106

J1106-01-04 5

1110233/EPC/4827/1112 2012.9.3

58

J1107

J1107-01-04 5

1110233/EPC/5481/1339 2012.9.18

59

J1108

J1108-01-05 5

1110233/EPC/8047/1889 2012.12.11

60
61
62

J1201
J1202
J1203

J1201-01-04 5
J1202-01-04 5
J1203-00-04 5

1110233/EPC/5269/1238 2012.9.12
1110233/EPC/5270/123 2012.9.12
1110233/EPC/1935/809 2012.6.6

63

J1204

J1204-02,03 5

1110233/EPC/5480/1338 2012.9.18

64

J1205

J1205-01-04 5

1110233/EPC/4971/1121 2012.9.4

65

J1206

66

J1301

J1206-01-04 5
J1206-01-04 5
J1301-01-05 5

1110233/EPC/5530/1359 2012.9.18
1110233/EPC/5897/1433 2012.9.28
1110233/EPC/5280/1249 2012.9.17

67

J1302

J1302-02-05 5

1110233/EPC/9496/2126 2013.1.23

68

J1303

J1303-02-04 5

1110233/EPC/9496/2126 2013.1.23

69

J1304

J1304-01-04 5

1110233/EPC/5478/1336 2012.9.17

70

J1305

J1305-01-06 5

1110233/EPC/5482/1340 2012.9.18

71

J1306

J1306-01,02 5

1110233/EPC/5166/1185 2012.9.10

72

J1401

J1401-01-16 5

1110233/EPC/4976/1126 2012.9.4

73

J1402

J1402-01-04 5

1110233/EPC/5020/1132 2012.9.5

Erection drawing of auxiliary steam header and relevant piping

Erection drawing of cold reheat steam to auxiliary steam piping

Erection drawing of auxiliary steam piping in boiler house

Erection drawing of 4th extraction steam to auxiliary steam piping

Erection drawing of auxiliary steam header to deaerator piping

Erection drawing of other auxiliary steam piping in turbine hall

Erection drawing of fuel oil automizing steam piping

Erection drawing of LP feedwater piping


Erection drawing of IP feedwater piping
Erection drawing of HP feedwater piping
Erection drawing of feedwater recirculating piping

Erection drawing of boiler desuperheating water piping

Erection drawing of HP bypass desuperheating water piping

Erection drawing of condensate piping


Erection drawing of condensate storage tank relevant piping

Erection drawing of condensate desuperheating water piping

Erection drawing of boiler filling water piping


Erection drawing of condensate discharge piping

Erection drawing of condensate service water piping

Erection drawing of HP heater drain piping

Erection drawing of LP heater drain piping

74

J1403

75

J1404

76

J1405

77

J1406

78

J1407

79

J1501

80

J1502

81

J1503

82

J1504

83

J1505

84

J1601

85

J1602

86

J1701

87

J1702

88

J1703

89

J1704

90

J1705

91

J1706

92
93

J1801
J1802

94

J1901

95

J1902

Erection drawing of deaerator tank overflow and drain piping

J1403-01-04 5

1110233/EPC/5298/1258 2012.9.12

J1404-01-05 5
J1404-01-04 5

1110233/EPC/4997/1130 2012.9.5
1110233_EPC_11830 2438 2013.3.13

J1405-01-05 5

1110233/EPC/4998/1131 2012.9.5

J1406-01-05 5
J1406-01-05 5

1110233/EPC/5278/1247 2012.9.12
1110233_EPC_11831 2439 2013.3.13

J1407-01-07 5

1110233/EPC/5902/1438 2012.9.29

J1501-01-04 5

1110233/EPC/5174/1193 2012.9.11

J1502-01-04 5

1110233/EPC/5612/1367 2012.9.18

J1503-01-04 5

1110233/EPC/5611/1366 2012.9.18

J1504-01-05 5

1110233/EPC/5294/1254 2012.9.12

J1505-01-06 5

1110233/EPC/5179/1198 2012.9.11

J1601-01-04 5

1110233/EPC/5479/1337 2012.9.17

J1602-01-04 5

1110233/EPC/5297/1257 2012.9.12

J1701-01-04 5

1110233/EPC/5274/1243 2012.9.12

J1702-01,02 5

1110233/EPC/5276/1245 2012.9.12

J1703-01-03 5
J1703-01-03 5

1110233/EPC/5180/1199 2012.9.11
1110233/EPC/5282/1251 2012.9.177

J1704-01-09 5

1110233/EPC/5302/1262 2012.9.12

J1705-0102 5

1110233/EPC/5277/1246 2012.9.12

J1706-01-04 5

1110233/EPC/5610/1365 2012.9.18

J1801-01-04 5
J1802-01-04 5

1110233/EPC/4773/1198 2012.8.29
1110233/EPC/9498/2128 2013.1.24

Erection drawing of circulating water piping in turbine hall

J1901-01-15 5
J1901-01,02,14,15 5
J1901-03-13 3

1110233/EPC/5362/1293 2012.9.12
1110233_EPC_11679 2423 2013.3.9

Erection drawing of condenser tube cleaning piping

J1902-01 5
J1902-01-04 5
J1902-01-04 5

1110233/EPC/5362/1293 2012.9.12
1110233/EPC/5279/1248 2012.9.17
1110233_EPC_11832 2440 2013.3.14

Erection drawing of HP heater vent piping

Erection drawing of LP heater vent piping

Erection drawing of deaerator vent piping


Erection drawing of drain piping in main buiding

Erection drawing of turbine proper drain piping

Erection drawing of turbine shaft sealing steam piping

Erection drawing of turbine shaft seal and valve stem leakage piping

Erection drawing of GSC drain and exhaust piping

Erection drawing of turbine steam sealing emergency exhaust piping

Erection drawing of condenser vacuum extraction piping

Erection drawing of Vacuum break piping


Erection drawing of feedwater pump turbine shaft sealing piping

Erection drawing of feedwater pump turbine drain piping

Erection drawing of feedwater pump turbine exhaust piping

Erection drawing of feedwater pump turbine lubricating oil piping

Erection drawing of feedwater pump sealing water piping

Erection drawing of motor driven feedwater pump working oil and


lubricating oil piping
Erection drawing of SCAPH drain piping
system diagram of scaph vent piping

