Beruflich Dokumente
Kultur Dokumente
Escaleras
Definiciones
0.25 kg/m
0.56 kg/m
1.02 kg/m
1.56 kg/m
2.24 kg/m
4.04 kg/m
Recomendaciones previas
Metrado de zapatas
1.00x1.20 m. (h=0.60m.)
8f 5/8
Zapata Z1:
NFZ -1.40
1. Excavacin
6f 5/8
2. Solado
3. Instalacin acero de zapatas
4. Izaje de acero de columnas
NNT +0.00
0.60
0.10
10
11
Metrado de zapatas
NNT +0.00
1.00x1.20 m. (h=0.60m.)
8f 5/8
NFZ -1.40
h =1.50
0.80
a =1.00
6f 5/8
0.60
h =0.60
0.10
b = 1.20 m
f 5/8 L = 20 cm
f 3/4 L = 25 cm
12
Metrado de zapatas
PLANTILLA PARA METRADOS
a (m)
b (m)
ELEMENTO
PARTIDA
ZAPATA 1
Excavacin
1.00
1.20
Solado
1.00
1.20
Encofrado
1.00
1.20
Concreto
1.00
1.20
perim (m)
h (m)
Area (m2)
1.50
Vol (m3)
1.80
1.20
4.40
0.60
0.60
Excavacin:
1.80 m3
Solado:
1.20 m2
Encofrado:
Concreto:
0.72 m3
2.64
0.72
13
Metrado de zapatas
PLANTILLA PARA METRADOS DE ACERO
ELEMENTO
Despiece
ZAPATA 1 (1.00x1.20)
N elem
1
2
l (m)
Ltotal (m)
1/4"
3/8"
1/2"
5/8"
0.86
6.88
6.88
1.06
6.36
6.36
3/4"
1"
8f5/8
6f5/8 2
L total
(m)
Factor (Kg/ml)
Recubrimiento r = 7 cm
Peso
(Kg)
13.24
0.25
0.56
1.02
1.56
2.24
4.04
20.65
r
8f 5/8
Para 1 :
Para 2 :
6f 5/8
14
Metrado de columnas
Columna C1: (25x50 cm.)
DETALLE DE NUDOS
4f3/4+4f5/8
COLUMNA
f3/8 @ .20
1@ .05 + 5@.10
DATOS:
VIGA
@ .10
N pisos: 2
H entrepiso: 2.60 m.
1@ .05 + 5@.10
15
H/6
Le
2H/3
Le
H/6
16
LOS ESTRIBOS
17
18
Metrado de columnas
N +5.30
VIGA
(.25x.50)
N +4.80
4f3/4+4f5/8
6
N +4.25
2.60
f3/8 @ .20
4
N +3.25
6
N +2.70
VIGA
(.25x.50)
4
N +2.20
6
N +1.65
2.60
4
N +0.65
6
NFP +0.10
0.90
0.60
NFZ -1.40
19
Metrado de columnas
PLANTILLA PARA METRADOS
ELEMENTO
PARTIDA
COLUMNA 1 Concreto
Encofrado
a (m)
b (m)
0.25
0.50
0.25
0.50
perim (m)
h (m)
Area (m2)
6.10
1.50
5.10
Vol (m3)
0.76
7.65
20
Metrado de columnas
PLANTILLA PARA METRADOS DE ACERO
ELEMENTO
Despiece
COLUMNA 1 (.25x.50)
1
4f3/4"
4f5/8"
N elem
l (m)
Ltotal (m)
1/4"
3/8"
7.10
28.4
7.10
28.4
2.32
49
113.68
113.68
(m)
113.68
1/2"
5/8"
3/4"
1"
28.40
28.40
3
.13
7
.17
.42
L total
Factor (Kg/ml)
Peso
(Kg)
0.25
0.56
63.66
1.02
28.40
28.40
1.56
2.24
44.30
63.62
4.04
21
Metrado de vigas
22
Metrado de vigas
23
24
25
26
27
28
Ubicacin de Tapas
29
Metrado de vigas
b (m)
ELEMENTO
PARTIDA
VIGA V-2
Concreto
0.25
0.50
Encofrado
0.25
0.30
Concreto:
0.90 m3
Encofrado:
6.67 m2
perim (m)
L (m)
Area (m2)
7.20
0.85
7.85
Vol (m3)
0.90
6.67
Metrado de vigas
PLANTILLA PARA METRADOS DE ACERO
ELEMENTO
Despiece N elem
1
l (m)
Ltotal (m)
8mm
3/8"
1/2"
5/8"
9.94
39.76
39.76
6.27
25.08
25.08
9.74
38.96
38.96
1.52
34
103.36
1.52
21.28
3/4"
1"
103.36
21.28
.19
4
.13
.44
L total
(m)
Factor (Kg/ml)
Peso
(Kg)
103.36
21.28
0.40
0.56
41.34
11.92
103.80
1.02
1.56
2.24
4.04
161.93
31
3.80
3.90 m
32
33
Vol.concreto= (0.40x0.05 +
0.10x0.15)2.5 = 0.0875 m3
Nladrillos= (100/30)2.5 = 8.33 und.
.05
.15
0.40
0.40
0.20
34
Despiece N elem
LOSA ALIGERADA
1f1/2"
1f3/8"
1
2
1f3/8"
1f3/8"
l (m)
Ltotal (m)
8mm
3/8"
8.49
76.41
1.07
9.63
9.63
1.55
13.95
13.95
2.15
19.35
19.35
1.07
9.63
9.63
1/2"
5/8"
3/4"
1"
76.41
1f3/8"
5
L total
(m)
Factor (Kg/ml)
Peso
(Kg)
0.40
52.56
76.41
0.56
1.02
29.43
77.94
1.56
2.24
4.04
36