Sie sind auf Seite 1von 17

DOC. No.

JOB No.

S-900-13A0-005

0-5151-20
DATE

28

Rev.

Jul

2011 SHEET

PREPD

A. Alvero

CHKD

K. Horikiri

APP'D

M. Sakai

4
1

OF

17

SPECIFICATION FOR WRAPPING TAPE


OF UNDERGROUND STEEL PIPE

Donggi Senoro LNG Project

FOR CONSTRUCTION

REV.

Date

Page

DESCRIPTION

PRED

CHKD

APPD

A1

11 Oct 07

All

For Deliverable

N.B.

K.T.

M.S.

28 Jul 2011

All

For Review

A. Alvero

K. Horikiri

M. Sakai

09 Sep 2011

All

For Construction (As per Clients Comments)

A. Alvero

K. Horikiri

M. Sakai

21 Mar 2012

All

For Construction (Added Insulation for U/G)

A. Alvero T. Imashiro M. Sakai

22 May 2012

All

For Construction

A. Alvero T. Imashiro M. Sakai

14 Feb 2013

For Construction (Added Electrical in Para. 3.3 (7))

A. Alvero T. Imashiro M. Sakai

A
R
D
13
0
2
N
B
I 15-FE

DSLNG Project

Job No. :
Doc. No. :

SPECIFICATION FOR WRAPPING TAPE OF


UNDERGROUND STEEL PIPE

0-5151-20
S-900-13A0-005 < Rev. 4>
SHEET 2 OF 17

Contents
1

GENERAL........................................................................................................................................ 3

REFERENCE DOCUMENT............................................................................................................. 3

WRAPPING SYSTEM ..................................................................................................................... 3


3.1
3.2
3.3
3.4
3.5

Acceptable Wrapping Materials .................................................................................................. 3


Handling and Storage of Materials.............................................................................................. 4
Application Procedure ................................................................................................................ 4
Repairs of Wrapping................................................................................................................... 6
Inspection for Wrapping Work..................................................................................................... 7

ATTACHMENT-1 .................................................................................................................................... 8
ATTACHMENT-2 ..................................................................................................................................17

A
R
D
13
0
2
N
B
I 15-FE

DSLNG Project

Job No. :
Doc. No. :

SPECIFICATION FOR WRAPPING TAPE OF


UNDERGROUND STEEL PIPE

0-5151-20
S-900-13A0-005 < Rev. 4>
SHEET 3 OF 17

GENERAL
This specification covers the minimum requirements for external corrosion protection for
underground carbon steel, stainless steel and galvanized steel piping for the Donggi-Senoro
LNG Project at field.

REFERENCE DOCUMENT
The requirements contained in the latest editions of the following standards shall form a part
of this specification, in the manner and to the extent indicated herein:
(1)

SSPC: Steel Structures Painting Council Volume 2, Systems and Specifications:


Chapter 2.0

(2)

NACE RP0274: High Voltage Electrical Inspection of Pipeline Coatings Prior to


Installation

WRAPPING SYSTEM

3.1

Acceptable Wrapping Materials


(1)

Priming for Tape Wrapping


Polyken Primer No. 1027 or equivalent
The primers consist of butyl based elastomers blended with polymeric resins dissolved
in an organic solvent system. The primer shall be capable of withstanding continuous
heat exposure to temperature range up to 85 C.

(2)

Mastic and Mastic Strip


Polyken No. 939 Polyethylene or equivalent
50 mm wide tape is preferable.
The mastic and mastic strip shall be capable of withstanding continuous heat
exposure to temperature range up to 85 C.

(3)

Inner Wrapping for pipes and welding connections


Polyken No. 980 Polyethylene or equivalent
50 mm, 100 mm or 150 mm wide tape is preferable.
Standard thickness is 20 mils (0.500 mm)
The inner wrapping for pipes and welding connections shall be capable of
withstanding continuous heat exposure to temperature range up to 85 C.

(4)

Inner Wrapping for flanges, valves and other fittings


Polyken No. 930 Polyethylene or equivalent
50 mm or 100 mm wide tape is preferable.
Standard thickness is 35 mils (0.889 mm)
The inner wrapping for flanges, valves and other fittings shall be capable of
withstanding continuous heat exposure to temperature range up to 66 C.

(5)

Outer Wrapping for pipes and welding connections


Polyken No. 955 Polyethylene or equivalent

A
R
D
13
0
2
N
B
I 15-FE

DSLNG Project

Job No. :
Doc. No. :

SPECIFICATION FOR WRAPPING TAPE OF


UNDERGROUND STEEL PIPE

0-5151-20
S-900-13A0-005 < Rev. 4>
SHEET 4 OF 17

50 mm, 100 mm or 150 mm wide tape is preferable.