96

J1903

Erection drawing of condenser drain and vent piping

J1903-01-04 5

1110233/EPC/5296/1256 2012.9.12

97

J1904

Erection drawing of condenser pit drain piping

J1904-01-07 5

1110233/EPC/5295/1255 2012.9.12

98

J2001

J2001-01-05 5

1110233/EPC/5887/1423 2012.9.28

99

J2101

J2101-01-05 5

1110233/EPC/5618/1373 2012.9.20

100

J2102

J2102-01-05 5

1110233/EPC/5173/1192 2012.9.11

101

J2103

Erectiong drawing of emergency cooling water piping for boiler


assisted circulation pump

J2103-01-04 5

1110233/EPC/5022/1196 2012.9.11

102

J2104

Erection drawing of closed cycle cooling water expansion tank and


relevant piping

J2104-01-04 5

1110233/EPC/9496/2126 2013.1.23

103

J2201

J2201-01-05 5

1110233/EPC/5261/1230 2012.9.12

104

J2202

J2202-01-04 5

1110233/EPC/5268/1237 2012.9.12

105

J2203

J2203-01-04 5

1110233/EPC/5267/1236 2012.9.12

106

J2204

J2204-01-09 5

1110233/EPC/5303/1263 2012.9.12

107

J2205

J2205-01-05 5

1110233/EPC/5358/1289 2012.9.12

108

J2206

J2206-01,02 5

1110233/EPC/5263/1232 2012.9.12

109

J2301

J2301-01-05 5

110233/EPC/5175/1194 2012.9.11

110

J2302

J2302-01-04 5

1110233/EPC/5273/1242 2012.9.12

111

J2303

J2303-01-05 5
J2303-01-05 5

1110233/EPC/5271/1240 2012.9.12
1110233/EPC/5897/1433 2012.9.28

112

J2304

J2304-01-04 5

1110233/EPC/5272/1241 2012.9.12

113

J2305

114

J2401

J2401-01-04 5

1110233/EPC/5902/1438 2012.9.29

115

J2402

J2402-01-05 5

1110233/EPC/9702/2162 2013.1.28

116

J2403

Erection drawing of open cycle cooling water piping

Erection drawing of closed cycle cooling water pipingin turbine hal

Erection drawing of closed cycle cooling water pipingin boiler


house

Erection drawing of turbine proper lubricating oil piping

Erection drawing of lubricating oil purifying piping

Erection drawing of lubricating oilstorage tank relevant piping

Erection drawing of oil tank gas exhaust piping


Erection drawing of oil tank emergency oil drain piping

Erection drawing of turbine jacking oil piping

Erection drawing of generator sealing oil piping

Erection drawing of generator hydrogen and carbon dioxide piping

Erection drawing of generator stator cooling water piping

Erection drawing of generator sealing oil gas exhaust piping

Erection drawing of generator brush supporter ventilation piping

Erection drawing of compressed air piping in turbine hall

Erection drawing of compressed air piping in boiler hall

Erection drawing of compressed air piping in plant area

117

J2404

118

J2501

119

J2502

120

J2601

121

J2602

122

J2603

123

J2604

Erection drawing of nitrogen piping


Erection drawing of boiler hall washing water piping

Erection drawing of air preheater washing water piping

Boiler fuel oil system diagram and valve table

Erection drawing of oil unloading equipment and piping

Erection drawing of oil tank area equipment and piping

Oil pump house equipment erection

124

J2605

Erection drawing of pumps house piping

125

J2606

126

J2607

127

J2608

128

J2609

129

J2610

130

J2611

131

J2612

132

J2613

133

J2901

Erection drawing of oil tank area miscellaneous piping

Erection drawing of dirty oil treatment system equipment and piping

Erection drawing of plant area fuel oil (HFO) piping

Erection drawing of plant area fuel oil (LDO) piping

Erection drawing of heavy oil heating steam piping

Erection drawing of heavy oil heating system drain piping

Making drawing of oil tank proper

Making and erection drawing of oil tank attachments


Erection drawing of diesel-engine generator auxiliary
equipment and piping

J2404-01-03 5

1110233/EPC/5165/1184 2012.9.10

J2501-01,02 5

1110233/EPC/9748/2173 2013.1.28

J2501-01-05 5

1110233_EPC_10723 2369 2013.3.17

J2601-01-03,05,06 1

1110233/EPC/8295/1924 2012.12.17

J2602-01-05 5
J2602-01-05 5

1110233/EPC/4653/1157 2012.8.27
1110233/EPC/8301/1930 2012.12.17

J2603-01-06 5
J2603-01-07 5
J2604-01 5

1110233/EPC/4660/1164 2012.8.27
1110233/EPC/9162/2077 2013.1.13
1110233/EPC/9772/2197 2013.1.29

J2605-01-02

1110233/EPC/9905/2224

2013.1.31

J2606-01-05 5
J2606-01-03 5

1110233/EPC/4728/1178 2012.8.28
1110233/EPC/9150/2065 2013.1.11

J2607-01-04 5
J2607-01-03 5

1110233/EPC/4593/1150 2012.8.24
1110233/EPC/5521/1350 2012.9.17

J2610-01-04 5

1110233/EPC/9497/2127 2013.1.24

J2611-01-04 5

1110233/EPC/9498/2128 2013.1.24

J2612-01-14 5

1110233/EPC/9767/2192 2013.1.29

J2613-01-09 5

1110233/EPC/8692/1994 2012.12.28

J2901-01-11

1110233/EPC/10400/2320 2013.2.12

It
em

Volume

drawing Title

one by one examine and


approve state

one by one
approve letter & date

H0101

General description, system diagram and layout drawing

H0101-01 5

1110233/EPC/5909/1445 2012.9.29

H0102

Main equipment and filling list

H0102-01 5

1110233/EPC/5903/1439 2012.9.29

H0103

Valve list

H0103-01 5

1110233/EPC/5903/1439 2012.9.29

4
5

H0104
H0105

H0104-01 5

1110233/EPC/5903/1439 2012.9.29

H0106

H0106-01-34 5

1110233/EPC/7186/254 2011.12.22

H0107

Material list
Paint and anticorrosion material list
Supports and hangers choice handbook for chemical

Power plant identification system(kks)--chemical part


KKS

H0107-01 5
H0107-01 5

1110233/EPC/5464/1322 2012.9.14
1110233/EPC/5700/1420 2012.9.28

H0200

DM system general layout and system drawing and instruction

H0200-01,02(0),02(4)-02(10) 1
H0200-0212302 5
H0200-02(0) 1

1110233/EPC/9768/2193 2013.1.29
1110233/EPC/10040/2257 2013.2.4
1110233/EPC/9768/2193 2013.3.8

H0201

Equipment and piping erection drawing of DM water system

10

H0202

Equipment and piping erection drawing of DM water pump


system

H0202-03-31 5
H0202-01 1
H0202-01 1

1110233/EPC/8737/1997 2012.12.31
1110233/EPC/9768/2193 2013.1.29
1110233_EPC_11687 2431 2013.3.11

11

H0203

Outdoor equipment and piping erection drawing of DM water


system

H0203-01,16 5

1110233/EPC/8584/1984 2012.12.26

12

H0204

Equipment and piping erection drawing of compressed air system

H0204-01,02,04-06 1
H0204-03 5

1110233/EPC/7888/1844 2012.12.5
1110233/EPC/8994/2039 2013.1.9

13

H0205

Equipment and piping erection drawing of DM water acid &


caustic metering system

H0205-01,17 1
H0205-15,16 1
H0205-02,15,16 1

1110233/EPC/9055/2048 2013.1.9
1110233/EPC/9493/2123 2013.1.23
1110233/EPC/9769/2194 2013.1.29

14

H0206

Manufacture drawing of 200m3 steel tanks 2000m3

H0206-08-14 1
H0206-04,07,09,11 5
H0206-04 5
H0206-01 1

1110233/EPC/4270/1089 2012.8.23
1110233/EPC/7616/1774 2012.11.28
1110233/EPC/8579/1979 2012.12.26
1110233/EPC/9923/2242 2013.2.1

15

H0207

Manufacture drawing of 200m3 steel tanks 200m3

H0207-02-09 5
H0207-01 1

1110233/EPC/7692/1796 2012.11.30
1110233/EPC/9923/2242 2013.2.1

16

H0208

Manufacture drawing of 300m3 steel tanks 300m3

H0208-02-09 5
H0208-01 1

1110233/EPC/7692/1796 2012.11.30
1110233/EPC/9923/2242 2013.2.1

H0201-07,12-14 1
H0201-03-04,06-14 5
H0201-02-63 5
H0201-09 1
H0201-030609 5

1110233/EPC/8052/1894 2012.12.12
1110233/EPC/8591/1991 2012.12.27
1110233/EPC/8999/2044 2013.1.9
1110233/EPC/9925/2244 2013.2.1.
1110233/EPC/10308/2300 2013.2.8

H0209-03-04 5
H0209-01,02,05 1

1110233/EPC/5903/1439 2012.9.29
1110233/EPC/9487/2117 2013.1.22

H0210-01-22 1

1110233/EPC/8744/2004 2012.12.31

H0211-01-03 1

1110233/EPC/9140/2055 2013.1.10

17

H0209

18

H0210

19

H0211

Acid and alkali neutralization system equpment and piping


erection drawing of DM water system

20

H0212

CO2
System drawing of potable water co2 dosing and lime stone filter
room

21

H0300

Sea water desalination system general layout and system drawing


and instruction

A2

22

H0301

Equipment and piping erection drawing of pressure filters

H0301-04-23 5
H0301-01-02,08-10,24 1
H0301-03
1

1110233/EPC/3343/995 2012.7.25
1110233/EPC/9139/2054 2013.1.10
1110233/EPC/9925/2244 2013.2.1

23

H0302

Equipment and piping erection drawing of SWRO


chemical cleaning

H0302-01,02,07 1

1110233/EPC/9055/2048 2013.1.9

24

H0303

Equipment and piping erection drawing of sea water high pressure


room

25

26

H0304

H0305

Layout drawing of assay building


Acid and alkali storage tank and piping erection drawing of DM
water system

Equipment and piping erection drawing of sea water low pressure


room

Outdoor equipment and piping erection drawing of sea water


desalination system

27

H0306

Equipment and piping erection drawing of chemical


dosing room

28

H0307

Equipment and piping erection drawing of Root blower


system

29

H0308

30

H0309

31

H0310

32

H0400

Equipmwnt erection drawing of flocculate


sedimentation pond
Equipmwnt erection drawing of V style filter
Equipment and piping erection drawing of flocculating
agent storage and dosing system
Generating chiorineby electrolyzing sea water system
instruction

H0212-01,02,04 1
H0212,03 1
H0212,04 5

H0303-02-29 5
H0303-02-03082912 5

H0304-01 2
H0304-01 1
H0304-16-23 02 5
H0304-26-27 5
H0305-01 2
H0305-03-37,49 5,5
H0305-01 1
H0305-0241-4548-58

1110233/EPC/8991/2036 2013.1.8
1110233/EPC/9489/2119 2013.1.23
1110233/EPC/11083/2385 2013.2.27

1110233/EPC/7352/1716 21.11.2012
1110233/EPC/10394/2314 2013.2.11
1110233/EPC/2495/913 2012.6.27
1110233/EPC/10040/2257 2013.2.4
1110233/EPC/10046/2263
04/02/2013 1110233-EPC_10497
2333 2013.2.14
1110233/EPC/2495/913 2012.6.27
1110233/EPC/3342/994 2012.7.25
1110233/EPC/10040/2257 2013.2.4
1110233/EPC/10048/2265 2013.2.5

H0306-09-12,14-17 1
H0306-09-17 5
H0306-01-08 1
H0306-13 5

1110233/EPC/9770/2195 2013.1.29
1110233/EPC/10040/2257
04/02/2013 1110233/EPC/10044/2261
04/02/2013
1110233_EPC_11348 2406 05/03/2013

H0307-01-03 1
H0307-01-02,08 1
h0307-01-0305 1

1110233/EPC/9492/2122 2013.1.23
1110233/EPC/10040/2257 2013.2.4
1110233/EPC/10318/2310 2013.2.11

H0308-05 5
H0308-01-05 1
H0309 2012.7.11 2

1110233/EPC/3049/948 2012.7.11
1110233/EPC/10051/2268 2013.2.4
1110233/EPC/3048/947 2012.7.11

H0310-02-14 5

1110233/EPC/10050/2267 2013.2.5

A2

1110233/EPC/7616/1774 2012.11.28

Equipment and piping erection drawing of generating chlorineby


electrolyzing sea water system

H0401-18-36 5
H0401-37 5
H0401-04-08,11-17,37,38 5
H0401-01 5
H0401-01 1
h0401-13-17 5
H0401-12 5

1110233/EPC/3341/993 2012.7.25
1110233/EPC/5917/1453 2012.10.1
1110233/EPC/9486/2116 2013.1.22
1110233/EPC/9904/2223 2013.1.31
1110233/EPC/10311/2303 2013.2.8
1110233/EPC/11096 /2398 2013.3.1
1110233_EPC_11352 2410 2013.3.5

H0601-01-07 5

1110233/EPC/5912/1448 2012.9.29

H0602-01-03 5

1110233/EPC/5911/1447 2012.9.29

33

H0401

34

H0500

35

H0501

36

H0600

37

H0601

38

H0602

39

H0603

40

H0700

41

H0701

42

H0702

Erection drawing of CPP external regeneration system and piping

43

H0703

Equipment and piping erection drawing of sluice pump and backwash pump

44

H0704

Erection drawing of CPP apiece unit interconnection piping

H0704-01-15 1
H0701-01-04 1

1110233/EPC/4970/1120 2012.9.3
1110233/EPC/10042/2259 2013.2.4

45

H0705

Equipment and piping erection drawing acid & caustic metering


system and wastewater collection system

H0705-08-19 5
H0705-04-06 5

2012.9.17
1110233/EPC/9912/2231 2013.1.31

46

H0706

Equipment and piping erection drawing acid & caustic storage


system system

H0706-09,10 5

1110233/EPC/5906/1442 2012.9.29

47

H0707

Equipment and piping erection drawing of compressed


air system

48

H0708

49

H0709

Hydrogen generation system instruction


Equipment and piping erection drawing of hydrogen generation
system
Thermal cycle dosing and SWAS instruction
Equipment and piping erection drawing of SWAS system of
thermal cycle
Layout drawing of condenser leakage detection device

Layout drawing of thermal cycle dosing system

CPP system general layout and system drawing and instruction

Erection drawing of CPP high flow rate mixed bed and piping

Equipment and piping erection drawing of backwash roots blower

Plastic lining piping axonometric drawing of CPU water system

H0603-01 1
H0603- 01 5

1110233/EPC/10311/2303 08/02/2013

H0700-02-03 5

1110233/EPC/10311/2303 08/02/2013

H0701-05-29 5

1110233/EPC/5527/1356 2012.9.18

H0702-04-13 5
h0702-01-03 1

1110233/EPC/3802/1002 2012.7.27
1110233/EPC/10309/2301
08/02/2013

H0703-03,06-12 5

H0707-05-07 5
H0707-01-04,06
H0707-01-04

1
1

1110233/EPC/3863/1015 2012.7.13

1110233/EPC/5470/1328 2012.9.17
1110233/EPC/10041/2258 04/02/2013
1110233/EPC/10312/2304 08/02/2013

H0708-04-06 5

1110233/EPC/3864/1016 2012.7.31

H0709-01-09 5

1110233/EPC/7213/1678 2012.11.15

50

H0800

Industrial waste water treatment system general layout and system


drawing and instruction

51

H0801

Equipment and piping outdoor erection drawing of Industrial


waste water treatment

52

H0802

Equipment and piping indoor erection drawing of Industrial waste


water treatment

53

H0803

54

H0804

55

H0805

Equipment and piping erection drawing of backwash roots blower

Erection drawing of PH regulating basin and flocculation tank and


piping PH
Equipment and piping erection drawing of waste water
treatmentDM water treatment and C.C.W water treatment
chemical dosing system

56

H0806

Acid and alkali storage tank and piping erection drawing of


Industrial waste water system

57

H0901

Piping connection drawing of plant area

58

H1001

equipment and piping erection drawing of


flocculating agent dosing system of ash handling
high efficiency settlling
equipment

H0800-02 2

1110233/EPC/3240/971 2012.7.20

H0801-04,06-26 5
H0801-01 5
H08010103040926 5

1110233/EPC/3239/970 2012.7.20
1110233/EPC/10311/2303 2013.2.8
1110233/ EPC /10406 /2326
2013.2.13

H0802-03-06,9-11 5
h0802-0108 5

1110233/EPC/3295/938 2012.7.6
1110233/EPC/10398/2318 2013.211

H0803-04-06 5
H0803-03 5

1110233/EPC/3295/978 2012.7.23
1110233/EPC/10395/2315 2013.2.11

H0804-03-09,11-12 5
H0804-01 1

1110233/EPC/2123/863 2012.6.14
1110233/EPC/10504/ 2340 2013.2.14

H0805-04,05 5
H0805-01-02 1

1110233/EPC/1504/767 2012.5.23
1110233 EPC 10407 2327 2013.2.13

H0806-03-13,19,23-25 5
H0806- 22 5
H0806-20,21 5
H0806-14-22 5

1110233/EPC/2575/919 2012.6.29
1110233/EPC/5911/1447 2012.9.29
1110233/EPC/5906/1442 2012.9.29
1110233/EPC/10393/2313 2013.2.11