Standard thickness is 20 mils (0.500 mm)
The outer wrapping for pipes and welding connections shall be capable of
withstanding continuous heat exposure to temperature range up to 85 C.
(6)

Outer Wrapping for flanges, valves and other fittings


Polyken No. 954 or No. 955 Polyethylene, or equivalent50 mm or 100 mm wide tape is
preferable.
Standard thickness is 15 mils (0.381 mm)
The outer wrapping for flanges, valves and other fittings shall be capable of
withstanding continuous heat exposure to temperature range up to 85 C.

(7)

Insulation Tape and Adhesive Tape


Sekisui insulation heat-retention tape HT5CW or equivalent.
Standard thickness is 5mm, 75mm wide tape is preferable.
Sekisui adhesive tape NLT-30T/50T or equivalent.
Standard thickness is 0.2mm, 30mm or 50mm wide tape is preferable.

3.2

Handling and Storage of Materials


(1)

Handling
Use of hooks, ropes of any kind, chains, cable or other sharp devices shall not be
permitted when transferred the wrapping tape. Coated and wrapped pipe shall be
handled at all time with wide non-abrasive canvas or leather belts, or other equipment
designed to prevent damage to coating.

(2)

Storage
All the wrapping materials shall be stored in accordance with the manufacturer's
specification.

3.3

Application Procedure
The procedure for applying wrapping materials to each part of the piping assemblies is
drawn on the sketches attached hereunder.
Details shall be referred Fig. 1 to 8 of Attachment-1.
(1)

A
R
D
13
0
2
N
B
I 15-FE

General
(a)

The wrapping work on the welding points shall be performed after the test for
piping is completed.

(b)

Wrapping work shall not be done when it is rainy, dusty, freezing, or in such
weather as will adversely affect the wrapping work, (except where protective
facilities and sufficient protections are provided).

(c)

Rolls of wrapping tape can be applied by means of suitable mechanical


wrapping equipment or hand application as approved by the tape manufacturer.
Sufficient tension shall be applied to ensure complete conformability and
intimate adhesion of the tape to the surface and to avoid air pocket.

DSLNG Project

Job No. :
Doc. No. :

SPECIFICATION FOR WRAPPING TAPE OF


UNDERGROUND STEEL PIPE

(2)

0-5151-20
S-900-13A0-005 < Rev. 4>
SHEET 5 OF 17

Surface Preparation
(a) Carbon Steel and Stainless Steel
Carbon steel and stainless steel surface of pipes, fittings and field welds shall be
cleaned by power tool to SSPC-SP 3 combined with hand tool to SSPC-SP 2. Weld
spatters, projections, sharp edges or indentations, burrs shall be ground smooth. Oil,
grease, and other contaminants shall be removed by a suitable solvent according to
SSPC-SP 1. Salt contamination, chemical cleaning agents and remaining detergents
shall be washed off using potable water. Cleaned field welds do not require paint
priming before the application of the tape primer and wrapping. Steel surface of pipes
shall be cleaned and dry prior to primer application.
The application of the tape primer and wrapping shall be in accordance with the
respective procedures listed below and may be supplemented with the Manufacturers
application procedure.
(b) Galvanized Steel
Oil, grease, and other contaminants shall be removed by a suitable solvent according
to SSPC-SP 1. Salt contamination, chemical cleaning agents and remaining
detergents shall be washed off using potable water. Cleaned field welds do not require
paint priming before the application of the tape primer and wrapping. Steel surface of
pipes shall be cleaned and dry prior to primer application.

(3)

Priming
The surface of the pipes shall be cleaned and dried prior to primer application.
Immediately after cleaning and dry by surface preparation, brush applies tape primer
or with roller-spreader in accordance with manufacturers recommendations. Rate of
primer application shall be from 0.1-0.2L/m2. Primer shall be applied to a uniform
thickness and shall be free of floods, runs, sags and drips. The primer shall be tacky to
dry at the time the tape is applied.

(4)

Tamping of Filler Materials


Mastic and mastic strip shall be used for filling the gaps and molding of the irregular
shapes of underground pipes, such as parts around the bolts and nuts on the flange
connection, valve, etc. (Refer to Fig. 4 and 5)
Mastic strip shall be put between wrapped piping and supports for protection of the
wrapped piping (Refer to Fig. 6).

(5)

Innerwrap Tape Wrapping


Wrapping of innerwrap tape shall be conducted when the primer has been half-dried.
Wrapping shall be completed where the primer paste has been coated on that day,
and the primer-coated surface shall not be left without wrapping to the following day.
(a)

A
R
D
13
0
2
N
B
I 15-FE

Straight pipes, elbows and tees, etc. (Refer to Fig. 1, 2 and 3)

Tape shall be applied spirally with a minimum overlap of 50 percent.

The tape shall be applied to ensure uniformity of tension and spiral direction
duringapplication by manual or using wrapping tools.