H0901-01-20 1

1110233/EPC/5700/1420 2012.9.28

H1001-03 5

1110233/EPC/5903/1439 2012.9.29

A2


one by one examine and
approve state

one by one
approve letter & date

KKS ID system and index for electrical part of power plant


KKS

D0104 5

1110233/EPC/7342/1706 2012.11.20

Installation drawing of 400kV switchyard 400kV

D0201-01,03-06,10,11-13 1

1110233/EPC/3045/944 2012.7.11

D0202-01-05,07-08 1,5

1110233/EPC/3046/945 2012.7.11

D0301-01-23 1

1110233/EPC/5029/1141 2012.9.6

D0302-01-07 1

1110233/EPC/5036/1148 2012.9.6

Installation drawing of generator isolated phase bus duct

D0401-01-11 1

1110233/EPC/7204/1669 2012.11.14

D0402

Installation drawing of segregated phase bus duct

D0402-01-11 1

1110233/EPC/5036/1148 2012.9.6

11

D0501

Installation and order drawing of 11kV auxiliary section in


main power building 11kV

D0501-01-14 1

1110233/EPC/5189/1208 2012.9.11

12

D0502

Installation and order drawing of 6.6kV auxiliary section in


main power building 6.6kV

D0502-01-10 1

1110233/EPC/5190/1209 2012.9.11

13

D0503

Installation and order drawing of 6.6kV common system


section 6.6kV

D0503 1
D0503 1
D0503 1

1110233/EPC/6911/1635 2012.11.6
1110233/EPC/7790/1802 2012.12.03
1110233/EPC/8152/1922 2012.12.17

14

D0504

Installation and order drawing of 6.6kV coal handling


system section 6.6kV

D0504-01-08 1

1110233/EPC/5744/1401 2012.9.26

15

D0505

Installation and order drawing of 415V PCC in main


power building 415V PC

D0505 1

1110233/EPC/6911/1635 2012.11.6

16

D0506

Installation and order drawing of 415V MCC in main


power building 415V MCC

D0506 1

1110233/EPC/7097/1651 2012.11.9

17

D0507

Installation and order drawing of 415V emergency system


415V

D0507 1

1110233/EPC/7342/1706 2012.11.20

It
em

Volume

drawing Title

D0101

General description, single diagram and content

D0102

List of electrical equipment and materials

D0103

KKS ID system and index for electrical part of power plant


KKS

D0104

D0201

D0202

D0301

D0302

D0401

10

Installation of 400kV overhead conductor 400kV

Installation drawing of transformer outdoor

Installation drawing of 400kV bus reactor 400kV

18

D0508

Installation and order drawing of 415V ESP system


section 415V

D0508 1

1110233/EPC/7163/1666 2012.11.14

19

D0509

Installation and order drawing of 415V coal handling


system section 415V

D0509 1

1110233/EPC/7483/1742 2012.11.23

20

D0510

Installation and order drawing of 415V chemical water


system section 415V

D0501 1

1110233/EPC/7099/1653 2012.11.9

21

D0511

Installation and order drawing of 415V water supply


system section 415V

D0511 1

1110233/EPC/7217/1681 2012.11.15

22

D0512

D0512 1

1110233/EPC/7439/1737 2012.11.23

23

D0513

D0513 1

1110233/EPC/8751/2011 2013.1.2

24

D0514

Installation and order drawing of 415V ash handling


system section 415V

D0514 1

1110233/EPC/9247/2089 2013.1.17

25

D0515

Electrical part of administrative and technical building

26

D0601

Electrical control protection and metering part of electric


relay room in central control building

27

D0602

Control and metering wiring drawing of generatortransformer

D0602 1

1110233/EPC/7160/1663 2012.11.14

28

D0603

Protection wiring drawing of generator-transformer & UT

D0603-09-15 5
A2

1110233/EPC/2489/907 2012.6.26
1110233/EPC/6688/1636 2012.11.6

29

D0604

Protection wiring drawing of ST

D0604 1

1110233/EPC/7160/1663 2012.11.14

30

D0605

Control and metering wiring drawing of UTST & SBT

D0605 1

1110233/EPC/9243/2085 2013.1.16

31

D0606

Electrical control protection and metering wiring drawing of


LV auxiliary transformer

D0606 1

1110233/EPC/7162/1665 2012.11.14

32

D0607

Electrical control protection and metering wiring drawing of


415V energency AC supply

D0607 1

1110233/EPC/7347/1711 2012.11.20

33

D0608

Wiring and order drawing of UPS

D0608 1

1110233/EPC/7163/1666 2012.11.14

Installation and order drawing of 415V water taking


system section out of plant 415V

Installation and order drawing of 415V fuel system section


415V

34

D0609

Wiring and order drawing of 220V DC system for main


building

D0609 1

1110233/EPC/8148/1918 2012.12.14

35

D0610

Wiring and order drawing of 220V DC system for auxiliary


shop

D0610 1

1110233/EPC/8590/1990 2012.12.27

36

D0611

ECMS system diagram

D0611 1

1110233/EPC/8430/1957 2012.12.21

37

D0612

I/0 list to DCS and terminal Wiring drawing DCSI/O

D0612 1

1110233/EPC/9264/2106 2013.1.18

38

D0613

I/0 list to CHP PLC and terminal Wiring drawing PLC


I/O

39

D0701

Electrical control protection and metering wiring drawing of


HV MOTORS

D0701 1

1110233/EPC/6690/1638 2012.11.6

40

D0702

Electrical control protection and metering wiring drawing of


LV MOTORS

D0702 1

1110233/EPC/8138/1908 2012.12.13

41

D0703

Electrical control protection and metering wiring drawing of


motor for CHP

D0703 1

1110233 EPC 9781 2206 2013.1.30

42

D0704

Coal handling industrial TV system

D0704 1

1110233/EPC/9910/2229 2013.1.31

43

D0801

Electrical control protection and metering part of network


relay room

D0801 1
D0801 1
D0801 1

1110233/EPC/7163/1666 2012.11.14
1110233/EPC/8431/1958 2012.12.21
1110233_EPC_11349 2407 2013.3.5

44

D0802

Electrical control protection and metering wiring drawing of


400kV line 400kV

45

D0803

Electrical control protection and metering wiring drawing of


400kV bus equipment 400kV

D0803-06-07 1

1110233/EPC/10314/2306 2013.2.8

46

D0804

Electrical control protection and metering wiring drawing of


400kV breaker

47

D0805

Wiring drawing of NCCS I/O cabinet

48

D0806

49

D0807

50

D0901

51

D0902

ELECTRICAL TARIFF ENERGY METERING SYSTEM

PROTECTION WIRING DRAWING OF 400KV


SWITCHYARD 400kv

A2
D0806 1

1110233/EPC/7163/1666 2012.11.14

D0807-01-20 1

1110233/EPC/10080/2276 05/02/2013

Installation and connection drawing of switchyard

D0901 5

1110233/EPC/7210/1675 2012.11.15

Installation and connection drawing of generatortransformer

D0902 1

1110233/EPC/9249/2091 2013.1.17

52

D0903

Installation and connection drawing of UT & ST

D0903-02,03,04,11 1

1110233/EPC/5607/1362 2012.9.17

53

D1001

Installation drawing of battery in main building

D1001 1

1110233/EPC/8036/1878 2012.12.10

54

D1002

Installation drawing of battery in auxiliary buildings

D1002 1

1110233/EPC/8431/1958 2012.12.21

55

D1101

Installation drawing of main power building slide wiring

D1101 5

1110233/EPC/2743/928 2012.7.4

56

D1102

Installation drawing of BOP workshop slide wiring

D1102 1

1110233/EPC/9246/2088 2013.1.17

57

D1201

General part of lightning and grounding protection for


whole plant

D1201 1

1110233/EPC/7204/1669 2012.11.14

58

D1202

Lightning and grounding protection of main power building


and switchyard

D1202 1

1110233/EPC/8436/1963 2012.12.21

59

D1203

Lightning and grounding protection of plant area and


other BOP auxiliary plant

60

D1301

General part of cable layout

61

D1302

Cable layout drawing of main power building

62

D1303

Cable layout drawing of electrical and control building

63

D1304

64

D1305

65

D1306

66

D1307

67

D1308

68

D1309

69

D1310

Cable layout drawing of other BOP auxiliary plant

70

D1311

Cable layout drawing of plant area

71

D1312

Cable list

72

D1313

Cable fire-fighting and fire-retardation measures

73

D1401

General of lighting

A2

1110233/EPC/10080/2276 05/02/2013

Cable layout drawing of 400kV switchyard 400kV

Cable layout drawing of ESP system


Cable layout drawing of coal handling system

Cable layout drawing of ash handling system

Cable layout drawing of chemical watersupply system

Cable layout drawing of water supply system

74
75
76

D1402
D1403
D1404

Lighting for main power building


Lighting for boiler
Lighting for CCB
Lighting for 400kV switchyard and NCB 400kV

Lighting for coal handling system


Lighting for chemical water and water supply system

Lighting for water supply system


Lighting for ash handling system
Lighting for plant area road
Lighting for other BOP auxiliary plant

A3

77

D1405

78

D1406

79

D1407

80
81
82
83

D1408
D1409
D1410
D1411

84

D1501

Terminal blocks diagram of 11kV auxiliary section in main


power building 11kV

D1501-07-86 5

1110233/EPC/9478/2108 2013.1.22

85

D1502

Terminal blocks diagram of 11kV station switchgear


11kV

D1502-05-62 5

1110233/EPC/9478/2108 2013.1.23

86

D1503

Terminal blocks diagram of 6.6kV unit switchgear


6.6kV

D1503 5

1110233/EPC/9910/2229 2013.1.31

87

D1504

Terminal blocks diagram of 6.6kV station switchgear


6.6kV

D1504 5

1110233/EPC/10719/2365 2013.2.22

88

D1505

Terminal blocks diagram of 6.6kV coal handling system


switchgear 6.6kV

D1505 5

1110233/EPC/9478/2108 2013.1.22

89

D1506

Terminal blocks diagram of 415V PCC in main power


building 415V PCC

D1506 5

1110233/EPC/10314/2306 08/02/2013

90

D1507

Terminal blocks diagram of 415V MCC in main power


building 415V MCC

D1507-01-02 5

1110233_EPC_10499 2335 2013.2.14

91

D1508

Terminal blocks diagram of 415V emergency system


415V

D1508 5

1110233/EPC/9478/2108 2013.1.22

92

D1509

Terminal blocks diagram of 415V ESP system section


415V

D1509 5

1110233/EPC/9478/2108 2013.1.22

93

D1510

Terminal blocks diagram of 415V coal handling system


section 415V

94

D1511

Terminal blocks diagram of 415V chemical water system


section 415V

D1511 5

1110233/EPC/9478/2108 2013.1.22

95

D1512

Terminal blocks diagram of 415V water supply system


section 415V

D1512 5

1110233/EPC/9478/2108 2013.1.22

96

D1513

Terminal blocks diagram of 415V water taking system


section out of plant 415V

97

D1514

Terminal blocks diagram of 415V fuel system section


415V

D1514 5

1110233/EPC/9478/2108 2013.1.22

98

D1515

Terminal blocks diagram of 415V ash handling system


section 415V

D1515 5

1110233/EPC/10084/2280 05/02/2013

99

D1516

100

D1601

D1601 5

1110233/EPC/7212/1677 2012.11.15

101

D1602

D1602 5

1110233/EPC/7212/1677 2012.11.15

102

D1603

D1603 5

1110233/EPC/7212/1677 2012.11.15

103

D1604

D1604 5

1110233/EPC/7212/1677 2012.11.15

104

D1605

Order drawing of power supply and control box

D1605 5

1110233/EPC/7212/1677 2012.11.15

105

D1606

Order drawing of lingting box,maintanence box & socket


box

D1606-01-02 1

1110233/EPC/9924/2243 2013.2.1

cable list for boiler - CCR - TG - section cable list for CCR,
TG AND FOR BOILER

VD-1110233-EL-0054 5

1110233_EPC_11909 2458 2013.3.16

cable list for boiler

VD-1110233-EL-0055 5

1110233_EPC_11916 2465 2013.3.16

106
107

VD-1110233-EL0054
VD-1110233-EL0055

Terminal blocks diagram of 415V switchgear in


administrative and technical building

Order drawing of relay panel


Order drawing of kilowatt hour meter and transducer
panel
Order drawing of water level control equipment

Order drawing of terminal box

D1513-00 5

1110233/EPC/10080/2276 05/02/2013


one by one examine and
approve state

one by one
approve letter & date

M0103-01 5

1110233/EPC/5469/1327 2012.9.17

M0201 1

1110233/EPC/9250/2092 2013.1.17

M0301-01 1

1110233/EPC/8986/2031 2013.1.8

M0303-01,02 1

1110233/EPC/10088/631 2012.3.27

Layout and erection drawing of No.5 conveyor


5

M0304-01,02 1

1110233/EPC/10088/632 2012.3.27

M0305

Layout and erection drawing of No.6 conveyor


6

M0305-01 1

1110233/EPC/8985/2030 2013.1.7

11

M0306

Layout and erection drawing of No.7 conveyor


7

M0306-01,02 1

1110233/EPC/10088/633 2012.3.27

12

M0307

M0307-01,02 5
M0307-01-02 5

1110233/EPC/9784/2209 2013.1.31
1110233/EPC/10094/2290 2013.2.7

13

M0308

M0308-00,01 1

1110233/EPC/10088/634 2012.3.27

14

M0309

Layout and erection drawing of No.10 conveyor


10

M0309-01,02 1
M0309-01,02 1

1110233/EPC/10088/635 2012.3.27
1110233/EPC/5614/1369 2012.9.18

15

M0401

Layout and erection drawing of No.2 transfer tower


2

M0401-01,02,tz01,tz02 2

1110233/EPC/9928/2247 2013.2.1

16

M0402

Layout and erection drawing of No.3 transfer tower


3

M0402-01-22 5

1110233/EPC/10097/2293 2013.2.7

17

M0403

Layout and erection drawing of No.4 transfer tower


4

M0403-01-22 5

1110233/EPC/10095/2291 07/02/2013

18

M0404

M0404-01-22 5

1110233/EPC/10096/2292 07/02/2013

19

M0405

m0405-01-02 1
M0405-01-11 5

1110233/EPC/2051/838 2012.6.11
1110233/EPC/5622/1377 2012.9.20

It
em

Volume

drawing Title

M0101

Section view of coal handling system and design instruction

M0102

M0103

M0201

M0202

M0301

M0302

M0303

M0304

10

Equipment list of coal handling system

Power plant identification system(KKS)--coal handling part


KKS-
Layout and erection drawing of stockpile & bucket wheel
stacker cum reclaimer

Layout and erection drawing of sprinkler in stockpile

Layout and erection drawing of No.2 conveyor


2
Layout and erection drawing of No.3 conveyor
3
Layout and erection drawing of No.4 conveyor
4

Layout and erection drawing of No.8 conveyor


8
Layout and erection drawing of No.9 conveyor
9

Layout and erection drawing of No.5 transfer tower


5
Layout and erection drawing of No.6 transfer tower
6

20

M0406

Layout and erection drawing of No.7 transfer tower


7

m0406-01-13 5

1110233/EPC/10313/2305 2013.2.8

21

M0407

Layout and erection drawing of bunker bay transfer towe

M0407-00-03 1
M0407-04-09 1

1110233/EPC/0020/655 2012.4.2
1110233/EPC/5164/1183 2012.9.10

22

M0501

Layout and erection drawing of crusher house

23

M0502

24

M0503

25

M0601

26

M0602

27

M0603

28

M0604

29

M0605

30

M0701

31

M0702

32

M0703

33

M0704

34

M0705

Layout and erection drawing of dust suppression spray in


belt conveyor

35

M0801

Layout drawing of bulldozer shed

M0801-01 2
M0801-01 5

1110233/EPC/3211/959 2012.7.18
1110233/EPC/9789/2214 2013.1.31

36

M0802

M0802-02 1
M0802-01-02 1

1110233/EPC/2072/849 2012.6.13
1110233/EPC/9786/2211 2013.1.31

37

M0901

38

M0902

Layout drawing of CHP complex building

Order drawing of conveyor

Order drawing of chutes

Erection drawing of roller screen

Erection drawing of crusher

M0501 2
M0501-01-16 5
M0502-01 5

1110233/EPC/9028/461 2012.2.22
1110233/EPC/10049/2266 04/02/2013
1110233/EPC/9788/2213 2013.1.31

M0503-01 5

1110233/EPC/9785/2210 2013.1.31

M0601-01-04 1

1110233/EPC/0014/656 2012.4.2

M0602-01-10 5

1110233/EPC/9902/2221 2013.1.31

M0603-00-02 1

1110233/EPC/0019/654 2012.4.2

Layout and erection drawing of electric drive double-side


plough

M0604-01-02 1

1110233/EPC/5379/1298 2012.9.14

Layout and erection drawing of motional circle chain and


belt scale

M0605-01-02 5

1110233/EPC/10036/2253 2013.2.1

Erection drawing of magnetic separator and metal detector

Erection drawing of sensor

Erection drawing of sampling device before power plant

Hydraulic cleaning instruction

Layout and erection drawing of clear water system

Layout and erection drawing of waste water system

Layout and erection drawing of dust suppression spray

A2

M0704-01-14 5

1110233/EPC/5519/1348 2012.9.17

It
em

Volume

drawing Title

K0101

K0102

K0103

4
5

K0104
K0105

General description and content


Plan layout drawing of central control room and electrical eqipment
room
Layout drawing of control console, panel