DSLNG Project

Job No. :
Doc. No. :

SPECIFICATION FOR WRAPPING TAPE OF


UNDERGROUND STEEL PIPE

(b)

0-5151-20
S-900-13A0-005 < Rev. 4>
SHEET 6 OF 17

Basically apply in double layer, completely overlapping tape on the starting


andending portions of the piping. The tape wrapping shall be finished on the
side of the piping where the end of the tape faces downwards (Refer to Fig.
1). These ends shall be cut using cutters or knives.

Flanges, valves and other fittings (Refer to Fig. 4 and 5)


Cut tape to adequate lengths according to the configurations of the surfaces to
be wrapped, and apply these pieces of the tape to the surfaces tightly according
to the overlapping allowance specified in the manufacturer's specification.

(c)

Welding connections (Refer to Fig. 7)


Apply in single layer, 100 mm wide tape to the weld line tightly as stretching it.
Subsequently, the same wrapping procedure as that for straight pipes, elbows
and tees shall be applied.

(d)

Through the wall (Refer to Fig. 8)


After the straight pipe is wrapped as aforesaid, insert the said wrapped pipe into
the penetration hole and fix the pipe in position. Clearance between the pipe and
the hole shall be filled with mastic or materials instructed by company.

(e)

Riser portion
Wrapping shall be applied to the riser portions of the underground piping (incl.
pipes, elbows, tees, flanges, valves and other fittings) up to 300 mm from
ground level. Tape shall be wrapped upward from the bottom of the piping.

(6)

Outerwrap Tape Wrapping


In a similar manner to the above, stretch the outerwrap tape and wrap it tightly and
uniformly around the surfaces of the innerwrap tape on straight pipes, elbows, flanges,
valves and other fittings, etc., with a minimum overlap of 50 percent.

(7)

3.4

Where a clearance between underground Hot Oil Piping and Electrical Cables is less
than 600 mm, insulation tape shall be applied with 10mm thickness and overlap of a
minimum 50 percent on wrapping tape. Subsequently adhesive tape shall be wrapped
tightly on insulation tape uniformly. (Refer to Fig. 9).

Repairs of Wrapping
Small defects or damage on the wrapping shall be repaired as follows:
(1)

(2)

A
R
D
13
0
2
N
B
I 15-FE

The outer and inner wraps around the damaged area shall be removed and clean to
the bare steel surface. Apply primer immediately to the bare steel surface and patch
with the inner wraps while the primer is tacky. The patch shall overlap by at least 100
mm on each side over the repair area. Apply primer over the patch area and
circumferential repair area and finish it with the spiral wrap.
The repair procedure shall be reviewed and approved by the Contractor before
starting the repair work. The repair procedure shall be in accordance with the wrapping
tape manufacturers instruction.

DSLNG Project

Job No. :
Doc. No. :

SPECIFICATION FOR WRAPPING TAPE OF


UNDERGROUND STEEL PIPE

(3)

3.5

A
R
D
13
0
2
N
B
I 15-FE

0-5151-20
S-900-13A0-005 < Rev. 4>
SHEET 7 OF 17

The repaired location, inspection, etc. shall be recorded.

Inspection for Wrapping Work


(1)

A holiday test shall be carried out using an adjustable high voltage holiday tester by
applying in accordance with NACE RP0274. The test voltage shall be checked at least
once per shift using a special high voltage meter. When the holiday test is carried out
the external pipe surface shall be free of moisture. The electrode shall be moved over
the pipe surface with a speed not more than 0.3 meters per second. Holiday test shall
be performed on completely wrapped piping system. Any defects shall be repaired in
accordance with paragraph 3.4. The whole surface shall be visually inspected. A
general form of field inspection check list is shown in Attachment 2.

(2)

Contractor inspection shall include, but not be limited to:


(a)

Receipt and correct storage of coating materials (primer, filler, innerwrap tape
and outerwrap tape)

(b)

Standard of cleaning of substrates immediately prior to surface preparation

(c)

Dew point and surface temperature during surface preparation and coating
operations

(d)

Surface preparation standard

(e)

Metal defects, dust, and surface debris, on the surface after surface preparation

(f)

Uniformity of coatings

(g)

Holiday detection

(h)

Coating defects and their correct repair

(i)

Correct calibration of inspection instruments

DSLNG Project

Job No. :
Doc. No. :

SPECIFICATION FOR WRAPPING TAPE OF


UNDERGROUND STEEL PIPE

0-5151-20
S-900-13A0-005 < Rev. 4>
SHEET 8 OF 17

ATTACHMENT-1

Note: The tape shall be applied spirally with a minimum overlap of 50 percent.
Fig. 1 UNDERGROUND PIPING (STRAIGHT PIPE)

A
R
D
13
0
2
N
B
I 15-FE

DSLNG Project

Job No. :
Doc. No. :