Power supply system drawing for I&C


Air supply system drawing for I&C

K0106

Layout drawing of field cabinets in main power building

K0107

Cable tray layout drawing of main power building,central control


building cable vault

8
9

K0108
K0109

I&C legend & code


Equipment list of I&C lab

10

K0110

I&C equipment list

11

K0111

I&C material list

DCS COAXIAL CABLE LENGTH LIST

12

K0112

13

K0113

14

K0301

15

K0302

16
17
18
19
20
21
22

K0303
K0304
K0305
K0306
K0307
K0308
K0309

one by one examine and


approve state

one by one
approve letter & date

K0101 5

1110233/EPC/7894/1850 2012.12.5

K0103-01,02 5

1110233/EPC/6575/1576 2012.10.18

K0104-01-06 5
K0105-01-05 5

1110233/EPC/10077/2273 04/02/2013
1110233/EPC/5925/1461 2012.10.3

K0106-01-11 5

1110233/EPC/3243/974 2012.7.23

K0107-01-09 2
k0107 A2

1110233/EPC/4055/1049 2012.8.7
1110233 /EPC/10720/2366 2013.2.22

K0108 5
K0109-01 5

K0111-02

3BCN811392E125601

1110233/EPC/8577/1977 2012.12.26
1110233/EPC/1936/814 2012.6.7

1110233/EPC/10088/2284 2013.2.6
1110233/EPC/10088/2284 2013.2.6

DCS ETHERNET CABLE LENGTH LIST

3BCN811392E125602

1110233/EPC/10088/2284 2013.2.6

DCS FIBER LENGTH LIST

3BCN811392E125603

1110233/EPC/10088/2284 2013.2.6

DCS SOE CABLE LENGTH LIST

3BCN811392E125604

1110233/EPC/10088/2284 2013.2.6

DCS HART CABLE LENGTH LIST

3BCN811392E125605

1110233/EPC/10088/2284 2013.2.6

I&C fire-fighting and fire-retardation drawing

Typical instrument hoop-up drawing


DCS configure drawing and design instruction DCS
DCS
DCS power and earthing drawingDCS

DCS I/O list of boilerDCS I/O


DCS I/O list of turbineDCS I/O
DCS I/O list of common systemDCS I/O
DCS cabinets CWD (1)DCS
DCS cabinets CWD (2)DCS
DCS cabinets CWD (3)DCS
DCS cabinets CWD (4)DCS

K0113-01-31 1

K0306-01,02 5
K0307-01 5
K0308-01 5
K0309-01 5

1110233/EPC/9920/2239 2013.1.18

1110233/EPC/8146/1916 2012.12.14
1110233/EPC/8146/1916 2012.12.14
1110233/EPC/8146/1916 2012.12.14
1110233/EPC/8146/1916 2012.12.14

23
24
25
26
27
28

K0310
K0311
K0312
K0313
K0314
K0315

DCS cabinets CWD (5)DCS


DCS cabinets CWD (6)DCS
DCS cabinets CWD (7)DCS
DCS cabinets CWD (8)DCS
DCS cabinets CWD (9)DCS
DCS cabinets CWD (10)DCS

K0310-01,02 5
K0311-01 5
K0312-01,02 5
K0313-01,02 5
K0314-01,02 5
K0315-01 5

1110233/EPC/8146/1916 2012.12.14
1110233/EPC/8146/1916 2012.12.14
1110233/EPC/8146/1916 2012.12.14
1110233/EPC/8146/1916 2012.12.14
1110233/EPC/8146/1916 2012.12.14
1110233/EPC/8146/1916 2012.12.14

29

K0401

CWD of control console, panel

K0401-01-05 5

1110233/EPC/6497/1572 2012.10.17

30

K0402

K0402-01-08 5

1110233/EPC/8149/1919 2012.12.14

31

K0403

32

K0404

I&C enclosure cabinet drawing

33

K0405

Drivers wiring drawing

34

K0406

I&C instrument wiring drawing

35

K0501

36
37
38
39

Power supply cabinet drawing for motor-operated valve

Power supply cabinet drawing for solenoid valve

K0403-01-10 5

1110233/EPC/10077/2273

04/02/2013

K0404-08-09 1

1110233/EPC/9920/2239 2013.1.18

K0405-02 1
K0406-03-06,10-12 5
K0406-13-15 5

1110233/EPC/6905/1629 2012.11.2
1110233/EPC/7683/1787 2012.11.29
1110233/EPC/7887/1843 2012.12.5

DEH CWD(DEH)

K0501 5

1110233/EPC/8575/1975 2012.12.26

K0502
K0503
K0504
K0505

TSI CWD(TSI)
ETS CWD(ETS)
Turbine junction box CWD
VMAS CWD

K0502 5

1110233/EPC/8573/1973 2012.12.26

40

K0506

Turbine BPS CWD

41
42
43

K0507
K0508
K0509

MEH CWDMEH
MTSI CWDMTSI
METS CWDMETS

K0507-01-04 5
K0508 5
K0509 5

1110233/EPC/9161/2076 2013.1.11
1110233/EPC/9248/2090 2013.1.17
1110233/EPC/8573/1973 2012.12.26

44

K0510

BFPT junction box CWD

k0510-01-09 5

1110233 EPC 10089 2285 2013.2.6

45

K0511

Feedwater pump junction box CWD

46

K0512

Turbine auxiliary equipment control device CWD

K0511-01-05 5
K0512-01-02,04-06 5
K0512-03 5

1110233/EPC/7101/1655 2012.11.9
1110233/EPC/7101/1655 2012.11.9
1110233/EPC/7490/1749 2012.11.26

47

K0513

Power supply cabinet for boiler soot blower CWD

K0513 5

1110233/EPC/6492/1561 2012.10.17

48

K0514

Air preheater proper control device CWD

K0514-01-05 5

1110233/EPC/6578/1579 2012.10.22

49

K0515

Boiler auxiliary equipment control device CWD

50

K0516

Hydrogen, oil and cooling water cabinet of generator CWD

K0504-01-11 5
A3

1110233/EPC/10077/2273
1110233/EPC/10077/2273

04/02/2013
04/02/2013

K0515-01-1116-2227-28 5

1110233/EPC/7490/1749 2012.11.26
1110233/EPC/7609/1767 2012.11.28
1110233/EPC/7344/1708 2012.10.20

K0516-01-09 5

1110233/EPC/6908/1632 2012.11.5

K0515-12-15,23-26 5
K0515-01 5

51

K0517

52

K0518

53
54

K0519
K0520

55

K0603

Boiler flame detection system CWD


BOILER TUBE LEAKAGE DETECTION SYSTEM CWD

Boiler industrial TV CWD


Boiler PCV valve control CWDPCV
Layout drawing of Ash handling system control room

Ash handling system control device CWD

56

K0604

57

K0605

58

K0607

59

K0702

60

K0703

61

K0705

Condensate polishing system control device CWD

62

K0707

SWAS control device CWD

63

K0708

64

K0710

65

K0712

66

K0713

Bottom ash handling system control device CWD

Coal mill reject handling control device CWD

DM water control system control device CWD

Layout drawing of water control room

Chemical dosing system control device CWD

Sea water desalination system control device CWD

Industrial waste water treatment system control device CWD

Generating chlorine by electrolyzing sea water system control


device CWD

K0517-01-07 5
K0517-01-07 5

1110233/EPC/6496/1571 2012.10.17
1110233/EPC/7259/1689 2012.11.19

K0518-01-07 5

1110233/EPC/6305/1526 2012.10.15

K0519 5
K0520-01-05 5

1110233/EPC/6308/1529 2012.10.15
1110233/EPC/6487/1556 2012.10.17

K0603 5

1110233/EPC/8984/2029 2013.1.7
1110233/EPC/7357/1721 2012.11.22
1110233/EPC/10086/2282 05/02/2013

K0604-03-58 5
K0604-01-02 5

K0605-01-10 5

1110233/EPC/6691/1639 2012.11.5

K0607 5

1110233/EPC/7492/1751 2012.11.26

K0702-01,06-23 5

1110233/EPC/7910/1866 2012.12.6

K0703-01 5

1110233/EPC/10083/2279 05/02/2013

K0705-01-05,07-13 5

1110233/EPC/8309/1938 2012.12.18

K0708-01-07 1

1110233/EPC/6905/1629 2012.11.2

K0710-01-25 5

1110233/EPC/8428/1955 2012.12.20

K0712-01-08,10-13
k0712-09 5

1110233/EPC/10078/2274 2013.2.5
1110233 EPC/11358/2416 2013.3.8

K0713-01-10,12-13 5
K0713-11 5

1110233/EPC/7614/1772 2012.11.28
1110233/EPC/7886/1842 2012.12.5

K0801-01-02,04-11,14-15 5
K0801-04,11,15 5
K0801-03 5
K0801-12-13 5

1110233/EPC/7432/1730 2012.11.22
1110233/EPC/8308/1937 2012.12.18
1110233/EPC/8577/1977 2012.12.26
1110233/EPC/9146/2061 2013.1.10

67

K0801

Circulating water pump house control device CWD

68

K0802

Comprehensive water system control device CWD

K0802-01 5

1110233/EPC/8577/1977 2012.12.26

69

K0804

Seawater make-up pump house control device CWD

K0804-01,03,10 5
K0804-04-09, 02,11 5

1110233/EPC/9261/2103 2013.1.18
1110233/EPC/8307/1936 2012.12.18

70

K0806

waste water system control device CWD

K0806 5

1110233/EPC/8983/2028 2013.1.7

71

K0807

Seawater pump house control device CWD

K0807-01-09 5

1110233/EPC/7853/1829 2012.12.4

72

K0808

Rain pump house control device CWD

K0808-01-09 5

1110233/EPC/7849/1825 2012.12.4

73

K0901

Compressor house control device CWD

K0901-01-08 1

1110233/EPC/7617/1775 2012.11.28

74

K0902

Fuel oil pump house control device CWD

K0902-01-09 5

1110233/EPC/7791/1803 2012.12.03

75
76

K0903
K0906

Hydrogen generation control device CWD


Turbine hall draft control device CWD

K0906 5

1110233/EPC/8983/2028 2013.1.7

77

K1002

Air conditioning system auto control CWD

K1002-01-07,09-1012 5
K1002-11 5 ; K1002-08
2

1110233/EPC/10315/2307 08/02/2013
1110233/EPC/11091/2393 2013.2.28

K1003

BOP PLC I/O PLC I/O list of BOP

78

K1004

Auxiliary system network control CWD

79

K1005

CCTV system control device CWD

80

K1006

CEMS CWDCEMS

81
82
83

K1301
K1302
K1303

bolier cable laying CWD


turbine cable laying CWD
BOP cable laying CWD

K1005 5

K1006-01-14 5

1110233/EPC/9754/2179 2013.1.29

1110233/EPC/10077/2273 2013.2.4

It
em

Volume

N0101

General description and content

N0102

Equipment list

N0103

Collective drawing for erection

N0104

Design instruction of KKS code -- HVAC part KKS

N0201

Ventilation for turbine hall

N0202

Ventilation and air conditioning for switchgear rooms of


Turbine hall

N0301

Refrigerating plant for CCB

N0302

Air conditioning system for central control room &


electronic equipment room

N0303

10

N0401

11

N0402

12

N0403

drawing Title

Ventilation and air conditioning system for electrical rooms


and chemical rooms of CCB

Dust extraction for bunker bay belt floor

one by one examine and


approve state

one by one
approve letter & date

N0101-01 1

1110233/EPC/6779/1614 2012.10.30

N0103-01-21 5

1110233/EPC/2250/881 2012.6.18

N0104 5

1110233/EPC/4473/1113 2012.8.21

N0201-01-07,15,16,20-24 1

1110233/EPC/7808/1820 2012.12.3

N0202-01,05,06,09-17 1
N0202-01-17 1

1110233/EPC/7265/1695 2012.11.19
1110233/EPC/8760/2020 2013.1.3

N0302-01-13 5
N0302-01-13 1
N0302-12 5

1110233/EPC/5525/1354 2012.9.18
1110233/EPC/9913/2232 2013.2.1
1110233/EPC/9919/2238 2013.2.1

N0303-01-19 1

1110233 EPC 9782 2207 2013.1.30

N0401-01-08 1

1110233/EPC/6783/1618 2012.10.30

Dust extraction for bunker bay transfer tower

N0402-01-10 1

1110233/EPC/6785/1620 2012.10.30

Dust extraction for Crusher house

N0403 5
N0403-01-08 5

1110233/EPC/5381/1300 2012.9.14
1110233_EPC_11678 2422 2013.3.8
1110233/EPC/5463/1321 2012.9.14
1110233_EPC/11350/2408 2013.3.5
1110233_EPC/11353/2411 2013.3.5
1110233_EPC_11689 2433 2013.3.12

13

N0404

Dust extraction for No. 7 transfer tower 7

N0404-01-11 5
N0404-01,04-11 5
N0404-03 5
N0404-02 5

14

N0405

Dust extraction for No. 6 transfer tower 6

N0405-01-10 5

1110233/EPC/5307/1267 2012.9.12

15

N0406

Dust extraction for No. 3 transfer tower 3

N0406-01-11 1

1110233/EPC/6786/1621 2012.10.30

16

N0407

Dust extraction for No. 4 transfer tower 4

N0407-01-11 1

1110233/EPC/6787/1622 2012.10.30

17

N0408

Dust extraction for No. 5 transfer tower 5

N0408-01-11 1

1110233/EPC/6788/1623 2012.10.31

18

N0409

Dust extraction for No. 2 transfer tower 2

19

N0410

Ventilation and air conditioning system for CHP complex


building

N0410-01-08 1

1110233/EPC/6692/1640 2012.11.7

20

N0501

Ventilation and air conditioning for DM water treatment


room, assay building and sea water desalination plant

N0501,01-10 1

1110233/EPC/6777/1622 2012.10.29

21

N0502

Ventilation and air conditioning for hydrogen storage room

N0502,01-04 1

1110233/EPC/5023/1135 2012.9.5

22

N0503

Ventilation for acid & alkali transfer pump room

N0503,01-03 1

1110233-EPC_6644-1586 2012.10.26

23

N0504

Ventilation and air conditioning for waste water treatment


station

N0504-01-04 1

1110233/EPC/7675/1779 2012.11.29

24

N0505

Ventilation and air conditioning for generating chlorine by


electrolyzing sea water room

N0505-01-05 1

1110233-EPC_6643-1585 2012.10.25

25

N0506

Ventilation and air conditioning for CPU regenration


building

N0506-01-03 1

1110233/EPC/9709/2169 2013.1.28

26

N0601

Ventilation and air conditioning for control room of weight


bridge

27

N0602

Ventilation and air conditioning for elevator machine room


of main power building

N0602,01-03 1

1110233/EPC/6774/1609 2012.10.29

28

N0603

Ventilation for auxiliary boiler house

29

N0604

Ventilation and air conditioning for fuel oil pump house

N0604,01-05 1

1110233/EPC/9159/2074 2013.1.11

30

N0605

Ventilation for 400kV GIS indoor 400kVGIS

N0605,01-04 1

1110233/EPC/7088/1642 2012.11.9

31

N0606

Ventilation and air conditioning for network control


building

N0606-01-09 1

1110233/EPC/9917/2236

32

N0607

N0607-01-06 1

1110233/EPC/6692/1640 2012.11.7

33

N0608

N0608-01,05-08,11,13 5
N0608-02-04,09,10,12,14,15 5

1110233/EPC/6692/1640 2012.11.7
1110233/EPC/7346/1710 2012.11.20

34

N0609

35

N0610

Cooling and ventilation for Ash slurry pump house

36

N0611

37

N0612

Ventilation and air conditioning for 6.6kV public switch


room 6.6kV
Ventilation and air conditioning for switchgear room of
ESP and air compressor house

Ventilation and air conditioning for control room of fly ash


silo

2013.2.1

N0609-01-03 2
N0609-01-04 1

1110233/EPC/3807/1007 2012.7.27
1110233/EPC/9914/2233 2013.2.1.