SPECIFICATION FOR WRAPPING TAPE OF


UNDERGROUND STEEL PIPE

Fig. 2 UNDERGROUND PIPING (ELBOW)

A
R
D
13
0
2
N
B
I 15-FE

0-5151-20
S-900-13A0-005 < Rev. 4>
SHEET 9 OF 17

DSLNG Project

Job No. :
Doc. No. :

SPECIFICATION FOR WRAPPING TAPE OF


UNDERGROUND STEEL PIPE

Fig. 3 UNDERGROUND PIPING (TEES)

A
R
D
13
0
2
N
B
I 15-FE

0-5151-20
S-900-13A0-005 < Rev. 4>
SHEET 10 OF 17

DSLNG Project

Job No. :
Doc. No. :

SPECIFICATION FOR WRAPPING TAPE OF


UNDERGROUND STEEL PIPE

Fig. 4 UNDERGROUND PIPING (FLANGE)

A
R
D
13
0
2
N
B
I 15-FE

0-5151-20
S-900-13A0-005 < Rev. 4>
SHEET 11 OF 17

DSLNG Project

Job No. :
Doc. No. :

SPECIFICATION FOR WRAPPING TAPE OF


UNDERGROUND STEEL PIPE

0-5151-20
S-900-13A0-005 < Rev. 4>
SHEET 12 OF 17

Fig. 5 UNDERGROUND PIPING (VALVES)

A
R
D
13
0
2
N
B
I 15-FE

DSLNG Project

Job No. :
Doc. No. :

SPECIFICATION FOR WRAPPING TAPE OF


UNDERGROUND STEEL PIPE

0-5151-20
S-900-13A0-005 < Rev. 4>
SHEET 13 OF 17

Fig. 6 UNDERGROUND PIPING (SUPPORTS)

A
R
D
13
0
2
N
B
I 15-FE

DSLNG Project

Job No. :
Doc. No. :

SPECIFICATION FOR WRAPPING TAPE OF


UNDERGROUND STEEL PIPE

0-5151-20
S-900-13A0-005 < Rev. 4>
SHEET 14 OF 17

Fig. 7 UNDERGROUND PIPING (WELDING POINT)

A
R
D
13
0
2
N
B
I 15-FE

DSLNG Project

Job No. :
Doc. No. :

SPECIFICATION FOR WRAPPING TAPE OF


UNDERGROUND STEEL PIPE

0-5151-20
S-900-13A0-005 < Rev. 4>
SHEET 15 OF 17

Note: Clearance between the pipe and the walls hole shall be filled with mastic or materials
instructed by the company.
Fig. 8 UNDERGROUND PIPING (THROUGH THE WALL)

A
R
D
13
0
2
N
B
I 15-FE

DSLNG Project

Job No. :
Doc. No. :

0-5151-20
S-900-13A0-005 < Rev. 4>
SHEET 16 OF 17

SPECIFICATION FOR WRAPPING TAPE OF


UNDERGROUND STEEL PIPE

Wrapping Tape
Pipe

Insulation Tape
(10mm)

Adhesive Tape

A-A Section

Wrapping Tape

A
Pipe

Note 1)
2)

Overwrap Insulation Tape

The Insulation tape shall be applied with 10mm thickness and overlap of 50 percent on
wrapping tape.
Subsequently adhesive tape shall be applied on Insulation tape.

Fig. 9 UNDERGROUND INSULATION FOR HOT OIL PIPE

A
R
D
13
0
2
N
B
I 15-FE

DSLNG Project

Job No. :
Doc. No. :

0-5151-20
S-900-13A0-005 < Rev. 4>
SHEET 17 OF 17

SPECIFICATION FOR WRAPPING TAPE OF


UNDERGROUND STEEL PIPE

ATTACHMENT-2
INSPECTION REPORT FOR WRAPPING
Document No.

Sheet No.

Job No.:

0-5151-20

Company:

PT Donggi Senoro LNG

Project Name:

Donggi Senoro LNG Project

Area of Unit:
Line Number:
Condition
Item

Surface
Preparation

Spec

Holiday Test
Visual

Atmos-

Substrate

pheric

Surface

Relative

Temp

Temp

Humidity

(C)

(C)

(%)

Inspection
Weather

Sat

SSPC-SP3
combine
with
SSPC-SP2

Unsat

Voltage:

Date

Remarks

Remaining

Sat

Unsat

N.A.

N.A.

N.A.

N.A.

N.A.

N.A.

N.A.

N.A.

N.A.

N.A.

N.A.

N.A.

Holidays

Mastic

Primer

Inner Wrap

Outer wrap

Others:

Signature:
Date:
Inspected by:
Witnessed / Reviewed by:

A
R
D
13
0
2
N
B
I 15-FE

Company
,

Contractor
,

Subcontractor
,

Applicator
,