Ventilation and air conditioning for CWP house

N0611,01-04 1

1110233/EPC/6499/1574 2012.10.17

Ventilation and air conditioning for comprehensive water


pump house

N0612,01-03 1

1110233/EPC/7205/1670 2012.11.15

Ventilation for seawater drainage pump house

N0613,01-05 1

1110233/EPC/8144/1914 2012.12.14

Ventilation for foam storage tank house

Ventilation and Air conditioning system for coal and oil


waste water treatment house

Ventilation and air conditioning for seawater make up pump


house

N0615,01-03 1

1110233/EPC/5024/1136 2012.9.5

N0616,01-23 1

1110233/EPC/6647/1589 2012.10.25

N0617

Cooling and ventilation for recycling water pump house

Cooling and ventilation for switchgear room for sea water

N0617-01-03 1

1110233/EPC/9501/2131 2013.1.24

43

N0618

makeup plant

N0618-01-05 1

1110233/EPC/8745/2005 2012.12.31

44

N0619

Ventilation and air conditioning for rain drainage pump


house

N0619,01-03 1

1110233/EPC/5529/1358 2012.9.18

45

N0620

Cooling and ventilation for ash water recycling pump house


for ash pond

N0620-01-04 1

46

N0701

47

N0702

N0702-01-04 1

1110233/EPC/9503/2133 2013.1.24

48

N0703

Ventilation and air conditioning for service building

Ventilation and air conditioning for workshop

Ventilation for workshop of bulldozer shed

N0703,01-03 1

1110233/EPC/6692/1640 2012.11.7

49

N0704

Ventilation and air conditioning for store

N0704-01-03 1

1110233/EPC/9500/2130 2013.1.24

38

N0613

39

N0614

40

N0615

41

N0616

42

1110233/EPC/9908/2227

2013.1.31


one by one examine and
approve state

one by one
approve letter & date

C0102-01-04,06-10 1

C0105-01 1

1110233/EPC/3964/1032 2012.8.2

C0201-01-03 5

1110233/EPC/9929/2248 2013.2.1

It
em

Volume

C0101

General description and content

C0102

System diagram and layout drawing

C0103

C0104

C0105

C0201

C0202

C0203

C0301

10

C0302

Erection drawing of equipment for ash water


recirculation pump house

11

C0303

Layout and erection drawing of slurry piping in ash


water recirculation pump house

12

C0304

Layout and erection drawing of balance piping in ash


water recirculation pump house

13

C0401

General layout drawing of compressor house

C0401-01,02 5

1110233/EPC/8738/1998 2012.12.31

14

C0402

Erection drawing of equipment in compressor house

C402-01-05 5

1110233/EPC/9602/2136 2013.1.24

15

C0403

Layout and erection drawing of compressed air piping


in ash handling compressor house

drawing Title

List of equipment and main material

Heat insulation and paint

Power plant identification system(KKS)--ash handling


part
KKS-
General layout drawing for BA handling system in
boiler area
Erection drawing of equipment for BA handling system
in boiler area

Layout and erection drawing of piping for BA handling


system in boiler area

General layout drawing for ash water recirculation


pump house

C0202-01,03 1
C0202-01 -03 5

1110233/EPC/5899/1435 2012.9.29
1110233/EPC/10037/2254 2013.2.1

C0301-01-03 5

1110233/EPC/9906/2225 2013.1.31

C0304,01,02(1),02(2) 5

C0403-03-12 5
C0403-01,02 5

1110233/EPC/9603/2137 2013.1.24

16

C0404

Layout and erection drawing of balance piping in ash


handling compressor house

17

C0501

General layout drawing of fly ash handling in boiler


area

18

C0502

19

C0404-01-06 5

1110233/EPC/9604/2138 2013.1.24

Layout and erection drawing of piping for fly ash


handling system under Economizer

C0502-03-06 5

1110233/EPC/4767/1196 2012.9.29

C0503

Layout and erection drawing of conveying equipment


& piping for fly ash handling system under Air Heater

C0503-03-06 5

1110233/EPC/4768/1197 2012.8.29

20

C0601

General layout drawing of fly ash handling in


precipitator area

21

C0602

Erection drawing of conveying equipment for fly ash


handling system in precipitator area

C0602-03-06 1

1110233/EPC/9932/607 2012.3.20

C0603-04-07 1

CNT 1110233/EPC/4155/1 067 2012.8.9

22

C0603

Layout and erection drawing of air piping for fly ash


handling system in precipitator area

23

C0604

Layout and erection drawing of equipment and piping


for ash hopper fluidizing system in precipitator area

C0604-01-09 5

1110233/EPC/10508/2344 2013.2.15

24

C0701

General layout drawing for FA silo

C0701-01-04 5

1110233/EPC/9901/2220 2013.1.31

25

C0702

Erection drawing of equipment on top of FA silo

C0702-03-05,07-09,11 1
C0702-01-03,05-06,09-10 5

1110233/EPC/4261/1080 2012.8.13
1110233/EPC/9899/2218 2013.1.31

26

C0703

Layout and erection drawing of FA conveying piping


for FA silo

C0703-08 1
C0703-01-07 5

1110233/EPC/10047/2264 2013.2.4

27

C0704

Layout and erection drawing of fluidizing trough for FA


silo

28

C0705

Layout and erection drawing of fluidizing equipment


and piping for FA silo

29

C0706

Layout and erection drawing of dry type unloading


equipment and piping for FA silo

30

C0707

Layout and erection drawing of wet type unloading


equipment and piping for FA silo

31

C0708

Layout and erection drawing of balance piping for FA


silo

C0704-01,02 1
C0704-01-03 5

1110233/EPC/9931/606 2012.3.20
1110233/EPC/9900/2219 2013.1.31

C0705-05-09 1

1110233/EPC/4265/1084 2012.8.2

C0706-01-03 5
C0706-06 5

C0707-01-02,04 1
C0707-03-04 5
C0708-07-12 5

1110233/EPC/9930/2249 2013.2.1
1110233/EPC/11088/2390 2013.2.27
1110233/EPC/4161/1 073 2012.12.28
1110233/EPC/10038/2255 2013.2.1
1110233/EPC/4823/1108 2012.8.31

32

C0709

Layout and erection drawing of equipment piping for


hydraulic FA ash handling system

33

C0801

General layout drawing of coal mill reject handling


system

34

C0802

Erection drawing of equipment for coal mill reject


handling system

35

C0803

Layout and erection drawing of conveying piping for


coal mill reject handling system

36

C0804

Layout and erection drawing of balance piping for coal


mill reject handling system

37

C0901

Layout and erection drawing of piping in plant area


part 1 1

38

C0902

Layout and erection drawing of piping in plant area


part 2 2

39
40
41
42
43

C0903
C0904
C0905
C0906
C0907

C0709-04-07 5
C0709-01-05 5

1110233/EPC/4824/1109 2012.8.31
1110233/EPC/11081/2383 2013.2.27

C0804-03-11 5

1110233/EPC/5066/1160 2012.9.6

C0907-02-04 5

1110233_EPC_11911 2460 2013.3.15